JPH0791196A - Segment feeder - Google Patents
Segment feederInfo
- Publication number
- JPH0791196A JPH0791196A JP5238339A JP23833993A JPH0791196A JP H0791196 A JPH0791196 A JP H0791196A JP 5238339 A JP5238339 A JP 5238339A JP 23833993 A JP23833993 A JP 23833993A JP H0791196 A JPH0791196 A JP H0791196A
- Authority
- JP
- Japan
- Prior art keywords
- segment
- carriage
- segments
- hoist
- erector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
(57)【要約】
【目的】 セグメントの供給時間の短縮化と、セグメン
ト台車の待ち時間の短縮化を図ったセグメント供給装置
を提供する。
【構成】 ホイスト10により搬送されたセグメント3
をエレクタ4へ供給するためのセグメント供給装置にお
いて、ホイスト10の放荷位置14とこれと所定距離L
離れたエレクタ4の受荷位置15との間に、少なくとも
1リング分以上の複数のセグメント3が環状に載せられ
る載置台16を設け、該載置台16に、各セグメント3
をそれぞれ独立に支持して循環させる循環台車20を設
けたことを特徴としている。
(57) [Summary] [Purpose] To provide a segment supply device which shortens the segment supply time and the segment waiting time. [Structure] Segment 3 conveyed by hoist 10
In the segment supply device for supplying the electric charge to the erector 4, the unloading position 14 of the hoist 10 and a predetermined distance L
A mounting table 16 on which a plurality of segments 3 of at least one ring or more are mounted in an annular shape is provided between the remote loading position 15 of the erector 4, and each segment 3 is mounted on the mounting table 16.
It is characterized in that a circulating carriage 20 is provided for independently supporting and circulating.
Description
【0001】[0001]
【産業上の利用分野】本発明は、トンネルの内壁を構築
するエレクタにセグメントを供給するためのセグメント
供給装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a segment supply device for supplying a segment to an erector that constructs an inner wall of a tunnel.
【0002】[0002]
【従来の技術】図3に示すように、シールド掘進機aに
より掘削された掘孔の内面には、エレクタbによってセ
グメントcが張設され、トンネル内壁が構築されること
になる。従来、このエレクタbへのセグメントcの供給
は、次のようになされていた。2. Description of the Related Art As shown in FIG. 3, a segment c is stretched by an erector b on the inner surface of a hole excavated by a shield machine a to construct an inner wall of a tunnel. Conventionally, the supply of the segment c to the erector b has been performed as follows.
【0003】まず、セグメント台車dに載せられたセグ
メントcが、トンネル入口部からトンネル奥部に搬送さ
れる。そして、掘進機aがセグメントcの1リング分掘
り進んだ後、セグメント台車d上のセグメントcをホイ
ストeで吊り下げて前方へ移動させ、エレクタbの後方
に設けられた供給装置fにセットする。その後、供給装
置fのセグメントcをプッシャーgによってエレクタb
に向けて押し出し、もってエレクタbへのセグメントc
の供給が達成される。First, the segment c placed on the segment carriage d is conveyed from the tunnel entrance to the tunnel interior. Then, after the excavator a digs one ring of the segment c, the segment c on the segment carriage d is hung by the hoist e and moved forward, and is set in the supply device f provided behind the erector b. . After that, the segment c of the supply device f is moved by the pusher g to the elector b.
Segment toward the erector b.
Supply is achieved.
【0004】[0004]
【発明が解決しようとする課題】しかし、上述の如きシ
ステムにあっては、エレクタbへセグメントcを供給す
る際に、セグメント台車d上のセグメントcをホイスト
eで吊下して1個づつ供給装置fにセットしているの
で、例えば1リング6ピースのセグメントcならホイス
トeをセグメント台車d−供給装置f間で6往復させな
ければならず、セグメントcの供給時間が長時間とな
る。よって、工期が遅延する。However, in the system as described above, when the segments c are supplied to the erector b, the segments c on the segment carriage d are hung by the hoist e and supplied one by one. Since it is set in the device f, for example, in the case of the segment c of 1 ring 6 pieces, the hoist e has to be reciprocated 6 times between the segment carriage d and the supply device f, and the supply time of the segment c becomes long. Therefore, the construction period is delayed.
【0005】また、セグメント台車d上の全てのセグメ
ントcをホイストe及び供給装置fでエレクタbに受け
渡すまでセグメント台車dを待機させなければならず、
トンネル入口部とトンネル奥部とを往復運行するセグメ
ント台車dの待ち時間が長くなってしまう。すなわち、
セグメント台車dは、その上に載せられた全てのセグメ
ントcがエレクタbに供給されなければ、トンネル入口
部に戻せない。よって、セグメント台車dの運行ダイヤ
が拘束され、特に長距離施工時に不利となる。Further, the segment carriage d must wait until all the segments c on the segment carriage d are delivered to the erector b by the hoist e and the supply device f,
The waiting time of the segment carriage d that travels back and forth between the tunnel entrance and the tunnel interior becomes long. That is,
The segment carriage d cannot be returned to the tunnel entrance unless all the segments c placed on it are supplied to the erector b. Therefore, the operation schedule of the segment carriage d is restricted, which is disadvantageous especially in long-distance construction.
【0006】以上の事情を考慮して創案された本発明の
目的は、セグメントの供給時間の短縮化と、セグメント
台車の待ち時間の短縮化を図ったセグメント供給装置を
提供することにある。An object of the present invention, which has been devised in view of the above circumstances, is to provide a segment supply device which shortens the segment supply time and the segment carriage waiting time.
【0007】[0007]
【課題を解決するための手段】上記目的を達成するため
に本発明は、ホイストにより搬送されたセグメントをエ
レクタへ供給するためのセグメント供給装置において、
ホイストの放荷位置とこれと所定距離離れたエレクタの
受荷位置との間に、少なくとも1リング分以上の複数の
セグメントが環状に載せられる載置台を設け、該載置台
に、各セグメントをそれぞれ独立に支持して循環させる
循環台車を設けたことを特徴としている。In order to achieve the above-mentioned object, the present invention provides a segment supply device for supplying a segment carried by a hoist to an erector.
A mounting table on which a plurality of segments of at least one ring or more are mounted in an annular shape is provided between the hoist unloading position and the erector receiving position separated from the hoist by a predetermined distance, and each segment is mounted on the mounting table. It is characterized by the provision of a circulating carriage that supports and circulates independently.
【0008】[0008]
【作用】ホイストから載置台に放荷されたセグメント
は、循環台車によって載置台上を循環させられ、順次エ
レクタ側に荷詰められる。このようにして載置台上に少
なくとも1リング分以上の複数のセグメントが組立順に
環状に載せられる。そして、このようにストレージされ
たセグメントを順次連続的にエレクタに供給する。これ
により、セグメント供給時間が大幅に短縮化される。The segments discharged from the hoist to the mounting table are circulated on the mounting table by the circulation carriage and sequentially loaded on the erector side. In this way, a plurality of segments of at least one ring or more are annularly placed on the mounting table in the order of assembly. Then, the segments thus stored are sequentially and continuously supplied to the erector. This greatly reduces the segment supply time.
【0009】また、上記ホイストには、トンネル入口側
から走行してきたセグメント台車上のセグメントが供給
されることになるが、本発明にあっては上記載置台に1
リング分以上の複数のセグメントを纏めて載せることが
できるので、セグメント台車上の全てのセグメントを載
置台に載せ換えることができる。よって、空になったセ
グメント台車を速やかにトンネル入口側に返走させるこ
とができ、セグメント台車の運行ダイヤが楽になる。Further, the segment on the segment truck that has traveled from the tunnel entrance side is supplied to the hoist.
Since it is possible to collectively mount a plurality of segments equal to or more than the ring, it is possible to replace all the segments on the segment carriage on the mounting table. Therefore, the emptied segment trolley can be quickly returned to the tunnel entrance side, and the operation schedule of the segment trolley becomes easier.
【0010】また、載置台上に載せられたセグメントが
損傷した場合や、セグメントの組立順序を変更する場合
には、循環台車によって各セグメントを適宜循環させる
ことにより損傷セグメントの戻しや組立順序の変更を行
う。Further, when the segments placed on the mounting table are damaged or when the assembly order of the segments is changed, the circulating cart circulates each segment as appropriate to return the damaged segments or change the assembly order. I do.
【0011】[0011]
【実施例】以下に本発明の一実施例を添付図面に基づい
て説明する。An embodiment of the present invention will be described below with reference to the accompanying drawings.
【0012】図1および図2に示すように、シールド掘
進機1のシールドフレーム2内に、セグメント3を組み
立てるエレクタ4が設けられている。エレクタ4は、シ
ールド径と同芯的に回転するリング体5と、リング体5
の中心に直角に取り付けられた伸縮自在なテレスコピッ
ク支柱6と、テレスコピック支柱6の先端に取り付けら
れ径方向に移動するアーム7体と、アーム体7の先端に
取り付けられ実質的にセグメント3を把持する把持部8
とからなっている。As shown in FIGS. 1 and 2, in the shield frame 2 of the shield machine 1, an erector 4 for assembling the segments 3 is provided. The erector 4 includes a ring body 5 that rotates concentrically with the shield diameter, and a ring body 5
The telescopic support column 6 attached at right angles to the center of the arm, the arm 7 attached to the tip of the telescopic support column 6 and moving in the radial direction, and attached to the end of the arm body 7 to substantially grip the segment 3. Gripping part 8
It consists of
【0013】エレクタ4の後方には、トンネル入口側か
ら走行してきたセグメント台車9上のセグメント3を前
方へ搬送するホイスト10が設けられている。ホイスト
10は、トンネルの長手方向に沿って配置されたホイス
トビーム11に係合して移動する移動体12と、移動体
12から吊り下げられセグメント3を引っ掛けるフック
13とからなっている。他方、セグメント台車9は2両
編成となっており、これらに1リング分のセグメント3
が載せられるようになっている。具体的には各台車9に
3個づつ計6個のセグメント3が載せられる。この2両
編成のセグメント台車9がトンネル入口部とトンネル奥
部とを往復することになる。A hoist 10 for transporting the segment 3 on the segment truck 9 traveling from the tunnel entrance side to the front is provided behind the erector 4. The hoist 10 includes a moving body 12 that moves by engaging with a hoist beam 11 arranged along the longitudinal direction of the tunnel, and a hook 13 that is hung from the moving body 12 and hooks the segment 3. On the other hand, the segment trolley 9 has a two-car train, and one segment of this segment 3
Can be posted. Specifically, a total of six segments 3 are mounted on each carriage 9, three in total. The segment carriage 9 of the two-car train reciprocates between the tunnel entrance and the tunnel back.
【0014】上記ホイスト10の放荷位置14とこれと
所定距離L離れたエレクタ4の受荷位置15との間に
は、少なくとも1リング分以上の複数のセグメント3が
環状に載せられる載置台16が配置されている。本実施
例にあっては載置台16上に1リング分のセグメント3
を載せるようにしているので、6個のセグメント3が載
せられる。載置台16は、陸上競技のトラック型に形成
されており、その外縁には所定高さ壁状の外側ループガ
イド17が設けられ、内縁には同様の内側ループガイド
18が設けられている。これら外側および内側ループガ
イド17,18で囲まれた循環路19には、各セグメン
ト3がそれぞれ独立に支持し、循環路19内を循環する
6個の循環台車20が設けられている。Between the unloading position 14 of the hoist 10 and the unloading position 15 of the erector 4 which is separated from the hoist 10 by a predetermined distance L, a plurality of segments 3 of at least one ring or more are placed in a ring shape on a mounting table 16. Are arranged. In this embodiment, one ring of segment 3 is placed on the mounting table 16.
Since 6 are mounted, 6 segments 3 can be mounted. The mounting table 16 is formed as a track-type track-type, and has an outer loop guide 17 having a wall shape of a predetermined height at its outer edge and a similar inner loop guide 18 at its inner edge. The circulation path 19 surrounded by the outer and inner loop guides 17 and 18 is provided with six circulation carriages 20 that each segment 3 independently supports and circulates in the circulation path 19.
【0015】循環台車20は、外側または内側ループガ
イド17,18にその周方向に沿って設けられたラック
(図示せず)に噛合するピニオン(図示せず)を有して
おり、かかるラック&ピニオンによって循環路19内を
自走するようになっている。循環台車20の自走方式
は、これに限らず例えば台車20の車輪25を回転させ
て前進させ、台車20の両側部にループガイド17,1
8に当接して進行方向を変えるガイドローラを設けても
よい。上記循環台車20の上面には、セグメント3を支
持すると共にそのセグメント3を回転させるターンテー
ブル21が設けられている。なお、図中、22は既設セ
グメント3に当接されその反力で掘進機1を推進させる
シールドジャッキ、23は掘進機1の前進に伴って載置
台16を牽引する牽引ワイヤ、24は載置台16のコ
ロ、25は循環台車20の車輪である。The circulating carriage 20 has a pinion (not shown) which meshes with a rack (not shown) provided on the outer or inner loop guides 17, 18 along the circumferential direction thereof. The pinion is designed to be self-propelled in the circulation path 19. The self-propelled method of the circulating carriage 20 is not limited to this, for example, the wheels 25 of the carriage 20 are rotated and moved forward, and the loop guides 17, 1 are provided on both sides of the carriage 20.
It is also possible to provide a guide roller that comes into contact with 8 and changes the traveling direction. A turntable 21 that supports the segment 3 and rotates the segment 3 is provided on the upper surface of the circulation cart 20. In the figure, 22 is a shield jack that abuts on the existing segment 3 to propel the excavator 1 with its reaction force, 23 is a pulling wire that pulls the mounting table 16 as the excavator 1 moves forward, and 24 is a mounting table. The rollers 16 and 25 are wheels of the circulating carriage 20.
【0016】以上の構成からなる本実施例の作用につい
て述べる。The operation of this embodiment having the above configuration will be described.
【0017】1リング分の6個のセグメント3は、2両
編成のセグメント台車9に載せられトンネル入口部から
トンネル奥部に搬送される。そして、ホイスト10に順
次吊り下げれて前方に移送され、90度回転させられた後
に放荷位置14において載置台16の最後尾の循環台車
20上に放荷される。このセグメント3は、循環台車2
0の走行によって載置台16上の循環路19を循環させ
られ、順次エレクタ4側に荷詰められる。このとき、循
環台車20の進行方向の関係上、横置きされたセグメン
ト3が自動的に縦置き状態となる。このようにして載置
台16上に1リング分6個のセグメント3がその組立順
に環状に載せられる(ストレージされる)。The six segments 3 for one ring are placed on the segment carriage 9 of the two-car train and conveyed from the tunnel entrance to the back of the tunnel. Then, the hoist 10 is sequentially suspended, transported forward, rotated by 90 degrees, and then unloaded at the unloading position 14 on the rearmost circulating carriage 20 of the mounting table 16. This segment 3 is a circulating truck 2
When the vehicle travels 0, it is circulated in the circulation path 19 on the mounting table 16 and sequentially loaded on the erector 4 side. At this time, due to the traveling direction of the circulating carriage 20, the horizontally placed segment 3 is automatically placed in the vertically placed state. In this way, the six segments 3 for one ring are annularly placed (stored) on the mounting table 16 in the order of assembly.
【0018】そして、載置台16上にストレージしたセ
グメント3を、循環台車20を循環させることにより順
次連続的にエレクタ4に供給する。すなわち、エレクタ
4は、そのテレスコピック支柱6を伸長させて把持部8
を受荷位置15まで伸ばし、載置台16の最先頭に位置
する循環台車20上のセグメント3を把持する。このと
きセグメント3のヨー角が把持部8に対してズレている
ときには、ターンテーブル21を回転させることによっ
て修正する。その後、テレスコピック支柱6を収縮させ
て把持したセグメント3を破線で示すセグメント組立位
置まで引き寄せ、リング体5を回転させて周方向に移動
させ、アーム体7を作動させて径方向に移動させて所望
の組立位置にセグメント3を嵌め込む。Then, the segments 3 stored on the mounting table 16 are sequentially and continuously supplied to the erector 4 by circulating the circulation carriage 20. That is, the erector 4 extends the telescopic support pillar 6 to hold the grip portion 8
Is extended to the load receiving position 15, and the segment 3 on the circulating carriage 20 located at the top of the mounting table 16 is gripped. At this time, when the yaw angle of the segment 3 deviates from the grip portion 8, it is corrected by rotating the turntable 21. After that, the telescopic support column 6 is contracted to draw the grasped segment 3 to the segment assembly position shown by the broken line, the ring body 5 is rotated to move in the circumferential direction, and the arm body 7 is operated to move in the radial direction to obtain the desired position. The segment 3 is fitted in the assembly position of.
【0019】このようにエレクタ4の直後に1リング分
のセグメント3をストレージするようにしたので、図3
に示すようにセグメント台車d上のセグメントcをホイ
ストeおよび供給装置fを介して1個づつエレクタbに
供給していた従来の供給装置よりもセグメント供給時間
を大幅に短縮化できる。また、セグメント3の連続供給
が可能となるので、掘進機1の推進とセグメント3の組
立とを同時に行う同時掘進工法等の高速施工に適する。As described above, since the segment 3 for one ring is stored immediately after the elector 4, as shown in FIG.
As shown in (3), the segment supply time can be significantly shortened as compared with the conventional supply device in which the segments c on the segment carriage d are supplied to the erector b one by one via the hoist e and the supply device f. Further, since the segment 3 can be continuously supplied, it is suitable for high-speed construction such as the simultaneous excavation method in which the propulsion of the excavator 1 and the assembly of the segment 3 are simultaneously performed.
【0020】また、上記ホイスト10には、トンネル入
口側から走行してきたセグメント台車9上の6個のセグ
メント3が順次供給されることになるが、本実施例にあ
っては上記載置台16に1リング分6個のセグメント3
を纏めて載せることができるので、セグメント台車9上
の全てのセグメント3を載置台16に載せ換えることが
できる。よって、空になったセグメント台車9を速やか
にトンネル入口側に返走させることができ、トンネル内
を往復動するセグメント台車9の運行ダイヤが楽にな
る。つまり、セグメント台車9の待ち時間を短縮化でき
る。Further, the six segments 3 on the segment carriage 9 traveling from the tunnel entrance side are sequentially supplied to the hoist 10, but in the present embodiment, the above-mentioned mounting table 16 is used. 6 segments for 1 ring 3
Since all of the segments 3 on the segment carriage 9 can be mounted on the mounting table 16 because they can be collectively mounted. Therefore, the emptied segment carriage 9 can be quickly returned to the tunnel entrance side, and the operation schedule of the segment carriage 9 that reciprocates in the tunnel becomes easy. That is, the waiting time of the segment cart 9 can be shortened.
【0021】また、載置台16上に載せられたセグメン
ト3が損傷した場合や、セグメント3の組立順序を変更
する場合には、循環台車20によって各セグメント3を
適宜循環させることにより行う。すなわち、損傷したセ
グメント3はそれを支持する循環台車20によって載置
台16の最後尾に移動させられ、ホイスト10でセグメ
ント台車9に戻される。セグメント3の組立順序を変更
するときは、セグメント3を載せた循環台車20を適宜
時計廻り或いは反時計廻りに循環させて行う。セグメン
ト3の方向(ヨー角)を偏向させるときには、セグメン
ト3を載せた循環台車20のターンテーブル21を回転
させて行う。When the segments 3 placed on the mounting table 16 are damaged or the order of assembling the segments 3 is changed, the circulation cart 20 appropriately circulates the respective segments 3. That is, the damaged segment 3 is moved to the rearmost position of the mounting table 16 by the circulation carriage 20 supporting the damaged segment 3 and returned to the segment carriage 9 by the hoist 10. When changing the assembly order of the segments 3, the circulation carriage 20 on which the segments 3 are mounted is appropriately circulated clockwise or counterclockwise. The deflection of the direction (yaw angle) of the segment 3 is performed by rotating the turntable 21 of the circulation carriage 20 on which the segment 3 is placed.
【0022】[0022]
【発明の効果】以上説明したように本発明に係るセグメ
ント供給装置によれば次の如き優れた効果を発揮でき
る。As described above, the segment feeding device according to the present invention can exert the following excellent effects.
【0023】(1) セグメントの供給時間を短縮化でき
る。(1) The segment supply time can be shortened.
【0024】(2) セグメント台車の待ち時間を短縮化で
きる。(2) The waiting time of the segment truck can be shortened.
【0025】(3) 損傷セグメントの戻しや組立順序の変
更ができる。(3) The damaged segment can be returned and the assembly order can be changed.
【図1】本発明の一実施例を示すセグメント供給装置の
平面図である。FIG. 1 is a plan view of a segment supply device showing an embodiment of the present invention.
【図2】上記セグメント供給装置の側面図である。FIG. 2 is a side view of the segment supply device.
【図3】従来例を示すセグメント供給装置の側面図であ
る。FIG. 3 is a side view of a segment supply device showing a conventional example.
【符号の説明】 3 セグメント 4 エレクタ 10 ホイスト 14 放荷位置 15 受荷位置 16 載置台 20 循環台車 L 所定距離[Explanation of Codes] 3 segment 4 Electa 10 Hoist 14 Unloading position 15 Receiving position 16 Placement table 20 Circulating trolley L Predetermined distance
Claims (1)
エレクタへ供給するためのセグメント供給装置におい
て、ホイストの放荷位置とこれと所定距離離れたエレク
タの受荷位置との間に、少なくとも1リング分以上の複
数のセグメントが環状に載せられる載置台を設け、該載
置台に、各セグメントをそれぞれ独立に支持して循環さ
せる循環台車を設けたことを特徴とするセグメント供給
装置。1. A segment supply device for supplying a segment transported by a hoist to an erector, wherein at least one ring or more is provided between the hoist unloading position and the erector receiving position separated from the hoist by a predetermined distance. The segment supply device is provided with a mounting base on which a plurality of segments are mounted in an annular shape, and a circulating carriage for independently supporting and circulating each segment is provided on the mounting base.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23833993A JP3221175B2 (en) | 1993-09-24 | 1993-09-24 | Segment feeder |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23833993A JP3221175B2 (en) | 1993-09-24 | 1993-09-24 | Segment feeder |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0791196A true JPH0791196A (en) | 1995-04-04 |
| JP3221175B2 JP3221175B2 (en) | 2001-10-22 |
Family
ID=17028737
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP23833993A Expired - Fee Related JP3221175B2 (en) | 1993-09-24 | 1993-09-24 | Segment feeder |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3221175B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09256797A (en) * | 1996-03-26 | 1997-09-30 | Kajima Corp | Segment transfer method and segment transfer device |
-
1993
- 1993-09-24 JP JP23833993A patent/JP3221175B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH09256797A (en) * | 1996-03-26 | 1997-09-30 | Kajima Corp | Segment transfer method and segment transfer device |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3221175B2 (en) | 2001-10-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2001200700A (en) | Segment transport method and device for small diameter shield | |
| JP3221175B2 (en) | Segment feeder | |
| JP3063045B2 (en) | Segment feeder for tunnel lining | |
| JP3098475B2 (en) | Segment supply method and segment supply device | |
| JPH09150918A (en) | Three dimensional storage facility for container | |
| JPS6025321B2 (en) | Barrel handling equipment | |
| JPS6019602A (en) | Transferring apparatus for handling object | |
| JP3763367B2 (en) | Segment loading device and segment loading method | |
| JP3038355B2 (en) | Segment feeder | |
| JPH10114287A (en) | Bicycle transfer equipment | |
| JPH10220055A (en) | Planar reciprocation type parking device | |
| JP4019506B2 (en) | Automated warehouse for vehicle storage | |
| JPH10131695A (en) | Segment transfer equipment in shield construction | |
| JP3238207B2 (en) | Segment feeder | |
| JP5063574B2 (en) | Segment carrying-in assembly method and segment carrying-in assembly facility | |
| JPS6039323Y2 (en) | Conveyance device | |
| JP4331058B2 (en) | Segment transshipment transport apparatus and transport method for shield tunnel | |
| JPH0266300A (en) | Segment supply equipment | |
| JPH10184292A (en) | Segment feeder | |
| JP3210604B2 (en) | Transport trolley operating device | |
| JP3765128B2 (en) | Segment transport device | |
| JPH06294299A (en) | Segment feeding device | |
| JPH0640553A (en) | Conveying facility using hanger | |
| JPH07208096A (en) | Segment loading device | |
| JP2001349195A (en) | Hardware mounting system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |