JPH0655372A - Bearing press-fitting method and device therefor - Google Patents

Bearing press-fitting method and device therefor

Info

Publication number
JPH0655372A
JPH0655372A JP23289992A JP23289992A JPH0655372A JP H0655372 A JPH0655372 A JP H0655372A JP 23289992 A JP23289992 A JP 23289992A JP 23289992 A JP23289992 A JP 23289992A JP H0655372 A JPH0655372 A JP H0655372A
Authority
JP
Japan
Prior art keywords
press
fitting
metal
bearing
housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23289992A
Other languages
Japanese (ja)
Inventor
Masakatsu Kimura
正勝 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsuba Corp
Original Assignee
Mitsuba Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsuba Electric Manufacturing Co Ltd filed Critical Mitsuba Electric Manufacturing Co Ltd
Priority to JP23289992A priority Critical patent/JPH0655372A/en
Publication of JPH0655372A publication Critical patent/JPH0655372A/en
Pending legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)
  • Mounting Of Bearings Or Others (AREA)

Abstract

PURPOSE:To support press-fitting load by a reaction receiving means on the outside surface of a housing regardless of the dispersion of the outside dimension of the housing. CONSTITUTION:After a housing is positioned by holding a fixed shaft 10 by a holding means 29, a reaction receiving means 39 in constant contact with the slant face 32a of a wedge 32 is brought into contact with the outside surface of the housing 1 by sliding the wedge 32 by a cylinder device 31a. The back face of the reaction receiving means 39 is connected to a stand 30 through the wedge 32. The press-fitting load at the time of press-fitting metals 5, 6 into the housing is supported by the reaction receiving means 39 on the outer surface of the housing 1. The housing 1 is thereby supported always appropriately by the reaction receiving means 39 so as to heighten press-fitting accuracy. Also, since the reaction receiving means 39 is automatically brought into contact with the outside surface of the housing 1, press-fitting work can be automated.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、軸受圧入方法に関し、
特に、軸受ハウジングに軸受を圧入する際の反力を受け
るための技術に係り、例えば、オートバイや自動車に搭
載される各種の回転駆動装置におけるギヤハウジングへ
の軸受メタルやボールベアリング等の組付工程に利用し
て有効な技術に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bearing press-fitting method,
In particular, it relates to a technique for receiving a reaction force when the bearing is press-fitted into the bearing housing, and for example, a process of assembling a bearing metal or a ball bearing to a gear housing in various rotary drive devices mounted on a motorcycle or an automobile Related to effective technology.

【0002】[0002]

【従来の技術】一般に、オートバイや自動車には各種の
電装品が搭載され、これら電装品を駆動するのにウオー
ム減速装置付きモータが使用されている。このウオーム
減速装置付きモータにおいては、ウオーム軸を回転自在
に支承するための軸受メタルが2個、ギヤハウジングの
同一軸線上にそれぞれ配されて圧入によって固定されて
いる。
2. Description of the Related Art Generally, various electric components are mounted on motorcycles and automobiles, and a motor with a worm speed reducer is used to drive these electric components. In this motor with a worm speed reducer, two bearing metals for rotatably supporting the worm shaft are arranged on the same axis of the gear housing and fixed by press fitting.

【0003】このような軸受ハウジングに2個の軸受メ
タルを圧入する軸受圧入方法として、従来、次のような
方法がある。
Conventionally, as a method of press-fitting two bearing metals into such a bearing housing, there is the following method.

【0004】まず、第1軸受メタルが圧入される圧入孔
と、外径が第1軸受メタルの外径よりも若干小径の第2
軸受メタルが圧入される圧入穴とが軸受ハウジングの同
一軸線上にそれぞれ開設される。一方、第1軸受メタル
と第2軸受メタルとが棒状に形成された圧入治具の外周
にそれぞれ嵌合される。そして、この圧入治具が軸受ハ
ウジングの圧入孔および圧入穴に、前記第2軸受メタル
嵌合側を先にして圧入孔側から前記軸線に沿って挿入さ
れて行く。この挿入に伴って、圧入孔に第1軸受メタル
が、圧入穴に第2軸受メタルが1行程にてそれぞれ圧入
される。
First, the press-fitting hole into which the first bearing metal is press-fitted, and the second diameter whose outer diameter is slightly smaller than the outer diameter of the first bearing metal.
A press-fitting hole into which the bearing metal is press-fitted is formed on the same axis of the bearing housing. On the other hand, the first bearing metal and the second bearing metal are fitted to the outer circumference of a press-fitting jig formed in a rod shape. Then, the press-fitting jig is inserted into the press-fitting hole and the press-fitting hole of the bearing housing from the press-fitting hole side along the axis line with the second bearing metal fitting side first. With this insertion, the first bearing metal is press-fitted into the press-fitting hole and the second bearing metal is press-fitted into the press-fitting hole in one stroke.

【0005】そして、この従来の軸受圧入方法において
は、第1軸受メタルの圧入孔への圧入と、第2軸受メタ
ルの圧入穴への圧入とが同時に開始し、かつ、同時に終
了するようになっている。このため、軸受ハウジングは
圧入治具のストロークに対して精度よく位置決めさせる
必要がある。
In this conventional bearing press-fitting method, the press-fitting of the first bearing metal into the press-fitting hole and the press-fitting of the second bearing metal into the press-fitting hole start and end at the same time. ing. Therefore, the bearing housing needs to be accurately positioned with respect to the stroke of the press fitting jig.

【0006】他方、軸受ハウジングはアルミダイキャス
トによって一体成形されるため、その外形寸法には成形
製品毎にばらつきが発生してしまう。したがって、軸受
ハウジングの外面に反力受け具を直接当接させて、圧入
治具による圧入荷重を受けるように構成したのでは、軸
受ハウジングを圧入治具のストロークに対して精度よく
位置決めすることができない。
On the other hand, since the bearing housing is integrally molded by aluminum die casting, the outer dimensions of the bearing housing vary from one molded product to another. Therefore, if the reaction force receiver is directly contacted with the outer surface of the bearing housing to receive the press-fitting load by the press-fitting jig, the bearing housing can be accurately positioned with respect to the stroke of the press-fitting jig. Can not.

【0007】そこで、従来は、軸受圧入方法のワークで
ある軸受ハウジングが軸受圧入作業専用の治具に装着さ
れた後、各製品毎の寸法ばらつきに対応した位置調整作
業が作業者の手作業によって実施され、この専用治具の
外面に反力受け具が当接されることにより、圧入荷重に
抗する反力と、前記圧入治具のストロークに対する軸受
ハウジングの位置精度とが確保されている。
Therefore, conventionally, after the bearing housing, which is the work of the bearing press-fitting method, is mounted on the jig dedicated to the bearing press-fitting work, the position adjustment work corresponding to the dimensional variation of each product is manually performed by the operator. Since the reaction force receiver is brought into contact with the outer surface of the dedicated jig, the reaction force against the press-fitting load and the positional accuracy of the bearing housing with respect to the stroke of the press-fitting jig are ensured.

【0008】[0008]

【発明が解決しようとする課題】しかしながら、従来の
軸受圧入方法においては、作業者による位置調整作業が
介在するため、作業能率が低下し、軸受圧入方法を自動
化することができないという不具合がある。
However, in the conventional bearing press-fitting method, there is a problem that the work efficiency is lowered and the bearing press-fitting method cannot be automated because position adjustment work by an operator is involved.

【0009】本発明の目的は、軸受ハウジングの寸法ば
らつきを吸収して、軸受ハウジングを常に一定の状態で
支えることができる軸受圧入技術を提供することにあ
る。
It is an object of the present invention to provide a bearing press-fitting technique capable of absorbing the dimensional variation of the bearing housing and always supporting the bearing housing in a constant state.

【0010】[0010]

【課題を解決するための手段】本発明に係る軸受圧入方
法は、軸受ハウジングの雌部に軸受が一方向から圧入さ
れる軸受圧入方法において、前記軸受ハウジングが位置
決めされた後、反力受け具がこの軸受ハウジングの外面
における前記軸受圧入方向延長線上の位置に、圧入方向
の向きと反対向きに移動されて当接されるとともに、こ
の反力受け具が軸受ハウジング当接面と反力側の固定構
造物に反力を求めるように連結されることを特徴とす
る。
A bearing press-fitting method according to the present invention is a bearing press-fitting method in which a bearing is press-fitted into a female part of a bearing housing from one direction, and after the bearing housing is positioned, a reaction force receiver Is moved and abutted at a position on the extension line of the bearing press-fitting direction on the outer surface of the bearing housing in a direction opposite to the direction of the press-fitting direction, and the reaction force receiving member is provided on the bearing housing abutment surface and the reaction force side. It is characterized in that it is connected to the fixed structure so as to obtain a reaction force.

【0011】[0011]

【作用】前記した手段によれば、軸受ハウジングの位置
決め後、軸受ハウジング毎の外形寸法のばらつきによっ
て、軸受ハウジングの外面と反力受け具との間に隙間が
発生しても、反力受け具はその隙間を解消する方向に移
動することにより、軸受ハウジングの外面に当接するこ
とになる。したがって、外形寸法のばらつきはこの反力
受け具の移動によって、軸受ハウジング毎にその都度自
動的に吸収されることになる。
According to the above-mentioned means, even if a gap is generated between the outer surface of the bearing housing and the reaction force receiving member after the positioning of the bearing housing due to the variation of the outer dimensions of the bearing housing, the reaction force receiving member. By moving in the direction of eliminating the gap, the abuts against the outer surface of the bearing housing. Therefore, the variation of the outer dimensions is automatically absorbed by the movement of the reaction force receiving device for each bearing housing.

【0012】このようにして反力受け具が軸受ハウジン
グの外面に常に当接した状態になるため、軸受ハウジン
グへの軸受の圧入時に軸受ハウジングに作用する荷重
は、軸受ハウジングに直接当接された反力受け具によっ
て適正に支えられることになる。したがって、軸受は軸
受ハウジングに適正に圧入される。
Since the reaction force receiving member is always in contact with the outer surface of the bearing housing in this way, the load acting on the bearing housing when the bearing is pressed into the bearing housing is directly contacted with the bearing housing. It will be properly supported by the reaction force receiver. Therefore, the bearing is properly pressed into the bearing housing.

【0013】[0013]

【実施例】図1は本発明の一実施例である軸受圧入装置
の要部の作用を説明するための正面断面図、図2はその
全体を示す一部切断正面図、図3はそのワーク保持装置
を示す一部切断正面図、図4は圧入治具案内装置および
駆動装置を示す一部切断正面図、図5はワーク保持装置
の要部を示す一部切断正面図、図6は圧入治具案内装置
の要部を示す正面断面図、図7は作用を説明するための
線図である。図8はワークを示す図であり、(a)は正
面断面図、(b)は側面図、(c)は平面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a front sectional view for explaining the operation of a main part of a bearing press-fitting device according to an embodiment of the present invention, FIG. 2 is a partially cut front view showing the whole, and FIG. FIG. 4 is a partially cut front view showing a holding device, FIG. 4 is a partially cut front view showing a press-fitting jig guiding device and a driving device, FIG. 5 is a partially cut front view showing a main part of a work holding device, and FIG. FIG. 7 is a front sectional view showing a main part of the jig guiding device, and FIG. 7 is a diagram for explaining the operation. 8A and 8B are views showing a work. FIG. 8A is a front sectional view, FIG. 8B is a side view, and FIG. 8C is a plan view.

【0014】本実施例において、本発明に係る軸受圧入
装置は、自動車の電装品を駆動するウオーム減速装置付
きモータのギヤハウジング(以下、ハウジングとい
う。)に、ウオーム軸を回転自在に支承するための軸受
メタル(以下、メタルという。)を2個、1ストローク
にてそれぞれ圧入するメタル圧入方法を実施するものと
して構成されている。
In the present embodiment, the bearing press-fitting device according to the present invention rotatably supports the worm shaft in the gear housing (hereinafter referred to as housing) of the motor with the worm speed reducer for driving the electric components of the automobile. The two metal bearings (hereinafter referred to as "metals") are each press-fitted in one stroke to perform a metal press-fitting method.

【0015】本実施例に係るハウジングは図8に示され
ているように構成されている。このハウジング1はアル
ミダイキャスト法によって、一体成形された本体2を備
えており、この本体2は平面視が略長方形の上面が開口
した箱形状に形成されている。本体2の短辺に位置する
一対の側壁部には、第1雌部としての圧入孔3および第
2雌部としての圧入穴4が同一軸線上にそれぞれ配され
て開設されており、圧入孔3には第1メタル5が、圧入
穴4には第2メタル6がそれぞれ圧入されるようになっ
ている。
The housing according to this embodiment is constructed as shown in FIG. The housing 1 is provided with a main body 2 integrally formed by an aluminum die casting method, and the main body 2 is formed in a box shape having a substantially rectangular upper surface with an open upper surface. A pair of side wall portions located on the short sides of the main body 2 are provided with a press-fitting hole 3 as a first female part and a press-fitting hole 4 as a second female part arranged on the same axis, respectively. A first metal 5 is press-fitted in 3 and a second metal 6 is press-fitted in the press-fitting hole 4.

【0016】圧入孔3は両端が開口した円柱形の中空形
状に形成されており、その内径は第1メタル5の外径と
等しくなるように設定されている。圧入穴4は圧入孔3
側の一端(以下、右端とする。)が開口し左端が閉じた
円柱形の中空形状に形成されている。圧入穴4の内径は
第2メタル6の外径と等しくなるように、かつ、圧入孔
3の内径よりも小径になるように設定されている。した
がって、第1メタル5の外径は第2メタル6の外径より
も大径に設定されていることになる。
The press-fitting hole 3 is formed in a hollow cylindrical shape with both ends open, and its inner diameter is set to be equal to the outer diameter of the first metal 5. Press-fit hole 4 is press-fit hole 3
One side (hereinafter, referred to as the right end) on the side is opened and the left end is closed to form a hollow cylindrical shape. The inner diameter of the press-fitting hole 4 is set to be equal to the outer diameter of the second metal 6 and smaller than the inner diameter of the press-fitting hole 3. Therefore, the outer diameter of the first metal 5 is set to be larger than the outer diameter of the second metal 6.

【0017】本実施例において、圧入孔3における圧入
の入口側端である右端から、圧入穴4における圧入の入
口側端である右端までの距離L2 は、後記する圧入治具
に嵌合された第1メタル5の圧入側先端である左端か
ら、第2メタル6の圧入側先端である左端までの距離L
1 よりも、第1メタル5の長さの1/2〜1/5程度、
長くなるように設定されている。
In the present embodiment, the distance L 2 from the right end which is the inlet side end of the press-fitting hole 3 to the right end which is the inlet side end of the press-fitting hole 4 is fitted to the press-fitting jig described later. The distance L from the left end, which is the press-fitting side end of the first metal 5, to the left end, which is the press-fitting side end of the second metal 6.
1 to about 1/2 to 1/5 of the length of the first metal 5,
It is set to be long.

【0018】なお、ハウジング本体2の圧入孔3と圧入
穴4との間に形成された円形中空室によって、ウオーム
ホイール(図示せず)を収容するための収容室7が構成
されている。また、ハウジング本体2における圧入孔3
の右脇にはモータ(図示せず)を連結するための取付部
8が形成されている。さらに、ハウジング本体2におけ
る開口面には垂直圧入穴9が、圧入孔3と圧入穴4との
軸線と直角に延在するように開設されており、この垂直
圧入穴9には後記する固定軸10が圧入されるようにな
っている。そして、この垂直圧入穴9および圧入孔3、
圧入穴4は所定の公差範囲内で精度よく製作されている
ため、メタル圧入作業に際して基準位置として使用され
ることになる。
It should be noted that the circular hollow chamber formed between the press-fitting hole 3 and the press-fitting hole 4 of the housing body 2 constitutes a storage chamber 7 for storing a worm wheel (not shown). In addition, the press-fitting hole 3 in the housing body 2
A mounting portion 8 for connecting a motor (not shown) is formed on the right side of the. Further, a vertical press-fitting hole 9 is formed in the opening surface of the housing body 2 so as to extend at a right angle to the axis of the press-fitting hole 3 and the press-fitting hole 4, and the vertical press-fitting hole 9 has a fixed shaft described later. 10 is press-fitted. Then, the vertical press-fitting hole 9 and the press-fitting hole 3,
Since the press-fitting hole 4 is accurately manufactured within a predetermined tolerance range, it will be used as a reference position for metal press-fitting work.

【0019】次に、前記構成に係るハウジング1への第
1メタル5および第2メタル6の圧入方法を実施するた
めの本発明の一実施例であるメタル圧入装置の構成につ
いて説明する。
Next, the structure of the metal press-fitting apparatus, which is an embodiment of the present invention for carrying out the method of press-fitting the first metal 5 and the second metal 6 into the housing 1 according to the above-mentioned structure, will be described.

【0020】本実施例に係るメタル圧入装置20は、ウ
オーム減速装置付きモータの組立作業が実施されるコン
ベア21におけるラインの一部に設備されており、コン
ベア21のラインに添うように据え付けられた機台22
を備えている。機台22にはワークとしてのハウジング
(以下、ワークということがある。)を保持するワーク
保持装置と、圧入治具案内装置と、圧入治具駆動装置と
が設備されている。
The metal press-fitting device 20 according to the present embodiment is installed in a part of the line of the conveyor 21 where the assembly work of the motor with the worm speed reducer is carried out, and is installed along the line of the conveyor 21. Machine base 22
Is equipped with. The machine base 22 is provided with a work holding device that holds a housing (hereinafter, also referred to as a work) as a work, a press-fitting jig guide device, and a press-fitting jig drive device.

【0021】ワーク保持装置23はワークとしてのハウ
ジング1を下側から保持するための下側シリンダ装置2
4を備えており、下側シリンダ装置24は機台22にお
けるコンベア21の直下位置に垂直方向上向きに据え付
けられている。コンベア21上における下側シリンダ装
置24の真上位置には保持台25が配設されており、こ
の保持台25は下側シリンダ装置24の伸長作動時にコ
ンベア21からワーク1を持ち上げた状態で保持するよ
うになっている。また、保持台25とシリンダ装置24
との間には受け台26が介設されており、メタル圧入作
業時、この受け台26によってハウジング1に下向きに
作用する荷重が支えられるようになっている。
The work holding device 23 is a lower cylinder device 2 for holding the housing 1 as a work from below.
4, the lower cylinder device 24 is installed vertically above the conveyor 21 on the machine base 22 in the vertical direction. A holding table 25 is disposed directly above the lower cylinder device 24 on the conveyor 21, and the holding table 25 holds the work 1 lifted from the conveyor 21 when the lower cylinder device 24 extends. It is supposed to do. In addition, the holding table 25 and the cylinder device 24
A pedestal 26 is interposed between and, so that a load acting downward on the housing 1 can be supported by the pedestal 26 during metal press-fitting work.

