JPH0811232A - Tire molding system - Google Patents
Tire molding systemInfo
- Publication number
- JPH0811232A JPH0811232A JP6148365A JP14836594A JPH0811232A JP H0811232 A JPH0811232 A JP H0811232A JP 6148365 A JP6148365 A JP 6148365A JP 14836594 A JP14836594 A JP 14836594A JP H0811232 A JPH0811232 A JP H0811232A
- Authority
- JP
- Japan
- Prior art keywords
- molding
- processing
- tire
- carriage
- traveling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000465 moulding Methods 0.000 title claims abstract description 129
- 238000000034 method Methods 0.000 claims abstract description 31
- 230000005540 biological transmission Effects 0.000 claims description 6
- 238000001514 detection method Methods 0.000 claims description 4
- 239000011324 bead Substances 0.000 abstract description 6
- 241000254043 Melolonthinae Species 0.000 abstract 1
- 238000007689 inspection Methods 0.000 description 20
- 238000010586 diagram Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 3
- 238000004073 vulcanization Methods 0.000 description 3
- 230000001133 acceleration Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29D—PRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
- B29D30/00—Producing pneumatic or solid tyres or parts thereof
- B29D30/005—General arrangement or lay-out of plants for the processing of tyres or parts thereof
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)
- Tyre Moulding (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、成形ドラムに順次所定
の部材を貼付加工して生タイヤの成形を行うタイヤ成形
システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tire forming system for forming green tires by sequentially adhering predetermined members to a forming drum.
【0002】[0002]
【従来の技術】一般に、加硫前の所謂生タイヤの成型
は、まず、別々の工程で形成された複数の部材を成形ド
ラム等に所定の順番に貼付したバンドサブアッセンブリ
にビードをセットしてバンドアッセンブリを成型する。
このバンドアッセンブリをタイヤの形状に折り返したの
ち、サイドトレッドを貼付することにより生ケースアッ
センブリとなる。2. Description of the Related Art Generally, so-called green tires before vulcanization are molded by first setting a bead on a band subassembly in which a plurality of members formed in different steps are attached to a molding drum or the like in a predetermined order. Mold the band assembly.
The band assembly is folded back into the shape of a tire, and then a side tread is attached to form a raw case assembly.
【0003】この生ケースアッセンブリに、レイヤベル
ト、キャップベルト等の複数のベルトを重ねて貼付し、
さらにトップトレッドを貼付して形成したBT(ベルト
トップ)バンドアッセンブリを組付けてステッチング処
理することにより生タイヤの成形が終了する。このよう
に形成した生タイヤを加硫することにより、例えば車両
のタイヤが形成される。A plurality of belts, such as a layer belt and a cap belt, are laminated and attached to this raw case assembly,
Further, a BT (belt top) band assembly formed by attaching a top tread is assembled and stitching is performed to complete the forming of the raw tire. By vulcanizing the green tire thus formed, for example, a vehicle tire is formed.
【0004】ところで、このような生タイヤを成形する
工程においても、作業の自動化が図られており、予め別
工程で形成された種々の部材を用いて、所定のサイズ幅
寸法、リム径の生タイヤを成型すことができるようにな
っている。By the way, even in the step of molding such a raw tire, the work is automated, and various members formed in advance in different steps are used to produce a predetermined size width dimension and rim diameter. Tires can be molded.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、タイヤ
の幅、リム径等のサイズを変更する場合には、自動化さ
れたラインに供給する部材をタイヤのサイズに合わせて
変更する必要があると共に、それぞれの部材を貼付する
ための加工装置等の治具も変更する必要がある。このた
め、自動化されたタイヤの成形工程では、タイヤサイズ
の変更は容易ではなく、少ない種類のタイヤを多量に成
形するのに適するが、種々のサイズのタイヤを自動的に
成形することができるものでは無かった。However, when the size of the tire such as the width and the rim diameter is changed, it is necessary to change the members to be supplied to the automated line according to the size of the tire. It is also necessary to change the jig such as a processing device for sticking the member. Therefore, in the automated tire molding process, it is not easy to change the tire size and it is suitable for molding a small number of tires in a large amount, but tires of various sizes can be molded automatically. It wasn't.
【0006】本発明は上記事実を考慮してなされたもの
で、多種類のタイヤを効率良く円滑に成形することを可
能とするタイヤ成形システムを提供することを目的とす
る。The present invention has been made in consideration of the above facts, and an object of the present invention is to provide a tire molding system capable of efficiently and smoothly molding various kinds of tires.
【0007】[0007]
【課題を解決するための手段】本発明の請求項1に係る
タイヤ成形システムは、成形ドラムの周囲に所定の部材
を順次加工して組付けて生タイヤを成形するための複数
の処理部のそれぞれにタイヤの幅サイズないしリム径に
応じて別々に設けた処理ステージと、前記成形ドラムを
備え駆動手段の駆動力により所定のライン上を走行して
移動する成形台車と、前記成形台車の移動用として前記
複数の処理工程の近傍を生タイヤの成形順序に応じてル
ープ状に接続しそれぞれの処理部の各処理ステージの所
定の位置への引込み路が設けられた走行ラインと、前記
複数の処理部及び前記成形台車が接続され、成形台車に
生タイヤの幅サイズないしリム径に応じて複数の処理部
の所定の処理ステージを結ぶ走行経路を指示して移動さ
せる制御手段と、を有することを特徴とする。According to a first aspect of the present invention, there is provided a tire forming system comprising a plurality of processing units for forming a green tire by sequentially processing and assembling predetermined members around a forming drum. A processing stage provided separately for each tire width size or rim diameter, a molding carriage that includes the molding drum and travels on a predetermined line by the driving force of the driving means, and moves the molding carriage. For use as a running line provided with a lead-in path to a predetermined position of each processing stage of each processing unit by connecting the vicinity of the plurality of processing steps in a loop according to the forming order of the raw tire, and the plurality of A processing unit and the molding carriage are connected to each other, and a control unit for instructing and moving a traveling route connecting predetermined processing stages of a plurality of processing units according to the width size or the rim diameter of the raw tire to the molding carriage, Characterized in that it has.
【0008】請求項2に係るタイヤ成形システムは、請
求項1のタイヤ成形システムであって、前記走行ライン
に沿った所定の位置にそれぞれの位置を識別可能に設け
た指標と、前記走行台車に設けられ前記指標を検出する
検出手段と、を備え、前記制御手段が前記走行経路を前
記指標を選択して指示したときに、前記成形台車が前記
指示された指標に沿って走行すると共に、指標に指示さ
れた所定の位置で停止することを特徴とする。A tire forming system according to a second aspect is the tire forming system according to the first aspect, wherein an index is provided at a predetermined position along the traveling line so as to be able to identify each position, and the traveling carriage is provided. A detection unit provided to detect the index, and, when the control unit selects and instruct the travel route by selecting the index, the molding carriage travels along the instructed index, It is characterized in that it stops at a predetermined position instructed by.
【0009】請求項3に係るタイヤ成形システムは、請
求項1又は請求項2のタイヤ成形システムであって、前
記複数の処理部を分けて設けた複数の処理工程と、前記
複数の処理工程のそれぞれに設けられたループ状の走行
ラインと、前記処理部として前記複数の処理工程に跨が
って設けられそれぞれの処理工程との間で成形部材の伝
達を行う伝達処理部と、を有することを特徴とする。A tire forming system according to claim 3 is the tire forming system according to claim 1 or 2, wherein the plurality of processing steps are separately provided, and the plurality of processing steps are provided. A loop-shaped traveling line provided for each, and a transfer processing section that is provided as the processing section across the plurality of processing steps and transfers the molding member between the processing steps. Is characterized by.
【0010】請求項4に係るタイヤ成形システムは、請
求項3のタイヤ成形システムであって、前記伝達処理部
が前記複数の処理部の少なくとも一つであることを特徴
とする。A tire forming system according to a fourth aspect is the tire forming system according to the third aspect, wherein the transmission processing unit is at least one of the plurality of processing units.
【0011】[0011]
【作用】本発明の請求項1に記載のタイヤ成形システム
は、タイヤのサイズに応じた成形ドラムを成形台車に設
けていると共に、生タイヤを成形するための複数の処理
部にタイヤのサイズに応じた処理ステージを設けてい
る。また、それぞれの処理部の処理ステージは、引込み
路を備えた走行ラインによって接続されて、制御手段に
よって走行経路が指示された成形台車が移動する。制御
手段は、タイヤのサイズに応じた成形ドラムを備えた成
形台車を処理手順に沿って各処理部の中からサイズに応
じた処理ステージの間を走行させて、成形ドラムに処理
を施してタイヤを成形する。In the tire forming system according to the first aspect of the present invention, the forming drum is provided on the forming trolley according to the size of the tire, and the size of the tire is adjusted to the plurality of processing parts for forming the raw tire. A corresponding processing stage is provided. Further, the processing stages of the respective processing units are connected by a traveling line provided with a pull-in path, and the molding carriage whose traveling path is instructed by the control means moves. The control means causes a molding carriage having a molding drum corresponding to the size of the tire to travel between processing stages corresponding to the size from each processing unit according to the processing procedure, and the tire is processed by processing the molding drum. To mold.
【0012】各処理ステージで作業を行うとき、走行台
車は引込み路へ入っているため、他の成形台車が走行ラ
インに沿って走行するのに支障をきたすことがない。こ
のため、多種類のサイズのタイヤを並行して成形するこ
とができると共に、多量のタイヤの成形が可能となる。When the work is performed at each processing stage, the traveling carriage is in the retracting path, so that it does not hinder another molding carriage from traveling along the traveling line. For this reason, tires of various sizes can be molded in parallel and a large number of tires can be molded.
【0013】請求項2に記載のタイヤ成形システムで
は、走行ラインに沿って走行台車が走行している位置を
確認できる指標を設けており、この指標にしたがって走
行台車を自動的に旋回、進路変更、停止させることがで
きる。In the tire molding system according to the second aspect, an index is provided for confirming the position where the traveling vehicle is traveling along the traveling line, and the traveling vehicle is automatically turned and the course is changed according to the index. , Can be stopped.
【0014】これによって、例えば、制御手段によって
走行経路を指示することにより、指示された走行経路に
沿って各処理部の処理ステージへ移動させることができ
る。このとき、制御手段は、各成形台車が走行するとき
に、互いの走行を妨げることがないように制御するだけ
でよい。Thus, for example, by instructing the traveling route by the control means, it is possible to move to the processing stage of each processing unit along the instructed traveling route. At this time, the control means only needs to perform control so as not to interfere with each other when the forming carriages travel.
【0015】請求項3に記載のタイヤ成形システムで
は、生タイヤを成形する工程を複数に分割し、それぞれ
の工程で成型された部材を伝達処理で受け渡すようにし
ている。In the tire forming system according to the third aspect, the step of forming the raw tire is divided into a plurality of parts, and the members formed in the respective steps are transferred by the transfer process.
【0016】複数の成型部材を単一のループ状に配置し
た工程で処理しようとすると、部材の流れが複雑となっ
てしまうが、複数の部材のそれぞれを別々に成型し、そ
れぞれを伝達処理部で受け渡すことにより、それぞれを
簡単な工程とすることができ、成型台車の走行経路の設
定及び走行の制御が容易となる。If a plurality of molding members are processed in a single loop-shaped process, the flow of the members becomes complicated. However, each of the plurality of members is molded separately, and each of them is transferred to the transmission processing unit. Each of the processes can be performed in a simple process by passing the items to each other, and it becomes easy to set the traveling route of the molding carriage and control the traveling thereof.
【0017】請求項4に記載のタイヤ成型システムで
は、伝達処理部をタイヤの成型に用いる工程の一つと兼
用させるようにしている。例えば、生ケースアッセンブ
リとBTバンドアッセンブリを組み合わせる工程を伝達
処理部とすることにより、不必要に処理部を増やす必要
がなく、効率の良いタイヤ成型システムを構成すること
ができる。In the tire molding system according to the fourth aspect, the transmission processing section is also used as one of the steps used for molding the tire. For example, by using the step of combining the raw case assembly and the BT band assembly as the transmission processing section, it is possible to configure an efficient tire molding system without needing to increase the processing section unnecessarily.
【0018】[0018]
【実施例】図1及び図2には、本実施例に適用したタイ
ヤ自動成形システム10を示している。このタイヤ自動
成形システム10は、図1に示す生タイヤ成形工程12
及び図2に示すBT(ベルトトップ・トレッド)バンド
成形工程14によって構成されている。生タイヤ成形工
程12、BTバンド成形工程14には、それぞれ略矩形
状の走行ライン16、18が形成されており、タイヤ自
動成形システム10では、それぞれの走行ライン16、
18に沿って後述する無人の成形台車20、21が自動
走行し、前の工程での部材による処理を施した成形ドラ
ムを次の工程へ移動させて新たな部材での処理を行うよ
うになっている。なお、本実施例では、走行ライン1
6、18を矩形状に形成しているが、本発明が適用され
る走行ラインの形状はこれに限定するものではない。EXAMPLE FIG. 1 and FIG. 2 show an automatic tire molding system 10 applied to this example. This tire automatic molding system 10 is a raw tire molding process 12 shown in FIG.
And a BT (belt top tread) band forming step 14 shown in FIG. In the green tire forming step 12 and the BT band forming step 14, substantially rectangular running lines 16 and 18 are formed, respectively, and in the tire automatic molding system 10, the running lines 16 and 18 are formed.
The unmanned molding carriages 20 and 21 to be described later automatically run along the line 18, and the molding drum, which has been treated by the member in the previous step, is moved to the next step and a new member is processed. ing. In this embodiment, the traveling line 1
Although 6 and 18 are formed in a rectangular shape, the shape of the traveling line to which the present invention is applied is not limited to this.
【0019】最初に図1及び図2を参照しながら、タイ
ヤ自動成形システム10の生タイヤ成形工程12及びB
Tバンド成形工程14について説明する。First, referring to FIGS. 1 and 2, green tire forming steps 12 and B of an automatic tire forming system 10 will be described.
The T-band forming step 14 will be described.
【0020】図1に示されるように、生タイヤ成形工程
12は、走行ライン16の周囲に、インナライナー(I
/L)・チューファー(CH)を貼り付けるI/L・C
H貼付部22、第1プライを貼り付ける第1プライ貼付
部24、第2プライを貼り付ける第2プライ貼付部2
6、ビードセット部28、折り返し部30、サイドトレ
ッド(ST)貼付部32及びトランスファー部34、生
タイヤステッチング部36、取出し部38が図1の紙面
左回りに順に配置されている。As shown in FIG. 1, in the green tire forming step 12, the inner liner (I
/ L) ・ Chuffer (CH) pasted on I / L ・ C
H sticking part 22, first ply sticking part 24 for sticking first ply, second ply sticking part 2 for sticking second ply
6, a bead set portion 28, a folded portion 30, a side tread (ST) attaching portion 32, a transfer portion 34, a raw tire stitching portion 36, and a take-out portion 38 are sequentially arranged counterclockwise in FIG.
【0021】この生タイヤ成形工程12では、成形台車
20が、I/L・CH貼付部22から図1の紙面左回り
に走行して、I/L・CH貼付部22でインナライナー
・チューファーが、第1及び第2プライ貼付部24、2
6でそれぞれ第1プライ及び第2プライが貼り付けられ
たのち、ビートセット部28でビードがセットされてバ
ンドアッセンブリの成形が行われる。In the green tire forming step 12, the forming carriage 20 runs counterclockwise from the I / L / CH attaching portion 22 in the plane of FIG. But the first and second ply attaching portions 24, 2
After the first ply and the second ply are attached in 6 respectively, the bead is set in the beat setting section 28 and the band assembly is formed.
【0022】このバンドアッセンブリは、次の折り返し
部30で折り返しリングによって折り返されたのち、S
T貼付部32でサイドトレッドが貼り付けられて、生ケ
ースアッセンブリの成形が行われる。This band assembly is folded back by the folding ring at the next folding portion 30 and then S
The side tread is attached at the T attaching portion 32, and the raw case assembly is molded.
【0023】この生ケースアッセンブリには、トランス
ファー部34で、図2に示すBTバンド成形工程14で
成形されたBTバンドアッセンブリが受け渡されて組付
けられ、次の生タイヤステッチング部36で生ケースア
ッセンブリとBTバンドアッセンブリがステッチング処
理されて生タイヤの成形が終了する。この生タイヤは、
次の取出し部38で成形台車20から取り出されて、次
工程(例えば加硫工程)へ送られる。The BT band assembly formed in the BT band forming step 14 shown in FIG. 2 is delivered to the raw case assembly by the transfer section 34 and assembled, and then the raw tire stitching section 36 is used. The case assembly and the BT band assembly are stitched to complete the molding of the raw tire. This raw tire
It is taken out from the molding cart 20 at the next take-out section 38 and sent to the next step (for example, a vulcanization step).
【0024】図2に示すBTバンド成形工程では、矩形
状の走行ライン18に沿って図2の紙面右回りに第1ベ
ルト貼付部40、第2ベルト貼付部42、レイヤベルト
/キャップベルト(LAY/CAP)貼付部44、トッ
プトレッド(TT)貼付部46及びトランスファ部34
が設けられている。In the BT band forming step shown in FIG. 2, the first belt attaching portion 40, the second belt attaching portion 42, the layer belt / cap belt (LAY) are rotated along the rectangular traveling line 18 in the clockwise direction of the paper surface of FIG. / CAP) pasting section 44, top tread (TT) pasting section 46 and transfer section 34
Is provided.
【0025】このBTバンド成形工程14では、成形台
車21が走行ライン18に沿って図2の紙面右回りに第
1ベルト貼付部40、第2ベルト貼付部42、LAY/
CAP貼付部44及びTT貼付部46を経ながら走行し
て、BTバンドアッセンブリが形成される。このBTバ
ンドアッセンブリは、トランスファー部34で成形台車
21から取り出されて、前記した生タイヤ成形工程12
を走行して生ケースアッセンブリが形成されている成形
台車20へ載せられて生ケースアッセンブリと組み合わ
せられる。In the BT band forming step 14, the forming carriage 21 rotates along the running line 18 in the clockwise direction on the paper surface of FIG. 2 for the first belt attaching portion 40, the second belt attaching portion 42, and LAY /
The BT band assembly is formed by running while passing through the CAP sticking portion 44 and the TT sticking portion 46. This BT band assembly is taken out from the molding carriage 21 at the transfer portion 34, and the green tire molding step 12 described above is performed.
And is mounted on a forming trolley 20 on which the raw case assembly is formed and is combined with the raw case assembly.
【0026】図1及び図2に示されるように、生タイヤ
成形工程12のI/L・CH貼付部22〜生タイヤステ
ッチング部36及びBTバンド成形工程14の第1ベル
ト貼付部40〜TT貼付部46のそれぞれには、複数台
(本実施例では、一例としてA〜NまでのN台としてい
る)の処理ステージが設けられている。それぞれの処理
ステージは、成形するタイヤのサイズに係わるタイヤの
幅、リム径に合わせて設けられており、タイヤ幅、リム
径の相違に応じた部材が図示しない前処理工程から順次
供給され、タイヤ幅、リム径が同一サイズのタイヤのみ
が同じ処理ステージで処理される。As shown in FIGS. 1 and 2, the I / L / CH attaching portion 22 to the raw tire stitching portion 36 in the raw tire forming step 12 and the first belt attaching portion 40 to TT in the BT band forming step 14. Each of the sticking units 46 is provided with a plurality of processing stages (in this embodiment, as an example, N units from A to N) are provided. Each processing stage is provided according to the tire width and rim diameter related to the size of the tire to be molded, and members according to the difference in tire width and rim diameter are sequentially supplied from a pretreatment process (not shown). Only tires with the same width and rim diameter are processed at the same processing stage.
【0027】次に生タイヤ成形工程12、BTバンド成
形工程14の走行ライン16、18を走行する成形台車
20、21について説明する。Next, the molding carriages 20 and 21 that travel on the running lines 16 and 18 in the green tire molding step 12 and the BT band molding step 14 will be described.
【0028】図3(A)に示されるように、成形台車2
0は無人走行車100の上部にブラケット102に支持
された成形ドラム104が配置されており、この成形ド
ラム104に前記した各処理部でバンドアッセンブリ、
生ケースアッセンブリが形成される。As shown in FIG. 3 (A), the forming trolley 2
In No. 0, the molding drum 104 supported by the bracket 102 is arranged on the upper part of the unmanned traveling vehicle 100, and the band assembly at each processing unit described above is formed on the molding drum 104,
A green case assembly is formed.
【0029】また、図3(B)に示されるように、成形
台車21は、無人走行車100の上部に設けたブラケッ
ト102に成形ドラムとしてBTドラム105が配置さ
れており、このBTドラム105にBTバンドアッセン
ブリが形成される。Further, as shown in FIG. 3B, in the forming carriage 21, a BT drum 105 is arranged as a forming drum on a bracket 102 provided on the upper part of the unmanned traveling vehicle 100. A BT band assembly is formed.
【0030】図3(A)、図3(B)及び図4に示され
るように、この無人走行車100は、下方が開放された
略矩形箱体上の台車106の四隅に設けられたキャスタ
107によって床面に支持され、この状態では作業員の
手押しで走行可能となっている(図4では一部のみ図
示)。As shown in FIGS. 3 (A), 3 (B) and 4, this unmanned vehicle 100 has casters provided at four corners of a dolly 106 on a substantially rectangular box whose bottom is opened. It is supported on the floor surface by 107, and in this state, it can run by being pushed by a worker (only a part is shown in FIG. 4).
【0031】図5及び図4に示されるように、この無人
走行車100の台車106には、前後方向の両側に自動
走行用の走行駆動装置110が互いに対向した状態で対
で取り付けられている。なお、この前後の走行駆動装置
110は、取り付ける向きののみが異なった同一形状の
ものであり、以下は、一方の走行駆動装置110につい
て説明する。なお、各図中の矢印C方向は、無人走行車
110の進行前後方向を示し、矢印D方向は、走行横方
向を示している。As shown in FIGS. 5 and 4, the carriage 106 of the unmanned vehicle 100 is provided with the traveling drive devices 110 for automatic traveling on both sides in the front-rear direction in a pair so as to face each other. . The front and rear traveling drive devices 110 have the same shape except that they are mounted in different directions, and one traveling drive device 110 will be described below. In addition, the arrow C direction in each drawing shows the forward and backward directions of the unmanned traveling vehicle 110, and the arrow D direction shows the traveling lateral direction.
【0032】図5に示されるように、この走行駆動装置
110は、略コ字状のブラケット112の内方に駆動モ
ータ114、116が取り付けられている。駆動モータ
114、116は、走行前後方向に対で設けられ、それ
ぞれの駆動軸114A、116Aがブラケット112の
側壁118を貫通して互いに反対方向へ走行横方向に沿
って突設されている。また、ブラケット112の側壁1
18には、横方向の外側にシャフト120が突設されて
おり、それぞれのシャフト120には、タイヤ108が
回転自在に取り付けられている。As shown in FIG. 5, in the traveling drive device 110, drive motors 114 and 116 are attached inside a substantially U-shaped bracket 112. The drive motors 114 and 116 are provided as a pair in the front-rear direction of travel, and the respective drive shafts 114A and 116A penetrate through the side walls 118 of the bracket 112 and project in opposite directions along the lateral travel direction. Also, the side wall 1 of the bracket 112
A shaft 120 is projectingly provided on the outer side of the shaft 18 in the lateral direction, and a tire 108 is rotatably attached to each shaft 120.
【0033】駆動モータ114、116の駆動軸114
A、116Aのそれぞれには、プーリー122が設けら
れ、タイヤ108に一体回転可能に設けられたプーリー
124との間に無端の駆動ベルト126が巻き掛けられ
ている。このため、駆動モータ114、116の駆動に
よって、ブラケット112の走行横方向の両側のタイヤ
108がそれぞれ別々に回転駆動されるようになってい
る。Drive shaft 114 of drive motors 114 and 116
A pulley 122 is provided on each of A and 116A, and an endless drive belt 126 is wound around a pulley 124 that is integrally rotatable with the tire 108. Therefore, by driving the drive motors 114 and 116, the tires 108 on both sides of the bracket 112 in the lateral traveling direction are separately driven to rotate.
【0034】一方、図7に示されるように、無人走行車
100の台車106には、上面の天板128の下側面に
軸130が掛け渡された一対のブロック132が取り付
けられている。この軸130には、可動ベース板134
の一端に固着された一対のブロック136が回転可能に
貫通している。このため、可動ベース板134は、軸1
30を中心に上下方向に揺動可能となっている。On the other hand, as shown in FIG. 7, the bogie 106 of the unmanned traveling vehicle 100 is provided with a pair of blocks 132 around which a shaft 130 is suspended on the lower surface of the top plate 128 on the upper surface. A movable base plate 134 is attached to the shaft 130.
A pair of blocks 136 fixed to one end of the is rotatably penetrated. Therefore, the movable base plate 134 is
It is possible to swing up and down around 30.
【0035】図6及び図7に示されるように、この可動
ベース板134の下方には、前記した走行駆動装置11
0が配設されており、稼働ベース板134の中央部に
は、円筒部材138が貫通して軸方向の中間部が固着さ
れている。この円筒部材138は下端部が閉塞されてお
り、上方から挿入されているコイルバネ140を収容し
ている。このコイルバネ140の上部は、円筒部材13
8から突出して天板128の下面に当接して可動ベース
板134を下方へ向けて付勢している。As shown in FIGS. 6 and 7, below the movable base plate 134, the traveling drive device 11 described above is provided.
0 is arranged, and a cylindrical member 138 penetrates through the central portion of the operation base plate 134, and an intermediate portion in the axial direction is fixed. The cylindrical member 138 has a closed lower end, and accommodates a coil spring 140 inserted from above. The upper part of this coil spring 140 is
8 is abutted against the lower surface of the top plate 128 to urge the movable base plate 134 downward.
【0036】また、可動ベース板134を貫通した円筒
部材138の先端部は、走行駆動装置110のブラケッ
ト112を貫通して、ブラケット112に設けられた図
示しない自動調芯軸受を介してブラケット112に接続
されている。図7に示されるように、走行駆動装置11
0のブラケット112には、可動ベース板134に当接
するコロ142が設けられており、可動ベース板134
とブラケット112の上面が略平行に保たれた状態で、
走行駆動装置110が円筒状部材138を中心に回転自
在に連結され、この可動ベース板134を介して台車1
06に取り付けられている。The tip of the cylindrical member 138 penetrating the movable base plate 134 also penetrates the bracket 112 of the traveling drive unit 110, and is attached to the bracket 112 via an unillustrated self-aligning bearing provided in the bracket 112. It is connected. As shown in FIG. 7, the traveling drive device 11
The bracket 112 of 0 is provided with a roller 142 that abuts against the movable base plate 134.
With the upper surfaces of the bracket 112 and the bracket 112 kept substantially parallel,
The traveling drive device 110 is rotatably connected around a cylindrical member 138, and the trolley 1 is mounted via the movable base plate 134.
It is attached to 06.
【0037】また、図6に示されるように、台車106
には、可動ベース板134のブロック136と反対側の
端部にコロ144が設けられており、このコロ144に
は、台車106の天板128に取り付けられた昇降モー
タ146の駆動軸146Aに設けられている偏心カム1
48が対向されている。この偏心カム148は、昇降モ
ータ146の駆動によって偏心回転し、コロ144を天
板128へ接近する方向へ押し上げ可能となっている。Further, as shown in FIG.
Is provided with a roller 144 at an end of the movable base plate 134 opposite to the block 136. The roller 144 is provided on a drive shaft 146A of a lifting motor 146 attached to a top plate 128 of the carriage 106. Eccentric cam 1
48 are facing each other. The eccentric cam 148 is eccentrically rotated by the drive of the lifting motor 146, and can push up the roller 144 in a direction approaching the top plate 128.
【0038】台車106では、偏心カム148がコロ1
44と離間した状態で可動ベース板134がコイルバネ
140の付勢力によって下方へ移動し、走行駆動装置1
10のタイヤ108をキャスタ107より突出させて床
面に接するようにしている。これによって、無人走行車
100は、走行駆動装置110の駆動モータ114、1
16によって回転駆動するタイヤ108による走行が可
能となる。In the dolly 106, the eccentric cam 148 has a roller 1
The movable base plate 134 moves downward by the urging force of the coil spring 140 in a state of being separated from the drive motor 44.
Ten tires 108 are projected from the casters 107 to contact the floor surface. As a result, the unmanned vehicle 100 is driven by the drive motors 114, 1
16 makes it possible to travel by the tire 108 that is rotationally driven.
【0039】このとき、走行駆動装置110の駆動モー
タ114、116によって左右のタイヤ108が別々に
回転することにより、台車106に対して走行駆動装置
110が円筒部材138を中心に回動してタイヤ108
の向きが代わり、台車106の前進、後進と共に左右の
旋回が可能となっている。なお、走行駆動装置110に
は、台車106に対してタイヤ108が直進方向へ向い
ていることを検出する図示しないリミットスイッチが設
けられており、左右の旋回状態からこのリミットスイッ
チによってタイヤ108が略直進状態となっていること
を確認するようにしている。At this time, the left and right tires 108 are separately rotated by the drive motors 114 and 116 of the traveling drive device 110, so that the traveling drive device 110 rotates with respect to the carriage 106 about the cylindrical member 138. 108
The direction of is changed, and it is possible to turn left and right as the carriage 106 moves forward and backward. The travel drive device 110 is provided with a limit switch (not shown) that detects that the tire 108 is in a straight traveling direction with respect to the carriage 106. I try to make sure that I'm in a straight line.
【0040】また、昇降モータ146によって偏心カム
148を回転させてコロ144を上方へ押し上げること
により、可動ベース板134を軸130を中心に回動さ
せて、タイヤ108を引き入れてキャスタ107が床面
に接するようにしている。これによって、無人走行車1
00が作業員の手押しによって移動可能となっている。Further, by rotating the eccentric cam 148 by the lifting motor 146 and pushing up the roller 144 upward, the movable base plate 134 is rotated around the shaft 130, the tire 108 is pulled in, and the caster 107 is placed on the floor. I try to contact him. As a result, the unmanned vehicle 1
00 can be moved by the manual operation of a worker.
【0041】図8には、無人走行車100の走行制御装
置150のブロック図を示している。この無人走行車1
00の走行制御装置150には、バッテリー152が設
けられており、このバッテリー152が、電源回路15
4を介して制御ユニット156に接続されている。この
制御ユニット156は、図示しないCPU、ROM及び
RAMメモリ、I/Oポート、複数のドライバによって
構成されており、それぞれの走行駆動装置110の駆動
モータ114、116、昇降モータ146へバッテリー
152からの電源を供給して駆動するようになってい
る。FIG. 8 is a block diagram of the traveling control device 150 of the unmanned vehicle 100. This unmanned vehicle 1
The drive control device 150 of No. 00 is provided with a battery 152.
4 to the control unit 156. The control unit 156 is composed of a CPU, a ROM and a RAM memory, an I / O port, and a plurality of drivers, which are not shown, and drives the drive motors 114 and 116 and the lift motor 146 of the traveling drive device 110 from the battery 152. It is designed to supply power and drive.
【0042】なお、無人走行車100には、バッテリー
152への充電用の充電ターミナル152Aが設けられ
ており、所定の位置に設けられている図示しない充電装
置と接続されることにより、バッテリー152への充電
が可能となる。The unmanned vehicle 100 is provided with a charging terminal 152A for charging the battery 152, and when it is connected to a charging device (not shown) provided at a predetermined position, the battery 152 is charged. Can be charged.
【0043】一方、この無人走行車110には、前部及
び後部にセンサユニット160が設けられている。この
センサユニット160は、発光素子と受光素子が対で設
けられた3個の光電センサ162A、162B、162
Cによって構成されている。このセンサユニット160
は、後述する走行ライン16、18を形成するガイドテ
ープの右端部、中央部及び左端部に対向するように配置
され、それぞれの光電センサ162A〜162Cがガイ
ドテープを検出しているか否かに応じて、走行駆動装置
110の駆動モータ114、116の回転数を制御し、
光電センサ162A〜162Cが常にガイドテープを検
出するようにしている。On the other hand, the unmanned vehicle 110 is provided with sensor units 160 at its front and rear portions. The sensor unit 160 includes three photoelectric sensors 162A, 162B, 162 each having a light emitting element and a light receiving element provided in a pair.
It is composed of C. This sensor unit 160
Are arranged so as to face the right end portion, the central portion, and the left end portion of the guide tape forming the running lines 16 and 18, which will be described later, and depending on whether or not each photoelectric sensor 162A to 162C detects the guide tape. To control the rotational speeds of the drive motors 114 and 116 of the traveling drive device 110,
The photoelectric sensors 162A to 162C always detect the guide tape.
【0044】また、無人走行車100には、横方向の一
端側の所定の位置にアドレスセンサ164が設けられて
いる。このアドレスセンサ164は、後述する走行ライ
ン16、18に沿って所定の位置に貼付されているアド
レスマークを検出するようになっている。本実施例で
は、アドレスセンサ164として磁気式センサを用い、
アドレスマークとして磁気テープを用いており、無人走
行車100は、この磁気テープによって示される情報か
ら走行ライン16、18上の位置及び次に行う処理を判
断することができるようになっている。Further, the unmanned vehicle 100 is provided with an address sensor 164 at a predetermined position on one end side in the lateral direction. The address sensor 164 is adapted to detect an address mark attached at a predetermined position along traveling lines 16 and 18 described later. In this embodiment, a magnetic sensor is used as the address sensor 164.
A magnetic tape is used as the address mark, and the unmanned traveling vehicle 100 can determine the position on the traveling lines 16 and 18 and the next process to be performed based on the information indicated by the magnetic tape.
【0045】この無人走行車100の走行制御装置15
0には、手動操作用の操作パネル166と共に、通信ユ
ニット168が設けられ、制御ユニット156に接続さ
れている。通信ユニット168は、無人走行車100を
タイヤ自動成形システム10の各処理部を一括してコン
トロールするホストコンピュータ170と無線によって
通信する。The traveling control device 15 of the unmanned vehicle 100
0, a communication unit 168 is provided together with an operation panel 166 for manual operation, and is connected to the control unit 156. The communication unit 168 wirelessly communicates the unmanned vehicle 100 with the host computer 170 that collectively controls the processing units of the automatic tire molding system 10.
【0046】図9に示されるように、ホストコンピュー
タ170は、生タイヤ自動成形システム10の生タイヤ
成形工程12及びBTバンド成形工程14の各処理部に
接続されており、それぞれの処理部の各処理ステージで
の処理の進行状況、部材の搬入状況を管理するようにな
っている。無人走行車100、すなわち、成形台車2
0、21は、このホストコンピュータ170から通信ユ
ニット168を介して入力される指示によって作動する
ようになっている。As shown in FIG. 9, the host computer 170 is connected to the respective processing units of the raw tire forming process 12 and the BT band forming process 14 of the raw tire automatic forming system 10, and the respective processing units are connected. The progress status of processing at the processing stage and the loading status of members are managed. The unmanned vehicle 100, that is, the forming carriage 2
0 and 21 are operated according to an instruction input from the host computer 170 via the communication unit 168.
【0047】なお、生タイヤ成形工程12では、ST貼
付部32とトランスファ部34の間に生ケースアッセン
ブリの検査を行う検査ステージ90が設けられ、生タイ
ヤステッチング部36と取出し部38の間に成形された
生タイヤの検査を行う検査ステージ92が設けられ、B
Tバンド成形工程14では、TT貼付部46とトランス
ファ部34の間に成形されたBTバンドの検査を行う検
査ステージ94が設けられており、これらの検査ステー
ジ90、92、94がホストコンピュータ170に接続
されている。In the raw tire molding step 12, an inspection stage 90 for inspecting the raw case assembly is provided between the ST attaching portion 32 and the transfer portion 34, and between the raw tire stitching portion 36 and the take-out portion 38. An inspection stage 92 for inspecting the molded green tire is provided, and
In the T-band forming step 14, an inspection stage 94 for inspecting the BT band formed between the TT attaching section 46 and the transfer section 34 is provided, and these inspection stages 90, 92, 94 are provided in the host computer 170. It is connected.
【0048】また、主走行路50では、I/L・CH貼
付部22の手前に成形台車20のホームポジション96
が設定され、主走行路60では、第1ベルト貼付部40
の手前に成形台車21のホームポジション98が設定さ
れており、それぞれの成形台車20、21は、ホームポ
ジション96、98でホストコンピュータ170から作
業指示が伝送されるようになっている。On the main traveling path 50, the home position 96 of the molding carriage 20 is located in front of the I / L / CH attaching section 22.
Is set, and in the main traveling path 60, the first belt attaching section 40
The home position 98 of the forming carriage 21 is set in front of, and the work instructions are transmitted from the host computer 170 to the forming carriages 20 and 21 at the home positions 96 and 98, respectively.
【0049】ここで、生タイヤ成形工程12及びBTバ
ンド成形工程14における成形台車20、21の走行に
ついて説明する。Here, the running of the forming carriages 20 and 21 in the green tire forming step 12 and the BT band forming step 14 will be described.
【0050】図1に示されるように、生タイヤ成形工程
12の走行ライン16は、外周部にループ状の主走行路
50が形成され、この主走行路50には、I/L・CH
貼付部22〜生タイヤステッチング部36の各処理ステ
ージへ分岐して戻る引込み路52が形成されている。ま
た、第1プライ貼付部24〜ST貼付部32の間には、
主走行路50の内側に主走行路50と平行に副走行路5
4が形成され、また、主走行路50の内方には、主走行
路50から分岐して戻る複数の充電路56、充電路56
のそれぞれから延長された待機路58が形成されてい
る。As shown in FIG. 1, the running line 16 of the green tire forming step 12 has a loop-shaped main running path 50 formed on the outer periphery thereof, and the main running path 50 has I / L.CH.
A lead-in path 52 that branches back to each processing stage of the sticking section 22 to the raw tire stitching section 36 is formed. In addition, between the first ply attaching section 24 to the ST attaching section 32,
Inside the main road 50, the sub-road 5 is parallel to the main road 50.
4 are formed, and inside the main traveling road 50, a plurality of charging passages 56 branching from the main traveling passage 50 and returning,
A waiting path 58 extending from each of the above is formed.
【0051】また、図2に示されるように、TBバンド
成形工程14の走行ライン18は、外周部にループ状の
主走行路60が形成され、この主走行路60からそれぞ
れの処理ステージへ向けて引込み路52が形成されると
共に、主走行路60の内側に複数の充電待機路62が形
成されている。Further, as shown in FIG. 2, the traveling line 18 of the TB band forming step 14 has a loop-shaped main traveling path 60 formed on the outer peripheral portion thereof, and the main traveling path 60 is directed toward each processing stage. And a plurality of charging standby paths 62 are formed inside the main traveling path 60.
【0052】図10(A)、図10(B)、図11
(A)及び図11(B)に示されるように、主走行路5
0、60、引込み路52、副走行路54、充電路56、
待機路58及び充電待機路62は、それぞれ一定幅のガ
イドテープ64が床面に貼付されて形成されており、前
記した如く、成形台車20、21は、無人走行車100
がセンサユニット160によってこのガイドテープ64
を検出しながら、ガイドテープ64によって構成された
走行ライン16、18に沿って走行するようになってい
る。FIGS. 10A, 10B and 11
As shown in (A) and FIG. 11 (B), the main road 5
0, 60, lead-in path 52, sub-running path 54, charging path 56,
The standby path 58 and the charging standby path 62 are each formed by adhering a guide tape 64 having a constant width to the floor surface. As described above, the forming carriages 20 and 21 are the unmanned vehicle 100.
The sensor unit 160 allows the guide tape 64
It is configured to travel along the travel lines 16 and 18 constituted by the guide tape 64 while detecting the.
【0053】図11(A)及び図11(B)に示される
ように、主走行路50、60、充電路56、待機路58
及び充電待機路62のコーナ部及び副走行路54、充電
路56、充電待機路62との間の進入口のコーナ部は、
所定の半径Rとなるようにガイドテープ64を円弧状に
貼付しており、成形台車20、21は、このガイドテー
プ64の円弧に沿って旋回しながら走行するようになっ
ている。また、図10(B)に示されるように、主走行
路50、60と引込み路52との間には、成形台車2
0、21の前後の走行駆動装置110に対応させて、所
定の間隔でガイドテープ64を2条に分けて貼付してい
る。As shown in FIGS. 11 (A) and 11 (B), the main running paths 50 and 60, the charging path 56, and the standby path 58.
And the corner portion of the charging standby path 62 and the corner portion of the entrance between the auxiliary traveling path 54, the charging path 56, and the charging standby path 62,
The guide tape 64 is attached in an arc shape so as to have a predetermined radius R, and the molding carriages 20 and 21 are configured to travel while turning along the arc of the guide tape 64. Further, as shown in FIG. 10B, the molding carriage 2 is provided between the main traveling paths 50 and 60 and the pull-in path 52.
Corresponding to the front and rear traveling drive devices 110 of 0 and 21, the guide tape 64 is divided into two and attached at a predetermined interval.
【0054】一方、走行ライン16、18には、ガイド
テープ64に沿った所定の位置にアドレスマーク66が
設けられている。このアドレスマーク66は、主走行路
50、60の引込み路52、副走行路54、充電路5
6、待機路58及び充電待機路62のそれぞれの分岐位
置を明確にすると共に、主走行路50、56からの分岐
位置に接近したことを示すためのアドレスマーク66が
分岐位置を示すアドレスマーク66から所定の距離だけ
手前側に設けられている。また、主走行路50、60に
沿った検査ステージ90、92、94及びホームポジシ
ョン96、98にも、それぞれの位置を示すためのアド
レスマーク66が設けられている。On the other hand, the traveling lines 16 and 18 are provided with address marks 66 at predetermined positions along the guide tape 64. The address mark 66 indicates the lead-in path 52 of the main running paths 50, 60, the sub-running path 54, and the charging path 5.
6, the branch position of each of the standby path 58 and the charging standby path 62 is clarified, and the address mark 66 for indicating that the branch position from the main traveling paths 50, 56 is approached is an address mark 66 indicating the branch position. Is provided on the front side by a predetermined distance from. Further, the inspection stages 90, 92, 94 and the home positions 96, 98 along the main traveling paths 50, 60 are also provided with address marks 66 for indicating their respective positions.
【0055】図10(A)に示されるように、主走行路
50、56、充電路56、待機路58、充電待機路62
等の直線路では、成形台車20、21を停止させる所定
の位置にアドレスマーク66Aが設けられ、そのアドレ
スマーク66Aの進行方向手前側には、所定の間隔離間
した位置に減速用のアドレスマーク66Bが設けられて
いる。これらの直線路を走行する成形台車20、21
は、所定のアドレスマーク66Aで停止しようとすると
きには、アドレスマーク66Aの手前のアドレスマーク
66Bを検出すると減速して、アドレスマーク66Aを
検出した位置、又はこのアドレスマーク66Aから所定
の距離走行した位置で正確に停止することができるよう
になっている。As shown in FIG. 10A, the main traveling paths 50 and 56, the charging path 56, the standby path 58, and the charging standby path 62.
On a straight road such as the above, an address mark 66A is provided at a predetermined position to stop the forming carriages 20 and 21, and the address mark 66B for deceleration is provided at a position separated by a predetermined distance on the front side in the traveling direction of the address mark 66A. Is provided. Forming trolleys 20 and 21 traveling on these straight roads
When stopping at a predetermined address mark 66A, when the address mark 66B in front of the address mark 66A is detected, the vehicle decelerates to a position where the address mark 66A is detected or a position where the vehicle travels a predetermined distance from the address mark 66A. You can now stop exactly.
【0056】また、図11(A)及び図11(B)に示
されるように、走行ライン16、18のコーナ部又は分
岐が形成されたコーナ部には、コーナ部の進入位置及び
退出位置にアドレスマーク66C、66Dが貼付される
と共に、アドレスマーク66Cの手前にアドレスマーク
66Eが貼付されている。成形台車20、21は、旋回
しようとするコーナ部の手前のアドレスマーク66Eを
検出すると減速し、アドレスマーク66Cの検出によっ
て、駆動モータ114、116の回転数を換えて、所定
の半径Rで旋回する。この旋回中にアドレスマーク66
Dを検出すると、直進状態に戻すと共に加速走行を開始
するようになっている。Further, as shown in FIGS. 11 (A) and 11 (B), the corners of the running lines 16 and 18 or the corners where the branches are formed are located at the entry and exit positions of the corners. The address marks 66C and 66D are attached, and the address mark 66E is attached in front of the address mark 66C. The forming carriages 20 and 21 decelerate when detecting the address mark 66E in front of the corner portion about to rotate, and change the number of rotations of the drive motors 114 and 116 according to the detection of the address mark 66C to rotate at a predetermined radius R. To do. During this turn, the address mark 66
When D is detected, the vehicle is returned to the straight traveling state and the acceleration traveling is started.
【0057】一方、図10(B)に示されるように、主
走行路50、60から引込み路52への引込み口及び引
込み路52から主走行路50、60への進入口には、ア
ドレスマーク66F、66Gが設けられており、このア
ドレスマーク66Fの手前にアドレスマーク66Hが設
けられている。成形台車20、21は、アドレスマーク
66Hによって進路変更するアドレスマーク66Fの手
前に差しかかったと判断すると減速し、この後アドレス
マーク66Fを検出すると、前後の走行駆動装置110
の駆動モータ114、116の変速によってタイヤ10
8を同時に相対回転させるようになっている。これによ
って、成形台車20、21は、横方向へ平行に引込み路
52へ移動し、アドレスマーク66Gを検出すると、直
進するようになっている。On the other hand, as shown in FIG. 10B, address marks are provided at the entrances from the main running paths 50, 60 to the lead-in paths 52 and the entrances from the draw-in paths 52 to the main running paths 50, 60. 66F and 66G are provided, and an address mark 66H is provided in front of the address mark 66F. The forming carriages 20 and 21 decelerate when determining that they are approaching the address mark 66F which is to change the course by the address mark 66H, and when the address mark 66F is detected thereafter, the front and rear traveling drive devices 110 are detected.
By changing the speeds of the drive motors 114 and 116 of the tire 10
It is designed such that 8 is relatively rotated at the same time. As a result, the forming carriages 20 and 21 move to the pull-in path 52 in parallel in the lateral direction, and when the address mark 66G is detected, they move straight.
【0058】なお、引込み路52でも所定の位置にアド
レスマーク66A、66Bが設けられ、処理ステージに
対向する所定の位置に停止可能となっている。引込み路
52から主走行路50、60への進入口にもアドレスマ
ーク66F、66Hと同様の移動を可能とするアドレス
マーク66が設けられている。Address marks 66A and 66B are also provided at predetermined positions in the pull-in path 52 so that they can be stopped at predetermined positions facing the processing stage. An address mark 66 that enables the same movement as the address marks 66F and 66H is also provided at the entrance from the lead-in path 52 to the main traveling paths 50 and 60.
【0059】次に本実施例の作用を説明する。本実施例
のタイヤ自動成形システム10では、生タイヤ成形工程
12の走行路16及びBTバンド成形工程14の走行ラ
イン18上に多数台の成形台車20、21が設けられて
いる。それぞれの成形台車20、21は、タイヤの幅サ
イズ、リム径毎の成形ドラム104又はBTドラム10
5が設けられている。また、それぞれの成形台車20、
21には予めID番号が付与されており、ホストコンピ
ュータ170が個別に処理指示を行っている。また、走
行ライン16、18には、所定の位置に一連のアドレス
マーク66が貼付されており、それぞれの成形台車2
0、21の制御ユニット156には、それぞれのアドレ
スマーク66に応じた処理内容が明確となるように予め
記憶されている。Next, the operation of this embodiment will be described. In the tire automatic molding system 10 of the present embodiment, a large number of molding carriages 20 and 21 are provided on the traveling path 16 of the raw tire molding step 12 and the traveling line 18 of the BT band molding step 14. Each of the molding carriages 20 and 21 has a molding drum 104 or a BT drum 10 for each tire width size and rim diameter.
5 are provided. In addition, each forming carriage 20,
An ID number is assigned to 21 in advance, and the host computer 170 issues a processing instruction individually. Further, a series of address marks 66 are attached at predetermined positions on the traveling lines 16 and 18, and each of the forming carriages 2
The control units 156 of 0 and 21 are pre-stored so that the processing content corresponding to each address mark 66 becomes clear.
【0060】各成形台車20、21は、主走行路50又
は主走行路60のホームポジション96、98でホスト
コンピュータ170から作業指示として、作業のための
走行経路に沿ったアドレスマーク66が入力される。こ
の作業指示は、成形するタイヤの幅サイズ、リム径に応
じた各処理部の処理ステージを選択して、それぞれの処
理ステージをつなぐための一連のアドレスマーク66が
入力される。また、それぞれの成形台車20、21の走
行開始の指示は、無線によって送られる。In each of the molding carriages 20 and 21, at the home positions 96 and 98 of the main traveling road 50 or the main traveling road 60, the address mark 66 along the traveling route for work is input as a work instruction from the host computer 170. It This work instruction selects a processing stage of each processing unit according to the width size of the tire to be molded and the rim diameter, and inputs a series of address marks 66 for connecting the processing stages. Further, the instruction to start running the respective molding carriages 20 and 21 is sent by radio.
【0061】ここで、図12に示すフローチャートを参
照しながら、生タイヤ成形工程12での成形台車20の
移動による生ケースアッセンブリから生タイヤの成形及
び、図13に示すフローチャートを参照しながらBTバ
ンド成形工程14での成形台車21の移動によるBTバ
ンドアッセンブリの成形について説明する。なお、本実
施例では一例として各処理部のBステージを用いたサイ
ズのタイヤの成形を行うものとしている。Now, referring to the flow chart shown in FIG. 12, forming a raw tire from the raw case assembly by moving the forming carriage 20 in the raw tire forming step 12, and referring to the flow chart shown in FIG. Molding of the BT band assembly by moving the molding carriage 21 in the molding step 14 will be described. In this embodiment, as an example, a tire having a size using the B stage of each processing unit is molded.
【0062】図12に示すフローチャートの最初のステ
ップ200では、待機路58で待機している成形台車2
0を選択してホームポジション96に移動させ、この成
形台車20に生ケースアッセンブリを形成した後、生タ
イヤを成形するための指示を行う(ステップ202)。
これに先立って、選択した成形台車20のバッテリー1
52に充電の必要がある場合は、一旦、充電路56で充
電を行った後に作業指示を行う。In the first step 200 of the flow chart shown in FIG. 12, the forming carriage 2 waiting on the waiting path 58.
After selecting 0 and moving it to the home position 96 to form a raw case assembly on the forming carriage 20, an instruction for forming a raw tire is given (step 202).
Prior to this, the battery 1 of the selected molding cart 20
When it is necessary to charge 52, charging is first performed on the charging path 56 and then a work instruction is given.
【0063】このステップ202での成形台車20への
作業指示は、各処理部のBステージの間を順に移動する
一連のアドレスマーク66を入力して行う。成形台車2
0は、指定されたアドレスマーク66に沿って移動し
て、所定の位置で停止し、次に移動開始の指示がある
と、さらに入力されたアドレスマーク66に沿って移動
する。The work instruction to the molding carriage 20 in this step 202 is performed by inputting a series of address marks 66 which sequentially move between the B stages of each processing section. Forming trolley 2
0 moves along the designated address mark 66, stops at a predetermined position, and then moves along the input address mark 66 when a movement start instruction is given.
【0064】次のステップ204では、I/L・CH貼
付部22の処理ステージ22Bで処理中であるか否かを
確認し、処理が終了した前の成形台車20が次の処理部
へ移動したことを確認した後、成形台車20の移動を指
示する(ステップ206)。In the next step 204, it is confirmed whether or not processing is being performed in the processing stage 22B of the I / L / CH attaching section 22, and the molding carriage 20 before the processing is moved to the next processing section. After confirming that, the movement of the molding cart 20 is instructed (step 206).
【0065】移動が指示された成形台車20は、アドレ
スマーク66を確認しながらI/L・CH貼付部22の
処理ステージ22Bの引込み路52へ進入し、所定の位
置で停止する。主走行路50から引込み路52へ進入す
る成形台車20は、前後の走行駆動装置110の作動に
よって横方向へ平行移動し、旋回等を行うことがないの
で、狭い移動スペースで正確に処理ステージ22Bの所
定の位置に接近させて停止することができる。また、成
形台車20を狭い場所で急に旋回させようとすると、成
形ドラム104を上方に配置しているため、挙動が不安
定になり易いが、平行移動させるために安定した状態で
移動することができる。The forming carriage 20 instructed to move enters the retracting path 52 of the processing stage 22B of the I / L / CH attaching section 22 while checking the address mark 66, and stops at a predetermined position. The forming carriage 20 that enters the retracting passage 52 from the main traveling passage 50 moves in parallel in the lateral direction by the operation of the front and rear traveling drive devices 110 and does not swivel, so that the processing stage 22B can be accurately performed in a narrow movement space. Can be stopped by approaching the predetermined position of the. Further, when the forming carriage 20 is suddenly turned in a narrow place, the forming drum 104 is arranged above, so that the behavior is likely to become unstable, but the forming carriage 104 moves in a stable state for parallel movement. You can
【0066】また、成形台車20が移動するときに、コ
ーナー部や引込み路52の手前にアドレスマーク66E
(図11(A)、(B)参照)や、アドレスマーク66
H(図10(B)参照)を設けて減速するようにしてい
るため、コーナー部や所定の引込み路52の近傍までの
直線部分を比較的速い速度で移動しても、容易にかつ円
滑にコーナー部での旋回や引込み路52への進入が可能
となる。Further, when the molding carriage 20 moves, the address mark 66E is provided in front of the corner portion and the drawing path 52.
(See FIGS. 11A and 11B) and the address mark 66.
Since H (see FIG. 10B) is provided to decelerate, even if the straight portion up to the corner or the vicinity of the predetermined retract path 52 is moved at a relatively high speed, it can be easily and smoothly. It is possible to turn at the corner and enter the lead-in path 52.
【0067】I/L・CH貼付部22では、成形台車2
0が引込み路52の所定の位置に停止したことを確認す
ると、I/L・CHの貼付作業を開始し、作業が終了す
ると、ホストコンピュータ170へ作業の終了を出力す
る。また、それぞれの処理部では、円滑に部材が供給さ
れているか等の処理状況もホストコンピュータ170へ
出力し、部材の不足等によって作業が停滞してしまうこ
とがないようにしている。In the I / L / CH attaching section 22, the forming carriage 2
When it is confirmed that 0 has stopped at a predetermined position of the pull-in path 52, the I / L • CH attaching work is started, and when the work is completed, the end of the work is output to the host computer 170. Further, in each processing unit, the processing status such as whether or not the members are smoothly supplied is also output to the host computer 170 so that the work will not be delayed due to lack of the members or the like.
【0068】次のステップ208では、I/L・CH貼
付部22からの終了信号から処理ステージ22Bで所定
の作業が終了したことを確認する(肯定判定)すると、
次のステップ210で、成形台車20を次の第1プライ
貼付部24の処理ステージ24Bへ移動させるのに他の
成形台車20と干渉することがないことを確認し(肯定
判定)、成形台車20を第1プライ貼付部24の処理ス
テージ24Bへの移動の指示を行う(ステップ21
2)。At the next step 208, when it is confirmed from the end signal from the I / L / CH attaching section 22 that the predetermined work is completed at the processing stage 22B (affirmative judgment),
In the next step 210, it is confirmed that the molding carriage 20 does not interfere with the other molding carriages 20 when the molding carriage 20 is moved to the processing stage 24B of the next first ply attaching section 24 (affirmative determination). To the processing stage 24B of the first ply attaching section 24 (step 21).
2).
【0069】成形台車20では、ホストコンピュータ1
70から移動の指示があると、引込み路52から主走行
路50へ平行移動し、主走行路50に沿ってアドレスマ
ーク66を確認しながら次の処理部へ移動する。In the forming carriage 20, the host computer 1
When there is a movement instruction from 70, the vehicle moves in parallel from the lead-in road 52 to the main traveling road 50, and moves to the next processing unit while checking the address mark 66 along the main traveling road 50.
【0070】このようにして、ホストコンピュータ17
0では、成形台車20を第1プライ貼付部24の処理ス
テージ24B(ステップ214〜218)、第2プライ
貼付部26の処理ステージ26B(ステップ220〜2
24)、ビードセット部28の処理ステージ28B(ス
テップ226〜230)、折り返し部30の処理ステー
ジ30B(ステップ232〜236)、ST貼付部32
の処理ステージ32B(ステップ238〜242)へ移
動させて成形ドラム104に所定サイズの生ケースアッ
センブリを成形する。In this way, the host computer 17
At 0, the molding cart 20 is moved to the processing stage 24B of the first ply attaching portion 24 (steps 214 to 218) and the processing stage 26B of the second ply attaching portion 26 (steps 220 to 2).
24), the processing stage 28B of the bead setting unit 28 (steps 226 to 230), the processing stage 30B of the folding portion 30 (steps 232 to 236), and the ST attaching unit 32.
To the processing stage 32B (steps 238 to 242) to mold a raw case assembly of a predetermined size on the molding drum 104.
【0071】ここで、ステップ240では、検査ステー
ジ90への成形台車20の移動が可能かを確認し、移動
が可能となっているときには(肯定判定)、成形台車2
0をST貼付部32の処理ステージ32Bから検査ステ
ージ90へ移動させ(ステップ242)る。検査ステー
ジ90では、成形ドラム104に形成している生ケース
アッセンブリの検査を行う。この検査が終了し(ステッ
プ244で確認)、成形している生ケースアッセンブリ
が規格通りであると、トランスファ部34の処理ステー
ジ34Bへの移動を指示する(ステップ250)。これ
によって、成形台車20はトランスファ部34の処理ス
テージ34(B)へ移動して所定の位置に停止する。な
お、検査結果から不具合が生じたとき(ステップ246
で否定判定)には、ステップ248へ移行してエラー処
理を行う。Here, in step 240, it is confirmed whether the molding carriage 20 can be moved to the inspection stage 90, and when the molding carriage 20 is movable (affirmative determination), the molding carriage 2 is moved.
0 is moved from the processing stage 32B of the ST attaching unit 32 to the inspection stage 90 (step 242). At the inspection stage 90, the raw case assembly formed on the forming drum 104 is inspected. When this inspection is completed (confirmed in step 244) and the raw case assembly being molded conforms to the standard, the transfer section 34 is instructed to move to the processing stage 34B (step 250). As a result, the molding carriage 20 moves to the processing stage 34 (B) of the transfer unit 34 and stops at a predetermined position. In addition, when a defect occurs from the inspection result (step 246
If the determination is negative, the process proceeds to step 248 and error processing is performed.
【0072】一方、図13に示すようにBTバンド成形
工程14では、前記した生タイヤ成形工程12での処理
と略同様の処理を行っている。このフローチャートの最
初のステップ300では、BTバンドアッセンブリの成
形に使用する成形台車21を選択して充電待機路62か
らホームポジション98へ移動させる。On the other hand, as shown in FIG. 13, in the BT band forming step 14, the same processing as that in the green tire forming step 12 is performed. In the first step 300 of this flowchart, the forming carriage 21 used for forming the BT band assembly is selected and moved from the charging standby path 62 to the home position 98.
【0073】次のステップ302では、成形台車21に
作業指示、即ち、各処理部のステージBへ順に移動して
所望のサイズのBTバンドアッセンブリが成形ドラム1
04に成形されるように出力して指示する。このとき、
生タイヤ成形工程12と同様に、必要なアドレスマーク
66を順に入力する。In the next step 302, a work instruction is given to the forming dolly 21, that is, the stage is moved to the stage B of each processing section in order and the BT band assembly of a desired size is formed into the forming drum 1.
Output and instruct to be molded into 04. At this time,
Similar to the green tire forming step 12, necessary address marks 66 are sequentially input.
【0074】次のステップ304では、第1ベルト貼付
部40の処理ステージ40Bへ成形台車21を移動可能
であるかを確認し、移動可能である(肯定判定)なら成
形台車21に移動開始を指示する。この後は、前記した
生タイヤ成形工程12の処理と同様の手順で第1ベルト
貼付部40の処理ステージ40B(ステップ308〜3
12)、第2ベルト貼付部42の処理ステージ42B
(ステップ314〜318)、LAY/CAP貼付部4
4の処理ステージ44B(ステップ320〜324)、
TT貼付部46の処理ステージ46B(ステップ326
〜330)で処理を行う。At the next step 304, it is confirmed whether or not the molding carriage 21 can be moved to the processing stage 40B of the first belt attaching section 40, and if it can be moved (affirmative determination), the molding carriage 21 is instructed to start moving. To do. After this, the processing stage 40B (steps 308 to 3) of the first belt attaching unit 40 is performed in the same procedure as the processing of the green tire forming step 12 described above.
12), the processing stage 42B of the second belt attaching unit 42
(Steps 314 to 318), LAY / CAP pasting unit 4
4 processing stage 44B (steps 320-324),
The processing stage 46B of the TT pasting unit 46 (step 326
~ 330).
【0075】これらの処理が終了した後に、成形台車2
1を検査ステージ94へ移動させ、検査ステージ94で
成形台車21のBTドラム105に成形しているBTバ
ンドアッセンブリの検査を行う。ステップ332、33
4では、検査ステージ94での検査の終了及び検査結果
を確認し、規格通りにBTバンドアッセンブリが形成さ
れていることを確認すると、ステップ338で、成形台
車21をトランスファ部34の処理ステージ34Bへ移
動するように指示する。なお、ステップ334で否定判
定されたときには、ステップ336へ移行してエラー処
理を行う。After these processes are completed, the forming carriage 2
1 is moved to the inspection stage 94, and the BT band assembly formed on the BT drum 105 of the forming carriage 21 is inspected by the inspection stage 94. Steps 332, 33
In step 4, after confirming the end of the inspection in the inspection stage 94 and the inspection result and confirming that the BT band assembly is formed according to the standard, in step 338, the molding carriage 21 is moved to the processing stage 34B of the transfer section 34. Instruct them to move. When a negative determination is made in step 334, the process proceeds to step 336 and error processing is performed.
【0076】トランスファ部34では、BTバンドアッ
センブリが成形されている成形台車21が所定の位置に
停止すると、この成形台車21からBTバンドアッセン
ブリを取り出す。In the transfer section 34, when the molding carriage 21 on which the BT band assembly is molded stops at a predetermined position, the BT band assembly is taken out from this molding carriage 21.
【0077】トランスファ部34でBTドラム105か
らBTバンドアッセンブリが取り出されたことを確認
(ステップ340で肯定判定)すると、次にこの成形台
車21を用いてBTバンドアッセンブリの成形を終了す
るかを判断し(ステップ342)、次の処理を行う場合
(否定判定)には、ステップ300へ戻る。また、処理
を終了するとき(肯定判定)には、成形台車20を充電
待機路62へ移動させて、必要に応じて充電処理を行い
停止させて待機させ(ステップ344で指示)て終了す
る。When the transfer unit 34 confirms that the BT band assembly has been taken out from the BT drum 105 (affirmative determination in step 340), it is then determined whether or not the molding of the BT band assembly is completed using this molding carriage 21. If the next process is performed (negative determination) (step 342), the process returns to step 300. Further, when the processing is to be ended (affirmative determination), the molding cart 20 is moved to the charging standby path 62, and if necessary, the charging processing is performed, stopped and waited (instructed in step 344), and the processing is ended.
【0078】一方、図12のフローチャートに示すよう
に、トランスファ部34で生ケースアッセンブリにBT
バンドアッセンブリが組付けられて、トランスファ部3
4での処理が終了したことを確認し(ステップ252で
肯定判定)、生タイヤステッチング部36の処理ステー
ジ36Bへの移動が可能であることを確認すると(ステ
ップ254で肯定判定)、成形台車20に移動の開始を
指示する(ステップ256)。On the other hand, as shown in the flowchart of FIG. 12, the BT is attached to the raw case assembly at the transfer section 34.
The band assembly is assembled and the transfer unit 3
When it is confirmed that the processing in step 4 has been completed (Yes in step 252) and that the raw tire stitching section 36 can be moved to the processing stage 36B (Yes in step 254), the forming cart 20 is instructed to start the movement (step 256).
【0079】生タイヤステッチング部36では、成形台
車20が所定の位置に停止すると処理を開始し、処理が
終了するとホストコンピュータ170へ処理の終了した
ことを出力する。これをホストコンピュータ170が確
認する(ステップ258で肯定判定)と、検査ステージ
92への成形台車20の移動が可能かを確認して(ステ
ップ260)、成形台車20を検査ステージ92へ移動
させる。The raw tire stitching section 36 starts the process when the molding carriage 20 stops at a predetermined position, and outputs the end of the process to the host computer 170 when the process is completed. When the host computer 170 confirms this (affirmative determination in step 258), it is confirmed whether the molding carriage 20 can be moved to the inspection stage 92 (step 260), and the molding carriage 20 is moved to the inspection stage 92.
【0080】検査ステージ92では、成形ドラム104
にサイズに応じた規格通りの生タイヤが成形されている
かを検査する。At the inspection stage 92, the molding drum 104
Inspect whether or not the raw tire is molded according to the standard according to the size.
【0081】この検査ステージ90での検査が終了(ス
テップ264で確認)し、規定通りに成形されていると
き(ステップ266で肯定判定)には、成形台車20に
取出し部38の処理ステージ38Bへの移動を指示する
(ステップ268)。When the inspection at the inspection stage 90 is completed (confirmed at step 264) and the molding is performed as specified (affirmative determination at step 266), the molding carriage 20 is moved to the processing stage 38B of the take-out section 38. Is instructed to move (step 268).
【0082】取出し部38では、形成台車20の成形ド
ラム104に成形している生タイヤを成形台車20から
取出し、保管ないし次の加硫工程へ搬送する。In the take-out section 38, the green tire formed on the forming drum 104 of the forming carriage 20 is taken out from the forming carriage 20 and stored or conveyed to the next vulcanization step.
【0083】ステップ270では、成形台車20から生
タイヤの取出しが終了したことを確認すると、この成形
台車20で次の成形処理を行うか否かを判断し(ステッ
プ272)、次の処理を行う場合(否定判定)はステッ
プ200へ移行し、新たな指示を出力する。また、この
成形台車20による処理を終了する場合には、成形台車
20を充電路56へ移動させて必要に応じて充電処理を
行い、待機路58へ移動させる(ステップ274)。At step 270, when it is confirmed that the green tires have been taken out from the molding carriage 20, it is judged whether or not the next molding processing is to be carried out by this molding carriage 20 (step 272), and the next processing is carried out. In the case (negative determination), the process proceeds to step 200 and a new instruction is output. Further, when the processing by the molding carriage 20 is finished, the molding carriage 20 is moved to the charging path 56, the charging processing is performed if necessary, and then moved to the standby path 58 (step 274).
【0084】このように、本実施例のタイヤ自動成形シ
ステム10では、多数台の成形台車20、21を用い
て、同一サイズのタイヤの成形は勿論、タイヤの幅、リ
ム径の異なるタイヤの成形も並行して行うことができ
る。このため、成形するタイヤサイズを変更するため
の、それぞれの処理部の設定を変更したり、それぞれの
処理部へ供給している部材の変更することなく、円滑に
多種類のタイヤサイズの成形を行うことができる。As described above, in the tire automatic molding system 10 of this embodiment, a large number of molding carriages 20 and 21 are used to mold not only tires of the same size but also tires having different tire widths and rim diameters. Can also be done in parallel. For this reason, it is possible to smoothly mold a wide variety of tire sizes without changing the setting of each processing unit or changing the members supplied to each processing unit in order to change the tire size to be molded. It can be carried out.
【0085】主走行路50、60上には、次の処理部へ
移動する成形台車20又は成形台車21しか存在せず、
他の成形台車20、21は引込み路52で処理が行われ
ているため、多数の成形台車20、21の同一の経路に
沿って移動させても、互いの移動が妨げられることがな
く円滑な移動が可能となる。On the main traveling paths 50 and 60, there is only the molding carriage 20 or the molding carriage 21 which moves to the next processing section,
Since the other molding carriages 20 and 21 are processed in the pull-in path 52, even if they are moved along the same path of a large number of molding carriages 20 and 21, their mutual movements are not hindered and smooth. It is possible to move.
【0086】また、成形台車20の進路変更や停止を行
うアドレスマーク66の手前に予備的にアドレスマーク
66(66A、66E、66H)を設けているため、直
線部分では成形台車20の比較的速い速度で走行させる
ことができ、成形台車20、21の移動を円滑にかつ確
実に行うことができ、短時間に多量のタイヤの成形が可
能となる。なお、本実施例では、それぞれの処理部に成
形するタイヤの種類に応じた数の処理ステージを設けた
が、異なるサイズのタイヤの中で、同一の部材を用いる
ことができる場合、異なるサイズのタイヤであっても処
理ステージを共用するように設定してもよく、これによ
って、多種類のタイヤを効率よく成形することが可能で
ある。Further, since the address mark 66 (66A, 66E, 66H) is preliminarily provided in front of the address mark 66 for changing the course of the molding carriage 20 or stopping, the molding carriage 20 is relatively fast in the straight line portion. It is possible to travel at a high speed, the molding carriages 20 and 21 can be smoothly and reliably moved, and a large amount of tires can be molded in a short time. In addition, in the present embodiment, the number of processing stages according to the type of tire to be molded is provided in each processing portion, but in the case where the same member can be used among tires of different sizes, different processing sizes are used. Even tires may be set so as to share the processing stage, which makes it possible to efficiently form many types of tires.
【0087】また、本実施例では、ブラケット102に
成形ドラム104又はBTドラム105が取り付けら
れ、無人走行装置100によって走行する走行台車2
0、21を用いたが、本発明に適用する成形台車の構
成、形状はこれに限定するものではなく、各処理部を自
動走行によって移動し、生ケースアッセンブリ、BTバ
ンドアッセンブリ、生タイヤを順次成形可能なものであ
れば適用可能である。Further, in the present embodiment, the forming truck 104 or the BT drum 105 is attached to the bracket 102, and the traveling vehicle 2 traveling by the unmanned traveling apparatus 100.
Although 0 and 21 were used, the configuration and shape of the forming carriage applied to the present invention are not limited to this, and each processing unit is moved by automatic traveling to sequentially form a raw case assembly, a BT band assembly, and a raw tire. Any material that can be molded is applicable.
【0088】また、本実施例では、それぞれループ状に
形成した異なる走行ライン16、18で成形台車20、
21を移動させる生タイヤ成形工程12とBTバンド成
形工程14に分けたタイヤ自動成形システム10を用い
て説明したが、一つの走行ラインで成形台車20のみを
移動させる構成であってもよく、また、3つ以上の異な
る走行ラインに沿って処理部を配置したものであっても
よい。Further, in this embodiment, the forming carriage 20 and the forming carriage 20 are respectively formed by different running lines 16 and 18 formed in loops.
The automatic tire forming system 10 divided into the raw tire forming step 12 for moving 21 and the BT band forming step 14 has been described, but it may be configured to move only the forming carriage 20 in one traveling line. The processing unit may be arranged along three or more different traveling lines.
【0089】さらには、タイヤ成形システムの一部を固
定ドラム式にすることも容易であり、例えば成形台車2
1を走行させているBTバンド成形工程14に代えて、
通常のBTバンド成形機を複数台並べて構成するように
したものでもよい。Furthermore, it is easy to make a part of the tire forming system a fixed drum type, for example, the forming carriage 2
1 in place of the BT band forming process 14 that is running,
It may be configured by arranging a plurality of normal BT band forming machines.
【0090】なお、本実施例で説明したタイヤの各成形
工程は、本発明を適用するタイヤ成形システムの各処理
部の構成を限定するものではなく、必要に応じて処理部
の削除及び追加を行うことができる。例えば、一部の部
材の製造設備まで成形台車を移動させて、製造された部
材を直接貼付するとか、成形台車を加硫工程(加硫機)
まで走行させて、完成した生タイヤを直接加硫機へ受け
渡すようにも容易に構成することができる。このとき、
ガイドテープ64を所定の規格に合わせて貼付すればよ
く、主走行路50、60の延長、主走行路50、60に
対するバイパス(例えば副走行路54)の設定も容易で
あり、より適切なタイヤ成形システムの構築が可能とな
る。It should be noted that each of the tire molding steps described in this embodiment does not limit the configuration of each processing section of the tire molding system to which the present invention is applied, and the processing section may be deleted or added as necessary. It can be carried out. For example, move the molding trolley to the manufacturing equipment for some of the components and directly attach the manufactured components, or vulcanize the molding trolley (vulcanizer).
It can be easily configured so that the completed raw tire is directly passed to the vulcanizer after being driven up to. At this time,
The guide tape 64 may be attached according to a predetermined standard, the main running paths 50 and 60 can be extended, and the bypass (for example, the sub running path 54) to the main running paths 50 and 60 can be easily set, and a more appropriate tire can be obtained. It is possible to build a molding system.
【0091】[0091]
【発明の効果】以上説明した如く、本発明のタイヤ成形
システムでは、多種類のサイズのタイヤの成形を並行し
て行うことができ、成形するタイヤサイズを変更するた
めに、各処理部に供給する部材を変更したり、装置の設
定を変える必要がない。これによって、効率的に多種類
のサイズのタイヤを大量に成形することが可能となる優
れた効果を有する。As described above, in the tire forming system of the present invention, tires of various sizes can be formed in parallel, and in order to change the tire size to be formed, each tire is supplied to each processing section. There is no need to change the member to be operated or change the setting of the device. This has an excellent effect that it is possible to efficiently form a large number of tires of various sizes.
【図1】本実施例の生タイヤ成形工程の概略構成図であ
る。FIG. 1 is a schematic configuration diagram of a raw tire forming process of the present embodiment.
【図2】本実施例のBTバンド成形工程の概略構成図で
ある。FIG. 2 is a schematic configuration diagram of a BT band forming process of the present embodiment.
【図3】成形台車を示す概略側面図である。FIG. 3 is a schematic side view showing a forming carriage.
【図4】無人走行車の概略斜視図である。FIG. 4 is a schematic perspective view of an unmanned vehicle.
【図5】無人走行車の概略平面図である。FIG. 5 is a schematic plan view of an unmanned vehicle.
【図6】走行駆動装置の概略斜視図である。FIG. 6 is a schematic perspective view of a traveling drive device.
【図7】走行駆動装置の概略正面図である。FIG. 7 is a schematic front view of the traveling drive device.
【図8】無人走行車の走行制御装置の概略構成を示すブ
ロック図である。FIG. 8 is a block diagram showing a schematic configuration of a travel control device for an unmanned vehicle.
【図9】本実施例に適用したタイヤ自動成形システムの
概略構成を示すブロック図である。FIG. 9 is a block diagram showing a schematic configuration of a tire automatic molding system applied to this embodiment.
【図10】(A)は走行ラインの直線路を示す概略図、
(B)は走行ラインの主走行路と引込み路の接続を示す
概略図である。FIG. 10 (A) is a schematic view showing a straight road of a traveling line,
(B) is a schematic diagram showing a connection between a main running path and a lead-in path of a running line.
【図11】(A)及び(B)はそれぞれ走行ラインのコ
ーナー部の概略図である。11A and 11B are schematic views of a corner portion of a traveling line.
【図12】生タイヤ成形工程での成形台車の走行を制御
するフローチャートである。FIG. 12 is a flow chart for controlling the running of a forming truck in a green tire forming process.
【図13】BTバンド成形工程での成形台車の走行を制
御するフローチャートである。FIG. 13 is a flowchart for controlling the traveling of the forming carriage in the BT band forming process.
10 タイヤ自動成型システム 12 生タイヤ成形工程 14 BTバンド成形工程 16、18 走行ライン 20、21 成形台車 34 トランスファ部(処理部、伝達処理部) 50、60 主走行路 52 引込み路 66(66A〜66H) アドレスマーク(指標) 100 無人走行車 104 成形ドラム 105 BTドラム(成形ドラム) 110 走行駆動装置(駆動手段) 164 アドレスセンサ(検出手段) 170 ホストコンピュータ(制御手段) 10 Tire Automatic Molding System 12 Raw Tire Molding Process 14 BT Band Molding Process 16, 18 Running Line 20, 21 Molding Cart 34 Transfer Section (Processing Section, Transmission Processing Section) 50, 60 Main Running Path 52 Retracting Path 66 (66A to 66H) ) Address mark (index) 100 Unmanned vehicle 104 Molding drum 105 BT drum (molding drum) 110 Traveling drive device (driving means) 164 Address sensor (detection means) 170 Host computer (control means)
Claims (4)
工して組付けて生タイヤを成形するための複数の処理部
のそれぞれにタイヤの幅サイズないしリム径に応じて別
々に設けた処理ステージと、 前記成形ドラムを備え駆動手段の駆動力により所定のラ
イン上を走行して移動する成形台車と、 前記成形台車の移動用として前記複数の処理工程の近傍
を生タイヤの成形順序に応じてループ状に接続しそれぞ
れの処理部の各処理ステージの所定の位置への引込み路
が設けられた走行ラインと、 前記複数の処理部及び前記成形台車が接続され、成形台
車に生タイヤの幅サイズないしリム径に応じて複数の処
理部の所定の処理ステージを結ぶ走行経路を指示して移
動させる制御手段と、 を有することを特徴とするタイヤ成形システム。1. A process in which predetermined members are sequentially processed around a molding drum and assembled to form a green tire, and the plurality of processing units are separately provided in accordance with the width size or rim diameter of the tire. A stage, a molding carriage provided with the molding drum and traveling and moving on a predetermined line by a driving force of a driving unit, and a vicinity of the plurality of processing steps for moving the molding carriage according to a molding order of a raw tire. And a running line provided with a drawing path to a predetermined position of each processing stage of each processing unit, the plurality of processing units and the molding carriage are connected, and the width of the raw tire on the molding carriage A tire forming system, comprising: a control unit that directs and moves a traveling route that connects predetermined processing stages of a plurality of processing units according to a size or a rim diameter.
れぞれの位置を識別可能に設けた指標と、 前記走行台車に設けられ前記指標を検出する検出手段
と、 を備え、前記制御手段が前記走行経路を前記指標を選択
して指示したときに、前記成形台車が前記指示された指
標に沿って走行すると共に、指標に指示された所定の位
置で停止することを特徴とする請求項1のタイヤ成形シ
ステム。2. An indicator, which is provided at a predetermined position along the traveling line so as to be able to identify each position, and a detection means, which is provided on the traveling carriage and detects the indicator, wherein the control means comprises: 2. The molding carriage travels along the instructed index and stops at a predetermined position instructed by the index when the travel route is selected and instructed. Tire building system.
処理工程と、 前記複数の処理工程のそれぞれに設けられたループ状の
走行ラインと、 前記処理部として前記複数の処理工程に跨がって設けら
れそれぞれの処理工程との間で成形部材の伝達を行う伝
達処理部と、を有することを特徴とする請求項1又は請
求項2のタイヤ成形システム。3. A plurality of processing steps in which the plurality of processing sections are provided separately, a loop-shaped running line provided in each of the plurality of processing steps, and a plurality of processing steps serving as the processing section across the plurality of processing steps. The tire molding system according to claim 1 or 2, further comprising: a transfer processing unit that is provided at a later time and that transfers a molding member between the processing steps.
なくとも一つであることを特徴とする請求項3のタイヤ
成形システム。4. The tire molding system according to claim 3, wherein the transmission processing unit is at least one of the plurality of processing units.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6148365A JPH0811232A (en) | 1994-06-29 | 1994-06-29 | Tire molding system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6148365A JPH0811232A (en) | 1994-06-29 | 1994-06-29 | Tire molding system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0811232A true JPH0811232A (en) | 1996-01-16 |
Family
ID=15451141
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6148365A Pending JPH0811232A (en) | 1994-06-29 | 1994-06-29 | Tire molding system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0811232A (en) |
Cited By (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2001032409A1 (en) * | 1999-10-29 | 2001-05-10 | Pirelli Pneumatici S.P.A. | Method and apparatus for manufacturing different types of tyres |
| JP2001162694A (en) * | 1999-12-07 | 2001-06-19 | Yokohama Rubber Co Ltd:The | Tire molding system and molding method |
| JP2002018972A (en) * | 2000-07-10 | 2002-01-22 | Yokohama Rubber Co Ltd:The | Apparatus and method for outputting indication for replacing equipment |
| JP2002321288A (en) * | 2001-04-23 | 2002-11-05 | Fuji Seiko Kk | Drum replacement method, pallet replacement method, and drum / pallet replacement method in a tire production system |
| JP2003103653A (en) * | 2001-09-21 | 2003-04-09 | Goodyear Tire & Rubber Co:The | Method and apparatus for charging bead |
| JP2003145638A (en) * | 2001-09-21 | 2003-05-20 | Goodyear Tire & Rubber Co:The | Method for accurately aligning tire assembly drum in work station of automatic tire assembling system |
| JP2003534160A (en) * | 2000-05-26 | 2003-11-18 | ピレリ・プネウマティチ・ソチエタ・ペル・アツィオーニ | Plant for simultaneous production of different types of tires |
| WO2004048075A1 (en) * | 2002-11-25 | 2004-06-10 | Bridgestone Corporation | Tire molding system, tire production system having the same, and tire producing method |
| JP2004526607A (en) * | 2001-05-29 | 2004-09-02 | ピレリ・プネウマティチ・ソチエタ・ペル・アツィオーニ | Automatic tire manufacturing method and plant |
| WO2005080069A1 (en) | 2004-02-24 | 2005-09-01 | Bridgestone Corporation | Method of manufacturing tire and device for supplying bead member |
| JP2006001024A (en) * | 2004-06-15 | 2006-01-05 | Bridgestone Corp | Green tire molding method and tire molding system |
| US7005023B2 (en) | 1999-10-29 | 2006-02-28 | Pirelli Pneumatici S.P.A. | Method of manufacturing tires |
| US7770622B2 (en) * | 1999-12-01 | 2010-08-10 | Pirelli Pneumatici S.P.A. | Plant for producing types of tyres different from each other |
| US20100307662A1 (en) * | 2007-09-27 | 2010-12-09 | Pirelli Tyre S.P.A. | Process and plant for producing tyres for vehicle wheels |
| US20110168322A1 (en) * | 2008-06-27 | 2011-07-14 | Pirelli Tyre S.P.A. | Process and plant for building tyres for vehicle wheels |
| US20110290403A1 (en) * | 2008-12-17 | 2011-12-01 | Pirelli Tyre S.P.A | Process and plant for building green tyres for vehicle wheels |
| JP2014097659A (en) * | 2014-01-21 | 2014-05-29 | Pirelli Tyre Spa | Method and plant for building wheel tire of vehicle and plant |
| US20140166189A1 (en) * | 2012-12-18 | 2014-06-19 | The Goodyear Tire & Rubber Company | Method and apparatus for building a tire |
| US20140374007A1 (en) * | 2011-12-23 | 2014-12-25 | Pirelli Tyre S.P.A. | Method, process and plant for controlling the manufacture of tyres for vehicle wheels |
| JP2016505423A (en) * | 2012-12-21 | 2016-02-25 | ピレリ・タイヤ・ソチエタ・ペル・アツィオーニ | Manufacturing method and plant for tire for vehicle wheel |
| JP2016137728A (en) * | 2016-04-27 | 2016-08-04 | ピレリ・タイヤ・ソチエタ・ペル・アツィオーニ | Method for constructing wheel tire of vehicle and plant |
| JP2017154216A (en) * | 2016-03-02 | 2017-09-07 | 平田機工株式会社 | Control method, work system, and manufacturing method |
| JP2018027614A (en) * | 2017-09-26 | 2018-02-22 | 平田機工株式会社 | Control method, work system and manufacturing method |
-
1994
- 1994-06-29 JP JP6148365A patent/JPH0811232A/en active Pending
Cited By (32)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7005023B2 (en) | 1999-10-29 | 2006-02-28 | Pirelli Pneumatici S.P.A. | Method of manufacturing tires |
| US8936058B2 (en) | 1999-10-29 | 2015-01-20 | Pirelli Pneumatici S.P.A. | Method and apparatus for manufacturing different types of tyres |
| WO2001032409A1 (en) * | 1999-10-29 | 2001-05-10 | Pirelli Pneumatici S.P.A. | Method and apparatus for manufacturing different types of tyres |
| US7770622B2 (en) * | 1999-12-01 | 2010-08-10 | Pirelli Pneumatici S.P.A. | Plant for producing types of tyres different from each other |
| JP2001162694A (en) * | 1999-12-07 | 2001-06-19 | Yokohama Rubber Co Ltd:The | Tire molding system and molding method |
| JP2003534160A (en) * | 2000-05-26 | 2003-11-18 | ピレリ・プネウマティチ・ソチエタ・ペル・アツィオーニ | Plant for simultaneous production of different types of tires |
| JP2002018972A (en) * | 2000-07-10 | 2002-01-22 | Yokohama Rubber Co Ltd:The | Apparatus and method for outputting indication for replacing equipment |
| JP2002321288A (en) * | 2001-04-23 | 2002-11-05 | Fuji Seiko Kk | Drum replacement method, pallet replacement method, and drum / pallet replacement method in a tire production system |
| JP2004526607A (en) * | 2001-05-29 | 2004-09-02 | ピレリ・プネウマティチ・ソチエタ・ペル・アツィオーニ | Automatic tire manufacturing method and plant |
| JP2003103653A (en) * | 2001-09-21 | 2003-04-09 | Goodyear Tire & Rubber Co:The | Method and apparatus for charging bead |
| KR100913649B1 (en) * | 2001-09-21 | 2009-08-24 | 더 굿이어 타이어 앤드 러버 캄파니 | Precision alignment of tire building drum to automated tire building system working axis |
| JP2003145638A (en) * | 2001-09-21 | 2003-05-20 | Goodyear Tire & Rubber Co:The | Method for accurately aligning tire assembly drum in work station of automatic tire assembling system |
| JP2009160949A (en) * | 2002-11-25 | 2009-07-23 | Bridgestone Corp | Tire molding system, tire manufacturing system including the same, and tire manufacturing method |
| WO2004048075A1 (en) * | 2002-11-25 | 2004-06-10 | Bridgestone Corporation | Tire molding system, tire production system having the same, and tire producing method |
| WO2005080069A1 (en) | 2004-02-24 | 2005-09-01 | Bridgestone Corporation | Method of manufacturing tire and device for supplying bead member |
| JP2006001024A (en) * | 2004-06-15 | 2006-01-05 | Bridgestone Corp | Green tire molding method and tire molding system |
| US20100307662A1 (en) * | 2007-09-27 | 2010-12-09 | Pirelli Tyre S.P.A. | Process and plant for producing tyres for vehicle wheels |
| US20180236738A1 (en) * | 2007-09-27 | 2018-08-23 | Pirelli Tyre, S.P.A. | Process and plant for producing tyres for vehicle wheels |
| US20110168322A1 (en) * | 2008-06-27 | 2011-07-14 | Pirelli Tyre S.P.A. | Process and plant for building tyres for vehicle wheels |
| JP2011525866A (en) * | 2008-06-27 | 2011-09-29 | ピレリ・タイヤ・ソチエタ・ペル・アツィオーニ | Method and plant for building tires for vehicle wheels |
| US11241850B2 (en) | 2008-06-27 | 2022-02-08 | Pirelli Tyre S.P.A. | Process and plant for building tyres for vehicle wheels |
| US10759129B2 (en) * | 2008-06-27 | 2020-09-01 | Pirelli Tyre S.P.A. | Process and plant for building tyres for vehicle wheels |
| US20110290403A1 (en) * | 2008-12-17 | 2011-12-01 | Pirelli Tyre S.P.A | Process and plant for building green tyres for vehicle wheels |
| US10363714B2 (en) * | 2011-12-23 | 2019-07-30 | Pirelli Tyre S.P.A. | Method, process and plant for controlling the manufacture of tyres for vehicle wheels |
| US20140374007A1 (en) * | 2011-12-23 | 2014-12-25 | Pirelli Tyre S.P.A. | Method, process and plant for controlling the manufacture of tyres for vehicle wheels |
| US11383469B2 (en) | 2011-12-23 | 2022-07-12 | Pirelli Tyre S.P.A. | Method, process and plant for controlling the manufacture of tyres for vehicle wheels |
| US20140166189A1 (en) * | 2012-12-18 | 2014-06-19 | The Goodyear Tire & Rubber Company | Method and apparatus for building a tire |
| JP2016505423A (en) * | 2012-12-21 | 2016-02-25 | ピレリ・タイヤ・ソチエタ・ペル・アツィオーニ | Manufacturing method and plant for tire for vehicle wheel |
| JP2014097659A (en) * | 2014-01-21 | 2014-05-29 | Pirelli Tyre Spa | Method and plant for building wheel tire of vehicle and plant |
| JP2017154216A (en) * | 2016-03-02 | 2017-09-07 | 平田機工株式会社 | Control method, work system, and manufacturing method |
| JP2016137728A (en) * | 2016-04-27 | 2016-08-04 | ピレリ・タイヤ・ソチエタ・ペル・アツィオーニ | Method for constructing wheel tire of vehicle and plant |
| JP2018027614A (en) * | 2017-09-26 | 2018-02-22 | 平田機工株式会社 | Control method, work system and manufacturing method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0811232A (en) | Tire molding system | |
| US7195047B2 (en) | Tire manufacturing module and method of manufacturing tires | |
| US5354404A (en) | Control for integrated tire building system | |
| JPS6311140B2 (en) | ||
| CN107532971B (en) | Process and apparatus for controlling tyres in a process and in a plant for manufacturing tyres for vehicle wheels | |
| JP2000505368A (en) | Assembly of an apparatus for manufacturing raw tires for vehicles | |
| US5135601A (en) | Ply material server apparatus | |
| US20140166189A1 (en) | Method and apparatus for building a tire | |
| JP2512467B2 (en) | Tire manufacturing equipment | |
| EP0747207A2 (en) | Tire building machine | |
| JP7068240B2 (en) | Self-driving car, self-driving car control system, self-driving car control method, self-driving car control program, and storage medium | |
| JP3760544B2 (en) | Transport device | |
| KR100913649B1 (en) | Precision alignment of tire building drum to automated tire building system working axis | |
| JPH08290710A (en) | Automated guided vehicle | |
| JPH08174709A (en) | Single stage type tire forming system | |
| JPH04362459A (en) | Automatic carrying device for carrying trolley | |
| JPH10329141A (en) | Tire molding system and mold lubricant coating device | |
| JPH09330122A (en) | How to return an automated guided vehicle | |
| JPH0839696A (en) | Tire molding device | |
| JP3322085B2 (en) | Operation control method and operation control device for unmanned traveling vehicle | |
| CN115092658A (en) | Coal sample bottle transmission system based on AGV dolly | |
| JPH08101713A (en) | Operation control method and operation control device for unmanned vehicle | |
| JP3191578B2 (en) | Operation control method and operation control device for unmanned traveling vehicle | |
| JP2003236946A (en) | Tire production system | |
| CN110901119A (en) | An all-steel three-drum engineering tire one-shot forming machine |