JPH07216875A - Jig for suspending reinforcement - Google Patents
Jig for suspending reinforcementInfo
- Publication number
- JPH07216875A JPH07216875A JP2484294A JP2484294A JPH07216875A JP H07216875 A JPH07216875 A JP H07216875A JP 2484294 A JP2484294 A JP 2484294A JP 2484294 A JP2484294 A JP 2484294A JP H07216875 A JPH07216875 A JP H07216875A
- Authority
- JP
- Japan
- Prior art keywords
- reinforcing bar
- main
- bar
- jig
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000002787 reinforcement Effects 0.000 title abstract description 35
- 238000003780 insertion Methods 0.000 claims abstract description 21
- 230000037431 insertion Effects 0.000 claims abstract description 21
- 230000003014 reinforcing effect Effects 0.000 claims description 142
- 239000000725 suspension Substances 0.000 claims description 41
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 230000008878 coupling Effects 0.000 abstract 1
- 238000010168 coupling process Methods 0.000 abstract 1
- 238000005859 coupling reaction Methods 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
- 210000003205 muscle Anatomy 0.000 description 48
- 239000011295 pitch Substances 0.000 description 13
- 238000010276 construction Methods 0.000 description 9
- 239000000463 material Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000000452 restraining effect Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、現場打設コンクリート
によって深礎杭を構築するための補強用鉄筋を吊り下げ
る際に用いるに好適な、鉄筋吊り下げ治具に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing bar suspension jig suitable for suspending reinforcing reinforcing bars for constructing deep foundation piles by using cast-in-place concrete.
【0002】[0002]
【従来の技術】従来、鉄筋をクレーンで揚重する場合に
は、該鉄筋を何本かづつ束ねて横に寝かせたままの状態
にしてクレーンに吊り下げ、これを足場等の上に揚重し
ていた。ところが、現場打設コンクリートによって深礎
杭を構築する際等には、主筋としてかなり長尺の鉄筋が
用いられるために、こうした揚重方法を行って、足場上
に鉄筋を横置きすることは出来ない。そこで、地上に寝
かせてある鉄筋の1端を掴む形でクレーンに吊下し、ク
レーン操作によって該鉄筋を、実際の配筋状態に即した
状態に立ててしまう方法が提案されている。2. Description of the Related Art Conventionally, when hoisting a reinforcing bar with a crane, a plurality of the reinforcing bars are bundled and left to lie sideways and suspended on a crane, which is then lifted on a scaffolding or the like. Was. However, when constructing deep foundation piles using cast-in-place concrete, since a fairly long reinforcing bar is used as the main bar, it is not possible to carry out such a lifting method and place the reinforcing bar horizontally on the scaffold. Absent. Therefore, a method has been proposed in which one end of a reinforcing bar laid on the ground is hung on a crane so as to be grasped and the reinforcing bar is erected in a state corresponding to an actual reinforcing bar arrangement by a crane operation.
【0003】[0003]
【解決しようとする課題】しかし、この方法では、鉄筋
を地上に立てたときに、クレーンに吊下された鉄筋の一
端側が他端側に対して遥か上に配置してしまう。する
と、こうして縦になった鉄筋を足場や鉄筋建て込み装置
等に移し替えるために、クレーンから切り離そうとする
場合には、作業員が高所作業によって、当該上端側にい
ってしまった部分からクレーンの掴持部を解放する作業
をいちいち人力を介して行わなければならない。従っ
て、煩雑であり、また、危険である。もちろん、遠隔操
作によって鉄筋を把持解放自在な鉄筋把持装置も提案さ
れてはいるが、こうした鉄筋把持装置は、その構成が複
雑になるために、経済性に難が生じる。そこで本発明
は、上記事情に鑑み、鉄筋を地上に立てた状態にして、
高所作業なく、クレーンと切り離すことが出来、装置構
成の簡単な、鉄筋吊り下げ治具を提供するものである。[Problems to be Solved] However, in this method, when the reinforcing bar is erected on the ground, one end side of the reinforcing bar suspended by the crane is arranged far above the other end side. Then, when attempting to disconnect from the crane in order to transfer the vertically reinforced reinforcing bar to a scaffolding or a reinforcing bar erection device, etc., the part that the worker went to the upper end side due to work at height The work of releasing the gripping part of the crane must be done manually. Therefore, it is complicated and dangerous. Needless to say, there has been proposed a reinforcing bar gripping device capable of gripping and releasing the reinforcing bar by remote operation, but such a reinforcing bar gripping device has a complicated structure, which causes difficulty in economy. Therefore, in view of the above circumstances, the present invention makes the reinforcing bar stand on the ground,
(EN) A jig for suspending a reinforcing bar, which can be separated from a crane without working at high places and has a simple device configuration.
【0004】[0004]
【課題を解決するための手段】即ち本発明は、鞘管(2
2)を有し、前記鞘管(22)に鉄筋挿通空間(22
s)を、鉄筋(37a)を該鉄筋(37a)の材軸方向
に沿って移動自在に挿通させ得る形で形成し、前記鞘管
(22)に、鉄筋(37a)を把持自在な鉄筋クランプ
(27)を吊下し、前記鞘管(22)に吊下係合手段
(23、25、26)を設けて、構成される。また、本
発明は、前記吊下係合手段(23、25、26)に前記
鞘管(22)と前記鉄筋クランプ(27)を、該鞘管
(22)と該鉄筋クランプ(27)が1対1に対応する
形で複数設けて、構成される。なお、( )内の番号等
は、図面における対応する要素を示す、便宜的なもので
あり、従って、本記述は図面上の記載に限定拘束される
ものではない。以下の作用の欄についても同様である。That is, the present invention provides a sheath tube (2
2), and the rebar insertion space (22
s) is formed so that the reinforcing bar (37a) can be inserted movably along the material axis direction of the reinforcing bar (37a), and the reinforcing bar (37a) can be gripped in the sheath pipe (22). (27) is suspended, and the suspension pipe (22) is provided with suspending engagement means (23, 25, 26). Further, according to the present invention, the suspension pipe (22) and the rebar clamp (27) are attached to the suspension engaging means (23, 25, 26), and the sheath pipe (22) and the rebar clamp (27) are connected to each other. A plurality of them are provided in a form corresponding to the pair 1, and configured. The numbers in parentheses () indicate the corresponding elements in the drawings for convenience, and therefore the present description is not limited to the description in the drawings. The same applies to the following action columns.
【0005】[0005]
【作用】上記した構成により、本発明は、鉄筋挿通空間
(22s)に挿通させた鉄筋(37a)を、鉄筋クラン
プ(27)に把持させる形にして、該鉄筋(37a)を
吊下係合手段(23、25、26)に吊下支持させるよ
うに作用する。また、本発明は、吊下係合手段(23、
25、26)が複数の鉄筋(37a)を纏めて吊下支持
出来るように作用する。With the above-described structure, the present invention makes the reinforcing bar (37a) inserted in the reinforcing bar insertion space (22s) held by the reinforcing bar clamp (27), and suspends the reinforcing bar (37a). It acts to suspend and support the means (23, 25, 26). Further, the present invention provides a suspension engaging means (23,
25, 26) act to collectively suspend and support a plurality of reinforcing bars (37a).
【0006】[0006]
【実施例】図1は本発明による鉄筋吊り下げ治具の一実
施例を用いて鉄筋建て込み装置により鉄筋建て込み作業
を行っている杭施工現場の様子を示す一部破断斜視図、
図2は図1に示す杭施工現場の坑口付近を示す拡大図、
図3は図1に示す鉄筋建て込み装置のゲージディスクを
部分を示す平面図、図4は図3に示すゲージディスクの
IV矢視部分の拡大図、図5は図1に示す鉄筋建て込み装
置のスライドガイド部分を示す平面図、図6は図1に示
す鉄筋建て込み装置の下部フレーム枠におけるVI矢視部
分の断側面図、図7は図1に示す鉄筋建て込み装置に鉄
筋吊り下げ治具を用いて主筋を装着している様子を示す
図、図8(a)乃至(c)は図1に示す杭施工現場にお
いて主筋に配力筋を溶接する様子を示す図である。EXAMPLE FIG. 1 is a partially cutaway perspective view showing a state of a pile construction site where a reinforcing bar erection work is being performed by a reinforcing bar erection device using an example of a reinforcing bar suspension jig according to the present invention.
2 is an enlarged view showing the vicinity of the wellhead of the pile construction site shown in FIG.
3 is a plan view showing a portion of the gauge disc of the reinforcing bar building device shown in FIG. 1, and FIG. 4 is a plan view of the gauge disc shown in FIG.
FIG. 5 is an enlarged view of an arrow IV portion, FIG. 5 is a plan view showing a slide guide portion of the reinforcing bar building device shown in FIG. 1, and FIG. 6 is a disconnection of a portion VI of the lower frame frame of the reinforcing bar building device shown in FIG. FIG. 7 is a side view, FIG. 7 is a view showing a state where main bars are attached to the reinforcing bar building device shown in FIG. 1 by using a reinforcing bar suspension jig, and FIGS. 8A to 8C are pile construction shown in FIG. It is a figure which shows a mode that the distribution muscle is welded to the main muscle in the field.
【0007】杭施工を行っている現場1には、図1に示
すように、後に杭30になるための縦穴3が、地面2a
から地中2に掘り下げられた形で、所定の径D1をなす
円柱状に形成されており、縦穴3の側壁3cには仮支保
用のモルタル36が、該縦穴3の口元部分である坑口3
aと穴底3bを接続する形で、円環状に吹き付け打設さ
れている。また、現場1には、鉄筋建て込み装置5が、
上記杭30のため、即ちコンクリート補強用の鉄筋(即
ち主筋37aと配力筋37b)を鉄筋組立体である鉄筋
籠37として、縦穴3中に建て込みするために設けられ
ており、鉄筋籠37は、その全体外観形状が円筒状をな
すように形成されている。鉄筋籠37は、その各々が上
下方向即ち縦に伸延する形で縦穴3の側壁3cに沿って
並ぶ複数の主筋37aと、その各々が該複数の主筋37
aに交差する形で横に伸延するよう、これ等複数の主筋
37aに溶接接続された複数の配力筋37bによって構
成されており、いま、鉄筋籠37は、鉄筋建て込み装置
5を介して、主筋37aと配力筋37bの接続作業を行
いながら、縦穴3中に建て込みされつつある。なお、配
力筋37bは、図2右部に示すように、その現場1への
搬入形状がそれぞれ半円状をなす形に形成されており、
該半円状の配力筋37bを2本1対にして円形状にラッ
プ溶接することによって、1本の配力筋37bが構成さ
れるものである。As shown in FIG. 1, a vertical hole 3 for later becoming a pile 30 is provided on the ground 2a at the site 1 where piles are being constructed.
A mortar 36 for temporary support is formed on the side wall 3c of the vertical hole 3 in a shape of a cylinder having a predetermined diameter D1 in the form of a pit 3
It is sprayed and cast in an annular shape so as to connect a and the hole bottom 3b. Also, at the site 1, there is a reinforcing bar building device 5,
It is provided for the pile 30 described above, that is, for the purpose of building the reinforcing bars for concrete reinforcement (that is, the main reinforcing bars 37a and the distributing bars 37b) into the vertical holes 3 as the reinforcing bar cage 37 which is the reinforcing bar assembly. Is formed so that its overall external shape is cylindrical. The rebar cage 37 has a plurality of main bars 37a arranged along the side wall 3c of the vertical hole 3 in the form of extending in the vertical direction, that is, the plurality of main bars 37a.
It is composed of a plurality of distribution muscles 37b welded and connected to the plurality of main reinforcements 37a so as to extend laterally in a manner intersecting with a. While being connected to the main reinforcement 37a and the distribution muscle 37b, it is being built in the vertical hole 3. In addition, as shown in the right part of FIG. 2, the force distribution muscles 37b are formed in such a shape that their respective carry-in shapes to the site 1 are semicircular,
A pair of the semicircular distribution muscles 37b is paired and circularly lap-welded to form one distribution muscle 37b.
【0008】鉄筋建て込み装置5は、図1に示すよう
に、フレーム6を有しており、フレーム6は、その4本
の支柱61の脚部61aによって、地面2a上に立設支
持されている。フレーム6の上端部には、中抜け円盤状
に形成されたゲージディスク61が、4本の梁62を介
して4本の支柱61に接続された形で、該4本の支柱の
真中部分に、主筋配筋手段として設けられており、ゲー
ジディスク61には、図3に示すように、複数の主筋配
置部71が、該ゲージディスク7の外周に沿って所定の
ピッチP1毎に形成されている。ゲージディスク7に形
成された複数の主筋配置部71は、建て込むべき主筋3
7aの配筋ピッチに対応した形で形成されており、実施
例においては、主筋配置部71の形成ピッチが5cm程度
に形成されていることによって、主筋37aの配筋ピッ
チを10、15、20cm等の5の整数倍ピッチから選択
し得るようになっている。As shown in FIG. 1, the reinforcing bar building device 5 has a frame 6, which is erected and supported on the ground 2a by the legs 61a of the four columns 61 of the frame 6. There is. At the upper end of the frame 6, a gauge disk 61 formed in a hollow disk shape is connected to the four columns 61 via four beams 62, and is attached to the middle portion of the four columns. As shown in FIG. 3, the gauge disc 61 is provided with a plurality of main reinforcement placement portions 71 formed along the outer periphery of the gauge disc 7 at predetermined pitches P1. There is. The plurality of main bar placement portions 71 formed on the gauge disk 7 are used for the main bar 3 to be built.
It is formed in a shape corresponding to the bar arrangement pitch of 7a, and in the embodiment, the formation pitch of the main bar arrangement portion 71 is formed to about 5 cm, so that the bar arrangement pitch of the main bar 37a is 10, 15, 20 cm. It is possible to select from an integer multiple of 5, such as.
【0009】ゲージディスク7の各主筋配置部71に
は、図4に示すように、杭30の配筋主筋径に対応した
径の主筋37aが、それぞれ1本づつ収容自在になって
おり、また主筋配置部71は、主筋37aを図4紙面と
交差方向である上下方向に移動自在にそれぞれ保持し得
るようになっている。さらに、ゲージディスク7には板
バネ等からなるストッパ72が、主筋固定具として主筋
配置部71の形成数量だけそれぞれの主筋配置部71に
設けられており、ストッパ72は、プレート73によっ
てその一端側をゲージディスク7に固着された形で設け
られている。そして、各ストッパ72は、図4一点鎖線
で示すように、内方側即ち該主筋配置部71側に向かっ
てのみ自在に撓むことが出来るようになっており、これ
によって、ストッパ72は、複数の主筋配置部71の各
々に前記主筋37aを水平方向に入れ込み自在(即ち図
4矢印A方向に向けて嵌入させ得るよう)になってい
る。As shown in FIG. 4, each main reinforcement arranging portion 71 of the gauge disc 7 is capable of accommodating one main reinforcement 37a having a diameter corresponding to the diameter of the main reinforcement of the pile 30. The main bar placement portion 71 is configured to be capable of holding the main bar 37a movably in the up-down direction which is a direction intersecting the plane of FIG. Further, the gauge disk 7 is provided with stoppers 72, such as leaf springs, as main bar fixing tools in the respective main bar disposition parts 71 by the number of the main bar disposition parts 71 formed. Is fixed to the gauge disk 7. As shown by the alternate long and short dash line in FIG. 4, each stopper 72 can freely bend only toward the inner side, that is, toward the main bar disposition portion 71 side. The main bar 37a can be inserted horizontally into each of the plurality of main bar arrangement portions 71 (that is, the main bar 37a can be inserted in the direction of arrow A in FIG. 4).
【0010】また、フレーム6の下部には、図1に示す
ように、円環状に形成されたスライドガイド8が、4本
の梁63を介して前記4本の支柱61に接続支持された
形で鉄筋建て込み位置決め具として設けられており、ス
ライドガイド8は、図2に示すように、前記地面2aよ
り若干上の坑口3a上に配置する形、即ち作業員39の
足元付近の高さ位置に配置する形になっている。また、
スライドガイド8は、前記ゲージディスク7と後述する
下部フレーム枠9の間において、該ゲージディスク7と
整合した位置に配置するよう、該ゲージディスク7と上
下方向に並べて設けられており、スライドガイド8の真
中部分には、図5に示すように、鉄筋挿通空間8sが、
前記鉄筋籠37の外径より若干大きな径D2をなす形で
円形状に形成されている。即ち、スライドガイド8の鉄
筋挿通空間8sは、組立て済み状態の鉄筋籠37を、図
5紙面と交差方向に示す上下方向に通過させ得るように
なっている。As shown in FIG. 1, a slide guide 8 formed in an annular shape is connected to and supported by the four columns 61 via four beams 63 at the lower portion of the frame 6. As shown in FIG. 2, the slide guide 8 is provided on the wellhead 3a slightly above the ground 2a, that is, at a height position near the foot of the worker 39. It is designed to be placed in. Also,
The slide guides 8 are vertically arranged side by side with the gauge disc 7 so as to be arranged at a position aligned with the gauge disc 7 between the gauge disc 7 and a lower frame frame 9 described later. As shown in FIG. 5, in the middle part of the
It is formed in a circular shape with a diameter D2 slightly larger than the outer diameter of the rebar cage 37. That is, the reinforcing bar insertion space 8s of the slide guide 8 allows the assembled reinforcing bar cage 37 to pass in the vertical direction shown in the direction intersecting the plane of FIG.
【0011】また、フレーム6の上部には、図1又は図
2に示すように、実施例においては3ヶの電動式のチェ
ーンブロック10が、前記ゲージディスク7の底面部分
から垂下するようこれに装着された形で設けられてお
り、3ヶのチェーンブロック10の下方(即ちゲージデ
ィスク7の下方)には、鉄筋建て込み装置5の主筋保持
手段である下部フレーム枠9が、牽引用の何本かのワイ
ヤ11によって該3ヶのチェーンブロック10に吊下さ
れて、縦穴3中を上下に移動自在な形で設けられてい
る。即ち、チェーンブロック10は、下部フレーム枠9
を上下に移動駆動位置決め自在な昇降装置として、フレ
ーム6に設けられており、通常の状態(即ち鉄筋建て込
み作業を行っている間)では、該チェーンブロック10
の操作によって、下部フレーム枠9が、上方側から下方
側に向けて下降移動のみをし得るようになっている。As shown in FIG. 1 or 2, on the upper portion of the frame 6, three electric chain blocks 10 are suspended from the bottom surface of the gauge disk 7 in this embodiment. The lower frame frame 9 which is a main bar holding means of the reinforcing bar erection device 5 is provided below the three chain blocks 10 (that is, below the gauge disc 7). It is hung from the three chain blocks 10 by one wire 11 and is provided in such a manner that it can move up and down in the vertical hole 3. That is, the chain block 10 includes the lower frame frame 9
Is provided on the frame 6 as an elevating device which can be driven to move up and down and positioned freely.
The lower frame frame 9 can only move downward from the upper side to the lower side by the operation.
【0012】下部フレーム枠9は、図1に示すように、
前記モルタル36が吹き付けされた状態の縦穴3の内径
より若干小さな径の円環状に形成されており、下部フレ
ーム枠9の下端部には、図6に示すように、支持部9a
が、該下部フレーム枠9の上端部側に形成された上フラ
ンジ部9bと対向する形で設けられている。下部フレー
ム枠9には、先に述べたように縦穴3の側壁3cに沿っ
て並ぶ複数の主筋37aが、上フランジ部9bに形成さ
れた挿通穴9sを介して支持部9a上に搭載されてお
り、従って、複数の主筋37aに接続された複数の前記
配力筋37bからなる鉄筋籠37は、下部フレーム枠9
に搭載支持されている。また、下部フレーム枠9の支持
部9aの底面側には、図6に示すように、前記縦穴3の
穴底3bに支持され得る形で、支持面9aが円周状に形
成されている。The lower frame 9 is, as shown in FIG.
The mortar 36 is formed in an annular shape having a diameter slightly smaller than the inner diameter of the vertical hole 3 in a state of being sprayed, and a lower end portion of the lower frame 9 has a supporting portion 9a as shown in FIG.
Are provided so as to face the upper flange portion 9b formed on the upper end side of the lower frame frame 9. As described above, the main frames 37a arranged along the side wall 3c of the vertical hole 3 are mounted on the lower frame 9 on the support portion 9a through the insertion holes 9s formed in the upper flange portion 9b. Therefore, the rebar cage 37 including the plurality of distribution muscles 37b connected to the plurality of main muscles 37a has a lower frame 9
It is mounted and supported by. Further, as shown in FIG. 6, on the bottom surface side of the supporting portion 9a of the lower frame 9, a supporting surface 9a is circumferentially formed so as to be supported by the hole bottom 3b of the vertical hole 3.
【0013】また、下部フレーム枠9には、図1に示す
ように、いくつかのフック保持具12が装着されてお
り、各フック保持具12には、図6に示すように、フッ
ク係合突起12aが、下部フレーム枠9の放射方向内方
において、下側に突する形でそれぞれ設けられている。
そして、フック保持具12は、下部フレーム枠9に接続
された部分とフック係合突起12aとの間にフック配置
溝12bが形成されており、フック保持具12には、フ
ック配置溝12bの下側からフック係合突起12aに引
掛けられた形で、前記ワイヤ11の下端部に接続された
吊輪13が係合保持されている。従って、前述したよう
に下部フレーム枠37が支持している前記鉄筋籠37
は、フック保持具12に係合保持されたワイヤ11を介
して、前記3ヶのチェーンブロック10に吊下支持され
ており、これによって鉄筋籠37は、該チェーンブロッ
ク10が装着されたフレーム6に支持された形になって
いる。なお、ワイヤ11と吊輪13の間には、図6に示
すように、レベル調整ジャッキ15が、該ワイヤ11の
図6矢印B、C方向の長さを調整し得るように設けられ
ており、該レベル調整ジャッキ15を介して、下部フレ
ーム枠9の平衡状態、即ち該下部フレーム枠9に搭載支
持された鉄筋籠37の平衡状態が調整保持され得るよう
になっている。Further, as shown in FIG. 1, several hook holders 12 are mounted on the lower frame 9, and each hook holder 12 is hook-engaged as shown in FIG. The protrusions 12a are provided so as to protrude downward inward in the radial direction of the lower frame frame 9.
The hook holder 12 has a hook arrangement groove 12b formed between a portion connected to the lower frame frame 9 and the hook engagement protrusion 12a. The hook holder 12 has a hook arrangement groove 12b below the hook arrangement groove 12b. The suspension ring 13 connected to the lower end of the wire 11 is engaged with and held by the hook engaging projection 12a from the side. Therefore, as described above, the rebar cage 37 supported by the lower frame frame 37.
Is hung and supported by the three chain blocks 10 via the wires 11 engaged and held by the hook holders 12, whereby the rebar cage 37 is mounted on the frame 6 to which the chain block 10 is mounted. The shape is supported by. A level adjustment jack 15 is provided between the wire 11 and the suspension ring 13 so as to adjust the length of the wire 11 in the directions of arrows B and C in FIG. The equilibrium state of the lower frame frame 9, that is, the equilibrium state of the reinforcing bar cage 37 mounted and supported on the lower frame frame 9 can be adjusted and held via the level adjustment jack 15.
【0014】さらに、鉄筋建て込み装置5のフレーム6
には、図2に示すように、前記ゲージディスク7に装着
された形で4ヶの油圧ジャッキ16が設けられており、
それぞれの油圧ジャッキ16には、配力筋保持手段であ
る配力筋受け治具17が、チェーン19を介してそれぞ
れ吊下されている。各配力筋受け治具17は、油圧ジャ
ッキ16を介して図2矢印D、E方向に示す上下方向に
所定長さ分だけ移動自在な形になっており、また、配力
筋受け治具17は、該配力筋受け治具17が吊下されて
いる油圧ジャッキ16の配設位置が、配力筋37bの配
筋時に該配力筋受け治具17を配置させるべき位置より
若干放射方向内方側に寄った形で、配力筋37bを建て
込みするべき位置の内方から外方に向けて移動自在な形
になっている。そして、配力筋受け治具17には、図8
(a)乃至(c)に示すように、複数の配力筋保持部で
ある掛け具191が、前記配力筋37bの配筋ピッチに
対応したピッチで上下方向に所定の間隔をなすよう複数
設けられており、各配力筋受け治具17の上下方向に並
ぶ複数の掛け具191は、ガイド9を介して連結された
形で、該ガイド9の操作によって、図8矢印F、G方向
に示す放射方向内外方向に所定ストローク分だけ突出後
退自在な形になっている。そして、配力筋受け治具17
は、複数の掛け具191のそれぞれに1本づつの配力筋
37bが搭載保持され得るようになっている。Further, the frame 6 of the reinforcing bar building device 5
2 is provided with four hydraulic jacks 16 mounted on the gauge disc 7, as shown in FIG.
A distribution force receiving jig 17 which is a distribution force holding means is suspended from each hydraulic jack 16 via a chain 19. Each of the force distribution receiving jigs 17 is configured to be movable by a predetermined length in the vertical direction shown by arrows D and E in FIG. 2 via the hydraulic jacks 16. Reference numeral 17 indicates that the arrangement position of the hydraulic jack 16 on which the force distribution receiving jig 17 is suspended is slightly radiated from the position where the force distribution receiving jig 17 is to be arranged when the force distribution muscle 37b is arranged. The shape is closer to the inner side in the direction, and is movable from the inner side to the outer side of the position where the distribution muscle 37b is to be built. The force distribution receiving jig 17 has a structure shown in FIG.
As shown in (a) to (c), a plurality of hooks 191 which are a plurality of force distribution muscle holding portions are arranged at predetermined pitches in the vertical direction at a pitch corresponding to the muscle distribution pitch of the power distribution muscles 37b. A plurality of hooks 191 that are provided and are arranged in the up-down direction of each force distribution jig 17 are connected to each other via the guide 9, and by operating the guide 9, the hooks 191 can be moved in the directions indicated by arrows F and G in FIG. The shape is such that it can be projected and retracted by a predetermined stroke in the radial direction in and out. Then, the force distribution receiving jig 17
Is configured such that one force distributing muscle 37b can be mounted and held on each of the plurality of hanging devices 191.
【0015】ところで、現場1には、図1に示すよう
に、クレーン車40が、縦穴40付近に位置する形で配
置されており、クレーン車40のフックブロック41に
は、鉄筋吊り下げ治具である主筋吊り具21が装着吊下
されている。主筋吊り具21は、図7に示すように、実
施例においては3ヶの鞘管22を有しており、各鞘管2
2の内部には、鉄筋挿通空間である主筋挿通空間22s
が、前記主筋37aを該主筋37aの材軸方向に沿って
(即ち上下に)移動自在に挿通させ得る形で形成されて
いる。3ヶの鞘管22は、連結部材23を介して、前記
主筋37aの配筋ピッチに対応したピッチで水平方向に
並ぶように連結されており、主筋吊り具21の3ヶの鞘
管22は、連結部材23に装着された牽引ワイヤ25、
束ね治具26を介して、前記フックブロック41に吊下
されている。従って、これ等、連結部材23、牽引ワイ
ヤ25、束ね治具26は、3ヶの鞘管22に設けられた
吊下係合手段を構成する形になっており、該吊下係合手
段によって、主筋吊り具21がフックブロック41に吊
下支持されている。By the way, as shown in FIG. 1, a crane vehicle 40 is arranged at the site 1 so as to be located near the vertical hole 40, and a hook block 41 of the crane vehicle 40 has a reinforcing bar hanging jig. The main bar suspension 21 is attached and hung. As shown in FIG. 7, the main bar suspension 21 has three sheath tubes 22 in the embodiment, and each sheath tube 2
Inside 2 is a main bar insertion space 22s which is a reinforcing bar insertion space.
However, the main bar 37a is formed so that the main bar 37a can be inserted along the axial direction of the main bar 37a (that is, vertically). The three sheath tubes 22 are connected via a connecting member 23 so as to be arranged in a horizontal direction at a pitch corresponding to the bar arrangement pitch of the main bars 37a. A pulling wire 25 attached to the connecting member 23,
It is suspended from the hook block 41 via a bundling jig 26. Therefore, the connecting member 23, the pulling wire 25, and the bundling jig 26 form a suspension engaging means provided on the three sheath pipes 22. The main bar suspension 21 is suspended and supported by the hook block 41.
【0016】また、主筋吊り具21には、図7に示すよ
うに、前記主筋37aを把持自在な鉄筋クランプである
クランプ27が、3ヶの鞘管22の下方において、該鞘
管22と1対1をなすように、前記連結部材23、牽引
ワイヤ25、束ね治具26が形成している吊下係合手段
に3ヶ設けられており、各クランプ27は長さL1をな
す接続ワイヤ29を介して前記連結部材23に吊下され
た形で、それぞれの鞘管22と連結接続されている。即
ち、主筋吊り具21は、これが前記吊下係合手段によっ
て、クレーン車40のフックブロック41に吊下されて
いる状態下において、各鞘管22と各クランプ27が、
該クランプ27の重量によって、所定の間隔L1を鉛直
方向に保持し得る形になっており、このとき、3ヶの鞘
管22は、クレーンの牽引力内に介在配置する形で、該
3ヶの鞘管22と3ヶのクランプ27が鉛直方向に並ぶ
ように配置し、これによって、主筋吊り具21は図1に
示すように、主筋37aをその材軸方向を鉛直方向に向
けた形で保持し得るようになっている。Further, as shown in FIG. 7, a clamp 27, which is a reinforcing bar clamp capable of gripping the main bar 37a, is attached to the main bar suspension 21 under the three sheath pipes 22. The connecting member 23, the pulling wire 25, and the bundling jig 26 are provided in three pieces so as to form a pair, and each clamp 27 has a connecting wire 29 having a length L1. It is connected and connected to each of the sheath tubes 22 in a form of being suspended from the connecting member 23 via the. That is, in the main bar suspending device 21, each sheath pipe 22 and each clamp 27 is in a state of being suspended by the suspension engaging means on the hook block 41 of the crane vehicle 40.
Due to the weight of the clamp 27, the predetermined distance L1 can be maintained in the vertical direction. At this time, the three sheath pipes 22 are arranged so as to be interposed in the traction force of the crane. The sheath tube 22 and the three clamps 27 are arranged so as to line up in the vertical direction, whereby the main bar suspension 21 holds the main bar 37a with its material axis direction oriented in the vertical direction, as shown in FIG. Is ready to go.
【0017】現場1は以上のような構成を有しているの
で、該現場1において杭30を構築する際には、縦穴3
を地面2aの所定の位置から所定の径D1をなすように
所定深さ分だけ掘り下げ形成し、その側壁3cにモルタ
ル36を所定厚さに吹き付け施工したところで、鉄筋建
て込み装置5を用いて、該縦穴3に複数の主筋37aと
複数の配力筋37bによる鉄筋籠37を鉄筋組立体とし
て建て込む作業を行う。そこで、まず、鉄筋籠5を建て
込みすべき縦穴3の坑口3aを包囲するように、即ち、
図1に示すように下部フレーム枠9が該縦穴3中を下降
自在な形で、鉄筋建て込み装置5を設置する。この際、
鉄筋建て込み装置5は、フレーム6の中心CL1が、縦
穴3の中心CL1に一致した形になるように設置する。Since the site 1 has the above-mentioned structure, when the pile 30 is constructed in the site 1, the vertical hole 3 is formed.
Is formed by digging from a predetermined position on the ground 2a by a predetermined depth so as to form a predetermined diameter D1, and the mortar 36 is sprayed on the side wall 3c to a predetermined thickness. A work of building a reinforcing bar cage 37 having a plurality of main bars 37a and a plurality of force distribution bars 37b into the vertical hole 3 as a reinforcing bar assembly is performed. Therefore, first, so as to surround the wellhead 3a of the vertical hole 3 in which the rebar cage 5 is to be built, namely,
As shown in FIG. 1, the lower frame 9 is installed in the vertical hole 3 in such a manner that the lower frame 9 can freely descend. On this occasion,
The reinforcing bar building-in device 5 is installed so that the center CL1 of the frame 6 coincides with the center CL1 of the vertical hole 3.
【0018】そこで、第1に、所定配筋本数の主筋37
aを、その各々の配筋位置に対応させた形で下部フレー
ム枠9に縦に保持させる作業を行う。そこでまず、主筋
吊り具21の3ヶの鞘管22の各々の主筋挿通空間22
sに、図1右奥部に示すように寝かせた状態の主筋37
aを挿通させると共に、該主筋37aの所定の位置(即
ち該主筋37aを縦にしたときに下部になる位置)にク
ランプ27を取り付ける。こうして、3ヶのクランプ2
7に3本の主筋37aを把持させた形にしておいて、束
ね治具26をクレーン車40のフックブロック41に係
合させてから、クレーン操作によって、該フックブロッ
ク41を上方に移動させる。すると、主筋吊り具21
は、主筋37aを把持している各クランプ27が、3ヶ
の鞘管23に設けられた連結部材23、牽引ワイヤ2
7、束ね治具26を吊り下げ係合手段としてクレーン4
0に吊下された形で、縦になる。このように、主筋37
aを寝かせた状態から縦に起こすとき、3本の主筋37
aは、3本の鞘管22によって、水平方向の移動を拘束
された形で起き上がり、また、縦になった主筋37a
は、当該3本の鞘管22による水平方向の拘束力と3本
の主筋37aの自重によってその材軸方向を鉛直方向に
向けるよう保持された形で、3ヶのクランプ27を介し
て主筋吊り具21に吊下された形になる。これによっ
て、3本の主筋37aは、図1に示すように、各主筋3
7aの材軸が撓むことなく、安定的に、主筋吊り具21
を介してフックブロック41に吊下保持される。Therefore, firstly, a predetermined number of main bars 37 are arranged.
The work of vertically holding a on the lower frame frame 9 in a form corresponding to the respective bar arrangement positions is performed. Therefore, first, the main muscle insertion space 22 of each of the three sheath tubes 22 of the main muscle suspender 21 is inserted.
s, the main bar 37 in a state of being laid down as shown in the right back part of FIG.
A is inserted, and the clamp 27 is attached to a predetermined position of the main bar 37a (that is, a position which becomes a lower part when the main bar 37a is set vertically). In this way, 3 clamps 2
7, the three main bars 37a are gripped, the bundling jig 26 is engaged with the hook block 41 of the crane vehicle 40, and then the hook block 41 is moved upward by the crane operation. Then, the main bar suspension 21
The clamps 27 holding the main bars 37a are connected to the connecting members 23 provided on the three sheath tubes 23 and the pulling wire 2
7, the crane 4 as a bundling jig 26 as a suspension engagement means
It hangs at 0 and becomes vertical. In this way, the main line 37
When a is laid down vertically and raised vertically, the three main bars 37
a is raised in a form in which horizontal movement is restrained by the three sheath tubes 22 and is a vertical main bar 37a.
Is held in such a manner that its axial direction is oriented vertically by the restraining force of the three sheath tubes 22 in the horizontal direction and the own weight of the three main bars 37a, and the main bars are suspended via the three clamps 27. It becomes the form hung on the tool 21. As a result, the three main bars 37a, as shown in FIG.
The main rod suspending device 21 is stably provided without bending the shaft of 7a.
It is hung and held by the hook block 41 via.
【0019】この状態で、さらにクレーン操作を介して
フックブロック41を適宜移動させ、該3本の主筋37
aを、ゲージディスク7、下部フレーム枠9間にそれぞ
れセットする。これには、まず、各主筋37aの下端部
を下部フレーム枠9に、挿通穴9sを挿通させて支持部
9aに搭載する形にしてから、該主筋37aの上端部
を、ゲージディスク7の所定位置の主筋配置部71に入
り込み配置させる。この際、各主筋配置部71にはスト
ッパ72が設けられているので、該ストッパ72を主筋
37aによって図4矢印A方向に押す形で、該主筋37
aを主筋配置部71に水平方向から入り込みさせる。す
ると、ストッパ72は、該ストッパ72が保有している
バネ力によって図4実線で示すようにプレート73側に
復元する形で、主筋37aが入り込み配置された主筋配
置部71を直ちに塞ぐ。即ち、該主筋配置部71から主
筋37aが放射方向外側に外れるのを防止する。これに
よって、主筋配置部71には、主筋37aが、該主筋配
置部71に対して上下に移動自在に保持された形にな
る。なお、ゲージディスク7には、所定のピッチP1
(実施例においては5mmピッチで)主筋配置部71が複
数形成されているので、該複数の主筋配置部71のう
ち、必要なもののみを選択的に用いることが出来る。即
ち、配筋が不要な位置にある主筋配置部71は用いない
で残す。In this state, the hook block 41 is further appropriately moved through the operation of the crane so that the three main bars 37
a is set between the gauge disk 7 and the lower frame frame 9. For this purpose, first, the lower end portions of the respective main reinforcements 37a are inserted into the lower frame frame 9 and the insertion holes 9s are inserted into the supporting portions 9a, and then the upper end portions of the main reinforcements 37a are fixed to the predetermined positions of the gauge disk 7. The main bar arranging portion 71 at the position is inserted and arranged. At this time, since a stopper 72 is provided in each main bar arrangement portion 71, the main bar 37 is pushed by the main bar 37a in the direction of arrow A in FIG.
a is inserted into the main bar arrangement portion 71 from the horizontal direction. Then, the stopper 72 immediately closes the main bar arrangement portion 71 in which the main bar 37a is inserted and arranged so as to be restored to the plate 73 side as shown by the solid line in FIG. 4 by the spring force of the stopper 72. That is, the main bar 37a is prevented from coming off from the main bar arrangement portion 71 to the outside in the radial direction. As a result, the main bar 37a is held in the main bar disposing portion 71 so as to be vertically movable with respect to the main bar disposing part 71. The gauge disk 7 has a predetermined pitch P1.
Since a plurality of main bar arrangement portions 71 are formed (at a pitch of 5 mm in the embodiment), only a necessary one of the plurality of main bar arrangement portions 71 can be selectively used. That is, the main bar arrangement portion 71 at a position where bar arrangement is unnecessary is not used and left.
【0020】こうして、主筋32aを順次3本づつ、下
部フレーム枠9の支持部9aに搭載し、ゲージディスク
7の主筋配置部71に配置させながら、クレーン操作に
よって、主筋吊り具21を下降させると、該主筋吊り具
21による吊下支持状態が解除された3本の主筋37a
は、その自重によって、下部フレーム枠7に縦に保持さ
れた形になる。そこで、主筋吊り具21の3ヶのクラン
プ27を順次主筋37aから取り外す。さらに、クレー
ン操作によってフックブロック41を上昇させる。する
と、クランプ27が主筋37aから取り外された状態の
主筋吊り具21は、3ヶの鞘管22が、各主筋挿通空間
22sを介して主筋37aに対して相対的に上方に移動
する形で、該主筋37aからその上側に抜けるように外
れる。従って、主筋吊り具21を用いれば、寝かせた状
態の主筋37aにクランプ27を取付けてクレーンを操
作するだけで、簡単に該主筋37aを縦にすることが出
来る。また、該クランプ27を縦になった主筋37aか
ら取り外すだけで、簡単に主筋吊り具21を主筋37a
から取り外すことが出来、これらの作業に高所作業や作
業の煩雑さが伴わない。In this manner, three main reinforcements 32a are sequentially mounted on the supporting portion 9a of the lower frame 9, and the main reinforcements 21 are lowered by the crane operation while arranging the main reinforcements on the support arrangement portion 71 of the gauge disk 7. , The three main bars 37a in which the suspension supporting state by the main bar suspension 21 has been released
Is held vertically by the lower frame frame 7 due to its own weight. Therefore, the three clamps 27 of the main bar suspension 21 are sequentially removed from the main bar 37a. Further, the hook block 41 is raised by operating the crane. Then, in the main muscle suspending device 21 with the clamp 27 removed from the main muscle 37a, the three sheath tubes 22 move upward relative to the main muscle 37a via the respective main muscle insertion spaces 22s. It comes off from the main bar 37a so as to come out to the upper side. Therefore, if the main bar suspension 21 is used, the main bar 37a can be easily made to be vertical only by attaching the clamp 27 to the laid main bar 37a and operating the crane. The main bar suspension 21 can be easily attached to the main bar 37a simply by removing the clamp 27 from the vertical main bar 37a.
It is possible to remove from the work, and these works do not involve work at heights and complexity of work.
【0021】こうして、上述した主筋37aをゲージデ
ィスク7、下部フレーム枠9間にセットする作業を繰返
すことによって、所定配筋本数の主筋37aを、その各
々の配筋位置に対応させた形で、下部フレーム枠9に縦
に搭載保持したところで、レベル調整ジャッキ15を駆
動操作して、各ワイヤ11の長さを調整する形で、下部
フレーム枠9のレベル調整を行う。これによって、該下
部フレーム枠9に搭載保持された所定本数の主筋37a
は、その各々が材軸方向を鉛直方向に向けた形になるよ
うに平衡保持される。そこで次に、該所定本数の主筋3
7aに配力筋37bを接続する作業を行う。By repeating the above-described operation of setting the main bars 37a between the gauge disk 7 and the lower frame 9, the main bars 37a having a predetermined number of bar arrangements are made to correspond to the respective bar arrangement positions. When vertically mounted on the lower frame 9, the level adjusting jack 15 is driven to adjust the length of each wire 11 to adjust the level of the lower frame 9. As a result, a predetermined number of main bars 37a mounted and held on the lower frame 9 are held.
Are balanced so that each of them has a shape in which the material axis direction is oriented in the vertical direction. Therefore, next, the predetermined number of main bars 3
Work for connecting the distribution muscle 37b to 7a is performed.
【0022】当該配力筋37bの主筋37aへの接続作
業時には、配力筋受け治具18を用いるが、鉄筋籠37
における最下部部分に位置する配力筋37bを主筋37
aに接続する際には、該主筋37aの下端に配力筋受け
治具18の下端部を合わせてセットする。そして、これ
より上側位置の配力筋37bを主筋37aに接続する際
には、図8(a)に示すように、既に主筋37aに接続
された配力筋37bの上方に各配力筋受け治具18を位
置決めセットする。なお、配力筋受け治具18の位置決
めは、最下端部の掛け具191を、既に主筋37aに接
続済みの配力筋37b等に係合保持させた形にしておい
て、4ヶの油圧ジャッキ16をそれぞれ駆動操作するこ
とによって行う。At the time of connection work of the distribution muscle 37b to the main reinforcement 37a, the distribution muscle receiving jig 18 is used.
The force distribution muscle 37b located at the bottom of the
When connecting to a, the lower end of the force distribution receiving jig 18 is set to the lower end of the main bar 37a. Then, when connecting the force distribution muscles 37b located above this to the main muscles 37a, as shown in FIG. 8 (a), the force distribution muscles 37b already connected to the main muscles 37a are located above the respective force distribution muscles 37b. The jig 18 is positioned and set. The positioning of the force distribution muscle receiving jig 18 is performed by setting the hanging tool 191 at the lowermost end to be engaged with and held by the force distribution muscles 37b already connected to the main muscles 37a. This is done by driving the jacks 16 respectively.
【0023】こうして位置決めした4ヶの配力筋受け治
具18のそれぞれは、下部フレーム枠9上に保持された
ことによって輪状になっている複数の主筋37aの内側
に配置する形になっている。そこで次に、図8(b)に
示すように、配力筋受け治具18を放射方向外側に若干
移動させると共に、ガイド19を介して複数の掛け具1
91を図8矢印G方向に突出させる形にして、主筋37
aの外側に該複数の掛け具191を突出配置させる。こ
の際、配力筋受け治具18の複数の掛け具191のうち
最下部に位置する掛け具191を、既に主筋37aに接
続済で最上部に位置していた配力筋37bに引掛けるよ
うにすると、配力筋受け治具18は、主筋37aの内方
側に的確に保持される。このとき配力筋受け治具18に
は掛け具191が、配力筋37bの配筋ピッチに対応し
た形で設けられているので、配力筋37bを配筋すべき
位置が、複数の掛け具191の配置位置によって直ちに
検出される。Each of the four force distribution bracing jigs 18 thus positioned is arranged inside a plurality of ring-shaped main braces 37a held by the lower frame 9. . Therefore, next, as shown in FIG. 8B, the force distribution bracing jig 18 is slightly moved outward in the radial direction, and a plurality of hooks 1 are provided via the guide 19.
The main bar 37 is formed by projecting 91 in the direction of arrow G in FIG.
The plurality of hooks 191 are arranged so as to project outside the a. At this time, of the plurality of hooks 191 of the force distribution receiving jig 18, the hook 191 located at the lowermost part is hooked on the force distribution muscle 37b which is already connected to the main bar 37a and located at the top. In this case, the force distribution muscle receiving jig 18 is accurately held on the inner side of the main muscle 37a. At this time, the hooks 191 are provided on the force distribution muscle receiving jig 18 in a form corresponding to the bar arrangement pitch of the force distribution muscles 37b, so that the positions where the force distribution muscles 37b should be arranged are plural. The position of the tool 191 is immediately detected.
【0024】そこで、4ヶの配力筋受け治具18を図2
に示すように、その各々の掛け具191が主筋37aの
外側に突出する形になるようにセットしたところで、図
2右部に示すように半円状になっている配力筋37b
を、引き続き図8(b)に示すように、配力筋受け治具
18の各掛け具191上に引掛ける形で係合保持させ
る。そして、該配力筋37bを、その1本1本が円周状
になるように、2本の半円状の配力筋37b、37bの
各両端部をラップさせながら、主筋37aに該主筋37
aと交差する形になるようそれぞれ溶接接続していく。
すると、当該複数の主筋37aへの配力筋37bの接続
作業を繰返すことによって、鉄筋組立体である鉄筋籠1
0を形成することが出来、このための鉄筋組立作業は、
図2に示すように、坑口3a付近の地面2a上におい
て、坑外作業で行うことが出来る。Therefore, the four force distribution receiving jigs 18 are shown in FIG.
As shown in Fig. 2, when the respective hooks 191 are set so as to project to the outside of the main bar 37a, the force distribution bar 37b having a semicircular shape as shown in the right part of Fig. 2 is formed.
Then, as shown in FIG. 8 (b), the hooks are engaged and held on the hanging members 191 of the force distribution receiving jig 18 in a hooked manner. Then, each of the force distribution muscles 37b is wrapped around each end portion of the two semicircular force distribution muscles 37b, 37b so that each of the distribution muscles 37b has a circular shape. 37
Weld and connect them so that they intersect with a.
Then, by repeating the work of connecting the distribution muscles 37b to the plurality of main reinforcements 37a, the reinforcement bar 1 which is the reinforcement assembly.
0 can be formed, and the rebar assembly work for this is
As shown in FIG. 2, the work can be performed outside the ground on the ground 2a near the wellhead 3a.
【0025】こうして、先にセットした配力筋受け治具
18の全ての段の掛け具191に係合させた配力筋37
bを主筋37aに溶接接続して、1サイクル分の配力筋
接続作業を終えたなら、次に図8(c)に示すように、
配力筋受け治具18を主筋37a(即ち組立中の鉄筋籠
37)と切り離す。これには、各油圧ジャッキ16を解
放して、それぞれの配力筋受け治具18を若干づつ下方
に移動させる。すると、該配力筋受け治具18は直ち
に、チェーン20を介して該油圧ジャッキ16に吊下さ
れた形になって、これにより主筋37aより放射方向内
方側に戻る形で配力筋受け治具18が、図8(c)に示
すように、主筋37aの内側に復元配置する。In this way, the force distribution muscles 37 engaged with the hooks 191 of all the steps of the force distribution muscle receiving jig 18 set previously.
When b is welded to the main bar 37a and the work for connecting the force distribution muscles for one cycle is completed, as shown in FIG. 8 (c),
The force distribution receiving jig 18 is separated from the main reinforcement 37a (that is, the rebar cage 37 being assembled). To this end, the respective hydraulic jacks 16 are released and the respective force distribution receiving jigs 18 are moved slightly downward. Then, the force distribution receiving jig 18 immediately becomes suspended from the hydraulic jack 16 via the chain 20 and thereby returns to the inner side in the radial direction from the main reinforcement 37a. As shown in FIG. 8C, the jig 18 is restored and arranged inside the main bar 37a.
【0026】このようにして、配力筋受け治具18の全
ての段の掛け具191の分だけ配力筋37bを主筋37
aに接続する作業を行うと、該配力筋受け治具18の長
さに対応した分だけの鉄筋籠組立作業が進行したことに
なる。そこで、このように配力筋受け治具18を用いて
鉄筋籠37を組み立てる作業を行いながら、所定のサイ
クルで、各チェーンブロック10を駆動し、各ワイヤ1
1を伸長させていく形で、下部フレーム枠9を縦穴3中
に少しづつ下降させていく。すると、下部フレーム枠9
上に搭載保持された形で、該下部フレーム枠9とゲージ
ディスク7の主筋配置部71間にセットされている所定
本数の主筋37aは、先に述べたように、該主筋37a
に接続された配力筋37bと共に、鉄筋籠37の組立済
部分として、縦穴3内に降ろされていく。従って、坑口
3a付近の地面2a上で作業員39が各チェーンブロッ
ク10を駆動操作することによって、主筋37aと配力
筋37bを、鉄筋籠37にした状態で、縦穴3内に建て
込む作業を行うことが出来る。なお、こうして鉄筋籠3
7の組立済部分を、縦穴3内に降ろしていく際に、該鉄
筋籠37を形成している各主筋37aは、ゲージディス
ク7の各主筋配置部71に対して相対的に下降移動する
形になり、このときに、該それぞれの主筋配置部71に
はストッパ72が設けられていることによって、それぞ
れの主筋37aは主筋配置部71から放射方向外側に外
れることなく、円滑にゲージディスク7に対して下降移
動することが出来る。In this way, the distribution muscles 37b corresponding to the hooks 191 on all the steps of the distribution muscle receiving jig 18 become the main reinforcements 37.
When the work of connecting to a is performed, the work of assembling the reinforcing rod cage corresponding to the length of the force distribution receiving jig 18 has progressed. Therefore, while performing the work of assembling the reinforcing bar cage 37 using the distribution force receiving jig 18 as described above, each chain block 10 is driven in a predetermined cycle and each wire 1
The lower frame 9 is gradually lowered into the vertical hole 3 in such a manner that 1 is extended. Then, the lower frame frame 9
The predetermined number of main bars 37a set between the lower frame frame 9 and the main bar arrangement portion 71 of the gauge disc 7 while being mounted and held on the main bar 37a are as described above.
Together with the force distribution bar 37b connected to, the rebar basket 37 is lowered into the vertical hole 3 as an assembled part. Therefore, when the worker 39 drives and operates each chain block 10 on the ground 2a near the wellhead 3a, the main bar 37a and the force distribution bar 37b are made into the rebar cage 37, and the work to build in the vertical hole 3 is performed. You can do it. In this way, rebar cage 3
When the assembled part of 7 is lowered into the vertical hole 3, each main bar 37a forming the rebar cage 37 moves downward relative to each main bar disposition portion 71 of the gauge disk 7. At this time, since the stoppers 72 are provided in the respective main reinforcement placement portions 71, the respective main reinforcements 37a are smoothly separated from the main reinforcement placement portion 71 in the radial direction without being displaced outward in the radial direction. You can move down.
【0027】ところで、上述したように縦穴3内に降ろ
されていく組立済部分の鉄筋籠37は、配力筋37bが
主筋37aに接続された位置より下方側にある坑口3a
付近において、スライドガイド8の鉄筋挿通空間8sを
通過する形で、下降移動する。この際、スライドガイド
8はゲージディスク7と整合した位置に設けられてお
り、該ゲージディスク7及びスライドガイド8が設けら
れているフレーム6の中心CL1は、縦穴3の中心CT
1と一致した形になっている。すると、該スライドガイ
ド8は、その内径即ち鉄筋挿通空間8sの径D2が、鉄
筋籠37の外径より若干大きな形で円環状に形成されて
いることによって、該鉄筋挿通空間8sを通過する組立
済部分の鉄筋籠37は、スライドガイド8の内側面に案
内される形で、常に該鉄筋籠37の部材中心を縦穴3の
中心CT1に一致させた形で、縦穴3中に降りることが
出来る。By the way, as described above, the assembled rebar cage 37 that is lowered into the vertical hole 3 has the wellhead 3a located below the position where the force distribution bar 37b is connected to the main bar 37a.
In the vicinity, the slide guide 8 moves downward while passing through the reinforcing bar insertion space 8s. At this time, the slide guide 8 is provided at a position aligned with the gauge disc 7, and the center CL1 of the frame 6 on which the gauge disc 7 and the slide guide 8 are provided is the center CT of the vertical hole 3.
The shape is consistent with 1. Then, the slide guide 8 has an inner diameter, that is, a diameter D2 of the reinforcing bar insertion space 8s that is slightly larger than the outer diameter of the reinforcing bar cage 37 and is formed in an annular shape, so that the slide guide 8 passes through the reinforcing bar insertion space 8s. The rebar cage 37 in the completed portion can be guided into the inner surface of the slide guide 8 and can descend into the vertical hole 3 in such a manner that the member center of the rebar cage 37 is always aligned with the center CT1 of the vertical hole 3. .
【0028】このようにして、先に述べたように所定配
筋本数の主筋37aを、その各々の配筋位置に対応させ
た形で、下部フレーム枠9とゲージディスク7の主筋配
置部71間にセットし、該所定本数の主筋37aに配力
筋37bを接続して、鉄筋籠37を組み立てながら、チ
ェーンブロック10の駆動操作によって下部フレーム枠
9を鉄筋籠37を組み立てた長さ分づつ下降させていく
作業を、所定のサイクルで繰り返していく作業を繰返す
ことによって、縦穴3に主筋37aと配力筋37bを、
これ等を接続した鉄筋籠37の状態で建て込むことが出
来る。すると、当該鉄筋籠組立及び建て込み作業を坑口
3a付近の地面2a上で行うことが出来、鉄筋組立のた
めに縦穴3の坑内に作業員39が降りたり、縦穴3上に
足場を仮設して高所作業を行う必要がない。なお、形成
構築すべき杭30の長さ、即ち縦穴3の深さが1本の主
筋37aの長さより大なるときには、主筋37aを上下
方向に順次ラップさせながら順次継ぎ足していく形で、
主筋37aを所定長さにすることが出来るので、縦穴3
に鉄筋建て込み装置5を設置したままの状態で、杭30
全長分の鉄筋籠37を建て込んでしまうことが出来、段
取り替えの必要がない。In this way, as described above, between the lower frame frame 9 and the main bar arrangement portion 71 of the gauge disc 7, the main bars 37a of a predetermined number are arranged in correspondence with the respective bar arrangement positions. , And connecting the distribution bars 37b to the predetermined number of main bars 37a and assembling the reinforcing bar cage 37, the lower frame frame 9 is lowered by the driving operation of the chain block 10 by the length of the assembled reinforcing bar cage 37. By repeating the work of repeating the work in a predetermined cycle, the main bar 37a and the force distribution bar 37b are provided in the vertical hole 3,
It can be built in the state of the rebar cage 37 to which these are connected. Then, the rebar cage assembly and erection work can be performed on the ground 2a near the pit mouth 3a, and the worker 39 goes down into the pit of the vertical hole 3 or the scaffold is temporarily installed on the vertical hole 3 for the rebar assembly. There is no need to work at heights. In addition, when the length of the pile 30 to be formed and constructed, that is, the depth of the vertical hole 3 is larger than the length of one main bar 37a, the main bars 37a are sequentially lapped in the vertical direction in a form of successive addition,
Since the main bar 37a can have a predetermined length, the vertical hole 3
With the reinforcing bar building device 5 installed in the
The rebar cage 37 for the entire length can be built in, and there is no need to change the setup.
【0029】さらに、このようにして、所定長さ分の鉄
筋籠37を、組立済状態で、縦穴37に建て込み設置す
ると、該鉄筋建て込みのために縦穴3を下降させた下部
フレーム枠9は、穴底3bに到達する。これによって、
下部フレーム枠9の支持部9aを介して、鉄筋籠37が
穴底3bに支持された形になる。すると、下部フレーム
枠9を吊下する形で、該下部フレーム枠9上の鉄筋籠3
7を支持していたワイヤ11は、それまで、下向きに突
出しているフック係合突起12aに吊輪13が引掛けら
れてフック配置溝12bに配置する形で、フック保持具
12に保持されていたので、当該下部フレーム枠9の穴
底3bへの到達によって、吊輪13がフック配置溝12
bに対して下方に移動する形で、フック係合突起12a
から抜ける。これによって、下部フレーム枠9(即ちこ
れが支持する鉄筋籠37)とワイヤ11(即ち該ワイヤ
11が接続しているチェーンブロック10)の係合状態
が解除される。即ち、下部フレーム枠9は、鉄筋建て込
み装置5における消耗部品として、穴底3bに置き去り
にし、該下部フレーム枠9以外の構成部分を鉄筋籠37
と切り離して回収し、他の杭30の施工位置に転用する
が、当該部品回収作業のために、作業員が縦穴30に入
る必要はなく、チェーンブロック10の操作によって、
これを行うことが出来る。即ち、安全性が高い。Further, in this way, when the rebar cage 37 of a predetermined length is assembled and installed in the vertical hole 37 in the assembled state, the lower frame frame 9 in which the vertical hole 3 is lowered for the rebar is installed. Reaches the bottom 3b of the hole. by this,
The reinforcing bar cage 37 is supported by the hole bottom 3b via the supporting portion 9a of the lower frame 9. Then, in the form of suspending the lower frame frame 9, the rebar cage 3 on the lower frame frame 9 is suspended.
The wire 11 that has supported the wire 7 is held by the hook holder 12 in such a manner that the hanging ring 13 is hooked on the hook engaging protrusion 12a projecting downward and is arranged in the hook arrangement groove 12b. Therefore, when the lower frame frame 9 reaches the hole bottom 3b, the suspension ring 13 is moved to the hook placement groove 12.
The hook engaging projection 12a moves downward with respect to b.
Get out of. As a result, the engagement state between the lower frame frame 9 (that is, the reinforcing bar cage 37 supported by the lower frame frame 9) and the wire 11 (that is, the chain block 10 to which the wire 11 is connected) is released. That is, the lower frame frame 9 is left as a consumable part of the reinforcing bar building device 5 on the hole bottom 3b, and the components other than the lower frame frame 9 are rebar cage 37.
Although it is separated and collected and diverted to the construction position of another pile 30, it is not necessary for the worker to enter the vertical hole 30 for the component collection work, and by operation of the chain block 10,
You can do this. That is, the safety is high.
【0030】そこで、上述したように吊輪13を介して
ワイヤ11を下部フレーム枠9と切離したところで、各
チェーンブロック10の駆動操作によってワイヤ11を
引上げ、鉄筋建て込み装置5を縦穴3から撤去すれば、
直ちに該縦穴3にコンクリートを打設する作業を行うこ
とが出来る。また、撤去した鉄筋建て込み装置を、未だ
鉄筋籠37が建て込みされていない縦穴3に転用し、新
たな鉄筋建て込み作業を開始することが出来る。従っ
て、施工効率が良く、杭施工を行うことが出来る。な
お、こうした鉄筋建て込み装置5の移設や、先に述べた
主筋37aの鉄筋建て込み装置5へのセットには、クレ
ーン車40を使用するが、鉄筋建て込み装置5は、鉄筋
籠37を保持していない状態で設置或いは移設され、ま
た、主筋37aのセットは3本づつ行われるので、該ク
レーン車40は小型のもので十分である。また、鉄筋籠
37は、坑口3a付近で組み立てられる形で、その組立
以前には、主筋37aと半円形の配力筋37bを、寝か
せた状態で重ねて保管しておくことが出来る。よって、
こうしたクレーン車40の設置や主筋37a、配力筋3
7b等の鉄筋の保管のために、広範な場所が占有される
ことはない。Therefore, as described above, when the wire 11 is separated from the lower frame frame 9 via the suspension ring 13, the wire 11 is pulled up by the drive operation of each chain block 10, and the reinforcing bar building device 5 is removed from the vertical hole 3. if,
Immediately, the work of placing concrete in the vertical hole 3 can be performed. Further, the removed reinforcing bar building device can be diverted to the vertical hole 3 in which the reinforcing bar cage 37 has not been built yet, and a new reinforcing bar building work can be started. Therefore, the construction efficiency is good and the pile construction can be performed. A crane truck 40 is used to relocate the reinforcing bar building device 5 and to set the main bar 37a to the reinforcing bar building device 5 described above, but the reinforcing bar building device 5 holds the reinforcing bar cage 37. Since the cranes 40 are installed or relocated in a state where they are not installed, and the main bars 37a are set three by three, it is sufficient that the crane vehicle 40 is small in size. The rebar cage 37 is assembled in the vicinity of the wellhead 3a, and before the assembly, the main bar 37a and the semicircular force distribution bar 37b can be stacked and stored in a lying state. Therefore,
Installation of such a crane truck 40, main bar 37a, power distribution bar 3
No extensive space is occupied for the storage of rebar such as 7b.
【0031】なお、上述した実施例においては、円柱形
状の縦穴3にその側壁3cに沿った円筒状の鉄筋籠37
を建て込みする例を述べたが、縦穴3及び鉄筋籠37の
形状は、これに限定されるものではない。従って、縦穴
3の真中部分にも鉄筋籠37等の鉄筋組立体を建て込み
しても構わない。また、その全体形状が板状をなす鉄筋
組立体を壁状の縦穴に建て込みしても構わない。さら
に、実施例においては、本発明による鉄筋吊り下げ治具
である主筋吊り具21を、杭30を施工する際に主筋3
7aを鉄筋建て込み装置5にセットするのに用いた例を
述べたが、本発明の鉄筋吊り下げ治具の適用用途はこれ
に限定されるものではなく、その他の長尺鉄筋の吊り下
げに用いても良いことは勿論である。また、実施例にお
いては、鉄筋吊り治具である主筋吊り具21において、
鞘管22に設けられる吊下係合手段は連結部材23、牽
引ワイヤ25、束ね治具26によって構成されている例
を述べたが、当該吊下係合手段は、主筋吊り具21っを
クレーン車40のフックブロック41に係合させ、これ
によって、鉄筋クランプであるクランプ27が把持する
鉄筋である主筋37aを吊下し得るようになっていれ
ば、その他の構成になっていても構わない。また、実施
例においては、3ヶの鞘管22が連結手段23によって
一体に連結されている例を述べたが、これ等複数の鞘管
22は1ヶ1ヶが牽引ワイヤ25を介して束ね治具26
下に吊下されている形で、該複数の鞘管22相互間の間
隔が可変であるようになっていても構わない。即ち、こ
れによって、様々なピッチの配筋に対応することが出来
る。また、鞘管22及びクランプ27の配設数量は任意
である。In the above-described embodiment, the cylindrical rebar cage 37 along the side wall 3c of the cylindrical vertical hole 3 is formed.
However, the shapes of the vertical hole 3 and the reinforcing bar cage 37 are not limited to this. Therefore, a reinforcing bar assembly such as the reinforcing bar cage 37 may be built in the center of the vertical hole 3. Further, a reinforcing bar assembly having a plate shape as a whole may be built in the wall-shaped vertical hole. Further, in the embodiment, the main reinforcement 3 which is the jig for suspending the reinforcing bar according to the present invention is used when the pile 30 is installed.
Although the example used to set 7a in the reinforcing bar building device 5 has been described, the application of the reinforcing bar hanging jig of the present invention is not limited to this, and can be used for hanging other long reinforcing bars. Of course, it may be used. In addition, in the embodiment, in the main bar suspension 21 that is a reinforcing bar suspension jig,
The example in which the suspension engaging means provided in the sheath pipe 22 is composed of the connecting member 23, the pulling wire 25, and the bundling jig 26 has been described, but the suspension engaging means includes the main bar suspension 21 and the crane. Other configurations may be adopted as long as they can be engaged with the hook block 41 of the vehicle 40 to suspend the main bar 37a which is the reinforcing bar grasped by the clamp 27 which is the reinforcing bar clamp. . Further, in the embodiment, the example in which the three sheath tubes 22 are integrally connected by the connecting means 23 has been described, but one of the plurality of sheath tubes 22 is bundled through the pulling wire 25. Jig 26
It is also possible that the interval between the plurality of sheath tubes 22 is variable in the form of being suspended below. That is, by this, it is possible to deal with the reinforcement of various pitches. Further, the numbers of the sheath tubes 22 and the clamps 27 arranged are arbitrary.
【0032】[0032]
【発明の効果】以上説明したように本発明によれば、鞘
管22を有し、前記鞘管22に主筋挿通空間22s等の
鉄筋挿通空間を、主筋37a等の鉄筋を該鉄筋の材軸方
向に沿って移動自在に挿通させ得る形で形成し、前記鞘
管22に、鉄筋を把持自在なクランプ27等の鉄筋クラ
ンプを吊下し、前記鞘管22に、連結部材23、牽引ワ
イヤ25、束ね治具26等の吊下係合手段を設けて構成
したので、鉄筋挿通空間に挿通させた鉄筋を、鉄筋クラ
ンプに把持させる形にすれば、該鉄筋を吊下係合手段に
吊下支持させることが出来る。これによって、鉄筋クラ
ンプが把持している鉄筋は、該吊下係合手段が係合して
いるクレーン車40のフックブロック41等の牽引装置
下に垂下保持される形になる。即ち、鉄筋は、該鉄筋の
下部を鉄筋クランプに把持された形で、その自重によっ
て吊下係合手段下に垂下される。従って、鉄筋を、横に
寝かせた状態から、鉄筋挿通空間に挿通させて且つ鉄筋
クランプに把持させた形にして、牽引装置を上昇移動さ
せることによって、地上に立てることが好適に出来る。
そして、当該鉄筋を立てた状態において、鉄筋クランプ
は鉄筋の下部に配置することになる。すると、この状態
において、(実際には該牽引装置以外の鉄筋建て込み装
置5等の装置に該立てた鉄筋を保持させてから)、鉄筋
クランプの把持状態を解除することが地上作業により簡
単に出来る。その後、前記牽引装置をさらに上昇移動さ
せると、鉄筋はその材軸方向(即ち該鉄筋を立てた状態
においては上下方向)に沿って鉄筋挿通空間に対して移
動自在であるところから、該鉄筋に対して鞘管22の鉄
筋挿通空間が相対的に上に移動する形で、該鞘管22が
鉄筋から抜ける。これによって、鉄筋吊り治具と鉄筋と
の係合状態が解除される。即ち、本発明は、複雑な機構
を必要とすることなく、簡単な装置構成にして、鉄筋を
立てた状態で、高所作業なく、クレーンと切り離すこと
が出来る。従って、本発明を、現場打設コンクリートに
よって深礎杭を構築するための補強用鉄筋を吊り下げる
際に用いれば、該鉄筋が長尺なものであっても、クレー
ン操作によって該鉄筋を、実際の配筋状態に即した状態
に立ててしまい、その後クレーンからの切離しを地上作
業で行うことが出来るので、非常に都合が良い。As described above, according to the present invention, the sheath tube 22 is provided, and the sheath tube 22 is provided with a reinforcing bar insertion space such as the main bar insertion space 22s and a reinforcing bar such as the main bar 37a. It is formed so that it can be inserted movably along the direction, and a reinforcing bar clamp such as a clamp 27 that can hold a reinforcing bar is hung on the sheath tube 22, and the connecting member 23 and the pulling wire 25 are connected to the sheath tube 22. Since the suspension engaging means such as the bundling jig 26 is provided, if the reinforcing bar inserted into the reinforcing bar insertion space is held by the reinforcing bar clamp, the reinforcing bar is suspended by the suspending engaging means. Can be supported. As a result, the reinforcing bar gripped by the reinforcing bar clamp is suspended and held under the pulling device such as the hook block 41 of the crane vehicle 40 with which the suspending engagement means is engaged. That is, the reinforcing bar is hung under the suspending engagement means by its own weight, with the lower part of the reinforcing bar being gripped by the reinforcing bar clamp. Therefore, it is possible to preferably stand the ground on the ground by moving the traction device upward from the state in which the reinforcing bar is laid down sideways, inserted into the reinforcing bar insertion space and held by the reinforcing bar clamp.
Then, in the state in which the reinforcing bar is erected, the reinforcing bar clamp is arranged below the reinforcing bar. Then, in this state (actually, after the standing reinforcing bar is held by a device other than the pulling device such as the reinforcing bar erection device 5), it is easy to release the gripped state of the reinforcing bar clamp by ground work. I can. Then, when the traction device is further moved upward, the rebar is movable in the rebar insertion space along the material axis direction (that is, the vertical direction when the rebar is erected). On the other hand, the sheath tube 22 is pulled out of the reinforcing bar in such a manner that the reinforcing bar insertion space of the sheath tube 22 moves relatively upward. As a result, the engagement state between the reinforcing bar suspension jig and the reinforcing bar is released. That is, the present invention can be separated from the crane without a complicated mechanism, with a simple device configuration, and with the rebar erected, without working at height. Therefore, if the present invention is used when suspending reinforcing reinforcing bars for constructing deep foundation piles by using cast-in-place concrete, even if the reinforcing bars are long, the reinforcing bars are actually used by crane operation. It is very convenient because it can be set up according to the state of the bar arrangement, and then it can be separated from the crane by ground work.
【0033】また、本発明において、前記吊下係合手段
に前記鞘管22と前記鉄筋クランプを、該鞘管22と該
鉄筋クランプが1対1に対応する形で複数設けて、鉄筋
吊り下げ治具を構成すると、吊下係合手段が複数の鉄筋
を纏めて吊下支持することが出来る。また、これ等複数
の鉄筋をクレーンと切り離す作業は、上述したように地
上で鉄筋クランプを操作する形で簡単に出来る。従っ
て、鉄筋を何本かづつ纏めて立てたいときに、好適にこ
れを行うことが出来、鉄筋組立に関る作業効率が一層向
上する。Further, in the present invention, the suspension engagement means is provided with a plurality of the sheath pipes 22 and the reinforcing bar clamps so that the sheath pipes 22 and the reinforcing bar clamps correspond to each other in a one-to-one correspondence, and the reinforcing bars are suspended. When the jig is configured, the suspension engagement means can suspend and support a plurality of reinforcing bars together. Further, the work of separating the plurality of reinforcing bars from the crane can be easily performed by operating the reinforcing bar clamp on the ground as described above. Therefore, when it is desired to collectively assemble several reinforcing bars, this can be suitably performed, and the work efficiency relating to the reinforcing bar assembly is further improved.
【図1】本発明による鉄筋吊り下げ治具の一実施例を用
いて鉄筋建て込み装置により鉄筋建て込み作業を行って
いる杭施工現場の様子を示す一部破断斜視図である。FIG. 1 is a partially cutaway perspective view showing a state of a pile construction site where a reinforcing bar erection work is being performed by a reinforcing bar erection device using an example of a reinforcing bar suspension jig according to the present invention.
【図2】図1に示す杭施工現場の坑口付近を示す拡大図
である。FIG. 2 is an enlarged view showing the vicinity of a wellhead at the pile construction site shown in FIG.
【図3】図1に示す鉄筋建て込み装置のゲージディスク
を部分を示す平面図である。FIG. 3 is a plan view showing a portion of a gauge disc of the reinforcing bar building device shown in FIG.
【図4】図3に示すゲージディスクのIV矢視部分の拡大
図である。FIG. 4 is an enlarged view of a portion of the gauge disc shown in FIG.
【図5】図1に示す鉄筋建て込み装置のスライドガイド
部分を示す平面図である。5 is a plan view showing a slide guide portion of the reinforcing bar building device shown in FIG. 1. FIG.
【図6】図1に示す鉄筋建て込み装置の下部フレーム枠
におけるVI矢視部分の断側面図である。6 is a cross-sectional side view of a portion of a lower frame of the reinforcing bar building device shown in FIG.
【図7】図1に示す鉄筋建て込み装置に鉄筋吊り下げ治
具を用いて主筋を装着している様子を示す図である。FIG. 7 is a diagram showing a state where main bars are attached to the reinforcing bar building device shown in FIG. 1 by using a reinforcing bar suspension jig.
【図8】図1に示す杭施工現場において主筋に配力筋を
溶接する様子を示す一連の図である。FIG. 8 is a series of views showing a manner in which a distribution bar is welded to a main bar in the pile construction site shown in FIG.
21……鉄筋吊り下げ治具(主筋吊り具) 22……鞘管 22s……鉄筋挿通空間(主筋挿通空間) 23……吊下係合手段(連結部材) 25……吊下係合手段(牽引ワイヤ) 26……吊下係合手段(束ね治具) 27……鉄筋クランプ(クランプ) 37a……鉄筋(主筋) 21 ... Reinforcing bar suspending jig (main reinforcing bar suspender) 22. Pulling wire) 26 ... Suspension engaging means (bundling jig) 27 ... Reinforcing bar clamp (clamp) 37a ... Reinforcing bar (main bar)
Claims (2)
沿って移動自在に挿通させ得る形で形成し、 前記鞘管に、鉄筋を把持自在な鉄筋クランプを吊下し、 前記鞘管に吊下係合手段を設けて構成した、鉄筋吊り下
げ治具。1. A sheath tube is provided, and a reinforcing bar insertion space is formed in the sheath tube so that the reinforcing bar can be inserted along the axial direction of the reinforcing bar so that the reinforcing bar is grasped by the sheath tube. A reinforcing bar suspension jig configured by suspending a flexible reinforcing bar clamp and providing a suspension engagement means on the sheath pipe.
ランプを、該鞘管と該鉄筋クランプが1対1に対応する
形で複数設けて構成した、請求項1記載の鉄筋吊り下げ
治具。2. The reinforcing bar suspension according to claim 1, wherein the suspension engagement means is provided with a plurality of the sheath pipes and the reinforcing bar clamps in such a manner that the sheath pipes and the reinforcing bar clamps have a one-to-one correspondence. Lowering jig.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6024842A JP2858206B2 (en) | 1994-01-27 | 1994-01-27 | Rebar hanging jig |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6024842A JP2858206B2 (en) | 1994-01-27 | 1994-01-27 | Rebar hanging jig |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH07216875A true JPH07216875A (en) | 1995-08-15 |
| JP2858206B2 JP2858206B2 (en) | 1999-02-17 |
Family
ID=12149476
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6024842A Expired - Lifetime JP2858206B2 (en) | 1994-01-27 | 1994-01-27 | Rebar hanging jig |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2858206B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114790736A (en) * | 2022-03-07 | 2022-07-26 | 中交第二航务工程局有限公司 | Self-adaptive balanced placing platform structure for underground continuous wall reinforcement cage and using method |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01210520A (en) * | 1988-02-18 | 1989-08-24 | Ohbayashi Corp | Temporary tightening of reinforcement |
| JPH0444568A (en) * | 1990-06-12 | 1992-02-14 | Taisei Corp | Rebar hanging method and lifting device |
-
1994
- 1994-01-27 JP JP6024842A patent/JP2858206B2/en not_active Expired - Lifetime
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01210520A (en) * | 1988-02-18 | 1989-08-24 | Ohbayashi Corp | Temporary tightening of reinforcement |
| JPH0444568A (en) * | 1990-06-12 | 1992-02-14 | Taisei Corp | Rebar hanging method and lifting device |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114790736A (en) * | 2022-03-07 | 2022-07-26 | 中交第二航务工程局有限公司 | Self-adaptive balanced placing platform structure for underground continuous wall reinforcement cage and using method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2858206B2 (en) | 1999-02-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH02243878A (en) | Device of demolishing chimney | |
| JP2858205B2 (en) | Reinforcing bar mounting method and rebar mounting device used for the same | |
| US4205826A (en) | Lifting and supporting apparatus for a tower crane | |
| JP2858206B2 (en) | Rebar hanging jig | |
| JP3070657B2 (en) | Reinforcing equipment | |
| JPH09177070A (en) | Method and apparatus for constructing rebar cage for deep foundation | |
| JP3220397B2 (en) | Elevating scaffold | |
| JPH09125370A (en) | Rebar building device | |
| JP3068781B2 (en) | Reinforcing equipment | |
| JP2004036235A (en) | Construction method for heightening steel tower | |
| JP3242775B2 (en) | Installation method of vertical container | |
| JP2681219B2 (en) | Working scaffolding in the deep foundation method | |
| JP3021199B2 (en) | Construction method of chimney inner cylinder and pull jack up device for the construction | |
| JP2872419B2 (en) | Method for assembling tower-like structure and scaffolding device for use in the method | |
| JP7576371B1 (en) | Method for constructing cast-in-place piles, temporary casing support device used in said method, and excavator for cast-in-place piles | |
| JPH10331487A (en) | Chimney construction method and chimney construction equipment | |
| JP2712121B2 (en) | Reinforcing bar mounting method, hanging jig used in the mounting method, and guide device | |
| CN115744745B (en) | Method for removing roof returning member | |
| JPH05263531A (en) | Automatic building method and push-up device | |
| JP5902513B2 (en) | Construction device | |
| CN211523220U (en) | Underground continuous wall construction device | |
| JP3778447B2 (en) | Hoop reinforcement arrangement jig and hoop reinforcement arrangement method | |
| JPH06322992A (en) | Wall erection device | |
| JPH08218638A (en) | Suspending jig, method of building reinforcement with the use of suspended jig, and reinforcement swing preventing jig used for suspended jig | |
| JPH0458523B2 (en) |