JPH0754336A - Construction method of composite wall body - Google Patents

Construction method of composite wall body

Info

Publication number
JPH0754336A
JPH0754336A JP5231051A JP23105193A JPH0754336A JP H0754336 A JPH0754336 A JP H0754336A JP 5231051 A JP5231051 A JP 5231051A JP 23105193 A JP23105193 A JP 23105193A JP H0754336 A JPH0754336 A JP H0754336A
Authority
JP
Japan
Prior art keywords
steel
wall body
wall
partition wall
earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5231051A
Other languages
Japanese (ja)
Inventor
Tetsuo Yokota
哲夫 横田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TODOROKIGUMI KK
Original Assignee
TODOROKIGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TODOROKIGUMI KK filed Critical TODOROKIGUMI KK
Priority to JP5231051A priority Critical patent/JPH0754336A/en
Publication of JPH0754336A publication Critical patent/JPH0754336A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

PURPOSE:To make any temporary sheathing work unnecessary and in its turn to shorten the construction period by composing a steel partition wall body through a process of providing separate wall body steel materials in series on the outer sides of a steel wall body and share the earth pressure with this steel partition wall body and the wall body steel materials. CONSTITUTION:A steel wall body 1 is formed by providing I-beams in series. T-steel sheet piles or linear steel sheet piles 3 are provided in series on the outer side of the steel wall body 1 by keeping a required space 't' therefrom through width fixing material 4, 5. Earth in the space inside the steel partition wall body composed of the steel wall body 1, the steel sheet pile 3 and the like is removed. Dowel reinforcements are placed on the steel wall body 1 after removing or leaving in place the width fixing material 4, 5 of the steel sheet piles 3. A composite wall body commonly used for a landslide protection is completed by placing concrete between the I-beams. A temporary sheathing work can be made unnecessary because a composite wall body can be constructed as sharing the earth pressure stress.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[産業上の利用分野]本発明は、基礎 地
下等における土留併用による合成壁体の構築工法に関す
るものである。
[Field of Industrial Application] The present invention relates to a method of constructing a synthetic wall body by using soil retention in a basement and the like.

【0002】[従来の技術]従来 各種鋼矢板 鋼管矢
板等を連接打設するか地下連続壁を構築するかして仮設
土留とし、さらにその内側空間を地下として利用する場
合土圧を全負担できるだけの壁厚を有する鉄筋コンクリ
ートで構築していた。
[Prior Art] Conventionally, various steel sheet piles Steel pipe sheet piles or the like are connected and cast or a continuous underground wall is constructed to make temporary earth retention, and if the inner space is used as underground, earth pressure can be fully borne. It was constructed of reinforced concrete with a wall thickness of.

【0003】[発明が解決しようとする課題]ところ
で、前記従来の技術では仮設としての各種土留壁を施工
する必要があるとともに各種土留に使用する鋼材は土圧
を負担するため断面係数の大きな鋼材が必要であり、本
体壁部の鉄筋コンクリートは土圧を全負担するため壁厚
が大きくなる。
[Problems to be Solved by the Invention] By the way, in the above-mentioned conventional techniques, it is necessary to construct various earth retaining walls as a temporary structure, and the steel materials used for various earth retaining materials bear earth pressure and therefore have a large section modulus. Since the reinforced concrete of the main body wall bears all earth pressure, the wall thickness becomes large.

【0004】[課題を解決するための手段]本発明は、
前記従来の問題を解決すべく開発したものであって、そ
の第1の要旨とするところは、壁体用鋼材を連続打設し
てなる鋼製壁体の内側空間を地下として利用するに当た
り、前記鋼製壁体の外側に所要の間隔を存して別個の壁
体用鋼材を連接設置して鋼製隔壁体となし、この鋼製隔
壁体と壁体用鋼材で土圧を分担負担することにある。
[Means for Solving the Problems] The present invention is
It was developed to solve the above-mentioned conventional problems, and the first gist thereof is to utilize the inner space of the steel wall body made by continuously casting the steel material for the wall body as the underground, Separate steel materials for wall bodies are connected to each other outside the steel wall body to form a steel partition wall body, and earth pressure is shared between the steel partition wall body and the steel material for wall body. Especially.

【0005】また本発明の第2の要旨とするところは、
壁体用鋼材としての各種I形鋼H形鋼を連続設置してな
る鋼製壁体の内側空間を地下として利用するに当たり、
鋼製隔壁体内側の土類を排除した後、ジベル筋を有する
鋼製壁体用鋼材間に鉄筋コンクリートを打設し鉄骨鉄筋
コンクリートとし応力を分担することにある。
The second gist of the present invention is as follows.
In using the inner space of the steel wall body, which is a series of various I-section steel and H-section steel as the steel material for wall bodies, as underground
After removing the earth inside the steel partition wall, reinforced concrete is placed between the steel materials for steel walls having gibber reinforcement to make the steel reinforced concrete and share the stress.

【0006】[作用]前記発明工法の如く、壁体用鋼材
は掘削中 隔壁体用鋼材との土圧分担材として、また構
築後は鉄筋コンクリートとの応力分担材として利用で
き、鉄骨鉄筋コンクリートとしての機能が果たせ、土留
併用の合成壁体の構築が可能となるため仮設土留工が不
要になる。
[Operation] As in the above-mentioned invention method, the steel for walls can be used as an earth pressure sharing material with the steel for partition walls during excavation, and can also be used as a stress sharing material with reinforced concrete after construction, and functions as a steel reinforced concrete. However, since it is possible to construct a composite wall that also uses earth retaining, temporary earth retaining work is not required.

【0007】[実施例]図2は、鋼製隔壁体の構築の図
である。I形鋼を連続設置してなる鋼製壁体(1)の内
側空間を利用するに当り、前記鋼製壁体の外側に所要の
間隔tを存して、T形鋼矢板又は直線形鋼矢板(3)を
幅止め材(4)(5)を介し連続設置して鋼製隔壁体
(2)となす構造の図である。図1は、本発明方法の第
1実施例を示す概略平面図であり、I形鋼を連続設置し
てなる鋼製壁体(1)の内側空間を利用するにあたり前
記鋼製壁体の外側に所要の間隔tを存してT形鋼矢板又
は直線形鋼矢板(3)を巾止め材(4)(5)を介して
連続設置し鋼製隔壁体(2)となしこの鋼製隔壁体
(2)の内側空間の土類を排除した後、T形鋼矢板
(3)の巾止め材(4)(5)を撤去又は存置した後
鋼製壁体(1)にジベル筋を設置し鋼製壁体鋼材間に鉄
筋を組立てコンクリートを打設し、鉄骨鉄筋コンクリー
トとした山留併用の合成壁体の構築工法の実施例であ
る。また前記鋼製隔壁体(2)のT形鋼矢板または直線
形鋼矢板(3)は鋼製隔壁体内側の土類を排除した後T
形鋼矢板 直線形鋼矢板(3)の内側に縁切工を施しコ
ンクリート打設後、コンクリートの硬化をまってセメン
トミルクを注入しながら引き抜いてもよいし、存置して
もよい。
[Example] FIG. 2 is a view showing the construction of a steel partition wall. When utilizing the inner space of the steel wall body (1) in which I-shaped steel is continuously installed, there is a required interval t outside the steel wall body, and a T-shaped sheet pile or a straight-shaped steel sheet. It is a figure of the structure which makes a steel partition wall (2) by installing a sheet pile (3) continuously through the width stop material (4) (5). FIG. 1 is a schematic plan view showing a first embodiment of the method of the present invention, and when utilizing the inner space of a steel wall body (1) in which I-shaped steel is continuously installed, the outside of the steel wall body is used. The T-shaped steel sheet pile or the straight-shaped steel sheet pile (3) is continuously installed via the width-stop members (4) and (5) at a required distance t to the steel partition wall body (2) without the steel partition wall. After removing the earth in the inner space of the body (2), and after removing or leaving the width stop members (4) and (5) of the T-shaped steel sheet pile (3)
This is an example of a construction method of a composite wall body in which steel pipes (1) are provided with gibber reinforcements, steel bars are assembled with steel bars between steel materials, and concrete is cast to make steel-framed reinforced concrete together with mountain retention. The T-shaped steel sheet pile or the straight-lined steel sheet pile (3) of the steel partition wall body (2) is removed after removing the earth inside the steel partition wall body.
Shaped Steel Sheet Pile After the straight-lined steel sheet pile (3) is subjected to edge cutting and concrete is poured, the concrete may harden and then the cement milk may be poured in or pulled out.

【0008】[実施例]図4は、鋼製隔壁体の構築の図
である。H形鋼を連続設置してなる鋼製壁体(1)の内
側空間を利用するに当り、前記鋼製壁体の外側に所要の
間隔tを存してT形鋼矢板または直線形鋼矢板(3)を
巾止め材(4)(5)を介し連続設置して鋼製隔壁体
(2)となす構造の図である。図3は、本発明方法の第
2実施例を示す概略平面図であり、H形鋼を連続設置し
てなる鋼製壁体(1)の内側空間を利用するにあたり、
前記鋼製壁体の外側に所要の間隔tを存してT形鋼矢板
又は直線形鋼矢板(3)を巾止め材(4)(5)を介し
て連続設置し鋼製隔壁体(2)となし、この鋼製隔壁体
(2)の内側空間の土類を排除した後、T形鋼矢板
(3)の巾止め材(4)(5)を撤去又は存置した後、
鋼製壁体(1)にジベル筋を設置、鋼製壁体鋼材間に鉄
筋を組立てコンクリートを打設し、鉄骨鉄筋コンクリー
トとした山留併用の合成壁体の構築工法の実施例であ
る。また前記鋼製隔壁体(2)のT形鋼矢板または直線
形鋼矢板(3)は鋼製隔壁体内側の土類を排除した後T
形鋼矢板 直線形鋼矢板(3)の内側に縁切工を施しコ
ンクリート打設後、コンクリートの硬化をまってセメン
トミルクを注入しながら引き抜いてもよいし、存置して
もよい。
[Example] FIG. 4 is a view showing the construction of a steel partition wall. When utilizing the inner space of the steel wall body (1) in which H-shaped steel is continuously installed, a T-shaped steel sheet pile or a straight-shaped steel sheet pile is provided outside the steel wall body with a required interval t. It is a figure of the structure which makes (3) the steel partition wall body (2) by continuously installing via the width stop material (4) (5). FIG. 3 is a schematic plan view showing a second embodiment of the method of the present invention, and in utilizing the inner space of the steel wall body (1) in which H-shaped steel is continuously installed,
A T-shaped steel sheet pile or a straight-shaped steel sheet pile (3) is continuously installed on the outer side of the steel wall body with a required interval t via width stop members (4) and (5) to form a steel partition wall body (2). ), After removing the earth in the inner space of the steel partition wall body (2), and after removing or leaving the width stoppers (4) and (5) of the T-shaped steel sheet pile (3),
This is an example of a method for constructing a composite wall body in which steel bars (1) are provided with gibber reinforcements, steel bars are assembled with steel bars between steel materials and concrete is cast to form steel-framed reinforced concrete, which is used in combination with mountain retention. The T-shaped steel sheet pile or the straight-lined steel sheet pile (3) of the steel partition wall body (2) is removed after removing the earth inside the steel partition wall body.
Shaped Steel Sheet Pile After the straight-lined steel sheet pile (3) is subjected to edge cutting to cast concrete, the hardening of the concrete may be performed and cement milk may be poured in or pulled out.

【0009】以上述べた本発明の如く鋼製隔壁体内の土
類を排除した後 鉄筋を組立てコンクリートを打設する
ことによりジベル筋を有する鋼製壁体と鉄筋コンクリー
トが一体化し、応力を分担し鉄骨鉄筋コンクリート構造
の合成壁体となる。
As described above, after removing the earth in the steel partition wall body and assembling the reinforcing bars and placing concrete, the steel wall body having the gibber reinforcement and the reinforced concrete are integrated, and the stress is shared by the steel frame. It becomes a composite wall of reinforced concrete structure.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の第1実施例を示す概略平面図である。FIG. 1 is a schematic plan view showing a first embodiment of the present invention.

【図2】本発明の鋼製隔壁体の構造概略平面図である。FIG. 2 is a schematic plan view of the structure of the steel partition wall of the present invention.

【図3】本発明の第2実施例を示す概略平面図である。FIG. 3 is a schematic plan view showing a second embodiment of the present invention.

【図4】本発明の鋼製隔壁体の構造概略平面図である。FIG. 4 is a schematic plan view of the structure of the steel partition wall of the present invention.

【符号の説明】[Explanation of symbols]

1 鋼製壁体 2 鋼製隔壁体 3 T形鋼矢板 直線形鋼矢板 4 巾止め材 5 〃 1 Steel wall body 2 Steel partition wall body 3 T-shaped steel sheet pile Linear steel sheet pile 4 Width stopper 5 〃

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 壁体用鋼材を連続設置してなる鋼製壁体
の内側空間を地下として利用するにあたり、前記鋼製壁
体の外側に、所要の間隔を存して別個の壁体用鋼材を連
接設置して鋼製隔壁体となし、この鋼製隔壁体を山留め
とし内側空間の土類を掘削排除したあと鋼製隔壁体内部
に壁部の鉄筋コンクリートを打設、鉄骨鉄筋コンクリー
トとすることを特徴とする土留併用による合成壁体の構
築工法。
1. When using an inner space of a steel wall body in which steel materials for wall bodies are continuously installed as underground, a separate wall body is provided outside the steel wall body at a required interval. Steel materials are connected to form a steel partition wall body, and this steel partition wall body is used as a mountain cleat to excavate and remove the earth in the inner space, and then the steel reinforced concrete of the wall part is placed inside the steel partition wall body to make steel reinforced concrete. The construction method of the synthetic wall by the combined use of soil retaining.
【請求項2】 前記鋼製壁体を構成する壁体用鋼材は、
各種I形鋼、H形鋼のいずれかであり、前記鋼製隔壁体
を構成する別個の壁体用鋼材は、T形鋼矢板およびまた
は直線形鋼矢板であることを特徴とする請求項1に記載
の土留併用による合成壁体の構築工法。
2. The steel material for wall bodies that constitutes the steel wall body,
It is one of various I-section steels or H-section steels, and the separate steel members for wall bodies constituting the steel partition walls are T-section steel sheet piles and / or straight-section steel sheet piles. Construction method of synthetic wall by combined use of soil retaining as described in.
【請求項3】 壁体用鋼材を連続設置してなる鋼製壁体
の内側空間を地下として利用するに当たり、前記の鋼製
隔壁体を土留として内側空間の土類を掘削排除したあと
壁体用鋼材としてのI形鋼 H形鋼にジベル筋を設置、
鉄筋を配筋しコンクリートを打設して鉄骨鉄筋コンクリ
ートとする土留併用による合成壁体の構築工法。
3. A wall body after excavating and removing earth in the inner space by using the steel partition wall as an earth retention when the inner space of the steel wall body in which steel materials for wall bodies are continuously installed is used as underground. Jibber reinforcement is installed on I-shaped steel and H-shaped steel as steel materials for
Construction method of composite wall by using soil retaining method to reinforce steel and cast concrete into steel reinforced concrete.
JP5231051A 1993-08-10 1993-08-10 Construction method of composite wall body Pending JPH0754336A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5231051A JPH0754336A (en) 1993-08-10 1993-08-10 Construction method of composite wall body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5231051A JPH0754336A (en) 1993-08-10 1993-08-10 Construction method of composite wall body

Publications (1)

Publication Number Publication Date
JPH0754336A true JPH0754336A (en) 1995-02-28

Family

ID=16917522

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5231051A Pending JPH0754336A (en) 1993-08-10 1993-08-10 Construction method of composite wall body

Country Status (1)

Country Link
JP (1) JPH0754336A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9087714B2 (en) 2010-09-01 2015-07-21 Ricoh Electronic Devices Co., Ltd. Semiconductor integrated circuit and semiconductor integrated circuit apparatus
CN120231328A (en) * 2025-05-30 2025-07-01 山东大学 A digital intelligent full-recovery multi-cycle deep foundation pit support structure and monitoring method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9087714B2 (en) 2010-09-01 2015-07-21 Ricoh Electronic Devices Co., Ltd. Semiconductor integrated circuit and semiconductor integrated circuit apparatus
CN120231328A (en) * 2025-05-30 2025-07-01 山东大学 A digital intelligent full-recovery multi-cycle deep foundation pit support structure and monitoring method

Similar Documents

Publication Publication Date Title
KR100313720B1 (en) Composite Underground Structure Construction Method
JPH06272267A (en) Method for utilizing soil cement post lined wall to built composite underground skeleton
JP4037187B2 (en) Underground structure construction method and underground structure
JP2001303584A (en) Connection structure between foundation pile head and footing
JPH0754336A (en) Construction method of composite wall body
JPH05179647A (en) Supporting structure for earth retaining wall
JP3832606B2 (en) Oval hollow cylinder
JPS6294617A (en) How to reinforce the outer wall of a building using retaining walls
JPH0258440B2 (en)
JP2605479B2 (en) Structure with eccentricity measures
JP2733722B2 (en) Construction method of deep foundation pile type retaining wall
JP2000192788A (en) Construction method for branch part of tunnel
JP2572680B2 (en) Underground structure by reverse strike method
JP7403390B2 (en) Synthetic structure and method of constructing the synthetic structure
JP3900684B2 (en) Construction method for underground structures
JP2693745B2 (en) How to build underground structures
JPH07103583B2 (en) Construction method for large span underground structure
JPH0369720A (en) Method of building annular beam for underground continuous wall
JPH02256800A (en) Composite segment
JPH02128018A (en) Construction of basement
CN118167350A (en) Spliced tunnel corrugated steel open cut tunnel structure and construction method
JPS60226917A (en) Underground excavation method
JPS63300111A (en) Construction of underground structure by underground continuous wall
JPS63312417A (en) Water construction of continuous wall using steel caisson
JPH0140183B2 (en)