JPH08158357A - Drilling agitator for soil cement pile method - Google Patents

Drilling agitator for soil cement pile method

Info

Publication number
JPH08158357A
JPH08158357A JP30188694A JP30188694A JPH08158357A JP H08158357 A JPH08158357 A JP H08158357A JP 30188694 A JP30188694 A JP 30188694A JP 30188694 A JP30188694 A JP 30188694A JP H08158357 A JPH08158357 A JP H08158357A
Authority
JP
Japan
Prior art keywords
soil
blades
cement
blade
rotary shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP30188694A
Other languages
Japanese (ja)
Other versions
JP2836808B2 (en
Inventor
Katsuhiko Sato
克彦 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TORABAASU KK
Original Assignee
TORABAASU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TORABAASU KK filed Critical TORABAASU KK
Priority to JP30188694A priority Critical patent/JP2836808B2/en
Publication of JPH08158357A publication Critical patent/JPH08158357A/en
Application granted granted Critical
Publication of JP2836808B2 publication Critical patent/JP2836808B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE: To simplify the working operation, by detachably attaching soil- discharging blades having a larger area than agitating blades to the agitating blades at the front end of a rotary shaft. CONSTITUTION: A plurality of pairs of agitating blades 2 are installed at the outer periphery of a rotary shaft 1 and excavating blades 5 are attached to the outer periphery of the front end of the rotary shaft 1 through blades 6 fitting the excavating blades. When operating it, soil-discharging blades 3 having a larger area than the agitating blades 2 are fitted to the agitating blades 2. After rotation of the rotary shaft to excavate the ground, it is pulled up and the excavated soil is removed. After removal of the soil-discharging blades 3 out of the agitating blades 2, cement milk is poured. And further, excavation and charge of cement milk are repeated by turns to form a soil cement pile.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明はソイルセメント杭工法に
おいて使用する削孔攪拌機に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a drilling stirrer used in a soil cement pile method.

【0002】[0002]

【従来の技術】ソイルセメント杭工法は(1)現地盤を
一端空堀した後、削孔にセメントミルクを注入しながら
セメントミルクと土砂とを攪拌混合する工法、(2)現
地盤を予め空堀することなく、削孔、セメントミルクの
注入、セメントミルクと土砂との攪拌混合を同時に行う
工法とに大別されるが、何れの場合も注入するセメント
ミルクの容量に相当する容量の土砂が地盤中から溢出
し、しかもこの土砂はセメント分を含んでいるので、流
出した土砂は環境を汚染するため産業廃棄物とし処理さ
れることとなり、処分に費用がかかり、コスト高を招い
ている。
2. Description of the Related Art The soil cement pile construction method is (1) a method in which the field board is first dug, and then cement milk and earth and sand are stirred and mixed while pouring cement milk into the hole, (2) the field board is dug in advance. However, in each case, the volume of earth and sand is equivalent to the volume of cement milk to be injected into the ground. Moreover, since this earth and sand overflows from the soil, and this earth and sand contains cement, the earth and sand that has flowed out is treated as industrial waste because it pollutes the environment, resulting in high disposal costs and high costs.

【0003】この対策として(1)の工法では空堀の際
に、後に注入するセメントミルクの容量に相当する容量
の土砂を排土することが知られている。
As a countermeasure against this, in the construction method (1), it is known that when digging, a volume of earth and sand corresponding to the volume of cement milk to be injected later is discharged.

【0004】[0004]

【発明が解決しようとする課題】しかし、(1)の工法
は比較的大規模の杭工事の際に採用されるものであり、
空堀とセメントミルクの注入、混合攪拌とに最低2種類
の機械を使用する必要がある。この事前の排土処理を比
較的小規模の杭工事の際に採用される(2)の工法にそ
の儘適用するすることは、排土のために新たな掘削機を
導入することが必要となり、更に一層のコスト高を招く
ことになる。
However, the construction method (1) is adopted in the construction of a relatively large-scale pile,
It is necessary to use at least two types of machines for emptying, injection of cement milk, and mixing and stirring. Applying this prior soil removal treatment to the construction method (2) adopted for relatively small-scale pile construction requires the introduction of a new excavator for soil removal. However, the cost will be further increased.

【0005】本発明は上記問題点に着目しなされたもの
であり、その目的は、比較的小規模のソイルセメント杭
を造成する際の削孔攪拌機を提案することにあり、この
削孔攪拌機の使用により、簡単な操作で硬環境汚染を起
す恐れのあるセメントミルクやセメント含有土砂を排出
することなく、ソイルセメント杭を造成することが可能
となる。
The present invention has been made in view of the above problems, and an object thereof is to propose a drilling stirrer for constructing a relatively small-scale soil cement pile. By using it, it becomes possible to construct soil cement piles by a simple operation without discharging cement milk or cement-containing soil that may cause hard environment pollution.

【0006】[0006]

【課題を解決するための手段】本発明は、削孔、セメン
トミルクの注入、セメントミルクと土砂との攪拌混合と
いうソイルセメント杭を造成する作業と、それに伴う排
土作業とを1基の機械で行う、との観点からなされた発
明である。
DISCLOSURE OF THE INVENTION The present invention provides a single machine for the work of constructing soil cement piles such as drilling, injecting cement milk, and stirring and mixing cement milk and earth and sand, and the soil discharging operation accompanying it. It is an invention made from the viewpoint of carrying out in.

【0007】即ち、本発明は、回転軸先端の攪拌羽根
に、攪拌羽根より かに大面積の排土羽根を着脱自在に
装着したソイルセメント杭工法用削孔攪拌機である。
That is, the present invention is a drilling stirrer for the soil cement pile construction method, in which an agitating blade at the tip of the rotary shaft is detachably attached with a soil discharging blade having a larger area than the agitating blade.

【0008】[0008]

【実施例】以下、図面を参照しながら、本発明を説明す
る。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings.

【0009】図1は本発明の削孔攪拌機の先端部を示す
もので、(a)は排土羽根装着時の斜視図、(b)は排
土羽根装着時の側面図、(c)は排土羽根の底面図であ
る。
1A and 1B show the tip of a hole agitator of the present invention. FIG. 1A is a perspective view of the excavator blade attached, FIG. 1B is a side view of the excavator blade attached, and FIG. It is a bottom view of an earth removal blade.

【0010】図2は本発明の削孔攪拌機を使用してソイ
ルセメント杭を造成する施工例の工程を示す縦断面図で
ある。
FIG. 2 is a vertical cross-sectional view showing the steps of a construction example of constructing a soil cement pile using the hole agitator of the present invention.

【0011】本発明の削孔攪拌機の本体は通常のソイル
セメント杭工法用削孔攪拌機と何ら異なるところはな
い。異なる点は図1(a)、(b)に示すように最先端
の攪拌羽根2に攪拌羽根2に比して かに大面積の排土
羽根3を着脱自在に装着した点である。図示してないが
回転軸1は通常の削孔攪拌機と同じく、内部にセメント
ミルク注入用配管を、先端にセメントミルク噴出孔を備
えている。外周には複数対の攪拌羽根2を備え、先端外
周には掘削刃取付羽根6を介して掘削刃5が取付けられ
ている。そして、回転軸1は通常のように正、逆の両方
向に回転可能であり、昇降自在である。ソイルセメント
杭造成のための削孔、セメントミルクの注入、セメント
ミルクと土砂との攪拌混合の作業時には、排土羽根3は
攪拌羽根2に装着されていないが、排土作業時には排土
羽根3を攪拌羽根2に装着した状態で回転軸1を正回転
して土砂を掘削したあと、回転を止めて回転軸1を引き
上げ、掘削した土砂を地上に排出する。このため、排土
羽根3は作業に支障を及ぼさない範囲で大面積であるこ
とが好ましい。排土羽根3には図1(b)に示すように
その下面にリップ溝型鋼または鋼板を攪拌羽根2の断面
形状に合うように加工した嵌合用鋼材4が溶接されてお
り、排土羽根3は嵌合用鋼材4を介して攪拌羽根2に嵌
合により着脱される。図1には最先端攪拌羽根2が2枚
1対のものを図示したが、最先端攪拌羽根2が3枚で1
対を構成する場合には3枚それぞれに排土羽根3を装着
する。
The main body of the drilling stirrer of the present invention is no different from the usual drilling stirrer for the soil cement pile construction method. The difference is that, as shown in FIGS. 1 (a) and 1 (b), a soil removal blade 3 having a larger area than the stirring blade 2 is detachably attached to the most advanced stirring blade 2. Although not shown, the rotary shaft 1 is provided with a cement milk injection pipe inside and a cement milk jetting hole at the tip, as in a normal hole agitator. A plurality of pairs of stirring blades 2 are provided on the outer periphery, and the excavating blade 5 is attached to the outer periphery of the tip via an excavating blade attachment blade 6. The rotary shaft 1 can be rotated in both normal and reverse directions as usual, and can be raised and lowered. Although the soil discharging blade 3 is not attached to the stirring blade 2 at the time of drilling for soil cement pile construction, injecting cement milk, and stirring and mixing cement milk and earth and sand, the soil discharging blade 3 is used at the time of soil discharging operation. After excavating the earth and sand by rotating the rotary shaft 1 in the state of being attached to the stirring blade 2, the rotation is stopped and the rotary shaft 1 is pulled up, and the excavated earth and sand is discharged to the ground. For this reason, it is preferable that the soil discharging blade 3 has a large area within a range that does not hinder the work. As shown in FIG. 1 (b), the earth removing blade 3 is welded with a fitting steel material 4 obtained by processing lip groove type steel or a steel plate so as to match the cross-sectional shape of the stirring blade 2 on the lower surface thereof. Is attached to and removed from the stirring blade 2 via the fitting steel material 4 by fitting. Although FIG. 1 shows a pair of the two most advanced stirring blades 2, one of the most advanced stirring blades 2 is one.
When forming a pair, the soil discharge blades 3 are attached to each of the three blades.

【0012】図2を参照しながら本発明の削孔攪拌機へ
の排土羽根3の着脱とソイルセメント杭工法の施工手順
との関連について説明する。
With reference to FIG. 2, the relation between the attachment / detachment of the soil discharging blade 3 to / from the hole agitator of the present invention and the construction procedure of the soil cement pile construction method will be described.

【0013】セメントミルクの注入を略同量宛2回に分
割して行って長さ数m〜10m程度の比較的短いソイル
セメント杭を造成する例である。
This is an example of constructing a relatively short soil cement pile having a length of several m to 10 m by performing injection of cement milk in two equal portions.

【0014】(1)回転軸1に排土羽根3を装着した状
態での作業。
(1) Work with the soil removal blade 3 attached to the rotary shaft 1.

【0015】地表より掘削を開始し数十cm〜1m程度
掘削したあと、回転軸1を引き上げて掘削土を排出す
る。排出した掘削土の容量が第1回目のセメントミルク
の注入・攪拌による容量増加分に相当する。(図2
(a)) (2)回転軸1より排土羽根3を取り外した状態での作
業。
After starting excavation from the surface of the earth and excavating for several tens of cm to 1 m, the rotary shaft 1 is pulled up and the excavated soil is discharged. The volume of excavated soil discharged corresponds to the volume increase due to the first injection and stirring of cement milk. (Fig. 2
(A)) (2) Work with the soil removal blade 3 removed from the rotary shaft 1.

【0016】削孔内を更に掘削し数十cm〜1.5m程
度掘削した時点から第1回目のセメントミルクの注入を
開始する。(図2(b)) (3)回転軸1より排土羽根3を取り外した状態での作
業((2)の継続)。
[0016] The first injection of cement milk is started from the time when the inside of the drilled hole is further excavated and several tens of cm to 1.5 m are excavated. (Fig. 2 (b)) (3) Work with the soil removal blade 3 removed from the rotary shaft 1 (continuation of (2)).

【0017】所定の深さまで掘削しながらセメントミル
クの注入、掘削土の攪拌を行ったのち回転軸1を引き上
げる。セメントミルクの注入により削孔内の土砂は隆起
している。(図2(c)) (4)回転軸1に排土羽根3を装着した状態での作業。
Cement milk is injected and excavated soil is stirred while excavating to a predetermined depth, and then the rotary shaft 1 is pulled up. Due to the injection of cement milk, the earth and sand in the drilled holes have risen. (Fig. 2 (c)) (4) Work in a state in which the soil removal blade 3 is attached to the rotary shaft 1.

【0018】(1)と同様に隆起した土砂を数十cm〜
1m程度掘削したあと、回転軸1を引き上げて掘削土を
排出する。排出した掘削土の容量が第2回目のセメント
ミルクの注入・攪拌による容量増加分に相当する。(図
2(d)) (5)回転軸1より排土羽根3を取り外した状態での作
業。
As in the case of (1), the raised sand is tens of cm
After excavating about 1 m, the rotary shaft 1 is pulled up and excavated soil is discharged. The volume of excavated soil discharged corresponds to the volume increase due to the second injection and stirring of cement milk. (Fig. 2 (d)) (5) Work with the soil removal blade 3 removed from the rotary shaft 1.

【0019】削孔内を数十cm程度掘削した時点から第
2回目のセメントミルクの注入を開始する。(図2
(e)) (6)回転軸1より排土羽根3を取り外した状態での作
業((5)の継続)。
The second injection of cement milk is started from the time when the inside of the drilled hole is excavated by several tens of cm. (Fig. 2
(E)) (6) Work with the soil removal blade 3 removed from the rotary shaft 1 (continuation of (5)).

【0020】最深部までセメントミルクの注入、掘削土
の攪拌を行ったのち回転軸1を引き上げる。セメントミ
ルクの注入により削孔内の土砂は隆起している。(図2
(f)) 以上で本発明の削孔攪拌機を使用しての1本のソイルセ
メント杭の造成は終了する。(1)〜(6)を繰り返し
て多数のソイルセメント杭を造成する。
After the cement milk is injected to the deepest part and the excavated soil is stirred, the rotary shaft 1 is pulled up. Due to the injection of cement milk, the earth and sand in the drilled holes have risen. (Fig. 2
(F)) With the above, the construction of one soil cement pile using the drilling stirrer of the present invention is completed. (1) to (6) are repeated to create a large number of soil cement piles.

【0021】それぞれの杭頭の高さにばらつきがあると
杭頭に設ける地中梁造成作業に支障となるので、杭頭上
部の土砂8を除去して杭頭の高さを揃える杭頭処理を行
う。
If there are variations in the height of each pile head, it will hinder the underground beam construction work to be installed on the pile head. Therefore, the pile 8 is removed by removing the earth and sand 8 above the pile head. I do.

【0022】図2の例では土砂とセメントミルクとの混
合を十分行い良質のソイルセメント杭を造成するようセ
メントミルクの注入を2回に分割したが、分割すること
なく1回で全量のセメントミルクを注入してもよい。そ
の際には上記(1)でセメントミルク全量に対応する容
量の掘削土を排出しておき、上記(2)では最後に杭頭
に残存させる土砂の高さ分だけ掘削した時点からセメン
トミルクの注入を開始する。
In the example of FIG. 2, the injection of cement milk was divided into two times so as to sufficiently mix soil and cement milk to create a high quality soil cement pile, but the whole amount of cement milk was injected once without dividing. May be injected. In that case, the amount of excavated soil corresponding to the total amount of cement milk was discharged in (1) above, and in (2) above, the amount of cement milk was excavated from the time of excavation for the height of the earth and sand left on the pile head at the end. Start infusion.

【0023】なお、セメントミルクの注入に先行して行
う排出土砂の量やセメントミルクの注入開始時点は、対
象地盤の状態、セメントミルク注入量、ソイルセメント
杭の杭頭レベルなどに基づいて、事前に算出しておく必
要がある。
The amount of earth and sand discharged prior to the injection of cement milk and the starting point of the injection of cement milk are based on the condition of the target ground, the injection amount of cement milk, the pile head level of soil cement piles, etc. Need to be calculated in advance.

【0024】[0024]

【発明の効果】本発明は以上のように構成させているの
で、以下の効果を奏する。
Since the present invention is configured as described above, it has the following effects.

【0025】(1)排土羽根の着脱という簡単な操作
で、1基の機械でソイルセメント杭を造成する作業と、
排土作業とを行うことができる。
(1) The work of constructing soil cement piles with one machine by the simple operation of attaching and detaching the soil discharge blades,
Can perform earth removal work.

【0026】(2)本発明の削孔攪拌機を使用すること
により、簡単な操作で硬環境汚染を起す恐れのあるセメ
ントミルクやセメント含有土砂を排出することなく、ソ
イルセメント杭を造成することが可能となる。
(2) By using the hole agitator of the present invention, a soil cement pile can be constructed by a simple operation without discharging cement milk or cement-containing soil which may cause hard environment pollution. It will be possible.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の削孔攪拌機の先端部を示すもので、
(a)は排土羽根装着時の斜視図、(b)は排土羽根装
着時の側面図、(c)は排土羽根の底面図である。
FIG. 1 is a view showing a tip end part of a hole agitator of the present invention,
(A) is a perspective view when the soil removal blade is attached, (b) is a side view when the soil removal blade is attached, and (c) is a bottom view of the soil removal blade.

【図2】 本発明の削孔攪拌機を使用してソイルセメン
ト杭を造成する施工例の工程を示す縦断面図である。
FIG. 2 is a vertical cross-sectional view showing a process of a construction example of constructing a soil cement pile using the hole agitator of the present invention.

【符号の説明】[Explanation of symbols]

1・・回転軸、2・・攪拌羽根、3・・排土羽根、4・
・嵌合用鋼材、5・・掘削刃、6・・掘削刃取付羽根、
7・・ソイルセメント、8・・掘削土。
1 ... Rotation axis, 2 ... Stirring blade, 3 ... Soil removal blade, 4 ...
・ Steel for fitting, 5 ・ ・ Drilling blade, 6 ・ ・ Drilling blade mounting blade,
7 ... Soil cement, 8 ... excavated soil.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】回転軸先端の攪拌羽根に、攪拌羽根より
かに大面積の排土羽根を着脱自在に装着したソイルセメ
ント杭工法用削孔攪拌機。
1. A stirring blade at the tip of a rotating shaft,
A drilling agitator for the soil cement pile construction method, in which a large area soil removal blade is detachably attached.
JP30188694A 1994-12-06 1994-12-06 Drill stirrer for soil cement pile method Expired - Fee Related JP2836808B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30188694A JP2836808B2 (en) 1994-12-06 1994-12-06 Drill stirrer for soil cement pile method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30188694A JP2836808B2 (en) 1994-12-06 1994-12-06 Drill stirrer for soil cement pile method

Publications (2)

Publication Number Publication Date
JPH08158357A true JPH08158357A (en) 1996-06-18
JP2836808B2 JP2836808B2 (en) 1998-12-14

Family

ID=17902327

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30188694A Expired - Fee Related JP2836808B2 (en) 1994-12-06 1994-12-06 Drill stirrer for soil cement pile method

Country Status (1)

Country Link
JP (1) JP2836808B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014047482A (en) * 2012-08-30 2014-03-17 Travers Corp Ground improvement device, surplus soil discharge inhibitor of ground improvement device, and ground improvement method
JP2015206226A (en) * 2014-04-22 2015-11-19 雅重機株式会社 Construction method of cement-based soil pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014047482A (en) * 2012-08-30 2014-03-17 Travers Corp Ground improvement device, surplus soil discharge inhibitor of ground improvement device, and ground improvement method
JP2015206226A (en) * 2014-04-22 2015-11-19 雅重機株式会社 Construction method of cement-based soil pile

Also Published As

Publication number Publication date
JP2836808B2 (en) 1998-12-14

Similar Documents

Publication Publication Date Title
KR102785205B1 (en) Ground improvement method
JP3750186B2 (en) Construction method of underground continuous wall
JP2806217B2 (en) Underground excavator
JP2836808B2 (en) Drill stirrer for soil cement pile method
JP2021169749A (en) How to improve the ground of the pile pull-out hole
JP2700781B2 (en) Construction method of soil cement pile
JPS6351515A (en) Excavator for ground improvement
JPH10195911A (en) Excavating, mixing and agitating equipment for construction machinery
JP2899671B2 (en) Continuous drilling soil cement wall method and construction excavator
JP2886365B2 (en) Construction method of pile
KR102785202B1 (en) Ground improvement device
JP3005741B2 (en) Ground improvement method
JPH1171751A (en) Execution method of soil-mortar diaphragm wall
JPH116143A (en) Deep mixing equipment and deep mixing method
JP6770762B1 (en) Top shaping method and top shaping bucket of ground improvement body
JPS5841225Y2 (en) stirring bit
JPS5945055B2 (en) multi-axis excavator
CN117328434A (en) Device and method for stirring foundation treatment piles by matching rotary digging machine
JPH0629509B2 (en) Construction method of field construction pile
JPH0621964Y2 (en) Concrete pouring equipment for cast-in-place piles
JP3727017B2 (en) Construction method of soil cement pile
JPH03166417A (en) Ground improving method and drilling auger to be used
JPH1077642A (en) Foundation structure of building and construction method therefor and excavating machine for soil improvement
JPH0757947B2 (en) Cast-in-place pile construction method
JP2026000228A (en) Method of removing and backfilling existing piles

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250