【0022】下側シリンダ装置24の真上には、ワーク
を上側から保持する上側シリンダ装置28が垂直方向下
向きに配設されており、この上側シリンダ装置28は後
記するガイドレール42に固定されたブラケット27に
据え付けられている。上側シリンダ装置28のピストン
ロッド28aの下端には保持具29が固定的に連結され
ており、この保持具29はハウジング1の垂直圧入穴9
に圧入されて垂直に立脚された固定軸10に上から嵌合
し得るように構成されている。
An upper cylinder device 28 for holding a work from the upper side is arranged vertically downward just above the lower cylinder device 24, and the upper cylinder device 28 is fixed to a guide rail 42 described later. It is mounted on the bracket 27. A holder 29 is fixedly connected to the lower end of the piston rod 28 a of the upper cylinder device 28, and the holder 29 is attached to the vertical press-fitting hole 9 of the housing 1.
It is configured so that it can be fitted from above onto a fixed shaft 10 that is press-fitted into and vertically erected.

【0023】機台22上における一端部(以下、左端部
とする。)には左側スタンド30が垂直方向に立脚され
ており、このスタンド30の上端部には楔駆動用のシリ
ンダ装置31が垂直方向下向きに据え付けられている。
このシリンダ装置31のピストンロッド31aの下端に
は楔32が一体移動するように連結されている。
A left stand 30 is vertically erected at one end (hereinafter, left end) on the machine base 22, and a wedge driving cylinder device 31 is vertically installed at an upper end of the stand 30. It is installed downwards.
A wedge 32 is connected to the lower end of the piston rod 31a of the cylinder device 31 so as to move integrally.

【0024】詳細な説明および図示は省略するが、この
楔駆動用シリンダ装置31はブレーキ装置を備えてお
り、このブレーキ装置はエア圧の供給排出回路に介設さ
れてバックプレッシャによって自動的に作動する制御
弁、および、その制御弁によって作動するピストン把持
装置等から構成されている。そして、楔駆動用シリンダ
装置31は負荷側からの力により短縮作動されるのを、
このブレーキ装置によって防止されるようになってい
る。
Although not described in detail and shown in the drawings, the wedge drive cylinder device 31 is provided with a brake device, which is installed in the air pressure supply / discharge circuit and is automatically operated by back pressure. Control valve, and a piston gripping device operated by the control valve. Then, the wedge drive cylinder device 31 is shortened by the force from the load side.
It is designed to be prevented by this brake device.

【0025】楔32は一主面に斜面32aを有する長方
形の板形状に形成されており、その斜面32aがワーク
1側に向けられた状態で、他側の主面32bがスタンド
30の右側面に摺接されている。本実施例において、楔
32の斜面32aは反対側の平行面32bに対して5度
だけ傾斜されている。
The wedge 32 is formed in a rectangular plate shape having a slope 32a on one main surface, and the main surface 32b on the other side is the right side surface of the stand 30 with the slope 32a facing the work 1 side. Is in sliding contact with. In this embodiment, the slope 32a of the wedge 32 is inclined by 5 degrees with respect to the parallel surface 32b on the opposite side.

【0026】スタンド30の右側面には平行ピン33が
4本、互いに平行に並べられて直角に植設されており、
各平行ピン33は楔32の両側面に摺接されている。こ
れら平行ピン33およびスタンド30の案内によって、
楔32はシリンダ装置31の伸縮作動に伴って垂直方向
に摺動し得るように構成されている。
On the right side surface of the stand 30, four parallel pins 33 are arranged in parallel with each other and are planted at right angles.
Each parallel pin 33 is in sliding contact with both side surfaces of the wedge 32. By the guide of the parallel pin 33 and the stand 30,
The wedge 32 is configured to slide in the vertical direction as the cylinder device 31 expands and contracts.

【0027】また、スタンド30の右側面にはストッパ
34が位置調整可能に設置されており、このストッパ3
4はその上端面が楔32の下端面に対向するように配設
されている。したがって、このストッパ34によって楔
32は下限位置が規制されるようになっている。
A stopper 34 is installed on the right side surface of the stand 30 so that its position can be adjusted.
4 is arranged such that its upper end surface faces the lower end surface of the wedge 32. Therefore, the lower limit position of the wedge 32 is restricted by the stopper 34.

【0028】スタンド30における楔32の取付位置に
はブッシュ35が左右方向に嵌入されており、このブッ
シュ35にはガイドロッド36が左右方向に挿通されて
摺動自在に支承されている。ガイドロッド36の左端に
はスプリングシート37が突設されており、ガイドロッ
ド36の外周にはスプリング38がスプリングシート3
7とブッシュ35との間に蓄力状態で介挿されて装着さ
れている。したがって、ガイドロッド36はスプリング
38によって常時、左方向へ付勢された状態になってい
る。
A bush 35 is inserted in the left-right direction at the mounting position of the wedge 32 in the stand 30, and a guide rod 36 is inserted in the bush 35 in the left-right direction and slidably supported. A spring seat 37 is provided on the left end of the guide rod 36, and a spring 38 is provided on the outer periphery of the guide rod 36.
7 and the bush 35 are inserted and installed in a state of energy accumulation. Therefore, the guide rod 36 is always biased leftward by the spring 38.

【0029】ガイドロッド36の右端部は、楔32の中
央部に垂直方向に長くなるように開設されたガイド孔3
2cに挿入されており、その右端部には反力受け具39
が直交するように固定されている。反力受け具39はワ
ーク1に対向するように配されており、そのワーク対向
面と反対側の左端面は楔32の斜面32aに摺動自在に
当接されている。この際、ガイドロッド36がスプリン
グ38によって常時、左方向に付勢されているため、反
力受け具39は楔32の斜面32aにスプリング38の
付勢力によって常時押接された状態になっている。
The right end portion of the guide rod 36 is a guide hole 3 formed in the central portion of the wedge 32 so as to extend vertically.
2c, and the reaction force receiving device 39 is provided at the right end thereof.
Are fixed so that they are orthogonal to each other. The reaction force receiving device 39 is arranged so as to face the work 1, and the left end face on the side opposite to the work facing face is slidably brought into contact with the slope 32 a of the wedge 32. At this time, since the guide rod 36 is constantly biased to the left by the spring 38, the reaction force receiving device 39 is constantly pressed against the slope 32a of the wedge 32 by the biasing force of the spring 38. .

【0030】機台22上における右端部には右側スタン
ド40が垂直に立脚されており、左側スタンド30と右
側スタンド40との間には圧入治具案内装置41が設備
されている。左右のスタンド30と40との間にはガイ
ドレール42が4本、前後の上下位置に配されて左右方
向に架設されている。下側の2本のガイドレール42、
42には移動ブロック44が左右方向に摺動自在に支持
されており、このブロック44は下側のガイドレール4
2に固定されたストッパ43によって右限位置が規制さ
れている。
A right stand 40 is vertically erected on the right end of the machine base 22, and a press-fitting jig guide device 41 is provided between the left stand 30 and the right stand 40. Between the left and right stands 30 and 40, four guide rails 42 are arranged in the front and rear up and down positions and are installed in the left and right direction. The lower two guide rails 42,
A moving block 44 is slidably supported on the left and right sides of the guide rail 42.
The right limit position is restricted by the stopper 43 fixed to 2.

【0031】移動ブロック44の上部におけるワーク1
と対向する水平位置には圧入治具ホルダ46が、前後方
向に水平に架設された支軸45によって回動自在に支持
されており、このホルダ46は電動モータやエアモータ
等の駆動装置(図示せず)によって往復回動駆動される
ようになっている。
Work 1 on top of moving block 44
A press-fitting jig holder 46 is rotatably supported by a support shaft 45 horizontally extending in the front-rear direction at a horizontal position opposed to the holder 46. The holder 46 is a drive device (not shown) such as an electric motor or an air motor. It is adapted to be reciprocally rotated by (No.).

【0032】移動ブロック44の左側端部には垂直側ス
トッパ47が水方向右向きに突設されており、この垂直
側ストッパ47は圧入治具ホルダ46が垂直状態になっ
たときにその下端部に突合することにより、そのホルダ
46の垂直位置を規制するようになっている。
A vertical stopper 47 is provided at the left end of the moving block 44 so as to project rightward in the water direction. The vertical stopper 47 is provided at the lower end of the press-fitting jig holder 46 when it is in a vertical state. By abutting, the vertical position of the holder 46 is regulated.

【0033】また、移動ブロック44の右側上端部には
水平側ストッパ48が垂直方向下向きに突設されてお
り、この水平側ストッパ48は圧入治具ホルダ46が水
平状態になったときにその右端部上面に突合することに
より、そのホルダ46の水平位置を規制するようになっ
ている。
Further, a horizontal stopper 48 is vertically projectingly provided on the upper right end portion of the moving block 44, and the horizontal stopper 48 is provided at the right end when the press-fitting jig holder 46 becomes horizontal. By abutting on the upper surface of the part, the horizontal position of the holder 46 is regulated.

【0034】さらに、移動ブロック44の水平側ストッ
パ48の左隣りにはショックアブソーバ49が垂直方向
下向きに据え付けられている。このショックアブソーバ
49は圧入治具ホルダ46が垂直状態から水平状態に移
行する際に、そのホルダ46の右端部上面に接触して衝
撃を緩和するようになっている。
Further, a shock absorber 49 is installed vertically downward on the left side of the horizontal stopper 48 of the moving block 44. The shock absorber 49 comes into contact with the upper surface of the right end portion of the holder 46 when the press-fitting jig holder 46 shifts from the vertical state to the horizontal state, and absorbs the impact.

【0035】圧入治具ホルダ46には圧入治具50が、
このホルダ46の垂直状態においてその上端面に開設さ
れた圧入治具取付穴46aにその一端部を嵌入されて保
持されている。
A press-fitting jig 50 is attached to the press-fitting jig holder 46.
In the vertical state of the holder 46, one end of the holder 46 is fitted and retained in a press-fitting jig mounting hole 46a formed in the upper end surface thereof.

【0036】圧入治具50は細長い多段円柱形状に形成
されており、その挿入に対する外側端面には真空吸着口
51が同心的に形成されており、この真空吸着口51に
は圧入治具50に開設された負圧供給路52aが接続さ
れている。負圧供給路52aはホルダ46に開設された
負圧供給口52bに接続されている。そして、負圧供給
口52bには負圧供給ホース(図示せず)が接続される
ようになっており、このホース、供給口52bおよび供
給路52aを介して真空ポンプ(図示せず)によって、
真空吸着口51においてスラスト軸受メタル(以下、ス
ラストメタルという。)11が真空吸着保持されるよう
になっている。
The press-fitting jig 50 is formed in a slender multi-stage cylindrical shape, and a vacuum suction port 51 is formed concentrically on the outer end face with respect to the insertion thereof. The opened negative pressure supply path 52a is connected. The negative pressure supply passage 52a is connected to the negative pressure supply port 52b opened in the holder 46. Then, a negative pressure supply hose (not shown) is connected to the negative pressure supply port 52b, and a vacuum pump (not shown) is provided via this hose, the supply port 52b and the supply path 52a.
The thrust bearing metal (hereinafter referred to as thrust metal) 11 is vacuum-held at the vacuum suction port 51.

【0037】圧入治具50の中間部には第1メタル5を
保持するための第1保持部53が形成されている。この
第1保持部53はその外径が第1メタル5の内径と等し
く設定されており、その外周に第1メタル5が嵌合され
ることにより、第1メタル5を着脱自在に保持するよう
になっている。
A first holding portion 53 for holding the first metal 5 is formed in the middle of the press-fitting jig 50. The outer diameter of the first holding portion 53 is set to be equal to the inner diameter of the first metal 5, and the first metal 5 is fitted to the outer periphery of the first holding portion 53 so that the first metal 5 is detachably held. It has become.

【0038】また、圧入治具50の先端部には第2メタ
ル6を保持するための第2保持部54が形成されてい
る。この第2保持部54はその外径が第2メタル6の内
径と等しく設定されており、その外周に第2メタル6が
嵌合されることにより、第2メタル6を着脱自在に保持
するようになっている。
A second holding portion 54 for holding the second metal 6 is formed at the tip of the press-fitting jig 50. The outer diameter of the second holding portion 54 is set to be equal to the inner diameter of the second metal 6, and the second metal 6 is fitted to the outer periphery of the second holding portion 54 so that the second metal 6 is detachably held. It has become.

【0039】そして、第1保持部53および第2保持部
54にそれぞれ保持された状態において、第1メタル5
の先端(先に圧入される側の端)と第2メタル6の先端
との距離L1 は、前記した圧入孔3と圧入穴4との距離
2 よりも、第1メタル5の長さの1/2〜1/5程度
長くなっている。換言すれば、第1保持部53および第
2保持部54による嵌合位置関係は、この条件が創り出
されるようにそれぞれ設定されている。
Then, the first metal 5 is held by the first holding portion 53 and the second holding portion 54, respectively.
The length of the tip distance L 1 between the end of the (previous end of the side to be pressed into) the second metal 6, than the distance L 2 between the press-fit hole 4 and press-fitting hole 3 described above, the first metal 5 It is about 1/2 to 1/5 longer. In other words, the fitting positional relationship between the first holding portion 53 and the second holding portion 54 is set so that this condition is created.

【0040】また、右側スタンド40には圧入治具駆動
装置60が設備されている。すなわち、右側スタンド4
0には圧入用シリンダ装置61が水平方向左向きに据え
付けられており、圧入用シリンダ装置61はロードセル
を介して移動ブロック44を左方向に押すようになって
いる。右側スタンド40にはブッシュ62が4個、前後
の上下位置において左右方向に延在するようにそれぞれ
固定されており、各ブッシュ62にはガイドロッド63
が挿通されて左右方向に摺動自在に支承されている。
A press-fitting jig driving device 60 is installed on the right stand 40. That is, the right side stand 4
At 0, a press-fitting cylinder device 61 is installed horizontally leftward, and the press-fitting cylinder device 61 pushes the moving block 44 leftward via a load cell. Four bushes 62 are fixed to the right stand 40 so as to extend in the left-right direction at the front and rear up and down positions.
Is inserted and is slidably supported in the left-right direction.

【0041】各ガイドロッド63はその左端部がプレー
ト64に固定されており、プレート64の中央にはロー
ドセル65が固定されている。ロードセル65はガイド
レール42に沿って配設された各リミットスイッチ(図
示せず)の指令に基づいて、後述する圧入荷重のピーク
値を検知するように構成されている。
The left end of each guide rod 63 is fixed to a plate 64, and a load cell 65 is fixed to the center of the plate 64. The load cell 65 is configured to detect a peak value of a press-fitting load, which will be described later, based on a command from each limit switch (not shown) arranged along the guide rail 42.

【0042】右側スタンド40における圧入用シリンダ
装置61の下方位置には戻し用シリンダ装置66が水平
方向左向きに据え付けられており、このシリンダ装置6
6のピストンロッド66aはブラケット67によって移
動ブロック44に連結されている。
At the position below the press-fitting cylinder device 61 on the right side stand 40, a returning cylinder device 66 is installed horizontally leftward.
The piston rod 66 a of No. 6 is connected to the moving block 44 by a bracket 67.

【0043】次に、前記構成に係るメタル圧入装置の作
用を説明することにより、本発明の一実施例であるメタ
ル圧入方法を説明する。
Next, the operation of the metal press-fitting device having the above structure will be described to explain the metal press-fitting method which is an embodiment of the present invention.

【0044】メタル圧入装置20のワークとしてのハウ
ジング1はコンベア21に載せられた状態で、メタル圧
入装置20の位置まで搬送されて来る。ワーク1は圧入
孔3が右側、圧入穴4が左側にそれぞれ向けられて、か
つ、垂直圧入穴9に圧入された固定軸10が上方に向け
られている。
The housing 1 as the work of the metal press-fitting device 20 is conveyed to the position of the metal press-fitting device 20 while being placed on the conveyor 21. In the work 1, the press-fitting hole 3 is directed to the right side, the press-fitting hole 4 is directed to the left side, and the fixed shaft 10 press-fitted in the vertical press-fitting hole 9 is directed upward.

【0045】そして、ワーク1は機台22上の下側シリ
ンダ装置24によってコンベア21上から持ち上げられ
るとともに、ガイドレール42に据え付けられた上側シ
リンダ装置28の保持具29によって固定軸10が保持
される。固定軸10が固定された垂直圧入穴9は高精度
に形成されているため、固定軸10が保持具29によっ
て保持されると、ワーク1は所定の位置決めが確保され
た状態になる。
The work 1 is lifted from the conveyor 21 by the lower cylinder device 24 on the machine base 22, and the fixed shaft 10 is held by the holder 29 of the upper cylinder device 28 installed on the guide rail 42. . Since the vertical press-fitting hole 9 to which the fixed shaft 10 is fixed is formed with high accuracy, when the fixed shaft 10 is held by the holder 29, the work 1 is in a state where the predetermined positioning is secured.

【0046】この状態で、楔駆動用シリンダ装置31が
伸長作動され、楔32は下降される。楔32が下降する
のに伴って、楔32の斜面32aにロッド36を介して
スプリング38の付勢力によって常時当接されている反
力受け具39は、斜面32aの傾斜に従って右方向に押
し出される。そして、反力受け具39がその右側の平面
をワーク1の左側端面に当接されると、反力受け具39
は保持具29によって位置決め保持されたワーク1に位
置規制されるため、楔駆動用シリンダ装置31はその伸
長作動をブレーキ装置によって自動的に停止される。
In this state, the wedge driving cylinder device 31 is extended and the wedge 32 is lowered. As the wedge 32 descends, the reaction force receiver 39, which is constantly in contact with the slope 32a of the wedge 32 by the urging force of the spring 38 via the rod 36, is pushed rightward according to the inclination of the slope 32a. . Then, when the reaction force receiver 39 is brought into contact with the left end surface of the work 1 with its right side plane, the reaction force receiver 39
Is regulated in position by the workpiece 1 positioned and held by the holder 29, so that the extension operation of the wedge drive cylinder device 31 is automatically stopped by the brake device.

【0047】したがって、固定軸10を基準にして位置
決めされたワーク1は圧入孔3と圧入穴4とを結ぶ軸線
方向(左右方向)におけるハウジング側壁の寸法ばらつ
きにかかわらず、反力受け具39によって圧入に抗する
反力受け面を受けられることになる。換言すれば、反力
受け具39は楔32の上下位置の調整によって、通例存
在するハウジング側壁の肉厚等についての左右方向の寸
法ばらつきを吸収して、ワーク1の反力受け面を常に適
正に受ける状態を創り出されることになる。
Therefore, the work 1 positioned on the basis of the fixed shaft 10 is moved by the reaction force receiving member 39 regardless of the dimension variation of the housing side wall in the axial direction (left-right direction) connecting the press-fitting holes 3 and 4. You will be able to receive a reaction force receiving surface that resists press fitting. In other words, the reaction force receiving device 39 adjusts the vertical position of the wedge 32 to absorb the dimensional variation in the left-right direction such as the wall thickness of the housing side wall, which is usually present, so that the reaction force receiving surface of the work 1 is always appropriate. It will create a condition that will be received by.

【0048】他方、圧入治具案内装置41においては、
圧入治具50に第1メタル5、第2メタル6およびスラ
ストメタル11が装着される。すなわち、圧入治具50
が垂直に維持された状態において、第1メタル5がパー
ツフィーダ(図示せず)によって圧入治具50に搬送さ
れて下降されることにより、第1保持部53の外周に嵌
合されて装着される。同様に、第2メタル6がパーツフ
ィーダ(図示せず)によって圧入治具50に搬送されて
下降されることにより、第2保持部54の外周に嵌合さ
れて装着される。
On the other hand, in the press-fitting jig guide device 41,
The first metal 5, the second metal 6, and the thrust metal 11 are mounted on the press-fitting jig 50. That is, the press-fitting jig 50
In a state in which the first metal 5 is maintained vertically, the first metal 5 is conveyed to the press-fitting jig 50 by a parts feeder (not shown) and lowered, so that the first metal 5 is fitted and mounted on the outer periphery of the first holding portion 53. It Similarly, the second metal 6 is conveyed to the press-fitting jig 50 by a parts feeder (not shown) and lowered, so that the second metal 6 is fitted and mounted on the outer periphery of the second holding portion 54.

【0049】続いて、スラストメタル11がパーツフィ
ーダ(図示せず)によって圧入治具50に搬送されて下
降されることにより、真空吸着口51に載せられる。真
空吸着口51に載せられたスラストメタル11は、この
真空吸着口51に負圧供給路52a、負圧供給口52b
によって負圧が供給されると、真空吸着口51に真空吸
着されて、圧入治具50に保持された状態になる。そし
て、スラストメタル11が真空吸着保持されると、第2
メタル6はスラストメタル11を介して圧入治具50に
確実に保持された状態になる。
Subsequently, the thrust metal 11 is transferred to the press-fitting jig 50 by a parts feeder (not shown) and lowered, so that the thrust metal 11 is placed on the vacuum suction port 51. The thrust metal 11 placed on the vacuum suction port 51 has a negative pressure supply path 52a and a negative pressure supply port 52b on the vacuum suction port 51.
When a negative pressure is supplied by the vacuum suction port 51, it is vacuum-sucked by the vacuum suction port 51 and held by the press-fitting jig 50. Then, when the thrust metal 11 is held by vacuum suction, the second
The metal 6 is securely held by the press-fitting jig 50 via the thrust metal 11.

【0050】圧入治具50に第1メタル5、第2メタル
6およびスラストメタル11が装着されると、圧入治具
ホルダ46が駆動装置(図示せず)によって90度回動
され、圧入治具50は水平方向左向きに倒される。この
回動作動に際して、圧入治具ホルダ46の水平時の右端
部がショックアブソーバ49によって緩衝されるため、
圧入治具50に装着された第1メタル5、第2メタル6
およびスラストメタル11が衝撃によって脱落したり、
遊動したりすることは防止される。
When the first metal 5, the second metal 6 and the thrust metal 11 are mounted on the press-fitting jig 50, the press-fitting jig holder 46 is rotated 90 degrees by a driving device (not shown), and the press-fitting jig is moved. 50 is tilted horizontally to the left. At the time of this rotation operation, the right end portion of the press-fitting jig holder 46 in the horizontal state is buffered by the shock absorber 49.
First metal 5 and second metal 6 mounted on the press-fitting jig 50
And the thrust metal 11 may fall off due to impact,
It is prevented from idling.

【0051】圧入治具50が水平に倒されると、圧入治
具駆動用シリンダ装置61が伸長作動され、移動ブロッ
ク44がロードセル65を介してガイドレール42に沿
って水平方向左向きに摺動される。この際、戻し用シリ
ンダ装置66のピストンロッド66aも伸長される。
When the press-fitting jig 50 is tilted horizontally, the press-fitting jig driving cylinder device 61 is extended and the moving block 44 is slid leftward in the horizontal direction along the guide rail 42 via the load cell 65. . At this time, the piston rod 66a of the returning cylinder device 66 is also extended.

【0052】移動ブロック44が圧入用シリンダ装置6
1によって左方向に前進されると、水平方向左向きにな
った圧入治具50がワーク1に対して前進され、圧入孔
3および圧入穴4に順次挿入されて行く。この際、圧入
治具50の挿入先端側である左端に嵌着された第2メタ
ル6は、その外径がワーク1の右側に位置する圧入孔3
の内径よりも小径に形成されているため、圧入孔3を通
過してしまう。
The moving block 44 is the press-fitting cylinder device 6
When the press-fitting jig 50 is moved leftward by 1, the press-fitting jig 50, which is horizontally leftward, is advanced toward the work 1 and sequentially inserted into the press-fitting hole 3 and the press-fitting hole 4. At this time, the second metal 6 fitted to the left end which is the insertion tip side of the press-fitting jig 50 has a press-fitting hole 3 whose outer diameter is located on the right side of the work 1.
Since it is formed to have a smaller diameter than the inner diameter of, it will pass through the press-fitting hole 3.

【0053】圧入治具50の前進に伴って第2メタル6
が圧入孔3を通過した後、第1メタル5が圧入孔3の右
端に到達すると、第1メタル5の圧入孔3への圧入が開
始される。そして、第1メタル5の圧入孔3への圧入が
第1メタル5の長さの1/2〜1/5程度進行した時点
で、リミットスイッチ(図示せず)が作動することによ
り、圧入荷重のピーク値がロードセル65によって検知
される。
As the press-fitting jig 50 advances, the second metal 6
When the first metal 5 reaches the right end of the press-fitting hole 3 after passing through the press-fitting hole 3, press-fitting of the first metal 5 into the press-fitting hole 3 is started. Then, when the press-fitting of the first metal 5 into the press-fitting hole 3 progresses about 1/2 to 1/5 of the length of the first metal 5, a limit switch (not shown) is actuated to press-fit the load. Is detected by the load cell 65.

【0054】他方、圧入治具50の第1メタル5および
第2メタル6の装着位置と、ワーク1の圧入孔3および
圧入穴4の位置との関係が前記した通り、L1 >L2
の関係に設定されているため、第1メタル5の圧入孔3
への圧入開始時点において、第2メタル6の圧入穴4へ
の圧入は開始されない。そして、第1メタル5の圧入孔
3への圧入荷重がピーク値を越えた時点で、第2メタル
6の圧入穴4への圧入が開始される。
On the other hand, the relationship between the mounting positions of the first metal 5 and the second metal 6 of the press-fitting jig 50 and the positions of the press-fitting holes 3 and 4 of the work 1 is L 1 > L 2 ,
Since the relationship is set to, the press-fitting hole 3 of the first metal 5
At the start of press-fitting into, the press-fitting of the second metal 6 into the press-fitting hole 4 is not started. Then, when the press-fitting load of the first metal 5 into the press-fitting hole 3 exceeds the peak value, the press-fitting of the second metal 6 into the press-fitting hole 4 is started.

【0055】次いで、圧入治具50のワーク1への前進
に伴って、第1メタル5の圧入孔3への残りの圧入行程
と、第2メタル6の圧入穴4への圧入行程とが同時に進
行する。そして、第1メタル5および第2メタル6の圧
入孔3および圧入穴4への両方の圧入行程におけるトー
タル圧入荷重についてのピーク値が、リミットスイッチ
(図示せず)が作動することにより、ロードセル65に
よって検知される。
Then, as the press-fitting jig 50 advances to the work 1, the remaining press-fitting process of the first metal 5 into the press-fitting hole 3 and the press-fitting process of the second metal 6 into the press-fitting hole 4 are simultaneously performed. proceed. Then, the peak value of the total press-fitting load in both the press-fitting holes 3 and the press-fitting holes 4 of the first metal 5 and the second metal 6 is actuated by the limit switch (not shown), whereby the load cell 65 Detected by.

【0056】その後、第1メタル5の圧入孔3への圧入
および第2メタル6の圧入穴4への圧入が同時に終了す
る。この終了時点はリミットスイッチ(図示せず)によ
って検知され、圧入用シリンダ装置61の伸長作動が停
止される。
Thereafter, the press-fitting of the first metal 5 into the press-fitting hole 3 and the press-fitting of the second metal 6 into the press-fitting hole 4 are simultaneously completed. The end point of this is detected by a limit switch (not shown), and the extension operation of the press-fitting cylinder device 61 is stopped.

【0057】ここで、図7は第1メタル5の圧入孔3へ
の圧入時における荷重および第2メタル6の圧入穴4へ
の圧入時における荷重と、圧入治具50のストロークと
の関係を示す線図である。
Here, FIG. 7 shows the relationship between the load when the first metal 5 is press-fitted into the press-fitting hole 3 and the load when the second metal 6 is press-fitted into the press-fitting hole 4, and the stroke of the press-fitting jig 50. It is a diagram showing.

【0058】図7において、縦軸には荷重が取られてお
り、aは圧入治具50の戻し用シリンダ装置66の推力
(約5kg)、bは第1メタル5の2mm圧入時の圧入
荷重(約30kg)、cは第1メタル5および第2メタ
ル6の定寸圧入時の圧入荷重(約150kg)、dは圧
入用シリンダ装置61の推力(約800kg)、であ
る。なお、ここで、具体的数値は荷重の比例関係につい
ての理解を容易にするための参考例である。
In FIG. 7, the vertical axis represents the load, a is the thrust of the returning cylinder device 66 of the press-fitting jig 50 (about 5 kg), and b is the press-fitting load when the first metal 5 is press-fitted to 2 mm. (About 30 kg), c is a press-fitting load (about 150 kg) when the first metal 5 and the second metal 6 are press-fitted, and d is a thrust force (about 800 kg) of the press-fitting cylinder device 61. Here, specific numerical values are reference examples for facilitating understanding of the proportional relationship of loads.

【0059】また、横軸には圧入治具50のストローク
が取られており、Aは第1メタル5の圧入開始点、Bは
第1メタル5の圧入荷重判定タイミング、B’は第2メ
タル6の圧入開始点、Cは第1メタル5および第2メタ
ル6の圧入荷重判定タイミング、C’は定寸圧入終了
(治具突き当り)点、である。なお、圧入荷重はピーク
値測定とし、O−B間およびO−C間の荷重ピーク値が
測定される。
Further, the stroke of the press-fitting jig 50 is taken along the horizontal axis, A is the press-fitting start point of the first metal 5, B is the press-fitting load determination timing of the first metal 5, and B'is the second metal. 6 is a press-fitting start point, C is a press-fitting load determination timing of the first metal 5 and the second metal 6, and C ′ is a fixed-size press-fitting end (jig abutment) point. The press-fit load is measured as a peak value, and the load peak values between OB and OC are measured.

【0060】そして、図7において、実線曲線12は良
品の場合の荷重−ストローク特性を示しており、ストロ
ークB〜C’間における荷重がb〜cの範囲にある場合
が良品と判定される。
In FIG. 7, the solid curve 12 shows the load-stroke characteristic in the case of a non-defective product, and the case where the load between the strokes B and C'is in the range of b to c is judged as a non-defective product.

【0061】これに対して、破線曲線13は第1メタル
5が無い場合の荷重−ストローク特性を示している。こ
の場合には、ストロークB’〜C’の範囲内における荷
重は、b〜cの範囲外にある。したがって、この場合に
は不良品と判定されることになる。そして、第1メタル
5が無い場合は、第1メタル5の圧入孔3への圧入が緩
過ぎる場合に相当する。
On the other hand, the broken line curve 13 shows the load-stroke characteristic when the first metal 5 is not provided. In this case, the load in the range of stroke B'-C 'is outside the range of b-c. Therefore, in this case, the product is determined to be defective. The case where the first metal 5 is not present corresponds to the case where the press-fitting of the first metal 5 into the press-fitting hole 3 is too slow.

【0062】また、一点鎖線曲線14は第2メタル6が
無い場合の荷重−ストローク特性を示している。この場
合には、ストロークB’〜C’の範囲内における荷重
は、b〜cの範囲外にある。したがって、この場合には
不良品と判定されることになる。そして、第2メタル6
が無い場合は、第2メタル6の圧入穴4への圧入が緩過
ぎる場合に相当する。
The alternate long and short dash line curve 14 shows the load-stroke characteristic when the second metal 6 is not provided. In this case, the load in the range of stroke B'-C 'is outside the range of b-c. Therefore, in this case, the product is determined to be defective. And the second metal 6
The case where there is no pressure corresponds to the case where the press-fitting of the second metal 6 into the press-fitting hole 4 is too slow.

【0063】前述したようにしてハウジング1の圧入孔
3および圧入穴4に第1メタル5および第2メタル6が
順次圧入されるに際して、ハウジング1の左端面に反力
受け具39がハウジング1の側壁についての寸法ばらつ
きの如何にかかわらず、常に当接されているため、圧入
治具50による圧入荷重の反力は反力受け具39によっ
て常に適正に得られる状態になっている。すなわち、反
力受け具39は楔32によってハウジング1の側壁につ
いての寸法誤差を吸収されて、スタンド30の右側面に
直角に当接されているため、圧入荷重が大きくても充分
な反力をスタンド30に求めることができる。
When the first metal 5 and the second metal 6 are sequentially press-fitted into the press-fitting hole 3 and the press-fitting hole 4 of the housing 1 as described above, the reaction force receiver 39 of the housing 1 is attached to the left end surface of the housing 1. The reaction force of the press-fitting load by the press-fitting jig 50 is always properly obtained by the reaction force receiving member 39 because the side wall is always in contact regardless of the dimensional variation of the side wall. That is, since the reaction force receiver 39 absorbs the dimensional error of the side wall of the housing 1 by the wedge 32 and is in contact with the right side surface of the stand 30 at a right angle, a sufficient reaction force is exerted even if the press-fitting load is large. You can ask the stand 30.

【0064】この際、楔32の斜面32aは5度に設定
されているため、圧入荷重に伴う垂直方向の分力、すな
わち、楔32を上方に逃がそうとする分力が、楔32の
スタンド30に対する直圧力による摩擦力を勝ることは
ない。したがって、反力受け具39とスタンド30との
間に楔32が介在されているのにもかかわらず、反力受
け具39は大きな圧力荷重を充分に支えることができ
る。
At this time, since the slope 32a of the wedge 32 is set to 5 degrees, the component force in the vertical direction due to the press-fitting load, that is, the component force for letting the wedge 32 escape upward, is generated. The friction force due to the direct pressure on the stand 30 is not overcome. Therefore, although the wedge 32 is interposed between the reaction force receiver 39 and the stand 30, the reaction force receiver 39 can sufficiently support a large pressure load.

【0065】以上のようにして、ハウジング1の圧入孔
3および圧入穴4に第1メタル5および第2メタル6が
圧入された後、圧入用シリンダ装置61が短縮作動され
る。また、戻し用シリンダ装置66が短縮作動され、移
動ブロック44がロードセル65と共にワーク1に対し
て後退される。移動ブロック44はストッパ43に接衝
すると、後退が規制された状態になる。
As described above, after the first metal 5 and the second metal 6 are press-fitted into the press-fitting hole 3 and the press-fitting hole 4 of the housing 1, the press-fitting cylinder device 61 is shortened. Further, the returning cylinder device 66 is shortened and the moving block 44 is retracted with respect to the work 1 together with the load cell 65. When the moving block 44 comes into contact with the stopper 43, the retreat is restricted.

【0066】ハウジング1の圧入孔3および圧入穴4に
第1メタル5および第2メタル6がそれぞれ圧入されて
いるため、この移動ブロック44の後退に伴って、圧入
治具50は第1メタル5および第2メタル6から引き抜
かれてホルダ46と共に後退される。
Since the first metal 5 and the second metal 6 are press-fitted in the press-fitting hole 3 and the press-fitting hole 4 of the housing 1, the press-fitting jig 50 moves the first metal 5 and the second metal 6 together. And it is pulled out from the second metal 6 and retracted together with the holder 46.

【0067】圧入治具50が引き抜かれた状態におい
て、ハウジング1の圧入孔3に第1メタル5が圧入さ
れ、圧入穴4に第2メタル6が圧入された状態になる。
また、第2メタル6が圧入された圧入穴4の底部にはス
ラストメタル11が存置された状態になる。
With the press-fitting jig 50 pulled out, the first metal 5 is press-fitted into the press-fitting hole 3 of the housing 1 and the second metal 6 is press-fitted into the press-fitting hole 4.
Further, the thrust metal 11 is left in the bottom of the press-fitting hole 4 into which the second metal 6 is press-fitted.

【0068】以上の圧入作業が終了すると、上側シリン
ダ装置28が短縮作動され、保持具29が固定軸10か
ら抜き出される。また、下側シリンダ装置24が短縮作
動され、ワーク1がコンベア21に載置される。次い
で、コンベア21が間欠送り作動され、ワーク1は次工
程に搬送されて行く。以降、前記作動が繰り換えされる
ことにより、ハウジング1への第1メタル5および第2
メタル6の圧入作業が順次実施されて行く。
When the above press-fitting work is completed, the upper cylinder device 28 is shortened and the holder 29 is pulled out from the fixed shaft 10. Further, the lower cylinder device 24 is shortened and the work 1 is placed on the conveyor 21. Next, the conveyor 21 is intermittently fed and the work 1 is conveyed to the next step. After that, by repeating the above operation, the first metal 5 and the second metal
The metal 6 press-fitting work is carried out sequentially.

【0069】前記実施例によれば次の効果が得られる。 第1メタル5の圧入孔3への圧入荷重のピーク値を
検知することにより、圧入後における第1メタル5の圧
入孔3からの抜け荷重を求めることができるため、圧入
作業後におけるオフラインでの抜け荷重についての専用
の測定工程を省略することができる。
According to the above embodiment, the following effects can be obtained. By detecting the peak value of the press-fitting load of the first metal 5 into the press-fitting hole 3, it is possible to obtain the pull-out load of the first metal 5 from the press-fitting hole 3 after press-fitting. It is possible to omit a dedicated measuring step for the pull-out load.

【0070】 第1メタル5の圧入後における第2メ
タル6と第1メタル5とのトータル圧入荷重についての
ピーク値を検知することにより、圧入後における第2メ
タル6の圧入穴4からの抜け荷重を求めることができる
ため、圧入作業後におけるオフラインでの抜け荷重につ
いての専用の測定工程を省略することができる。
By detecting the peak value of the total press-fitting load of the second metal 6 and the first metal 5 after the press-fitting of the first metal 5, the pull-out load of the second metal 6 from the press-fitting hole 4 after the press-fitting is detected. Therefore, it is possible to omit a dedicated measuring step for the off-line pull-out load after the press-fitting work.

【0071】 前記およびによって、ウオーム減
速装置付きモータの製造工程全体としての作業性を高め
ることができる。
By the above and, it is possible to improve the workability of the entire manufacturing process of the motor with the worm speed reducer.

【0072】 圧力治具50によるハウジング1に対
する第1メタル5および第2メタル6の圧入作業に際し
て、圧入治具50の圧入荷重を反力受け具39によって
適正に受けることができるため、圧入治具50によるハ
ウジング1に対する第1メタル5および第2メタル6の
圧入作業を適正に実施させることができる。
When the pressure jig 50 press-fits the first metal 5 and the second metal 6 into the housing 1, the press-fitting load of the press-fitting jig 50 can be properly received by the reaction force receiving member 39. The work of press-fitting the first metal 5 and the second metal 6 into the housing 1 by 50 can be properly performed.

【0073】 反力受け具39のワーク1に対する位
置を楔32によって変更調整することにより、ワーク1
における圧入方向の側壁についての寸法ばらつきを吸収
することができるため、ワーク1の加工寸法誤差による
寸法のばらつきにかかわらず、ワーク1の圧入荷重を常
に一定に支えることができ、圧入精度を常に一定に維持
することができるとともに、圧入精度を高めることがで
きる。
By changing and adjusting the position of the reaction force receiver 39 with respect to the work 1 by the wedge 32, the work 1
Since the dimensional variation of the side wall in the press-fitting direction can be absorbed, the press-fitting load of the work 1 can always be supported constantly regardless of the dimensional variation due to the processing dimensional error of the work 1 and the press-fitting accuracy is always constant. Can be maintained at the same time, and the press-fitting accuracy can be improved.

【0074】なお、本発明は前記実施例に限定されるも
のではなく、その要旨を逸脱しない範囲において、種々
変更可能であることはいうまでもない。
It is needless to say that the present invention is not limited to the above-mentioned embodiment, and various modifications can be made without departing from the scope of the invention.

【0075】例えば、圧入治具案内装置は、前記実施例
のように構成するに限らず、圧入治具が水平状態のま
ま、圧入治具に第1メタルおよび第2メタルが装着され
るように構成してもよい。
For example, the press-fitting jig guide device is not limited to the structure of the above-described embodiment, and the first metal and the second metal can be mounted on the press-fitting jig while the press-fitting jig is in the horizontal state. You may comprise.

【0076】圧入治具駆動装置は、圧入行程と戻し行程
とが各別のシリンダ装置によって実行されるように構成
するに限らず、兼用のシリンダ装置によって実行される
ように構成してもよい。
The press-fitting jig driving device is not limited to be configured such that the press-fitting process and the returning process are performed by the separate cylinder devices, but may be configured to be performed by the dual-purpose cylinder device.

【0077】圧入荷重値の検出は、圧入治具と圧入用シ
リンダ装置との間に介設されたロードセルによって実行
されるように構成するに限らず、圧入用シリンダ装置に
組み込まれた圧力計等によって実行されるように構成し
てもよい。
The detection of the press-fitting load value is not limited to be executed by the load cell provided between the press-fitting jig and the press-fitting cylinder device, but may be a pressure gauge incorporated in the press-fitting cylinder device. It may be configured to be performed by.

【0078】前記実施例においては、滑り軸受である軸
受メタルが圧入される場合について説明したが、圧入さ
れる軸受は、転がり軸受であるボールベアリングやロー
ラベアリング等であってもよい。
In the above embodiment, the case where the bearing metal which is a slide bearing is press-fitted has been described, but the bearing which is press-fitted may be a ball bearing or a roller bearing which is a rolling bearing.

【0079】また、前記実施例においては、ウオーム減
速装置付きモータにおけるギヤハウジングにウオーム軸
の両端部を回転自在に支承するための軸受が圧入される
場合について説明したが、本発明はこれに限らず、軸受
ハウジングの同軸上に2個の軸受が圧入される軸受圧入
技術全般に適用することができる。
Further, in the above embodiment, the case where the bearings for rotatably supporting both ends of the worm shaft are press-fitted into the gear housing in the motor with the worm speed reducer has been described, but the present invention is not limited to this. Instead, the present invention can be applied to general bearing press-fitting technology in which two bearings are press-fitted coaxially with the bearing housing.

【0080】[0080]

【発明の効果】以上説明したように、本発明によれば、
反力受け具が外形寸法のばらつきを吸収して軸受ハウジ
ングの外面に常に自動的に当接することにより、軸受の
圧入時に軸受ハウジングに作用する荷重を適正に支える
ことができるため、圧入精度を常に一定に維持すること
ができるとともに、圧入精度を高めることができる。ま
た、軸受ハウジングの専用治具装着後における作業者の
手作業による位置調整作業を省略することができるた
め、作業能率を高めることができるとともに、軸受圧入
作業の自動化を実現させることができる。
As described above, according to the present invention,
Since the reaction force receiver absorbs variations in external dimensions and always automatically contacts the outer surface of the bearing housing, the load acting on the bearing housing during press fitting of the bearing can be properly supported. It can be maintained constant and the press-fitting accuracy can be improved. Further, since it is possible to omit the manual position adjustment work by the operator after mounting the dedicated jig for the bearing housing, it is possible to improve the work efficiency and realize the automation of the bearing press-fitting work.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例である軸受圧入装置の要部の
作用を説明するための正面断面図である。
FIG. 1 is a front cross-sectional view for explaining an operation of a main part of a bearing press-fitting device that is an embodiment of the present invention.

【図2】その全体を示す一部切断正面図である。FIG. 2 is a partially cut front view showing the whole thereof.

【図3】そのワーク保持装置を示す一部切断正面図であ
る。
FIG. 3 is a partially cut front view showing the work holding device.

【図4】圧入治具案内装置および駆動装置を示す一部切
断正面図である。
FIG. 4 is a partially cut front view showing a press-fitting jig guide device and a drive device.

【図5】ワーク保持装置の要部を示す一部切断正面図で
ある。
FIG. 5 is a partially cut front view showing a main part of the work holding device.

【図6】圧入治具案内装置の要部を示す正面断面図であ
る。
FIG. 6 is a front sectional view showing a main part of a press-fitting jig guide device.

【図7】作用を説明するための線図である。FIG. 7 is a diagram for explaining the operation.

【図8】ワークを示す図であり、(a)は正面断面図、
(b)は側面図、(c)は平面図である。
FIG. 8 is a view showing a work, (a) is a front sectional view,
(B) is a side view and (c) is a plan view.

【符号の説明】[Explanation of symbols]

1…ハウジング、2…本体、3…圧入孔(第1雌部)、
4…圧入穴(第2雌部)、5…第1メタル(第1軸
受)、6…第2メタル(第2軸受)、7…ウオームホイ
ール収容室、8…モータ取付部、9…垂直圧入穴、10
…固定軸、20…メタル圧入装置(軸受圧入装置)、2
1…コンベア、22…機台、23…ワーク保持装置、2
4…下側シリンダ装置、25…保持台、26…受け台、
27…ブラケット、28…上側シリンダ装置、28a…
ピストンロッド、29…保持具、30…左側スタンド、
31…楔駆動用シリンダ装置、31a…ピストンロッ
ド、32…楔、32a…斜面、32b…平行、32c…
ガイド孔、33…平行ピン、34…ストッパ、35…ブ
ッシュ、36…ガイドロッド、37…スプリングシー
ト、38…スプリング、39…反力受け具、40…右側
スタンド、41…圧入治具案内装置、42…ガイドレー
ル、43…ストッパ、44…移動ブロック、45…支
軸、46…圧入治具ホルダ、46a…圧入治具取付穴、
47…垂直側ストッパ、48…水平側ストッパ、49…
ショックアブソーバ、50…圧入治具、51…真空吸着
口、52a…負圧供給路、52b…負圧供給口、53…
第1保持部、54…第2保持部、60…圧入治具駆動装
置、61…圧入用シリンダ装置、62…ブッシュ、63
…ガイドロッド、64…プレート、65…ロードセル、
66…戻し用シリンダ装置、66a…ピストンロッド、
67…ブラケット。
1 ... Housing, 2 ... Main body, 3 ... Press-fitting hole (first female portion),
4 ... press-fitting hole (second female part), 5 ... first metal (first bearing), 6 ... second metal (second bearing), 7 ... worm wheel accommodating chamber, 8 ... motor mounting part, 9 ... vertical press-fitting Holes, 10
… Fixed shaft, 20… Metal press-fitting device (bearing press-fitting device), 2
1 ... Conveyor, 22 ... Machine stand, 23 ... Work holding device, 2
4 ... Lower cylinder device, 25 ... Holding base, 26 ... Receiving base,
27 ... Bracket, 28 ... Upper cylinder device, 28a ...
Piston rod, 29 ... Retainer, 30 ... Left stand,
31 ... Wedge driving cylinder device, 31a ... Piston rod, 32 ... Wedge, 32a ... Slope, 32b ... Parallel, 32c ...
Guide hole, 33 ... Parallel pin, 34 ... Stopper, 35 ... Bushing, 36 ... Guide rod, 37 ... Spring seat, 38 ... Spring, 39 ... Reaction force receiver, 40 ... Right stand, 41 ... Press-fitting jig guide device, 42 ... Guide rail, 43 ... Stopper, 44 ... Moving block, 45 ... Spindle, 46 ... Press-fitting jig holder, 46a ... Press-fitting jig mounting hole,
47 ... Vertical stopper, 48 ... Horizontal stopper, 49 ...
Shock absorber, 50 ... Press-fitting jig, 51 ... Vacuum suction port, 52a ... Negative pressure supply path, 52b ... Negative pressure supply port, 53 ...
1st holding part, 54 ... 2nd holding part, 60 ... press fitting jig drive device, 61 ... press fitting cylinder device, 62 ... bush, 63
… Guide rod, 64… Plate, 65… Load cell,
66 ... Return cylinder device, 66a ... Piston rod,
67 ... Bracket.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 軸受ハウジングの雌部に軸受が一方向か
ら圧入される軸受圧入方法において、 前記軸受ハウジングが位置決めされた後、反力受け具が
この軸受ハウジングの外面における前記軸受圧入方向延
長線上の位置に、圧入方向の向きと反対向きに移動され
て当接されるとともに、この反力受け具が軸受ハウジン
グ当接面と反力側の固定構造物に反力を求めるように連
結されることを特徴とする軸受圧入方法。
1. A bearing press-fitting method in which a bearing is press-fitted into a female part of a bearing housing from one direction, wherein after the bearing housing is positioned, a reaction force receiver is provided on an extension line of the bearing press-fitting direction on an outer surface of the bearing housing. Is moved to the position opposite to the direction of the press-fitting direction and abutted, and this reaction force receiver is connected to the bearing housing contact surface and the fixed structure on the reaction side so as to obtain a reaction force. A method for press-fitting a bearing, which is characterized in that
【請求項2】 請求項1に記載の軸受圧入方法を実施す
る軸受圧入装置であって、 前記軸受ハウジングを位置決めして保持するワーク保持
装置と、 前記軸受が装着された圧入治具を前記圧入方向に移動さ
せる圧入治具駆動装置と、 前記ワーク保持装置の前記圧入治具駆動装置と反対側の
片脇に固定された固定構造物に前記圧入方向延長線と直
交するように摺動自在に当接され、その直交方向位置が
調整されるように構成されている楔と、 この楔に常時当接されており、この楔の前記位置によっ
て前記軸受ハウジングの外面に当接される反力受け具と
を備えていることを特徴とする軸受圧入装置。
2. A bearing press-fitting device for carrying out the bearing press-fitting method according to claim 1, wherein a work holding device for positioning and holding the bearing housing, and a press-fitting jig on which the bearing is mounted are press-fitted. A press-fitting jig driving device that is moved in a direction, and a slidable structure that is orthogonal to the press-fitting direction extension line on a fixed structure that is fixed to one side of the work holding device on the side opposite to the press-fitting jig driving device. A wedge that is in contact with the wedge and is configured to adjust its position in the orthogonal direction, and a reaction force receiver that is always in contact with the wedge and is in contact with the outer surface of the bearing housing by the position of the wedge. And a bearing press-fitting device.
JP23289992A 1992-08-07 1992-08-07 Bearing press-fitting method and device therefor Pending JPH0655372A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23289992A JPH0655372A (en) 1992-08-07 1992-08-07 Bearing press-fitting method and device therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23289992A JPH0655372A (en) 1992-08-07 1992-08-07 Bearing press-fitting method and device therefor

Publications (1)

Publication Number Publication Date
JPH0655372A true JPH0655372A (en) 1994-03-01

Family

ID=16946588

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23289992A Pending JPH0655372A (en) 1992-08-07 1992-08-07 Bearing press-fitting method and device therefor

Country Status (1)

Country Link
JP (1) JPH0655372A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006242271A (en) * 2005-03-03 2006-09-14 Mitsui Eng & Shipbuild Co Ltd How to insert a plain bearing and shaft attached to a structure
JP2008256113A (en) * 2007-04-05 2008-10-23 Jtekt Corp Assembly method of rolling bearing device for wheel
JP2009210124A (en) * 2008-02-06 2009-09-17 Asmo Co Ltd Rotary shaft attaching method, and bearing structure of rotary shaft
WO2010150306A1 (en) * 2009-06-23 2010-12-29 平田機工株式会社 Pressing-in jig, pressing-in device, and pressing-in method
WO2010150305A1 (en) * 2009-06-23 2010-12-29 平田機工株式会社 Pressing-in device
JP2011163161A (en) * 2010-02-05 2011-08-25 Keihin Corp Intake control device for internal combustion engine
CN103736880A (en) * 2013-01-18 2014-04-23 南京市栖霞区康宏塑料厂 Device for connecting close-wound spring
CN107598538A (en) * 2017-10-31 2018-01-19 苏州汉腾自动化设备有限公司 A kind of frock of integrated installation bearing
CN108723747A (en) * 2018-06-27 2018-11-02 河源职业技术学院 A kind of automatic assembling mechanism for finger tip gyro
CN112847219A (en) * 2021-03-12 2021-05-28 福州聚丰汽车零部件有限公司 Motor worm press-fitting tool
CN114248093A (en) * 2021-12-06 2022-03-29 安徽会合智能设备有限公司 A floating reaction force support mechanism and equipment for press-fitting of guide bearings
CN114535946A (en) * 2020-11-26 2022-05-27 逸美德科技股份有限公司 Inclined pushing assembly mechanism and method
CN115945888A (en) * 2023-03-09 2023-04-11 廊坊科森电器有限公司 Bearing press-fitting equipment for permanent magnet synchronous motor for automobile
CN116475728A (en) * 2023-06-06 2023-07-25 柳州卓通汽车零部件有限公司 A press-fit tooling and press-fit method for sub-frame counter-press bushings

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006242271A (en) * 2005-03-03 2006-09-14 Mitsui Eng & Shipbuild Co Ltd How to insert a plain bearing and shaft attached to a structure
JP2008256113A (en) * 2007-04-05 2008-10-23 Jtekt Corp Assembly method of rolling bearing device for wheel
JP2009210124A (en) * 2008-02-06 2009-09-17 Asmo Co Ltd Rotary shaft attaching method, and bearing structure of rotary shaft
WO2010150306A1 (en) * 2009-06-23 2010-12-29 平田機工株式会社 Pressing-in jig, pressing-in device, and pressing-in method
WO2010150305A1 (en) * 2009-06-23 2010-12-29 平田機工株式会社 Pressing-in device
JP5330514B2 (en) * 2009-06-23 2013-10-30 平田機工株式会社 Press-fitting jig, press-fitting device and press-fitting method
JP2011163161A (en) * 2010-02-05 2011-08-25 Keihin Corp Intake control device for internal combustion engine
CN103736880A (en) * 2013-01-18 2014-04-23 南京市栖霞区康宏塑料厂 Device for connecting close-wound spring
CN107598538A (en) * 2017-10-31 2018-01-19 苏州汉腾自动化设备有限公司 A kind of frock of integrated installation bearing
CN108723747A (en) * 2018-06-27 2018-11-02 河源职业技术学院 A kind of automatic assembling mechanism for finger tip gyro
CN108723747B (en) * 2018-06-27 2023-11-21 河源职业技术学院 Automatic assembly mechanism for fingertip gyroscope
CN114535946A (en) * 2020-11-26 2022-05-27 逸美德科技股份有限公司 Inclined pushing assembly mechanism and method
CN112847219A (en) * 2021-03-12 2021-05-28 福州聚丰汽车零部件有限公司 Motor worm press-fitting tool
CN114248093A (en) * 2021-12-06 2022-03-29 安徽会合智能设备有限公司 A floating reaction force support mechanism and equipment for press-fitting of guide bearings
CN115945888A (en) * 2023-03-09 2023-04-11 廊坊科森电器有限公司 Bearing press-fitting equipment for permanent magnet synchronous motor for automobile
CN116475728A (en) * 2023-06-06 2023-07-25 柳州卓通汽车零部件有限公司 A press-fit tooling and press-fit method for sub-frame counter-press bushings

Similar Documents

Publication Publication Date Title
CN111805230B (en) An automatic cross shaft assembly line
JPH0655372A (en) Bearing press-fitting method and device therefor
CN109746682B (en) Drilling and chamfering processing line for vehicle door part
CN107855595B (en) A fully automatic multi-positioning high-speed sawing machine
JP2647806B2 (en) Wheel axle automatic assembly equipment
CN117733608B (en) Vertical machining center anchor clamps and lathe
CN116967727B (en) Automatic assembly system of PCU accessory
JPH0655371A (en) Bearing press-fitting method and device therefor
KR101503015B1 (en) Apparatus for Assembling Bolts Automatically
CN119407510B (en) A bearing pressing device for automobile bearing seat
JPH0985549A (en) Press-fitting machine with retaining member assembling function and same assembling method with this press-fitting machine
CN120587895A (en) A bushing press-fitting device for cylinder cover processing
CN118989966A (en) Automatic assembly equipment for bearing assemblies
CN113618489B (en) Device for detecting and correcting jumping precision of numerical control machine tool and using method
JP4443913B2 (en) Wood precut processing machine
CN209578869U (en) A kind of magic chuck of Special purpose turning equipment
CN111015171B (en) Automatic shaft sleeve and ball core mounting equipment of universal bearing
CN212858310U (en) Welding fixture
CN214816395U (en) A equipment detects all-in-one for auto parts production
CN109866015B (en) Gear shrinkage cavity correction equipment
CN111376291B (en) A power starting device for workpiece processing fixtures
CN114101510A (en) Precise calibration continuous stamping device for high-precision die
CN223431310U (en) Auxiliary support device for loading and unloading workpieces of CNC machine tools
CN214816394U (en) Torsion-controllable automatic screw mounting device
JP2002046036A (en) General-purpose clamp device and clamp method