JPH0757675B2 - How to install the elevator guide rail - Google Patents
How to install the elevator guide railInfo
- Publication number
- JPH0757675B2 JPH0757675B2 JP28576087A JP28576087A JPH0757675B2 JP H0757675 B2 JPH0757675 B2 JP H0757675B2 JP 28576087 A JP28576087 A JP 28576087A JP 28576087 A JP28576087 A JP 28576087A JP H0757675 B2 JPH0757675 B2 JP H0757675B2
- Authority
- JP
- Japan
- Prior art keywords
- side metal
- rail
- horizontal piece
- piece
- guide rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
- B66B7/024—Lateral supports
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、エレベータの乗りかご或いは釣合おもりを
案内するエレベータガイドレールの取付方法に関するも
のである。Description: TECHNICAL FIELD The present invention relates to a method for mounting an elevator guide rail for guiding a car or a counterweight of an elevator.
第3図,第4図は例えば実開昭55−11996号公報に示さ
れた従来のエレベータのガイドレールの取付部分を示し
ている。第3図,第4図においては、1はガイドレー
ル、2は水平片2cおよびこれと直角な垂直片2dを有する
アングル状のレール側金具であり、垂直片2dに孔2aが、
水平片2cにガイドレール1の奥行方向位置調整用の長孔
2bがそれぞれ形成されている。3はレールクリップ、4
はレールクリップ3およびレール側金具2の垂直片2dの
孔2aに挿通されるボルト、5はナット、6はばね座金で
あり、これらの部品によってガイドレール1がレール側
金具2の垂直片2dに固定されている。3 and 4 show a mounting portion of a guide rail of a conventional elevator shown in, for example, Japanese Utility Model Laid-Open No. 55-11996. In FIGS. 3 and 4, 1 is a guide rail, 2 is an angled rail-side metal fitting having a horizontal piece 2c and a vertical piece 2d perpendicular thereto, and a hole 2a is formed in the vertical piece 2d.
A long hole for adjusting the position of the guide rail 1 in the depth direction on the horizontal piece 2c
2b are formed respectively. 3 is a rail clip, 4
Is a bolt that is inserted into the hole 2a of the rail clip 3 and the vertical piece 2d of the rail-side metal fitting 2, 5 is a nut, and 6 is a spring washer. It is fixed.
7は水平片7cおよびこれと直角な垂直片7dを有するアン
グル状の壁側金具であり、垂直片7dにアンカボルト8の
ずれに対応する長孔7aが、また水平片7cにはガイドレー
ル1の前後方向位置調整用に長穴7bがそれぞれ形成され
ている。Reference numeral 7 is an angled wall side metal fitting having a horizontal piece 7c and a vertical piece 7d which is perpendicular to the horizontal piece 7c. The vertical piece 7d has a long hole 7a corresponding to the displacement of the anchor bolt 8, and the horizontal piece 7c has the guide rail 1 Slotted holes 7b are formed respectively for adjusting the position in the front-back direction.
9はナット、10はばね座金および平座金であり、これら
とアンカボルト8によって壁側金具7の垂直片7dが昇降
路壁11に固定されている。12は上記長孔2b,7bに挿通さ
れるボルト、13はナト、14はばね座金および平座金であ
り、これらの部品によって、壁側金具7の水平片7cと、
この水平片7c上に重ね合わされたレール側金具2の水平
片2cとが締付け固定されている。15はガイドレール1を
芯出しするための基準線であり、基準線15は昇降路の頂
部からピットまで個々のガイドレールごとに垂直に張ら
れている。16はレール側金具2と壁側金具7のずれを防
止するための溶接である。Reference numeral 9 is a nut, 10 is a spring washer and a flat washer, and the vertical piece 7d of the wall side metal fitting 7 is fixed to the hoistway wall 11 by these and the anchor bolt 8. 12 is a bolt that is inserted into the long holes 2b and 7b, 13 is a nut, 14 is a spring washer and a flat washer, and these parts enable the horizontal piece 7c of the wall side metal fitting 7 to
The horizontal piece 2c of the rail-side metal fitting 2 superposed on the horizontal piece 7c is fastened and fixed. Reference numeral 15 is a reference line for centering the guide rail 1, and the reference line 15 extends vertically from the top of the hoistway to the pit for each guide rail. Reference numeral 16 is welding for preventing the rail-side metal fitting 2 and the wall-side metal fitting 7 from being displaced.
次に、ガイドレールの取付方法について説明する。ま
ず、昇降路壁11におけるガイドレール1の固定に適する
位置にアンカボルト8を内込みなどによって固定し、こ
のアンカボルト8を壁側金具7の垂直片7dの長孔7aを嵌
め、ばね座金および平座金10,ナット9を用いて垂直片7
dを昇降路壁11に締付けることにより、壁側金具7を走
行路壁11に固定する。次に、レールクリップ3に挿通し
たボルト4をレール側金具2の垂直片2dに設けた孔2aに
嵌挿し、ナット5,ばね座金6を用い垂直片2dにガイドレ
ール1をレールクリップ3を介して締付ける。Next, a method of mounting the guide rail will be described. First, the anchor bolt 8 is fixed to the hoistway wall 11 at a position suitable for fixing the guide rail 1 by inserting the anchor bolt 8 into the long hole 7a of the vertical piece 7d of the wall-side metal fitting 7, and the spring washer and Vertical washer 10 with nut 9 and flat washer 7
The wall side metal fitting 7 is fixed to the traveling road wall 11 by tightening d on the hoistway wall 11. Next, the bolt 4 inserted into the rail clip 3 is fitted into the hole 2a provided in the vertical piece 2d of the rail-side metal fitting 2, and the guide rail 1 is inserted through the rail clip 3 into the vertical piece 2d using the nut 5 and the spring washer 6. Tighten.
そして、壁側金具7の水平片7cとレール側金具2の水平
片2cとを重ね合わせ、両水平片7c,2cに設けた長孔7b,2b
にボルト12を挿通し、ナット13,ばね座金および平座金1
4を用いて水平片7c,2cを仮固定し、基準線15からガイド
レール1までの寸法AおよびBを出してボルト12をさら
に締付ける。その後、レール側金具2の壁側金具7に対
するずれを防止するために、水平片2cと水平片7cとを溶
接16することにより、レール側金具2と壁側金具7とを
固定している。Then, the horizontal piece 7c of the wall-side metal fitting 7 and the horizontal piece 2c of the rail-side metal fitting 2 are overlapped with each other, and the long holes 7b, 2b provided in both the horizontal pieces 7c, 2c.
Insert bolt 12 into nut, nut 13, spring washer and plain washer 1
The horizontal pieces 7c and 2c are temporarily fixed using 4, and the dimensions A and B from the reference line 15 to the guide rail 1 are taken out and the bolt 12 is further tightened. Then, in order to prevent the rail-side metal fitting 2 from being displaced with respect to the wall-side metal fitting 7, the rail-side metal fitting 2 and the wall-side metal fitting 7 are fixed by welding 16 the horizontal piece 2c and the horizontal piece 7c.
上記のような従来のエレベータガイドレールの取付方法
では、壁側金具7とレール側金具2にボルト12を挿通す
る長孔7b,2bが互いに直交するようにそれぞれ形成され
ている。このため、例えば地震発生時には、ガイドレー
ル1に作用する地震時荷重によりボルト12が長孔7b,2b
の形状範囲内でずれるおそれがある。このような現象が
生ずると、壁側金具7とレール側金具2との位置にずれ
が生ずるので、このずれ防止のため各水平片7c,2cを溶
接により固定している。In the conventional method of mounting the elevator guide rail as described above, the long holes 7b, 2b through which the bolts 12 are inserted are formed in the wall-side metal fitting 7 and the rail-side metal fitting 2 so as to be orthogonal to each other. For this reason, for example, when an earthquake occurs, the bolts 12 may cause the bolts 12 to be elongated holes 7b, 2b due to the earthquake load acting on the guide rail 1.
There is a risk of deviation within the shape range of. When such a phenomenon occurs, the wall-side metal fitting 7 and the rail-side metal fitting 2 are displaced from each other. Therefore, in order to prevent the displacement, the horizontal pieces 7c and 2c are fixed by welding.
一方、近年、既設ビルデイングにおけるエレベータの撤
去新設工事が増加しているが、これらの既設ビルデイン
グでは火災防止のため火気使用が制限される場合が多
い。このため、溶接作業の出来ない現場が多くなり、こ
れらの現場では上記の方法が採用できない問題があっ
た。On the other hand, in recent years, new construction work for removing elevators from existing building has increased, but in these existing building, fire use is often restricted to prevent fire. Therefore, there are many sites where welding work cannot be performed, and there is a problem that the above method cannot be adopted at these sites.
