JPH0735722B2 - Turbine controller - Google Patents

Turbine controller

Info

Publication number
JPH0735722B2
JPH0735722B2 JP60296004A JP29600485A JPH0735722B2 JP H0735722 B2 JPH0735722 B2 JP H0735722B2 JP 60296004 A JP60296004 A JP 60296004A JP 29600485 A JP29600485 A JP 29600485A JP H0735722 B2 JPH0735722 B2 JP H0735722B2
Authority
JP
Japan
Prior art keywords
valve
steam
turbine
pressure
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP60296004A
Other languages
Japanese (ja)
Other versions
JPS62153507A (en
Inventor
蔵 進藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP60296004A priority Critical patent/JPH0735722B2/en
Publication of JPS62153507A publication Critical patent/JPS62153507A/en
Publication of JPH0735722B2 publication Critical patent/JPH0735722B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Control Of Turbines (AREA)

Description

【発明の詳細な説明】 〔発明の技術分野〕 本発明はタービン制御装置に係り、特にタービン起動時
に蒸気条件に対応した蒸気量を制御できるようにしたタ
ービンバイパス系統を備えたタービン制御装置に関す
る。
Description: TECHNICAL FIELD The present invention relates to a turbine control device, and more particularly to a turbine control device provided with a turbine bypass system capable of controlling a steam amount corresponding to a steam condition when a turbine is started.

〔発明の技術的背景とその問題点〕[Technical background of the invention and its problems]

一般にタービンバイパス系統を火力発電プラントに採用
する場合には、起動時間の短縮等が評価され、最近では
造水プラント等のように大量のプロセス蒸気を必要とす
る工業プラントへ抽気を供給する大容量抽気タービンで
もタービンバイパス系統の採用が増加している。この場
合にタービンバイパス系統の採用は、蒸気タービンの起
動時間の短縮等のためではなく、造水プラント等の主目
的プロセスへの蒸気供給のためであり、蒸気タービンは
むしろ造水プラントの附属装置であるとも言えるので、
タービンバイパス系統を含めた蒸気タービンは一般の火
力プラントに比較して厳しい使用条件下にある。第3図
は上記のタービンバイパス系統を備えた抽気タービンプ
ラントの概略構成を示す系統図であって、再熱器1aを有
するボイラー1で発生した蒸気は、主蒸気止め弁2およ
び蒸気加減弁3を経て高圧タービン4に導入され、この
高圧タービン4で仕事を行なった蒸気は逆止弁5を経て
再びボイラー1にもどり、再熱された後に再熱蒸気弁6a
およびインターセプト弁6bを有する組合せ再熱弁6を通
って中圧タービン7に導入される。このようにして中圧
タービン7に導入された蒸気は、ここで仕事を行なって
抽気加減弁20を経て低圧タービン21に流入して仕事を行
ない、その後復水器23で復水され、復水ポンプ24、低圧
ヒーター27、給水ポンプ10および高圧ヒーター11を順次
通過して再びボイラー1にもどる。高圧タービン4、中
圧タービン7、および低圧タービン21に共通の軸に発電
機22が連結されている。
Generally, when a turbine bypass system is used in a thermal power plant, reduction in start-up time is evaluated, and recently, a large capacity to supply bleed air to an industrial plant that requires a large amount of process steam, such as a desalination plant. Turbine bypass systems are also increasingly used in extraction turbines. In this case, the adoption of the turbine bypass system is not for shortening the start-up time of the steam turbine but for supplying steam to the main purpose process such as the fresh water plant, and the steam turbine is rather an auxiliary device of the fresh water plant. Since it can be said that
The steam turbine including the turbine bypass system is under severer usage conditions than general thermal power plants. FIG. 3 is a system diagram showing a schematic configuration of an extraction turbine plant including the turbine bypass system described above. Steam generated in the boiler 1 having the reheater 1a is a main steam stop valve 2 and a steam control valve 3 The steam that has been introduced into the high-pressure turbine 4 via the high-pressure turbine 4 and has worked in the high-pressure turbine 4 returns to the boiler 1 via the check valve 5 and is reheated.
And through the combined reheat valve 6 with the intercept valve 6b to the medium pressure turbine 7. The steam thus introduced into the intermediate-pressure turbine 7 performs work here, flows into the low-pressure turbine 21 through the extraction control valve 20, performs the work, and then is condensed in the condenser 23 to be condensed. It passes through the pump 24, the low-pressure heater 27, the water supply pump 10, and the high-pressure heater 11 in order, and returns to the boiler 1 again. A generator 22 is connected to a shaft common to the high pressure turbine 4, the intermediate pressure turbine 7, and the low pressure turbine 21.

一方、中圧タービン7で仕事を行なった蒸気の一部は、
逆止弁8を介して抽気され、その抽気された蒸気の一部
が脱気器9に供給されるとともに、残りの蒸気は逆止弁
16を経て集合ヘッダー17に導入され、供給弁18a,18bを
通って造水プラント19a,19bに供給される。また、主蒸
気止め弁2の上流側と逆止弁5の下流側とは高圧タービ
ン4をバイパスするために高圧バイパス弁13を有する高
圧バイパス管12によって接続されており、組合せ再熱弁
6の上流側と逆止弁16の下流側および復水器23とは、そ
れぞれ中圧バイパス弁15を有する中圧バイパス管14、お
よび低圧バイパス弁25を有する低圧バイパス管26によっ
て接続されている。低圧バイパス管26は、組合せ再熱弁
6、中圧タービン7、抽気加減弁20および低圧タービン
21からなる蒸気系統に対するバイパス路を形成してい
る。
On the other hand, part of the steam that worked in the medium-pressure turbine 7
A part of the extracted steam is extracted to the deaerator 9 while the remaining steam is extracted by the check valve 8.
It is introduced into the collective header 17 via 16 and supplied to the fresh water plants 19a and 19b through the supply valves 18a and 18b. The upstream side of the main steam stop valve 2 and the downstream side of the check valve 5 are connected by a high pressure bypass pipe 12 having a high pressure bypass valve 13 for bypassing the high pressure turbine 4, and upstream of the combination reheat valve 6. The side and the downstream side of the check valve 16 and the condenser 23 are connected by a medium pressure bypass pipe 14 having a medium pressure bypass valve 15 and a low pressure bypass pipe 26 having a low pressure bypass valve 25, respectively. The low pressure bypass pipe 26 includes the combination reheat valve 6, the intermediate pressure turbine 7, the extraction control valve 20, and the low pressure turbine.
It forms a bypass for the 21 steam system.

