JPH0641977A - Construction method of continuous underground water stop wall - Google Patents

Construction method of continuous underground water stop wall

Info

Publication number
JPH0641977A
JPH0641977A JP12461792A JP12461792A JPH0641977A JP H0641977 A JPH0641977 A JP H0641977A JP 12461792 A JP12461792 A JP 12461792A JP 12461792 A JP12461792 A JP 12461792A JP H0641977 A JPH0641977 A JP H0641977A
Authority
JP
Japan
Prior art keywords
bag
wall
excavation groove
excavation
water blocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP12461792A
Other languages
Japanese (ja)
Other versions
JP2829805B2 (en
Inventor
Shunkichi Senboku
俊吉 千北
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Raito Kogyo Co Ltd
Original Assignee
Raito Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raito Kogyo Co Ltd filed Critical Raito Kogyo Co Ltd
Priority to JP12461792A priority Critical patent/JP2829805B2/en
Publication of JPH0641977A publication Critical patent/JPH0641977A/en
Application granted granted Critical
Publication of JP2829805B2 publication Critical patent/JP2829805B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

(57)【要約】 【目的】使用する安定液の劣化を無くするとともに、止
水シートの建込み、連結作業を容易とし施工性および止
水性に優れた連続止水壁を構築する。 【構成】壁面安定液5を用いながら地盤内に掘削溝6を
形成し、この掘削溝6に対して、両側部のそれぞれに実
質的に前記掘削溝深さ相当長さを有する連結金具2a、
2bを備えた、不透液性シートよりなる袋体1を収縮状
態で建て込んだ後、この袋体1内に充填材を注入して、
前記掘削溝6内に不透液性シートによって被包された連
続止水壁Wを構築する。前記袋体1は、前記連結金具よ
り若干短めとされ、かつ前記連結金具はその相対差分の
余長を下方に突出させた状態とされ、止水壁設置後の状
態で袋体1の下部に空間Mを形成し、前記連結金具2
a、2bによって形成された縦孔空間Pより注入ロッド
を挿入して前記下部空間Mにグラウト材を充填し根固め
を行う。
(57) [Summary] [Purpose] To prevent deterioration of the stabilizing liquid to be used, and to construct a continuous water blocking wall that is easy to build and connect water blocking sheets and has excellent workability and water blocking performance. [Structure] An excavation groove 6 is formed in the ground while using a wall stabilizing liquid 5, and a connecting fitting 2a having substantially the same depth as the excavation groove depth on both sides of the excavation groove 6,
After the bag 1 made of a liquid-impermeable sheet provided with 2b is built in a contracted state, a filling material is injected into the bag 1,
A continuous water blocking wall W covered with a liquid impermeable sheet is constructed in the excavation groove 6. The bag body 1 is slightly shorter than the connecting metal fitting, and the connecting metal fitting is in a state in which the extra length of the relative difference is projected downward. A space M is formed and the connecting fitting 2
An injection rod is inserted through the vertical hole space P formed by a and 2b, and the lower space M is filled with grout material to perform root consolidation.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建設工事における止水
壁、ダム用連続止水壁や有害物質流失防止壁等として地
中に構築される連続止水壁の構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing a continuous water stop wall which is constructed in the ground as a water stop wall in a construction work, a dam continuous water stop wall, a hazardous substance flow prevention wall and the like.

【0002】[0002]

【従来の技術】地中内に止水壁を構築する方法として
は、近年、多用されている地下連続止水壁工法がある。
この地下連続止水壁工法としては、高圧ジェットを利用
して地盤内に溝を形成し、その空間にアスファルト乳
剤、セメント系グラウト材を注入する方法、地盤改良に
よる方法、また溝壁保護のためにベントナイト安定液等
を使用しながら、地中に所定深さの溝を掘削した後、ア
スファルト乳剤、セメント系グラウト材等を掘削溝内に
流し込んだり、前記安定液中に硬化剤を投入して自然硬
化させるなどして、連続した止水壁を地中に構築する方
法等がある。
2. Description of the Related Art As a method for constructing a water blocking wall in the ground, there is an underground continuous water blocking wall method which has been widely used in recent years.
This underground continuous water-stop wall construction method uses a high-pressure jet to form a groove in the ground, injects asphalt emulsion and cement grout into the space, improves the ground, and protects the groove wall. While using a bentonite stabilizer, etc., after excavating a groove of a predetermined depth in the ground, pour asphalt emulsion, cement-based grout material, etc. into the excavation groove, or put a curing agent in the stabilizer. There is a method of constructing a continuous water blocking wall in the ground by naturally hardening it.

【0003】前述の連続止水壁工法により構築された壁
体を、止水壁として十分に機能させるためには、壁体に
クラックなどの発生がないこと、ジョイント部の水密構
造が優れていること等が要求されるが、現実には施工の
不確実さ、地震等による過大応力クラック等の理由によ
り、長期に渡って完全な止水性を期待することはできな
いため、止水シートを用いた連続止水壁工法が採用され
ている。近年、開発された連続止水壁工法としては、た
とえば特開平4−5094号公報、特公昭61−494
51号公報、特開昭63−304821号公報、特開昭
56−85018号公報、特開昭63−522号公報等
に記載されたものがある。
In order for the wall body constructed by the continuous water-stop wall construction method to fully function as a water-stop wall, the wall body is free from cracks and the watertight structure of the joint portion is excellent. However, in reality, due to uncertainties in construction, excessive stress cracks caused by earthquakes, etc., complete waterproofing cannot be expected over a long period of time, so a waterproof sheet was used. The continuous water stop wall method is adopted. As a continuous water-blocking wall method developed in recent years, for example, Japanese Patent Laid-Open No. 4-5094 and Japanese Patent Publication No. 61-494.
51, JP-A-63-304821, JP-A-56-85018, and JP-A-63-522.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、前記止
水シートを用いた連続止水壁工法の主たる工法は、一枚
の止水シートを掘削溝中に建て込んだ後、その表裏側に
硬化剤を充填するものであるが、止水シートの建込みに
際して施工上種々の問題がある。たとえば、止水シート
を安定液中に建て込む場合、自重により降下させること
ができないため、前記特開昭56−85018号公報記
載の発明のように、両端に支柱等を取付けて止水シート
の降下を行う方法が提案されている。この場合には、ク
レーン等で一旦前記支柱を吊り下げた後、鉛直方向に建
て込むことになるが、正確に建て込めるシート横長に限
界があった。また、前記特開昭63−304821号公
報に記載されているように、複数本の支柱間に止水シー
トを張設したものを横方向にコンパクトにまとめた状態
で建込む方法も提案されているが、掘削深度が大きくな
ると、コンパクトにまとめた止水シートを正確に張設す
ることが困難となる。さらに、止水シート間での連結に
際しても、止水シートを開いた状態で建込み、連結しな
ければならず、この連結作業が困難であるとともに、多
くの手間と時間を要していた。
However, the main construction method of the continuous water-stop wall construction method using the water-stop sheet is that one sheet of water-stop sheet is built in the excavation groove, and then the curing agent is applied to the front and back sides thereof. However, there are various construction problems when installing the waterproof sheet. For example, when the water blocking sheet is built in the stabilizing solution, it cannot be lowered by its own weight. Therefore, as in the invention described in JP-A-56-85018, columns are attached to both ends of the water blocking sheet. A method of making a descent has been proposed. In this case, the pillars are temporarily suspended by a crane or the like, and then they are built in the vertical direction, but there is a limit to the lateral length of the seat that can be accurately built. Further, as described in Japanese Patent Laid-Open No. 63-304821, there has been proposed a method in which a water blocking sheet is stretched between a plurality of struts and is installed in a laterally compact state. However, as the excavation depth increases, it becomes difficult to accurately stretch the waterproof sheet in a compact size. Furthermore, when connecting between the water blocking sheets, the water blocking sheets must be installed and connected in an open state, and this connection work is difficult and requires a lot of labor and time.

【0005】一方、連続壁の構築に際しては、掘削溝内
を所定ブロック(エレメント)単位ごとに順次施工が成
されるが、使用する壁面安定液との関係で種々の問題が
生じている。仮に、ベントナイト安定液を用いる場合に
は、既にセメント系硬化剤で硬化させたユニットに隣接
する次ユニットを掘削する際、硬化剤のカルシウムイオ
ンなどによりベントナイト安定液が汚染されるため、ベ
ントナイト安定液が劣化し壁面の崩壊を招いたり、廃液
量が多くなったりするとともに、既に硬化した隣接ユニ
ットの壁面および継手部にベントナイトが付着し結果的
に未固結部分が発生して漏水の原因となるなどの問題が
発生していた。さらに、ベントナイト安定液の劣化によ
りゲル粘性および比重が大きくなるため、掘削効率が低
下するとともに、排泥の分級作業、止水シートの設置作
業および固化作業が難化するなどの問題がある。また、
自硬性安定液を用いた場合には、硬化時間からの制約に
より掘削、止水シートの建込み等種々の作業に制限を受
ける、また自硬性安定液の劣化によりゲル粘性および比
重が増加し、前述した問題が同様に発生する。さらに、
ポリマー安定液を使用した場合には、それ自体を硬化さ
せることが困難であるなどの問題がある。
On the other hand, when constructing a continuous wall, the excavation trench is sequentially constructed for each predetermined block (element) unit, but various problems occur in relation to the wall stabilizing liquid used. If the bentonite stabilizer is used, when excavating the next unit adjacent to the unit that has already been hardened with a cement-based hardening agent, the bentonite stabilizer is contaminated by calcium ions of the hardening agent. Deteriorates and causes the wall to collapse, and the amount of waste liquid increases, and bentonite adheres to the wall and joint of the already hardened adjacent unit, resulting in the formation of unconsolidated parts and water leakage. There was a problem such as. Further, the deterioration of the bentonite stabilizing solution increases the gel viscosity and the specific gravity, which lowers the excavation efficiency and makes it difficult to classify the sludge, install the water blocking sheet, and solidify. Also,
When a self-curing stabilizer is used, it is restricted by various operations such as excavation and installation of a waterproof sheet due to restrictions from the curing time, and gel viscosity and specific gravity increase due to deterioration of the self-curing stabilizer, The above-mentioned problems similarly occur. further,
When a polymer stabilizer is used, there are problems such as difficulty in curing itself.

【0006】そこで、本発明の主たる課題は、使用する
安定液の劣化を無くし、これに伴って発生していた種々
の問題点を解決すること、および止水シートの建込み、
連結作業を容易とし、施工性および止水性に優れた連続
止水壁の構築方法を提供するものである。
[0006] Therefore, the main object of the present invention is to eliminate the deterioration of the stabilizing solution used, and solve the various problems that have arisen with it, and to install the waterproof sheet.
It is intended to provide a method of constructing a continuous water blocking wall which facilitates connection work and is excellent in workability and water blocking performance.

【0007】[0007]

【課題を解決するための手段】前記課題は、壁面安定液
を用いながら地盤内に掘削溝を形成し、この掘削溝に対
して、前記掘削溝深さより若干短長とされ、かつその両
側部のそれぞれに実質的に前記溝深さ相当の長さを有
し、その相対差分の余長を下方に突出する連結金具を備
えた、不透液性シートよりなる袋体を収縮状態で建て込
んだ後、この袋体内部に充填材を注入し、前記掘削溝内
に不透液性シートによって被包された連続止水壁を形成
するとともに、隣接する止水壁同士を繋ぐ連結部におい
て前記連結金具によって地盤深さ方向の縦孔空間を確保
し、該縦孔空間より注入ロッドを挿入して、前記連結金
具によって浮き上がり状態で支持された前記袋体と掘削
溝底部との空間にグラウト材を充填し根固めを行ったこ
とで解決できる。
[Means for Solving the Problems] The problem is to form an excavation groove in the ground while using a wall stabilizing liquid, and to make the excavation groove slightly shorter than the depth of the excavation groove, and to provide both side portions thereof. A bag body made of a liquid-impervious sheet having a length substantially equivalent to the groove depth and provided with a connecting metal fitting projecting an extra length of the relative difference downward is built in a contracted state. After that, a filling material is injected into the bag body to form a continuous water blocking wall covered with a liquid impermeable sheet in the excavation groove, and at the connecting portion connecting adjacent water blocking walls to each other. A vertical hole space in the depth direction of the ground is secured by the connecting fitting, an injection rod is inserted from the vertical hole space, and a grout material is provided in the space between the bag body and the bottom of the excavation groove supported by the connecting fitting in a floating state. It is possible to solve it by filling and solidifying.

【0008】[0008]

【作用】本発明における止水シートとしては、不透液性
シートよりなる袋体のものを使用する。この袋体は、掘
削溝深さより若干短めとされ、かつその両側部のそれぞ
れに実質的に前記溝深さ相当の長さを有し、その相対差
分の余長を下方に突出させた連結金具を備えるものであ
る。先ず、掘削溝内への建込みに際しては、袋体の両側
部に固設された連結金具を心材として前記袋体を収縮さ
せてコンパクトに固形化した状態で挿入するため、簡単
に建て込むことができるとともに、その連結作業も容易
に行うことができる。袋体の建込みが完了したならば、
前記袋体の内部に充填材を注入して、前記掘削溝内に不
透液性シートによって被包された止水壁を形成する。注
入される充填材は、掘削に使用される壁面安定液とは完
全に分離され、互いに混ざることがないため、壁面安定
液の汚染がなくなり、従来問題となっていた種々の問題
点が解決される。また、前記充填材は、地上においてそ
の品質管理を行い得るため、強度および品質等を任意に
調整できるとともに、スライム等の混入もないため、所
望の品質を有する止水壁体を構築できるようになる。な
お、前記袋体内部に溝幅方向に配設された隔壁または複
数の繋ぎ材を有するものを用いると、比較的簡単に注入
完了状態でも形状が保持されるとともに、掘削溝幅方向
への膨出を防止できる。
In the present invention, the water blocking sheet is a bag made of a liquid impermeable sheet. This bag body is slightly shorter than the depth of the excavation groove, has a length substantially corresponding to the groove depth on each of both sides thereof, and a connecting fitting in which an extra length of the relative difference is projected downward. It is equipped with. First, when installing in the excavation ditch, since the connecting metal fittings fixed to both sides of the bag body are used as the core material to contract the bag body and insert it in a compact and solidified state, it can be easily installed. In addition to being able to do so, the connecting work can be performed easily. Once the bag is built,
A filling material is injected into the bag body to form a water blocking wall covered with a liquid impermeable sheet in the excavation groove. The injected filler is completely separated from the wall stabilizing liquid used for excavation and does not mix with each other, so the contamination of the wall stabilizing liquid is eliminated, and various problems that have been problems in the past are solved. It Further, since the filler can be quality-controlled on the ground, strength and quality can be arbitrarily adjusted, and since slime and the like are not mixed in, it is possible to construct a water blocking wall having a desired quality. Become. If a bag having a partition wall or a plurality of connecting members arranged in the groove width direction is used inside the bag, the shape can be retained relatively easily even in the injection completed state and the expansion in the excavation groove width direction can be achieved. You can prevent it from coming out.

【0009】さらに、在来工法の場合には、グラウト材
を充填したり、壁面安定液に硬化剤を投入して硬化させ
たり、自硬性安定液の硬化を待ったりして壁体を構築す
るものであるため、隣接するエレメントが所定の強度を
有するようになるまで掘削ができなかったが、本発明法
の場合には、前記袋体内に充填材を充填するものである
ため、施工上の制約がなくなり連続した作業を行うこと
ができるとともに、インターロッキングパイプ等の建込
みも不要となり、作業が効率化する。さらに、本発明で
は、隣接する止水壁同士を繋ぐ連結部において前記連結
金具によって深さ方向の縦孔空間を確保し、該空間より
注入ロッドを挿入して、前記連結金具によって浮き上が
り状態で支持された前記袋体と掘削溝底部との空間にグ
ラウト材を充填し根固めを行うため、確実でかつ信頼性
の高い止水壁を構築することができる。
Further, in the case of the conventional construction method, the wall body is constructed by filling the grout material, adding a curing agent to the wall surface stabilizing liquid to cure, or waiting for the self-hardening stabilizing liquid to cure. Therefore, it was not possible to excavate until the adjacent element has a predetermined strength, but in the case of the method of the present invention, the bag is filled with a filler, so There are no restrictions and continuous work can be performed, and interlocking pipes and the like are not required to be built, which improves work efficiency. Further, in the present invention, a vertical hole space in the depth direction is secured by the connecting fitting at a connecting portion connecting adjacent water blocking walls, an injection rod is inserted from the space, and is supported by the connecting fitting in a floating state. Since the grout material is filled in the space between the bag body and the bottom of the excavation groove, which is solidified, a reliable and highly reliable water blocking wall can be constructed.

【0010】[0010]

【実施例】以下、本発明を実施例に基づき詳説する。図
1は本発明に係る地中連続止水壁における根固め施工要
領図であり、図2は本発明法に係る不透液性袋体1の建
込み状態図であり、図3および図4は前記袋体1の構造
図であり、図5は建込み後の注入施工手順を示す図であ
る。本発明法において用いられる不透液性の袋体1は、
ポリエチレンシート、ナイロンシート、キャンバスシー
ト等のプラスチックシート、あるいは合成ゴム等適宜の
不透液性シート素材よりなる直方体の袋体であって、建
込み時には、図3に示されるように、側壁シート部分が
蛇腹状に折り畳まれ、収縮した状態で挿入される。ま
た、袋体1は前記掘削溝深さよりも若干短めとされ、か
つその両側部に実質的に掘削溝深さ相当の長さとされる
雄雌それぞれの連結金具2a、2bが固設されており、
前記連結金具2a、2bは、前記袋体1との相対差分の
余長を下方に突出する足としている。前記連結金具2
a、2bとしては、好ましくは鋼製のものを使用する
と、前記袋体1の芯材となり、かつウエイトとして機能
するため、運搬および建込みが容易となる。前記袋体1
の内部には、建込み完了状態の方向で溝幅方向に配設さ
れた隔壁1a〜1eによって、複数のセル1A〜1Fに
分割されている。前記隔壁1a〜1eは、たとえば図6
に示されるように、周辺地盤が軟弱または比較的弱い場
合に、鎖線で示されるように、袋体1が溝幅方向に膨出
するのを防止するとともに、注入後においても袋体1が
直方の形状を保持し得るように設けられたものである。
また、各セル1A〜1Fの天井シート部分には、それぞ
れ注入孔1f、1f…が形成されており、セル1A〜1
F内に順次充填材が注入され、注入完了状態では、図4
に示す形状となる。なお、前記袋体1の寸法Bおよびセ
ル割り等については、施工性、施工工程、日当りの施工
延長等を慎重に検討した上で決定される。なお、前記隔
壁1a〜1eは、前述の趣旨より、図4のように、各セ
ル1A〜1Fを完全に仕切るシート材でなくてもよく、
図6のように、隔壁1a、1c、1eについては、セル
間の流通を許容するように、たとえば網状のシート、ま
たは適宜の間隔で設けられた繋ぎ材であってもよい。
EXAMPLES The present invention will be described in detail below based on examples. FIG. 1 is a diagram of a rooting construction procedure in a continuous underground water blocking wall according to the present invention, FIG. 2 is a diagram showing the impermeable bag 1 according to the present invention in a built-up state, and FIGS. [Fig. 5] is a structural diagram of the bag body 1, and Fig. 5 is a diagram showing an injection construction procedure after being built. The liquid-impervious bag body 1 used in the method of the present invention is
A rectangular parallelepiped bag made of a suitable liquid-impermeable sheet material such as a polyethylene sheet, a nylon sheet, a canvas sheet or the like, or a synthetic rubber, etc., and a side wall sheet portion as shown in FIG. Is folded in a bellows shape and inserted in a contracted state. Further, the bag body 1 is slightly shorter than the depth of the excavation groove, and male and female connecting fittings 2a and 2b each having a length substantially equivalent to the depth of the excavation groove are fixedly provided on both sides thereof. ,
The connecting fittings 2a and 2b are legs that protrude downward with an extra length of relative difference from the bag body 1. The connecting fitting 2
When a steel material is preferably used as a and 2b, it serves as a core material of the bag body 1 and functions as a weight, which facilitates transportation and installation. The bag 1
The inside of the cell is divided into a plurality of cells 1A to 1F by partition walls 1a to 1e arranged in the groove width direction in the direction of the completed construction. The partition walls 1a to 1e are shown in FIG.
As shown in Fig. 4, when the surrounding ground is soft or relatively weak, the bag body 1 is prevented from bulging in the groove width direction as shown by the chain line, and the bag body 1 is rectified even after the injection. It is provided so as to retain the shape of.
Further, injection holes 1f, 1f ... Are formed in the ceiling sheet portions of the cells 1A to 1F, respectively.
The filler is sequentially injected into F, and when the injection is completed, as shown in FIG.
It becomes the shape shown in. The size B of the bag 1 and the cell division are determined after careful consideration of the workability, the work process, the extension of work per day, and the like. The partition walls 1a to 1e do not have to be sheet materials for completely partitioning the cells 1A to 1F as shown in FIG.
As shown in FIG. 6, the partition walls 1a, 1c, and 1e may be, for example, a mesh sheet or a connecting member provided at appropriate intervals so as to allow the flow between the cells.

【0011】地中止水壁の構築に当たっては、先ず一般
的な溝掘削の要領に従って、溝掘り用定規、孔壁の保
護、安定液の流出防止等より、一対のガイドウォール
4、4が溝を挟んで布設した後、バケット式、衝撃式ま
たは回転式等の適宜に選定された掘削機を用いて、その
掘削溝6内を壁面安定液5で満たしながら溝掘削が行わ
れる。なお、掘削に際しては、本発明法は隣接する壁体
の硬化を待つことなく連続して施工が行える関係上、掘
削順序は何ら制限されず、一方向へ連続して掘削するこ
とができる。
In constructing a ground suspension water wall, first, in accordance with the general procedure for trench excavation, a pair of guide walls 4 and 4 form a trench by taking measures such as a ruler for trench excavation, protection of hole walls, and prevention of stabilizing liquid outflow. After sandwiching and laying, the excavator which is appropriately selected such as bucket type, impact type or rotary type is used to excavate the excavation trench 6 while filling the excavation trench 6 with the wall surface stabilizing liquid 5. In the case of excavation, the method of the present invention allows continuous construction without waiting for the hardening of the adjacent walls, and therefore the excavation order is not limited at all, and the excavation can be performed continuously in one direction.

【0012】次に、溝掘削の完了した部分から、前記袋
体1の建込みが行われる。建込みに際しては、図2に示
されるように、現場に持ち込まれたクレーン等の重機
(図示しない)により前記袋体1が吊持され、そのまま
鉛直方向に建込まれる。その際、施工済み止水壁W
(1')の側端に固設された雄連結金具2aに対して、建
込み袋体1の雌連結金具2bを嵌入させ、これをガイド
として吊り下ろす。
Next, the bag 1 is built from the portion where the trench excavation is completed. At the time of building, as shown in FIG. 2, the bag 1 is suspended by a heavy machine (not shown) such as a crane brought to the site, and is built in the vertical direction as it is. At that time, the completed water blocking wall W
The female connecting fitting 2b of the built-in bag 1 is fitted into the male connecting fitting 2a fixed to the side end of (1 '), and is suspended as a guide.

【0013】前記袋体1の建込みが完了したならば、図
5に示される要領に従って、充填材の注入が行われる。
壁体の延長方向が図面の右方である場合には、図5
(c)に示されるように、袋体1の最左側セル1Aに対
して充填が行われる。セル1Aは充填材の注入とともに
脹らみ、これより右側の袋体1部分を溝6の右方側に押
し出す。次に図5(d)に示されるように、左側セルよ
り順次、セル1B、1Cに充填材の注入を行い、溝6の
右方側に延長させ、1エレメント間において図5(e)
に示されるように、不透液性シートによって被包された
止水壁Wが構築される。なお、袋体1の建込みに際して
は、前述図2のように、施工済みの袋体1’に対して建
込み時に連結する方法でも良いし、また予め地上で複数
の袋体1、1…を連結した後、これらをまとめて溝内に
建て込むこともできる。
When the building of the bag 1 is completed, the filling material is injected according to the procedure shown in FIG.
If the extension direction of the wall is to the right of the drawing, then FIG.
As shown in (c), the leftmost cell 1A of the bag 1 is filled. The cell 1A expands as the filling material is injected, and the portion of the bag 1 on the right side of the cell 1A is pushed out to the right side of the groove 6. Next, as shown in FIG. 5D, the filling material is sequentially injected into the cells 1B and 1C from the left side cell to extend to the right side of the groove 6 and the space between one element is increased as shown in FIG.
As shown in, a water blocking wall W covered with a liquid impermeable sheet is constructed. When the bag 1 is built, as shown in FIG. 2, a method may be used in which it is connected to the completed bag 1 ′ at the time of building, or a plurality of bags 1, 1 ... It is also possible to assemble these into a groove after connecting them together.

【0014】袋体1内に注入される前記充填材として
は、たとえばアスファルト乳剤、セメント系ミルク、モ
ルタル、コンクリート等を好適に用いることができる
他、単純に止水としての機能のみを持たせるのであれ
ば、水、廃液、砂等の液体、粒状体をも用いることがで
きる。さらに、産業廃棄物の減少を図るために、掘削時
に使用しているベントナイト安定液の置換分をそのま
ま、または硬化剤を混入して前記袋体1内に充填するこ
ともできる。また、その注入は、流し込みによることで
も良いし、また所定の圧力をもって圧入することでもよ
い。
As the filler to be injected into the bag body 1, for example, asphalt emulsion, cement-based milk, mortar, concrete or the like can be preferably used, and since it simply has only the function of stopping water. If it is possible to use water, waste liquid, liquid such as sand, or granular material. Further, in order to reduce the amount of industrial waste, it is possible to fill the bag body 1 with the replacement portion of the bentonite stabilizing solution used at the time of excavation as it is or with a curing agent mixed therein. In addition, the injection may be performed by pouring or by press-fitting with a predetermined pressure.

【0015】一方、止水壁構築深さが浅い、または地盤
が比較的強固であるなどの条件の下では、図7および図
8に示される袋体7を用いることもできる。前記袋体7
は、隔壁等の仕切り材を有しない直方の袋体であって、
前記袋体1と同様、その側部に連結金具2a、2bを有
するとともに、その天井シート部分には、注入孔7aを
有し、建込み時には図6のように蛇腹状に折り畳まれ、
収縮した状態で挿入され、前記袋体1と同様の手順に従
って、充填材の注入が行われる。
On the other hand, under the condition that the construction depth of the water blocking wall is shallow or the ground is relatively strong, the bag body 7 shown in FIGS. 7 and 8 can be used. The bag 7
Is a rectangular bag having no partitioning material such as partition walls,
Similar to the bag body 1, it has connecting fittings 2a, 2b on its side parts, and an injection hole 7a in its ceiling sheet part, and when assembled, it is folded into a bellows shape as shown in FIG.
It is inserted in a contracted state, and the filling material is injected according to the same procedure as that of the bag body 1.

【0016】ところで、本発明における止水壁Wの連結
部においては、後述詳細の根固め施工との関係で、連結
金具2a,2b…によって地盤深さ方向の縦孔空間Pが
形成される。具体的には、図3および図7に示される袋
体1、7の場合には、雄連結金具2aには断面T字状の
鋼材が用いられ、雌連結金具2bには側方に開口溝を有
する断面箱型の鋼材が用いられることにより、これらの
連結金具が相互に連結された状態で、地盤深さ方向の縦
孔空間Pが確保される。他に用いられる連結金具の具体
的形状としては、たとえば、図9に示されるように、袋
体10の左右両側部のそれぞれに連結アーム11a、1
1b(12a、12b)が固設された断面コ字状の連結
金具11(12)を用いることもできるし、また、図1
0に示されるように、袋体13の両側部のそれぞれに、
フランジの一方側を切断したH型シートパイル14、1
5を用いることもできる。前記連結金具2a、2b、1
1、…は、袋体1、7…の建込み時にはウエイトとして
機能し、掘削溝内への建込みを容易にするとともに、ス
ライム処理時には袋体の防護材として機能する。また、
これらによって袋体1、7…の伸長側側縁の鉛直面が確
保され、相互の連結が容易となる。
By the way, in the connection portion of the water blocking wall W in the present invention, a vertical hole space P in the depth direction of the ground is formed by the connection fittings 2a, 2b, ... Specifically, in the case of the bags 1 and 7 shown in FIGS. 3 and 7, a steel material having a T-shaped cross section is used for the male connecting fitting 2a, and an opening groove is formed laterally for the female connecting fitting 2b. By using the steel material having a box-shaped cross-section, the vertical hole space P in the depth direction of the ground is secured in a state where these connecting fittings are connected to each other. As a concrete shape of the other connecting metal fitting, for example, as shown in FIG. 9, the connecting arms 11a and 1a are provided on the left and right sides of the bag body 10, respectively.
It is also possible to use a connecting fitting 11 (12) having a U-shaped cross section in which 1b (12a, 12b) is fixedly installed, and FIG.
As shown in 0, on both sides of the bag body 13,
H-shaped sheet pile 14, 1 with one side of the flange cut
5 can also be used. The connection fittings 2a, 2b, 1
.. function as a weight when the bags 1, 7 are built, facilitate the building in the excavation trench, and function as a protective material for the bags when sliming. Also,
By these, the vertical planes of the side edges on the extension side of the bags 1, 7 ... Are secured and the mutual connection is facilitated.

【0017】本発明における袋体1は、図1に示される
ように、設置状態で両側部に固設された連結金具2a、
2bの先端が掘削溝の底部に当接することにより、掘削
溝底部より浮き上がり状態で支持され、その下部空間M
に対して、モルタルまたはコンクリート等のグラウト材
が充填され根固めが行われる。根固めに際しては、前記
連結金具2a、2bによって形成された縦孔空間Pよ
り、注入ロッド15が挿入され、ロッド15の先端ノズ
ルより、袋体1の下部空間Mに向けてベントナイト固化
材、またはセメントミルク、モルタル、若しくはコンク
リート等のグラウト材が圧入される。グラウト注入圧
は、30kgf/cm2 以上、好ましくは50kgf/cm2 以上程
度の圧力で充分である。注入されたグラウト材は、前記
袋体1の下部空間Mはもちろん、袋体1の隔壁1a.1
b…部の縦溝6a、6a…に対しても入り込むため、充
分な止水性が確保される。なお、注入ロッド15に代え
てトレミー管を用いて、コンクリートを前記下部空間M
に打設することもできる。コンクリートであっても、そ
の流動性により前記下部空間Mに充填することが可能と
思われる。さらに、グラウト材等の注入・打設に際し
て、たとえば図11に示されるように、一方側の縦孔空
間Pよりベントナイト安定液をポンプアップするととも
に、他方側の縦孔空間Pに導入し、循環流を生ぜしめ、
注入・打設されるグラウト材等の袋体1下部への回り込
みを良好とすることもできる。特に連結間距離が長い場
合、コンクリートの打設の場合等に、比較的有効な方法
となる。
As shown in FIG. 1, the bag body 1 according to the present invention is provided with connecting metal fittings 2a fixed to both sides in the installed state.
When the tip of 2b contacts the bottom of the excavation groove, it is supported above the bottom of the excavation groove and is supported in its lower space M.
On the other hand, grouting material such as mortar or concrete is filled and root consolidation is performed. At the time of root consolidation, the injection rod 15 is inserted through the vertical hole space P formed by the coupling fittings 2a, 2b, and the bentonite solidifying material is inserted from the tip nozzle of the rod 15 toward the lower space M of the bag body 1, or Grout materials such as cement milk, mortar, or concrete are pressed in. The grout injection pressure of 30 kgf / cm 2 or more, preferably about 50 kgf / cm 2 or more is sufficient. The injected grout material is not limited to the lower space M of the bag body 1 and the partition walls 1a. 1
Since it also enters the vertical grooves 6a, 6a ... of the b portion, a sufficient waterproofness is secured. In addition, instead of the injection rod 15, a tremie pipe is used to replace the concrete with the lower space M.
It can also be set in. It seems that even the concrete can be filled in the lower space M due to its fluidity. Further, when pouring and placing grout material or the like, as shown in FIG. 11, for example, the bentonite stabilizing solution is pumped up from the vertical hole space P on one side and introduced into the vertical hole space P on the other side for circulation. Create a flow,
It is also possible to make the grouting material or the like that is poured and placed around the lower portion of the bag body 1 good. In particular, when the distance between the joints is long, it is a relatively effective method when pouring concrete.

【0018】他方、止水壁の構築に当たっては、掘削後
のスライム除去が必要となるが、仮に図12に示される
ように、クラムシェルバケット9により袋体1の隣接す
る部分でのスライムSの除去を行う場合には、図13に
示されるように、断面コ字状の防護鋼材8によって建込
み後の袋体1を防護しながら除去作業を行うと、袋体1
を傷付けることなく作業を行うことができる。なお、前
記防護鋼材8は建込み時の治具としても使用することが
できる。
On the other hand, in constructing the water blocking wall, it is necessary to remove slime after excavation, but as shown in FIG. 12, the slime S in the adjoining portion of the bag body 1 is temporarily removed by the clamshell bucket 9 as shown in FIG. In the case of removing, as shown in FIG. 13, if the removing work is performed while protecting the bag body 1 after being built by the protective steel material 8 having a U-shaped cross section, the bag body 1
You can work without damaging. The protective steel material 8 can also be used as a jig for building.

【0019】ここで、前述した袋体1内への充填材の注
入に伴う側方移動について説明すると、図14に示され
るように、溝6内に充満している壁面安定液5の比重を
γsとすると、深さ方向の圧力分布はγs ・Hで表され
る。一方、袋体1内に注入される充填材の比重γtとす
ると深さ方向の圧力分布は同様にγt・Hで表される。
通常、壁面安定液として用いられるベントナイト液の比
重は1.15〜1.25程度の範囲であり、前記充填材
はセメント系のもの等を用いると1.30〜1.70程
度の範囲であるため、その比重の差分による押出し力
(γt−γs )・Hが押出し方向に圧力ΔPとして作用
することになる。したがって、この比重差による付加圧
力、および注入圧力等を必要に応じて用いることによ
り、十分に側方に押し出すことが可能と思われる。ま
た、場合によっては、袋体1の移動先端側上端Aを適
時、何等かの方法で移動拘束した状態で注入を行うと下
端側での圧力を増すことができ、移動を容易ならしめる
ことができる。
The lateral movement associated with the injection of the filler into the bag 1 described above will now be described. As shown in FIG. 14, the specific gravity of the wall surface stabilizing liquid 5 filled in the groove 6 is If γ s , the pressure distribution in the depth direction is represented by γ s · H. On the other hand, assuming that the specific gravity of the filler injected into the bag body 1 is γt, the pressure distribution in the depth direction is also represented by γt · H.
Usually, the specific gravity of the bentonite liquid used as the wall stabilizing liquid is in the range of about 1.15 to 1.25, and when the filler is cement-based, it is in the range of about 1.30 to 1.70. Therefore, the pushing force (γt−γ s ) · H due to the difference in specific gravity acts as the pressure ΔP in the pushing direction. Therefore, it is considered possible to sufficiently push laterally by using the additional pressure due to the difference in specific gravity, the injection pressure, and the like as necessary. In some cases, if the upper end A of the bag body 1 on the side of the moving tip side is injected in a timely and restrained manner by some method, the pressure on the lower end side can be increased and the movement can be facilitated. it can.

【0020】[0020]

【発明の効果】以上詳説のとおり、本発明に係る連続止
水壁によれば、使用する安定液の劣化を無くし、これに
伴って発生していた種々の問題点を解決することができ
る。また、止水シートの建込み、連結作業が容易となり
施工性および止水性に優れたものとなる。
As described above in detail, according to the continuous water blocking wall of the present invention, it is possible to eliminate the deterioration of the stabilizing liquid used and solve the various problems caused by the deterioration. Further, the work of constructing and connecting the water blocking sheet is facilitated, and the workability and the water blocking property are excellent.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る地下連続止水壁における根固め施
工要領図である。
FIG. 1 is a diagram of a rooting construction procedure for an underground continuous water stop wall according to the present invention.

【図2】本発明法に係る袋体1の建込み状態図である。FIG. 2 is a diagram showing a state in which the bag body 1 according to the method of the present invention is installed.

【図3】袋体1の収縮状態図である。FIG. 3 is a contracted state diagram of the bag body 1.

【図4】袋体1の充填材注入後の状態図である。FIG. 4 is a state diagram of the bag body 1 after the filling material is injected.

【図5】袋体建込み後の注入施工手順図である。FIG. 5 is a diagram showing an injection procedure after the bag is built.

【図6】隔壁の機能説明図である。FIG. 6 is a functional explanatory diagram of a partition wall.

【図7】1セル構造の袋体の収縮状態図である。FIG. 7 is a contracted state diagram of a bag having a one-cell structure.

【図8】1セル構造の袋体の充填材注入状態図である。FIG. 8 is a view showing a state where a bag having a one-cell structure is filled with a filler.

【図9】他の連結金具を備えた袋体の収縮状態図であ
る。
FIG. 9 is a contracted state diagram of a bag body including another connecting fitting.

【図10】他の連結金具を備えた袋体の収縮状態図であ
る。
FIG. 10 is a contracted state view of a bag body including another connecting fitting.

【図11】根固め工の施工状況図である。[Fig. 11] Fig. 11 is a construction status diagram of a rooting work.

【図12】スライム処理要領図である。FIG. 12 is a slime treatment procedure diagram.

【図13】スライム処理時の袋体防護状態図である。FIG. 13 is a bag body protection state diagram during slime processing.

【図14】袋体の側方移動についての説明図である。FIG. 14 is an explanatory diagram of lateral movement of the bag body.

【符号の説明】[Explanation of symbols]

1・7…袋体、1a〜1e…隔壁、1f…注入孔、2a
・2b…連結金具、4…ガイドウォール、5…壁面安定
液、6…掘削溝、8…防護鋼材、9…クラムシェルバケ
ット、W…止水壁
1. 7 ... bag body, 1a to 1e ... partition wall, 1f ... injection hole, 2a
・ 2b ... Connection fitting, 4 ... Guide wall, 5 ... Wall stabilizing liquid, 6 ... Excavation groove, 8 ... Protective steel material, 9 ... Clamshell bucket, W ... Water blocking wall

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】壁面安定液を用いながら地盤内に掘削溝を
形成し、この掘削溝に対して、前記掘削溝深さより若干
短長とされ、かつその両側部のそれぞれに実質的に前記
溝深さ相当の長さを有し、その相対差分の余長を下方に
突出する連結金具を備えた、不透液性シートよりなる袋
体を収縮状態で建て込んだ後、この袋体内部に充填材を
注入し、前記掘削溝内に不透液性シートによって被包さ
れた連続止水壁を形成するとともに、隣接する止水壁同
士を繋ぐ連結部において前記連結金具によって地盤深さ
方向の縦孔空間を確保し、該縦孔空間より注入ロッドを
挿入して、前記連結金具によって浮き上がり状態で支持
された前記袋体と掘削溝底部との空間にグラウト材を充
填し根固めを行ったことを特徴とする地中連続止水壁の
構築方法。
1. An excavation groove is formed in the ground while using a wall stabilizing liquid, and the excavation groove is slightly shorter than the excavation groove depth, and the groove is substantially formed on each of both sides of the excavation groove. After building a bag made of a liquid-impermeable sheet in a contracted state, having a length corresponding to the depth and having a connecting metal fitting projecting the extra length of the relative difference downward, the bag is placed inside the bag. Injecting a filler to form a continuous water stop wall covered with a liquid impermeable sheet in the excavation trench, and in the connecting portion connecting adjacent water stop walls, the connecting metal fittings in the ground depth direction A vertical hole space was secured, an injection rod was inserted from the vertical hole space, and the space between the bag body and the bottom of the excavation groove supported in a floating state by the connecting metal fitting was filled with grout material to perform root consolidation. A method of constructing a continuous underground water stop wall, which is characterized in that
JP12461792A 1992-05-18 1992-05-18 How to build a continuous underground water barrier Expired - Fee Related JP2829805B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12461792A JP2829805B2 (en) 1992-05-18 1992-05-18 How to build a continuous underground water barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12461792A JP2829805B2 (en) 1992-05-18 1992-05-18 How to build a continuous underground water barrier

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP4044893A Division JP3023236B2 (en) 1992-03-02 1992-03-02 How to construct a suspended water wall

Publications (2)

Publication Number Publication Date
JPH0641977A true JPH0641977A (en) 1994-02-15
JP2829805B2 JP2829805B2 (en) 1998-12-02

Family

ID=14889860

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12461792A Expired - Fee Related JP2829805B2 (en) 1992-05-18 1992-05-18 How to build a continuous underground water barrier

Country Status (1)

Country Link
JP (1) JP2829805B2 (en)

Also Published As

Publication number Publication date
JP2829805B2 (en) 1998-12-02

Similar Documents

Publication Publication Date Title
KR102153902B1 (en) Slurry wall, construction method for the same and wire mesh assembly
KR20160131410A (en) Temporary construction and originally construction the outer layer of a 2-layer wall type underground road building method
CN108166532A (en) A kind of groutable underground continuous wall connector and its construction method
US4453366A (en) Process of forming a continuous wall in the ground
JP3676441B2 (en) Pit and construction method of basement using it
KR101924383B1 (en) A Environment-Friendly construction method of drainage channel on softground by Grouting and Mixing of Solidifying Agent
JP2912500B2 (en) How to build a continuous underground water barrier
US5871307A (en) Pre-cast concrete panel wall
JP2829805B2 (en) How to build a continuous underground water barrier
JP2835799B2 (en) Construction method of continuous underground water barrier with pumping well
JP3194192B2 (en) Open shield method
JP3023236B2 (en) How to construct a suspended water wall
JPS6145724B2 (en)
JP2779879B2 (en) How to construct a suspended water wall
JP4612356B2 (en) How to create a slope
KR102777905B1 (en) waterproofing construction method for underwater construction areas
KR102517949B1 (en) Buried box structure for staggered lapping and method for construction of slurry wall using the same
CA2171897C (en) Pre-cast concrete panel wall
KR20210119710A (en) Slurry wall, construction method for the same and wire mesh assembly
JPH10121496A (en) Forming method of water passage section in continuous underground wall
JPS63122817A (en) Impermeable walls using impermeable sheets, their construction methods, and impermeable sheets used for impermeable walls
JPS63304821A (en) Construction work of underground continuous cut-off wall
JP2524579B2 (en) Reinforcement method of existing retaining wall under water surface
EP1067243A2 (en) Catchment basin for above ground water and construction method thereof
DE4445707A1 (en) Economical removal of same level traffic surfaces

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080925

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090925

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100925

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110925

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees