JPH0724062B2 - Labor safety management device - Google Patents
Labor safety management deviceInfo
- Publication number
- JPH0724062B2 JPH0724062B2 JP16362284A JP16362284A JPH0724062B2 JP H0724062 B2 JPH0724062 B2 JP H0724062B2 JP 16362284 A JP16362284 A JP 16362284A JP 16362284 A JP16362284 A JP 16362284A JP H0724062 B2 JPH0724062 B2 JP H0724062B2
- Authority
- JP
- Japan
- Prior art keywords
- disaster
- information
- data
- labor
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、磁気カードや光カード、ICカード等の個人携
帯用カードを使って労務・工程管理情報や健康管理情
報、災害経歴情報等の作業員各自の固有情報を入力して
労務管理や工程管理、健康管理、災害予知等のデータを
作成し出力する労務安全管理装置に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention uses a personal portable card such as a magnetic card, an optical card, or an IC card to perform labor / process management information, health management information, disaster history information, etc. The present invention relates to a labor safety management device that inputs unique information of each worker to create and output data such as labor management, process management, health management, and disaster prediction.
作業所を管理する場合、一般に複数の作業所がその対象
となるのが普通である。ところで、各作業所では、応援
者、短期就労者、新規入場者、遅刻者等の様々な作業員
がいてこれらの把握が必要であるとともに、また、常勤
者であっても、当日の就労者氏名の確認、退場者の確認
が必要である等、把握しなければならない管理事項は非
常に多岐にわたっている。このように作業所において
は、就労者氏名の把握、受入教育の徹底、連絡先や健康
状態のチェック、定時以後の残留者の確認、その他多岐
にわたる労務管理が必要であるが、その労務管理は、工
事規模により種々の方法で実施されている。When managing a work place, it is common to have multiple work places. By the way, at each work place, there are various workers such as supporters, short-term workers, new entrants, late workers, etc., and it is necessary to grasp these, and even if it is a full-time worker, the workers on the day There are a wide variety of management items that must be grasped, such as confirmation of names and confirmation of exiters. In this way, in the workplace, it is necessary to grasp the name of the worker, thorough receiving education, check the contact information and health condition, check the remaining person after the scheduled time, and various other labor management, but the labor management is , Various methods are used depending on the scale of construction.
一般に、或る1日についてその日に就労する作業員は、
管理対象となる作業員全員のうちの約1/5程度であると
いわれており、作業員全員を対象とする作業所毎の作業
員の把握、労務管理、工程管理、安全管理は、重要であ
るが、現実には労務管理をそれぞれの工事現場の責任者
が個別に行ったりしており、総合的に管理する等の有効
な管理方式の採用は非常に難しかった。そのため、作業
所の労務管理に一貫性がなく、工事総合管理を進める上
で大きなネックになっていた。本発明は、このような考
案に基づくものであり、作業員各自の固有情報と全体の
工事情報をもとに工程管理、労務管理、安全管理も含め
た総合的な工事管理が可能な労務安全管理装置を提供す
ることを目的とするものである。In general, a worker who works on a certain day
It is said that about one-fifth of all workers subject to management are grasped, and it is important to grasp the workers at each work site, labor management, process management, and safety management for all workers. However, in reality, the personnel in charge of each construction site individually perform labor management, and it was very difficult to adopt an effective management method such as comprehensive management. As a result, labor management at work sites is inconsistent, which has been a major obstacle in advancing comprehensive work management. The present invention is based on such a device, and is capable of comprehensive work management including process management, labor management, and safety management based on the unique information of each worker and overall construction information. It is intended to provide a management device.
そのために本発明の労務安全管理装置は、ポータブル・
タイプのケース上面に配置される、記録カードに対しリ
ード/ライトするカード・リーダ/ライタ、データや処
理指示等を入力するキーボード、入出力データを表示す
るディスプレイとプリンタ、及び報知器、前記ポータブ
ル・タイプのケース側背面に配置される、個別配置され
記録カードをリードする複数のカード・リーダと複数の
作業所を総合して管理する中央管理部と災害予知を行う
災害情報処理システムの回線に接続するためのインター
フェイス手段、及び補助記憶媒体を装着しデータを格納
するための補助記憶装置、並びに ポータブル・タイプのケース内部に収納される、インタ
ーフェイス手段からのデータやケース上面に配置された
カード・リーダ/ライタからのデータその他の入出力デ
ータを処理するデータ処理装置からなり、カード・リー
ダ/ライタとカード・リーダを介し作業員が携帯する記
憶カードに対して作業員の所属や職種、資格等の情報か
らなる労務・工程管理情報と作業員の健康指標を示す情
報からなる健康管理情報と作業員の過去の災害経歴等の
情報からなる災害予知情報とをリード/ライトし、災害
情報処理システムにより、工事の内容や条件によって評
価値が固定される項目の値と工事の進行に伴って評価値
が変動する現場の安全管理状況等の項目の値等を積算し
て災害危険度を計算し災害危険度が所定値より大きい場
合に安全管理状況の悪い項目に対応して抽出した災害予
知情報、データ処理装置により、記録データからリード
した労務・工程管理情報と予め設定されている作業の基
準工程情報とをもとに作成した工程や職種別等の作業員
数の予測計算、特定条件者のリストその他の労務・工程
管理データ、健康管理情報と予め設定されている基準値
及び測定日の有効期限とを比較し健康管理情報のチェッ
クを行い作成した健康チェックリストをディスプレイ、
プリンタ、及び報知器等の出力手段を使って出力するよ
うに構成したことを特徴とするものである。Therefore, the labor safety management device of the present invention is
A card reader / writer for reading / writing on a recording card, a keyboard for inputting data and processing instructions, a display and printer for displaying input / output data, a notification device, the portable device, which is arranged on the upper surface of the type case. Connected to the line of the disaster information processing system that performs disaster prediction and a central management unit that comprehensively manages multiple card readers that individually read recording cards and multiple workplaces that are placed on the back of the type case Interface means for storing data, an auxiliary storage device for storing data by mounting an auxiliary storage medium, and a card reader placed inside the portable type case and arranged on the upper surface of the case / Consists of a data processing device that processes data from the writer and other input / output data , A card reader / writer and a memory card carried by the worker via the card reader, from labor / process management information consisting of information such as worker's affiliation, occupation type, and qualification, and information indicating the worker's health index Read / write the health management information and the disaster prediction information that consists of information such as the worker's past disaster history, etc., and the value and the value of the item whose evaluation value is fixed by the disaster information processing system depending on the content and conditions of the construction The disaster risk level is calculated by adding up the values of items such as the safety management status of the site where the evaluation value fluctuates as the disaster progresses. Number of workers such as process and job type created based on the disaster prediction information extracted by the data processing device and the labor / process management information read from the recorded data by the data processing device and the reference process information of the work set in advance. Prediction calculation, list of specific conditioners, other labor / process management data, health management information is compared with preset reference values and expiration dates of measurement days, and the health management information is checked to create a health checklist. display,
It is characterized in that it is configured to output by using an output means such as a printer and a notification device.
本発明の労務安全管理装置では、作業員各自の固有情報
がカード・リーダ/ライタでリードされると、労務・工
程管理情報の所属や資格の有無その他特定の条件毎に集
計が行われ、或いは基準工程情報との比較が行われ算出
された工程や職種別等の作業員数の予測、無資格者や残
留者等のリストが出力される。また、健康管理情報では
血圧の高い作業員や血圧の測定日が有効期間を経過して
いる作業員等のリストも出力される。さらには、災害情
報処理システムにおいて工事の内容や工事進行現場の状
況をもとに災害危険度が算出され、災害危険度が高い場
合には、その災害の予知とその災害の経歴者のリストが
出力される。本発明の労務安全管理装置は、ポータブル
・タイプ(可搬タイプ)となっているため、作業所での
専有面積が少なく、必要時に即使用できる。また、カー
ド・リーダ/ライタでは、カードのリードだけでなく、
キーボードからのキー入力に従って適宜カードの作成や
固有情報の内容についての訂正、変更、追加等を行うこ
とができる。なお、記憶部の一部をバッファ領域に使用
することにより、複数台の読み取り処理を行うことがで
き、タスク制御方式の採用により複数作業の同時処理を
行うようにすることも勿論可能であることはいうまでも
ない。In the labor safety management device of the present invention, when the unique information of each worker is read by the card reader / writer, the labor / process management information is aggregated according to the affiliation or qualification of the labor / process management information or other specific conditions, or The number of workers such as the process and job type calculated by comparison with the reference process information is calculated, and a list of unqualified workers and remaining workers is output. The health management information also outputs a list of workers with high blood pressure or workers whose blood pressure measurement date has passed the valid period. Furthermore, in the disaster information processing system, the disaster risk is calculated based on the contents of the construction and the situation of the construction site. If the disaster risk is high, the forecast of the disaster and the list of persons who have experienced the disaster will be displayed. Is output. Since the labor safety management device of the present invention is a portable type (portable type), it has a small occupation area in a work place and can be used immediately when necessary. In addition, in the card reader / writer, not only the card read,
According to the key input from the keyboard, it is possible to appropriately create a card and correct, change, add, etc. the content of the unique information. By using a part of the storage unit as a buffer area, it is possible to perform a reading process for a plurality of units, and it is of course possible to perform a simultaneous process for a plurality of works by adopting a task control method. Needless to say.
以下、実施例を図面を参照しつつ説明する。 Hereinafter, embodiments will be described with reference to the drawings.
第1図は本発明の労務安全管理装置の外観を示す図、第
2図は第1図図示の労務安全管理装置のハードウェア構
成例を示す図、第3図は本発明の労務安全管理装置に適
用される作業員各自の固有情報の例を示す図、第4図は
本発明の労務安全管理装置の機能ブロックの1例を示す
図である。FIG. 1 is a diagram showing an external appearance of a labor safety management device of the present invention, FIG. 2 is a diagram showing a hardware configuration example of the labor safety management device of FIG. 1, and FIG. 3 is a labor safety management device of the present invention. FIG. 4 is a diagram showing an example of unique information of each worker applied to FIG. 4, and FIG. 4 is a diagram showing an example of functional blocks of the labor safety management apparatus of the present invention.
図において、1と23はプリンタ、2はプリンタ操作部、
3はカード・リーダ・ステータス、4、5と22はディス
プレイ、6と21はキーボード、7は操作手順ガイド、8
はカプラー収納部、9はファン、10はキースイッチ、11
と20はカード入出力装置、12はフロッピィ収納部、13と
25は報知器、14は電源コネクタ、15はヒューズ、16はAC
コンセント、17はプリンタ用紙挿入口、18はインターフ
ェイス・ボード、19はデータ処理装置、24はフロッピィ
・ディスク、26は回線インターフェイス、30はシステム
・データ入力部、31は固有情報入力部、32は工程管理テ
ーブル、33は災害情報処理部、34は工程管理情報処理
部、35は労務管理情報処理部、36は健康管理情報処理
部、37は災害予知部、38ないし41は出力部をそれぞれ示
している。In the figure, 1 and 23 are printers, 2 is a printer operation unit,
3 is a card reader status, 4, 5 and 22 are displays, 6 and 21 are keyboards, 7 is a procedure guide, and 8
Is a coupler housing, 9 is a fan, 10 is a key switch, 11
And 20 are card input / output devices, 12 is floppy storage, 13
25 is an alarm, 14 is a power connector, 15 is a fuse, 16 is AC
Outlet, 17 printer paper insertion slot, 18 interface board, 19 data processor, 24 floppy disk, 26 line interface, 30 system data input section, 31 specific information input section, 32 process A management table, 33 is a disaster information processing unit, 34 is a process management information processing unit, 35 is a labor management information processing unit, 36 is a health management information processing unit, 37 is a disaster prediction unit, and 38 to 41 are output units. There is.
第1図図示の労務安全管理装置は、ポータブル・タイプ
で各作業所に配置されるものであり、カプラー収納部8
のカプラーを使ってセンターと接続される構成のもので
ある。センターには複数の作業所を総合して管理する中
央管理部及び工事の内容や工事進行現場の状況をもとに
災害危険度を算出し災害予知を行う災害情報処理システ
ムが配置されている。第1図において、カード入出力装
置11は、作業員各自が携帯する磁気カードや光カード等
に記録された固有情報をリードするとともに、キーボー
ド6から入力された固有情報を磁気カードや光カードに
ライトすることができるものである。またディスプレイ
4は、例えば液晶ディスプレイ(LCD)が用いられ、カ
ナや英数字の表示が行われ、ディスプレイ5は発光ダイ
オードが用いられ、血圧等の時効者数や、入場者数、障
害者数等の数量計表示が行われる。労務安全管理装置に
は、勿論処理装置及び各種の制御プログラムを格納した
記憶装置を具備し、作業員が携帯する各自の磁気カード
や光カード、ICカードをこのカード入出力装置11にリー
ドさせると、労務・工程管理情報の所属や資格の有無そ
の他特定の条件毎に集計が行われ、或いは基準工程情報
との比較が行われ算出された工程や職種別等の作業員数
の予測、無資格者や残留者等のリストがプリンタ1から
出力される。工程管理上、例えば無資格者のチェックが
なされた場合には、その無資格者に対しては報知器13か
らアラーム出力も行われる。また、健康管理情報で血圧
の高い作業員や血圧の測定日が有効期間を経過している
作業員に対しては、その都度報知器13からアラーム出力
され、さらには健康管理情報で異常と判定された作業員
のリストも出力される。報知器13からのアラーム出力
は、例えば血圧が比較基準値を越えた場合や、測定日が
有効期間を経過している場合その他の内容によって音色
を変えたり、音声で出力するようにしてもよいことはい
うまでもない。労務安全管理装置の背面図を示したのが
第1図であり、ハードウェアの構成例を示したのが第2
図である。なお、回線インターフェイス26はカプラーで
なく、変復調装置(MODEM)その他の通信結合手段や専
用回線を用いてもよい。また、フロッピィ・ディスク24
は、光ディスクでもよく、ここにカード入力情報その他
の管理情報を記憶し、このディスクを使って全体の作業
所を管理するシステムに各作業所の管理情報を入力する
ようにしてもよい。The labor safety management device shown in FIG. 1 is a portable type and is arranged at each work place.
It is a structure that is connected to the center using a coupler. The center is equipped with a central management unit that comprehensively manages a plurality of work sites, and a disaster information processing system that calculates a disaster risk level and predicts a disaster based on the contents of the construction and the situation of the construction progress site. In FIG. 1, a card input / output device 11 reads unique information recorded on a magnetic card or an optical card carried by each worker, and transfers unique information input from the keyboard 6 to a magnetic card or an optical card. It is something that can be written. The display 4 is, for example, a liquid crystal display (LCD) and displays kana and alphanumeric characters, and the display 5 is a light emitting diode. The number of prescriptions such as blood pressure, the number of visitors, the number of persons with disabilities, etc. Is displayed. The labor safety management device is of course equipped with a processing device and a storage device storing various control programs, and when each worker carries his or her own magnetic card, optical card, or IC card, the card input / output device 11 can be read. Prediction of the number of workers such as labor and process management information calculated based on the affiliation and qualification of labor / process management and other specific conditions, or comparison with standard process information, unqualified personnel The printer 1 outputs a list of people who remain, and the like. In terms of process control, for example, when an unqualified person is checked, the alarm device 13 also outputs an alarm to the unqualified person. Also, for workers with high blood pressure in the health management information or for workers whose blood pressure measurement date has passed the valid period, an alarm is output from the alarm device 13 each time, and further it is judged as abnormal by the health management information. A list of workers who have been killed is also output. The alarm output from the alarm device 13 may be changed by changing the timbre according to other contents such as when the blood pressure exceeds the comparison reference value or when the measurement date has passed the valid period, or may be output by voice. Needless to say. The rear view of the labor safety management device is shown in FIG. 1, and the hardware configuration example is shown in the second.
It is a figure. Note that the line interface 26 may be a modulator / demodulator (MODEM) or other communication coupling means or a dedicated line instead of a coupler. Also, the floppy disk 24
May be an optical disc, and card input information and other management information may be stored here, and the management information of each work place may be input to a system for managing the whole work place using this disc.
