JPH0764257B2 - Train rescheduling plan creation device - Google Patents

Train rescheduling plan creation device

Info

Publication number
JPH0764257B2
JPH0764257B2 JP60244652A JP24465285A JPH0764257B2 JP H0764257 B2 JPH0764257 B2 JP H0764257B2 JP 60244652 A JP60244652 A JP 60244652A JP 24465285 A JP24465285 A JP 24465285A JP H0764257 B2 JPH0764257 B2 JP H0764257B2
Authority
JP
Japan
Prior art keywords
train
plan
change
station
timetable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP60244652A
Other languages
Japanese (ja)
Other versions
JPS62103256A (en
Inventor
喜代俊 駒谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP60244652A priority Critical patent/JPH0764257B2/en
Publication of JPS62103256A publication Critical patent/JPS62103256A/en
Publication of JPH0764257B2 publication Critical patent/JPH0764257B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] この発明は、列車運行管理システムにおける列車運転整
理案作成装置に関するものである。
[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a train operation replanning plan preparation device in a train operation management system.

[従来の技術] 従来、大部分の鉄道会社では指令員が紙に書かれた列車
ダイヤ図を見ながら駅設備,走行時間などから判断して
整理案を作成していた。
[Prior Art] Conventionally, in most railway companies, a dispatcher created a rearrangement plan by judging from station equipment, running time, etc., while looking at a train diagram drawn on paper.

一方、整理案を作成するための準備段階として国鉄新幹
線においてのみ運行管理システムの一部として、指令員
に列車の待避案を提案するものがあった。
On the other hand, as part of the operation management system only on the JNR Shinkansen as a preparatory step for preparing a rearrangement plan, there was one that proposed a train retreat plan to the dispatcher.

[発明が解決しようとする問題点] しかしながら、前者の場合、経験的な知識に対する依存
度が高く、熟練を要する作業であり、必ずしも常に最適
な運転整理を行える保証がなかった。また、ダイヤ乱れ
時に、指令員は遅延状況の把握,整理案の作成,指令の
伝達などの多くの作業を短時間で行わなければならず、
しかも判断を誤ると復旧が遅れて乗客にも多大な迷惑を
かけることになっていた。
[Problems to be Solved by the Invention] However, in the former case, the work is highly dependent on empirical knowledge and requires skill, and there is no guarantee that optimal operation rescheduling will always be possible. In addition, when the schedule is disturbed, the ordering staff has to carry out a lot of work such as grasping the delay situation, preparing a schedule, and transmitting the order in a short time.
Moreover, incorrect judgment would delay recovery and cause a great deal of inconvenience to passengers.

また、後者の場合、待避駅を変更した場合に、それによ
って生じる待避列車と通過列車の遅延時間の和から判断
する方式であり、局所的にはそれで良くても全列車の運
行を考えれば適切でない場合も多く、また、待避関係の
変更だけで運休,振替などの運行整理は行えず実用的で
はなかった。
In the latter case, when the evacuation station is changed, it is a method of judging from the sum of the delay times of the evacuation train and the passing train caused by it, and even if it is good locally, it is appropriate considering the operation of all trains. In many cases, it was not practical because it was not possible to arrange operations such as suspension or transfer simply by changing the evacuation relationship.

最近では、運行管理システムの導入などにより、遅延状
況の把握と指令の伝達はかなり自動化されつつあるが、
運転整理案の作成は指令員にとっていまだに大きな負担
となっている。
Recently, due to the introduction of operation management system, etc., the grasp of delay situation and the transmission of commands have been considerably automated,
Creating a rescheduling plan is still a heavy burden on the dispatcher.

この発明は上記のような従来のものの欠点を除去するた
めになされたもので、常に全列車の運行を考えながら待
避変更,振替,運用変更,運休を含めた運転整理案を作
成し、そのシミュレーション結果を表示することによっ
て、運転整理案作成時の指令員の負担を軽減でき、かつ
計画ダイヤに復旧する時間を短縮することができる列車
運転整理案作成装置を提供することを目的とするもので
ある。
The present invention has been made to eliminate the above-mentioned drawbacks of the conventional ones, and while always considering the operation of all trains, a rescheduling plan including a change of shelter, a transfer, a change of operation, and suspension of operation is prepared and its simulation is performed. By displaying the result, it is an object of the present invention to provide a train operation rescheduling plan preparation device that can reduce the burden on the dispatcher when preparing a rescheduling plan and can shorten the time to restore the schedule. is there.

[問題点を解決するための手段] 本発明の列車運転整理案作成装置は、時間などの情報を
入力してシミュレーション結果を出力するシミュレータ
1と、このシミュレータ1に接続され、各列車ごとに待
避駅の変更,振替などの列車運行に対する変更可能性と
その変更を行うための条件を記録したダイヤデータベー
ス2と、上記シミュレータ1に接続された表示装置3と
を有して成り、上記シミュレータ1は、列車運行が乱れ
たとき、発生した遅延時間を運転開始時間,あるいは予
想される運転再開時間などを上記情報として入力して、
運転再開後一切の運行の変更を行わずに運行した場合の
予測ダイヤを求め、この得られた予測ダイヤから、列車
の待避駅の繰上げ可能性と待避関係の依存性とを求めて
待避液の待避案を作成するとともに、この作成された待
避案に対して各駅での遅延列車群の遅れを求めながら、
上記ダイヤデータベース2に記憶されている運行変更の
ための条件を比較して、ダイヤ変更案を作成し、さらに
この作成されたダイヤ変更案に対して、列車運行の将来
予測と,遅延時間等の評価量とを上記シミュレーション
結果として求めて上記表示装置3に出力し、運転整理案
として表示させる。
[Means for Solving Problems] The train operation rescheduling plan creating apparatus of the present invention is a simulator 1 that inputs information such as time and outputs a simulation result, and is connected to this simulator 1 to save each train. The simulator 1 comprises a diamond database 2 that records the possibility of changing train operations such as station changes and transfers and the conditions for making such changes, and a display device 3 connected to the simulator 1. , When the train operation is disturbed, enter the delay time that has occurred as the operation start time or the expected operation restart time as the above information,
After obtaining the forecast timetable for the case where the train was operated without any change in operation after restarting the operation, from this obtained forecast timetable, the possibility of moving up the train shelter station and the dependency of the shelter relationship were calculated. While creating a rescue plan, while seeking the delay of the delayed train group at each station for this created rescue plan,
The conditions for changing trains stored in the above-mentioned train database 2 are compared with each other to prepare a plan for changing trains. Further, with respect to the prepared plan for changing trains, future prediction of train operation, delay time, etc. The evaluation amount and the simulation result are obtained and output to the display device 3 to be displayed as a rescheduling plan.

[作用] 列車運行が乱れたとき、発生した遅延時間と運転開始時
間,あるいは予想される運転再開時間などが情報として
シミュレータ1に入力される。これによりシミュレータ
1は、まず、運転再開後一切の運行の変更を行わずに運
行した場合の予測ダイヤを求める。次に、この予測ダイ
ヤから、列車の待避駅の繰上げ可能性と待避関係の依存
性とを求めて待避駅の待避案を作成する。次に、この上
記待避案に対して各駅での遅延列車群の遅れを求めなが
ら、ダイヤデータベース2に記憶されている運行変更の
ための条件を比較して、ダイヤ変更案を作成する。最後
に、このダイヤ変更案に対して、列車運行の将来予測と
遅延時間等の評価量とを求める。そしてシミュレータ1
は、シミュレーション結果である将来予測と評価量とを
表示装置3に出力し、運転整理案として表示させる。
[Operation] When train operation is disturbed, the generated delay time and operation start time, or expected operation restart time are input to the simulator 1 as information. As a result, the simulator 1 first obtains a prediction diagram when the vehicle is operated without any change of operation after the operation is restarted. Next, the evacuation plan of the evacuation station is created by obtaining the possibility of moving up the evacuation station of the train and the dependency of the evacuation relationship from this prediction diagram. Next, while obtaining the delay of the delayed train group at each station with respect to the evacuation plan, the conditions for changing the operation stored in the timetable database 2 are compared to create a timetable change plan. Finally, the future prediction of train operation and the evaluation amount such as delay time are calculated for this timetable change plan. And simulator 1
Outputs the future prediction and the evaluation amount, which are simulation results, to the display device 3 and displays them as a rescheduling plan.

[実施例] 以下図面に基づいて本発明の一実施例を説明する。[Embodiment] An embodiment of the present invention will be described below with reference to the drawings.

第1図は、列車運転整理案作成装置のブロック図であ
る。第1図において、1はシミュレータ、2は各列車ご
とに待避駅の変更,振替などの列車運行に対する変更可
能性とその変更を行うための条件を記録したダイヤデー
タベース、3は表示装置である。尚、ダイヤデータベー
ス2と表示装置3はシミュレータ1に接続されている。
FIG. 1 is a block diagram of a train operation replanning plan creating apparatus. In FIG. 1, reference numeral 1 is a simulator, 2 is a diagram database that records the possibility of changing train operations such as changing train stations for each train, and the conditions for making such changes, and 3 is a display device. The diamond database 2 and the display device 3 are connected to the simulator 1.

シミュレータ1は、列車運行が乱れたとき、発生した遅
延時間と運転開始時間,あるいは予想される運転再開時
間などを情報として入力して、運転再開後一切の運行の
変更を行わずに運行した場合の予測ダイヤを求め、この
得られた予測ダイヤから、列車の待避駅の繰上げ可能性
と待避関係の依存性とを求めて待避駅の待避案を作成す
るとともに、この作成された待避案に対して各駅での遅
延列車群の遅れを求めながら、上記ダイヤデータベース
2に記憶されている運行変更のための条件を比較して、
ダイヤ変更案を作成し、さらにこの作成されたダイヤ変
更案に対して、列車運行の将来予測と,遅延時間等の評
価量とを上記シミュレーション結果として求めて上記表
示装置3に出力し、運転整理案として表示させるもので
ある。
When the train operation is disturbed, the simulator 1 inputs the generated delay time and operation start time, or expected operation restart time as information, and operates without any change of operation after operation restart The demand schedule of the train station is calculated from the obtained train schedule and the possibility of moving up the train station and the dependency of the train relation are calculated. While comparing the conditions for operation changes stored in the above-mentioned timetable database 2 while obtaining the delay of the delayed train group at each station,
The schedule change plan is created, and the future prediction of train operation and the evaluation amount such as the delay time are obtained as the simulation result for the created schedule change plan, and are output to the display device 3 for rescheduling. It is displayed as a plan.

次に本発明による列車運転整理案作成装置の動作を第1
図,及び第2図に示すフローチャートを参照しながら詳
しく説明する。
Next, the operation of the train operation rescheduling plan creating apparatus according to the present invention will be described first.
This will be described in detail with reference to the drawings and the flowchart shown in FIG.

はじめに、例えばI駅でJ列車の出発あるいは到着が10
分遅れたというように、発生した遅延と運転開始時間と
が情報としてシミュレータ1に与えられると(ステップ
S1)、シミュレータ1はまず、運転再開後一切の運行の
変更を行わずに運行した場合の予測ダイヤを求める(ス
テップS2)。次に、シミュレータ1は、上記求めた予測
ダイヤから、遅延をおこした列車及びその後に遅延のお
きた駅を計画ダイヤより遅れて通過あるいは停車する列
車を遅延列車群に設定するとともに、待避関係を計画ダ
イヤ通りの時刻に実施できるもの(これの集合をTとす
る)と、遅れが生じるもの(これの集合をFとする)に
分類する(ステップS3)。ここで、集合Tの待避関係だ
けを変更すれば遅延時間はより増加するだけである。従
って、運転整理が少なくとも一切の変更を行わない場合
よりは遅延時間の短い整理案を作成することを目的とす
る以上、集合Fの待避関係のみを変更の対象とすればよ
い。そして、変更した後の予測ダイヤで集合Tの待避関
係がやはり計画ダイヤ通りに実施できれば、集合Tの待
避関係を変更の対象から除外してもよかったことが保証
される。さらに、集合Fの待避関係を次の2つに分類す
る(ステップS4)。
At the beginning, for example, 10 departures or arrivals of J trains at station I
If the generated delay and the operation start time are given to the simulator 1 as information such as the delay by a minute (step
S1), the simulator 1 first obtains a prediction diagram when the vehicle operates without any change in operation after the operation is restarted (step S2). Next, the simulator 1 sets, from the above-obtained predicted timetables, trains that are delayed or trains that pass or stop later than the planned timetable in the delayed train group, and set the evacuation relationship. It is classified into those that can be implemented at the time according to the plan schedule (the set of which is T) and those that cause a delay (the set of which is F) (step S3). Here, if only the saving relationship of the set T is changed, the delay time only increases. Therefore, for the purpose of creating a rescheduling plan with a shorter delay time than when the operation rescheduling does not make at least any change, only the evacuation relationship of the set F needs to be changed. Then, if the evacuation relationship of the set T can still be implemented according to the planned timetable in the changed forecast timetable, it is guaranteed that the evacuation relationship of the set T may be excluded from the change target. Further, the saving relationship of the set F is classified into the following two (step S4).

集合F1 繰上げ可能 集合F2 繰上げ不可能 集合F1は上記遅延列車群が先行列車との間で待つ待避関
係であり、繰上げ(待避駅を列車の進行する方向にある
他の駅に変更すること)を行わないと、先行列車が計画
より長い時間通過列車を待たなければならなくなる。こ
れは、その通過列車の遅れが決まれば、駅設備と列車の
走行条件から、どの駅で待避すれば遅延時間が最小にな
るか決定できる。
Set F1 can be moved up Set F2 cannot be moved up Set F1 is a shunting relationship in which the above-mentioned delayed train group waits with the preceding train, and shunting (changing the shunting station to another station in the direction in which the train is traveling) Otherwise, the preceding train will have to wait longer than planned for the passing train. If the delay of the passing train is determined, it can be determined at which station the delay time should be minimized from the station equipment and the running conditions of the train.

また、集合F2は集合F1以外の待避関係であり、これはさ
らに次の2つに分類される(ステップS5)。
Further, the set F2 has a saving relationship other than the set F1, and this is further classified into the following two (step S5).

集合F2−1 依存関係あり 集合F2−2 依存関係なし ここで、依存関係があるとは、待避関係を持つ2本の列
車がそれぞれその待避関係より時間的に前に、集合Fに
属する待避関係を持っている場合をさす。つまり、依存
関係を持つ待避関係も、繰上げ可能な待避関係と同様
に、それ以前の待避関係を固定してやると駅設備と列車
の走行条件から、どの駅で待避すれば遅延時間が最小に
なるかが決定できる。以上のことにより、待避案作成に
おいては、一意的に決定できない集合F2−2の待避関係
についてのみ、各待避関係について駅設備と遅延発生時
刻とから、どの駅まで待避を繰下げられるかを求めて、
複数個の待避案を作成する(ステップS6)。
Set F2-1 Dependence relationship Set F2-2 Dependence relationship Here, there is a dependence relationship that two trains having a shunting relationship belong to the set F before the shunting relationship in time. If you have In other words, even if the evacuation relationship that has a dependency relationship is similar to the evacuation relationship that can be carried forward, if the evacuation relationship before that is fixed, at which station the delay time will be the minimum if the evacuation relationship is saved based on the station equipment and train running conditions. Can be determined. Due to the above, in the creation of a save plan, only for the save relationship of the set F2-2 that cannot be uniquely determined, for each save relationship, the station equipment and the delay occurrence time are used to determine to which station the save can be postponed. ,
Create a plurality of evacuation plans (step S6).

次に、シミュレータ1は、上記のように作成された各待
避案に対して、各駅での遅延列車群の遅れを求めながら
(ステップS7)、ダイヤデータベース1に記録されてい
るダイヤ変更のための条件と照合を行い、条件が合えば
待避駅の変更,振替,運用変更,運休を行い(ステップ
S8)、ダイヤ変更案を作成する(ステップS9)。ダイヤ
データベース1には、例えば、I列車はK1駅でJ列車を
待避するが、J列車のK駅着がt1秒遅れるならば、K2駅
で待避するよう変更する,というように、各列車ごとに
待避駅の変更,振替,列車運用に対する変更可能性とそ
のための条件を記録しておく。この条件は、駅設備や走
行条件から決められるが、熟練した指令員の経験的知識
をもとに各列車の使命などを考慮して書きかえてもよ
い。
Next, the simulator 1 obtains the delay of the delayed train group at each station for each of the escape plans created as described above (step S7), and changes the timetable recorded in the timetable database 1 Check the conditions, and if the conditions are met, change the evacuation station, transfer, change the operation, or cancel the operation (step
S8), to create a schedule change plan (step S9). In the timetable database 1, for example, the I train evacuates the J train at the K1 station, but if the J train arrives at the K station is delayed by t1 seconds, it is changed to the K2 station. Record the possibility of changing the transfer station, transfer, and train operation and the conditions for that. This condition is determined based on station equipment and running conditions, but may be rewritten in consideration of the mission of each train based on the empirical knowledge of a skilled dispatcher.

次に、シミュレータ1は、上記のように作成されたダイ
ヤ変更案に対して列車ダイヤが予測する(ステップS1
0)とともに、遅延時間・正常ダイヤへの復帰時刻・ダ
イヤ変更件数・遅延列車本数などの評価量が計算し(ス
テップS11)、これら計算結果を表示装置3に出力して
運転整理案として表示させる(ステップS12)。
Next, the simulator 1 predicts the train schedule for the schedule change plan created as described above (step S1).
Along with 0), evaluation amounts such as delay time, time to return to normal schedule, number of timetable changes, number of delayed trains, etc. are calculated (step S11), and these calculation results are output to the display device 3 and displayed as a rescheduling plan. (Step S12).

このように、遅延発生後の予測ダイヤを求めて、繰上げ
可能性および依存性という概念を導入することにより、
検討すべき待避関係の数を大幅にしぼることができ、そ
の待避案にもとづくダイヤ変更案を短時間で作成するこ
とが可能となった。これにより、指令員は各ダイヤ変更
案に対する予測列車ダイヤと評価量をもとにして最も適
した運転整理案を採用すればよい。
In this way, by obtaining the prediction diagram after the delay occurs and introducing the concept of carry-over possibility and dependency,
It is possible to significantly reduce the number of evacuation relations to be considered, and it is possible to create a schedule change plan based on the evacuation plan in a short time. Accordingly, the dispatcher may adopt the most suitable operation rescheduling plan based on the estimated train schedule and the evaluation amount for each schedule change plan.

ただし上記実施例では、駅での着発時刻の遅延について
説明したが、路線上にある線路区間の不通あるいは一時
的な速度制限による遅延についても同様に処理できる。
また、ダイヤデータベース1は、I列車がある駅で可能
なダイヤ変更とその条件を記憶したものであるから、以
上の説明で述べた待避駅の変更・振替・運用変更以外に
例えば途中駅での運行打ち切り,入庫などのダイヤ変更
も同様に設定することができる。
However, in the above embodiment, the delay of the arrival and departure time at the station has been described, but the delay due to the interruption of the line section on the route or the temporary speed limitation can be similarly processed.
In addition, the timetable database 1 stores the timetable changes and the conditions that can be performed at a station with an I train. Therefore, in addition to the change, transfer, and operation change of the evacuation station described above, for example, at an intermediate station. It is possible to set the timetable changes such as suspension of operation and warehousing.

なお以上は、入力された遅延と運転開始時間に対して運
転整理案を作成する場合について説明したが、この発明
はこれに限らず既存の運行管理システムに組込んで、常
時は列車運行の監視結果から現在位置を確認・更新し、
遅延発生時に動作し遅延後の予想運転開始時間だけを入
力すれば運転整理案を作成・表示するといった方法も考
えられる。このとき、シミュレーション結果および評価
量から自動判断させることで運転整理の無人化に使用し
てもよい。また、今後は熟練者の不足が予想されること
から、指令員の教育用に使用してもよい。
In the above, the case of creating a traffic rescheduling plan for the input delay and operation start time has been described, but the present invention is not limited to this, and can be incorporated into an existing operation management system to constantly monitor train operation. Check and update the current position from the result,
It is possible to create and display a rescheduling plan by operating when a delay occurs and inputting only the expected operation start time after the delay. At this time, it may be used for unmanned operation rescheduling by automatically determining from the simulation result and the evaluation amount. Further, since it is expected that there will be a shortage of skilled persons in the future, it may be used for education of the dispatcher.

[発明の効果] 以上説明したようにこの発明の列車運転整理案作成装置
は、各列車ごとに待避駅の変更,振替などの列車運行に
対する変更可能性とその変更を行うための条件を記録し
たダイヤデータベースと、表示装置と、列車運行が乱れ
たとき、発生した遅延時間と運転開始時間,あるいは予
想される運転再開時間などを情報として入力して、運転
再開後一切の運行の変更を行わずに運行した場合の予測
ダイヤを求め、この得られた予測ダイヤから、列車の待
避駅の繰上げ可能性と待避関係の依存性とを求めて待避
駅の待避案を作成するとともに、この作成された待避案
に対して各駅での遅延列車群の遅れを求めながら、上記
ダイヤデータベースに記憶されている運行変更のための
条件を比較して、ダイヤ変更案を作成し、さらにこの作
成されたダイヤ変更案に対して、列車運行の将来予測
と,遅延時間等の評価量とを上記シミュレーション結果
として求めて上記表示装置に出力し、運転整理案として
表示させるシミュレータとを備えて成るので、運転整理
を行う指令員の負担は大幅に軽減され、正常ダイヤに復
旧するまでの時間を短縮できる。従って、列車運行の乱
れが乗客へ及ぼす影響も軽減される。また、指令員の教
育や運転整理の自動化による省力化への効果も大きい。
[Effects of the Invention] As described above, the train operation rescheduling plan creating apparatus of the present invention records the possibility of changing train operations, such as the change of the shelter station and the transfer of each train, and the conditions for making the change. When the train database is disturbed by the timetable database, display device and train operation, input the delay time and operation start time, or expected operation restart time, etc. as information and do not change the operation at all after restarting operation. The forecast schedule for when the train was operated was calculated, and from this obtained forecast diagram, the escape plan for the train station was created along with the possibility of raising the train station and the dependency of the train relationship. While seeking the delay of the train group delayed at each station in response to the evacuation plan, compare the conditions for operation changes stored in the above timetable database to create a timetable change plan For the proposed timetable change plan, a future prediction of train operation and an evaluation amount such as delay time are obtained as the simulation results, output to the display device, and displayed as a rescheduling plan. The load on the dispatcher who carries out operation rescheduling is greatly reduced, and the time required to restore the normal schedule can be shortened. Therefore, the influence of train operation disturbance on passengers is also reduced. In addition, there is a great effect on labor saving by educating the dispatcher and automating the rescheduling.

【図面の簡単な説明】[Brief description of drawings]

第1図はこの発明による列車運転整理案作成装置のブロ
ック図、第2図はシミュレータの動作を説明したフロー
チャート図である。 図において、1はシミュレータ、2はダイヤデータベー
ス、3は表示装置である。
FIG. 1 is a block diagram of a train operation rescheduling plan preparation device according to the present invention, and FIG. 2 is a flowchart diagram explaining the operation of the simulator. In the figure, 1 is a simulator, 2 is a diamond database, and 3 is a display device.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】時間などの情報を入力してシミュレーショ
ン結果を出力するシミュレータ1と、このシミュレータ
1に接続され、各列車ごとに待避駅の変更,振替などの
列車運行に対する変更可能性とその変更を行うための条
件を記録したダイヤデータベース2と、上記シミュレー
タ1に接続された表示装置3とを有し、 上記シミュレータ1は、列車運行が乱れたとき、発生し
た遅延時間と運転開始時間,あるいは予想される運転再
開時間などを上記情報として入力して、運転再開後一切
の運行の変更を行わずに運行した場合の予測ダイヤを求
め、この得られた予測ダイヤから、列車の待避駅の繰上
げ可能性と待避関係の依存性とを求めて待避液の待避案
を作成するとともに、この作成された待避案に対して各
駅での遅延列車群の遅れを求めながら、上記ダイヤデー
タベース2の記憶されている運行変更のための条件を比
較して、ダイヤ変更案を作成し、さらにこの作成された
ダイヤ変更案に対して、列車運行の将来予測と,遅延時
間等の評価量とを上記シミュレーション結果として求め
て上記表示装置3に出力し、運転整理案として表示させ
ることを特徴とする列車運転整理案作成装置。
1. A simulator 1 for inputting information such as time and outputting a simulation result, and a possibility of change in train operation such as a change of shelter station or transfer for each train and its change. The simulator 1 has a time-series database 2 which records conditions for performing the above, and a display device 3 connected to the simulator 1. The simulator 1 has a delay time and an operation start time which occur when train operation is disturbed, or Enter the expected restart time, etc. as the above information and obtain a forecast timetable for when the train is operated without any change in operation after the restart of the operation. From the obtained forecast timetable, advance the train shelter station In addition to creating a solution plan for the solution to save the possibility and dependency of the relationship, the delay of the train group delayed at each station should not be calculated for the created solution plan. However, by comparing the stored conditions for changing trains in the timetable database 2, a timetable change plan is created, and the future schedule of train operation and delay time are prepared for the created timetable change plan. A train rescheduling plan preparation device, characterized in that an evaluation amount such as is calculated as the simulation result and is output to the display device 3 to be displayed as a rescheduling plan.
JP60244652A 1985-10-31 1985-10-31 Train rescheduling plan creation device Expired - Lifetime JPH0764257B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60244652A JPH0764257B2 (en) 1985-10-31 1985-10-31 Train rescheduling plan creation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60244652A JPH0764257B2 (en) 1985-10-31 1985-10-31 Train rescheduling plan creation device

Publications (2)

Publication Number Publication Date
JPS62103256A JPS62103256A (en) 1987-05-13
JPH0764257B2 true JPH0764257B2 (en) 1995-07-12

Family

ID=17121932

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60244652A Expired - Lifetime JPH0764257B2 (en) 1985-10-31 1985-10-31 Train rescheduling plan creation device

Country Status (1)

Country Link
JP (1) JPH0764257B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019172142A (en) * 2018-03-29 2019-10-10 株式会社日立製作所 Operation arrangement support system and operation arrangement support method

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0223003A (en) * 1988-07-12 1990-01-25 Hitachi Ltd Operation supporting system for rolling stock
JP2645092B2 (en) * 1988-08-04 1997-08-25 株式会社東芝 Automatic operation management system
CN115071786B (en) * 2022-06-28 2024-08-06 交控科技股份有限公司 Train operation simulation method and device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5924671B2 (en) * 1977-06-03 1984-06-11 三菱電機株式会社 Complex cyanide processing equipment
JPS59176159A (en) * 1983-03-24 1984-10-05 三菱電機株式会社 Service arrangement schedule preparation device
JPS60174359A (en) * 1984-02-20 1985-09-07 株式会社日立製作所 Train operation control system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019172142A (en) * 2018-03-29 2019-10-10 株式会社日立製作所 Operation arrangement support system and operation arrangement support method

Also Published As

Publication number Publication date
JPS62103256A (en) 1987-05-13

Similar Documents

Publication Publication Date Title
US5390880A (en) Train traffic control system with diagram preparation
CN112883640B (en) Digital Twin Station System, Operation Scheduling Method and Application Based on the System
WO2016017740A1 (en) Interlocking device
JP5019240B2 (en) Diamond evaluation device
Berrebi et al. Translating research to practice: Implementing real-time control on high-frequency transit routes
JP7458811B2 (en) Crew working time calculation system
JP2015013487A (en) Train operation control system, train operation simulation device, and train operation simulation method
WO2016017739A1 (en) Interlocking device
JP4670081B2 (en) Operation planning plan creation device
JP4943982B2 (en) Station and vehicle base premises replacement plan creation device
JP2010221839A (en) Train operation prediction device
JPH09315310A (en) Train operation management device
JPH0764257B2 (en) Train rescheduling plan creation device
JP4573661B2 (en) Distributed train operation management system and control method thereof
JP2018090137A (en) Vehicle operation support system
JP2007118674A (en) Driving arrangement support system and driving arrangement support method
JP2004243857A (en) Crew operation arrangement support device and crew operation arrangement support method
JPS62143762A (en) Automatic train rescheduling plan creation method
JP2800657B2 (en) Bus operation management method and bus operation display method
JP2000095111A (en) Train schedule creation device by thinning and train automatic course control device
Prasad et al. Optimising indian railways infrastructure by AI
JP3458222B2 (en) Traffic coordination support device
JPH0858592A (en) Operation arrangement support device
JP2001206224A (en) Automatic course control device
JPH05286440A (en) Passenger guidance control system

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term