JPH0696890B2 - Double corridor structure - Google Patents
Double corridor structureInfo
- Publication number
- JPH0696890B2 JPH0696890B2 JP62311745A JP31174587A JPH0696890B2 JP H0696890 B2 JPH0696890 B2 JP H0696890B2 JP 62311745 A JP62311745 A JP 62311745A JP 31174587 A JP31174587 A JP 31174587A JP H0696890 B2 JPH0696890 B2 JP H0696890B2
- Authority
- JP
- Japan
- Prior art keywords
- corridor
- floor
- ceiling
- height
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Floor Finish (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 この発明は主として実験室、研究室等比較的室内の改修
の頻度が高い建物に実施される、二重廊下構造に関する
ものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to a double corridor structure, which is mainly implemented in a building such as a laboratory or a laboratory where the frequency of renovation is relatively high.
〔発明が解決しようとする問題点〕 実験室や研究室等では実験、研究内容の変更に従って室
内の改修、それに伴う配管工事が行われるが、従来の施
設では通常天井内には配管・ダクトの配置に必要なスペ
ースしか確保されないため室内改修時の配管・ダクトの
追加、変更作業が難しく、一般に天井内のメインテナン
ス上支障が大きいのが実情である。[Problems to be solved by the invention] In laboratories, laboratories, etc., rooms are modified according to changes in experiments and research, and the piping work accompanying it is carried out. Since only the space required for the layout is secured, it is difficult to add and change pipes and ducts when renovating the room, and in general the maintenance of the ceiling is a major obstacle.
この発明はこうした実験室等における配管・ダクトのメ
インテナンス上の問題に着目してなされたもので、天井
内に容易にメインテナンスができるスペースを確保する
ことにより上記の問題点を解決しようとするものであ
る。The present invention was made by paying attention to the problem of maintenance of pipes and ducts in such a laboratory, and is intended to solve the above problems by securing a space in the ceiling where maintenance can be easily performed. is there.
本発明は、廊下上方天井ふところに設備配管が配置され
た建物において、上階床と下階床との間に躯体に支持さ
せた床版を配設し上方廊下と下方廊下を形成すると共
に、上方、下方廊下を直立歩行可能な階高を確保できる
ように高くし、この高くした分を隣接する居室の天井内
空間の階高を高くし、上方廊下と天井内空間とを出入自
在にしたものであり、上方廊下をメインテナンス通路と
して配管工事、配管・ダクトの維持管理が行われる。The present invention, in a building in which equipment piping is arranged in the upper ceiling of the corridor, to form a floor slab supported by the skeleton between the upper floor and the lower floor to form an upper corridor and a lower corridor, The upper and lower corridors are raised to ensure a floor height that allows upright walking, and this raised amount is used to increase the floor height of the space in the ceiling of the adjacent living room so that the upper corridor and the space in the ceiling can enter and exit freely. The upper corridor will be used as a maintenance passage for plumbing and maintenance of piping and ducts.
以下本発明を一実施例を示す図面に基づいて説明する。 The present invention will be described below with reference to the drawings illustrating an embodiment.
この発明の二重廊下構造は下方廊下Aの上方にメインテ
ナンス通路となる上方廊下Bを形成して1フロアに廊下
を二重に配置した構造としたものである。The double corridor structure of the present invention has a structure in which an upper corridor B serving as a maintenance passage is formed above the lower corridor A and the corridors are double arranged on one floor.
第1図、第2図はそれぞれ本発明、従来構造の構成例を
示したものであるが、ここに示されるように本発明では
上方のメインテナンス通路となる上方廊下B及び下方廊
下を共に直立歩行可能な高さを確保できるように建物の
階高が大きく取られる。この結果廊下Aに接する実験室
等の居室C上にも天井空間の高いキャットウォークDが
確保される。FIG. 1 and FIG. 2 respectively show examples of the structure of the present invention and the conventional structure. As shown here, in the present invention, both the upper corridor B and the lower corridor, which are upper maintenance passages, walk upright. The floor height of the building is large so that the height can be secured. As a result, a catwalk D with a high ceiling space is secured on a living room C such as a laboratory that is in contact with the corridor A.
天井ふところの設備配管Eは階高の増大を必要最小限に
抑えるために第1図に示すように梁1に近接して配置さ
れ、これによって階高は従来より一割程度大きくすれば
足りる。具体的には廊下A、廊下Bの天井高をそれぞれ
2.5mとした場合、階高は5.0m程度となる。The equipment pipe E at the ceiling part is arranged close to the beam 1 as shown in FIG. 1 in order to suppress the increase of the floor height to a necessary minimum, whereby the floor height may be increased by about 10% as compared with the conventional one. Specifically, the ceiling heights of corridor A and corridor B are respectively
If the height is 2.5m, the floor height will be around 5.0m.
従来より一割程度大きくした分は廊下Aに接する居室C
の天井空間(キャットウォークD)の高さを高くするこ
とができる。Room C that is in contact with corridor A is about 10% larger than before
The height of the ceiling space (catwalk D) can be increased.
上方廊下Bと天井空間Dとの間を仕切らずメインテナン
スに際し自由に出入りできるようにしてある。There is no partition between the upper corridor B and the ceiling space D, so that it is possible to freely enter and exit during maintenance.
第3図はメインテナンス通路Bの詳細を示したものであ
るが、ここに示すようにメインテナンス通路Bは廊下A
の天井高位置に配置される床版2により形成される。FIG. 3 shows details of the maintenance passage B. As shown here, the maintenance passage B is in the corridor A.
It is formed by the floor slab 2 arranged at the ceiling height position.
床版2は建物の躯体に支持されて配置される。第3図の
実施例では吊天井の要領で、上階の躯体から吊木3を吊
り下げ、その下端に通路方向に取り付けられる床版受け
4上にALC版等の床版2を設置している。The floor slab 2 is arranged so as to be supported by the body of the building. In the embodiment of FIG. 3, the hanging tree 3 is hung from the frame on the upper floor in the manner of a suspended ceiling, and the floor slab 2 such as an ALC plate is installed on the floor slab receiver 4 attached at the lower end in the passage direction. There is.
床版2と上階床との間、すなわちメインテナンス通路B
には直立歩行可能な高さが確保される。Between the floor slab 2 and the upper floor, that is, the maintenance passage B
The height that can walk upright is secured.
また居室C上にはメインテナンス通路Bと同様に床版2
が設置され、この床版2がキャットウォークDとして活
用されるが、床版2上にはキャットウォークとしての機
能を果たせるだけの空間が確保される。In addition, the floor slab 2 is placed on the living room C in the same manner as the maintenance passage B.
Is installed and this floor slab 2 is utilized as a catwalk D, but a space sufficient to fulfill the function as a catwalk is secured on the floor slab 2.
この発明は以上の通りであり、廊下上に直立歩行可能な
メインテナンス通路を形成し、キャットウォーク間の出
入自在とするものであるため室内改修時等の配管工事及
び設備配管の維持管理を容易に行うことが可能となる。The present invention is as described above. Since a maintenance walkway that allows upright walking is formed in the corridor to allow access between catwalks, it is easy to perform plumbing and maintenance of facility piping when repairing rooms. It becomes possible to do.
第1図、第2図はそれぞれ本発明、従来構造の実施例を
示した断面図であり、第3図はメインテナンス通路の形
成例を示した断面図である。 A……廊下、B……メインテナンス通路、C……居室、
D……キャットウォーク、E……設備配管、 1……梁、2……床版、3……吊木、4……床版受け。1 and 2 are sectional views showing an embodiment of the present invention and a conventional structure, respectively, and FIG. 3 is a sectional view showing an example of forming a maintenance passage. A: Corridor, B: Maintenance passage, C: Living room,
D: Catwalk, E: Equipment piping, 1 ... Beam, 2 ... Floor slab, 3 ... Hanging tree, 4 ... Floor slab receiver.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 塚本 信行 東京都港区元赤坂1丁目2番7号 鹿島建 設株式会社内 (72)発明者 柏原 忠茂 東京都港区元赤坂1丁目2番7号 鹿島建 設株式会社内 (56)参考文献 実開 昭60−87950(JP,U) 実開 昭60−87949(JP,U) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Nobuyuki Tsukamoto 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (72) Inventor Tadashige Kashiwara 1-2-7 Moto-Akasaka, Minato-ku, Tokyo No. Kashima Construction Co., Ltd. (56) References: Actually open Sho 60-87950 (JP, U) Actually open Sho 60-87949 (JP, U)
Claims (1)
れた建物において、 上階床と下階床との間に躯体に支持させた床版を配設し
上方廊下と下方廊下を形成すると共に、上方、下方廊下
を直立歩行可能な階高を確保できるように高くし、この
高くした分を隣接する居室の天井内空間の高さを高く
し、上方廊下と天井内空間とを出入自在にしたことを特
徴とする二重廊下構造。1. In a building in which facility piping is arranged at the upper ceiling of a corridor, a floor slab supported by a frame is provided between the upper floor and the lower floor to form an upper corridor and a lower corridor. , The upper and lower corridors are raised to secure a floor height that allows walking upright, and this increased amount raises the height of the space in the ceiling of the adjacent living room so that the upper corridor and the space in the ceiling can enter and leave freely. Double corridor structure characterized by
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62311745A JPH0696890B2 (en) | 1987-12-09 | 1987-12-09 | Double corridor structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62311745A JPH0696890B2 (en) | 1987-12-09 | 1987-12-09 | Double corridor structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01154935A JPH01154935A (en) | 1989-06-16 |
| JPH0696890B2 true JPH0696890B2 (en) | 1994-11-30 |
Family
ID=18020968
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP62311745A Expired - Lifetime JPH0696890B2 (en) | 1987-12-09 | 1987-12-09 | Double corridor structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0696890B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2022137932A (en) * | 2021-03-09 | 2022-09-22 | 株式会社ランドビジネス | Underfloor structure of multi-story building |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5377193B2 (en) * | 2009-09-25 | 2013-12-25 | 株式会社野村総合研究所 | Data center floor structure and data center |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6087949U (en) * | 1983-11-24 | 1985-06-17 | 株式会社大林組 | double floor building |
| JPS6087950U (en) * | 1983-11-24 | 1985-06-17 | 株式会社大林組 | double floor building |
-
1987
- 1987-12-09 JP JP62311745A patent/JPH0696890B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2022137932A (en) * | 2021-03-09 | 2022-09-22 | 株式会社ランドビジネス | Underfloor structure of multi-story building |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01154935A (en) | 1989-06-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0696890B2 (en) | Double corridor structure | |
| JP7011360B1 (en) | Multi-storey wooden house | |
| JPH0561421B2 (en) | ||
| JP6913408B1 (en) | One-story wooden house | |
| JP2003184331A (en) | Building construction of mid-to-high-rise apartment house | |
| JP2002155635A (en) | Data center | |
| JP2876343B2 (en) | Floor structure of apartment house | |
| JPS63304854A (en) | Double passage structure | |
| JP2003064892A (en) | Interior structure of dwelling unit | |
| JP2876344B2 (en) | Apartment house structure | |
| JPH0819778B2 (en) | Building structure | |
| JPH06128989A (en) | Installed piping structure of apartment house | |
| JP2003082868A (en) | Multiple dwelling house | |
| JPH077489Y2 (en) | Toilet equipment structure of multi-story building | |
| JPH0768780B2 (en) | Large underground space building | |
| JPH07269137A (en) | Living space composition method of apartment and apartment | |
| JP2026058879A (en) | Container-based apartment buildings and their construction methods | |
| JP2024074727A (en) | Drainage structure, construction method for drainage structure, and building | |
| JPH069630U (en) | Guide rail for room transfer | |
| JPS6310272B2 (en) | ||
| JPH11190082A (en) | Apartment house considering comfort and individuality | |
| JPH03115661A (en) | Multiple dwelling house | |
| JPH0768781B2 (en) | Multi-storey bathroom | |
| JP2001234635A (en) | Floor planning method for plane stagger form dwelling house | |
| JPH07139196A (en) | Equipment structure for multistory housing |