JPH0639767B2 - Preliminary shear deformation holding device for rubber bearing - Google Patents
Preliminary shear deformation holding device for rubber bearingInfo
- Publication number
- JPH0639767B2 JPH0639767B2 JP62058523A JP5852387A JPH0639767B2 JP H0639767 B2 JPH0639767 B2 JP H0639767B2 JP 62058523 A JP62058523 A JP 62058523A JP 5852387 A JP5852387 A JP 5852387A JP H0639767 B2 JPH0639767 B2 JP H0639767B2
- Authority
- JP
- Japan
- Prior art keywords
- metal plate
- plate
- holding
- rubber bearing
- rubber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000002184 metal Substances 0.000 claims description 67
- 229910000831 Steel Inorganic materials 0.000 description 12
- 239000010959 steel Substances 0.000 description 12
- 230000037431 insertion Effects 0.000 description 10
- 238000003780 insertion Methods 0.000 description 10
- 238000010008 shearing Methods 0.000 description 6
- 238000003466 welding Methods 0.000 description 5
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、橋桁等の上部構造物と橋脚または橋台等の下
部構造物との間に予備せん断変形されたゴム支承をセッ
トする場合に使用する予備せん断変形保持装置に関する
ものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention is used when setting a pre-shear-deformed rubber bearing between an upper structure such as a bridge girder and a lower structure such as a bridge pier or abutment. The present invention relates to a preliminary shearing deformation holding device.
従来、特開昭62−45803号公報により公表されて
いるゴム支承の予備せん断変形保持装置の場合は、第1
1図ないし第13図に示すように、ゴム層1とこれに一
体に設けられた上部金属板2および下部金属板3とから
なるゴム支承4におけるゴム層1を、そのゴム層1の上
部が前方に偏位すると共に下部が後方に偏位するように
予備せん断変形させ、下面板9および上面板10とこれ
らを連結する多数のリブ11とからなる金属製前部支承
部材12を前記ゴム支承4の前部に配置し、下面板13
および上面板14とこれらを連結する多数のリブ15と
からなる金属製後部支承部材16を前記ゴム支承4の後
部に配置し、ゴム支承4における下部金属板3の前端部
を前部支承部材12に係合し、ゴム支承4における上部
金属板2の後端部を後部支承部材16に係合し、ゴム支
承4の左右両側に配置された金属製連結部材17を介し
て金属製前部支承部材12および金属製後部支承部材1
6の左右両端部を連結し、かつ左右両側の連結部材17
の両端部をボルト18により連結し、前記各上面板1
0,14に設けた離脱防止用突出部19,20を上部金
属板2の上部に設けた凹部21,22内に配置すると共
に、前記各下面板9,13に設けた離脱防止用突出部2
3,24を下部金属板3の下部に設けた凹部25,26
内に配置している。Conventionally, in the case of the preliminary shear deformation holding device for rubber bearings disclosed in Japanese Patent Laid-Open No. 62-45803,
As shown in FIGS. 1 to 13, the rubber layer 1 in a rubber bearing 4 composed of a rubber layer 1 and an upper metal plate 2 and a lower metal plate 3 integrally provided with the rubber layer 1 is The metal front support member 12 including the lower plate 9 and the upper plate 10 and a large number of ribs 11 connecting them is pre-shear-deformed so as to be displaced forward and the lower part is displaced rearward. It is arranged in the front part of 4 and the bottom plate 13
A metal rear support member 16 composed of the upper plate 14 and a large number of ribs 15 connecting them is arranged at the rear of the rubber support 4, and the front end of the lower metal plate 3 in the rubber support 4 is attached to the front support member 12. , The rear end of the upper metal plate 2 of the rubber bearing 4 is engaged with the rear bearing member 16, and the metal front bearing is supported via the metal connecting members 17 arranged on both left and right sides of the rubber bearing 4. Member 12 and metal rear support member 1
The left and right end portions of 6 are connected, and the left and right connecting members 17
Both end portions of the upper plate 1 are connected by bolts 18,
The disengagement preventing projections 19 and 20 provided on the lower metal plates 0 and 14 are arranged in the recesses 21 and 22 provided on the upper part of the upper metal plate 2, and the disengagement preventing projections 2 provided on the lower plates 9 and 13 are arranged.
Recesses 25 and 26 in which 3, 24 are provided in the lower part of the lower metal plate 3.
It is placed inside.
しかるに、前記従来の予備せん断変形保持装置の場合
は、ゴム支承4の全巾にわたって延長する立体構造の金
属製前部支承部材12および金属製後部支承部材16と
左右両側の連結部材17とを、ゴム支承4の全周を囲む
ように配置しているので、大型で重量が重くコスト高に
なり、かつ構造も複雑であるという問題がある。However, in the case of the above-mentioned conventional preliminary shear deformation holding device, the metal front support member 12 and the metal rear support member 16 and the connecting members 17 on the left and right sides of the three-dimensional structure extending over the entire width of the rubber support 4, Since the rubber bearing 4 is arranged so as to surround the entire circumference, there is a problem that the rubber bearing 4 is large, heavy, costly, and has a complicated structure.
本発明は前述の問題を有利に解決できるゴム支承の予備
せん断変形保持装置を提供することを目的とするもので
あて、本発明の要旨とするころは、ゴム層1とこれに一
体に設けられた上部金属板2および下部金属板3とから
なるゴム支承4におけるゴム層1の上部が前方に偏位す
ると共に下部が後方に偏位するように予備せん断変形さ
れ、前記ゴム支承4の左右両側に配置された保持板7
に、上部金属板2の後端部に係合される後部ストッパ5
が固定され、前記各保持板7に下部金属板3の前部に係
合される前部ストッパ6が固定され、上部金属板2の側
部と各保持板7とにわたって、前後方向に間隔をおいて
配置された複数の係止ピン8が挿通され、下部金属板3
の側部と各保持板7とにわたって、前後方向に間隔をお
いて配置された複数の係止ピン8が挿通され、左右の保
持板7の両端部はボルト18を介して連結されているこ
とを特徴とするゴム支承の予備せん断変形保持装置にあ
る。An object of the present invention is to provide a pre-shear deformation holding device for a rubber bearing that can advantageously solve the above-mentioned problems, and the gist of the present invention is to provide the rubber layer 1 and the rubber layer 1 integrally therewith. In the rubber bearing 4 composed of the upper metal plate 2 and the lower metal plate 3, pre-shear deformation is performed so that the upper portion of the rubber layer 1 is displaced forward and the lower portion is displaced rearward. Holding plate 7 placed on
The rear stopper 5 that is engaged with the rear end of the upper metal plate 2.
Is fixed, and a front stopper 6 engaged with the front portion of the lower metal plate 3 is fixed to each of the holding plates 7, and a space is provided in the front-rear direction between the side portion of the upper metal plate 2 and each of the holding plates 7. The plurality of locking pins 8 arranged in advance are inserted, and the lower metal plate 3
A plurality of locking pins 8 arranged at intervals in the front-rear direction are inserted between the side portions of the holding plate 7 and the holding plates 7, and both ends of the left and right holding plates 7 are connected via bolts 18. The pre-shear deformation holding device for rubber bearings is characterized by
次に本発明を図示の例によって詳細に説明する。第1図
ないし第5図は本発明の実施例に係るゴム支承の予備せ
ん断変形保持装置を示すものであって、隅部が円弧状に
なっている矩形または正方形のゴム層1の上面および下
面に矩形または正方形の上部金属板2および下部金属板
3が一体に固着され、かつ上部金属板2の上面の中央に
上部係止突起27が一体に設けられると共に、下部金属
板3の下面の中央に下部係止突起28が一体に設けられ
て、ゴム支承4が構成されている。The present invention will now be described in detail with reference to the illustrated example. 1 to 5 show a preliminary shearing deformation holding device for a rubber bearing according to an embodiment of the present invention, in which the upper and lower surfaces of a rectangular or square rubber layer 1 whose corners are arcuate. A rectangular or square upper metal plate 2 and a lower metal plate 3 are integrally fixed to each other, and an upper locking protrusion 27 is integrally provided at the center of the upper surface of the upper metal plate 2 and the center of the lower surface of the lower metal plate 3. The lower support protrusion 28 is integrally provided on the rubber support 4 to configure the rubber support 4.
前記ゴム支承4におけるゴム層1は、そのゴム層1の上
部が前方に偏位すると共に下部が後方に偏位するように
予備せん断変形され、ゴム支承4の左右両側面に当接さ
れた帯状金属板からなる保持板7の内面の後方上部に、
上部金属板2の後端面に係合される水平な後部ストッパ
5が溶接により固着され、かつ前記保持板7の内面の前
方下部に、下部金属板3の前端面に係合される水平な前
部ストッパ6が溶接により固着され、前記保持板7とこ
れに固着された後部ストッパ5および前部ストッパ6と
によりストッパ付き保持板29が構成されている。The rubber layer 1 of the rubber bearing 4 is pre-shear-deformed so that the upper portion of the rubber layer 1 is displaced forward and the lower portion is displaced rearward, and is in contact with both left and right side surfaces of the rubber bearing 4. On the upper rear part of the inner surface of the holding plate 7 made of a metal plate,
A horizontal rear stopper 5 engaged with the rear end surface of the upper metal plate 2 is fixed by welding, and a horizontal front stopper engaged with the front end surface of the lower metal plate 3 at the lower front portion of the inner surface of the holding plate 7. The partial stopper 6 is fixed by welding, and the holding plate 7 and the rear stopper 5 and the front stopper 6 fixed to the holding plate 7 constitute a holding plate 29 with a stopper.
前記上部金属板2の左右両側および下部金属板3の左右
両側に、それぞれ複数のピン挿入用円形孔30が設けら
れ、かつ保持板7の上部および下部には、前記ピン挿入
用円形孔30に対向する位置において前後方向に延長す
るピン挿入用長孔31が設けられ、そのピン挿入用長孔
31とピン挿入用円形孔30にわたって鋼製係止ピン8
が嵌挿されている。A plurality of pin insertion circular holes 30 are provided respectively on the left and right sides of the upper metal plate 2 and on the left and right sides of the lower metal plate 3, and the pin insertion circular holes 30 are provided on the upper and lower portions of the holding plate 7. A long hole 31 for pin insertion extending in the front-rear direction is provided at a position facing each other, and the steel locking pin 8 extends over the long hole 31 for pin insertion and the circular hole 30 for pin insertion.
Has been inserted.
ゴム支承4を予備せん断変形させてその状態に保持する
場合、ゴム支承4に上方から圧縮力を加えると共に下部
金属板3を固定した状態で、上部金属板2に対しジャッ
キによる横圧力を加えて、ゴム層1を前後方向にせん断
変形させ、次いでゴム支承4の左右両側にストッパ付き
保持板29を配置して、そのストッパ付き保持板29に
おける後部ストッパ5を上部金属板2の後端面に係合す
るように配置すると共に、ストッパ付き保持板29にお
ける前部ストッパ6を下部金属板3の前端面に係合する
ように配置し、かつ保持板7と上部金属板2および下部
金属板3とにわたて係止ピン8を挿通し、かつ左右の保
持板7の両端部をそれぞれにわたて挿通したボルト18
を介して連結して、ゴム支承4と各ストッパ付き保持板
29との離脱を防止し、次に前設圧縮力および横圧力を
解放する。When the rubber bearing 4 is pre-shear-deformed and held in that state, a compressive force is applied to the rubber bearing 4 from above and the lower metal plate 3 is fixed, and lateral pressure is applied to the upper metal plate 2 by a jack. , The rubber layer 1 is shear-deformed in the front-rear direction, then holding plates 29 with stoppers are arranged on both left and right sides of the rubber bearing 4, and the rear stopper 5 of the holding plate 29 with stoppers is engaged with the rear end surface of the upper metal plate 2. The front stopper 6 of the holding plate 29 with stopper is arranged so as to engage with the front end surface of the lower metal plate 3, and the holding plate 7, the upper metal plate 2 and the lower metal plate 3 A bolt 18 inserted through the locking pin 8 and through both ends of the left and right holding plates 7 respectively.
To prevent the rubber bearing 4 and the holding plate 29 with stoppers from coming off, and then release the pre-compression force and lateral pressure.
ゴム層1に予備せん断変形を与えて、ゴム支承4から上
下方向の圧縮力を解放したとき、ゴム層1の予備せん断
変形復元力により上部金属板2および下部金属板3が前
後方向に傾こうとする(回転しようとする)が、その傾
きは係止ピン8により阻止される。When the pre-shear deformation is applied to the rubber layer 1 and the vertical compressive force is released from the rubber bearing 4, the pre-shear deformation restoring force of the rubber layer 1 causes the upper metal plate 2 and the lower metal plate 3 to tilt in the front-back direction. However, the inclination is blocked by the locking pin 8.
なお前記上部金属板2,下部金属板3およびストッパ付
き保持板29は例えば鋼材により製作される。The upper metal plate 2, the lower metal plate 3 and the holding plate 29 with a stopper are made of steel, for example.
第6図ないし第8図は前記実施例の予備せん断変形保持
装置により保持されたゴム支承を下部構造物と上部構造
物との間にセットした状態を示すものであって、橋脚ま
たは橋台等の下部構造物32の上面に鋼製ベースプレー
ト33が載置されて複数のアンカーボルト34により固
定され、前記ゴム支承4および保持板7がベースプレー
ト33に載置されると共に、下部金属板3の下部の下部
係止突起28がベースプレート33の下部係止凹部35
に嵌入され、かつベースプレート33の上面に、各保持
板7の前後方向の一端部に対向する位置において鋼製反
力受材36が溶接により固定され、さらに前記ベースプ
レート33に、保持板7と反力受材36との間において
ジャッキ受具取付用ねじ孔37が設けられている。FIGS. 6 to 8 show a state in which the rubber bearing held by the preliminary shearing deformation holding device of the above-mentioned embodiment is set between the lower structure and the upper structure, such as a pier or abutment. A steel base plate 33 is placed on the upper surface of the lower structure 32 and fixed by a plurality of anchor bolts 34, the rubber bearing 4 and the holding plate 7 are placed on the base plate 33, and the lower part of the lower metal plate 3 is The lower locking projection 28 is the lower locking recess 35 of the base plate 33.
And a steel reaction force receiving member 36 is fixed to the upper surface of the base plate 33 by welding at a position facing one end portion of each holding plate 7 in the front-rear direction. A screw hole 37 for mounting the jack receiving member is provided between the force receiving member 36 and the force receiving member 36.
前記ゴム支承4の上部金属板2に鋼製ソールプレート3
8が載置されると共に、上部金属板2の上部の上部係止
突起27がソールプレート38の上部係止凹部39に嵌
入され、さらにソールプレート38の上面に、上部係止
凹部39の上部を塞ぐ鋼製蓋板40が溶接または接着剤
により固定され、またソールプレート38の上部に多数
のアンカー部材41が螺合または溶接により固定されて
いる。Steel sole plate 3 on upper metal plate 2 of rubber bearing 4
8 is placed, the upper locking projection 27 on the upper part of the upper metal plate 2 is fitted into the upper locking recess 39 of the sole plate 38, and the upper part of the upper locking recess 39 is placed on the upper surface of the sole plate 38. A steel cover plate 40 to be closed is fixed by welding or an adhesive, and a large number of anchor members 41 are fixed to the upper portion of the sole plate 38 by screwing or welding.
前述のようにして、予備せん断変形保持装置により保持
されたゴム支承4をベースプレート33の上にセットす
ると共に、アンカー部材41を備えているソールプレー
ト38をゴム支承4の上にセットしたのち、橋桁等の上
部構造物42を構成するコンクリートを打設する。As described above, the rubber bearing 4 held by the preliminary shearing deformation holding device is set on the base plate 33, and the sole plate 38 having the anchor member 41 is set on the rubber bearing 4 and then the bridge girder. Concrete that constitutes the upper structure 42 such as the above is placed.
前記コンクリートが硬化したのち、ボルト18を保持板
7から取外し、かつ第9図に示すように、反力受材36
に接触する鋼製ジャッキ受具43をベースプレート33
に載置してボルト44により固定し、次に保持板7の端
部とジャッキ受具43との間に配置した液圧ジャッキか
らなる離脱用ジャッキ45をジャッキ受具43に対しボ
ルト等により固定しそのジャッキ45によりストッパ付
き保持板29の一端部を外側に押圧移動して、ストッパ
付き保持板29におけるストッパをゴム支承4における
金属板から外し、かつジャッキ受具43を撤去し、さら
に必要に応じ係止ピン8を取外して、第10図に示す状
態にする。After the concrete has hardened, the bolt 18 is removed from the holding plate 7 and, as shown in FIG.
The steel jack support 43 that contacts the base plate 33
And then fixed by bolts 44, and then fixed by a bolt or the like to the jack receiving member 43, which is a detaching jack 45 composed of a hydraulic jack arranged between the end of the holding plate 7 and the jack receiving member 43. Then, one end of the holding plate with stopper 29 is pushed outward by the jack 45 to remove the stopper of the holding plate with stopper 29 from the metal plate of the rubber bearing 4, and the jack receiving member 43 is removed. Correspondingly, the locking pin 8 is removed and brought into the state shown in FIG.
次に上部構造物42にプレストレスを導入し、そのプレ
ストレス導入による上部構造物42の収縮およびクリー
プならびに上部構造物42の乾燥収縮等により、ゴム支
承4のゴム層1を予備せん断変形解除方向にせん断変形
させる。Next, prestress is introduced into the upper structure 42, and the prestressing causes the upper structure 42 to shrink and creep, and the upper structure 42 to dry and shrink, so that the rubber layer 1 of the rubber bearing 4 is preliminarily sheared and deformed. To shear deformation.
ストッパ付き保持板29をゴム支承4から外す場合、反
力受材36およびジャッキ受具43をベースプレート3
3の前後両側に固定し、ストッパ付き保持板29の両端
部をジャッキにより同時に押圧移動して、ストッパ付き
保持板29をゴム支承4から外すようにしてもよい。When removing the holding plate 29 with stopper from the rubber bearing 4, the reaction force receiving member 36 and the jack receiving member 43 are attached to the base plate 3
3 may be fixed to both front and rear sides, and both ends of the stopper-equipped holding plate 29 may be simultaneously pushed and moved by the jacks to remove the stopper-equipped holding plate 29 from the rubber bearing 4.
また本発明を実施する場合、上部金属板2および下部金
属板3のピン挿入用円形孔30に係止ピン8を圧入固定
してもよく、あるいは上部金属板2および下部金属板3
のピン挿入用円形孔30に雌ねじを設けると共に、係止
ピン8に雄ねじを設けて、その係止ピン8を上部金属板
2および下部金属板3のピン挿入用円形孔30に螺合固
定してもよい。Further, when carrying out the present invention, the locking pin 8 may be press-fitted and fixed in the pin insertion circular holes 30 of the upper metal plate 2 and the lower metal plate 3, or the upper metal plate 2 and the lower metal plate 3 may be fixed.
A female screw is provided in the pin insertion circular hole 30 and a male screw is provided in the locking pin 8, and the locking pin 8 is screwed and fixed to the pin insertion circular hole 30 of the upper metal plate 2 and the lower metal plate 3. May be.
上部構造物42のコンクリートを打設する前にジャッキ
受具43をベースプレート33に固定しておいてもよ
く、あるいは上部構造物42のコンクリート打設する前
に、ジャッキ受具43をベースプレート33に固定する
と共に、ジャッキ受具43と保持板7の端部との間に離
脱用ジャッキ45を介在させておいてもよい。The jack receiver 43 may be fixed to the base plate 33 before placing the concrete of the upper structure 42, or the jack receiver 43 may be fixed to the base plate 33 before placing the concrete of the upper structure 42. In addition, the detaching jack 45 may be interposed between the jack receiver 43 and the end portion of the holding plate 7.
本発明によれば、ゴム層1とこれに一体に設けられた上
部金属板2および下部金属板3とからなるゴム支承4に
おけるゴム層1の上部が前方に偏位すると共に下部が後
方に偏位するように予備せん断変形され、前記ゴム支承
4の左右両側に配置された保持板7に、上部金属板2の
後端部に係合される後部ストッパ5が固定され、前記保
持板7に下部金属板3の前部に係合される前部ストッパ
6が固定され、上部金属板2の側部と各保持板7とにわ
たって、前後方向に間隔をおいて配置された複数の係止
ピン8が挿通され、下部金属板3の側部と各保持板7と
にわたって、前後方向に間隔をおいて配置された複数の
係止ピン8が挿通され、左右の保持板7の両端部はボル
ト18を介して連結されているので、構造が簡単で小型
軽量な一対のストッパ付き保持板29により、ゴム支承
4を容易に予備せん断変形状態に保持することができ、
かつゴム支承4における上部金属板2および下部金属板
3と保持板7とにわたって、前後方向に間隔をおいて配
置された複数の係止ピン8が挿通されているので、ゴム
支承4と左右両側のストッパ付き保持板29とが、相対
的に上下方向にずれ動いて離脱する恐れを、簡単な手段
によって排除することができ、しかもゴム層1に予備せ
ん断変形を与えたとき発生しようとする上部金属板2お
よび下部金属板3の前後方向の傾きを、前記係止ピン8
により確実に阻止することができ、しかも、左右両側の
保持板7の端部を連結するボルト18により、運搬およ
び取扱い中にストッパ付き保持板29がゴム支承4から
離脱するのを防止することができ、さらに本発明のゴム
支承の予備せん断変形保持装置は、構造が簡単で小型で
あるので、低コストで製作でき、しかも軽量であるの
で、取扱いも容易である等の効果が得られる。According to the present invention, the upper part of the rubber layer 1 in the rubber bearing 4 composed of the rubber layer 1 and the upper metal plate 2 and the lower metal plate 3 integrally provided thereto is displaced forward and the lower part is displaced rearward. The rear stoppers 5 engaged with the rear end portions of the upper metal plates 2 are fixed to the holding plates 7 which are pre-shear-deformed so as to be positioned, and which are arranged on both left and right sides of the rubber bearing 4, and are attached to the holding plates 7. A front stopper 6 that is engaged with the front portion of the lower metal plate 3 is fixed, and a plurality of locking pins that are arranged at intervals in the front-rear direction across the side portion of the upper metal plate 2 and each holding plate 7. 8 are inserted, and a plurality of locking pins 8 arranged at intervals in the front-rear direction are inserted across the side portion of the lower metal plate 3 and each holding plate 7, and both ends of the left and right holding plates 7 are bolted. Since it is connected via 18, a pair of strikes with a simple structure and small size and light weight The path with the holding plate 29 can hold the rubber bearing 4 facilitates preliminary shear deformation,
Further, since the plurality of locking pins 8 arranged at intervals in the front-rear direction are inserted through the upper metal plate 2 and the lower metal plate 3 of the rubber bearing 4 and the holding plate 7, the rubber bearing 4 and the left and right sides are inserted. It is possible to eliminate the risk that the holding plate 29 with the stopper of the above will relatively shift in the vertical direction and come off, and it is possible to eliminate by the simple means. The inclination of the metal plate 2 and the lower metal plate 3 in the front-rear direction is determined by the locking pin 8
The holding plate 29 with stoppers can be prevented from coming off from the rubber bearing 4 during transportation and handling by the bolts 18 connecting the ends of the holding plates 7 on both the left and right sides. Further, the pre-shear deformation holding device for rubber bearings according to the present invention has a simple structure and a small size, so that it can be manufactured at a low cost and is lightweight, so that it is easy to handle.
第1図ないし第5図は本発明の一実施例に係るゴム支承
の予備せん断変形保持装置を示すものであって、第1図
は側面図、第2図は縦断側面図、第3図は平面図、第4
図は一部を拡大して示す側面図、第5図は第4図のA−
A線断面図である。第6図ないし第8図は下部構造物に
固定されたベースプレートの上に予備せん断変形保持装
置により保持されたゴム支承とアンカー部材付きソール
プレートとを順次セットした状態を示すものであって、
第6図は縦断側面図、第7図は平面図、第8図は正面図
である。第9図はストッパ付き保持板をゴム支承から取
外すときの状態を示す平面図、第10図はストッパ付き
保持板および鋼製ジャッキ受具を取外した後のベースプ
レート上のゴム支承およびアンカー部材付きソールプレ
ートを示す平面図である。第11図ないし第13図は従
来のゴム支承の予備せん断変形保持装置を示すものであ
って、第11図は縦断側面図、第12図は側面図、第1
3図は平面図である。 1…ゴム層、2…上部金属板、3…下部金属板、4…ゴ
ム支承、5…後部ストッパ、6…前部ストッパ、7…保
持板、8は係止ピン、18…ボルト、27…上部係止突
起、28…下部係止突起、29…ストッパ付き保持板、
30…ピン挿入用円形孔、31…ピン挿入用長孔、32
…下部構造物、33…鋼製ベースプレート、34…アン
カーボルト、35…下部係止凹部、36…鋼製反力受
材、38…鋼製ソールプレート、39…上部係止凹部、
41…アンカー部材、42…上部構造物、43…鋼製ジ
ャッキ受具、44…ボルト、45…離脱用ジャッキ。1 to 5 show a preliminary shearing deformation holding device for a rubber bearing according to an embodiment of the present invention. FIG. 1 is a side view, FIG. 2 is a longitudinal side view, and FIG. Top view, 4th
The figure is a side view showing a part of it in an enlarged manner, and FIG.
It is an A line sectional view. 6 to 8 show a state in which a rubber bearing held by a preliminary shearing deformation holding device and a sole plate with anchor members are sequentially set on a base plate fixed to a lower structure,
6 is a vertical side view, FIG. 7 is a plan view, and FIG. 8 is a front view. FIG. 9 is a plan view showing a state where the holding plate with stopper is removed from the rubber bearing, and FIG. 10 is a rubber bearing on the base plate and the sole with anchor member after the holding plate with stopper and the steel jack receiver are removed. It is a top view which shows a plate. 11 to 13 show a conventional pre-shear deformation retaining device for a rubber bearing, wherein FIG. 11 is a longitudinal side view, FIG. 12 is a side view, and FIG.
FIG. 3 is a plan view. DESCRIPTION OF SYMBOLS 1 ... Rubber layer, 2 ... Upper metal plate, 3 ... Lower metal plate, 4 ... Rubber support, 5 ... Rear stopper, 6 ... Front stopper, 7 ... Holding plate, 8 is a locking pin, 18 ... Bolt, 27 ... Upper locking protrusion, 28 ... Lower locking protrusion, 29 ... Holding plate with stopper,
30 ... Circular hole for pin insertion, 31 ... Long hole for pin insertion, 32
... lower structure, 33 ... steel base plate, 34 ... anchor bolt, 35 ... lower locking recess, 36 ... steel reaction force receiving material, 38 ... steel sole plate, 39 ... upper locking recess,
41 ... Anchor member, 42 ... Upper structure, 43 ... Steel jack receiver, 44 ... Bolt, 45 ... Removal jack.
Claims (1)
属板2および下部金属板3とからなるゴム支承4におけ
るゴム層1の上部が前方に偏位すると共に下部が後方に
偏位するように予備せん断変形され、前記ゴム支承4の
左右両側に配置された保持板7に、上部金属板2の後端
部に係合される後部ストッパ5が固定され、前記各保持
板7に下部金属板3の前部に係合される前部ストッパ6
が固定され、上部金属板2の側部と各保持板7とにわた
って、前後方向に間隔をおいて配置された複数の係止ピ
ン8が挿通され、下部金属板3の側部と各保持板7とに
わたって、前後方向に間隔をおいて配置された複数の係
止ピン8が挿通され、左右の保持板7の両端部はボルト
18を介して連結されていることを特徴とするゴム支承
の予備せん断変形保持装置。1. A rubber bearing 4 consisting of a rubber layer 1 and an upper metal plate 2 and a lower metal plate 3 which are provided integrally with the rubber layer 1 has its upper part displaced to the front and its lower part displaced to the rear. The rear stoppers 5 engaged with the rear end portions of the upper metal plates 2 are fixed to the holding plates 7 which are pre-shear-deformed as described above and arranged on both the left and right sides of the rubber bearing 4, and the holding plates 7 are attached to the respective holding plates 7. A front stopper 6 engaged with the front portion of the lower metal plate 3.
Are fixed, and a plurality of locking pins 8 arranged at intervals in the front-rear direction are inserted between the side portion of the upper metal plate 2 and each holding plate 7, and the side portion of the lower metal plate 3 and each holding plate. 7, a plurality of locking pins 8 arranged at intervals in the front-rear direction are inserted, and both ends of the left and right holding plates 7 are connected via bolts 18. Pre-shear deformation holding device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62058523A JPH0639767B2 (en) | 1987-03-13 | 1987-03-13 | Preliminary shear deformation holding device for rubber bearing |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62058523A JPH0639767B2 (en) | 1987-03-13 | 1987-03-13 | Preliminary shear deformation holding device for rubber bearing |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63223205A JPS63223205A (en) | 1988-09-16 |
| JPH0639767B2 true JPH0639767B2 (en) | 1994-05-25 |
Family
ID=13086788
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP62058523A Expired - Lifetime JPH0639767B2 (en) | 1987-03-13 | 1987-03-13 | Preliminary shear deformation holding device for rubber bearing |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0639767B2 (en) |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6245803A (en) * | 1985-08-22 | 1987-02-27 | 株式会社 ビ−ビ−エム | Preparatory shearing deformation holding apparatus of rubbersupport |
-
1987
- 1987-03-13 JP JP62058523A patent/JPH0639767B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63223205A (en) | 1988-09-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3275230B2 (en) | Connection gap bridge device | |
| US5234206A (en) | Clamping apparatus of construction molding board | |
| JPH0378885B2 (en) | ||
| JPH0378886B2 (en) | ||
| JPS6245803A (en) | Preparatory shearing deformation holding apparatus of rubbersupport | |
| JPS63223205A (en) | Apparatus for holding preparatory shearing deformation of rubber support | |
| JP2000282411A (en) | Rubber bearing device and construction method using the same | |
| JP2000144634A (en) | Flastic support device | |
| JP2715045B2 (en) | Movement limiter for movable end of bridge girder | |
| JPH0796869A (en) | Undercarriage of crawler type construction machine | |
| JPH049883B2 (en) | ||
| JP2715048B2 (en) | Pre-slide type bridge girder support method | |
| US20260117534A1 (en) | Corner formwork system | |
| JP3127360B2 (en) | Exchangeable elastic bearing device for bridge and its installation method | |
| JP2560974Y2 (en) | Pre-shear deformation holding device for rubber bearing | |
| JPS6282105A (en) | Preparatory shearing deformation holding apparatus supportedby rubber | |
| JP2945285B2 (en) | Concrete formwork | |
| JP2895833B1 (en) | Pre-shear deformation holding member, holding device, and holding method for rubber bearing | |
| JPH10249835A (en) | Molding machine for concrete product | |
| JPH01174710A (en) | Method of mounting rubber bearing having been shear-deformed, for structure member | |
| JPH09228316A (en) | Rubber bearing device and construction method using the same | |
| JP2580498B2 (en) | Bridge elastic bearing device having a plurality of planarly compounded rubber bearings | |
| JP3238673B2 (en) | Installation method of pre-shear type elastic bearing device | |
| JP3019943B2 (en) | Manufacturing equipment for prestressed concrete members | |
| JPH0621455B2 (en) | How to place a sheet pile |