JPH0742151A - Method and device for excavating pile foundation having bottom expanding part - Google Patents
Method and device for excavating pile foundation having bottom expanding partInfo
- Publication number
- JPH0742151A JPH0742151A JP20867193A JP20867193A JPH0742151A JP H0742151 A JPH0742151 A JP H0742151A JP 20867193 A JP20867193 A JP 20867193A JP 20867193 A JP20867193 A JP 20867193A JP H0742151 A JPH0742151 A JP H0742151A
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pile foundation
- expanded
- excavating
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
(57)【要約】 (修正有)
【目的】 周辺構造物の地盤沈下を防止し、かつ狭い場
所でも施工ができ、施工能率の向上が図れると共に、大
きい拡底部の施工が可能な拡底部を有する杭基礎掘削方
法及びその装置を提供する。
【構成】 杭基礎の拡底予定部の周囲に地盤改良液を注
入して地盤改良し、杭基礎構築予定部の中心部にアンカ
−用鋼管3を建込み、この鋼管内にアンカ−用PCワイ
ヤ−31を挿入してワイヤ−の先端を固化材により定着
し、先端部に掘削範囲の拡張可能な掘削部材61を有す
る旋回用鋼管5をアンカ−用鋼管に外装し、さらにこの
旋回用鋼管に鋼管杭8を外装し、掘削部材の掘削範囲を
縮小した状態で旋回用鋼管を回転させ、アンカ−用鋼管
に反力を取りながら先掘りし、鋼管杭を拡底予定部まで
圧入した後、旋回用鋼管の掘削部材を拡張し、拡底予定
部を拡張掘削する。
(57) [Summary] (Corrected) [Purpose] To prevent the ground subsidence of the surrounding structures and to be able to perform construction even in a narrow space, to improve the construction efficiency and to construct a widened bottom that allows the construction of a large bottom. A pile foundation excavating method and an apparatus therefor are provided. [Structure] The soil improvement liquid is injected around the area where the bottom of the pile foundation is to be expanded to improve the ground, and the anchor steel pipe 3 is installed in the center of the area where the pile foundation is to be constructed, and the anchor PC wire is inside the steel pipe. -31 is inserted and the tip of the wire is fixed with a solidifying material, and the turning steel pipe 5 having a drilling member 61 capable of expanding the drilling range at the tip is sheathed on the anchor steel pipe. The steel pipe pile 8 is installed as an exterior, the turning steel pipe is rotated in a state where the excavation area of the excavating member is reduced, and the steel pipe for anchoring is pre-drilled while receiving a reaction force, and the steel pipe pile is press-fitted to the planned bottom expansion portion, and then turned. The excavating member of the steel pipe for use is expanded, and the planned expansion part is expanded.
Description
【0001】[0001]
【産業上の利用分野】本発明は、拡底部を有する杭基礎
掘削方法及びその装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for excavating a pile foundation having an expanded bottom portion.
【0002】[0002]
【従来技術の問題点】都市部の軟弱地盤地帯の工事空間
が制限された狭い場所で高耐力基礎構造物を掘削する場
合、大型掘削機が使用できないため、地下水を排水して
水位を下げ、人力で掘削していた。従って、地盤沈下に
より周辺構造物に大きな影響を与えるおそれがあるとと
もに、施工能率の低下が問題となっていた。[Problems of the prior art] When excavating a high-resilience foundation structure in a narrow space where the construction space of the soft ground area in an urban area is limited, a large excavator cannot be used, so groundwater is drained to lower the water level. It was excavating manually. Therefore, there is a possibility that the ground subsidence may have a great influence on the surrounding structures, and at the same time, a decrease in construction efficiency has been a problem.
【0003】[0003]
【発明の目的】本発明は、上記のような問題点を解決す
るためになされたもので、周辺構造物の地盤沈下を防止
し、かつ狭い場所でも施工ができ、施工能率の向上が図
れると共に、大きい拡底部の施工が可能な拡底部を有す
る杭基礎掘削方法及びその装置を提供することを目的と
する。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, prevents ground subsidence of surrounding structures, and enables construction in a narrow space, and improves construction efficiency. An object of the present invention is to provide a pile foundation excavating method and apparatus having a bottom expanding part capable of constructing a large bottom expanding part.
【0004】[0004]
【課題を解決するための手段】即ち、本発明は、杭基礎
の拡底予定部の周囲に地盤改良液を注入して地盤改良
し、杭基礎構築予定部の中心部にアンカ−用鋼管を建込
み、この鋼管内にアンカ−用PCワイヤ−を挿入してワ
イヤ−の先端を固化材により定着し、先端部に掘削範囲
の拡張可能な掘削部材を有する旋回用鋼管を前記アンカ
−用鋼管に外装し、さらにこの旋回用鋼管に鋼管杭を外
装し、前記掘削部材の掘削範囲を縮小した状態で旋回用
鋼管を回転させ、アンカ−用鋼管に反力を取りながら先
掘りし、鋼管杭を拡底予定部まで圧入した後、旋回用鋼
管の掘削部材を拡張し、拡底予定部を拡張掘削して行
う、拡底部を有する杭基礎掘削方法である。また、上記
拡底部を有する杭基礎掘削方法に用いる掘削装置であっ
て、杭基礎中心部に建込む旋回用鋼管と、この鋼管の先
端部に開閉可能に設けたブ−ムと、このブ−ムの先端に
設けた掘削部材とよりなる、拡底部を有する杭基礎の掘
削装置である。[Means for Solving the Problems] That is, according to the present invention, a soil improvement liquid is injected around a portion of a pile foundation to be expanded to improve the soil, and an anchor steel pipe is constructed at the center of the portion to be constructed the pile foundation. Then, a PC wire for an anchor is inserted into the steel pipe, the tip of the wire is fixed by a solidifying material, and a swiveling steel pipe having a drilling member capable of expanding the excavation range at the tip portion is used as the anchor steel pipe. The outer pipe is further covered with a steel pipe pile on the swiveling steel pipe, the swiveling steel pipe is rotated in a state where the excavation range of the excavating member is reduced, and the steel pipe pile is pre-digged while taking a reaction force to the anchor steel pipe. This is a pile foundation excavation method having a bottom expansion part, which is performed by press-fitting to the bottom expansion planned part, expanding the excavation member of the turning steel pipe, and expanding and excavating the bottom expansion planned part. Further, the present invention is an excavation device used for a method for excavating a pile foundation having the above-mentioned bottom portion, wherein a steel pipe for swiveling built in the center of the pile foundation, a boom provided at the tip of this steel pipe so as to be openable and closable, and this boom It is an excavation device for a pile foundation having an expanded bottom portion, which is composed of an excavation member provided at the tip of a ram.
【0005】[0005]
【実施例】以下、図面を参照しながら、本発明の一実施
例について説明する。 <イ>地盤改良 図2に示すように、杭基礎の拡底予定部1の上方地盤に
架台2を設置し、地盤改良用定規21と注入管22を所
定の深度まで建込む。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. <B> Ground improvement As shown in FIG. 2, a pedestal 2 is installed on the ground above the planned bottom expansion part 1 of the pile foundation, and a ground improvement ruler 21 and an injection pipe 22 are built to a predetermined depth.
【0006】そして、拡底予定部1の外周囲に地盤改良
液を注入して地盤改良部23を築造する。この地盤改良
部23は、拡底予定部1の掘削時に、周囲地盤の崩壊を
防止するためのものである。[0006] Then, a ground improvement liquid is injected into the outer periphery of the planned bottom expansion portion 1 to build the ground improvement portion 23. The ground improvement section 23 is for preventing the surrounding ground from collapsing when excavating the bottom expansion scheduled portion 1.
【0007】<ロ>アンカ−の定着 図1に示すように、杭基礎構築予定部の中心部にアンカ
−用鋼管3を建込み、その中にアンカ−用PCワイヤ−
31を挿入、貫通させて、その先端を固化材により定着
する。<B> Anchor anchoring As shown in FIG. 1, an anchor steel pipe 3 is installed in the center of the pile foundation construction planned portion, and an anchor PC wire is installed therein.
31 is inserted and penetrated, and its tip is fixed with a solidifying material.
【0008】<ハ>掘削機の構造 本発明の掘削機は、図1に示すように、杭基礎中心部に
建込む旋回用鋼管5と、その先端部に開閉可能に設けた
開閉ブ−ム6と、さらにその先端に設けた掘削部材61
とよりなる。<C> Structure of excavator As shown in FIG. 1, the excavator according to the present invention has a steel pipe 5 for swiveling built in the center of a pile foundation and an opening / closing boom provided at its tip end so as to be openable and closable. 6 and an excavating member 61 provided at the tip
And consists of.
【0009】開閉ブ−ム6はその一端を旋回用鋼管5に
軸支し、両端を旋回用鋼管5とブ−ム6とに軸支した伸
縮ジャッキ62により開閉可能に構成する。なお、掘削
部材61は、回転可能なドラムの周面に掘削ビットを植
設した構造など、その他種々の構造が考えられる。The open / close boom 6 is constructed such that one end thereof is pivotally supported by the swiveling steel pipe 5 and both ends thereof can be opened / closed by a telescopic jack 62 pivotally supported by the swiveling steel pipe 5 and the boom 6. The excavating member 61 may have various other structures such as a structure in which an excavating bit is planted on the peripheral surface of a rotatable drum.
【0010】<ニ>杭部の掘削 架台2上に旋回機4を設置し、旋回用鋼管5を建込んだ
アンカ−用鋼管3に外装し、さらにこの旋回用鋼管5に
鋼管杭8を外装する。<D> Excavation of pile section A swivel machine 4 is installed on the pedestal 2, and the anchor steel pipe 3 in which the swivel steel pipe 5 is installed is exteriorly mounted. Further, the steel pipe pile 8 is exteriorly mounted on the swivel steel pipe 5. To do.
【0011】そして、開閉ブ−ム6を畳み、掘削部材6
1の掘削範囲を縮小した状態で、旋回用鋼管5を旋回機
4により回転させて先掘りし、鋼管杭8を拡底予定部1
まで圧入する。鋼管杭8の圧入には、アンカ−用鋼管3
(PCワイヤ−7)で反力をとったセンタ−ホ−ルジャ
ッキ71などを用いる。Then, the opening / closing boom 6 is folded and the excavation member 6 is folded.
In the state where the excavation range of 1 is reduced, the turning steel pipe 5 is rotated by the turning machine 4 to dig ahead, and the steel pipe pile 8 is expanded to the bottom part 1
Press into. For press-fitting the steel pipe pile 8, the anchor steel pipe 3
A center wheel jack 71 having a reaction force with (PC wire-7) is used.
【0012】<ホ>ガイド装置 図1に示すように、掘削機により先堀する際には、旋回
用鋼管5の周囲にガイド装置を装着する。この装置は、
図3に示すように、旋回用鋼管5の外周に装着した装着
盤51と、その周囲の複数箇所に設置したガイドロ−ラ
52と、装着盤51の周面に突設したドロ落しブラシ5
3よりなる。<E> Guide device As shown in FIG. 1, when excavating with an excavator, a guide device is mounted around the turning steel pipe 5. This device
As shown in FIG. 3, a mounting board 51 mounted on the outer circumference of the swiveling steel pipe 5, guide rollers 52 installed at a plurality of locations around the steel board 5, and a drop-off brush 5 projecting on the peripheral surface of the mounting board 51.
It consists of three.
【0013】ガイドロ−ラ52は、旋回用鋼管5の建込
み時に孔壁に押し当てて、旋回用鋼管5が中心位置を保
つようにするためのものである。また、ドロ落しブラシ
53は、孔壁の凹凸を削り取って、鋼管杭8の建込みを
容易にするためのものである。The guide roller 52 is for pressing the turning steel pipe 5 against the wall of the hole when the turning steel pipe 5 is installed so that the turning steel pipe 5 maintains its center position. The drop-off brush 53 is for scraping off the irregularities of the hole wall to facilitate the construction of the steel pipe pile 8.
【0014】<ヘ>拡底部の掘削 掘削部材61及び鋼管杭8が拡底予定部1まで到達した
後、開閉ブ−ム6を徐々に拡張しながら掘削を行う。こ
れによって、図1に示すような拡底部11の掘削が可能
となる。<F> Excavation of bottom expansion part After the excavation member 61 and the steel pipe pile 8 reach the bottom expansion planned part 1, excavation is performed while gradually expanding the opening / closing boom 6. This enables excavation of the expanded bottom portion 11 as shown in FIG.
【0015】[0015]
【本発明の効果】本発明は以上説明したようになるた
め、次のような効果を得ることができる。 <イ>機械掘削が可能となったため、地下水位を低下さ
せる必要がなく、周辺構造物の地盤沈下を防止すること
ができる。また、従来の人力掘削と比較すると施工能率
が向上するため、大幅な施工期間の短縮を図ることがで
きるとともに、作業の安全性が確保される。さらに、機
械掘削により、大深度の基礎構造物の施工が可能となっ
た。Since the present invention is as described above, the following effects can be obtained. <B> Since mechanical excavation is possible, it is not necessary to lower the groundwater level, and it is possible to prevent ground subsidence of surrounding structures. Further, since the construction efficiency is improved as compared with the conventional manual excavation, the construction period can be greatly shortened and the safety of the work is secured. Furthermore, mechanical excavation made it possible to construct a deep foundation structure.
【0016】<ロ>本発明の掘削機を用いると、基礎杭
部の幅を小さく、拡底部の幅を大きくできるため、コス
トが安くしかも高耐力の基礎の施工が可能となる。<B> When the excavator of the present invention is used, since the width of the foundation pile portion can be made small and the width of the bottom expanding portion can be made large, it is possible to construct a foundation having low cost and high yield strength.
【図1】 本発明の一実施例の地盤改良工程の説明図FIG. 1 is an explanatory diagram of a ground improvement process according to an embodiment of the present invention.
【図2】 本発明の一実施例の拡底部掘削工程の説明図FIG. 2 is an explanatory view of an expanded bottom excavation process according to an embodiment of the present invention.
【図3】 ガイド装置の説明図FIG. 3 is an explanatory view of a guide device.
Claims (2)
を注入して地盤改良し、 杭基礎構築予定部の中心部にアンカ−用鋼管を建込み、
この鋼管内にアンカ−用PCワイヤ−を挿入してワイヤ
−の先端を固化材により定着し、 先端部に掘削範囲の拡張可能な掘削部材を有する旋回用
鋼管を前記アンカ−用鋼管に外装し、さらにこの旋回用
鋼管に鋼管杭を外装し、 前記掘削部材の掘削範囲を縮小した状態で旋回用鋼管を
回転させ、アンカ−用鋼管に反力を取りながら先掘り
し、鋼管杭を拡底予定部まで圧入した後、 旋回用鋼管の掘削部材を拡張し、拡底予定部を拡張掘削
して行う、 拡底部を有する杭基礎掘削方法。1. A ground improvement liquid is injected around the area where the bottom of the pile foundation is to be expanded to improve the ground, and an anchor steel pipe is installed in the center of the area where the pile foundation is to be constructed,
An anchor PC wire is inserted into this steel pipe, the tip of the wire is fixed by a solidifying material, and a swiveling steel pipe having an excavating member capable of expanding the excavation range at the tip is sheathed on the anchor steel pipe. Further, a steel pipe pile is further installed on the turning steel pipe, the turning steel pipe is rotated in a state where the excavation member has a reduced excavation range, and the steel pipe for anchoring is pre-digged while taking a reaction force to expand the bottom of the steel pipe pile. A method for excavating a pile foundation with a bottom expansion part, in which the excavation member of the steel pipe for turning is expanded and then the part to be expanded bottom is expanded and excavated.
削方法に用いる掘削装置であって、杭基礎中心部に建込
む旋回用鋼管と、この鋼管の先端部に開閉可能に設けた
ブ−ムと、このブ−ムの先端に設けた掘削部材とよりな
る、拡底部を有する杭基礎の掘削装置。2. An excavating device used in the method for excavating a pile foundation having an expanded bottom portion according to claim 1, wherein a swiveling steel pipe is built in a central portion of the pile foundation, and a buoy provided at the tip of the steel pipe so as to be openable and closable. An excavation device for a pile foundation having an expanded bottom portion, which comprises a boom and an excavation member provided at the tip of the boom.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20867193A JPH0742151A (en) | 1993-07-30 | 1993-07-30 | Method and device for excavating pile foundation having bottom expanding part |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP20867193A JPH0742151A (en) | 1993-07-30 | 1993-07-30 | Method and device for excavating pile foundation having bottom expanding part |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0742151A true JPH0742151A (en) | 1995-02-10 |
Family
ID=16560136
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP20867193A Pending JPH0742151A (en) | 1993-07-30 | 1993-07-30 | Method and device for excavating pile foundation having bottom expanding part |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0742151A (en) |
-
1993
- 1993-07-30 JP JP20867193A patent/JPH0742151A/en active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| GB2154630A (en) | Construction method for foundation piling | |
| JPH0742151A (en) | Method and device for excavating pile foundation having bottom expanding part | |
| JP2000054375A (en) | Foundation pile and foundation construction method using the same | |
| JP2002275892A (en) | Method and apparatus for placing steel pipe pile | |
| JP3165997B2 (en) | Casting method and equipment for sheet piles | |
| JPS5827366B2 (en) | Head reinforcement pile construction equipment | |
| JP2002105956A (en) | Charging of mc type widening bottom pipe anchor into ground | |
| JP4523716B2 (en) | Foundation pile construction method | |
| JP2003336253A (en) | Steel pipe pile foundation and construction method of the same | |
| JP2846925B2 (en) | Nakabori construction method with tip enlarged diameter pile | |
| JPH11256576A (en) | Pile press-fit device | |
| JP3146375B2 (en) | Existing structure retention method | |
| JPH06316927A (en) | Installation of open section pile in large diameter | |
| JPH0627405B2 (en) | Ready-made pile burying method | |
| CN221895768U (en) | An expansion type separation anchor | |
| JPS61254716A (en) | Setting of in-place concrete pile | |
| JPH0791933B2 (en) | Ground improvement device | |
| JP3015842B2 (en) | Excavation method | |
| JP2524654B2 (en) | Kason deposition method | |
| JP2881501B2 (en) | Construction method for high strength cast-in-place concrete piles | |
| JP2575088B2 (en) | Improvement method and equipment of foundation ground | |
| JP2002167759A (en) | Execution method of foundation pile | |
| JPH0519433Y2 (en) | ||
| JP3007755U (en) | Magnifying head | |
| JPH0711633A (en) | Construction method of pile with bag, and enlarging excavation device |