さらに他の抽気タービン100から抽気された蒸気は、集
合ヘッダー170に導入され供給弁180a,180bを通って造水
プラント190a,190bに供給される。集合ヘッダー17と集
合ヘッダー170が仕切弁171を介して接続されていること
により、この仕切弁171を任意に操作することにより造
水プラントの運用がそれぞれ単独であったり、またどち
らからの抽気タービンが電力需要低下、定期点検あるい
は事故等の理由で停止中でも仕切弁171を開くことによ
り集合ヘッダーから蒸気が供給されるので、1台の蒸気
タービンで2つのプラント分の造水プラントの同時運用
ができる。なお、ボイラー1がすでに起動を終了してい
れば、タービンの起動前であっても中圧バイパス弁15を
有する中圧バイパス管14を介して集合ヘッダー17に蒸気
を供給することが可能であり、ボイラー1とタービンバ
イパス系統(バイパス管12,14の系統)のみで造水プラ
ント19a,19bだけの運転ができる。
The steam extracted from the other extraction turbine 100 is introduced into the collecting header 170 and is supplied to the desalination plants 190a and 190b through the supply valves 180a and 180b. Since the collective header 17 and the collective header 170 are connected via the sluice valve 171, the desalination plant can be operated independently by operating the sluice valve 171 arbitrarily, or the extraction turbine from either one can be operated. However, even if it is stopped due to a decrease in power demand, periodic inspections, accidents, etc., steam is supplied from the collective header by opening the sluice valve 171. Therefore, one steam turbine can operate two desalination plants simultaneously. it can. If the boiler 1 has already started up, it is possible to supply steam to the collecting header 17 through the intermediate pressure bypass pipe 14 having the intermediate pressure bypass valve 15 even before the turbine is started up. Only the boiler 1 and the turbine bypass system (system of the bypass pipes 12 and 14) can operate only the desalination plants 19a and 19b.

ところで、一般にタービンバイパス系統を有する蒸気タ
ービンでは、蒸気タービンの起動時において、高圧ター
ビンに主蒸気を、また中圧タービンに再熱蒸気を同時に
流入させ、徐々に蒸気タービンの回転速度を上昇させて
負荷運転へと移行させる。この場合、通常、高圧タービ
ンと中圧タービンへの蒸気供給量は、高圧タービン車室
内の風損による温度上昇を防止するため、冷却蒸気とし
て高圧タービン側の方が多く流れるように流量比率が考
慮されており、かつそれらの蒸気圧力は、高圧・低圧の
各バイパス系統により常に一定条件に制御される。
By the way, generally, in a steam turbine having a turbine bypass system, at the time of starting the steam turbine, the main steam is made to flow into the high-pressure turbine and the reheated steam is made to flow into the intermediate-pressure turbine at the same time, and the rotational speed of the steam turbine is gradually increased. Change to load operation. In this case, normally, the steam supply amount to the high-pressure turbine and the medium-pressure turbine is considered so that the cooling steam flows more on the high-pressure turbine side in order to prevent the temperature from rising due to windage loss in the high-pressure turbine compartment. In addition, the steam pressures of the steam generators are always controlled under constant conditions by the high pressure and low pressure bypass systems.

ところで、プラントの主目的が前述のごとく造水である
ような場合には、タービンバイパス系統を利用してター
ビンの起動前より先に造水プラントのみを起動する場合
や、2つの造水プラントを同時に運転する場合等には、
そのたびごとに蒸気タービンの起動に全く無関係に主蒸
気および高温再熱蒸気の圧力・温度が決定される。ま
た、これらの圧力・温度はその時の造水プラントの要求
負荷に応じて変化するので、蒸気タービンの起動蒸気条
件が一定とならず、不確定な状態でタービン起動をしな
ければならないので、時には高圧タービンへの蒸気量が
不足し、高圧タービンの最終段が過熱して破損したりす
る欠点があった。
By the way, in the case where the main purpose of the plant is desalination as described above, the turbine bypass system is used to start only the desalination plant before starting the turbine, or two desalination plants are installed. When driving at the same time,
Each time, the pressure and temperature of the main steam and the high temperature reheated steam are determined irrespective of the start of the steam turbine. Also, since these pressures and temperatures change according to the required load of the desalination plant at that time, the starting steam condition of the steam turbine is not constant, and the turbine must be started in an uncertain state. There was a drawback that the amount of steam to the high-pressure turbine was insufficient and the final stage of the high-pressure turbine was overheated and damaged.

〔発明の目的〕[Object of the Invention]

本発明はこのような欠点を除去するために、主蒸気およ
び高温再熱蒸気条件がプロセス側に対応して変化して
も、その状況下での最適な蒸気タービンの起動条件を選
択して安全に蒸気タービンの起動を行なえる蒸気タービ
ン制御装置を提供することを目的とする。
In order to eliminate such drawbacks, the present invention selects the optimum steam turbine starting conditions under such conditions even if the conditions of main steam and high temperature reheated steam change corresponding to the process side, and it is safe. It is an object of the present invention to provide a steam turbine control device capable of starting a steam turbine.

〔発明の概要〕[Outline of Invention]

本発明は、ボイラーからの主蒸気により主蒸気弁を介し
て高圧タービンを運転する主蒸気系統と、高圧タービン
からの蒸気を再熱器を介して得られた再熱蒸気によりイ
ンターセプト弁を介して中圧タービンを運転する再熱蒸
気系統と、中圧タービンからの蒸気により抽気加減弁を
介して低圧タービンを運転する低圧蒸気系統と、主蒸気
弁および高圧タービンをバイパスする高圧バイパス弁
と、インターセプト弁および中圧タービンをバイパスし
再熱器からの再熱蒸気を造水プラントに対して供給する
中圧バイパス弁と、インターセプト弁、中圧タービン、
抽気加減弁および低圧タービンをバイパスする低圧バイ
パス弁とを備えたタービンプラントを制御するタービン
制御装置において、タービン起動に際して、低圧バイパ
ス弁が全閉状態にないことを条件として、主蒸気の圧力
および再熱蒸気の圧力に従い、中圧タービンへの流入再
熱蒸気の流量が高圧タービンに流入する主蒸気量を基準
として所定の比率になるようにインターセプト弁のみを
制御対象としてその開度を制御する制御手段を設けたこ
とを特徴とするものであって、蒸気タービンの起動時に
おける煩雑な起動操作を行なうことなく、しかも起動時
における高圧タービンの過熱による事故を未然に防止で
きるようにしたものである。
The present invention uses a main steam from a boiler to operate a high-pressure turbine through a main steam valve, and a steam from the high-pressure turbine is reheated by a reheater to obtain steam through an intercept valve. The reheat steam system that operates the medium-pressure turbine, the low-pressure steam system that operates the low-pressure turbine through the extraction control valve with the steam from the medium-pressure turbine, the high-pressure bypass valve that bypasses the main steam valve and the high-pressure turbine, and the intercept. A medium pressure bypass valve that bypasses the valve and the medium pressure turbine and supplies reheated steam from the reheater to the desalination plant; an intercept valve; a medium pressure turbine;
In a turbine control device for controlling a turbine plant equipped with an extraction control valve and a low-pressure bypass valve for bypassing a low-pressure turbine, when the turbine is started, the pressure of the main steam and Control that controls the opening of only the intercept valve so that the flow rate of reheat steam flowing into the medium-pressure turbine becomes a predetermined ratio based on the amount of main steam flowing into the high-pressure turbine according to the pressure of the hot steam. It is characterized in that means is provided, and an accident due to overheating of the high-pressure turbine at the time of startup can be prevented in advance without performing a complicated startup operation at startup of the steam turbine. .

〔発明の実施例〕Example of Invention

以下、第1図および第2図を参照して本発明の一実施例
について説明する。なお、上図中第3図と同一部分につ
いては同一符号を付し、その詳細な説明は省略する。
An embodiment of the present invention will be described below with reference to FIGS. 1 and 2. The same parts as those in FIG. 3 in the above figure are designated by the same reference numerals, and detailed description thereof will be omitted.

高圧タービン4の回転速度は、速度検出歯車200aおよび
磁気ピックアップ200bを有する速度検出器200によって
検出され、周波数/電圧変換器201を介して加算器202に
与えられる。この高圧タービン4の回転速度信号と速度
負荷設定器203からの設定信号との差、すなわち速度偏
差信号が加算器202で形成され、インターセプト弁の速
度調定回路204、主蒸気加減弁の速度調定回路205および
主蒸気止め弁の速度調定回路206に与えられる。この速
度調定回路206の出力信号は加算器210に与えられる。こ
の加算器210には全周噴射/部分噴射バイアス回路209か
らのバイアス信号も入力され、その和信号と、負荷制限
器212からの信号が低値優先回路213に入力される。低値
優先回路213の出力信号と定数回路207からの信号が加算
器216で加算され、その和信号は、加算器242a、増幅器2
42b、電力増幅器242c、電気・油圧変換器242d、差動ト
ランス242eおよび復調器242fから成っている弁位置制御
回路242に与えられる。速度調定回路205の出力信号と全
周噴射/部分噴射バイアス回路209からのバイアス信号
は、加算器208で加算され、その出力信号は負荷制限器2
12からの信号と共に低値優先回路211に入力され、その
低値出力が加算器215に与えられる。この加算器215には
定数回路225からの信号も入力され、その出力信号は前
述の弁位置制御回路242と同様構成の弁位置制御回路243
に与えられる。論理回路237からの信号を受ける関数発
生器238の出力信号は、全開バイアス回路226から低圧バ
イパス弁25が全閉のときに閉じるスイッチ241を介して
与えられる信号と共に加算器240に入力される。加算器2
40の出力信号と速度調定回路204からの信号は、低値優
先回路239に入力され、この低値優先回路239の出力信号
は弁位置制御回路244に与えられる。造水プラントに供
給される再熱蒸気の圧力信号は、圧力検出器217を介し
て加算器218に与えられる。この加算器218には抽気圧設
定器219からの設定信号も入力され、その偏差信号が抽
気圧力制限回路220を介して低値優先回路221に与えられ
る。低値優先回路221には抽気制限器222からの信号も入
力され、その出力信号と定数回路224の信号との偏差が
加算器223で演算される。定数回路224には切換スイッチ
214を介して低値優先回路211または213の出力信号が選
択的に入力される。加算器223から出力される偏差信号
は弁位置制御回路245に与えられる。切換スイッチ214
は、全周噴射/部分噴射バイアス回路209による全周噴
射/部分噴射の運転切換により切換え動作する。弁位置
制御回路242,243,244,245はそれぞれ油筒246、,247,24
8,249を介して主蒸気止め弁2、蒸気加減弁3、インタ
ーセプト弁6b、抽気加減弁20の開度を制御する。論理回
路237は、第2図に示すごとく、ボイラー1からの主蒸
気圧力と再熱器1aからの再熱蒸気圧力に従って高圧ター
ビン4への流入蒸気量と中圧タービン7への流入蒸気量
の比率を決定するために設けられているものであるが、
その具体例については後述する。弁位置制御回路243、
弁位置制御回路244および弁位置制御回路245の構成は、
弁位置制御回路242と同じであり、それぞれ加算器、増
幅器、電力増幅器、電気・油圧変換器、差動トランスお
よび復調器から成っている。
The rotation speed of the high-pressure turbine 4 is detected by the speed detector 200 having the speed detection gear 200a and the magnetic pickup 200b, and is given to the adder 202 via the frequency / voltage converter 201. The difference between the rotation speed signal of the high-pressure turbine 4 and the setting signal from the speed load setter 203, that is, the speed deviation signal is formed by the adder 202, and the speed adjustment circuit 204 of the intercept valve and the speed adjustment of the main steam control valve are formed. The constant circuit 205 and the main steam stop valve speed adjusting circuit 206 are provided. The output signal of the speed adjusting circuit 206 is given to the adder 210. A bias signal from the full-circulation injection / partial injection bias circuit 209 is also input to the adder 210, and the sum signal and the signal from the load limiter 212 are input to the low value priority circuit 213. The output signal of the low value priority circuit 213 and the signal from the constant circuit 207 are added by the adder 216, and the sum signal is added by the adder 242a and the amplifier 2
42b, power amplifier 242c, electro-hydraulic converter 242d, differential transformer 242e, and demodulator 242f. The output signal of the speed adjustment circuit 205 and the bias signal from the full-circle injection / partial injection bias circuit 209 are added by the adder 208, and the output signal is the load limiter 2
The signal from 12 is input to the low value priority circuit 211, and the low value output is given to the adder 215. A signal from the constant circuit 225 is also input to the adder 215, and its output signal is a valve position control circuit 243 having the same configuration as the valve position control circuit 242 described above.
Given to. The output signal of the function generator 238, which receives the signal from the logic circuit 237, is input to the adder 240 together with the signal provided from the fully open bias circuit 226 via the switch 241 which is closed when the low pressure bypass valve 25 is fully closed. Adder 2
The output signal of 40 and the signal from the speed adjustment circuit 204 are input to the low value priority circuit 239, and the output signal of this low value priority circuit 239 is given to the valve position control circuit 244. The pressure signal of the reheated steam supplied to the desalination plant is given to the adder 218 via the pressure detector 217. A setting signal from the extraction pressure setting device 219 is also input to the adder 218, and the deviation signal is given to the low value priority circuit 221 via the extraction pressure limiting circuit 220. The signal from the extraction limiter 222 is also input to the low value priority circuit 221, and the deviation between the output signal and the signal of the constant circuit 224 is calculated by the adder 223. Changeover switch for constant circuit 224
The output signal of the low value priority circuit 211 or 213 is selectively input via 214. The deviation signal output from the adder 223 is given to the valve position control circuit 245. Changeover switch 214
Is switched by the operation switching of the full-circulation injection / partial injection by the full-circulation injection / partial injection bias circuit 209. Valve position control circuits 242, 243, 244, 245 are oil cylinders 246, 247, 24, respectively.
The openings of the main steam stop valve 2, the steam control valve 3, the intercept valve 6b, and the extraction control valve 20 are controlled via 8,249. As shown in FIG. 2, the logic circuit 237 controls the amount of steam flowing into the high pressure turbine 4 and the amount of steam flowing into the intermediate pressure turbine 7 according to the main steam pressure from the boiler 1 and the reheat steam pressure from the reheater 1a. It is provided to determine the ratio,
A specific example will be described later. Valve position control circuit 243,
The configurations of the valve position control circuit 244 and the valve position control circuit 245 are
It is the same as the valve position control circuit 242 and includes an adder, an amplifier, a power amplifier, an electro-hydraulic converter, a differential transformer and a demodulator.

さて、タービンの起動パターンには大別して次の3種が
ある。
By the way, there are the following three types of turbine start-up patterns.

(A) コールドスタート 当該プラントがタービンバイパス系統を備え、かつ抽気
を用いる工業プラント、例えば造水プラントを備えてい
ながらも、これらを運用、運転することなく、最初に単
なる再熱タービンとして蒸気タービンを起動する起動パ
ターン。
(A) Cold start Even if the plant has a turbine bypass system and an industrial plant that uses bleed air, for example, a desalination plant, the steam turbine is first used as a simple reheat turbine without operating and operating these plants. The activation pattern to activate.

(B) ホットスタート(1) タービンバイパス系統を用いて自己の有する造水プラン
トがすでに運転状態にあり、その後自己の蒸気タービン
を起動する起動パターン。
(B) Hot start (1) A startup pattern in which the own desalination plant using the turbine bypass system is already in the operating state, and then the steam turbine of the own is started.

(C) ホットスタート(2) タービンバイパス系統を用いて、自己プラントのボイラ
ー1台だけで、自己の造水プラントおよび他の造水プラ
ントの2つを運転しながら、その後自己の蒸気タービン
を起動する起動パターン。
(C) Hot start (2) Using the turbine bypass system, with only one boiler of its own plant, while operating both its own desalination plant and other desalination plants, then start its own steam turbine The activation pattern to do.

ここでホットスタート(1)、(2)は何もプラント起
動の一過程として造水プラントを先に運転するばかりで
なく、蒸気タービンのトリップ動作後の再起動の場合で
も、タービンバイパス系統を用いて造水プラント側を連
続運転している場合には、適用されることは詳細説明を
するまでもない。
Here, the hot start (1) and (2) not only operate the desalination plant first as a process of starting the plant, but also use the turbine bypass system even when restarting after the trip operation of the steam turbine. Needless to say, it is applied when the desalination plant side is continuously operated.

以下、各起動パターンごとに順に第1図の装置の動作を
説明する。
The operation of the apparatus shown in FIG. 1 will be described below for each activation pattern.

(A) コールドスタート コールドスタートの場合はタービンバイパス系統を用い
ずに、すなわち各バイパス弁はすべて全閉状態にしてタ
ービン起動を行なうのであり、高圧タービン4と中圧タ
ービン7への蒸気供給量の比率を考慮する必要はなく、
このときの流量比率は1:1である。この場合に蒸気ター
ビンの回転速度(負荷)を制御するため、まず高圧ター
ビン4に連結している速度検出器200によってタービン
回転速度に比例した周波数信号が得られる。この信号
は、周波数/電圧変換器201により周波数に比例したア
ナログ信号に変換される。このアナログ信号は、実回転
速度信号であり、加算器202によって速度負荷設定器203
からの設定信号と比較演算されて速度偏差信号が形成さ
れ、この速度偏差信号は3つに分岐される。そのうちの
1つは、蒸気加減弁3用の速度調定回路205に与えら
れ、ここで速度調定率に合った速度制御信号が形成され
る。また他の1つは、主蒸気止め弁2用の速度調定回路
206に与えられ、ここで速度調定率に合った速度制御信
号が形成される。これらの速度制御信号は、その絶対割
合により全周噴射運転と部分噴射運転の切換えを行なう
ための全周噴射/部分噴射バイアス回路209からのバイ
アス信号と加算器208および加算器210で加算されて、低
値優先回路211および低値優先回路213の入力となる。そ
してこれらの低値優先回路211,213では、負荷制限器212
からの制限信号と比較演算され、低値を有する信号が出
力されてその後加算器215,216で抽気圧力制御系からの
制御信号と加え合わされた後に、蒸気加減弁3もしくは
主蒸気止め弁2の制御信号となって弁位置制御回路243
もしくは弁位置制御回路242へ入力される。
(A) Cold start In the case of cold start, the turbine bypass system is not used, that is, the turbines are started with all bypass valves fully closed, and the steam supply amount to the high pressure turbine 4 and the intermediate pressure turbine 7 is reduced. You don't have to consider the ratio,
The flow rate ratio at this time is 1: 1. In this case, in order to control the rotation speed (load) of the steam turbine, a frequency signal proportional to the turbine rotation speed is first obtained by the speed detector 200 connected to the high pressure turbine 4. This signal is converted by the frequency / voltage converter 201 into an analog signal proportional to the frequency. This analog signal is an actual rotation speed signal and is added by the adder 202 to the speed load setter 203.
The speed deviation signal is formed by being compared with the setting signal from the speed deviation signal, and this speed deviation signal is branched into three. One of them is supplied to the speed adjustment circuit 205 for the steam control valve 3, where a speed control signal matching the speed adjustment rate is formed. The other one is a speed adjusting circuit for the main steam stop valve 2.
206, where a speed control signal matching the speed regulation rate is formed. These speed control signals are added by the adder 208 and the adder 210 with the bias signal from the full-circle injection / partial-injection bias circuit 209 for switching the full-circle injection operation and the partial injection operation by the absolute ratio. , And becomes an input to the low value priority circuit 211 and the low value priority circuit 213. In the low value priority circuits 211 and 213, the load limiter 212
The control signal of the steam control valve 3 or the main steam stop valve 2 is compared with the control signal from the extraction pressure control system by the adders 215 and 216 after the signal having a low value is output after comparison with the limit signal from Become valve position control circuit 243
Alternatively, it is input to the valve position control circuit 242.

一方、低値優先回路211および低値優先回路213の出力
は、全周噴射/部分噴射バイアス回路209による全周噴
射/部分噴射の運転切換えで動作するスイッチ214を介
して定数回路224を経て加算器223にも供給される。定数
回路224は、速度制御系からの蒸気加減弁3もしくは主
蒸気止め弁2の弁開度信号と抽気加減弁20の開度信号と
の流量変化を等しくするために設けられているものであ
る。
On the other hand, the outputs of the low-value priority circuit 211 and the low-value priority circuit 213 are added via the constant circuit 224 via the switch 214 that operates by the operation switching of the full-circulation injection / partial injection bias circuit 209. It is also supplied to the vessel 223. The constant circuit 224 is provided to equalize the flow rate changes of the valve opening signal of the steam control valve 3 or the main steam stop valve 2 and the opening signal of the extraction control valve 20 from the speed control system. .

弁位置制御回路242,243,244,245は、第1図に示すよう
にいずれも同一構成を持っているので、代表して主蒸気
止め弁2用のものについて説明すると、加算器216から
の主蒸気止め弁2用の制御信号は、加算器242aで電気・
油圧変換器242dの出力から導出される主蒸気止め弁2の
実開度信号と比較演算されて開度誤差信号として取り出
される。この開度誤差信号は増幅器242bで主蒸気止め弁
位置制御の最適ループゲインをもって調節された後に電
力増幅器242cで電力増幅され電気・油圧変換器242dに伝
達される。この電気・油圧変換器242dの機械的出力信号
は、1つには主蒸気止め弁2用の油筒246の入力信号と
なり、この油筒246により油圧増幅されて主蒸気止め弁
2の弁開度を制御する。他方、電気・油圧変換器242dの
機械的出力信号は、電気・油圧変換器242dに直結した差
動トランス242eによって位置信号に変換され、復調器24
2fで電気信号に復調された後に加算器242aに主蒸気止め
弁2の実開度信号として与えられる。
Since the valve position control circuits 242, 243, 244, 245 all have the same configuration as shown in FIG. 1, the one for the main steam stop valve 2 will be described as a representative. For the main steam stop valve 2 from the adder 216, The control signal of the
The actual opening signal of the main steam stop valve 2 derived from the output of the hydraulic pressure converter 242d is compared and calculated, and is taken out as an opening error signal. This opening degree error signal is adjusted by the amplifier 242b with the optimum loop gain of the main steam stop valve position control, then power-amplified by the power amplifier 242c and transmitted to the electro-hydraulic converter 242d. One of the mechanical output signals of the electric / hydraulic converter 242d becomes an input signal of the oil cylinder 246 for the main steam stop valve 2, and the oil pressure is amplified by the oil cylinder 246 to open the main steam stop valve 2. Control the degree. On the other hand, the mechanical output signal of the electro-hydraulic converter 242d is converted into a position signal by the differential transformer 242e directly connected to the electro-hydraulic converter 242d, and the demodulator 24
After being demodulated to an electric signal in 2f, it is given to the adder 242a as an actual opening signal of the main steam stop valve 2.

以上により構成される閉ループの弁位置制御回路242
は、加算器242aに入力される開度指令値と実開度とが等
しくなるように主蒸気止め弁2の弁開度を制御すること
になる。また、加算器215および加算器216の出力は、弁
位置制御回路242および弁位置制御回路243に入力される
が、全周噴射/部分噴射バイアス回路209の操作により
任意の負荷以上では回転速度(負荷)制御は蒸気加減弁
3側に移行しており、主蒸気止め弁2と蒸気加減弁3と
が同時に制御状態になることはない。また速度偏差信号
の分岐された3つのうち残りの1つは、インターセプト
弁6b用の速度調定回路204に伝達され低値優先回路239の
入力信号となる。この低値優先回路239には、後述のホ
ットスタート時に使用される制御回路からの信号と、低
圧バイパス弁25が全閉のときに閉じるスイッチ241を介
して与えられるインターセプト弁全開バイアス信号との
和の信号が入力され、これらの2つの入力信号について
低値優先の比較演算が行なわれ、その結果として蒸気加
減弁3に先行してインターセプト弁6bを開くための制御
信号となってインターセプト弁6bの弁位置制御回路244
へ出力される。
Closed loop valve position control circuit 242 configured as above
Will control the valve opening of the main steam stop valve 2 so that the opening command value input to the adder 242a becomes equal to the actual opening. Further, the outputs of the adder 215 and the adder 216 are input to the valve position control circuit 242 and the valve position control circuit 243, but by operating the full-circulation injection / partial injection bias circuit 209, the rotational speed ( The (load) control is shifted to the steam control valve 3 side, and the main steam stop valve 2 and the steam control valve 3 are not in the control state at the same time. The remaining one of the three branched speed deviation signals is transmitted to the speed adjusting circuit 204 for the intercept valve 6b and becomes the input signal of the low value priority circuit 239. This low value priority circuit 239 is the sum of the signal from the control circuit used at the time of hot start described later and the intercept valve fully open bias signal provided via the switch 241 which is closed when the low pressure bypass valve 25 is fully closed. Signal is input, a comparison operation of low value priority is performed on these two input signals, and as a result, it becomes a control signal for opening the intercept valve 6b prior to the steam control valve 3 and becomes a control signal for the intercept valve 6b. Valve position control circuit 244
Is output to.

次に抽気圧力制御系について説明すれば、タービン装置
から造水プラントへの抽気圧力は圧力検出器217によっ
て抽気圧力に比例したアナログ信号として検出される。
この検出信号は、加算器218によって抽気圧力設定器219
からの設定信号と比較演算される。加算器218から出力
される抽気圧力偏差信号は、抽気圧力制御回路220に伝
達され、抽気圧力調定率に対応した抽気圧力制御信号と
なる。この抽気圧力制御信号は低値優先回路221に伝達
され、ここで抽気制限器222からの制限信号と低値優先
のための比較演算が行なわれる。この低値優先回路222
の出力は、定数回路225および定数回路207を経て蒸気加
減弁3および主蒸気止め弁2の制御系の加算器215およ
び加算器216に入力され、抽気圧力制御系からの弁開度
指令値として流量変化を等しくするために比較演算され
る。また低値優先回路221からの出力は、加算器223で前
述のような速度制御系からの、すなわち定数回路224か
らの抽気加減弁開度指令値と加え合わされて抽気加減弁
開度信号が形成され、抽気加減弁20の弁位置制御回路24
5へ出力される。
Explaining the extraction pressure control system, the extraction pressure from the turbine device to the desalination plant is detected by the pressure detector 217 as an analog signal proportional to the extraction pressure.
This detection signal is sent to the extraction pressure setting device 219 by the adder 218.
Is calculated and compared with the setting signal from. The extraction pressure deviation signal output from the adder 218 is transmitted to the extraction pressure control circuit 220 and becomes an extraction pressure control signal corresponding to the extraction pressure adjustment rate. This bleed pressure control signal is transmitted to the low value priority circuit 221, where the limit signal from the bleed air limiter 222 and the comparison calculation for low value priority are performed. This low value priority circuit 222
Is input to the adder 215 and the adder 216 of the control system of the steam control valve 3 and the main steam stop valve 2 via the constant circuit 225 and the constant circuit 207, and is output as a valve opening command value from the extraction pressure control system. A comparison operation is performed to equalize the flow rate changes. The output from the low value priority circuit 221 is added by the adder 223 from the speed control system as described above, that is, the bleed air control valve opening command value from the constant circuit 224 to form a bleed air control valve opening signal. The valve position control circuit 24 of the bleed air control valve 20
Output to 5.

以上のようにタービンバイパス系統を備え、かつ造水プ
ラントを備えていながら、蒸気タービンの起動前にこれ
らを運用、運転することなく、単なる再熱タービンとし
て蒸気タービンを起動する場合には、低圧バイパス弁25
が全閉であることを条件にインターセプト弁6bが速度調
定率に対応し蒸気加減弁3に先行して開弁するので、高
圧タービン4と中圧タービン7の蒸気流入量が等しくな
る。
Even if the turbine bypass system is provided and the desalination plant is provided as described above, if the steam turbine is started as a simple reheat turbine without operating and operating these before starting the steam turbine, the low pressure bypass Valve 25
Since the intercept valve 6b is opened prior to the steam control valve 3 corresponding to the speed adjustment rate on the condition that is fully closed, the steam inflow amounts of the high pressure turbine 4 and the intermediate pressure turbine 7 become equal.

(B) ホットスタート(1)、(2) 次にホットスタートの場合について説明すれば、この場
合にはタービンバイパス系統を用いて蒸気タービンの起
動前から造水プラント側に蒸気供給を行なっており、タ
ービンバイパス運転であることから、前述したように高
圧タービン4と中圧タービン7との間の蒸気流量比率を
考慮しなければならない。しかし、造水プラント側の要
求蒸気量に従い低圧タービンバイパス弁25で制御される
高温再熱蒸気圧力と、高圧バイパス弁13で制御される主
蒸気圧力が変化するので、蒸気流量の比率もしくは絶対
値を蒸気タービンごとに、しかも起動ごとに見直しする
必要が生ずる。
(B) Hot start (1), (2) Next, the case of hot start will be described. In this case, the turbine bypass system is used to supply steam to the desalination plant side before the steam turbine is started. Since it is the turbine bypass operation, the steam flow rate ratio between the high-pressure turbine 4 and the intermediate-pressure turbine 7 must be taken into consideration as described above. However, the high-temperature reheat steam pressure controlled by the low-pressure turbine bypass valve 25 and the main steam pressure controlled by the high-pressure bypass valve 13 change according to the required steam amount on the side of the desalination plant. Will need to be reviewed for each steam turbine and each time it is started.

ここで、主蒸気および高温再熱蒸気の圧力の概略を検討
すると、低圧バイパス弁25で制御される高温再熱蒸気圧
力は、中圧バイパス弁15で造水プラントに供給する蒸気
量が自己の造水プラント1台の運転と、他を含めた2台
の運転のときとでは、すでに設置されている中圧バイパ
ス弁を用いて蒸気量の増加に対応するので、中圧バイパ
ス弁15の前側圧力すなわち高温再熱蒸気圧力を上昇させ
ればよい。このため、結果的には低圧バイパス弁25の圧
力制御設定値を自己造水プラント1台だけの運転時(以
下説明上、PR1=7Kと記号化する)と他を含めた2台運
転時(以下説明上、PR2=14Kと記号化する)の2種類が
必要である。一方、主蒸気圧力は、タービンを起動する
時のボイラーの運転状態から定格条件時(以下説明上、
PM1=140Kと記号化する)と昇圧運転時(以下説明上、P
M2≦140Kと記号化する。定格条件以下)に大別される。
これらの4種類の各蒸気圧力の組合せによりホットスタ
ート(1)と、ホットスタート(2)のときの制御態様
について説明する。なお、ホットスタート(1)とホッ
トスタート(2)では、運転される造水プラントの数量
の違いのみであり、以下の説明ですべてが含まれるので
特別に区別しない。またホットスタートの場合には、イ
ンターセプト弁6bの制御以外は、特に変更となる部分が
ないので、その変更となるところだけを説明する。イン
ターセプト弁6bの制御信号は、インターセプト弁6bの速
度調定回路204からの出力と、全周噴射と部分噴射の運
転切換えにより動作するスイッチ214を介して論理回路2
37、関数発生器238および加算器240を経た主蒸気止め弁
2もしくは蒸気加減弁3側からの信号が低値優先回路23
9に入力される。ここで、加算器240の出力信号は、低圧
バイパス弁25が運転状態であるのでスイッチ241がオン
されず関数発生器238側からの制御信号そのものとな
る。また低値優先回路239に入力される速度調定回路204
からの制御信号と、加算器240からの制御信号とでは、
後者が常に低値となるように構成されている。すなわ
ち、論理回路237は、前述の主蒸気および高温再熱蒸気
の圧力条件により第2図に示すように高圧タービン4を
冷却するに十分なように計算された流量比率の選択を行
ない、その選択された流量比率に対応した主蒸気に係る
数値としての制御信号が関数発生器238に出力される。
この関数発生器238の出力信号は、主蒸気止め弁2もし
くは蒸気加減弁3とインターセプト弁6bの流量特性の関
数であり、論理回路237からの入力信号を受けてインタ
ーセプト弁6bの制御信号に変換するが、第2図によれば
流量比率が3:1,2:1であることから高圧タービン4側を
基準に変換されるので、中圧タービン7側の実出力は1/
3もしくは1/2の低値となって加算器240に入力される。
このため、低値優先回路239では常に加算器240側が低値
となる。
Here, considering the outline of the pressures of the main steam and the high-temperature reheat steam, the high-temperature reheat steam pressure controlled by the low-pressure bypass valve 25 is controlled by the amount of steam supplied to the desalination plant by the intermediate-pressure bypass valve 15. In the operation of one desalination plant and the operation of two units including the other, since the increase in the amount of steam is dealt with by using the medium pressure bypass valve already installed, the front side of the medium pressure bypass valve 15 The pressure, that is, the high temperature reheat steam pressure may be increased. Therefore, as a result, the pressure control set value of the low-pressure bypass valve 25 is operated when only one self-producing plant (in the following description, is symbolized as P R1 = 7 K ) and other two are operated. There are two types of time (which will be symbolized as P R2 = 14 K in the following description). On the other hand, the main steam pressure changes from the operating state of the boiler when starting the turbine to the rated condition (in the following description,
P M1 = 140 K ) and boosting operation (P
Symbolize as M2 ≤ 140 K. Below the rated conditions).
A control mode at the time of hot start (1) and hot start (2) by combining these four kinds of steam pressures will be described. It should be noted that the hot start (1) and the hot start (2) are different only in the quantity of the desalination plant to be operated, and all are included in the following description, so no special distinction is made. Further, in the case of hot start, there is no particular change except for the control of the intercept valve 6b, so only the change will be described. The control signal of the intercept valve 6b is output from the speed adjusting circuit 204 of the intercept valve 6b and the logic circuit 2 via the switch 214 that operates by switching the operation between full-circle injection and partial injection.
The signal from the main steam stop valve 2 or steam control valve 3 side that has passed through 37, the function generator 238 and the adder 240 is the low value priority circuit 23.
Entered in 9. Here, the output signal of the adder 240 is the control signal itself from the function generator 238 side because the switch 241 is not turned on because the low-pressure bypass valve 25 is in the operating state. In addition, the speed adjustment circuit 204 input to the low value priority circuit 239
From the control signal from the adder 240,
The latter is configured to always have a low value. That is, the logic circuit 237 selects the flow rate ratio calculated to be sufficient for cooling the high pressure turbine 4 as shown in FIG. 2 according to the pressure conditions of the main steam and the high temperature reheated steam described above, and makes the selection. A control signal as a numerical value relating to the main steam corresponding to the determined flow rate ratio is output to the function generator 238.
The output signal of the function generator 238 is a function of the flow rate characteristics of the main steam stop valve 2 or the steam control valve 3 and the intercept valve 6b, and is converted into a control signal of the intercept valve 6b by receiving the input signal from the logic circuit 237. However, according to FIG. 2, since the flow rate ratio is 3: 1, 2: 1, conversion is performed with the high-pressure turbine 4 side as the reference, so the actual output on the medium-pressure turbine 7 side is 1 /
A low value of 3 or 1/2 is input to the adder 240.
Therefore, in the low value priority circuit 239, the adder 240 side always has a low value.

このような論理回路237と関数発生器238による制御方式
によれば、ホットスタート(1)およびホットスタート
(2)では、その流量比は、異なるが、常に主蒸気止め
弁2もしくは蒸気加減弁3の制御信号を基にインターセ
プト弁6bの制御信号が形成されるので、これらの主蒸気
止め弁2もしくは蒸気加減弁3とインターセプト弁6bと
は連動して開閉動作を行なうことになり、任意の負荷に
おいてタービンバイパス運転終了、すなわち低圧バイパ
ス弁25が全閉してスイッチ241がオンし、インターセプ
ト弁の全開バイアス回路226からの全開バイアス信号が
印加されるまで前述の連動関係が持続される。
According to such a control method by the logic circuit 237 and the function generator 238, the hot start (1) and the hot start (2) have different flow rate ratios, but the main steam stop valve 2 or the steam control valve 3 is always used. Since the control signal for the intercept valve 6b is formed based on the control signal for the intercept valve 6b, the main steam stop valve 2 or the steam control valve 3 and the intercept valve 6b are linked to perform the opening / closing operation. In the turbine bypass operation, that is, until the low pressure bypass valve 25 is fully closed and the switch 241 is turned on, and the full open bias signal from the full open bias circuit 226 of the intercept valve is applied, the aforementioned interlocking relationship is maintained.

〔発明の効果〕〔The invention's effect〕

本発明は上述のように構成したので、タービン起動に際
し、運用途中で何らかの原因により高圧タービンと中圧
タービンの流量比が変化した場合でも、その流量比変化
に応答して流量変化を司る蒸気弁はインターセプト弁と
なり、そのため蒸気タービンにおける外乱要素がより少
なく、より良好な起動制御を達成することができる。し
かも起動時における高圧タービンの過熱による重大な事
故を未然に防止することができる。
Since the present invention is configured as described above, even when the flow rate ratio between the high pressure turbine and the intermediate pressure turbine changes during operation during turbine startup due to some cause, the steam valve that controls the flow rate change in response to the change in the flow rate ratio. Becomes an intercept valve, so that there are fewer disturbance elements in the steam turbine and better startup control can be achieved. Moreover, it is possible to prevent a serious accident due to overheating of the high-pressure turbine at the time of startup.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明のタービン制御装置の一実施例を示すブ
ロック図、第2図は高圧タービンと中圧タービンとの流
量比を決定する論理回路のロジック図、第3図は本発明
を適用する蒸気タービンの概略系統図である。 2……主蒸気止め弁、3……蒸気加減弁、4……高圧タ
ービン、6……組合せ再熱弁、6a……再熱蒸気止め弁、
6b……インターセプト弁、19a,19b,190a,190b……造水
プラント、203……速度・負荷設定器、205……蒸気加減
弁速度調定回路、209……全噴射/部分噴射バイアス回
路、226……全開バイアス回路、240……加算器、242,24
3,244,245……弁位置制御回路、242a……加算器、242b
……増幅器、242c……電力増幅器、242d……電気・油圧
変換器、242e……差動トランス、242f……復調器、237
……論理回路、238……関数発生器。
FIG. 1 is a block diagram showing an embodiment of a turbine control device of the present invention, FIG. 2 is a logic diagram of a logic circuit for determining a flow rate ratio between a high pressure turbine and an intermediate pressure turbine, and FIG. It is a schematic system diagram of a steam turbine that does. 2 ... Main steam stop valve, 3 ... Steam control valve, 4 ... High-pressure turbine, 6 ... Combination reheat valve, 6a ... Reheat steam stop valve,
6b …… intercept valve, 19a, 19b, 190a, 190b …… desalination plant, 203 …… speed / load setter, 205 …… steam control valve speed adjustment circuit, 209 …… full injection / partial injection bias circuit, 226 …… Fully open bias circuit, 240 …… Adder, 242,24
3,244,245 …… Valve position control circuit, 242a …… Adder, 242b
...... Amplifier, 242c …… Power amplifier, 242d …… Electro-hydraulic converter, 242e …… Differential transformer, 242f …… Demodulator, 237
...... Logic circuit, 238 …… Function generator.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】ボイラーからの主蒸気により主蒸気弁を介
して高圧タービンを運転する主蒸気系統と、高圧タービ
ンからの蒸気を再熱器を介して得られた再熱蒸気により
インターセプト弁を介して中圧タービンを運転する再熱
蒸気系統と、中圧タービンからの蒸気により抽気加減弁
を介して低圧タービンを運転する低圧蒸気系統と、主蒸
気弁および高圧タービンをバイパスする高圧バイパス弁
と、インターセプト弁および中圧タービンをバイパスし
再熱器からの再熱蒸気を工業用プラントに対して供給す
る中圧バイパス弁と、インターセプト弁、中圧タービ
ン、抽気加減弁および低圧タービンをバイパスする低圧
バイパス弁とを備えたタービンプラントを制御するター
ビン制御装置において、 タービン起動に際して、低圧バイパス弁が全閉状態にな
いことを条件として、主蒸気の圧力および再熱蒸気の圧
力に従い、中圧タービンへの流入再熱蒸気の流量が高圧
タービンに流入する主蒸気量を基準として所定の比率に
なるようにインターセプト弁のみを制御対象としてその
開度を制御する制御手段を設けたことを特徴とするター
ビン制御装置。
Claim: What is claimed is: 1. A main steam system for operating a high-pressure turbine via a main steam valve from a main steam from a boiler, and a reheated steam obtained from a high-pressure turbine via a reheater via an intercept valve. A reheat steam system for operating a medium-pressure turbine, a low-pressure steam system for operating a low-pressure turbine with steam from the medium-pressure turbine via an extraction control valve, a high-pressure bypass valve for bypassing the main steam valve and the high-pressure turbine, A medium-pressure bypass valve that bypasses the intercept valve and the medium-pressure turbine and supplies reheated steam from the reheater to the industrial plant, and a low-pressure bypass that bypasses the intercept valve, the medium-pressure turbine, the bleeder regulator and the low-pressure turbine. In a turbine control device that controls a turbine plant equipped with a valve, the low-pressure bypass valve is fully closed when the turbine is started. If not, the interception is performed so that the flow rate of reheated steam flowing into the intermediate pressure turbine becomes a predetermined ratio based on the amount of main steam flowing into the high pressure turbine according to the pressure of main steam and the pressure of reheated steam. A turbine control device comprising control means for controlling the opening of only a valve as a control target.
JP60296004A 1985-12-27 1985-12-27 Turbine controller Expired - Lifetime JPH0735722B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60296004A JPH0735722B2 (en) 1985-12-27 1985-12-27 Turbine controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60296004A JPH0735722B2 (en) 1985-12-27 1985-12-27 Turbine controller

Publications (2)

Publication Number Publication Date
JPS62153507A JPS62153507A (en) 1987-07-08
JPH0735722B2 true JPH0735722B2 (en) 1995-04-19

Family

ID=17827883

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60296004A Expired - Lifetime JPH0735722B2 (en) 1985-12-27 1985-12-27 Turbine controller

Country Status (1)

Country Link
JP (1) JPH0735722B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114776398B (en) * 2022-04-11 2024-01-26 华北电力科学研究院有限责任公司 An automatic control method and device for a steam turbine combined heating system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59219603A (en) * 1983-05-27 1984-12-11 三菱重工業株式会社 Reheating boiler for factory
JPS60201009A (en) * 1984-03-27 1985-10-11 Toshiba Corp Operation of reheat steam turbine plant

Also Published As

Publication number Publication date
JPS62153507A (en) 1987-07-08

Similar Documents

Publication Publication Date Title
CA1193455A (en) Turbine high pressure bypass temperature control system and method
US4598551A (en) Apparatus and method for controlling steam turbine operating conditions during starting and loading
JP3481983B2 (en) How to start a steam turbine
KR910003260B1 (en) Steam turbine power plant control system with steam bypass system and control method
US4253308A (en) Turbine control system for sliding or constant pressure boilers
JPS6158644B2 (en)
CA1193454A (en) Turbine high pressure bypass pressure control system
GB2166226A (en) Apparatus and method for fluidly connecting a boiler into a pressurized steam feed line and combined-cycle steam generator power plant embodying the same
JP4503995B2 (en) Reheat steam turbine plant and operation method thereof
JP2013064372A (en) Low pressure turbine bypass control device, and power plant
JPH0735722B2 (en) Turbine controller
JP2002115807A (en) Operating method of driving turbine for boiler feed pump and operating device thereof
JP2674263B2 (en) Control method for reheat steam turbine
JP3029440B2 (en) Steam turbine for power generation
JP2554704B2 (en) Turbine controller
JPH0743089B2 (en) Degasser internal pressure control system
JPS581246B2 (en) Steam turbine starting device with turbine bypass system
JP2528162B2 (en) Low voltage turbine bypass controller
JPH08121112A (en) Single-axis combined cycle power generation facility
JPS642762B2 (en)
JPH0759883B2 (en) Low pressure turbine bypass valve controller
JPS6032082B2 (en) Feed water temperature control device
JP2523493B2 (en) Turbin bypass system
JPH07224609A (en) Turbine controller
JPH03134203A (en) Reheating extraction turbine

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term