カード入出力装置11でリードされる作業員各自の固有情
報としては、例えば、第3図図示の如く、その作業員
の所属や本籍、生年月日、氏名、職種、資格等の労務・
工程管理情報、血圧とその測定日、障害その他の健康
管理情報、過去の災害発生内容や災害発生日等の災害
経歴情報等であり、作業員各自が携帯する磁気カードや
光カード等にその作業員の固有情報が記録される。Specific information of each worker read by the card input / output device 11 is, for example, as shown in FIG. 3, labor, such as the worker's affiliation, permanent domicile, date of birth, name, occupation, and qualification.
Process management information, blood pressure and its measurement date, obstacle and other health management information, disaster history information such as past disaster occurrence content and disaster occurrence date, etc., and work on magnetic cards and optical cards etc. carried by each worker The member's unique information is recorded.
第1図図示の労務安全管理装置は、例えば第4図図示の
如き機能ブロックで表すことができる。第4図におい
て、システム・データ入力部30は基準工程情報や災害予
知のためのデータを入力する例えばキーボードであり、
固有情報入力部31は、作業員各自の固有情報を入力する
ものであり、第1図図示のカード入出力装置11に相当す
る。The labor safety management apparatus shown in FIG. 1 can be represented by a functional block as shown in FIG. 4, for example. In FIG. 4, the system data input unit 30 is, for example, a keyboard for inputting standard process information and data for disaster prediction,
The unique information input unit 31 inputs the unique information of each worker and corresponds to the card input / output device 11 shown in FIG.
工程管理テーブル32は、作業の基準工程情報を登録して
おくものであり、工事を受注したときに作成される作業
工程(日程)に従って登録され、例えば、鳶の資格者が
必要な高所作業がある場合には、鳶の資格者が必要であ
ることや作業日程に対応して鳶の資格者の所要人日数等
が登録される。The process management table 32 is for registering standard process information of work, and is registered according to the work process (schedule) created when an order for construction is received. In such a case, the number of required days of the eagle qualified person is registered in accordance with the fact that the eagle qualified person is required and the work schedule.
災害情報処理部33は、災害予知をするための要因測定項
目より経験に基づいた災害危険度を算出するものであ
る。災害危険度の測定項目としては、受注した工事の内
容によって評価される固定値と、工事の進行に伴って評
価される変動値とがある。固定値の特性要因としては、
工事区分や構造、延面積、階数(地下、地上)、工期そ
の他の要素により評価される工事の難易度、工事責任者
やその作業所の過去の災害発生データ等により評価され
る災害経歴の有無、鉄骨建方工事や足場組払し工事等の
危険工事工程の有無が考慮され、変動値の特性要因とし
ては、事前計画の実施状況、安全施工サイクルの実施状
況、安全管理状況の評価、是正状況の経歴評価が考慮さ
れ、工事の進行に伴って所定の期間毎に、過去の経験に
基づいて算定された数値を使ってこれらの評価を行い、
危険度の配分計算を行うことによって、墜落、飛来、落
下、クレーンその他の災害予知が行われる。The disaster information processing unit 33 calculates a disaster risk degree based on experience from factor measurement items for predicting a disaster. The disaster risk measurement items include a fixed value evaluated according to the contents of the ordered construction and a variable value evaluated along with the progress of the construction. As the characteristic factor of the fixed value,
Whether or not there is a disaster history evaluated by the degree of difficulty of construction evaluated by the construction category, structure, total area, number of floors (underground, above ground), construction period, and other factors, and the past disaster occurrence data of the construction manager and the workplace. The presence or absence of dangerous construction processes such as steel erection work and scaffolding construction work are considered, and the characteristic factors of the fluctuation values are the implementation status of the preliminary plan, the implementation status of the safe construction cycle, and the evaluation and correction of the safety management status. A historical evaluation of the situation is taken into consideration, and these evaluations are performed at predetermined intervals along with the progress of construction using the numerical values calculated based on past experience,
By predicting the degree of risk distribution, a crash, flight, drop, crane, or other disaster prediction will be performed.
例えば墜落防止の観点から、設備関係をみると作業床設
備や開口部、受台足場、枠組足場等の是正指摘項目、こ
れらの是正指摘細目が挙げられる。そして、作業床設置
の是正指摘細目では、作業床無、手摺無・脱落、手摺高
90cm未満、床幅40cm未満、すきま3cm以上、足場板選
別、支持物、端部囲い、棚養生、床材固定転位等が挙げ
られる。そこで作業所現場において、これらの各細目に
ついて診断を行い、安全診断チェック・シートを作成し
て、この安全診断チェック・シートの内容が本発明のシ
ステムに入力される。災害危険度の算出では、先に説明
した固定値の特性要因のうち、例えば工事の難易度につ
いてみると、用途別が事務所の場合には0.85、構造別が
SRC造の場合には0.70、延面積別が4000坪の場合には0.5
0、階数が9階の場合には0.75、工期が12ヶ月の場合に
は0.85のように過去の災害発生事例のデータをもとに評
価点を設定する。同様に、工事長の災害経歴の有無、翌
月の危険工事、事前計画実施状況、安全施工サイクル、
安全管理状況評価、是正状況経歴評価等の項目について
もそれぞれ評価点を設定しその評価点を積算する。そし
て、積算値が所定値を越えた場合(例えば総合点100に
対して40を越えた場合)に災害危険度が高いと判断して
災害予知情報を選択し出力する。例えば是正指摘細目の
作業床無や手摺無・脱落が2ヶ月前から当月まで診断指
摘細目にされていて、災害危険度が高くなったとする
と、「過去の事例から墜落災害の危険が高い。KYミーテ
ィング、点検是正等の実施強化」のようなメッセージ、
災害発生状況図を抽出して出力する。For example, from the viewpoint of crash prevention, from the viewpoint of equipment, items to be corrected and pointed out such as work floor equipment, openings, pedestal scaffolds, frame scaffolds, and the like, are points to be pointed out. As for the correction point details of the work floor installation, there are no work floor, no handrails / drops, and handrail height.
Less than 90 cm, floor width less than 40 cm, clearance 3 cm or more, scaffolding board selection, support, edge enclosure, shelf curing, floor material fixed dislocation, etc. Therefore, at the work site, a diagnosis is made for each of these details, a safety diagnosis check sheet is created, and the contents of this safety diagnosis check sheet are input to the system of the present invention. In the calculation of disaster risk, among the characteristic factors of fixed values explained above, for example, regarding the difficulty level of construction, 0.85 if the use type is an office, and if it is a structure type
0.70 in the case of SRC construction, 0.5 when the total area is 4000 tsubo
Set an evaluation point based on the data of past disaster occurrence cases such as 0, 0.75 when the number of floors is 9th floor and 0.85 when the construction period is 12 months. Similarly, the construction manager's history of disaster, next month's dangerous construction, pre-plan implementation status, safe construction cycle,
For each item such as safety management status evaluation and correction status background evaluation, an evaluation score is set and the evaluation score is added up. Then, when the integrated value exceeds a predetermined value (for example, when the total value exceeds 40 with respect to 100), it is determined that the disaster risk is high, and disaster prediction information is selected and output. For example, if there is no work floor, no handrails, or dropouts for corrective indications from 2 months ago to the current month, and if the risk of disaster increases, the risk of a disaster is high. Message such as "enhancement of meetings, implementation of inspection and correction",
Extract and output the disaster situation diagram.
工程管理情報処理部34は、固有情報入力部31に作業員各
自の固有情報が入力されると、労務・工程管理情報から
工程管理に必要なデータを作成するものである。工程管
理に必要なデータとしては、例えば、その日の各職種の
人数を集計することにより、工程管理テーブル32に登録
されたその日の各工程毎に必要な職種の人数割合から工
程/職種別作業員数予測データが作成され、或いはその
日迄の各職種毎の就業実績人日数を集計し、その集計値
と工程管理テーブル32に登録されたその日迄の人日数と
を比較することにより、翌月、2ケ月先、3ケ月先の職
種別作業員の過不足予測データが作成され、さらには、
業者(所属)別に作業員を集計することにより業者別作
業員の過不足予測データが作成される。When the unique information of each worker is input to the unique information input unit 31, the process management information processing unit 34 creates data necessary for process management from the labor / process management information. The data necessary for process management includes, for example, counting the number of workers for each job type on the day, and calculating the number of workers required for each process on the day registered in the process control table 32 from the number of workers for each process / job type. Forecast data is created, or the actual number of working days for each type of job up to that day is totaled, and the total value is compared with the number of human days up to that day registered in the process control table 32. Forecast and deficiency data of workers by occupation for three months ahead are created.
By calculating the number of workers by trader (affiliation), the worker excess / deficiency prediction data for each trader is created.
労務管理情報処理部35は、固有情報入力部31に作業員各
自の固有情報が入力されると、労務・工程管理情報から
労務管理に必要なデータを作成するものである。労務管
理に必要なデータとしては、例えば、工程管理テーブル
32に登録されたその日の各工程毎に必要な職種と資格と
をもとに、無資格者のチェックを行うことにより、工程
別の無資格者リストが作成され、また、作業員各自の入
場時刻と退場時刻とを記録し、退場時刻の未記録者をサ
ーチすることによって残留者リストが作成される。When the unique information of each worker is input to the unique information input unit 31, the labor management information processing unit 35 creates data necessary for labor management from the labor / process management information. The data required for labor management is, for example, a process management table.
The unqualified person list for each process is created by checking the unqualified persons based on the occupation and qualification required for each process of the day registered in 32, and each worker can enter A record of the time of departure and the time of exit is recorded, and a list of remaining persons is created by searching for unrecorded persons at the time of exit.
健康管理情報処理部36は、健康管理に必要な血圧その他
の値につき、比較基準値と有効期間が設定されており、
固有情報入力部1に作業員各自の固有情報が入力される
と、作業員各自の健康管理情報が比較基準値を越えてい
るか否か、測定日が有効期間を過ぎているか否かを調
べ、比較基準値を越えている作業員、有効期間を過ぎて
いる作業員のリストを作成したり、障害者のサーチを行
い、障害者リストを作成したりするものである。The health management information processing unit 36 has a comparison reference value and an effective period set for blood pressure and other values necessary for health management.
When the unique information of each worker is input to the unique information input unit 1, it is checked whether or not the health management information of each worker exceeds the comparison reference value, and whether or not the measurement date exceeds the valid period, This is to create a list of workers who have exceeded the comparison reference value or a worker whose validity period has expired, or to search for persons with disabilities to create a list of persons with disabilities.
災害予知部37は、災害情報処理部33により災害危険度が
異常に高いと判定された場合、その災害予知のメッセー
ジを編集し、また、その災害の過去の経歴者リストを作
成するものである。When the disaster information processing unit 33 determines that the disaster risk level is abnormally high, the disaster prediction unit 37 edits the message of the disaster prediction, and also creates a list of past history of the disaster. .
出力部38ないし41は、それぞれ工程管理情報処理部34、
労務管理情報処理部35、健康管理情報処理部36、災害予
知部37で作成されたデータを出力するものであり、これ
らは共通の印字出力手段や表示出力手段であってもよ
い。The output units 38 to 41 are the process management information processing unit 34,
The labor management information processing unit 35, the health management information processing unit 36, and the disaster prediction unit 37 output the data, and these may be common print output means or display output means.
なお、第4図に示す各処理部、災害予知部37からなるデ
ータ処理装置は、第1図に示す労務安全処理装置のケー
ス内部に収納されるが、災害情報処理部33や労務管理情
報処理部35等は、複数の作業所を総括して管理するセン
ターに設け、例えば変復調装置(モデム;MODEM)を介し
て作業所及びセンターを公衆回線に接続するように構成
してもよい。また、災害予知部37を災害情報処理部33の
中に含めた構成とし、災害情報処理部33は、全作業員に
ついて過去の災害経歴を登録するとともに、「過去事例
から、墜落災害の危険性が高い。KYミーティング、点検
是正等の実施強化。」の如き各種の災害予知メッセージ
及びその災害発生状況図等も登録しておき、災害予知に
際しては、警報手段等により報知するとともに、災害予
知メッセージ、その災害発生状況図及びその災害経歴者
リストを出力してもよい。このような災害情報処理部33
をセンターに設け、複数の作業所を総括管理することに
より、作業所間を頻繁に移動している作業員についても
常時どこの作業所に就労しているかを把握することがで
き、各作業所への災害予知に際しても、災害経歴者を的
確に知らせ、災害を未然に防止するための対策を講じる
ことができる。The data processing device including the processing units shown in FIG. 4 and the disaster prediction unit 37 is housed inside the case of the labor safety processing device shown in FIG. 1, but the disaster information processing unit 33 and the labor management information processing unit. The unit 35 and the like may be provided in a center that collectively manages a plurality of work places, and may be configured to connect the work place and the center to a public line via, for example, a modulator / demodulator (modem; MODEM). In addition, the disaster prediction unit 37 is configured to be included in the disaster information processing unit 33, and the disaster information processing unit 33 registers past disaster history for all workers and "from the past case, the risk of a fall disaster. KY meetings, strengthening implementation of inspection and correction, etc. ”and various disaster prediction messages and their disaster occurrence status maps are also registered. The disaster occurrence status map and the disaster history list may be output. Such a disaster information processing unit 33
By establishing a center in the center and managing multiple work sites in a centralized manner, it is possible to always know which work place even a worker who frequently moves between work sites can work. Even when predicting a disaster, it is possible to accurately inform the person who has experienced the disaster and take measures to prevent the disaster.
第5図は本発明のシステム構成例を示す図、第6図は集
合ライン・アダプタの外観を示す図、第7図はゲート・
ターミナルの外観を示す図である。図において、51は労
務安全管理装置、52はカプラー、53は集合ライン・アダ
プタ、54ないし57はゲート・ターミナル、58と61はライ
ン・アダプタ、59と62はキースイッチ、60はカード・リ
ーダ、CDはカードをそれぞれ示している。FIG. 5 is a diagram showing an example of the system configuration of the present invention, FIG. 6 is a diagram showing the appearance of a collective line adapter, and FIG. 7 is a gate
It is a figure which shows the external appearance of a terminal. In the figure, 51 is a labor safety management device, 52 is a coupler, 53 is a collective line adapter, 54 to 57 are gate terminals, 58 and 61 are line adapters, 59 and 62 are key switches, 60 is a card reader, Each CD represents a card.
第1図図示の労務安全管理装置は、第5図図示の如く、
集合ライン・アダプタ53を用いることによって、作業所
の複数個所にゲート・ターミナル54ないし57を配置し、
複数個所からの作業員の出入りを一元的に管理するよう
に構成することができる。ライン・アダプタを4個備え
た集合ライン・アダプタの外観を示したのが第6図であ
り、各ゲート・ターミナルの外観を示したのが第7図で
ある。The labor safety management system shown in FIG. 1 is as shown in FIG.
By using the collective line adapter 53, the gate terminals 54 to 57 are arranged at a plurality of places in the work place,
It can be configured to integrally manage the entrance and exit of workers from a plurality of places. FIG. 6 shows the appearance of a collective line adapter provided with four line adapters, and FIG. 7 shows the appearance of each gate terminal.
以上の説明から明らかなように、本発明によれば、作業
所の労務に係わる事務量を大幅に削減することができ、
さらには、種々の工事別労務実績データが簡単に得られ
るため、これを分析することにより工事・工種別適正標
準工数の設定や見積・実行予算へ反映させることができ
る。しかも、第1図図示の如き構成で数kg程度の小型、
軽量な装置とすることができ、使用方法も簡単で、作業
所での専有面積も僅かしかとらないので、持ち運び及び
設置も容易となり、装置が必要な時に直ちに使用に供す
ることができる。また、本発明のシステムを作業員把握
のツールとして利用することにより、固定化された作
業員の把握ができるので、品質向上対策として教育の充
実を図ることができる、コスト低減対策として、業者
別労務の需給調整と先行手配による平滑化を図ることが
できる、工程管理対策として、予定工期の遅延状況に
対する予測と事前応援体制の手当を迅速に行うことがで
きる、安全対策として、血圧等、健康管理と災害予測
に対する的確な対応をとることができる、等工事総合管
理の推進を支援することができる。As is clear from the above description, according to the present invention, it is possible to significantly reduce the amount of work involved in labor at a work place,
Further, since various labor performance data by construction can be easily obtained, it is possible to reflect the data on the setting of the appropriate standard man-hours for each construction / manufacturing and the estimation / execution budget by analyzing this. Moreover, with the structure shown in FIG. 1, a small size of about several kg,
It can be a lightweight device, is easy to use, and occupies only a small area in a work place. Therefore, it can be easily carried and installed, and the device can be immediately used when needed. Further, by using the system of the present invention as a tool for grasping workers, it is possible to grasp fixed workers, so that it is possible to enhance education as a quality improvement measure. As a process control measure, it is possible to make adjustments to the supply and demand of labor and smooth it by prior arrangement. As a process control measure, it is possible to quickly predict the delay situation of the planned construction period and allow for advance support system. It is possible to support the promotion of integrated construction management, which can take appropriate measures for management and disaster prediction.
第1図は本発明の労務安全管理装置の外観を示す図、第
2図は第1図図示の労務安全管理装置のハードウェア構
成例を示す図、第3図は本発明の労務安全管理装置に適
用される作業員各自の固有情報の例を示す図、第4図は
本発明の労務安全管理装置の機能ブロックの1例を示す
図、第5図は本発明のシステム構成例を示す図、第6図
は集合ライン・アダプタの外観を示す図、第7図はゲー
ト・ターミナルの外観を示す図である。 1と23……プリンタ、2……プリンタ操作部、3……カ
ード・リーダ・ステータス、4、5と22……ディスプレ
イ、6と21……キーボード、7……操作手順ガイド、8
……カプラー収納部、9……ファン、10、59と62……キ
ースイッチ、11と20……カード入出力装置、12……フロ
ッピィ収納部、13と25……報知器、14……電源コネク
タ、15……ヒューズ、16……ACコンセント、17……プリ
ンタ用紙挿入口、18……インターフェイス・ボード、19
……データ処理装置、24……フロッピィ・ディスク、26
……回線インターフェイス、30……システム・データ入
力部、31……固有情報入力部、32……工程管理テーブ
ル、33……災害情報処理部、34……工程管理情報処理
部、35……労務管理情報処理部、36……健康管理情報処
理部、37……災害予知部、38ないし41……出力部、51…
…労務安全管理装置、52……カプラー、53……集合ライ
ン・アダプタ、54ないし57……ゲート・ターミナル、58
と61……ライン・アダプタ、60……カード・リーダ、CD
……カード。FIG. 1 is a diagram showing an external appearance of a labor safety management device of the present invention, FIG. 2 is a diagram showing a hardware configuration example of the labor safety management device of FIG. 1, and FIG. 3 is a labor safety management device of the present invention. Showing an example of unique information of each worker applied to FIG. 4, FIG. 4 is a diagram showing an example of functional blocks of the labor safety management apparatus of the present invention, and FIG. 5 is a diagram showing an example of system configuration of the present invention. FIG. 6 is a view showing the appearance of the assembly line adapter, and FIG. 7 is a view showing the appearance of the gate terminal. 1 and 23 ... Printer, 2 ... Printer operation part, 3 ... Card reader status, 4, 5 and 22 ... Display, 6 and 21 ... Keyboard, 7 ... Operating procedure guide, 8
...... Coupler storage, 9 ...... Fan, 10, 59 and 62 ...... Key switch, 11 and 20 ...... Card input / output device, 12 ...... Floppy storage, 13 and 25 ...... Alarm, 14 ...... Power supply Connector, 15 ... Fuse, 16 ... AC outlet, 17 ... Printer paper insertion slot, 18 ... Interface board, 19
...... Data processing device, 24 …… Floppy disk, 26
...... Line interface, 30 …… System data input section, 31 …… Specific information input section, 32 …… Process management table, 33 …… Disaster information processing section, 34 …… Process management information processing section, 35 …… Labor affairs Management information processing unit, 36 ... Health management information processing unit, 37 ... Disaster prediction unit, 38 or 41 ... Output unit, 51 ...
… Labor safety management equipment, 52 …… Couplers, 53 …… Assembly line adapters, 54 or 57 …… Gate terminals, 58
And 61 …… Line adapter, 60 …… Card reader, CD
……card.
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭59−11437(JP,A) 特開 昭58−175072(JP,A) 情報処理ハンドブック(情報処理学会昭 和47年)P.11−1〜11−36「11編経営情 報システムの基礎」 ─────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-59-11437 (JP, A) JP-A-58-175072 (JP, A) Information Processing Handbook (Information Processing Society of Japan 47) 11-1 to 11-36 “11 Basics of Management Information System”
Claims (1)
れる、記録カードに対しリード/ライトするカード・リ
ーダ/ライタ、データや処理指示等を入力するキーボー
ド、入出力データを表示するディスプレイとプリンタ、
及び報知器、 前記ポータブル・タイプのケース側背面に配置される、
個別配置され記録カードをリードする複数のカード・リ
ーダと複数の作業所を総合して管理する中央管理部と災
害予知を行う災害情報処理システムの回線に接続するた
めのインターフェイス手段、及び補助記憶媒体を装着し
データを格納するための補助記憶装置、並びに ポータブル・タイプのケース内部に収納される、インタ
ーフェイス手段からのデータやケース上面に配置された
カード・リーダ/ライタからのデータその他の入出力デ
ータを処理するデータ処理装置 からなり、 カード・リーダ/ライタとカード・リーダを介し作業員
が携帯する記憶カードに対して作業員の所属や職種、資
格等の情報からなる労務・工程管理情報と作業員の健康
指標を示す情報からなる健康管理情報と作業員の過去の
災害経歴等の情報からなる災害予知情報とをリード/ラ
イトし、 災害情報処理システムにより、工事の内容や条件によっ
て評価値が固定される項目の値と工事の進行に伴って評
価値が変動する現場の安全管理状況等の項目の値等を積
算して災害危険度を計算し災害危険度が所定値より大き
い場合に安全管理状況の悪い項目に対応して抽出した災
害予知情報、 データ処理装置により、記録カードからリードした労務
・工程管理情報と予め設定されている作業の基準工程情
報とをもとに作成した工程や職種別等の作業員数の予測
計算、特定条件者のリストその他の労務・工程管理デー
タ、健康管理情報と予め設定されている基準値及び測定
日の有効期限とを比較し健康管理情報のチェックを行い
作成した健康チェックリスト をディスプレイ、プリンタ、及び報知器等の出力手段を
使って出力するように構成したことを特徴とする労務安
全管理装置。1. A card reader / writer for reading / writing a recording card, a keyboard for inputting data and processing instructions, a display and a printer for displaying input / output data, which are arranged on the upper surface of a portable type case.
And an alarm device, which is disposed on the rear side of the portable type case,
A plurality of card readers that are individually arranged to read recording cards, a central management unit that comprehensively manages a plurality of work sites, an interface means for connecting to a line of a disaster information processing system that performs disaster prediction, and an auxiliary storage medium Auxiliary storage device for mounting and storing data, and data from the interface means and data from the card reader / writer arranged on the top surface of the case and other input / output data stored in the portable type case It consists of a data processing device that processes data, and labor / process management information and work consisting of information such as the worker's affiliation, job category, qualification, etc. for the memory card carried by the worker via the card reader / writer and card reader. Disaster prediction information consisting of health management information consisting of information indicating the worker's health index and information such as past disaster history of workers The value of the item whose evaluation value is fixed by the disaster information processing system and the value of the item such as the safety management status of the site where the evaluation value changes according to the progress of the construction Accident prediction information extracted by accumulating data such as the above to calculate the disaster risk when the disaster risk is higher than the specified value, and the labor / process that was read from the recording card by the data processing device. Prediction calculation of the number of workers such as processes and job types created based on management information and preset process information of work, list of specific conditioners other labor and process management data, health management information and Check the health management information by comparing the set reference value with the expiration date of the measurement date, and use the created health checklist using output means such as a display, printer, and alarm. Labor and characterized by being configured to output Te safety management device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16362284A JPH0724062B2 (en) | 1984-08-03 | 1984-08-03 | Labor safety management device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP16362284A JPH0724062B2 (en) | 1984-08-03 | 1984-08-03 | Labor safety management device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6142060A JPS6142060A (en) | 1986-02-28 |
| JPH0724062B2 true JPH0724062B2 (en) | 1995-03-15 |
Family
ID=15777424
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP16362284A Expired - Lifetime JPH0724062B2 (en) | 1984-08-03 | 1984-08-03 | Labor safety management device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0724062B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2912964B2 (en) * | 1987-06-24 | 1999-06-28 | 清水建設株式会社 | Process control table creation system |
| JPH02244286A (en) * | 1989-03-17 | 1990-09-28 | Fujita Corp | Work managing method using portable handy terminal |
| JPH0689284A (en) * | 1990-12-18 | 1994-03-29 | Shimizu Corp | Entrance/exit managing device for workshop |
| JP3026119B2 (en) * | 1991-07-02 | 2000-03-27 | 清水建設株式会社 | Large-scale workplace management system |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5911437A (en) * | 1982-07-10 | 1984-01-21 | Comput Services Corp | Data terminal device having radio calling function |
| JPS58175072A (en) * | 1983-03-14 | 1983-10-14 | Hitachi Ltd | Terminal device for traveling sales man |
-
1984
- 1984-08-03 JP JP16362284A patent/JPH0724062B2/en not_active Expired - Lifetime
Non-Patent Citations (1)
| Title |
|---|
| 情報処理ハンドブック(情報処理学会昭和47年)P.11−1〜11−36「11編経営情報システムの基礎」 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6142060A (en) | 1986-02-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7363193B2 (en) | Safety management system and method | |
| US20220180689A1 (en) | Intergrated management system for first aid kit vending machines and method thereof | |
| US8041587B2 (en) | Integrated safety management system | |
| US20060074740A1 (en) | Medical facility employee scheduling method using patient acuity information | |
| Jacobs et al. | Selecting bus drivers: Multiple predictors, multiple perspectives on validity, and multiple estimates of utility | |
| JPH0724062B2 (en) | Labor safety management device | |
| JPH0724061B2 (en) | Labor safety management system | |
| JP7295723B2 (en) | MAINTENANCE WORK PLANNING SUPPORT DEVICE AND MAINTENANCE WORK PLANNING SUPPORT METHOD | |
| KR100715752B1 (en) | Congestion state management device and congestion state management system | |
| JP2517223B2 (en) | Work place management system | |
| JPH0724063B2 (en) | Central management system | |
| JP2003242316A (en) | Worker placement adjustment management system | |
| EP0627708B1 (en) | System for controlling and/or recording and/or indicating of elapsed time and/or of events following one another in the time | |
| JPH0461145B2 (en) | ||
| JP3026119B2 (en) | Large-scale workplace management system | |
| Hunt Jr et al. | System to measure the use of pharmacy personnel | |
| JP2007199911A (en) | Working hour management support system | |
| JP3213893B2 (en) | Equipment management equipment at work sites | |
| JPH06187525A (en) | Portable terminal for checking count | |
| JPH09115021A (en) | Attendance control system | |
| JPS6370375A (en) | Work managing system | |
| Randell et al. | The Job Skills Bank in Drug Addiction Treatment | |
| Wright Jr | Evaluation of workplace safety performance: A case study of an auditing process | |
| Andolina | The Automation of Critical Path/CareMap® Systems | |
| JPH113446A (en) | Job managing device |