JPH064998B2 - Underground joining method for shield tunnel - Google Patents
Underground joining method for shield tunnelInfo
- Publication number
- JPH064998B2 JPH064998B2 JP16597886A JP16597886A JPH064998B2 JP H064998 B2 JPH064998 B2 JP H064998B2 JP 16597886 A JP16597886 A JP 16597886A JP 16597886 A JP16597886 A JP 16597886A JP H064998 B2 JPH064998 B2 JP H064998B2
- Authority
- JP
- Japan
- Prior art keywords
- shield machine
- shield
- tunnel
- ground
- penetration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【発明の詳細な説明】 「産業上の利用分野」 この発明は、1本のトンネルを2台のシールド機を用い
てトンネルの両端部から同時に掘削して途中で接合する
際のシールド・トンネルの地中接合工法に関する。DETAILED DESCRIPTION OF THE INVENTION "Industrial field of application" The present invention relates to a shield tunnel for simultaneously excavating one tunnel from both ends of the tunnel by using two shield machines and joining the tunnels on the way. Underground connection method.
「従来の技術」 従来、この種のシールド・トンネルの地中接合工法とし
ては、第7図に示すようなものが知られている。"Prior Art" Conventionally, as shown in Fig. 7, an underground bonding method for this type of shield tunnel is known.
図において、符号Gは両端部から掘削してきたシールド
・トンネルの接合部付近の地山であり、地山G内では紙
面に対して右側に一方のトンネルTaを掘削したシール
ド機1と、左側に他方のトンネルTbを掘削したシール
ド機2とが所定の間隔(約30cm程度)の地山Giを残
した状態で向かい合っている。そして、シールド機1,
2の後方に形成されたトンネルTa,Tbの壁面は、セ
グメント3a,3a,…、3b,3b,…によって覆工
が行なわれている。また、シールド機1,2の先端部に
はスキンプレート1a,2aに対して所定の傾斜角(α
=17°〜25°)で、又周方向に所定のピッチで地山
G内に穿孔式凍結管4a,4bが設置されていると共
に、スキンプレート1a,2aおよび最前部のセグメン
ト3a,3bには全内周面に貼付け凍結管(図示せず)
が設置された構成となっている。In the figure, reference symbol G is the ground near the junction of the shield tunnels that have been excavated from both ends. Within the ground G, the shield machine 1 excavating one tunnel Ta on the right side with respect to the paper surface and the shield machine 1 on the left side. The shield machine 2 excavating the other tunnel Tb faces each other while leaving a natural ground Gi at a predetermined interval (about 30 cm). And the shield machine 1,
Walls of the tunnels Ta and Tb formed at the rear of 2 are lined with segments 3a, 3a, ..., 3b, 3b ,. Further, the tip end portions of the shield machines 1 and 2 have a predetermined inclination angle (α) with respect to the skin plates 1a and 2a.
= 17 ° to 25 °), and perforation type freezing tubes 4a, 4b are installed in the ground G at a predetermined pitch in the circumferential direction, and at the skin plates 1a, 2a and the frontmost segments 3a, 3b. Is a freeze tube attached to the entire inner surface (not shown)
Has been installed.
そして、前記スキンプレート1a,2aに設置された穿
孔式凍結管4a,4b及び貼付け凍結管内にブラインを
循環させることにより、地山Giを囲むようにスキンプ
レート1a,2aの外周部の地山Gfを凍結させた後、
シールド機1,2の前部5a,5bを解体し、次いで、
前記シールド機1,2間に残された地山Giを掘削し、
その壁面を覆工することにより左右から掘削してきたト
ンネルTaとTbとを接合させ、シールド・トンネルを
完成させる。The brine is circulated in the perforation type freezing tubes 4a, 4b and the sticking freezing tubes installed on the skin plates 1a, 2a, so as to surround the natural ground Gi and the natural ground Gf at the outer peripheral portion of the skin plates 1a, 2a. After freezing
Dismantle the front parts 5a, 5b of the shield machines 1, 2, and then
The ground Gi left between the shield machines 1 and 2 is excavated,
By covering the wall surface, the tunnels Ta and Tb excavated from the left and right are joined to complete a shield tunnel.
「発明が解決しようとする問題点」 ところが、前記従来のシールド・トンネルの接合方法に
おいては、接合地点において両方のシールド機相互間に
通常30cm程度の隙間ができることになり、止水や土留
が完全とは言い難く安全性に問題があること、また、補
助工法として主に採用される凍結工法は多くの工費や工
期を要すると共に、海底下での施工時に塩分の混入した
凍土の強度が低下すること、凍結時の凍土膨張および解
凍時の地盤沈下の影響があること、凍土の管理が難しい
こと等の問題点があった。“Problems to be solved by the invention” However, in the conventional shield tunnel joining method, a gap of about 30 cm is usually formed between both shield machines at the joining point, and water stoppage and earth retention are complete. It is difficult to say that there is a problem with safety, and the freezing method mainly used as an auxiliary method requires a lot of construction cost and construction period, and the strength of frozen soil mixed with salt decreases during construction under the seabed. However, there were problems such as the influence of frozen soil expansion during freezing and ground subsidence during thawing, and the difficulty in managing frozen soil.
本発明は、前記問題点に鑑みてなされたもので、両側か
ら掘進してきた2台のシールド機を地中において所定の
寸法誤差範囲内で確実に接合させることにより、トンネ
ル接合部付近の地山Gからシールド機の接合部に作用す
る土水圧に対するシールや止水を確実なものとし、接合
作業を安全に行うことができると共に、トンネルの地中
接合工事に要する工期を大幅に短縮し、かつ工費を低減
することのできるシールド・トンネルの地中接合工法を
提供することを目的としている。The present invention has been made in view of the above problems, and reliably joins two shield machines excavated from both sides in the ground within a predetermined dimensional error range, thereby providing a natural ground near a tunnel junction. Sealing and stopping water against the earth pressure acting on the joint part of the shield machine from G can be performed securely, and the joint work can be performed safely, and the construction period required for the underground joint work of the tunnel is greatly shortened, and It is an object of the present invention to provide an underground joining method for shield tunnels that can reduce construction costs.
「問題点を解決するための手段」 この発明は、前記問題点を解決するために、スキンプレ
ートの先端部が外筒と内筒とにより二重に形成されてい
ると共に前記外筒及び内筒の間に貫入リングが格納され
ている第1のシールド機及びスキンプレートの先端部が
前記第1のシールド機と同径の外筒と内筒とにより二重
に形成されることによって構成される貫入室を有する第
2のシールド機を1組として両側からトンネルを掘削
し、このトンネル掘削工程終了前において、前記第1の
シールド機と第2のシールド機とを所定間隔をおいて停
止させるとともに、この第1のシールド機と第2のシー
ルド機との間に鋼管による水平ボウリングを行なって相
対位置を確認した後、前記少なくとも一方のシールド機
を方向制御を行いながら他方のシールド機の直前まで推
進させ、次いで、前記第1のシールド機の貫入リングを
前方に摺動させて第2のシールド機の貫入室内に貫入す
ることにより第1及び第2のシールド機の間に残された
トンネル接合部の地山を覆った後、前記第1及び第2の
シールド機のスキンプレートを残したままシールド機を
解体してトンネルを接合し、次いで前記スキンプレート
の内面にコンクリートを打設して前記接合部の壁面を覆
工することを特徴としている。"Means for Solving the Problems" In order to solve the above problems, the present invention has a skin plate in which the distal end portion is double formed by an outer cylinder and an inner cylinder, and the outer cylinder and the inner cylinder are The first shield machine in which the penetration ring is housed between the first shield machine and the front end of the skin plate are doubled by an outer cylinder and an inner cylinder having the same diameter as the first shield machine. A tunnel is excavated from both sides by using a second shield machine having a penetration room as one set, and before the completion of the tunnel excavation process, the first shield machine and the second shield machine are stopped at a predetermined interval and After confirming the relative position by horizontal bowling with a steel pipe between the first shield machine and the second shield machine, the other shield machine is controlled while the direction control is performed on the at least one shield machine. Of the first shield machine, and then the penetration ring of the first shield machine is slid forward to penetrate into the penetration chamber of the second shield machine to leave the space between the first and second shield machines. After covering the ground of the tunnel junction, dismantling the shield machine while leaving the skin plates of the first and second shield machines to join the tunnel, and then placing concrete on the inner surface of the skin plate. Then, the wall surface of the joint portion is lined.
「実施例」 以下、この発明を図面を参照しながら説明する。第1図
ないし第6図は、この発明のシールド・トンネルの地中
接合工法の一実施例を説明するための図である。これら
の図において、前記第7図に示した従来の技術の構成要
素と同一の要素については同一符号を付してある。[Examples] Hereinafter, the present invention will be described with reference to the drawings. 1 to 6 are views for explaining one embodiment of the underground joining method for a shield tunnel of the present invention. In these figures, the same components as those of the conventional technique shown in FIG. 7 are designated by the same reference numerals.
図において、符号Gは両端部から掘削してきたシールド
・トンネルの接合部付近の地山であり、この地山G内で
は、第1のシールド機1がその前部に設けられたカッタ
装置10により、紙面に対して右側に第1のトンネルT
aを掘削し、また第2のシールド機がその前部に設けら
れたカッタ装置20により左側に他方のトンネルTbを
掘削している。そして、シールド機1の後方に形成され
たトンネルTaの壁面は、このシールド機1の内部で組
み立てられたセグメント3a,3a,・・・によって1
次覆工されていると共に、シールド機2の後方に形成さ
れたトンネルTbの壁面は、このシールド機2の内部で
組み立てられたセグメント3b,3b,・・・によって
1次覆工が行なわれている。In the figure, reference numeral G is a ground near the junction of the shield tunnel excavated from both ends, and in this ground G, the first shield machine 1 is provided by the cutter device 10 provided in the front part thereof. , The first tunnel T on the right side of the page
In addition, a second shield machine is excavating the other tunnel Tb on the left side by the cutter device 20 provided in the front portion thereof. The wall surface of the tunnel Ta formed at the rear of the shield machine 1 is formed by the segments 3a, 3a, ...
The wall surface of the tunnel Tb formed behind the shield machine 2 is subjected to the primary lining by the segments 3b, 3b, ... There is.
第1のシールド機1には、円筒状に形成されてこのシー
ルド機1本体の外殻を成すスキンプレート1aが設けら
れている。このスキンプレート1aの先端部1bは、ス
キンプレート1aと同径に形成された外筒11と、この
外筒11より小径に形成された内筒12とにより、二重
に形成されている。この外筒11と内筒12との間に
は、円筒状の一体又は複数個に分割された貫入リング1
3が格納されており、これと外筒11及び内筒12との
間にはリップシール,Oリング,Oシール(図示せず)
等の止水手段が設けられている。また、スキンプレート
1a内には、外筒11と内筒12とに直交して固定され
た仕切板14が設けてあり、仕切板14の中心軸線上に
はカッタ装置10の軸部15が取り付けられており、シ
ールドテール部1c付近には周方向の所定間隔置きに、
セグメント3aの側面に反力を取ってシールド機1を推
進させる推進ジャッキ16,16,・・・が固定された
構成とされている。なお、前記円筒状に一体に形成され
た貫入リング13の先端部には、貫入リング13の軸方
向に延在するスリット(図示せず)を、周方向の所定間
隔毎に複数本形成して変形自由度をもたせ、後述する貫
入室に貫入し易いようにしてもよい。The first shield machine 1 is provided with a skin plate 1a formed in a cylindrical shape and forming an outer shell of the main body of the shield machine 1. The tip portion 1b of the skin plate 1a is double formed by an outer cylinder 11 having the same diameter as the skin plate 1a and an inner cylinder 12 having a smaller diameter than the outer cylinder 11. Between the outer cylinder 11 and the inner cylinder 12, a penetrating ring 1 which is cylindrical or is divided into a plurality of pieces.
3 is stored, and a lip seal, an O ring, and an O seal (not shown) are provided between this and the outer cylinder 11 and the inner cylinder 12.
Water stop means such as is provided. In addition, a partition plate 14 fixed orthogonally to the outer cylinder 11 and the inner cylinder 12 is provided in the skin plate 1a, and the shaft portion 15 of the cutter device 10 is mounted on the central axis of the partition plate 14. In the vicinity of the shield tail portion 1c, at predetermined intervals in the circumferential direction,
.. for propelling the shield machine 1 by applying a reaction force to the side surface of the segment 3a are fixed. In addition, a plurality of slits (not shown) extending in the axial direction of the penetrating ring 13 are formed at a predetermined interval in the circumferential direction at the tip of the penetrating ring 13 integrally formed in the cylindrical shape. It may have a degree of freedom of deformation so that it can easily penetrate into a penetration chamber described later.
第2のシールド機2には、前記第1のスキンプレート1
aと同径の円筒状に形成されたスキンプレート2aが設
けられ、このスキンプレート2aの先端部2bは、前記
第1のシールド機1の外筒11と同径の外筒21と、前
記内筒12と同径の内筒22とにより、二重に形成され
ることによって前記貫入リング13を貫入させるための
貫入室23を構成している。そして、この貫入室23内
にはシールド機2が推進する際に、貫入室23内に土砂
や礫等が詰まらないように、アスファルト,高分子樹脂
等の熱可塑性充填材(図示せず)を密に充填しておくと
ともに、前記熱可塑性充填材を囲むように電熱線等の加
熱手段を設けておく。スキンプレート2a内には外筒2
1と内筒22とに直交して固定された仕切板24が設け
られており、仕切板24の中心軸線上にはカッタ装置2
0の軸部25が取り付けられており、シールドテール部
2c付近に周方向所定間隔置きにセグメント3bの側面
に反力を取ってシールド機2を推進させる推進ジャッキ
26,26,・・・が固定された構成とされている。The second shield machine 2 includes the first skin plate 1
A cylindrical skin plate 2a having the same diameter as a is provided, and a tip portion 2b of the skin plate 2a has an outer cylinder 21 having the same diameter as the outer cylinder 11 of the first shield machine 1 and the inner shell 21a. The tube 12 and the inner tube 22 having the same diameter form a penetration chamber 23 for penetrating the penetration ring 13 by being doubled. A thermoplastic filler (not shown) such as asphalt or polymer resin is provided in the penetration chamber 23 so that the penetration chamber 23 is not clogged with soil, gravel or the like when the shield machine 2 is propelled. It is closely packed and a heating means such as a heating wire is provided so as to surround the thermoplastic filler. The outer cylinder 2 is inside the skin plate 2a.
1 and the inner cylinder 22 are provided with a partition plate 24 fixed orthogonally thereto, and the cutter device 2 is provided on the central axis of the partition plate 24.
0 shaft portion 25 is attached, and propulsion jacks 26, 26, ... for propelling the shield machine 2 by fixing reaction force to the side surface of the segment 3b at fixed intervals in the circumferential direction near the shield tail portion 2c are fixed. It has been configured.
さらに、前記第1及び第2のシールド機1,2の前部に
設けられたカッタ装置10,20は、その先端部に先端
刃10a,20aが外筒11及び21と内筒12及び2
2との間で径方向に伸縮自在に取り付けられているとと
もに、軸部15,25はスキンプレート1a及び2aの
中心軸線に沿って前後方向に移動自在な構成とされてお
り、仕切板14及び24には、第3図に示すように、シ
ールド機の前部に泥土を注入するための泥土注入用パイ
プ17,17及び27,27が取り付けられている。Further, in the cutter devices 10 and 20 provided at the front portions of the first and second shield machines 1 and 2, tip blades 10a and 20a are provided at outer ends of outer cutters 11 and 21 and inner cylinders 12 and 2, respectively.
The shaft portions 15 and 25 are configured to be movable in the front-rear direction along the central axis of the skin plates 1a and 2a, while being mounted to be expandable and contractible in the radial direction between the partition plate 14 and As shown in FIG. 3, pipes 17, 17 and 27, 27 for pouring mud for pouring mud into the front part of the shield machine are attached to 24.
つぎに、第1図ないし第6図を用いて本発明の地中接合
工法について説明する。Next, the underground joining method of the present invention will be described with reference to FIGS. 1 to 6.
(i)まず、第1図において右側から、第1のシールド機
1を用いてカッタ装置10により地山Gを掘削し、その
掘削した坑の壁面にセグメント3a,3a,・・・の覆
工を行い、このセグメント3a,3a,・・・に反力を
取って推進ジャッキ16,16,・・・を駆動させるこ
とによりシールド機1を推進させて一方のトンネルTa
を築造していく。これと同時に、第1図において左側か
ら、第2のシールド機2を用いてカッタ装置20により
地山Gを掘削し、その掘削した坑の壁面にセグメント3
b,3b,・・・の覆工を行い、このセグメント3b,
3b,・・・に反力を取って推進ジャッキ26,26,
・・・を駆動させることによりシールド機2を推進させ
て他方のトンネルTbを築造していく。その際、カッタ
装置10,20の伸縮自在な先端刃10a,20aを伸
長させて、このカッタ装置10,20が前記スキンプレ
ート1a,2aと少なくとも同径のトンネルを掘削でき
るようにする。(i) First, from the right side in FIG. 1, a ground device G is excavated by the cutter device 10 using the first shield machine 1, and the lining of the segments 3a, 3a, ... , And the reaction force is applied to the segments 3a, 3a, ... To drive the propulsion jacks 16, 16 ,.
To build. At the same time, from the left side in FIG. 1, the ground device G is excavated by the cutter device 20 using the second shield machine 2, and the segment 3 is formed on the wall surface of the excavated mine.
The lining of b, 3b, ...
3b, ...
Drives the shield machine 2 to build the other tunnel Tb. At this time, the retractable tip blades 10a, 20a of the cutter devices 10, 20 are extended so that the cutter devices 10, 20 can excavate a tunnel having at least the same diameter as the skin plates 1a, 2a.
(ii)次に、第2図に示すように、本トンネル掘削終了前
において、シールド機1とシールド機2とを所定間隔
(本実施例においては約10mの距離)lをおいて停止
させる。そして、第1のシールド機1の内部から第2の
シールド機2の前面に設けられた止水機能を有する受け
入れ部28に向けて鋼管29による水平ボーリングを行
い、鋼管29を第2のシールド機2の内部に貫入させ
る。そして、第1及び第2のシールド機1,2間に架設
した鋼管29の一端部(第1のシールド機1の内部)に
レーザー照準器30を設置するとともに、他端部に(第
2のシールド機2の内部)に受光器31を設置し、前記
レーザー照準器30から発振させたレーザー光を鋼管2
9内を通して受光器31により受光させ、前記発振点と
受光点及びシールド機の基準線との位置関係を測量する
ことにより第1のシールド機1と第2のシールド機2と
の相対位置を確認する。(ii) Next, as shown in FIG. 2, the shield machine 1 and the shield machine 2 are stopped at a predetermined interval (a distance of about 10 m in this embodiment) 1 before the end of the tunnel excavation. Then, horizontal boring is performed by the steel pipe 29 from the inside of the first shield machine 1 toward the receiving portion 28 provided on the front surface of the second shield machine 2 and having a water blocking function, and the steel pipe 29 is moved to the second shield machine. Insert into the inside of 2. Then, the laser sighting device 30 is installed at one end (inside the first shield machine 1) of the steel pipe 29 installed between the first and second shield machines 1 and 2, and at the other end (second The light receiver 31 is installed in the shield machine 2), and the laser light oscillated from the laser sighting device 30 is supplied to the steel tube 2
The relative position between the first shield machine 1 and the second shield machine 2 is confirmed by measuring the positional relationship between the oscillation point, the light receiving point, and the reference line of the shield machine by receiving light through the light receiver 31 through 9 To do.
なお、シールド機相互間の相対位置を確認する方法は、
前記鋼管29内にレーザーを通すことにより行う方法に
限定されることなく、鋼管29にレベル視線を通す等、
相対位置を確認できる方法であればなんでもよい。In addition, the method of confirming the relative position between shield machines is
It is not limited to a method of passing a laser through the steel pipe 29, and a level line of sight is passed through the steel pipe 29.
Any method can be used as long as the relative position can be confirmed.
(iii)第1及び第2のシールド機1,2の相対位置が確
認されると、前記鋼管29を引き抜いて撤去するととも
に、鋼管29の貫通孔を閉塞した後、第1のシールド機
1と第2のシールド機2とが所定の誤差範囲(本実施例
においては、シールド機1,2の中心軸線の平行移動誤
差=上下左右方向に5cm以内、中心軸線の成す角度=1
°以内)で向かい合うように、第2のシールド機2をシ
ールド機相互に残された距離lの間で方向制御を行いな
がら推進させ、第1のシールド機1と30cm〜1mの地
山Giを残して対向させる。(iii) When the relative positions of the first and second shield machines 1 and 2 are confirmed, the steel pipe 29 is pulled out and removed, and the through hole of the steel pipe 29 is closed, and then the first shield machine 1 is removed. A predetermined error range with the second shield machine 2 (in the present embodiment, the parallel movement error of the central axes of the shield machines 1 and 2 is within 5 cm in the vertical and horizontal directions, and the angle formed by the central axes is 1).
The second shield machine 2 is propelled so as to face each other within a distance l left between the shield machines while facing each other so as to face each other (within °), and the first shield machine 1 and the ground Gi of 30 cm to 1 m are struck. Leave them to face each other.
この工程において、第1及び第2のシールド機1,2の
相対位置を測定した結果、その誤差が大きなものであ
り、急激な方向修正が必要となった場合の第2のシール
ド機2の方向制御の手段としては、シールド機2のカッ
タ装置20の先端刃20aをスキンプレート2aの外径
より所定の長さだけ突出可能な構造として、スキンプレ
ート2aの外周部を余掘しながらそこへ作泥材を注入す
ることにより、スキンプレート2aの外周部を泥土で覆
った後、シールド機2を移動させたい側の泥土をスキン
プレート2a内に設けたポンプ(図示せず)により吸引
するとともに、反対側のスキンプレート2aの外側へ高
圧で排出してスキンプレート2aを移動させることによ
り、シールド機2の方向修正を行う。これによれば、通
常の方向制御では掘進しながらでないとできない方向修
正が、シールド機2を停止させた状態で可能となり、短
距離で大きな方向制御が可能であるとともに、中心軸線
に対して平行移動を行うことができる。As a result of measuring the relative positions of the first and second shield machines 1 and 2 in this step, the error is large, and the direction of the second shield machine 2 when a sudden direction correction is necessary. As a control means, the tip blade 20a of the cutter device 20 of the shield machine 2 has a structure capable of projecting by a predetermined length from the outer diameter of the skin plate 2a, and the outer peripheral portion of the skin plate 2a is dug into the outer blade of the same. By injecting mud material, the outer peripheral portion of the skin plate 2a is covered with mud, and then the mud on the side where the shield machine 2 is to be moved is sucked by a pump (not shown) provided in the skin plate 2a, The direction of the shield machine 2 is corrected by discharging the skin plate 2a at a high pressure to the outside of the skin plate 2a on the opposite side and moving the skin plate 2a. According to this, it is possible to correct the direction, which can only be done while proceeding with normal direction control, while the shield machine 2 is stopped, and it is possible to perform a large direction control in a short distance and to perform parallel direction to the central axis. You can move.
また、前記スキンプレート2aを前後に2分割し、それ
らをターンバックルを介したボルトにより連結した簡易
な中折れ機構(図示せず)を採用したり、組み立てるセ
グメント3bに、厚さを薄くした鋼製の薄型セグメント
(図示せず)を使用したりすることにより、さらに、シ
ールド機2の急激な方向修正を可能とし、第1のシール
ド機1との相対位置の誤差を縮めることができる。Further, the skin plate 2a is divided into front and rear parts, and a simple center bending mechanism (not shown) in which they are connected by a bolt via a turnbuckle is adopted, or the segment 3b to be assembled is made of thin steel. By using a thin segment (not shown) made of a product, the direction of the shield machine 2 can be rapidly corrected, and the error in the relative position with respect to the first shield machine 1 can be reduced.
(iv)つぎに、第2のシールド機2を第1のシールド機1
に対して、その相対位置を所定の誤差範囲内となるよう
に修正しながら近付けた後、30cm〜1m程度の地山G
iを残して対向させる。それから、第3図に示すよう
に、第1のシールド機1のカッタ装置10と第2のシー
ルド機2のカッタ装置20とを互いに逆向きに回転させ
ながら、注入管17及び27から切羽に対して泥土を注
入し、シールド機1,2間に残された地山Giの土砂や
礫を泥土に置換する。こうすることにより、シールド機
1,2間に礫等の障害物がなくなり、下記の工程で行
う、シールド機1,2をさらに近接させたり、貫入リン
グ13を貫入室23に貫入する作業を円滑かつ確実に行
うことが可能となる。(iv) Next, replace the second shield machine 2 with the first shield machine 1
Against this, the relative position is corrected to be within a predetermined error range and brought closer to the ground, and then a natural ground G of about 30 cm to 1 m
Face i, leaving i. Then, as shown in FIG. 3, while rotating the cutter device 10 of the first shield machine 1 and the cutter device 20 of the second shield machine 2 in mutually opposite directions, the injection pipes 17 and 27 with respect to the cutting face are rotated. To inject mud to replace earth and sand and gravel of the ground Gi left between the shield machines 1 and 2 with mud. By doing so, there are no obstacles such as gravel between the shield machines 1 and 2, and the work of bringing the shield machines 1 and 2 closer to each other or penetrating the penetrating ring 13 into the penetrating chamber 23 is performed smoothly in the following steps. And it becomes possible to perform reliably.
(v)つぎに、第4図に示すように、第1及び第2のシー
ルド機1,2のカッタ装置10,20の先端刃10a,
20aを縮めることにより、カッタ装置10,20の先
端をそれぞれ内筒12及び22の内径より僅かに短い状
態とした後、軸部15を第1のシールド機1の後方(紙
面に対して右側)に、また、軸部25を第2のシールド
機2の後方(紙面に対して左側)へスライドさせること
により、カッタ装置10を内筒12の内側に格納すると
ともに、カッタ装置20を内筒22の内側へ格納する。(v) Next, as shown in FIG. 4, the tip blades 10a of the cutter devices 10 and 20 of the first and second shield machines 1 and 2,
After the tips of the cutter devices 10 and 20 are made slightly shorter than the inner diameters of the inner cylinders 12 and 22, respectively, by shrinking the 20a, the shaft portion 15 is placed behind the first shield machine 1 (right side with respect to the paper surface). Further, by sliding the shaft portion 25 to the rear of the second shield machine 2 (on the left side with respect to the paper surface), the cutter device 10 is stored inside the inner cylinder 12, and the cutter device 20 is moved to the inner cylinder 22. Store inside.
(vi)カッタ装置10,20が内筒12,22内に格納さ
れると、推進ジャッキ26を駆動させることにより第2
のシールド機2をさらに推進させて、第1のシールド機
1との間の隙間が10cm以下となるように近接させた
後、第5図に示すように、第1のシールド機1の貫入リ
ング13を軸線に沿って摺動させることにより第2のシ
ールド機2の貫入室23内に順次差し込んで貫入させ
る。その際、貫入リング13を貫入室23内に貫入させ
る前に、シールド機2が推進するときに貫入室23内に
土砂や礫等が詰まらないように設けた熱可塑性充填材
を、加熱手段により加熱して軟化させることにより、貫
入リング13の貫入を円滑に行うようにする。貫入リン
グ13が貫入された後には、前記熱可塑性充填材が自然
冷却により再び硬化し、貫入部分の止水効果を高めるこ
とができる。(vi) When the cutter devices 10 and 20 are housed in the inner cylinders 12 and 22, the propulsion jack 26 is driven to drive the second device.
After further advancing the shield machine 2 of the first shield machine 2 so that the clearance between the shield machine 2 and the first shield machine 1 is close to 10 cm or less, as shown in FIG. By sliding 13 along the axis, it is sequentially inserted into the penetration chamber 23 of the second shield machine 2 and allowed to penetrate. At that time, before the penetration ring 13 is penetrated into the penetration chamber 23, a thermoplastic filler provided so as not to be clogged with dirt, gravel and the like in the penetration chamber 23 when the shield machine 2 is propelled by the heating means. By heating and softening, the penetration of the penetration ring 13 is performed smoothly. After the penetration ring 13 is penetrated, the thermoplastic filler is hardened again by natural cooling, and the water blocking effect of the penetration portion can be enhanced.
なお、貫入室23内に貫入リング13を貫入する方法と
しては、前記実施例の方法に限定されることなく、貫入
室23内部にその中を密接状態で軸線方向に沿って摺動
可能な、リング形ないし分割されたリング形のピストン
部材(図示せず)を設け、このピストン部材をシールド
機内に設けたジャッキ(図示せず)によってロツド(図
示せず)を介して貫入室内で往復駆動させて、貫入室2
3内に詰まった土砂や礫等を外に排出することにより空
間部を確保した後、貫入リング13を貫入する方法や、
貫入リング13の先端部に高圧ジェットノズル(図示せ
ず)を装備しておき、貫入室23内に差し込む際には、
前記ノズルから高圧ジェットを噴射しながら貫入室23
内の土砂や礫を吹き飛ばして、貫入室23内の空間を確
保しながら貫入リング13を貫入する方法である。これ
らの方法を用いる際には、貫入室23内に所定の方法に
より薬液注入を行って止水を施すようにする。It should be noted that the method of penetrating the penetrating ring 13 into the penetrating chamber 23 is not limited to the method of the above-described embodiment, and the inside of the penetrating chamber 23 can be slid along the axial direction in a close contact state, A ring-shaped or divided ring-shaped piston member (not shown) is provided, and this piston member is reciprocally driven in the penetration chamber via a rod (not shown) by a jack (not shown) provided in the shield machine. The penetration room 2
Method to penetrate the penetration ring 13 after securing the space by discharging the earth and sand and gravel etc.
A high pressure jet nozzle (not shown) is provided at the tip of the penetration ring 13, and when the high pressure jet nozzle is inserted into the penetration chamber 23,
Penetration chamber 23 while ejecting a high-pressure jet from the nozzle
This is a method in which the sand and gravel inside are blown away and the penetration ring 13 is penetrated while ensuring the space inside the penetration chamber 23. When using these methods, a chemical solution is injected into the penetration chamber 23 by a predetermined method to stop the water.
また、前記貫入リング13を貫入室23に向けて移動さ
せる貫入リングの駆動装置としては、最初からシールド
機1内に専用の押出ジャッキを設けておき、それによっ
て駆動させるようにしてもよいが、本実施例において
は、貫入リング13を駆動させる時点で、貫入リング1
3の後端部の周方向所定間隔毎に固定しておいたロッド
(図示せず)に、それと対応するようにスキンプレート
1a内の周方向の所定間隔毎にセンターホールジャッキ
32,32,・・・を取り付け、これによってロッド3
3,33,・・・を継ぎ足しながら順次貫入リング13
を押出すようにする。この装置を用いることにより、高
価な押出ジャッキを使い捨てにすることがなく、さら
に、推進ジャッキ16,16,・・・を取り外した後の
空間部分に取り付けるようにすれば、その分シールド機
1のスキンプレート1aの長さを短縮することが可能と
なり、大幅なコストダウンを図ることができるととも
に、シールド機1の方向制御が容易となる。Further, as a drive device for the penetration ring that moves the penetration ring 13 toward the penetration chamber 23, a dedicated push jack may be provided in the shield machine 1 from the beginning, and it may be driven by it. In this embodiment, the penetration ring 1 is driven when the penetration ring 13 is driven.
The center hole jacks 32, 32, 32 are fixed to the rods (not shown) fixed at the rear end portions of the rear end portion 3 at predetermined intervals in the circumferential direction at predetermined intervals in the circumferential direction in the skin plate 1a. ..Attached, which allows rod 3
Penetration ring 13 in sequence while adding 3, 33, ...
To be extruded. By using this device, the expensive push jack is not made disposable, and if the propelling jacks 16, 16, ... The length of the skin plate 1a can be shortened, the cost can be greatly reduced, and the direction control of the shield machine 1 can be facilitated.
(vii)貫入リング13が貫入室23内に貫入されてシー
ルド機1,2間に残された接合部の地山Giを覆った後
には、貫入リング13とスキンプレート1a,2aの前
部1b,2bとの間に薬液注入を行って十分に止水を施
す。そして、第6図に示すように、シールド機1,2を
スキンプレート1a,2aを残したまま解体した後、貫
入リング13と内筒12,22とを溶接により隙間なく
一体化し、ついで、スキンプレート1a,2aの内側
に、トンネルTa,Tbへ施した二次覆工のコンクリー
トCの打設面と面一になるように、コンクリートCSを
打設することにより接合部の覆工を行う。(vii) After the penetration ring 13 penetrates into the penetration chamber 23 and covers the ground Gi of the joint left between the shield machines 1 and 2, the penetration ring 13 and the front portion 1b of the skin plates 1a and 2a are covered. , 2b to inject a chemical solution to sufficiently stop the water. Then, as shown in FIG. 6, the shield machines 1 and 2 are disassembled with the skin plates 1a and 2a left, and then the penetration ring 13 and the inner cylinders 12 and 22 are integrated by welding without a gap. plate 1a, the inner side of the 2a, so that the tunnel Ta, hitting設面flush concrete C in the secondary lining subjected to Tb, performs lining of the joint by pouring a concrete C S .
したがって、本工法を用いることにより、地中において
接合前に第1のシールド機1と第2のシールド機2との
相対位置を正確に確認した後、第2のシールド機2を所
定の誤差範囲内で確実に第1のシールド機1に接近させ
ることができ、貫入リング13を貫入室23に確実に貫
入してシールド機1,2を接合することができ、接合部
の地山Giをスキンプレート1a,2aおよび貫入リン
グ13により完全に覆うことができ、凍結工法等の補助
工法を用いることなく、安全かつ確実にトンネルの接続
作業を行うことができ、工期の大幅な短縮や工費の大幅
削減を実現することができる。Therefore, by using this method, the relative position between the first shield machine 1 and the second shield machine 2 is accurately confirmed before joining in the ground, and then the second shield machine 2 is moved to a predetermined error range. It is possible to reliably approach the first shield machine 1 inside, to securely penetrate the penetration ring 13 into the penetration chamber 23, and to bond the shield machines 1 and 2, and to skin the ground Gi of the joint part. It can be completely covered with the plates 1a and 2a and the penetration ring 13, and the tunnel connection work can be performed safely and reliably without using an auxiliary construction method such as a freezing construction method, which greatly shortens the construction period and greatly reduces the construction cost. Reductions can be realized.
なお、前記実施例においては、シールド機1,2を接近
させる際に、第2のシールド機2を方向制御を行いなが
ら近付けたが、それに限らず、第2のシールド機2を停
止させておき、そこへ所定の装備を施した第1のシール
ド機1を方向制御を行いながら近接させるようにしても
良い。In addition, in the said Example, when approaching the shield machines 1 and 2, the 2nd shield machine 2 was approached, carrying out direction control, However, It is not restricted to that, and the 2nd shield machine 2 is stopped. Alternatively, the first shield machine 1 provided with predetermined equipment may be brought close thereto while performing direction control.
「発明の効果」 以上説明したようにこの発明は、外筒と内筒との間に貫
入リングが格納されている第1のシールド機及び外筒と
内筒とにより構成された貫入室を有する第2のシールド
機を1組として両側からトンネルを掘削し、このトンネ
ル掘削工程終了前に所定間隔をおいてシールド機を停止
させるとともに、シールド機相互間に鋼管による水平ボ
ウリングを行なって相対位置を確認した後、一方のシー
ルド機を方向修正を行いながら推進させ、次いで、貫入
リングを貫入室内に貫入することによりシールド機間に
残されたトンネル接合部の地山を覆った後、スキンプレ
ートを残したままシールド機を解体してトンネルを接合
し、次いでスキンプレートの内面にコンクリートを打設
して接合部の壁面を覆工するようにしたものであるの
で、両側から掘進してきた2台のシールド機の相対位置
を地中において正確に確認できるとともに、所定の寸法
誤差範囲内で確実に近接させることができ、貫入リング
を貫入室内に貫入することによりトンネル接合部付近の
地山をスキンプレートもよって完全に覆うことができ、
シールド機の接合部に作用する止水圧に対する土留や止
水を確実なものとし、凍結工法等の補助工法を用いるこ
となく、接合作業を安全に行うことができると共に、ト
ンネルの地中接合工事に要する工期を大幅に短縮し、か
つ工費を大幅に低減することができる。[Advantages of the Invention] As described above, the present invention has the first shield machine in which the penetration ring is housed between the outer cylinder and the inner cylinder, and the penetration chamber constituted by the outer cylinder and the inner cylinder. A tunnel is excavated from both sides with the second shield machine as a set, the shield machine is stopped at a predetermined interval before the tunnel excavation process is completed, and horizontal bowling with a steel pipe is performed between the shield machines to determine the relative position. After checking, propel one shield machine while correcting the direction, then cover the ground of the tunnel junction left between the shield machines by penetrating the penetration ring into the penetration chamber, and then remove the skin plate. Since the shield machine was dismantled while leaving it, the tunnel was joined, then concrete was placed on the inner surface of the skin plate to cover the wall surface of the joint, The relative position of two shield machines excavated from both sides can be accurately confirmed in the ground, and they can be surely brought close to each other within a predetermined dimensional error range. Tunnel penetration is achieved by penetrating the penetration ring into the penetration chamber. You can completely cover the ground near the part with a skin plate,
Secures soil retention and water stop against the water stop pressure that acts on the joint of the shield machine, and can safely perform the joint work without using auxiliary construction methods such as freezing construction method and underground tunnel joint work The required construction period can be greatly shortened and the construction cost can be greatly reduced.
第1図ないし第6図はこの発明のシールド・トンネルの
地中接合工法の一実施例を説明するためのものであり、
第1図は地中を2台のシールド機によって両側から掘進
することによって築造されたトンネルの側断面図、第2
図は所定間隔をおいてシールド機を停止させてそれらの
相対位置を確認しているところを示すトンネルの側断面
図、第3図はシールド機間の地山の地盤改良を施してい
るところを示すトンネルの側断面図、第4図はシールド
機のカッタ装置を縮めているところを示すトンネルの側
断面図、第5図は貫入リングによりシールド機を接続し
地山を覆っているところを示すトンネルの側断面図、第
6図はシールド機を解体してトンネルを貫通させて完成
させたところを示すトンネルの側断面図、第7図は従来
の技術を示すトンネルの側断面図である。 G……地山、Gi……トンネル接合部地山、Ta,Tb
……トンネル、1……第1のシールド機、2……第2の
シールド機、1a,2a……スキンプレート、1b,2
b……スキンプレート先端部、1c,2c……シールド
テール部、3a,3b……セグメント、10,20……
カッタ装置、10a,20a……先端刃、11,21…
…外筒、12,22……内筒、13……貫入リング、1
6,26……推進ジャッキ、23……貫入室、29……
鋼管、Cs,C……コンクリート。1 to 6 are for explaining an embodiment of the underground joining method for the shield tunnel of the present invention,
Fig. 1 is a side sectional view of a tunnel constructed by excavating the ground by two shield machines from both sides.
The figure shows a cross-sectional side view of the tunnel showing the shield machines being stopped at a predetermined interval and checking their relative positions. Figure 3 shows the ground improvement of the ground between the shield machines. Fig. 4 is a side sectional view of the tunnel shown in Fig. 4, Fig. 4 is a sectional side view of the tunnel showing the cutter device of the shield machine contracted, and Fig. 5 shows the shield machine connected by a penetration ring to cover the ground. FIG. 6 is a side sectional view of the tunnel showing a state where the shield machine is disassembled and the tunnel is penetrated to complete the tunnel machine, and FIG. 7 is a side sectional view of the tunnel showing the conventional technique. G ... Ground, Gi ... Tunnel junction ground, Ta, Tb
...... Tunnel, 1 ... First shield machine, 2 ... Second shield machine, 1a, 2a ... Skin plate, 1b, 2
b ... Skin plate tip, 1c, 2c ... Shield tail, 3a, 3b ... Segment, 10, 20 ...
Cutter device, 10a, 20a ... Tip blades 11, 21, ...
... outer cylinder, 12,22 ... inner cylinder, 13 ... penetration ring, 1
6,26 …… Propulsion jack, 23 …… Penetration room, 29 ……
Steel pipe, C s, C ...... concrete.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 宮沢 和夫 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 本多 章浩 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 久保 裕之 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 荒井 久雄 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 土屋 信洋 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 中川 孝雄 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 清水 良彦 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 東 洋二 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kazuo Miyazawa 2-16-1 Kyobashi, Chuo-ku, Tokyo Within Shimizu Construction Co., Ltd. (72) Inventor Akihiro Honda 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hiroyuki Kubo 2-161-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hisao Arai 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Ken Incorporated Co., Ltd. (72) Inventor Nobuhiro Tsuchiya 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Corporation Incorporated (72) Inventor Takao Nakagawa 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction In-house (72) Inventor Yoshihiko Shimizu 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Yoji Toyoji 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Stock Association The inner
Claims (1)
掘削しつつ、内部で1次覆工用のセグメントを組み立て
ながら地中を推進させるシールド掘進機を2台用い、築
造すべきトンネルの両端側からそれぞれトンネルを掘削
してそれらを途中で接合することによりトンネルを完成
させる際のシールド・トンネルの地中接合工法であっ
て、スキンプレートの先端部が外筒と内筒とにより二重
に形成されていると共に前記外筒及び内筒の間に貫入リ
ングが格納されている第1のシールド機及びスキンプレ
ートの先端部が前記第1のシールド機と同径の外筒と内
筒とにより二重に形成されることによって構成される貫
入室を有する第2のシールド機を1組として両側からト
ンネルを掘削し、このトンネル掘削工程終了前におい
て、前記第1のシールド機と第2のシールド機とを所定
間隔をおいて停止させるとともに、この第1のシールド
機と第2のシールド機との間に鋼管による水平ボウリン
グを行なって相対位置を確認した後、前記少なくとも一
方のシールド機を方向制御を行いながら他方のシールド
機の直前まで推進させ、次いで、前記第1のシールド機
の貫入リングを前方に摺動させて第2のシールド機の貫
入室内に貫入することにより第1及び第2のシールド機
の間に残されたトンネル接合部の地山を覆った後、前記
第1及び第2のシールド機のスキンプレートを残したま
まシールド機を解体してトンネルを接合し、次いで前記
スキンプレートの内面にコンクリートを打設して前記接
合部の壁面を覆工することを特徴とするシールド・トン
ネルの地中接合工法。1. A tunnel to be built by using two shield excavators that excavate the ground by a cutter device provided in the front part and propel the ground while assembling the segments for the primary lining inside. This is a method of underground joining of shield tunnels when tunnels are completed by excavating tunnels from both ends and joining them in the middle, and the tip of the skin plate consists of an outer cylinder and an inner cylinder. A first shield machine having a heavy weight and a penetrating ring housed between the outer cylinder and the inner cylinder, and an outer cylinder and an inner cylinder in which the tip end of the skin plate has the same diameter as that of the first shield machine. A tunnel is excavated from both sides with a second shield machine having a penetrating chamber configured by being double-formed by and the first seal before completion of the tunnel excavation process. The machine and the second shield machine are stopped at a predetermined interval, and horizontal bowling with a steel pipe is performed between the first shield machine and the second shield machine to confirm the relative position. Propulsing one shield machine to the position immediately before the other shield machine while controlling the direction, and then sliding the penetration ring of the first shield machine forward to penetrate into the penetration chamber of the second shield machine. After covering the ground of the tunnel junction left between the first and second shield machines by, dismantling the shield machine while leaving the skin plates of the first and second shield machines, and constructing the tunnel. An underground joining method for a shield tunnel, which comprises joining and then placing concrete on the inner surface of the skin plate to cover the wall surface of the joining portion.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16597886A JPH064998B2 (en) | 1986-07-15 | 1986-07-15 | Underground joining method for shield tunnel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16597886A JPH064998B2 (en) | 1986-07-15 | 1986-07-15 | Underground joining method for shield tunnel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6322994A JPS6322994A (en) | 1988-01-30 |
| JPH064998B2 true JPH064998B2 (en) | 1994-01-19 |
Family
ID=15822607
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16597886A Expired - Lifetime JPH064998B2 (en) | 1986-07-15 | 1986-07-15 | Underground joining method for shield tunnel |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH064998B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002364284A (en) * | 2001-06-07 | 2002-12-18 | Nishimatsu Constr Co Ltd | Excavator and excavation method |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2639444B2 (en) * | 1988-11-25 | 1997-08-13 | 清水建設株式会社 | Underground joining method and underground joining equipment for shield tunnel |
-
1986
- 1986-07-15 JP JP16597886A patent/JPH064998B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002364284A (en) * | 2001-06-07 | 2002-12-18 | Nishimatsu Constr Co Ltd | Excavator and excavation method |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6322994A (en) | 1988-01-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2683515B2 (en) | Male / female joint of earth retaining pipe, connecting device, and method for forming mountain retaining wall using earth retaining pipe | |
| JP2942874B2 (en) | How to join tunnels | |
| JP2663106B2 (en) | Construction method of outer wall of propulsion pipe and large cavity | |
| JPS6322994A (en) | Method of underground joining construction of shield-tunnel | |
| JP2612771B2 (en) | Underground joining method of different diameter shield tunnel | |
| JP2766352B2 (en) | Shield machine | |
| JP2950166B2 (en) | Starting method of shield machine from existing tunnel | |
| JP3948578B2 (en) | Rock tunneling machine | |
| KR102686751B1 (en) | Tbm . | |
| JPH0369438B2 (en) | ||
| JPH0518184A (en) | Underground shield machine and tunnel joining method | |
| JPH0423994Y2 (en) | ||
| JP2005146711A (en) | Shield excavator for branch tunnel construction | |
| JPH0588349B2 (en) | ||
| JPH0369439B2 (en) | ||
| JP3811482B2 (en) | Shield tunnel joining method | |
| JPH01137094A (en) | Method of excavation construction of tunnel, etc. and injector used for said method of construction | |
| JP2003049596A (en) | Tunnel construction method with widened part | |
| JPH0774588B2 (en) | Underground tunnel joint method | |
| JPH0791941B2 (en) | Underground joining method of shield tunnel and its shield machine | |
| JP2966173B2 (en) | Tunnel excavation ground reinforcement method | |
| JPH064999B2 (en) | Structure of penetration room of underground joint type shield machine | |
| JPS62258093A (en) | Underground connection method for shield tunnel | |
| JPS62276193A (en) | Method of underground junction construction of shield-tunnel | |
| JPH0633714B2 (en) | Underground joining method for shield tunnel and its equipment |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |