JPH0640278Y2 - Curing net mounting hardware - Google Patents
Curing net mounting hardwareInfo
- Publication number
- JPH0640278Y2 JPH0640278Y2 JP14546088U JP14546088U JPH0640278Y2 JP H0640278 Y2 JPH0640278 Y2 JP H0640278Y2 JP 14546088 U JP14546088 U JP 14546088U JP 14546088 U JP14546088 U JP 14546088U JP H0640278 Y2 JPH0640278 Y2 JP H0640278Y2
- Authority
- JP
- Japan
- Prior art keywords
- binding
- curing net
- net
- mounting hardware
- fixing portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 230000002265 prevention Effects 0.000 description 3
- 239000002184 metal Substances 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Description
【考案の詳細な説明】 [産業上の利用分野] 本考案は、木造建物の建方時に於ける墜落防止用ネッ
ト、即ち養生ネットを張設するための取付金物に関する
ものである。[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a fitting for mounting a fall prevention net, that is, a curing net, when constructing a wooden building.
[従来の技術] 木造建築物は、柱や梁等の構造物の下小屋作業と地業基
礎工事が完了すると、軸組・小屋組を一気に建て込むの
が、一般的である。[Prior Art] In a wooden building, it is general to build a framework and a shed at a stretch when the lower shed work for structures such as pillars and beams and the foundation work for foundation work are completed.
この建方は、通常一日で終わり、その後、構造体の垂直
・水平度等を出しながら筋かいの取り付けを行ない、屋
根葺きや外壁を施工してから、床に板を張るようにして
いる。This erection is usually completed in one day, after which the braces are installed while showing the verticality and horizontalness of the structure, roofing and outer walls are constructed, and then the floor is laid. .
以上のように建方をしてから、床に板を張るまでの間に
は相当の日数があり、その間、屋根葺き、間柱や筋かい
の取り付け作業等の各種の作業をしなければならず、作
業中に2階の床や天井部分の開口部から作業員が転落し
たり、資材が落下する等の事故が生ずる。There is a considerable number of days from the time of building as described above until the boards are laid on the floor, during which time various tasks such as roofing, studs and bracing must be done. During the work, an accident such as a worker falling from the opening of the floor or the ceiling of the second floor or a material falling may occur.
近年、湿気防止等の理由により、建物の基礎部分全体に
コンクリートが打設されることが多く、このような場合
には特に、上記墜落事故は大怪我や時には死亡事故につ
ながりかねない重大な問題となっている。In recent years, concrete is often placed on the entire foundation of a building for reasons such as prevention of moisture.In such a case, the above-mentioned crash accident is a serious problem that may lead to serious injury or even death. Has become.
このような墜落事故を防止するために、従来から、床を
張る前の床開口部等に墜落防止用の養生ネットを張っ
て、第4図に示すように、落下した作業員を受け止めて
人身事故を未然に防止するようになっている。In order to prevent such a fall accident, conventionally, a curing net for fall prevention has been set up at the floor opening etc. before the floor is stretched, and as shown in FIG. It is designed to prevent this.
[考案が解決しようとする課題] 従来、この種の養生ネットを張設するに際しては、第4
図に示すようにロープ等の結束材でネット周辺部を柱や
梁に取付けていた。[Problems to be Solved by the Invention] Conventionally, when installing this type of curing net,
As shown in the figure, the periphery of the net was attached to columns and beams with a binding material such as rope.
しかしながら、上記従来の結束方法では、結束に手間が
かかるだけでなく、結束が不完全で解け易い等の問題点
があった。However, the above-mentioned conventional binding method has problems in that binding is not only troublesome, but also binding is incomplete and easy to untie.
本考案は、上記従来の問題点を解決するためになされた
もので、その目的とするところは、迅速かつ確実に取付
け結束することのできる養生ネットの取付金物を提供す
ることにある。The present invention has been made to solve the above conventional problems, and an object of the present invention is to provide a curing net mounting hardware that can be quickly and reliably mounted and bound.
[課題を解決するための手段] 本考案の養生ネットの取付金物は、相互にほぼ直交する
方向に形成された平板状の固定部と結束部により構成さ
れ、該固定部にはボルト挿通穴または複数の釘穴を穿設
して、ボルトまたは釘により柱や梁等の木質構造材料に
固定すると共に、上記結束部には結束穴を形成して、こ
れに養生ネットの結束用ロープ等の吊網を通して結束す
るようにしたことを特徴とするものである。[Means for Solving the Problem] The attachment fitting for the curing net of the present invention is composed of a flat plate-shaped fixing portion and a binding portion formed in directions substantially orthogonal to each other, and the fixing portion has a bolt insertion hole or A plurality of nail holes are drilled and fixed to a wooden structure material such as a pillar or a beam with bolts or nails, and a binding hole is formed in the binding portion, and a rope for binding a curing net or the like is suspended in the binding hole. It is characterized by binding through a net.
[実施例] 以下、本考案の実施例について図面を参照しながら説明
する。[Embodiment] An embodiment of the present invention will be described below with reference to the drawings.
第1図において、1は取付金物であって、平板状の固定
部1aと結束部1bにより構成されている。該固定部1aと結
束部1bとは、相互にほぼ直交する方向に形成されてい
る。In FIG. 1, reference numeral 1 denotes an attachment metal piece, which is composed of a flat plate-shaped fixing portion 1a and a binding portion 1b. The fixing portion 1a and the binding portion 1b are formed in directions substantially orthogonal to each other.
上記固定部1aには、ボルト挿通穴1a′があけられてい
て、この中にボルトを通して柱や梁等に固定するように
なっている。A bolt insertion hole 1a 'is formed in the fixing portion 1a, and a bolt is passed through the hole to fix it to a pillar or a beam.
また、上記結束部1bにも結束穴1b′が形成されていて、
これに養生ネットの結束用ロープ等の吊網を通して結束
するようになっている。Further, a binding hole 1b 'is also formed in the binding portion 1b,
It is designed to be bound through a hanging net such as a rope for binding a curing net.
第2図は別の実施例を示すもので、上記固定部1aには釘
を打付けるための複数の釘穴1a″があけられていて、柱
や横架材等の木質構造材料に釘で固定するようになって
いる。FIG. 2 shows another embodiment, in which a plurality of nail holes 1a ″ for driving nails are formed in the fixing portion 1a, so that the wooden structure material such as a pillar or a horizontal member can be nailed. It is designed to be fixed.
第3図は、上記取付金物1を梁2に固定して、この結束
穴1a′に養生ネットNの結束用ロープ等の吊網Rを通し
て結束し、養生ネットNを張設した状態をしめすもので
ある。FIG. 3 shows a state in which the mounting hardware 1 is fixed to the beam 2 and is bound through the binding hole 1a 'through a hanging net R such as a rope for binding the curing net N, and the curing net N is stretched. Is.
[考案の効果] 本考案は、柱や梁の仕口等に固定される取付金物に養生
ネット取付用の結束穴を設けたので、取付けが迅速かつ
確実に出来る利点がある。[Advantage of the Invention] The present invention has an advantage that a mounting hole can be mounted quickly and surely because a mounting hole for mounting a curing net is provided in a mounting metal member fixed to a joint of a column or a beam.
第1図および第2図は各々取付金物の実施例を示す斜視
図、第3図は本取付金物による養生ネットの取付状態を
示す図、第4図は養生ネットによる落下作業員の受止め
状態を示す図である。 1…取付金物、1a…固定部、1a′,1a″…取付穴、1b…
結束部、1b′…結束穴、2…梁、N…養生ネット、R…
吊網。1 and 2 are perspective views showing an embodiment of a mounting hardware, FIG. 3 is a view showing a mounting state of a curing net by the mounting hardware, and FIG. 4 is a receiving state of a dropping worker by the curing net. FIG. 1 ... Mounting hardware, 1a ... Fixing part, 1a ', 1a "... Mounting hole, 1b ...
Bundling part, 1b '... Bundling hole, 2 ... Beam, N ... Curing net, R ...
Hanging net.
Claims (1)
状の固定部と結束部により構成され、該固定部にはボル
ト挿通穴または複数の釘穴を穿設して、ボルトまたは釘
により柱や梁等の木質構造材料に固定すると共に、上記
結束部には結束穴を形成して、これに養生ネットの結束
用ロープ等の吊網を通して結束するようにしたことを特
徴とする養生ネットの取付金物。1. A flat plate-shaped fixing portion and a binding portion which are formed in directions substantially orthogonal to each other, and a bolt insertion hole or a plurality of nail holes are formed in the fixing portion, and the fixing portion is formed by bolts or nails. A curing net characterized in that it is fixed to a wooden structural material such as a pillar or a beam, and a binding hole is formed in the binding portion, and is bound through a hanging net such as a rope for binding the curing net. Mounting hardware.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14546088U JPH0640278Y2 (en) | 1988-11-09 | 1988-11-09 | Curing net mounting hardware |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14546088U JPH0640278Y2 (en) | 1988-11-09 | 1988-11-09 | Curing net mounting hardware |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0268047U JPH0268047U (en) | 1990-05-23 |
| JPH0640278Y2 true JPH0640278Y2 (en) | 1994-10-19 |
Family
ID=31414072
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14546088U Expired - Fee Related JPH0640278Y2 (en) | 1988-11-09 | 1988-11-09 | Curing net mounting hardware |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0640278Y2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6936201B2 (en) | 1998-02-04 | 2005-08-30 | Mannington Mills, Inc. | Surface coverings containing fused recycled material and processes of making the same |
-
1988
- 1988-11-09 JP JP14546088U patent/JPH0640278Y2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6936201B2 (en) | 1998-02-04 | 2005-08-30 | Mannington Mills, Inc. | Surface coverings containing fused recycled material and processes of making the same |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0268047U (en) | 1990-05-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4584813A (en) | Method for installing a hanger for a structural member | |
| US20100058687A1 (en) | Method of constructing a multi-storey building using prefabricated modular panels | |
| US4570403A (en) | Foundations anchor for a modular building | |
| US6226945B1 (en) | Safety mesh roof facing system | |
| SK286165B6 (en) | Method for building construction | |
| US3908329A (en) | Polygonal building construction | |
| US7219474B2 (en) | Load bearing building panel | |
| US6508043B1 (en) | Building construction system and method | |
| JPH0640278Y2 (en) | Curing net mounting hardware | |
| JP7505336B2 (en) | Sash installation method | |
| RU2198988C2 (en) | Process of erection of monolithic walls of buildings and structures in permanent forms | |
| JP2654935B2 (en) | Construction method of ribbed slab and spacer for rib reinforcement | |
| CA2639339A1 (en) | Method of constructing a multi-storey building using prefabricated modular panels | |
| JPH0650611Y2 (en) | Curing net mounting hardware | |
| JP3029756U (en) | Wooden house consisting of frame and wall panel | |
| JPH03129034A (en) | Construction of floor and connecting device between striking-in mold frame for floor slab and self erection type truss-shaped steel reinforcement | |
| JP3001841B2 (en) | Frame bolting structure and its bracket | |
| JPH0513862Y2 (en) | ||
| JPH04153465A (en) | Constructing method with partition bearing-wall panel for extension | |
| JP3341120B2 (en) | Roof structure in framed wall method | |
| JP2939781B2 (en) | Building frame wall method | |
| JP3032735U (en) | Wooden braces L-shaped plate | |
| JPH0616552U (en) | Hollow reinforced beam and its bracket | |
| JPS6136698Y2 (en) | ||
| JPH07166557A (en) | Continuous footing member for wooden building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |