JPH0810052B2 - Ash melting furnace - Google Patents

Ash melting furnace

Info

Publication number
JPH0810052B2
JPH0810052B2 JP16650492A JP16650492A JPH0810052B2 JP H0810052 B2 JPH0810052 B2 JP H0810052B2 JP 16650492 A JP16650492 A JP 16650492A JP 16650492 A JP16650492 A JP 16650492A JP H0810052 B2 JPH0810052 B2 JP H0810052B2
Authority
JP
Japan
Prior art keywords
ash
bottom wall
melting
wall portion
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP16650492A
Other languages
Japanese (ja)
Other versions
JPH0611127A (en
Inventor
美智男 石田
英雄 下谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanadevia Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP16650492A priority Critical patent/JPH0810052B2/en
Priority to SG1995002377A priority patent/SG44372A1/en
Priority to US08/078,721 priority patent/US5320050A/en
Priority to EP93109570A priority patent/EP0575874B1/en
Priority to DK93109570.7T priority patent/DK0575874T3/en
Priority to DE69313195T priority patent/DE69313195T2/en
Priority to AT93109570T priority patent/ATE157070T1/en
Priority to CN93107413A priority patent/CN1043075C/en
Priority to CNB981196063A priority patent/CN1163691C/en
Priority to KR1019930011620A priority patent/KR970003610B1/en
Publication of JPH0611127A publication Critical patent/JPH0611127A/en
Publication of JPH0810052B2 publication Critical patent/JPH0810052B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Gasification And Melting Of Waste (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、例えば都市ごみ焼却炉
または産業廃棄物用焼却炉から排出される焼却灰を溶融
するための灰溶融炉に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an ash melting furnace for melting incineration ash discharged from, for example, an incinerator for municipal waste or an incinerator for industrial waste.

【0002】[0002]

【従来の技術】従来、例えば都市ごみ焼却炉から排出さ
れる焼却灰を溶融固化させて、減容化および無害化を図
るために、バーナにより加熱する灰溶融炉がある。
2. Description of the Related Art Conventionally, for example, there is an ash melting furnace in which incinerator ash discharged from an incinerator for municipal solid waste is melted and solidified to heat it with a burner in order to reduce the volume and render it harmless.

【0003】この従来の灰溶融炉の炉本体の底壁部は、
焼却灰の投入側から溶融灰の排出側に向かって下向きに
傾斜して配置されるとともに、加熱用のバーナが設けら
れた溶融室は排出側に配置され、また溶融室で発生した
燃焼排ガスにより、投入された焼却灰を予熱(乾燥およ
び加熱)する予熱室が投入側に配置され、さらに投入側
には灰投入用ホッパーおよび灰の押出し装置が配置され
ていた。
The bottom wall of the furnace body of this conventional ash melting furnace is
The melting chamber provided with a burner for heating is arranged on the discharge side while being arranged so as to incline downward from the input side of the incinerated ash toward the discharge side of the molten ash, and due to the combustion exhaust gas generated in the melting chamber. A preheating chamber that preheats (drys and heats) the incinerated ash that has been input is disposed on the input side, and further, an ash input hopper and an ash extrusion device are disposed on the input side.

【0004】また、上記炉本体の底壁部の幅方向(灰の
移動方向と直交する方向)における断面形状は、ストレ
ートにされており、すなわち平面形状であった。したが
って、灰投入用ホッパーから、押出し装置により炉本体
内に投入された焼却灰は、予熱室において、傾斜された
炉本体の底壁面上を排出側に移動する間に、溶融室から
流れてくる燃焼排ガスにより予熱(乾燥および加熱)さ
れる。そして、この予熱された焼却灰は溶融室に移動し
て、溶融室側に設けられたバーナにより加熱溶融された
後、底壁部上を流下し、排出側に形成された溶融灰の排
出口から冷却槽に落下されて冷却固化されていた。
The cross-sectional shape of the bottom wall of the furnace body in the width direction (direction orthogonal to the ash movement direction) is straight, that is, flat. Therefore, the incinerated ash, which has been charged into the furnace body by the extruder from the ash charging hopper, flows from the melting chamber in the preheating chamber while moving to the discharge side on the bottom wall surface of the inclined furnace body. Preheated (dried and heated) by flue gas. Then, the preheated incinerated ash moves to the melting chamber, is heated and melted by the burner provided on the melting chamber side, and then flows down on the bottom wall portion, and the discharge port of the molten ash formed on the discharge side is formed. It was dropped into the cooling tank and cooled and solidified.

【0005】[0005]

【発明が解決しようとする課題】しかし、上述したよう
に、溶融室における炉本体の底壁部の幅方向における断
面形状がストレートすなわち全幅に亘って平面形状であ
るとともに、加熱用バーナによりその全幅に亘って均一
に加熱するのが困難であるため、中央部の灰がより早く
溶融するが、両側部の灰については溶融するのが遅い。
However, as described above, the cross-sectional shape of the bottom wall of the furnace body in the melting chamber in the width direction is straight, that is, the flat shape over the entire width, and the entire width is increased by the heating burner. The ash in the center melts faster, but the ash on both sides slows to melt, because it is difficult to heat it uniformly over the ash.

【0006】このため、底壁部上において、溶融灰の流
下速度にばらつきが生じ、排出される溶融灰の状態が均
一でなくなるとともに、底壁部の上面が排出口側に向か
って真っすぐに傾斜しているため、灰の滞留時間も短
く、したがって未溶融状態の灰が排出され易いという問
題があり、さらには溶融灰が底壁部の上面全体に拡がっ
て溶融灰の温度が低下して固化し易くなり、排出口が閉
塞してしまうという問題があった。
Therefore, the flow rate of the molten ash varies on the bottom wall, the discharged ash is not in a uniform state, and the upper surface of the bottom wall is inclined straight toward the discharge port side. Therefore, there is a problem that the ash staying time is short and unmelted ash is easily discharged.Furthermore, the molten ash spreads over the entire upper surface of the bottom wall, and the temperature of the molten ash decreases and solidifies. However, there is a problem that the discharge port is blocked.

【0007】そこで、本発明は上記問題を解消し得る灰
溶融炉を提供することを目的とする。
Therefore, an object of the present invention is to provide an ash melting furnace which can solve the above problems.

【0008】[0008]

【課題を解決するための手段】上記課題を解決するた
め、本発明の灰溶融炉は、灰をバーナにより加熱して溶
融させる灰溶融炉であって、一端側に灰投入用の投入口
が形成されるとともに他端側に溶融灰の排出口が形成さ
れた炉本体の底壁部を、一端側から他端側に向かって下
方に傾斜して設け、この炉本体内の一端寄り位置に灰の
予熱室を形成するとともに、他端寄り位置に加熱用バー
ナが設けられた溶融室を形成し、かつこの溶融室側の底
壁部の投入口側寄り部分の幅方向における断面形状を山
形状に形成するとともに、排出口側寄り部分の幅方向に
おける断面形状を谷形状に形成したものである。
In order to solve the above problems, an ash melting furnace of the present invention is an ash melting furnace that heats and melts ash by a burner, and has an ash charging port at one end side. The bottom wall of the furnace body that is formed and has a molten ash discharge port formed on the other end side is provided so as to incline downward from one end side toward the other end side, and at a position near one end in this furnace body A preheating chamber for ash is formed, a melting chamber is provided with a heating burner at a position near the other end, and the cross-sectional shape in the width direction of the portion of the bottom wall portion on the melting chamber side close to the inlet side is formed. In addition to being formed in a shape, the cross-sectional shape in the width direction of the portion near the discharge port is formed in a valley shape.

【0009】[0009]

【作用】上記の構成によると、炉本体の溶融室側の底壁
部の投入口側である前部底壁部が山形状に形成されると
ともに排出口側である後部底壁部が谷形状に形成されて
いるので、溶融灰は幅方向においても移動する。したが
って、溶融灰は均一な状態になるとともに、溶融室にお
ける灰の滞留時間が長くなるので、未溶融の状態で排出
口に移動するのを防止することができる。
According to the above construction, the front bottom wall portion which is the inlet side of the bottom wall portion on the melting chamber side of the furnace body is formed in a mountain shape, and the rear bottom wall portion which is the discharge side is valley shaped. The molten ash also moves in the width direction because it is formed in the. Therefore, the molten ash is in a uniform state and the ash stays in the melting chamber for a long time, so that it is possible to prevent the ash from moving to the discharge port in an unmelted state.

【0010】また、後部底壁部では溶融灰は中央部に集
まって排出口に流れるため温度の低下が少ないととも
に、その大きい慣性力を保持した状態で排出口に向かう
ため、排出口における閉塞状態の発生を回避することが
できる。
Further, in the rear bottom wall, the molten ash gathers in the central portion and flows to the discharge port, so that the temperature does not decrease much, and since the molten ash heads to the discharge port while maintaining a large inertial force, the discharge port is blocked. Can be avoided.

【0011】[0011]

【実施例】以下、本発明の一実施例を図1〜図4に基づ
き説明する。図1において、1は灰をバーナにより加熱
して溶融させる灰溶融炉で、その炉本体2の底壁部3は
灰の投入側から排出側に向かって下向きに傾斜して設け
られている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. In FIG. 1, reference numeral 1 denotes an ash melting furnace for heating and melting ash by a burner, and a bottom wall portion 3 of a furnace body 2 thereof is provided so as to be inclined downward from an ash input side to an ash discharge side.

【0012】上記炉本体2の一端側の端壁部7には灰の
投入口21が形成されるとともに、他端側の端壁部8に
は溶融灰の排出口(スラグポートともいい、例えば水冷
管により構成されている)22が形成され、また炉本体
2の内部の投入口21寄り部分には、灰の予熱室11が
形成されるとともに、排出口22寄り部分には、灰を加
熱して溶融させる溶融室12が形成されており、さらに
炉本体2内の上記予熱室11と溶融室12との連通空間
部13は絞られて狭くされている。なお、この連通空間
部13の予熱室11側の上壁部9は、上方に拡がるよう
に、すなわち上向きに傾斜されて、この絞り部分で生じ
る圧力損失が小さくなるように考慮されている。
An ash inlet 21 is formed in the end wall 7 on one end side of the furnace body 2, and a molten ash discharge port (also called a slag port, for example, is formed on the end wall 8 on the other end side. 22 composed of a water cooling pipe) is formed, and a preheating chamber 11 for ash is formed in a portion of the furnace body 2 near the charging port 21, and ash is heated in a portion near the discharging port 22. A melting chamber 12 for melting is formed, and a communication space 13 between the preheating chamber 11 and the melting chamber 12 in the furnace body 2 is narrowed and narrowed. The upper wall 9 of the communication space 13 on the side of the preheating chamber 11 is designed so as to spread upward, that is, be inclined upward so that the pressure loss generated at the throttle portion becomes small.

【0013】また、上記炉本体2の予熱室11と溶融室
12との境部における底壁部3には、溶融室12側が低
くなるように段差6が設けられるとともに、この段差6
の高さHは、予熱室11における灰の層厚を目安として
設けられ、すなわち灰の層厚(通常は、100〜200
mm程度の範囲内である)とほぼ等しくなるような高さに
されており、しかもこの段差6は、溶融室12側の底壁
部すなわち溶融側底壁部5上における灰固着層の高さよ
りも高くなるようにされるとともに、後述する灰の押出
し装置の力の作用線と溶融側底壁部5上面との交点が、
排出口22よりも充分内側に位置するように考慮されて
いる。
Further, a step 6 is provided on the bottom wall 3 at the boundary between the preheating chamber 11 and the melting chamber 12 of the furnace body 2 so that the melting chamber 12 side is lowered, and this step 6
The height H of the ash is set based on the ash layer thickness in the preheating chamber 11, that is, the ash layer thickness (usually 100 to 200).
(in the range of about mm), and this step 6 is higher than the height of the ash fixing layer on the bottom wall portion on the melting chamber 12 side, that is, on the melting side bottom wall portion 5. And the intersection point between the line of action of the force of the ash extruding device described later and the upper surface of the melting side bottom wall portion 5,
It is designed to be located sufficiently inside the discharge port 22.

【0014】したがって、溶融側底壁部5の傾斜角度は
予熱室11の底壁部である予熱側底壁部4よりも小さく
されている。なお、予熱側底壁部4の傾斜角度は、灰の
摩擦角より小さく設定されており、例えば10度程度に
されている。
Therefore, the inclination angle of the melting side bottom wall portion 5 is smaller than that of the preheating side bottom wall portion 4 which is the bottom wall portion of the preheating chamber 11. The inclination angle of the preheating side bottom wall portion 4 is set smaller than the friction angle of ash, and is set to, for example, about 10 degrees.

【0015】さらに、上記溶融側底壁部5は、灰の移動
方向において前部と後部とに分けられるとともに、前部
底壁部5aの前後方向における傾斜角度は、0〜5度の
範囲内に、例えば2度程度にされるとともに、後部底壁
部5bの前後方向における傾斜角度は、10〜20度範
囲内に、例えば15度程度にされている。
Further, the melting side bottom wall portion 5 is divided into a front portion and a rear portion in the moving direction of the ash, and the inclination angle of the front bottom wall portion 5a in the front-rear direction is within the range of 0 to 5 degrees. The angle of inclination of the rear bottom wall portion 5b in the front-rear direction is within the range of 10 to 20 degrees, for example, around 15 degrees.

【0016】そして、図2〜図4に示すように、上記前
部底壁部5aの幅方向(灰の移動方向とは直交する方
向)においては山形状にされ、また後部底壁部5bの幅
方向においては谷形状にされている。
As shown in FIGS. 2 to 4, the front bottom wall portion 5a has a mountain shape in the width direction (direction orthogonal to the ash movement direction), and the rear bottom wall portion 5b has a mountain shape. It has a valley shape in the width direction.

【0017】なお、この前部底壁部5aの幅方向の傾斜
角度θは例えば2〜5度程度の範囲内とされる。上記溶
融室12側の上壁部9には、灰を加熱するための加熱用
バーナ31が取り付けられ、また上記予熱室11の上壁
部9でしかも投入口21が形成された端壁部7から所定
距離だけ離れた位置に、燃焼排ガスの取出口23が形成
され、この取出口23に排ガス取出管24が接続されて
いる。
The inclination angle θ of the front bottom wall portion 5a in the width direction is within the range of about 2 to 5 degrees, for example. A heating burner 31 for heating ash is attached to the upper wall portion 9 on the melting chamber 12 side, and the upper wall portion 9 of the preheating chamber 11 and the end wall portion 7 in which the charging port 21 is formed are also provided. A combustion exhaust gas outlet 23 is formed at a position away from the exhaust gas by a predetermined distance, and an exhaust gas outlet pipe 24 is connected to the outlet 23.

【0018】さらに、上記炉本体2の投入口21には、
灰を投入するための灰投入用ホッパー25が接続される
とともに、この灰投入用ホッパー25の底部には、灰投
入用ホッパー25内の灰を、炉本体2内に押し出すため
の押出し装置26が設けられている。
Further, the charging port 21 of the furnace body 2 has
An ash charging hopper 25 for charging ash is connected, and at the bottom of the ash charging hopper 25, an extruding device 26 for pushing the ash in the ash charging hopper 25 into the furnace body 2 is provided. It is provided.

【0019】この押出し装置26は、投入口21側から
炉本体2内に対して出退自在に設けられた押出し部材2
7と、この押出し部材27を出退させるシリンダー装置
28とから構成されている。
The push-out device 26 is provided with a push-out member 2 which is provided so as to be able to move in and out of the furnace body 2 from the charging port 21 side.
7 and a cylinder device 28 for moving the pushing member 27 back and forth.

【0020】また、上記炉本体2の排出口22に対応す
る下部には、排出口22から排出された溶融灰を冷却す
るための冷却槽32が配置され、この冷却槽32内に
は、溶融灰が冷却して固化された灰(スラグ)を掻き出
すための掻出し用コンベヤ33が配置されている。
A cooling tank 32 for cooling the molten ash discharged from the discharge port 22 is arranged at a lower portion of the furnace body 2 corresponding to the discharge port 22. A scraping conveyor 33 is arranged to scrape out the ash (slag) that is solidified by cooling the ash.

【0021】なお、溶融側底壁部5の表面の起伏、すな
わちアンジユレーションは、炉本体を構成する水冷管ま
たは水冷ジャケットで概略構成し、熱伝導の高い耐火
材、例えば炭化ケイ素のライニング層で最終的に調整さ
れる。
The undulation of the surface of the bottom wall 5 on the melting side, that is, the undulation, is roughly constituted by a water-cooling pipe or a water-cooling jacket constituting the furnace body, and a refractory material having a high heat conductivity, for example, a lining layer of silicon carbide. Will be adjusted finally.

【0022】したがって上記構成において、灰投入用ホ
ッパー25から押出し装置26を介して炉本体2内に投
入された焼却灰Aは、溶融室12から連通空間部13を
介して流れてくる燃焼排ガスBにより予熱(乾燥および
加熱)されながら、予熱室11から溶融室12側に移動
し、そして溶融室12内で加熱用バーナ31により高温
に加熱されて溶融される。
Therefore, in the above structure, the incineration ash A charged into the furnace main body 2 from the ash charging hopper 25 through the extrusion device 26 is the combustion exhaust gas B flowing from the melting chamber 12 through the communication space portion 13. Is moved from the preheating chamber 11 to the melting chamber 12 side while being preheated (dried and heated), and is heated to a high temperature by the heating burner 31 in the melting chamber 12 to be melted.

【0023】そして、溶融された灰すなわち溶融灰(溶
融スラグ)Cは、排出口22から冷却槽32内に排出さ
れて、ここで冷却固化され、スラグとして掻出し用コン
ベヤ33により、外部に取り出される。
The molten ash, that is, molten ash (molten slag) C is discharged from the discharge port 22 into the cooling tank 32, cooled and solidified therein, and taken out as slag by the scraping conveyor 33. Be done.

【0024】ところで、上述したように、予熱室11か
ら溶融室12側に移動された灰は、ここで加熱用バーナ
31により溶融されるが、この溶融灰は、図2に示すよ
うに、その前部底壁部5aにおいては、左右の側壁部1
0側に移動した後、後部底壁部5b側に移り、この後部
底壁部5bにおいては中央側に移動して、排出口22に
向かうことになる。
By the way, as described above, the ash moved from the preheating chamber 11 to the melting chamber 12 side is melted by the heating burner 31 here, and this molten ash is, as shown in FIG. In the front bottom wall portion 5a, the left and right side wall portions 1
After moving to the 0 side, it moves to the rear bottom wall part 5b side, and in this rear bottom wall part 5b, it moves to the center side and goes to the discharge port 22.

【0025】このように、溶融灰は、溶融側底壁部5に
おいて、炉本体2の幅方向においても移動するため、中
央側の溶融状態の灰と側部側の未溶融状態の灰とが混じ
り合い、溶融灰は均一な状態になるとともに、溶融室に
おける灰の滞留時間も長くなるので、未溶融の状態で灰
が排出口22に移動するのを防止することができる。ま
た、後部底壁部5bでは、溶融灰は中央部に集って排出
口22に流れるため、温度の低下が少ないとともに、そ
の大きい慣性力を保持した状態で排出口22に向かうた
め、排出口22における閉塞を回避することができる。
As described above, since the molten ash also moves in the width direction of the furnace body 2 in the molten side bottom wall portion 5, the molten ash on the center side and the unmelted ash on the side portion are separated. Since the mixed ash becomes uniform and the ash stays in the melting chamber for a long time, it is possible to prevent the ash from moving to the discharge port 22 in the unmelted state. Further, in the rear bottom wall portion 5b, since the molten ash gathers in the central portion and flows to the discharge port 22, the temperature drop is small and the molten ash heads to the discharge port 22 while maintaining its large inertial force. The blockage at 22 can be avoided.

【0026】なお、予熱室11側の灰は押出し装置26
により溶融室12側に移動されるが、溶融側底壁部5の
方が予熱側底壁部4よりも、その灰の層厚さ分だけ低く
されているため、たとえ溶融室12側に固着層が発生し
た場合でも、予熱室11側から押されてくる灰が、丁
度、固着層を押すことになり、このため、溶融室12内
における灰の挙動(供給量)、炉内の温度、溶融灰の粘
度などを外部から操作することができる。
The ash on the preheating chamber 11 side is pushed out by the extrusion device 26.
However, since the melting-side bottom wall portion 5 is made lower than the preheating-side bottom wall portion 4 by the layer thickness of the ash, the melting-side bottom wall portion 5 is fixed to the melting chamber 12 side. Even when a layer is generated, the ash pushed from the preheating chamber 11 side just pushes the fixed layer, and therefore the behavior of the ash in the melting chamber 12 (supply amount), the temperature in the furnace, The viscosity of molten ash can be manipulated externally.

【0027】また、上記炉本体2内における予熱室11
と溶融室12との間の連通空間部13は狭く絞られてい
るために、加熱用バーナ31からの輻射熱が予熱室11
側に放射されるのが防止され、さらに燃焼排ガスの取出
口23は、炉本体2の端壁部7から離して設けられてい
るため、予熱室11側に流れてきた燃焼排ガスは、一
旦、投入口21側の端壁部7に衝突して、その勢いが減
じられた後、すなわち迂回した後、排ガス取出管24か
ら排出されるため、燃焼排ガス中に含まれていた灰分
は、その迂回時に落下する。
The preheating chamber 11 in the furnace body 2
Since the communication space 13 between the melting chamber 12 and the melting chamber 12 is narrowed down, the radiant heat from the heating burner 31 is preheated in the preheating chamber 11.
Of the combustion exhaust gas, and the combustion exhaust gas outlet 23 is provided away from the end wall portion 7 of the furnace body 2. Therefore, the combustion exhaust gas flowing into the preheating chamber 11 side is temporarily After colliding with the end wall portion 7 on the input port 21 side and reducing its momentum, that is, after detouring, the ash contained in the combustion exhaust gas is detoured. Sometimes it falls.

【0028】ところで、上記実施例における灰の押出し
装置26は、炉本体2の幅方向において、一台配置する
ようにしてもよく、また幅方向において複数台配置して
もよい。複数台配置することにより、灰をより細かく制
御することができる。
By the way, as for the ash extruding device 26 in the above embodiment, one unit may be arranged in the width direction of the furnace body 2, or a plurality of units may be arranged in the width direction. The ash can be controlled more finely by arranging a plurality of units.

【0029】[0029]

【発明の効果】以上のように本発明の構成によると、溶
融室側の底壁部の投入口側である前部底壁部を山形状に
するとともに排出口側である後部底壁部を谷形状に形成
したので、溶融灰は幅方向においても移動するため、溶
融灰は均一な状態になるとともに、溶融室における灰の
滞留時間を長くすることができるので、灰が未溶融の状
態で排出口に移動するのを防止することができ、また後
部底壁部では溶融灰は中央部に集まって排出口に流れる
ため温度の低下が少ないとともに、その大きい慣性力を
保持した状態で排出口に向かうため、排出口における閉
塞状態の発生を回避することができる。
As described above, according to the configuration of the present invention, the front bottom wall portion on the inlet side of the bottom wall portion on the melting chamber side is formed into a mountain shape, and the rear bottom wall portion on the outlet side is formed. Since it is formed in a valley shape, the molten ash also moves in the width direction, so that the molten ash is in a uniform state and the ash residence time in the melting chamber can be lengthened, so that the ash is not melted. It is possible to prevent the molten ash from moving to the discharge port, and at the rear bottom wall, the molten ash gathers in the center and flows to the discharge port, so that the temperature does not drop much and the discharge port is maintained with its large inertial force. Therefore, it is possible to avoid the occurrence of the blocked state at the discharge port.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例における灰溶融炉の概略構成
を示す断面図である。
FIG. 1 is a cross-sectional view showing a schematic configuration of an ash melting furnace in an embodiment of the present invention.

【図2】同実施例における灰溶融炉の要部平面図であ
る。
FIG. 2 is a plan view of a main part of an ash melting furnace in the example.

【図3】図2のD−D断面図である。FIG. 3 is a sectional view taken along line DD of FIG.

【図4】図2のE−E断面図である。FIG. 4 is a sectional view taken along line EE of FIG.

【符号の説明】[Explanation of symbols]

1 灰溶融炉 2 炉本体 3 底壁部 4 予熱側底壁部 5 溶融側底壁部 5a 前部底壁部 5b 後部底壁部 11 予熱室 12 溶融室 21 投入口 22 排出口 31 加熱用バーナ 1 Ash Melting Furnace 2 Furnace Main Body 3 Bottom Wall 4 Preheating Side Bottom Wall 5 Melting Side Bottom Wall 5a Front Bottom Wall 5b Rear Bottom Wall 11 Preheating Chamber 12 Melting Chamber 21 Charge Port 22 Discharge Port 31 Heating Burner

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】灰をバーナにより加熱して溶融させる灰溶
融炉であって、一端側に灰投入用の投入口が形成される
とともに他端側に溶融灰の排出口が形成された炉本体の
底壁部を、一端側から他端側に向かって下方に傾斜して
設け、この炉本体内の一端寄り位置に灰の予熱室を形成
するとともに、他端寄り位置に加熱用バーナが設けられ
た溶融室を形成し、かつこの溶融室側の底壁部の投入口
側寄り部分の幅方向における断面形状を山形状に形成す
るとともに、排出口側寄り部分の幅方向における断面形
状を谷形状に形成したことを特徴とする灰溶融炉。
1. An ash melting furnace for heating and melting ash by a burner, the furnace body having a ash charging port formed at one end and a molten ash discharging port formed at the other end. The bottom wall of the furnace is inclined downward from one end side to the other end side, an ash preheating chamber is formed at a position near one end in the furnace body, and a heating burner is provided at a position near the other end. The melting chamber is formed, and the cross-sectional shape in the width direction of the portion near the inlet of the bottom wall on the melt chamber side is formed in a mountain shape, and the cross-sectional shape in the width direction of the portion near the outlet is formed in a valley. Ash melting furnace characterized by being formed into a shape.
JP16650492A 1992-06-24 1992-06-25 Ash melting furnace Expired - Fee Related JPH0810052B2 (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
JP16650492A JPH0810052B2 (en) 1992-06-25 1992-06-25 Ash melting furnace
SG1995002377A SG44372A1 (en) 1992-06-24 1993-06-16 Ash melting furnace
US08/078,721 US5320050A (en) 1992-06-24 1993-06-16 Ash melting furnace
EP93109570A EP0575874B1 (en) 1992-06-24 1993-06-16 Ash melting furnace
DK93109570.7T DK0575874T3 (en) 1992-06-24 1993-06-16 Ash melting furnace.
DE69313195T DE69313195T2 (en) 1992-06-24 1993-06-16 Ash melting furnace
AT93109570T ATE157070T1 (en) 1992-06-24 1993-06-16 ASH MELTING FURNACE
CN93107413A CN1043075C (en) 1992-06-24 1993-06-23 Ash melting furnace
CNB981196063A CN1163691C (en) 1992-06-24 1993-06-23 Furnace
KR1019930011620A KR970003610B1 (en) 1992-06-24 1993-06-24 Ash melting furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16650492A JPH0810052B2 (en) 1992-06-25 1992-06-25 Ash melting furnace

Publications (2)

Publication Number Publication Date
JPH0611127A JPH0611127A (en) 1994-01-21
JPH0810052B2 true JPH0810052B2 (en) 1996-01-31

Family

ID=15832587

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16650492A Expired - Fee Related JPH0810052B2 (en) 1992-06-24 1992-06-25 Ash melting furnace

Country Status (1)

Country Link
JP (1) JPH0810052B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6629453B1 (en) 2000-03-17 2003-10-07 Ford Global Technologies, Llc Method and apparatus for measuring the performance of an emissions control device

Also Published As

Publication number Publication date
JPH0611127A (en) 1994-01-21

Similar Documents

Publication Publication Date Title
US5320050A (en) Ash melting furnace
JPH0810052B2 (en) Ash melting furnace
JPH086911B2 (en) Ash melting furnace
US3030094A (en) Rotary furnace installations and method of processing charges therein
JPH0152650B2 (en)
JPH0520647B2 (en)
JPH0810053B2 (en) Ash melting furnace
JPH054565B2 (en)
JP3310874B2 (en) Melting furnace
JPH0682026A (en) Ash melting furnace
JP3457129B2 (en) Incineration ash melting furnace
JPH053868Y2 (en)
JPH0611128A (en) Ash melting furnace
JPH0523940Y2 (en)
JP2662834B2 (en) Melting furnace
JPH05296434A (en) Burning furnace for gasifying coal and melt slag discharge hole thereof
JPH0579225U (en) Incineration ash melting treatment device
JPH0684812B2 (en) Method and apparatus for incineration ash melting treatment
JPH086910B2 (en) Ash melting furnace
JP2648269B2 (en) Ash melting furnace
JPH0372889B2 (en)
JPS5918317Y2 (en) Melting furnace with water-cooled spout
JPH0523942Y2 (en)
JPH11173532A (en) Combustion ash melting furnace
JP2000074352A (en) Internal melting furnace of waste incinerator

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20090131

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090131

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20100131

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110131

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 15

Free format text: PAYMENT UNTIL: 20110131

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 16

Free format text: PAYMENT UNTIL: 20120131

LAPS Cancellation because of no payment of annual fees