また、溶接可能な場合でも、溶接時に発生する溶接熱で
レール側金具2および壁側金具7が変形するためガイド
レール1の取付精度が変化し、結局、エレベータの乗り
心地が悪くなる等の問題点があった。Further, even when welding is possible, since the rail-side metal fitting 2 and the wall-side metal fitting 7 are deformed by the welding heat generated at the time of welding, the mounting accuracy of the guide rail 1 is changed, and eventually the riding comfort of the elevator is deteriorated. There was a point.
この発明は、係る問題点を解決するためになされたもの
で、熱が発生する溶接作業を行うことなく、レール側金
具および壁側金具の位置ずれ防止を可能としたエレベー
タガイドレールの取付方法を得ることができる。The present invention has been made to solve the above problems, and provides an elevator guide rail mounting method capable of preventing the rail-side metal fittings and the wall-side metal fittings from being displaced without performing heat-generating welding work. Obtainable.
この発明にかあるエレベータガイドレールの取付方法
は、水平片およびこれと直角な垂直片を有する壁側金具
の上記垂直片を昇降路壁に締結し、水平片およびこれと
直角な垂直片を有するレール側金具の上記垂直片にガイ
ドレールを締結し、その後該レール側金具の水平片を上
記壁側金具の水平片に重ね合わせ位置決めして、上記各
水平片の長孔に挿通したボルトを締付けて上記壁側金具
に上記レール側金具を締結した後、上記一方の水平片が
上記他方の水平片に食い込むダボ出しを行ったものであ
る。An elevator guide rail mounting method according to the present invention includes a horizontal piece and a vertical piece perpendicular to the horizontal piece, which is fastened to a hoistway wall, and has a horizontal piece and a vertical piece perpendicular to the hoistway wall. Fasten the guide rail to the vertical piece of the rail-side metal fitting, then position the horizontal piece of the rail-side metal fitting on the horizontal piece of the wall-side metal fitting, position it, and tighten the bolts inserted into the long holes of each horizontal piece. After the rail-side metal fitting is fastened to the wall-side metal fitting, the one horizontal piece bites into the other horizontal piece to form a dowel.
この発明においては、平温状態で各水平片に機械的圧力
を加え、一方の水平片が他方の水平片に食い込むダボ出
しを行っているので、各水平片は互いに固定される。In the present invention, mechanical pressure is applied to each horizontal piece in a normal temperature state, and one horizontal piece engages with the other horizontal piece to form a dowel, so that the horizontal pieces are fixed to each other.
従って、地震発生時の荷重がガイドレールに作用しても
レール側金具および壁側金具に位置ずれが生じることが
ない。Therefore, even if a load is applied to the guide rail when an earthquake occurs, the rail-side metal fitting and the wall-side metal fitting are not displaced.
以下、この発明の一実施例を第1図および第2図を参照
して詳細に説明する。An embodiment of the present invention will be described in detail below with reference to FIGS. 1 and 2.
なお、この実施例では、上記従来例と同一ないし均等な
部材,部位には同一符号を付してその説明を省略する。In this embodiment, the same or equivalent members and parts as those in the above-mentioned conventional example are designated by the same reference numerals, and the description thereof will be omitted.
この発明に係るエレベータガイドレールの取付方法で
は、昇降路壁11におけるガイドレール1の固定に適する
位置にアンカボルト8の打ち込みなどによって固定し、
このアンカボルト8を壁側金具7の垂直片7dの長孔7aに
嵌め、ばね座金および平座金10,ナット9を用いて垂直
片7dを昇降路壁11に固定する。In the method for mounting the elevator guide rail according to the present invention, the anchor rail 8 is fixed to the hoistway wall 11 at a position suitable for fixing the guide rail 1, and the like.
The anchor bolt 8 is fitted into the elongated hole 7a of the vertical piece 7d of the wall-side metal fitting 7, and the vertical piece 7d is fixed to the hoistway wall 11 using the spring washer, the flat washer 10 and the nut 9.
次に、レールクリップ3に挿通したボルト4をレール側
金具2の垂直片2dに設けた孔2aに嵌挿し、ばね座金6,ナ
ット5を用い垂直片2dにガイドレール1をレールクリッ
プ3を介して締付ける。そして、壁側金具7の水平片7c
とレール側金具2の水平片2cとを重ね合わせ、水平片7
c,2cに設けた長孔7b,2bにボルト12を挿通し、図示しな
いばね座金および平座金,ナットを用いて水平片7c,2を
仮固定し、基準線15からガイドレール1までの寸法Aお
よびBを出してボルト12をさらに締付ける。Next, the bolt 4 inserted into the rail clip 3 is fitted into the hole 2a provided in the vertical piece 2d of the rail side metal fitting 2 and the guide rail 1 is inserted through the rail clip 3 into the vertical piece 2d using the spring washer 6 and the nut 5. Tighten. And the horizontal piece 7c of the wall side metal fitting 7
And the horizontal piece 2c of the rail side metal fitting 2 are overlapped, and the horizontal piece 7
Insert the bolt 12 into the long holes 7b, 2b provided in c, 2c, temporarily fix the horizontal pieces 7c, 2 using spring washers, plain washers, and nuts not shown, and measure from the reference line 15 to the guide rail 1. Take out A and B and further tighten the bolt 12.
次に、図示しないプレス等により水平片2cに凹面2eと凸
形ダボ2fとを形成し、水平片7cには凸形ダボ2fが食い込
む凹面7eと、凹面7eに対応する凸形ダボ7fとを形成する
ダボ出し20を行う。このダボ出し20は水平片2cの左右両
側に行われる。Next, a concave surface 2e and a convex dowel 2f are formed on the horizontal piece 2c by a not-shown press or the like, and the horizontal piece 7c has a concave surface 7e into which the convex dowel 2f bites and a convex dowel 7f corresponding to the concave surface 7e. The forming dowel 20 is formed. The dowel projecting 20 is performed on both left and right sides of the horizontal piece 2c.
上記のようなエレベータガイドレールの取付方法では、
水平片2cの凸形ダボ2fが水平片7cの凹面7eに食い込むの
で、水平片2cと水平片7cとは互いに強く強調される。In the above elevator guide rail mounting method,
Since the convex dowel 2f of the horizontal piece 2c bites into the concave surface 7e of the horizontal piece 7c, the horizontal piece 2c and the horizontal piece 7c are strongly emphasized to each other.
従って、地震発生時の荷重がガイドレール1に作用して
もレール側金具2および壁側金具7には位置ずれは生じ
ない。Therefore, even if the load when the earthquake occurs acts on the guide rail 1, the rail-side metal fitting 2 and the wall-side metal fitting 7 are not displaced.
この発明は以上説明したとおり、壁側金具にレール側金
具を締結した後、一方の水平片は他方の水平片に食い込
むダボ出しを行うことにより、各水平片は互いに強く固
定される。従って地震発生器における地震時荷重がガイ
ドレールに作用してもレール側金具,壁側金具には相互
の位置ずれは生じない。しかも、溶接作業が不要なので
火気使用が制限される既設ビルデイングでも使用可能な
効果がある。また、溶接熱による部材の変形は発生しな
いので、ガイドレールを高精度に所定位置に取付けられ
る。従って、エレベータの乗り心地が悪くならない効果
がある。また、工事は機械的作業のみで行えるので工事
が簡素化する効果がある。As described above, according to the present invention, after the rail-side metal fittings are fastened to the wall-side metal fittings, one horizontal piece engages with the other horizontal piece to form a dowel, whereby the horizontal pieces are firmly fixed to each other. Therefore, even if the earthquake load of the earthquake generator acts on the guide rail, the rail-side metal fittings and the wall-side metal fittings will not be displaced from each other. Moreover, since welding work is not required, it can be used even in an existing building where the use of fire is restricted. Further, since the member is not deformed by the heat of welding, the guide rail can be attached at a predetermined position with high accuracy. Therefore, there is an effect that the riding comfort of the elevator is not deteriorated. Moreover, since the construction can be performed only by mechanical work, the construction can be simplified.
第1図はこの発明の一実施例を示す平面図、第2図は第
1図のII−II線矢視断面図、第3図,第4図は従来例を
示し、第3図は平面図、第4図は正面図である。 1……ガイドレール、2……レール側金具、2b……長
孔、2c……水平片、2d……垂直片、7……壁側金具、7b
……長孔、7c……水平片、7d……垂直片、12……ボル
ト、20……ダボ出し。 なお、図中同一符号は同一又は相当部分を示す。1 is a plan view showing an embodiment of the present invention, FIG. 2 is a sectional view taken along the line II-II in FIG. 1, FIGS. 3 and 4 show a conventional example, and FIG. 3 is a plan view. FIG. 4 and FIG. 4 are front views. 1 ... Guide rail, 2 ... Rail side metal fitting, 2b ... Long hole, 2c ... Horizontal piece, 2d ... Vertical piece, 7 ... Wall side metal fitting, 7b
...... Long hole, 7c ...... Horizontal piece, 7d ...... Vertical piece, 12 ...... Bolt, 20 ...... Dowel out. The same reference numerals in the drawings indicate the same or corresponding parts.
Claims (1)
壁側金具の上記垂直片を昇降路壁に締結し、水平片およ
びこれと直角な垂直片を有するレール側金具の上記垂直
片にガイドレールを締結し、その後該レール側金具の水
平片を上記壁側金具の水平片に重ね合わせて位置決め
し、上記各水平片の長孔に挿通したボルトを締付けて上
記壁側金具に上記レール側金具を締付けた後、上記一方
の水平片が上記他方の水平片に食い込むダボ出しを行っ
たことを特徴とするエレベータガイドレールの取付方
法。1. A vertical piece of a wall-side metal fitting having a horizontal piece and a vertical piece perpendicular to the horizontal piece is fastened to a hoistway wall, and is attached to the vertical piece of a rail-side metal piece having a horizontal piece and a vertical piece perpendicular thereto. Fasten the guide rail, then position the horizontal piece of the rail side fitting on the horizontal piece of the wall side fitting, position it, and tighten the bolts inserted into the long holes of each horizontal piece to fix the rail to the wall side fitting. A method for mounting an elevator guide rail, characterized in that after tightening the side fitting, the one horizontal piece engages with the other horizontal piece to form a dowel.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28576087A JPH0757675B2 (en) | 1987-11-12 | 1987-11-12 | How to install the elevator guide rail |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28576087A JPH0757675B2 (en) | 1987-11-12 | 1987-11-12 | How to install the elevator guide rail |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01127588A JPH01127588A (en) | 1989-05-19 |
| JPH0757675B2 true JPH0757675B2 (en) | 1995-06-21 |
Family
ID=17695697
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP28576087A Expired - Lifetime JPH0757675B2 (en) | 1987-11-12 | 1987-11-12 | How to install the elevator guide rail |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0757675B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04182289A (en) * | 1990-11-16 | 1992-06-29 | Mitsubishi Electric Corp | Fixing device of elevator guide rail |
| JP6800900B2 (en) * | 2018-02-26 | 2020-12-16 | 東芝エレベータ株式会社 | Elevator guide rail fixing device and its fixing method |
-
1987
- 1987-11-12 JP JP28576087A patent/JPH0757675B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01127588A (en) | 1989-05-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH1181487A (en) | T bolt support and its installation method | |
| JPH0757675B2 (en) | How to install the elevator guide rail | |
| JP2943812B2 (en) | Pillar structure | |
| JPH04182289A (en) | Fixing device of elevator guide rail | |
| JP4698805B2 (en) | Elevator car equipment | |
| JPH01127586A (en) | Guide rail bracket for elevator | |
| JPH06102510B2 (en) | Elevator guide rail device | |
| JPH0122806Y2 (en) | ||
| JPH01321282A (en) | Device for fixing guide rail of elevator | |
| JP2816046B2 (en) | Guide rail mounting device | |
| JPS644884Y2 (en) | ||
| JPH044108Y2 (en) | ||
| JPH0114614Y2 (en) | ||
| JPS6328319Y2 (en) | ||
| JPH03177287A (en) | Supporter for guide rail | |
| JPH0343297Y2 (en) | ||
| JPH0416857Y2 (en) | ||
| JP2529684Y2 (en) | Railway rail fixture | |
| JPH07315725A (en) | Elevator counterweight | |
| JPH056309Y2 (en) | ||
| JPH0447287Y2 (en) | ||
| JPH0762887A (en) | Beam holding structure under post/beam installation structure | |
| JPH019847Y2 (en) | ||
| JPS6397586A (en) | How to install elevator guide rails | |
| JP2813367B2 (en) | Mounting hardware and precast concrete panels |