JPH07189267A - Caisson blade skeleton body forming method - Google Patents
Caisson blade skeleton body forming methodInfo
- Publication number
- JPH07189267A JPH07189267A JP15934793A JP15934793A JPH07189267A JP H07189267 A JPH07189267 A JP H07189267A JP 15934793 A JP15934793 A JP 15934793A JP 15934793 A JP15934793 A JP 15934793A JP H07189267 A JPH07189267 A JP H07189267A
- Authority
- JP
- Japan
- Prior art keywords
- caisson
- skeleton
- lot
- blade
- press
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 25
- 238000010276 construction Methods 0.000 claims abstract description 40
- 238000005520 cutting process Methods 0.000 claims abstract description 24
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 56
- 229910052742 iron Inorganic materials 0.000 claims description 28
- 239000002184 metal Substances 0.000 claims description 8
- 229910052751 metal Inorganic materials 0.000 claims description 8
- 239000011178 precast concrete Substances 0.000 claims description 7
- 230000002093 peripheral effect Effects 0.000 claims description 6
- 238000011065 in-situ storage Methods 0.000 claims description 4
- 238000005266 casting Methods 0.000 claims description 3
- 230000001788 irregular Effects 0.000 abstract description 3
- 239000002689 soil Substances 0.000 description 49
- 238000009412 basement excavation Methods 0.000 description 16
- 239000004567 concrete Substances 0.000 description 16
- 238000010586 diagram Methods 0.000 description 15
- 239000004576 sand Substances 0.000 description 12
- 239000004927 clay Substances 0.000 description 7
- 238000009415 formwork Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 6
- 238000000151 deposition Methods 0.000 description 5
- 230000008021 deposition Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000004904 shortening Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 125000000391 vinyl group Chemical group [H]C([*])=C([H])[H] 0.000 description 1
- 229920002554 vinyl polymer Polymers 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、ケーソンの躯体に設け
られた刃口躯体の形成工法に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for forming a blade end skeleton provided on a skeleton skeleton.
【0002】[0002]
【従来の技術】ケーソン工法は、予め地上で構築された
ケーソンの下端部(函内)の地山を掘削して行くと、こ
の地山がケーソンの重量を支え切れなくなった時にケー
ソンは自然に沈下するという基本原理によるものであ
り、工期が短かく、人員も少なくて済む等の利点によっ
て、近年、橋梁基礎等の構築において広く採用されてい
る。2. Description of the Related Art The caisson method is to excavate the ground at the lower end (Hakouchi) of a caisson built on the ground in advance, and when this ground cannot support the weight of the caisson, the caisson will naturally It is based on the basic principle of subsidence, and has been widely adopted in recent years in the construction of bridge foundations, etc. due to the advantages such as a short construction period and a small number of personnel.
【0003】最近、オープンケーソン工法において、油
圧ジャッキとアースアンカーとの組み合わせによってケ
ーソンをその上部から圧入する工法が開発され、これに
よって、ケーソン躯体の姿勢や沈下速度を外力によって
制御することができるようになった。Recently, in the open caisson method, a method has been developed in which a caisson is press-fitted from the upper side by a combination of a hydraulic jack and an earth anchor, whereby the posture and sinking speed of the caisson body can be controlled by an external force. Became.
【0004】又、ケーソンの姿勢及び状態と、土の抵抗
力とに関する各種パラメータの計測技術が発達してき
た。又、計測データを処理し、処理結果を、地山の掘削
工事及びケーソンの圧入沈設工事に適切且つ迅速にフィ
ードバックする情報化された圧入管理技術も急速な進歩
を見せている。Further, techniques for measuring various parameters relating to the posture and condition of the caisson and the resistance of soil have been developed. In addition, the informationized press-fitting management technology that processes the measurement data and feeds back the processed results appropriately and promptly to the excavation work of the natural ground and the press-fitting and submergence work of the caisson is showing rapid progress.
【0005】上述のような各分野での技術の発達によっ
て、最近、都会地において周辺を建物や地下鉄等に囲ま
れた不整形な敷地に高層ビル等の大型建築物を構築する
場合に、少ないコスト及び人員で短い工期で構築するた
めに、その地下部分をオープンケーソン工法を用いて構
築しようとする傾向が増大しつつある。Due to the development of the technology in each field as described above, it is rare when building a large building such as a high-rise building on an irregular site surrounded by buildings and subways in the urban area recently. There is an increasing tendency to construct the underground part using the open caisson method in order to construct it in a short construction period with cost and personnel.
【0006】オープンケーソン工法では、ケーソン躯体
の周壁下端に刃型の刃口躯体を設ける。この刃口躯体は
2つの機能を有する。即ち、第1に、函内を掘削してい
る時は、ケーソン躯体が不意に落下しないようにケーソ
ン躯体の荷重を支持していなければならないが、掘削時
に刃口躯体周辺の土を所定量だけ残すことによって、ケ
ーソン躯体の荷重の一部を刃口躯体に支持させる。[0006] In the open caisson method, a blade-type blade opening skeleton is provided at the lower end of the peripheral wall of the caisson skeleton. This blade skeleton body has two functions. That is, firstly, when excavating the inside of the box, it is necessary to support the load of the caisson skeleton so that the caisson skeleton does not drop unexpectedly. By leaving it, part of the load of the caisson body is supported by the blade body.
【0007】第2に、刃口躯体は、刃型形状をしている
ことによって、ケーソン躯体を圧入沈下させる時に、そ
の周辺の土を切り崩すための切り先としての機能を果た
し、ケーソン躯体の沈下が円滑且つ短時間で行われるよ
うにしている。Secondly, since the blade skeleton body has a blade-shaped shape, when the caisson skeleton body is press-fitted and submerged, the blade skeleton skeleton body functions as a cutting edge for cutting down the soil around the caisson skeleton body, and the caisson body sunk Is carried out smoothly and in a short time.
【0008】従来は、例えば図27に示すように、ケー
ソンの刃口躯体1はケーソン躯体2の最下端部にある梁
7と一緒に下記のように構築されていた。先ず、地山8
の表面GL上に、刃口躯体1を支持するための捨てコン
クリート3を打設する。Conventionally, for example, as shown in FIG. 27, a caisson blade skeleton body 1 is constructed as follows together with a beam 7 at the lowermost end of a caisson body 2. First, the ground 8
The waste concrete 3 for supporting the blade skeleton body 1 is placed on the surface GL of.
【0009】次に、足場を組んで、刃口躯体1とケーソ
ン躯体2とを一体として形成するための型枠4を組み立
てる。この際、型枠4のケーソン躯体2の部分を下から
支持するための支保工5を設置する。Next, a scaffold is assembled to assemble a form 4 for integrally forming the blade body 1 and the caisson body 2. At this time, a supporting structure 5 for supporting the caisson frame 2 portion of the form 4 from below is installed.
【0010】そして、型枠4の中で鉄筋を組み、コンク
リートを打設することによって、刃口躯体1とケーソン
躯体2とを一体として構築する。その際、刃口躯体1の
先端部には刃先金物6を取り付ける。Then, the reinforcing bar is assembled in the form 4 and the concrete is poured to construct the blade skeleton skeleton 1 and the caisson skeleton 2 integrally. At this time, a blade metal fitting 6 is attached to the tip of the blade skeleton body 1.
【0011】上記のようにして、刃口躯体1とケーソン
躯体2の最下部とを一体として構築した後に支保工5を
撤去する。そして、刃口躯体1の周辺の土を残して地山
8の掘削を行った後にケーソン躯体2を上方から油圧で
圧入することによって、刃口躯体1の周辺の土を崩して
刃口躯体1及びケーソン躯体2を一体として沈設させて
いた。After the blade skeleton body 1 and the lowermost portion of the caisson skeleton body 2 are constructed integrally as described above, the supporting work 5 is removed. Then, after excavating the natural ground 8 while leaving the soil around the blade opening body 1 in place, the caisson body 2 is hydraulically pressed from above to collapse the soil around the blade opening body 1 to collapse the blade opening body 1. And, the caisson frame 2 was integrally sunk.
【0012】[0012]
【発明が解決しようとする課題】しかしながら、上記従
来の構築方法では、支保工5の設置及び撤去に多大の時
間を要するため、工期短縮の障害になっていた。その
上、支保工5を全部一緒に撤去することができないた
め、刃口躯体1の刃先金物6への荷重が不均一になり、
その結果、ケーソン躯体2の不同沈下が起こり安全上問
題となっていた。However, in the above-mentioned conventional construction method, it takes a lot of time to install and remove the support work 5, which is an obstacle to shortening the construction period. Moreover, since it is not possible to remove all the supporting members 5 together, the load on the cutting edge hardware 6 of the blade skeleton body 1 becomes uneven,
As a result, differential settlement of the caisson skeleton 2 occurred, which was a safety issue.
【0013】従って、工期短縮と安全施工の両方の要求
を満足するケーソンの刃口躯体に解決しなければならな
い課題を有している。Therefore, there is a problem to be solved in a caisson blade skeleton body that satisfies both the requirements of shortening the construction period and safety construction.
【0014】[0014]
【課題を解決するための手段】上記課題を解決するため
に、本発明に係るケーソンの刃口躯体は、ケーソン躯体
の周壁下端に設けられ、且つ、刃型形状をなす刃口躯体
であって、上記ケーソン躯体の構築とは独立に、上記ケ
ーソン躯体を沈設する地中に先行的に構築され、後に、
地上で構築された上記ケーソン躯体と連結されるように
構成される。In order to solve the above-mentioned problems, the caisson blade body according to the present invention is provided at the lower end of the peripheral wall of the caisson body, and is a blade-shaped body body. , Independently of the construction of the caisson skeleton, it is constructed in advance in the ground where the caisson skeleton is sunk, and later,
It is configured to be connected to the caisson body constructed on the ground.
【0015】又、上記刃口躯体は、予め鉄板とプレキャ
ストコンクリートとで一体構成された既製品を使用して
構成される。そして、上記刃口躯体は、現場打ちで作成
され、この際、刃先金物を鉄板で補強し、型枠として兼
用して構成される。更に、上記刃口躯体の先端部に、摩
擦切り部材を設ける。The blade skeleton body is constructed by using an off-the-shelf product which is preliminarily integrated with an iron plate and precast concrete. Then, the blade skeleton body is formed by in-situ casting, and at this time, the blade tip metal piece is reinforced with an iron plate and is also used as a mold. Further, a friction cutting member is provided at the tip of the blade body.
【0016】[0016]
【作用】上記構成により、ケーソン躯体を沈設する地山
のケーソン刃口躯体該当部分を先行的に掘削し、この掘
削された地中にケーソン刃口躯体を配設する。一方、ケ
ーソン躯体は、地面によって支持されて地上で構築され
る。つまり、刃口躯体とケーソン躯体とは、夫々独立に
構築され、後に連結されて一体となるのである。With the above construction, the portion corresponding to the caisson blade skeleton body of the ground where the caisson skeleton body is to be laid is excavated in advance, and the caisson blade skeleton body is arranged in the excavated ground. On the other hand, the caisson frame is supported on the ground and constructed on the ground. In other words, the blade body and the caisson body are constructed independently of each other, and are later connected and integrated.
【0017】このように、刃口躯体はケーソン躯体とは
独立に地中に先行的に構築され、一方、ケーソン躯体は
地面に支持されて構築されるから、従来技術における支
保工5が不要となる。その結果、支保工5の組み立て及
び撤去のための人と時間とが節約され、工期が短縮され
ると共に、圧入時には、不同沈下の恐れがなく安全性が
向上する。As described above, since the blade body is constructed in advance in the ground independently of the caisson body, while the caisson body is constructed by being supported on the ground, the supporting work 5 in the prior art is unnecessary. Become. As a result, the man and time for assembling and removing the support work 5 are saved, the construction period is shortened, and there is no fear of differential settlement when press-fitting, and safety is improved.
【0018】又、刃口躯体は、ケーソン躯体とは独立に
構築されるから、工場等で鉄板とプレキャストコンクリ
ートとによって一体として製作し、これを予め先行掘削
しておいた地山の該当位置に運搬して配設すればよく、
或はコンクリート現場打ちで構築してもよい。Further, since the blade opening skeleton is constructed independently of the caisson skeleton, it is manufactured integrally with an iron plate and precast concrete at a factory or the like, and is placed at a corresponding position of the ground previously excavated beforehand. It may be transported and installed,
Alternatively, it may be constructed by concrete pouring.
【0019】現場打ちの場合には、刃先金物を鉄板で補
強し、型枠として兼用することにより資材、人件費共に
軽減される。又、刃口躯体の刃先先端部に摩擦切り部材
を設けることによって、周辺の土との間の摩擦を減少
し、ケーソン躯体の圧入を円滑にする。In the case of in-situ casting, the cutting edge hardware is reinforced with an iron plate and is also used as a form, so that both material and labor costs are reduced. Further, by providing the friction cutting member at the tip of the blade tip body, friction with the surrounding soil is reduced, and the caisson body is smoothly press-fitted.
【0020】[0020]
【実施例】以下、本発明に係るケーソンの刃口躯体を適
用したケーソン工事の実施例について図1〜図22を用
いて説明する。本実施例は、図1に示すように、隣接建
物、道路、地下鉄に囲まれた不整形の敷地に、高層建
築、例えば地上10階建ての建物の地下部分をオープン
ケーソンによって構築するものである。EXAMPLES Examples of caisson construction using the caisson blade body according to the present invention will be described below with reference to FIGS. In this embodiment, as shown in FIG. 1, a high-rise building, for example, an underground portion of a building with 10 floors above ground is constructed by an open caisson on an irregular site surrounded by adjacent buildings, roads and subways. .
【0021】このオープンケーソンは、ケーソン躯体2
と、ケーソン躯体2の周壁下端に設けられた刃型の刃口
躯体1とからなる。ケーソン躯体2は、4層のロット、
即ち、下から第1ロット躯体2a、第2ロット躯体2
b、第3ロット躯体2c、第4ロット躯体2dを、順次
積み重ねて構築している。This open caisson is a caisson body 2
And a blade-type blade mouthpiece body 1 provided at the lower end of the peripheral wall of the caisson body 2. The caisson body 2 is a four-layer lot,
That is, from the bottom, the first lot body 2a and the second lot body 2
b, the third lot skeleton 2c, and the fourth lot skeleton 2d are sequentially stacked and constructed.
【0022】第1ロット躯体2aの高さは約5.5メー
トル、重量約4000トンであり、第2ロット躯体2b
は地下3階に相当し、その高さは約5.4メートル、重
量は約2500トンであり、第3のロット躯体2cは地
下2階に相当し、その高さは約5.4メートル、重量は
約2000トンであり、第4のロット躯体2dは地下1
階に相当し、その高さは約5.3メートル、重量は約1
800トンである。The height of the first lot body 2a is about 5.5 meters and the weight thereof is about 4000 tons.
Corresponds to the third basement level, its height is about 5.4 meters, its weight is about 2500 tons, and the third lot skeleton 2c corresponds to the second basement, its height is about 5.4 meters, It weighs about 2000 tons, and the fourth lot body 2d is underground 1
Equivalent to a floor, its height is about 5.3 meters and its weight is about 1
It is 800 tons.
【0023】ケーソン工事は、各ロット躯体の構築と、
そのロット躯体の直下のロット躯体以下の圧入沈設とを
併行して行う効率的な方法を用いている。The caisson construction consists of building each lot body,
An efficient method is used in which press-fitting and deposition below the lot skeleton immediately below the lot skeleton is performed in parallel.
【0024】即ち、先ず刃口躯体1と第1ロット躯体2
aとを夫々独立に構築し、それらを連結する。そして、
刃口躯体1及び第1ロット躯体2aを一体として圧入沈
設しながら第1ロット躯体2aの上に第2ロット躯体2
bを構築する。That is, first, the blade skeleton body 1 and the first lot body 2
build a and a respectively independently, and connect them. And
The second lot skeleton 2 is placed on the first lot skeleton 2a while press-fitting the blade skeleton skeleton 1 and the first lot skeleton 2a as one body.
build b.
【0025】次に、第2ロット躯体2b以下の躯体を一
体として圧入沈設しながら、第2ロット躯体2bの上に
第3ロット躯体2cを構築してから、第3ロット躯体2
c以下を一体として圧入沈設しながら、第3ロット躯体
2cの上に第4ロット躯体2dを構築する。Next, the third lot skeleton 2 is constructed after the third lot skeleton 2c is constructed on the second lot skeleton 2b while press-fitting and depositing the skeletons of the second lot skeleton 2b and below as one body.
The fourth lot skeleton 2d is constructed on the third lot skeleton 2c while press-fitting and substituting c and below as one body.
【0026】最後に、第4ロット躯体2d以下を一体と
して圧入沈設することによって、ケーソンの施工を終了
する。Finally, the caisson construction is completed by press-fitting and digging together the fourth lot skeletons 2d and below.
【0027】尚、圧入は、アースアンカー9と油圧ジャ
ッキ10との組み合わせからなる周知の圧入設備を第1
ロット躯体2a上の複数箇所に配設し、これらの圧入設
備の動作を各種計測器とデータ処理装置とで情報化され
た圧入制御システムによって制御することによって行っ
ている。For the press-fitting, the well-known press-fitting equipment consisting of a combination of the ground anchor 9 and the hydraulic jack 10 is used as the first.
The lots are provided at a plurality of positions on the skeleton 2a, and the operations of these press-fitting facilities are controlled by a press-fitting control system that is informed by various measuring instruments and data processing devices.
【0028】ケーソン工法においては、ある敷地に地下
躯体を安全、円滑、且つ能率的に沈設するためには、そ
の敷地の地質調査が重要である。本実施例の敷地の地質
調査の結果によれば、土質は、例えば図7に示す地質柱
状図で表わされるように、上から埋土が約2.30メー
トル、ローム層が約5.70メートル、疑灰質シルトが
約7.60メートル、粘土が約9.80メートル、粘土
質シルトが約10.60メートル、シルト質細砂が約1
2.05メートル、細砂が約13.10メートル、中砂
が約14.50メートル、シルト混じり細砂が約15.
50メートル、貝殻混じり細砂が約17.30メート
ル、シルトが約18.60メートル、細砂が約20.3
0メートル、砂質シルトが約19.30メートル、細砂
が約20.30メートル、砂混じりシルトが約23.4
0メートル、砂混じり中砂が約24.50メートル、砂
礫が約30.55メートルとなっており、これら土質の
N値、せん断抵抗角、粘着力共に、深度方向に大きな変
化が見られ、土砂の掘削とケーソンの沈設の管理を難し
くする要因の一つとなっている。In the caisson method, in order to safely, smoothly and efficiently deposit an underground skeleton on a site, it is important to survey the site. According to the results of the geological survey of the site of the present embodiment, the soil quality is, for example, as shown in the geological column diagram in FIG. 7, about 2.30 meters of buried soil and about 5.70 meters of loam layer from the top. , Pseudo ash silt is about 7.60 meters, clay is about 9.80 meters, clay silt is about 10.60 meters, silty fine sand is about 1
2.05m, fine sand about 13.10m, medium sand about 14.50m, silt mixed fine sand about 15.
50 meters, about 17.30 meters of fine sand mixed with shells, about 18.60 meters of silt, about 20.3 of fine sand
0 meters, sandy silt about 19.30 meters, fine sand about 20.30 meters, sand mixed silt about 23.4
0 m, sand mixed sand is about 24.50 m, and gravel is about 30.55 m. A great change in the depth direction can be seen in the N value of these soils, shear resistance angle, adhesive strength, etc. It is one of the factors that make it difficult to control excavation and caisson deposition.
【0029】以下、ケーソン工事準備から工事完了まで
の工事全体の流れについて項目に従って説明する。 1.基礎杭及びアースアンカーの設置(図2、図4、図
5参照) 先ず、アースドリル工法等によって、数十本の基礎杭が
支持層の深さに打設される。この基礎杭はケーソン工法
により地下建設が完了した時に第1ロット躯体2aと連
結されることになる。The flow of the whole construction from the caisson construction preparation to the construction completion will be described below item by item. 1. Installation of foundation piles and earth anchors (see FIGS. 2, 4, and 5) First, dozens of foundation piles are driven to the depth of the support layer by the earth drill method or the like. This foundation pile will be connected to the first lot body 2a when the underground construction is completed by the caisson method.
【0030】次に、複数のアースアンカー9を所定の複
数の位置に設置する。アースアンカー9は、ケーソンを
沈下するのに最適な深さまで削孔された穴の底に打ち込
まれ固定されたコンクリートからなるアンカー本体と、
このアンカー本体を上に引っ張る緊張材とを有してお
り、この緊張材は後に油圧ジャッキ10と連結される。Next, a plurality of ground anchors 9 are installed at a plurality of predetermined positions. The earth anchor 9 is an anchor body made of concrete that is fixed and fixed to the bottom of a hole drilled to the optimum depth for sinking the caisson.
The tension member pulls the anchor body upward, and the tension member is connected to the hydraulic jack 10 later.
【0031】2.刃口躯体1の製作と地山の先行掘削
(図8〜図10参照) アースアンカー9等の設置とほぼ併行して、地山8の刃
口躯体1該当位置に、刃口躯体1を埋設するための穴8
aを先行的に掘削する。この時、既に工場等において、
図8に示すように、プレキャストコンクリート1aと、
鉄板1bと、空洞1cとからなる刃口躯体1が製作され
て準備されているようにする。2. Manufacture of blade base 1 and preliminary excavation of the ground (see FIGS. 8 to 10) Almost in parallel with the installation of ground anchors 9 and the like, the blade base 1 is buried at the position corresponding to the blade base 1 of the ground 8. Hole 8 for
A is excavated in advance. At this time, already in factories,
As shown in FIG. 8, with precast concrete 1a,
The blade skeleton body 1 including the iron plate 1b and the cavity 1c is manufactured and prepared.
【0032】刃口躯体1は、プレキャストコンクリート
1aと鉄板1bとで一体形成されているため充分に大き
い耐圧強度を有している。又、刃口躯体1は鉄板1bの
厚さは薄く、その上、空洞1cを形成してあるから軽量
であり、現場での運搬等の作業に便利なように作られて
いる。Since the blade skeleton body 1 is integrally formed of the precast concrete 1a and the iron plate 1b, it has a sufficiently large pressure resistance. Further, the blade skeleton body 1 is light in weight because the iron plate 1b is thin and the cavity 1c is formed on the iron plate 1b, and is made convenient for the work such as transportation on site.
【0033】又、プレキャストコンクリート1aの内面
には凹凸を付けている。この凹凸によって、現場で空洞
1cにコンクリートを流し込み第1ロット躯体2aと一
体化した時に、両者の結合力が大きくなるようにしてい
る。The inner surface of the precast concrete 1a is uneven. Due to the unevenness, when concrete is poured into the cavity 1c at the site and integrated with the first lot skeleton 2a, the bonding force between the two is increased.
【0034】又、刃口躯体1の刃先には、摩擦切り18
を設けている。これは、ケーソン躯体2を沈下させる
時、ケーソン躯体の周面と周囲の土との摩擦をできるだ
け減少し、沈設を円滑にするためのものである。Further, the cutting edge of the blade skeleton body 1 has a friction cutting 18
Is provided. This is to reduce the friction between the peripheral surface of the caisson body and the surrounding soil as much as possible when the caisson body 2 is submerged, and to make the deposition smooth.
【0035】3.刃口躯体1の配設 上記既製の刃口躯体1は、穴8aの掘削開始時には工事
現場に運搬され、既に準備されている。そこで、刃口躯
体1を、図9に示すように、掘削された穴8aの中に配
設する。3. Arrangement of the blade end frame 1 The ready-made blade end frame 1 is transported to the construction site at the start of excavation of the hole 8a and is already prepared. Therefore, the blade skeleton body 1 is arranged in the excavated hole 8a as shown in FIG.
【0036】4.第1ロット躯体2aの構築(図1〜図
6参照) 第1ロット躯体2aの構築は、刃口躯体1の構築と併行
して独立に行われている。その構築作業は、地山8の地
面GLによって支持して行われ、鉄筋組み立て、型枠形
成、躯体コンクリート打設、養生、第1ロット躯体2a
完成、型枠及び足場の解体の各工程からなる。4. Construction of the first lot skeleton 2a (see FIGS. 1 to 6) The construction of the first lot skeleton 2a is carried out independently of the construction of the blade skeleton skeleton 1. The construction work is carried out by being supported by the ground GL of the ground 8, and the rebar assembly, formwork formation, skeleton concrete placement, curing, first lot skeleton 2a
Completion, dismantling the formwork and scaffolding.
【0037】この場合、第1ロット躯体2aは、地山8
によって支持されているので、支保工が不要であり、且
つ、安定性も良いので、従来に比して、施工工期が短縮
されると共に安全性も高い。In this case, the first lot skeleton 2a is the ground 8
Since it is supported by, the supporting work is unnecessary and the stability is good, so the construction period is shortened and the safety is high compared with the conventional one.
【0038】第1ロット躯体2aは、ケーソン躯体2の
周囲に沿って適当な間隔で立設された複数の柱2eと、
これらの柱2eを含む周壁2fと、2本の柱2e間を適
宜水平に連結するように設けられた複数の梁2gとで一
体に構成されている。尚、隣接する梁2gの間には複数
の開口12が形成される。The first lot skeleton 2a includes a plurality of pillars 2e which are erected at appropriate intervals along the periphery of the caisson skeleton 2.
A peripheral wall 2f including these pillars 2e and a plurality of beams 2g provided so as to appropriately connect the two pillars 2e horizontally are integrally configured. A plurality of openings 12 are formed between the adjacent beams 2g.
【0039】3.刃口躯体1と第1ロット躯体2aとの
連結(図10参照) 第1ロット躯体2aのコンクリート打ちの時に、刃口躯
体1の空洞部1cにコンクリートを流し込み、図10に
示すように、刃口躯体1と第1ロット躯体2aとを一体
化する。3. Connection between the blade mouth skeleton 1 and the first lot skeleton 2a (see FIG. 10) When concrete is poured into the first lot skeleton 2a, concrete is poured into the cavity portion 1c of the blade skeleton skeleton 1 and, as shown in FIG. The mouthpiece 1 and the first lot body 2a are integrated.
【0040】4.圧入設備とクレーン等の設置(図1〜
図6参照) 完成した第1ロット躯体2aの上に、タワークレーン1
4を設置する。そして、第1ロット躯体2aの開口12
を跨ぐようにして加圧桁11を設置する。更に、加圧桁
11の上に油圧ジャッキ10を設置し、油圧ジャッキ1
0とアースアンカー9の上記緊張材の上端とを連結す
る。4. Installation of press fitting equipment and crane (Fig. 1-
(Refer to FIG. 6) The tower crane 1 is placed on the completed first lot body 2a.
Install 4. Then, the opening 12 of the first lot body 2a
The pressure girder 11 is installed so as to straddle. Further, the hydraulic jack 10 is installed on the pressure girder 11, and the hydraulic jack 1
0 and the upper end of the tension member of the ground anchor 9 are connected.
【0041】このようにして、アースアンカー9の緊張
材を油圧ジャッキ10で引っ張ることによって、油圧ジ
ャッキ10の圧力を加圧桁11に対して下向きに印加す
ることができるようになる。尚、各油圧ジャッキ10の
配設位置は、上記土質調査結果に基づき決定されてい
る。In this way, by pulling the tension member of the earth anchor 9 with the hydraulic jack 10, the pressure of the hydraulic jack 10 can be applied downward to the presser girder 11. In addition, the arrangement position of each hydraulic jack 10 is determined based on the results of the soil investigation.
【0042】5.掘削(図3参照) ケーソン躯体2の外側の地面上にはグラブホッパー15
及びクラムシェル16が設置され、タワークレーン14
によって開口12を通って、ミニバックホウ13等の掘
削機器がケーソン躯体2の下に配置される。又、ケーソ
ン躯体2の外側の適当な位置にダンプトラック17が配
置される。5. Excavation (see Figure 3) Grab hopper 15 on the ground outside the caisson frame 2
And clamshell 16 are installed, and tower crane 14
Through the opening 12, an excavating device such as a mini backhoe 13 is arranged under the caisson frame 2. Further, the dump truck 17 is arranged at an appropriate position outside the caisson frame 2.
【0043】次に、刃口躯体1の周囲の土を、後述する
ように、土質に応じて定められた法面角度及び分量に従
っ残して、その他の土をミニバックホウ13等を用いて
掘削する。この掘削された土砂はタワークレーン14、
クラブホッパー15等によって開口12を通って吊りあ
げられ、ダンプトラック17に積載されて外部へ運搬さ
れる。Next, as will be described later, the soil around the blade structure 1 is left according to the slope angle and amount determined according to the soil quality, and the other soil is excavated by using the mini backhoe 13 or the like. To do. This excavated earth and sand is tower crane 14,
It is hung up through the opening 12 by the club hopper 15, etc., loaded on the dump truck 17 and transported to the outside.
【0044】6.第1ロット躯体2aの圧入沈設(図2
〜図6参照) 掘削が終了したら、油圧ジャッキ10を動作させ、加圧
桁11を介して第1ロット躯体2aに下向きの圧力を加
える。すると、刃口躯体1の周囲に残してある土の抵抗
力が圧入力に抗し切れなくなった時、刃口躯体1と第1
ロット躯体2aとは、一体となって沈下する。6. Press-fitting and sinking the first lot body 2a (Fig. 2
(See FIG. 6) After the excavation is completed, the hydraulic jack 10 is operated to apply downward pressure to the first lot skeleton 2a via the presser girder 11. Then, when the resistance force of the soil remaining around the blade body 1 becomes unable to withstand the pressure input, the blade body 1 and the first body
The lot body 2a and the lot body 2a sink together.
【0045】7.第2、第3、第4ロット躯体の構築及
び沈設 第iロット躯体(i=2〜4)の構築は、第(i−1)
ロット躯体以下の躯体の圧入沈設と併行して、上記の第
1ロット躯体2aの構築と同様の手順で、地上で、足場
の組立、鉄筋の組立、型枠の組立、コンクリート打設、
養生、型枠及び足場の解体の各工程によって行われる。7. Construction of the 2nd, 3rd, and 4th lot skeletons and deposition The construction of the i-th lot skeleton (i = 2 to 4) is (i-1)
In parallel with the press-fitting and sinking of the skeletons below the lot skeleton, in the same procedure as the construction of the first lot skeleton 2a, on the ground, scaffold assembly, rebar assembly, formwork assembly, concrete pouring,
It is carried out by each process of curing, dismantling the formwork and scaffolding.
【0046】そして、第iロット躯体の構築が完了する
と、第iロット躯体以下の全躯体を、上記のように油圧
によって圧入沈設し、この圧入沈設と併行して、第(i
+1)ロット躯体の構築を行う。When the construction of the i-th lot skeleton is completed, all the skeletons below the ith lot skeleton are press-fitted and sunk by the hydraulic pressure as described above, and in parallel with this press-fitting and sunk, the (i
+1) Build the lot skeleton.
【0047】8.機材の撤去等 以上のようにしてケーソン躯体2の沈設が完了したら、
タワークレーン14及びグラブホッパー15を解体し、
加圧桁11、及び油圧ジャッキ10を撤去する。尚、ア
ースアンカー9は、放置される。8. Removal of equipment, etc. When the caisson frame 2 is completely laid down as described above,
Dismantle the tower crane 14 and grab hopper 15,
The pressure girder 11 and the hydraulic jack 10 are removed. The earth anchor 9 is left as it is.
【0048】9.底部コンクリート打設、完了 最後に、第1のロット躯体1aと基礎杭とを連結するた
めのコンクリートを打設してケーソンの沈設工事は完了
する。9. Bottom concrete pouring, completion Finally, the caisson digging work is completed by pouring concrete for connecting the first lot skeleton 1a and the foundation pile.
【0049】上述したような、多数の人員と機器とを同
時に働かせて実施する大規模なケーソン沈設工事を安全
且つ最短期間で行うためには、従来のようにオペレータ
が沈下計を用いてその経験と勘によって行う方法では到
底実施不可能である。In order to safely and quickly perform a large-scale caisson laying work, as described above, in which a large number of personnel and equipment are operated at the same time, an operator uses a subsidence gauge to gain experience as in the past. It is impossible at all to implement it by the method of using intuition.
【0050】そのため、本実施例においては、予め作業
工程毎に予想される危険項目を抽出してその対策をたて
ることによって形成された徹底した安全管理システム
と、経験や勘に頼らず科学的な理論と現実に採取された
データとに基づく情報化された半自動圧入管理システム
とが適用されている。Therefore, in the present embodiment, a thorough safety management system formed by extracting the dangerous items expected for each work process in advance and taking countermeasures against them, and a scientific system without relying on experience or intuition An informationized semi-automatic press-fit management system based on various theories and data actually collected is applied.
【0051】上記、安全管理システム及び情報化された
半自動圧入管理システムについては、本発明に係る刃口
躯体と直接関係がないので詳細説明は省略する。しかし
ながら、安全管理事項の中で一つだけ本発明に係る刃口
躯体1に関係のある、土の法面の角度管理について以下
説明する。The safety management system and the computerized semi-automatic press-fitting management system described above are not directly related to the blade skeleton body according to the present invention, and a detailed description thereof will be omitted. However, the angle management of the slope of the soil, which is related to the blade skeleton body 1 according to the present invention among only one safety management item, will be described below.
【0052】本ケーソン工事においては、地山を掘り進
むに従って、土質はローム、粘土、砂と変化して行く。
このことは、掘削した土の自然の法面角度が変化するこ
とを意味し、一律な掘削方法で掘削した場合には、土の
抵抗力とケーソンの荷重のアンバランスが生じ、ケーソ
ンの急沈下や、沈下不足の原因になる。In this caisson construction, the soil quality changes to loam, clay and sand as the ground is dug.
This means that the natural slope angle of the excavated soil changes, and when excavating with a uniform excavation method, an imbalance between the soil resistance and the caisson load occurs, causing rapid caisson settlement. It also causes a lack of subsidence.
【0053】従って、本実施例においては、下記のよう
に、土質に応じて法面角度を変化するように管理を行っ
ている。この法面角度の管理は法尻位置を必ず確認する
ことによって確実に行っている。Therefore, in this embodiment, control is performed so that the slope angle is changed according to the soil quality as described below. This slope angle is managed by surely confirming the slope end position.
【0054】土質がローム層の場合には、掘削は図11
〜図14に示すような手順で行われる。即ち、先ず、図
11に示すように、法尻位置Pから第1ロット躯体2a
梁2gの下のローム層19の法面角度を約45度にす
る。When the soil is loam layer, excavation is performed as shown in FIG.
~ The procedure is as shown in Fig. 14. That is, first, as shown in FIG. 11, from the trailing edge position P to the first lot body 2a.
The slope angle of the loam layer 19 under the beam 2g is set to about 45 degrees.
【0055】次に、図12に示すように、梁2gの真下
のローム層19からなる土19aを、ケーソン躯体を支
持する部分19bを残して直角に削り取る。Next, as shown in FIG. 12, the soil 19a consisting of the loam layer 19 directly below the beam 2g is cut off at a right angle, leaving a portion 19b for supporting the caisson frame.
【0056】そして、図13に示すように、ケーソン躯
体を圧入することによって、図12に示す残してあった
土19bを外側に押し出した後に、図14に示すよう
に、法面に押し出されて流れ落ちた土を掘削し搬出す
る。Then, as shown in FIG. 13, the caisson skeleton is press-fitted to push out the remaining soil 19b shown in FIG. 12 to the outside, and as shown in FIG. Excavate the soil that has run off and carry it out.
【0057】又、粘土層20の場合には、最初は図15
に示すように、粘土層20が刃口躯体1と梁2gの一部
と接し、その法尻位置Pにおける法面角度は約45度と
する。そして、図16に示すように、法面に沿って所定
の厚さだけ土20aを掘削した後に、図17に示すよう
に、ケーソン躯体2を圧入して土20aに相当するぶん
の土20bを下側に押し出しをする。その結果、図18
に示すように、法面及びその下の面に流れ落ちた土20
cを掘削し搬出する。Further, in the case of the clay layer 20, first, as shown in FIG.
As shown in, the clay layer 20 is in contact with the blade skeleton body 1 and a part of the beam 2g, and the slope angle at the slope position P is about 45 degrees. Then, as shown in FIG. 16, after excavating the soil 20a by a predetermined thickness along the slope, as shown in FIG. 17, the caisson skeleton body 2 is press-fitted to remove the soil 20b corresponding to the soil 20a. Push it down. As a result, FIG.
As shown in, soil 20 that has run down the slope and the surface below it.
Excavate c and carry it out.
【0058】砂質土21の場合には、先ず図19に示す
ように、砂質土21は刃口躯体1にのみ接し、法尻位置
Pからの法面角度は約60度となるようにする。In the case of the sandy soil 21, first, as shown in FIG. 19, the sandy soil 21 contacts only the blade skeleton body 1 and the slope angle from the slope position P is about 60 degrees. To do.
【0059】そして、図20に示すように、法面に沿っ
て所定の厚さの土21aだけ掘削し、次に図21に示す
ように、ケーソン躯体2を圧入する。その結果、図22
に示すように、傾斜面及びその下の面に流れ落ちた土2
1bを掘削し搬出する。Then, as shown in FIG. 20, the soil 21a having a predetermined thickness is excavated along the slope, and then, as shown in FIG. 21, the caisson frame 2 is press-fitted. As a result, FIG.
As shown in Fig. 2, the soil that has run down to the slope and the surface below it 2
Excavate 1b and carry it out.
【0060】上記のように、深度による土質の変化に応
じて掘削と圧入の作業手順を変化させることによって、
ケーソン沈設工事の安全性が高まると共に、工事の進行
速度が一定となる。又、場所によって刃口抵抗力に偏り
があるような場合には場所によって掘削手順を変えるこ
とによって、不同沈下を防止することができる。As described above, by changing the work procedure for excavation and press-fitting according to the change in soil quality depending on the depth,
The safety of caisson construction will increase and the speed of construction will be constant. Further, when the cutting edge resistance force is biased depending on the location, it is possible to prevent the differential settlement by changing the excavation procedure depending on the location.
【0061】本ケーソン圧入沈設工事は、下記の基準に
従って実施される。 (1)圧入開始前は、全員退去し、点呼を行い、根切底
が無人状態であることを確認する。又、機械類は全て、
開口部12の下に集める。 (2)ケーソン躯体2の水平を確認する。The caisson press-fitting and substituting work is carried out according to the following criteria. (1) Before the start of press-fitting, all members leave and make a roll call to confirm that the root cutting base is unattended. Also, all the machinery is
Collect under the opening 12. (2) Check the horizontalness of the caisson body 2.
【0062】(3)各油圧ジャッキ10に平均に予備載
荷(例えば約50トン)する。この際、例えば0トンか
ら50トンに加圧した後0トンに戻し、これを3回繰り
返す。これによって、ケーソン外周の土によって発生す
る初期摩擦力を除去する。(3) An average preliminary load (for example, about 50 tons) is applied to each hydraulic jack 10. At this time, for example, the pressure is increased from 0 ton to 50 ton, then returned to 0 ton, and this is repeated three times. This removes the initial frictional force generated by the soil around the caisson.
【0063】(4)初期摩擦力が無くなったことを歪み
量によって確認した後に、例えば約75トンまで加圧す
る。 (5)沈下が進まない場合には、例えば25トンずつ最
大200トンまで増圧する。この場合、増圧後は充分な
静止時間(実施例においては5分以上)を設け、沈下の
傾向を把握する。(4) After confirming that the initial frictional force has disappeared by the amount of strain, pressurization is applied to, for example, about 75 tons. (5) When the settlement does not proceed, the pressure is increased by 25 tons up to a maximum of 200 tons. In this case, a sufficient rest time (5 minutes or more in the example) is provided after the pressure increase to grasp the tendency of subsidence.
【0064】(6)例えば約175トンを越えても予定
沈下量に達しない場合は、原因を究明し、対策を再考す
る。なお、所定重量(実施例においては200トン)以
上の荷重は加えない。 (7)予定沈下量に達したら、全油圧ジャッキ10の油
圧を抜き、ケーソン躯体2が水平であることを確認す
る。この際、油圧が完全に抜け、ケーソン躯体2の沈下
が完全に止ったことを確認するまでは、根切底には立ち
入らないように注意する。(6) For example, if the planned subsidence amount is not reached even if the amount exceeds about 175 tons, the cause is investigated and the countermeasure is reconsidered. In addition, a load of a predetermined weight (200 tons in the embodiment) or more is not applied. (7) When the planned subsidence amount is reached, release the hydraulic pressure of all the hydraulic jacks 10 and confirm that the caisson frame 2 is horizontal. At this time, be careful not to enter the root cut bottom until it is confirmed that the hydraulic pressure is completely released and the subsidence of the caisson body 2 is completely stopped.
【0065】以下、刃口躯体1の第2実施例について説
明する。それは、刃口躯体1を現場打ちするものであ
る。それには、先ず図23に示すように、地山8の刃口
躯体該当位置に、刃口躯体1よりも大きい穴8bを掘削
する。この穴8bは、外側(敷地境界線側)は垂直で、
内側は傾斜している。尚、ケーソン躯体の沈設予定地の
地盤が崩れ易い土質である場合には、敷地境界線に沿っ
て、山留め用の横矢板23が設けられている。The second embodiment of the blade skeleton body 1 will be described below. That is, the blade body 1 is cast in situ. To do so, first, as shown in FIG. 23, a hole 8b larger than the blade skeleton body 1 is excavated at a position corresponding to the blade skeleton body of the natural ground 8. This hole 8b is vertical on the outside (site border side),
The inside is inclined. When the ground where the caisson frame is to be settled has a soil that is likely to collapse, a lateral sheet pile 23 for retaining the mountain is provided along the boundary line of the site.
【0066】穴8bの底にコンクリートの頭板22を設
置する。次に、刃口躯体1の外側型枠材となるコンパネ
24と内側型枠材となるコンパネ25とをセパレータ2
6で接続して刃口躯体1の型枠を作成する。A concrete head plate 22 is installed on the bottom of the hole 8b. Next, a separator panel 24, which is an outer mold material of the blade skeleton body 1, and a control panel 25, which is an inner mold material, are separated from each other by the separator 2
Connect at 6 to create a mold for the blade skeleton 1.
【0067】このようにして作成された型枠を頭板22
上に立設する。この際、コンパネ25と穴8bの傾斜面
との間に適当な数の支持棒27を挿入し、コンパネ24
が頭板22に対して直角になるようにする。The formwork thus created is used for the headboard 22.
Stand on top. At this time, an appropriate number of support rods 27 are inserted between the control panel 25 and the inclined surface of the hole 8b, and the control panel 24
Should be perpendicular to the headboard 22.
【0068】次に、コンパネ24とコンパネ25とで形
成された型枠の先端部分に、刃先金物28を設置する。
刃先金物28は、図25に示すように、コンパネ24と
接する鉄板28aと、コンパネ25と接する鉄板28b
と、鉄板28aと鉄板28bとの間を接続する鉄板28
cと、鉄板29と、鉄板30と、摩擦切り31とから構
成されている。Next, the cutting edge metal fitting 28 is installed at the tip of the mold frame formed by the control panel 24 and the control panel 25.
As shown in FIG. 25, the blade hardware 28 includes an iron plate 28 a that contacts the control panel 24 and an iron plate 28 b that contacts the control panel 25.
And an iron plate 28 for connecting between the iron plate 28a and the iron plate 28b
c, an iron plate 29, an iron plate 30, and a friction cut 31.
【0069】鉄板28aと鉄板28bとは、型枠を兼用
している。又、鉄板29及び鉄板30の各下端は、夫々
鉄板28b及び鉄板28aに固定されており、それらの
各上端は、夫々図26に示すように、上方の第1ロット
躯体2aまで達している。The iron plate 28a and the iron plate 28b also serve as a mold. Further, the lower ends of the iron plate 29 and the iron plate 30 are fixed to the iron plate 28b and the iron plate 28a, respectively, and the upper ends thereof reach the upper first lot body 2a, respectively, as shown in FIG.
【0070】又、鉄板28a及び鉄板28bの各左右両
縁には、継鉄32が直角に取り付けられている。継鉄3
2には複数のボルト穴32aが設けられている。Further, yokes 32 are attached at right angles to the left and right edges of the iron plate 28a and the iron plate 28b, respectively. Yoke 3
2 is provided with a plurality of bolt holes 32a.
【0071】上記構造の刃先金物28を、コンパネ24
とコンパネ25の間に左右方向に並べて配設し、隣接す
る刃先金物28の各継鉄32を、ボルト穴32aにボル
トを差し込むことによって接続する。The cutting tool 28 having the above-mentioned structure is attached to the control panel 24.
And the control panel 25 are arranged side by side in the left-right direction, and the yokes 32 of the adjacent blade metal fittings 28 are connected by inserting bolts into the bolt holes 32a.
【0072】又、コンパネ24の上記刃先金物28の上
方位置にマガジン33を取り付ける。マガジン33は、
ビニールシート等の滑材を巻いた筒を内蔵しており、刃
口躯体1が沈下する時、この滑材を外へ繰り出すことに
よって、ケーソンの周面と土との間の摩擦を軽減する機
能を有する。Further, the magazine 33 is attached to a position above the cutting edge metal fitting 28 of the control panel 24. Magazine 33
It has a built-in cylinder wrapped with a vinyl sheet or other slipping material, and when the blade body 1 sinks, this slipping material is pushed out to reduce the friction between the caisson surface and the soil. Have.
【0073】上記の刃先金物28の設置及び接続と、マ
ガジン33の設置が終了したらコンパネ24とコンパネ
25との間にコンクリートを流し込んで刃口躯体1を構
築する。刃口躯体1のコンクリート打ちは、第1ロット
躯体2aのコンクリート打ちの時に一緒に行い、刃口躯
体1と第1ロット躯体2aとを一体化する。このように
して構築された刃口躯体は、上記のように鉄板によって
補強された刃先金物28を有するので、耐圧強度が極め
て大きい。When the installation and connection of the above-mentioned blade hardware 28 and the installation of the magazine 33 are completed, concrete is poured between the control panel 24 and the control panel 25 to construct the blade skeleton body 1. The concrete pouring of the blade skeleton body 1 is performed together with the concrete pouring of the first lot skeleton 2a, and the blade skeleton body 1 and the first lot skeleton 2a are integrated. The blade skeleton body constructed in this manner has the blade tip metal piece 28 reinforced by the iron plate as described above, and therefore has extremely high pressure resistance.
【0074】[0074]
【発明の効果】以上説明したように、本発明に係るケー
ソンの刃口躯体は、地上で構築されるケーソン躯体とは
独立に地中で構築されるから、この刃口躯体を予め工場
等で先行的に製作すると共に先行的に穴を掘削し、ケー
ソン躯体の工事と併行して刃口躯体を構築することがで
き、工期を著しく短縮することができると云う極めて優
れた効果を奏する。As described above, the caisson skeleton body according to the present invention is constructed in the ground independently of the caisson skeleton body constructed on the ground. It is possible to construct the blade skeleton body in parallel with the construction of the caisson skeleton by producing it in advance and excavating the hole in advance, and it is possible to remarkably reduce the construction period, which is an extremely excellent effect.
【0075】又、ケーソン躯体の第1ロット躯体の構築
は、地面上で行うことができるから、従来の工法では必
要であった支保工等を使用しなくても済む。従って、従
来支保工の設置及び撤去に要していた人時がゼロとなる
ため、構築工事を短時日で実施することができると云う
効果も奏する。Further, since the caisson skeleton skeleton skeleton can be constructed on the ground, it is not necessary to use the supporting work or the like which is required in the conventional construction method. Therefore, the number of man-hours conventionally required to install and remove the support work is reduced to zero, and the construction work can be carried out in a short time.
【0076】しかも、支保工の撤去時におけるケーソン
躯体の不同沈下の恐れもなくなり、工事の安全性、精
度、及び効率が向上すると云う効果も奏する。Moreover, there is no fear of the differential settlement of the caisson skeleton when the supporting work is removed, and the safety, accuracy and efficiency of the construction can be improved.
【0077】又、刃口躯体を鉄板とプレキャストコンク
リートとによって一体構成し、無筋にしても充分の耐圧
が得られるように構成しているから、軽量で材料も少な
くて済む。従って、現場での運搬、取り付け等の作業が
容易となり、且つ、コストが安くなると云う効果を奏す
る。Further, since the blade skeleton body is integrally formed by the iron plate and the precast concrete, and is constructed so that sufficient pressure resistance can be obtained even if it is unreinforced, it is lightweight and requires less material. Therefore, there is an effect that the work such as transportation and installation at the site becomes easy and the cost becomes low.
【0078】更に、刃口躯体の先端に摩擦切り部材を取
り付けているため、ケーソン躯体の圧入沈設時の摩擦を
小さくでき、圧入沈設が円滑に行われ、それが工期短縮
及び精度の向上につながると云う効果を奏する。Further, since a friction cutting member is attached to the tip of the blade body, friction at the time of press-fitting and sinking of the caisson body can be reduced, and press-fitting and sinking can be performed smoothly, which leads to shortening of the construction period and improvement of accuracy. There is an effect called.
【図1】本発明に係る刃口躯体を用いたケーソン工事の
実施例を示す上面図である。FIG. 1 is a top view showing an example of caisson construction using a blade skeleton body according to the present invention.
【図2】同A−A断面図である。FIG. 2 is a sectional view taken along line AA of FIG.
【図3】同A−A要部断面図である。FIG. 3 is a sectional view of a main part of the same AA.
【図4】同B−B断面図である。FIG. 4 is a sectional view taken along line BB of FIG.
【図5】同C−C断面図である。FIG. 5 is a sectional view taken along line CC of FIG.
【図6】同右側面図である。FIG. 6 is a right side view of the same.
【図7】同実施例の敷地の地質柱状図である。FIG. 7 is a geological column diagram of the site of the same example.
【図8】本発明に係る刃口躯体の一実施例を示す説明図
である。FIG. 8 is an explanatory view showing an example of a blade skeleton body according to the present invention.
【図9】同刃口躯体を地中に設置した様子を示す説明図
である。FIG. 9 is an explanatory diagram showing a state in which the blade skeleton body is installed in the ground.
【図10】同刃口躯体と第1ロット躯体との連結を示す
説明図である。FIG. 10 is an explanatory view showing the connection between the blade end skeleton and the first lot skeleton.
【図11】土質がローム層の場合における掘削前の刃口
躯体周りの土の様子を示す説明図である。FIG. 11 is an explanatory diagram showing a state of soil around a blade opening skeleton before excavation when the soil is a loam layer.
【図12】同場合における刃口躯体周りの掘削の様子を
示す説明図である。FIG. 12 is an explanatory diagram showing a state of excavation around the blade skeleton body in the same case.
【図13】同場合における圧入時の刃口躯体周りの土の
様子を示す説明図である。FIG. 13 is an explanatory view showing a state of the soil around the blade opening skeleton body at the time of press fitting in the same case.
【図14】同場合における圧入後の土の様子を示す説明
図である。FIG. 14 is an explanatory diagram showing a state of soil after press fitting in the same case.
【図15】土質が粘土層の場合における掘削前の刃口躯
体周りの土の様子を示す説明図である。FIG. 15 is an explanatory diagram showing a state of soil around a blade opening skeleton before excavation when the soil is a clay layer.
【図16】同場合における刃口躯体周りの掘削の様子を
示す説明図である。FIG. 16 is an explanatory view showing a state of excavation around the blade skeleton body in the same case.
【図17】同場合における圧入時の刃口躯体周りの土の
様子を示す説明図である。FIG. 17 is an explanatory diagram showing a state of the soil around the blade opening skeleton body at the time of press fitting in the same case.
【図18】同場合における圧入後の土の様子を示す説明
図である。FIG. 18 is an explanatory diagram showing a state of soil after press-fitting in the same case.
【図19】土質が砂質土の場合における掘削前の刃口躯
体周りの土の様子を示す説明図である。FIG. 19 is an explanatory diagram showing a state of soil around a blade opening skeleton before excavation when the soil is sandy soil.
【図20】同場合における刃口躯体周りの掘削の様子を
示す説明図である。FIG. 20 is an explanatory diagram showing a state of excavation around the blade skeleton body in the same case.
【図21】同場合における圧入時の刃口躯体周りの土の
様子を示す説明図である。FIG. 21 is an explanatory view showing a state of the soil around the blade opening skeleton body at the time of press fitting in the same case.
【図22】同場合における圧入後の土の様子を示す説明
図である。FIG. 22 is an explanatory diagram showing a state of soil after press-fitting in the same case.
【図23】本発明に係る刃口躯体の第2の実施例を示す
説明図である。FIG. 23 is an explanatory view showing a second embodiment of the blade skeleton body according to the present invention.
【図24】同実施例の下部の詳細を示す説明図である。FIG. 24 is an explanatory diagram showing details of a lower portion of the embodiment.
【図25】同実施例における刃先金物の構造を示す説明
図である。FIG. 25 is an explanatory view showing a structure of a cutting edge metal article in the example.
【図26】同実施例における鉄筋を示す説明図である。FIG. 26 is an explanatory diagram showing a reinforcing bar in the example.
【図27】従来技術を示す説明図である。FIG. 27 is an explanatory diagram showing a conventional technique.
1 刃口躯体 2 ケーソン躯体 3 捨てコンクリート 4 型枠 5 支保工 6 刃先金物 7 梁 8 地山 9 アースアンカー 10 油圧ジャッキ 11 加圧桁 12 開口 13 ミニバックホウ 14 タワークレーン 15 クラブホッパー 16 クラムシェル 17 ダンプトラック 18、31 摩擦切り 19 ローム層 20 粘土層 21 砂質土 22 頭板 23 横矢板 24、25 コンパネ 26 スペーサ 27 支持棒 28 刃先金物 29、30 鉄板 32 継鉄 33 マガジン 1 Blade skeleton skeleton 2 Caisson skeleton 3 Discarded concrete 4 Formwork 5 Supporting work 6 Cutting edge hardware 7 Beam 8 Ground 9 Ground anchor 10 Hydraulic jack 11 Pressed girder 12 Opening 13 Mini backhoe 14 Tower crane 15 Club hopper 16 Clamshell 17 Dump Tracks 18, 31 Friction cutting 19 Loam layer 20 Clay layer 21 Sandy soil 22 Headboard 23 Horizontal sheet pile 24, 25 Control panel 26 Spacer 27 Support rod 28 Cutting tool 29, 30 Iron plate 32 Yoke 33 Magazine
Claims (4)
つ刃型形状をなす刃口躯体であって、前記ケーソン躯体
の構築とは独立に、前記ケーソン躯体を沈設する地中に
先行的に構築した後に、地上で構築された前記ケーソン
躯体と連結されることを特徴とするケーソンの刃口躯体
形成工法。1. A blade skeleton body provided in the lower end of the peripheral wall of the caisson skeleton and having a blade shape, which is constructed in advance in the ground where the caisson skeleton is sunk independently of the construction of the caisson skeleton. After that, it is connected to the caisson skeleton constructed on the ground, the method for forming a caisson blade skeleton skeleton.
トコンクリートとで一体構成された既製品を使用するこ
とを特徴とする請求項1に記載のケーソンの刃口躯体形
成工法。2. The caisson's blade skeleton forming method according to claim 1, wherein the blade skeleton skeleton body uses a ready-made product which is preliminarily integrated with an iron plate and precast concrete.
その刃先金物を鉄板で補強すると共に、型枠を兼用する
ことを特徴とする請求項1に記載のケーソンの刃口躯体
形成工法。3. The blade skeleton body is created by casting in-situ,
The caisson's blade skeleton forming method according to claim 1, wherein the blade metal is reinforced with an iron plate and is also used as a mold.
を設けたことを特徴とする請求項1、2又は3に記載の
ケーソンの刃口躯体形成工法。4. The caisson blade skeleton forming method according to claim 1, 2 or 3, wherein a friction cutting member is provided at a tip end portion of the blade skeleton body.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5159347A JP2838019B2 (en) | 1993-06-29 | 1993-06-29 | Caisson blade framing method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP5159347A JP2838019B2 (en) | 1993-06-29 | 1993-06-29 | Caisson blade framing method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07189267A true JPH07189267A (en) | 1995-07-28 |
| JP2838019B2 JP2838019B2 (en) | 1998-12-16 |
Family
ID=15691863
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP5159347A Expired - Fee Related JP2838019B2 (en) | 1993-06-29 | 1993-06-29 | Caisson blade framing method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2838019B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009084918A (en) * | 2007-10-01 | 2009-04-23 | Hiroshi Saito | Underground structure construction method and underground structure constructed by the construction method |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS49127409A (en) * | 1973-04-07 | 1974-12-06 | ||
| JPS63201214A (en) * | 1987-02-13 | 1988-08-19 | Ohbayashigumi Ltd | Settling of caisson |
| JPH05156645A (en) * | 1991-02-20 | 1993-06-22 | Taisei Corp | Structure for fixing cutting edge portion of caisson and for stopping water |
-
1993
- 1993-06-29 JP JP5159347A patent/JP2838019B2/en not_active Expired - Fee Related
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS49127409A (en) * | 1973-04-07 | 1974-12-06 | ||
| JPS63201214A (en) * | 1987-02-13 | 1988-08-19 | Ohbayashigumi Ltd | Settling of caisson |
| JPH05156645A (en) * | 1991-02-20 | 1993-06-22 | Taisei Corp | Structure for fixing cutting edge portion of caisson and for stopping water |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009084918A (en) * | 2007-10-01 | 2009-04-23 | Hiroshi Saito | Underground structure construction method and underground structure constructed by the construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2838019B2 (en) | 1998-12-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100564700C (en) | The job practices of lattice type steel column tower crane pedestal | |
| SG11202107482SA (en) | Method for constructing structure | |
| JP2688560B2 (en) | Construction method of underground structure | |
| JP3850785B2 (en) | Caisson laying method using main foundation pile | |
| JP2000352296A (en) | Method o constructing passage just under underground structure | |
| CN100443673C (en) | Construction method | |
| CN106988337B (en) | It is a kind of for reducing the reinforcement means of bar shaped shallow foundation house differential settlement | |
| JP2868651B2 (en) | Earth retaining method above existing underground structure | |
| JP3002126B2 (en) | Temporary receiving method for structures | |
| JPH06341154A (en) | Construction of underground building frame | |
| KR0179708B1 (en) | Working method for underground structure of a building | |
| JPH10317374A (en) | Method for constructing underground column made of reinforced concrete | |
| CN117738065A (en) | Construction method for seamless connection of steel-concrete trestle and earthwork ramp | |
| JPS62288269A (en) | Method for extending underground stair of building | |
| JP2838019B2 (en) | Caisson blade framing method | |
| CN114215106A (en) | Multi-pile support column structure adopting upper steel structure full-reverse construction method and construction method | |
| JPS63280153A (en) | Reverse construction method for underground framework | |
| JP3790310B2 (en) | Construction method of the building by the prior construction of steel frame | |
| CN113294010A (en) | Structure for separating bottom of ancient coffin chamber and construction method thereof | |
| JP2736542B2 (en) | Construction method of underground structure omitting temporary materials | |
| JPH07138972A (en) | Construction method for underground skeleton | |
| KR100615149B1 (en) | Reverse casting method of concrete ground structure | |
| JP2571427B2 (en) | Heavy load work floor method using existing underground structure | |
| JPH08291529A (en) | Basement floor construction method | |
| CN115198797B (en) | Underground communication channel construction method combining three-side surrounding pipe curtain method and open cut |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |