JPH0820942A - Method for continuously forming drainage wall in the ground and casing for placing plate drainage material - Google Patents

Method for continuously forming drainage wall in the ground and casing for placing plate drainage material

Info

Publication number
JPH0820942A
JPH0820942A JP18177794A JP18177794A JPH0820942A JP H0820942 A JPH0820942 A JP H0820942A JP 18177794 A JP18177794 A JP 18177794A JP 18177794 A JP18177794 A JP 18177794A JP H0820942 A JPH0820942 A JP H0820942A
Authority
JP
Japan
Prior art keywords
drainage
plate
casing
ground
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18177794A
Other languages
Japanese (ja)
Other versions
JP3407066B2 (en
Inventor
Eijiro Matsumura
栄二郎 松村
Hiroyuki Yai
裕幸 屋井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP18177794A priority Critical patent/JP3407066B2/en
Publication of JPH0820942A publication Critical patent/JPH0820942A/en
Application granted granted Critical
Publication of JP3407066B2 publication Critical patent/JP3407066B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Earth Drilling (AREA)

Abstract

(57)【要約】 【目的】 排水性能に優れた排水壁を効率良く施工
できる、地中に排水壁を連続して形成する方法と板状排
水材打設用ケーシングを提供すること。 【構成】 ガイド材12,12を具備するケーシン
グ10と板状排水材20とを使用し、ケーシング10の
一方のガイド材12を既設のガイド柱30に案内させて
各板状排水材20を接近させて打設する。板状排水材2
0群により排水性に連続性を有する排水壁50を構築す
る。
(57) [Abstract] [Purpose] To provide a method for continuously forming a drainage wall in the ground and a casing for placing a plate-shaped drainage material, which enables efficient construction of a drainage wall having excellent drainage performance. [Structure] A casing 10 having guide members 12, 12 and a plate-shaped drainage member 20 are used, and one guide member 12 of the casing 10 is guided by an existing guide column 30 to bring the plate-shaped drainage members 20 closer to each other. Let me set it. Plate drainage material 2
A drainage wall 50 having continuity in drainage is constructed by group 0.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は堤体等の各種盛土構造物
や軟弱地盤を対象とした、地中に排水壁を連続して形成
する方法及び板状排水材打設用ケーシングに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for continuously forming a drainage wall in the ground and a plate-like drainage material casting casing for various embankment structures such as bank bodies and soft ground.

【0002】[0002]

【従来の技術】一般に堤体は経時的な浸透性能の低下や
台風時における大量の降雨浸透水に起因して堤体内部の
浸潤線が急激に上昇するために堤体の安全性が脅かされ
る場合がある。このような事態に対処するため、堤内
側を開削して砂や砕石等を充填して排水路を形成する方
法や、堤内側を良質土砂や砕石等と置換する方法や、
ドレーン材等を使用して堤体を補強する方法等を単独
或いは併用することが知られている。
2. Description of the Related Art Generally, a dam body is threatened due to a decrease in infiltration performance over time and a drastic rise in the infiltration line inside the dam body due to a large amount of rainfall infiltration water during a typhoon. There are cases. In order to deal with such a situation, a method of excavating the inside of the dike and filling it with sand or crushed stone to form a drainage channel, a method of replacing the inside of the dike with good quality sand or crushed stone,
It is known to use a method of reinforcing a levee body using a drain material or the like alone or in combination.

【0003】[0003]

【発明が解決しようとする問題点】前記した浸透水の排
水手段にはつぎのような問題点がある。 <イ> 堤体の開削を伴う方法にあっては開削作業中に
おける堤体の安全性が脅かされるだけでなく、安全性確
保のために仮堤防としての山留工を必要とし、施工コス
ト及び施工期間の点で問題が残る。 <ロ> ドレーン材を使用する補強方法にあっても施工
コスト、施工性、補強効果の実効性の各点で問題があ
り、その改善技術の提案が望まれている。
DISCLOSURE OF THE INVENTION Problems to be Solved by the Invention The above-mentioned means for draining permeated water have the following problems. <B> In the method involving the excavation of the embankment, not only the safety of the embankment during the excavation work is threatened, but also mountain retaining work as a temporary embankment is required to ensure the safety, and the construction cost and The problem remains in terms of construction period. <B> Even with the reinforcement method using the drain material, there are problems in terms of construction cost, workability, and effectiveness of the reinforcement effect, and it is desired to propose a technique for improvement.

【0004】[0004]

【本発明の目的】本発明は以上の点に鑑みてなされたも
ので、その目的とするところは、つぎの地中に排水壁を
連続して形成する方法及び板状排水材打設用ケーシング
を提供することにある。 排水性能に優れた排水壁を地中に連続して形成する方
法。 施工性に優れた、地中に排水壁を連続して形成する方
法。 経済性に優れた、地中に排水壁を連続して形成する方
法。 板状排水材を精度良く打設できる、板状排水材打設用
ケーシング
SUMMARY OF THE INVENTION The present invention has been made in view of the above points, and it is an object of the present invention to provide a method for continuously forming a drainage wall in the ground and a casing for placing a plate-like drainage material. To provide. A method of continuously forming a drainage wall with excellent drainage performance in the ground. A method of continuously forming drainage walls in the ground with excellent workability. An economical method that continuously forms drainage walls in the ground. Casing for driving plate-shaped drainage materials that can be used to accurately drive plate-shaped drainage materials

【0005】[0005]

【問題点を解決するための手段】本発明は、地中に排水
壁を連続して構築する方法において、複数の板状排水材
を相互に接近させて打設することを特徴とする、地中に
排水壁を連続して形成する方法である。さらに本発明は
地中に排水壁を連続して構築する方法において、両端に
ガイド材を具備するケーシングと共に板状排水材を既設
の板状排水材に接近させて打設すると共に、前記ケーシ
ングの一方のガイド材に連結させたガイド柱を地中に貫
入し、ケーシングを抜き取って前記ガイド柱と板状排水
材を地中に残置させ、板状排水材の打設位置を移動する
以上の各工程を繰り返して行い、前記ケーシングの打設
時にケーシングの他方のガイド材を既設のガイド柱に案
内させて打設し、前記ケーシングを抜き取る際、ケーシ
ングの他方のガイド材に既設のガイド柱を連結して抜き
取ることを特徴とする、地中に排水壁を連続して形成す
る方法である。さらに本発明は地中に排水壁を連続して
構築する方法において、複数の板状排水材を相互に接近
させて打設し、前記板状排水材と板状排水材の間に透水
性を有する粒体を充填した有孔筒を位置させることを特
徴とする、地中に排水壁を連続して形成する方法であ
る。さらに本発明は地中に排水壁を連続して構築する方
法において、両端にガイド材を具備するケーシングと共
に板状排水材を既設の板状排水材に接近させて打設し、
前記板状排水材と板状排水材の間に有孔構造のドレーン
ガイド筒を位置させ、ケーシングを抜き取って前記板状
排水材とドレーンガイド筒を地中に残置させることを特
徴とする、地中に排水壁を連続して形成する方法であ
る。さらに本発明は堤体の横断方向に沿って複数の板状
排水材を配列することを特徴とする、地中に排水壁を形
成する方法である。さらに本発明は板状排水材を内挿し
て地中に打設する板状排水材打設用ケーシングにおい
て、板状排水材の断面形を呈し、上下を開放した筒体
と、前記筒体の両端に設けられ、地中の板状排水材に隣
接させて打設した棒状のガイド部材に係合可能なガイド
材を具備することを特徴とする、板状排水材打設用ケー
シングである。
The present invention is a method for continuously constructing a drainage wall in the ground, characterized by placing a plurality of plate-shaped drainage materials in close proximity to each other. This is a method of continuously forming drainage walls inside. Furthermore, the present invention is a method for continuously constructing a drainage wall in the ground, in which a plate-shaped drainage material is placed close to an existing plate-shaped drainage material together with a casing having guide members at both ends, and the casing The guide pillar connected to one of the guide materials is penetrated into the ground, the casing is removed, the guide pillar and the plate-shaped drainage material are left in the ground, and the placement position of the plate-shaped drainage material is moved. Repeat the steps to guide the other guide material of the casing to the existing guide column when placing the casing, and when removing the casing, connect the existing guide column to the other guide material of the casing. It is a method of continuously forming a drainage wall in the ground, which is characterized in that the drainage wall is extracted. Furthermore, the present invention is a method for continuously constructing a drainage wall in the ground, in which a plurality of plate-shaped drainage materials are placed in close proximity to each other, and water permeability is provided between the plate-shaped drainage materials. It is a method for continuously forming a drainage wall in the ground, which is characterized in that a perforated cylinder filled with the granular material is positioned. Furthermore, the present invention is a method for continuously constructing a drainage wall in the ground, in which a plate-shaped drainage material is cast close to an existing plate-shaped drainage material together with a casing having guide members at both ends,
A drain guide tube having a perforated structure is located between the plate-like drainage material and the plate-like drainage material, and the casing is extracted to leave the plate-like drainage material and the drain guide tube in the ground. This is a method of continuously forming drainage walls inside. Furthermore, the present invention is a method for forming a drainage wall in the ground, characterized by arranging a plurality of plate-shaped drainage materials along the transverse direction of the bank. Furthermore, the present invention is a casing for placing a plate-shaped drainage material in which the plate-shaped drainage material is inserted and placed in the ground. A plate-shaped drainage material placing casing comprising guide members provided at both ends and engageable with a rod-shaped guide member placed adjacent to a plate-like drainage material in the ground.

【0006】[0006]

【実施例1】以下図面を参照しながら本発明の一実施例
について説明する。 <イ>排水材打設用ケーシング 図1に排水材打設用ケーシング10(以下「ケーシング
10」という)の一例を示す。ケーシング10は板状排
水材20を保護しながら地中に打設するための上下を開
放した筒体で、相対向して位置した一対の保護板11,
11と、保護板11,11の両端に設けた断面コ字形の
ガイド材12,12とからなり、その内部に板状排水材
20を挿通可能な空間13が形成されている。各ガイド
材12,12の上部には複数のピン穴14が穿設されて
いて、後述するガイド柱30のピン穴31と共に連結ピ
ン32の挿入又は抜取操作により、ケーシング10を任
意の各ガイド柱30に着脱できるようになっている。
Embodiment 1 An embodiment of the present invention will be described below with reference to the drawings. <a> Drainage material casting casing FIG. 1 shows an example of the drainage material casting casing 10 (hereinafter referred to as “casing 10”). The casing 10 is a cylindrical body that is open at the top and bottom for placing the drainage material 20 in the ground while protecting it, and has a pair of protection plates 11 facing each other.
11 and the guide members 12, 12 having U-shaped cross sections provided at both ends of the protective plates 11, 11, and a space 13 into which the plate-shaped drainage material 20 can be inserted is formed therein. A plurality of pin holes 14 are formed in the upper portion of each guide member 12, 12, and the casing 10 is inserted into or removed from the casing 10 by inserting or removing a connecting pin 32 together with a pin hole 31 of a guide column 30 described later. It can be attached to and detached from 30.

【0007】<ロ>板状排水材 板状排水材20は板状の芯体21の両面を透水膜22で
覆い全方向に排水性を有する板材であり、芯体21は例
えば複数の通水孔を有する樹脂板の両面にエンボス加工
を施して構成され、また透水膜22は例えば不織布で構
成されている。板状排水材20はドラムに巻き取られ、
例えば杭打振動機等の重機のリーダの途上に引き出し自
在に載置されて使用される。
<B> Plate-shaped drainage material The plate-shaped drainage material 20 is a plate material in which both surfaces of a plate-shaped core body 21 are covered with water-permeable membranes 22 and which has drainability in all directions. Both sides of a resin plate having holes are embossed, and the water permeable membrane 22 is made of, for example, a nonwoven fabric. The plate-shaped drainage material 20 is wound on a drum,
For example, it is used by being placed on the leader of a heavy machine such as a pile driving vibrator so that it can be pulled out freely.

【0008】<ハ>ガイド柱 ガイド柱30はケーシング10の建込位置を案内するた
めの部材で、例えばH形鋼を使用できる。本実施例では
ケーシング10のガイド材12をガイド柱30に外装さ
せて摺動させる場合について説明するが、ガイド材12
をガイド柱30に内装させるようにしてもよいことは勿
論である。またこの場合、ガイド柱30としてはH形鋼
の他にボックス鋼も使用できる。またガイド柱30は板
状排水材20の打設長を有する必要はなく、ケーシング
10の打設時においてガイド柱30がぐらつかない程度
の貫入長であればよい。
<C> Guide Column The guide column 30 is a member for guiding the installed position of the casing 10, and for example, H-section steel can be used. In this embodiment, a case where the guide member 12 of the casing 10 is slid on the guide pillar 30 is described.
Of course, the guide pillar 30 may be internally provided. Further, in this case, as the guide column 30, not only H-section steel but also box steel can be used. Further, the guide pillar 30 does not need to have the driving length of the plate-shaped drainage material 20, but may have a penetration length such that the guide pillar 30 does not wobble when the casing 10 is driven.

【0009】[0009]

【作用】次に排水壁の構築方法について説明する。 <イ>打設準備 図2の(A)は施工現場を上方から見た図で、符号20
aは地中に打設されている板状排水材、30aは板状排
水材20aの延長側の端に接近して打設されているガイ
ド柱である。図示しない重機にケーシング10を垂下す
ると共に、板状排水材20の始端部をケーシング10に
上部から下部へ向けて内挿して固定する。板状排水材2
0の固定方法としては、ケーシング10の下方に引き出
した板状排水材20に、ケーシング10の下部開口を閉
塞して係止可能な蓋材(図示せず)を取り付ける方法が
考えられる。さらに図1に示すようにケーシング10の
図面右側のガイド材12に連結ピン32を介してガイド
柱30bを一体に連結しておく。
[Operation] Next, a method for constructing the drainage wall will be described. <A> Preparation for driving Fig. 2 (A) is a view of the construction site viewed from above, and is designated by reference numeral 20.
Reference numeral a is a plate-shaped drainage material that is placed in the ground, and 30a is a guide column that is placed close to the end of the plate-shaped drainage material 20a on the extension side. The casing 10 is hung on a heavy machine (not shown), and the starting end portion of the plate-shaped drainage material 20 is inserted and fixed to the casing 10 from the upper part to the lower part. Plate drainage material 2
As a fixing method of 0, a method of attaching a lid member (not shown) that closes the lower opening of the casing 10 and can be locked to the plate-shaped drainage material 20 drawn out below the casing 10 can be considered. Further, as shown in FIG. 1, the guide column 30b is integrally connected to the guide member 12 on the right side of the casing 10 in the drawing via the connecting pin 32.

【0010】<ロ>板状排水材の打設工程 そして、図2の(B)に示すようにケーシング10に振
動又は圧入力を加えて板状排水材20bを所定の深度ま
で打設する。この際、ケーシング10の図面左側のガイ
ド材12を既設のガイド柱30aにガイドさせて正確な
位置に板状排水材20bを打設する。また板状排水材2
0bの打設に伴いケーシング10と一体のガイド柱30
bも同時に地中に貫入される。
<B> Step for placing plate drainage material Then, as shown in FIG. 2B, the plate drainage material 20b is driven up to a predetermined depth by applying vibration or pressure input to the casing 10. At this time, the guide material 12 on the left side of the casing 10 in the drawing is guided by the existing guide columns 30a to drive the plate-shaped drainage material 20b at an accurate position. In addition, plate-shaped drainage material 2
Guide pillar 30 that is integrated with casing 10 when driving 0b
b is also penetrated into the ground at the same time.

【0011】<ハ>ケーシングの抜取工程 次に図2の(C)に示すように,ケーシング10の図面
右側のガイド材12とガイド柱30bとの間の連結を解
除すると共に、ケーシング10の図面左側のガイド材1
2と既設のガイド柱30aとの間を連結ピン32で連結
する。そして、ケーシング10に抜取力を加えてケーシ
ング10と共に図面左側のガイド柱30aを引き抜き、
図2の(D)のように地中に板状排水材20とガイド柱
30bを残置する。
<C> Casing Extraction Step Next, as shown in FIG. 2C, the connection between the guide member 12 and the guide column 30b on the right side of the casing 10 in the drawing is released and the casing 10 is drawn. Left guide material 1
2 and the existing guide pillar 30a are connected by a connecting pin 32. Then, a pulling force is applied to the casing 10 to pull out the guide pillar 30a on the left side of the drawing together with the casing 10,
As shown in FIG. 2D, the plate-shaped drainage material 20 and the guide columns 30b are left in the ground.

【0012】<ニ>板状排水材の切断工程 ケーシング10を地上まで引き上げたら、板状排水材2
0をケーシング10の下方位置で切断して、既述した<
イ>と同様にケーシング10内から突出する板状排水材
20へ蓋材を取り付けると共に、撤去したガイド柱30
aをケーシング10の図面左側から右側のガイド材12
へ付け替える。以上の各工程を繰り返しながら、板状排
水材20を排水壁の構築方向に沿って順次打設する。
尚、ケーシング10を反転可能に垂下し、ケーシング1
0の抜き取りを完了したらケーシング10を鉛直軸を中
心に反転させれば、抜き取り後における地上でのガイド
柱30の付け替え作業を省略することができる。
<D> Cutting process of plate-shaped drainage material When the casing 10 is pulled up to the ground, the plate-shaped drainage material 2
0 was cut at the lower position of the casing 10 and described above.
Similarly to the above, the lid member is attached to the plate-shaped drainage material 20 protruding from the inside of the casing 10, and the guide pillar 30 is removed.
a is a guide member 12 from the left side to the right side of the casing 10 in the drawing.
Change to. While repeating the above steps, the plate-shaped drainage material 20 is sequentially placed along the construction direction of the drainage wall.
In addition, the casing 10 is hung down so that the casing 1 can be inverted.
When the removal of 0 is completed and the casing 10 is inverted about the vertical axis, the work of replacing the guide column 30 on the ground after the removal can be omitted.

【0013】<ホ>排水壁の機能 図3、4は複数の板状排水材20により構成される排水
壁50の形成例を示すもので、堤内側に構築された排水
壁50は堤体40の縦断方向に向けて形成した縦断壁5
1と、一方を縦断壁51に接続し、堤体40の横断方向
に向けて形成した横断壁52とにより構成されている。
図中、符号41は堤体40の法尻に配設したドレーンパ
イプである。各板状排水材20は排水間隔が短いから、
各壁51、52は排水性の点で連続性を有する。このよ
うに堤体40内に設けた排水壁50を通じて浸透水が堤
内側へ効果的に排水される。その結果、排水壁50を設
ける前の浸潤線L1 が浸潤線L2 の位置まで降下する。
また排水壁50を通じて堤体40中の間隙水が消散され
るから、堤体40の安定性が確保される。一般にドレー
ン工法はドレーン材を適宜の間隔を隔てて地中に埋設す
ることと、ドレーン材の埋設してある地盤に載荷重をか
けることが必須の要件であった。本発明では各板状排水
材20を相互に接近させて打設することで、排水壁50
に縦横方向に向けた排水性を付与することができる。し
かも、板状排水材20に載荷重をかけなくとも排水路と
して機能するので、これまでのドレーン工法と比べて排
水原理がまったく異なる。また開削工法と異なり開削工
や山留工を必要とせず、板状排水材20を地中に打設す
るだけの作業で済むため開削工法と比較して施工性の点
で優れる。尚、排水壁50の形成範囲や形成方向につい
ては排水対象物や排水方向を考慮して適宜選択する性質
のものである。また排水壁50を横断壁52のみで構成
する場合もある。
<E> Function of drainage wall FIGS. 3 and 4 show an example of the formation of a drainage wall 50 composed of a plurality of plate-shaped drainage materials 20. The drainage wall 50 constructed inside the bank is a bank body 40. Vertical wall 5 formed in the vertical direction of
1 and a transverse wall 52, one of which is connected to the longitudinal wall 51 and is formed in the transverse direction of the bank 40.
In the figure, reference numeral 41 is a drain pipe arranged at the skirt of the bank 40. Since each plate-shaped drainage material 20 has a short drainage interval,
Each wall 51, 52 has continuity in terms of drainage. In this way, the permeated water is effectively drained to the inside of the bank through the drainage wall 50 provided inside the bank 40. As a result, the infiltration line L1 before providing the drainage wall 50 descends to the position of the infiltration line L2.
Further, since the pore water in the bank 40 is dissipated through the drainage wall 50, the stability of the bank 40 is ensured. Generally, in the drain method, it was essential to embed the drain material at an appropriate interval in the ground and apply a load to the ground in which the drain material was embedded. In the present invention, the drainage wall 50 is formed by placing the plate-shaped drainage materials 20 in close proximity to each other.
It is possible to provide the drainage property in the vertical and horizontal directions. Moreover, since it functions as a drainage channel without applying a load to the plate-shaped drainage material 20, the drainage principle is completely different from the conventional drainage method. Further, unlike the excavation method, it does not require excavation or mountain retaining work, and only requires the work of placing the plate-shaped drainage material 20 in the ground, which is superior in workability to the excavation method. It should be noted that the formation range and the formation direction of the drainage wall 50 are appropriately selected in consideration of the drainage target object and the drainage direction. Further, the drainage wall 50 may be composed of only the transverse wall 52.

【0014】[0014]

【実施例2】図5〜7は隣り合う各板状排水材20間の
透水性能を向上させた他の実施例を示す。
[Embodiment 2] FIGS. 5 to 7 show another embodiment in which the water permeability between adjacent plate-shaped drainage members 20 is improved.

【0015】<イ>構成 [ケーシング]図5は本実施例で使用するケーシング6
0を示す。本実施例のケーシング60が図示しない板状
排水材20を保護しながら地中に打設する部材であるこ
とや、筒体61に板状排水材20を挿通可能な空間62
を有することや、筒体61の両端にガイド材63,63
を設けることは、前記した実施例1と同様であるが、本
実施例ではガイド材63,63の断面形状がドレーンガ
イド筒70を収容可能なように円弧形に湾曲している点
が実施例1と相違する。すなわちケーシング60は断面
矩形を呈する筒体61の短辺側の側面に、湾曲するガイ
ド材63,63を固着して構成される。
<A> Configuration [Casing] FIG. 5 shows a casing 6 used in this embodiment.
Indicates 0. The casing 60 of the present embodiment is a member that is placed in the ground while protecting the plate-shaped drainage material 20 (not shown), and the space 62 in which the plate-shaped drainage material 20 can be inserted into the tubular body 61.
And that the guide members 63, 63 are provided at both ends of the tubular body 61.
However, in this embodiment, the cross-sectional shape of the guide members 63, 63 is curved in an arc shape so as to accommodate the drain guide cylinder 70. Different from Example 1. That is, the casing 60 is configured by fixing the curved guide members 63, 63 to the short side surface of the tubular body 61 having a rectangular cross section.

【0016】[ドレーンガイド筒]またドレーンガイド
筒70はケーシング60の打設時におけるガイド機能
と、地中に残置して各板状排水材20間に位置する地盤
の透水性を高めるために機能する部材で、周面に多数の
開孔71を有する筒体で構成され、地中に挿入する際に
土砂の侵入を阻止できるできるように筒の下部に蓋72
を取り付けて閉塞できるようになっている。またドレー
ンガイド筒70は打設予定の板状排水材20とほぼ等し
い長さを有する。
[Drain guide cylinder] The drain guide cylinder 70 has a function of guiding when the casing 60 is placed, and a function of increasing the water permeability of the ground left between the plate-shaped drainage materials 20 while remaining in the ground. It is composed of a tubular body having a large number of openings 71 on its peripheral surface, and a lid 72 is provided at the bottom of the tubular body so as to prevent the invasion of earth and sand when it is inserted into the ground.
It can be closed by attaching. Further, the drain guide cylinder 70 has a length substantially equal to that of the plate-shaped drainage material 20 to be placed.

【0017】<ロ>排水壁の構築方法 図6は排水壁の構築方法を示す平面図で、図6の(A)
の符号20aは先行して打設した板状排水材、70aは
板状排水材20aに接近して地中に圧入され、かつ砂や
砂利等の透水性を有する粒体73の充填されたドレーン
ガイド筒である。 そして、図6の(B)に示すよう
に、板状排水材20bの始端を内挿して固定したケーシ
ング60を地中に振動又は圧入力を加えて打設する。こ
の際、ケーシング60の図面左側のガイド材63を既設
のドレーンガイド筒70aに外装し、ドレーンガイド筒
70aをガイド材として地中に板状排水材20bを打設
する。さらにケーシング60の貫入作業と並行して図面
右側のガイド材63に底部を閉鎖した別途のドレーンガ
イド筒70bを内挿して地中に打設する。板状排水材2
0bを所定の深度まで打設したらケーシング60のみを
抜き取り、図6の(C)に示すように地中に板状排水材
20bとドレーンガイド筒70bを残置する。そして地
中に残置させたドレーンガイド筒70bに粒体73を充
填する。ケーシング60を抜き取った後に板状排水材2
0を切断する。以上のに工程を繰り返して所定の連続し
た排水壁を構築する。
<B> Method for constructing drainage wall FIG. 6 is a plan view showing a method for constructing a drainage wall.
Reference numeral 20a denotes a plate-shaped drainage material that has been cast in advance, and 70a denotes a drain that is pressed into the ground by approaching the plate-shaped drainage material 20a and is filled with water-permeable particles 73 such as sand and gravel. It is a guide tube. Then, as shown in FIG. 6B, the casing 60, in which the starting end of the plate-shaped drainage material 20b is inserted and fixed, is driven into the ground by applying vibration or a pressure input. At this time, the guide material 63 on the left side of the casing 60 in the drawing is exteriorly mounted on the existing drain guide cylinder 70a, and the plate-shaped drainage material 20b is driven into the ground using the drain guide cylinder 70a as a guide material. Further, in parallel with the penetration work of the casing 60, a separate drain guide cylinder 70b with the bottom closed is inserted into the guide member 63 on the right side of the drawing and driven into the ground. Plate drainage material 2
When 0b is driven to a predetermined depth, only the casing 60 is extracted, and the plate-shaped drainage material 20b and the drain guide cylinder 70b are left in the ground as shown in FIG. 6 (C). Then, the particles 73 are filled in the drain guide cylinder 70b left in the ground. After removing the casing 60, the plate-shaped drainage material 2
Cut off 0. The above steps are repeated to construct a predetermined continuous drainage wall.

【0018】<ハ>効果 本実施例にあっては、図7に示すように板状排水材20
と板状排水材20の間に位置する透水性を有する粒体7
3の充填されたドレーンガイド筒70の透水性能が高い
から、排水壁の排水性能がより向上する。
<C> Effect In the present embodiment, as shown in FIG.
7 having water permeability, which is located between the plate and the drainage material 20
Since the drain guide cylinder 70 filled with No. 3 has high water permeability, the drainage performance of the drainage wall is further improved.

【0019】[0019]

【実施例3】図8は他の形状の排水壁50の平面図を示
すもので、図8の(A)は縦断壁51にV字形に横断壁
52を配置して接続した例を示し、図8の(B)は縦断
壁51に直交する方向に向けて複数の横断壁52を一定
間隔を隔てて配置すると共に、各横断壁52から分岐壁
53を分岐させて接続した例を示す。
[Embodiment 3] FIG. 8 is a plan view of a drainage wall 50 having another shape. FIG. 8A shows an example in which a vertical wall 51 and a transverse wall 52 are arranged in a V shape and connected. FIG. 8B shows an example in which a plurality of transverse walls 52 are arranged at regular intervals in a direction orthogonal to the vertical walls 51, and branch walls 53 are branched from the transverse walls 52 and connected.

【0020】[0020]

【実施例4】以上は堤体に適用した場合について説明し
たが、構造物の周囲に排水壁50を環状又は井桁状に
連続して構築すれば、地震に対する地盤の液状化防止対
策としても活用できる。また雨水浸透機能を具備する透
水性舗装の下部の地中に排水壁50を設ければ、雨水の
浸透施設としても利用することができる。さらにまた、
地下水脈の流れ方向を修正することに利用することも可
能である。 さらにまた既設堤体40の法尻部に排水壁
50を構築した後、この既設の堤体40の上部を盛土に
より嵩上げして大断面の堤防を構築することもできる。
[Embodiment 4] The case where the drainage wall 50 is applied to the dam body has been described above. However, if the drainage wall 50 is continuously constructed in the shape of a ring or a girder around the structure, it is also used as a measure for preventing liquefaction of the ground against an earthquake. it can. Further, if the drainage wall 50 is provided in the ground below the water-permeable pavement having a rainwater infiltration function, it can be used as a rainwater infiltration facility. Furthermore,
It can also be used to correct the flow direction of a groundwater vein. Furthermore, after constructing the drainage wall 50 at the sloping portion of the existing dam body 40, the upper part of the existing dam body 40 can be raised by embankment to construct a large-scale embankment.

【0021】[0021]

【発明の効果】本発明は以上説明したようになるから次
のような効果を得ることができる。 <イ> 板状排水材を相互に接近して打設できるので、
従来のドレーン工法と比較して板状排水材群による排水
性が向上し、高い排水性能の排水壁が得られる。 <ロ> 板状排水材と板状排水材の間に砂の充填された
ドレーンガイド筒を位置させると、板状排水材間の透水
性能がより高いから、排水壁の排水性能がより向上す
る。 <ハ> 板状排水材を接近させて打設するだけであるか
ら、開削工法と比較して施工性に優れる。 <ニ> 先行して地中に貫入させたガイド柱又はドレー
ンガイド筒をガイド部材としてケーシングを地中に貫入
できるので、板状排水材を高精度に打設できる。 <ホ> 既設堤体に多大の変形を与えずに、排水性能を
改善できる。
Since the present invention is as described above, the following effects can be obtained. <B> Since plate-shaped drainage materials can be placed close to each other,
Compared with the conventional drainage method, the drainage performance of the plate-shaped drainage material group is improved, and a drainage wall with high drainage performance can be obtained. <B> When the drain guide tube filled with sand is located between the plate-shaped drainage materials, the water permeability between the plate-shaped drainage materials is higher, and the drainage performance of the drainage wall is further improved. . <C> Since the plate-shaped drainage material is simply placed in close proximity, the workability is superior to that of the open-cut method. <D> Since the casing can be penetrated into the ground by using the guide column or the drain guide cylinder that has been penetrated into the ground as a guide member in advance, it is possible to drive the plate-shaped drainage material with high accuracy. <E> The drainage performance can be improved without significantly deforming the existing dam body.

【図面の簡単な説明】[Brief description of drawings]

【図1】 実施例1に係るケーシングの斜視図FIG. 1 is a perspective view of a casing according to a first embodiment.

【図2】 実施例1に係る排水壁の構築方法の説明図FIG. 2 is an explanatory diagram of a drainage wall construction method according to the first embodiment.

【図3】 排水壁を堤体内に形成した堤体の横断面図[Fig. 3] Cross-sectional view of a levee body with a drainage wall formed inside the levee body.

【図4】 その平面図4 is a plan view of FIG.

【図5】 ドレーンガイド筒を使用する実施例2の説明
図
FIG. 5 is an explanatory diagram of a second embodiment using a drain guide cylinder.

【図6】 実施例2に係る排水壁の構築方法の説明図FIG. 6 is an explanatory diagram of a drainage wall construction method according to a second embodiment.

【図7】 ドレーンガイド筒を介在させた板状排水材の
隣接部を横断面図
FIG. 7 is a cross-sectional view of the adjacent portion of the plate-shaped drainage material with the drain guide tube interposed.

【図8】 排水壁の形状例を示すモデル平面図FIG. 8 is a model plan view showing an example of the shape of a drainage wall.

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 E21B 7/20 ─────────────────────────────────────────────────── ─── Continuation of the front page (51) Int.Cl. 6 Identification code Internal reference number FI technical display location E21B 7/20

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 地中に排水壁を連続して構築する方法
において、 複数の板状排水材を相互に接近させて打設することを特
徴とする、 地中に排水壁を連続して形成する方法。
1. A method for continuously constructing a drainage wall in the ground, characterized in that a plurality of plate-shaped drainage materials are placed close to each other, and the drainage wall is continuously formed in the ground. how to.
【請求項2】 地中に排水壁を連続して構築する方法
において、 両端にガイド材を具備するケーシングと共に板状排水材
を既設の板状排水材に接近させて打設すると共に、 前記ケーシングの一方のガイド材に連結させたガイド柱
を地中に貫入し、 ケーシングを抜き取って前記ガイド柱と板状排水材を地
中に残置させ、 板状排水材の打設位置を移動する以上の各工程を繰り返
して行い、 前記ケーシングの打設時にケーシングの他方のガイド材
を既設のガイド柱に案内させて打設し、 前記ケーシングを抜き取る際、ケーシングの他方のガイ
ド材に既設のガイド柱を連結して抜き取ることを特徴と
する、 地中に排水壁を連続して形成する方法。
2. A method of continuously constructing a drainage wall in the ground, in which a plate-shaped drainage material is cast close to an existing plate-shaped drainage material together with a casing having guide members at both ends, and the casing is also provided. The guide pillar connected to one of the guide materials is penetrated into the ground, the casing is removed, the guide pillar and the plate drainage material are left in the ground, and the placement position of the plate drainage material is moved. Each step is repeated, and when the casing is cast, the other guide material of the casing is guided by being guided to the existing guide pillar, and when the casing is removed, the existing guide pillar is attached to the other guide material of the casing. A method of continuously forming drainage walls in the ground, which is characterized by connecting and extracting.
【請求項3】 地中に排水壁を連続して構築する方法
において、 複数の板状排水材を相互に接近させて打設し、 前記板状排水材と板状排水材の間に透水性を有する粒体
を充填した有孔筒を位置させることを特徴とする、 地中に排水壁を連続して形成する方法。
3. A method of continuously constructing a drainage wall in the ground, in which a plurality of plate-shaped drainage materials are placed close to each other, and water permeability is provided between the plate-shaped drainage materials. A method for continuously forming a drainage wall in the ground, which comprises locating a perforated cylinder filled with particles having
【請求項4】 地中に排水壁を連続して構築する方法
において、 両端にガイド材を具備するケーシングと共に板状排水材
を既設の板状排水材に接近させて打設し、 前記板状排水材と板状排水材の間に有孔構造のドレーン
ガイド筒を位置させ、 ケーシングを抜き取って前記板状排水材とドレーンガイ
ド筒を地中に残置させることを特徴とする、 地中に排水壁を連続して形成する方法。
4. A method for continuously constructing a drainage wall in the ground, in which a plate-shaped drainage material is cast close to an existing plate-shaped drainage material together with a casing having guide members at both ends, and the plate-shaped drainage material is formed. A drain guide tube having a perforated structure is located between the drainage material and the plate-like drainage material, and the casing is removed to leave the plate-like drainage material and the drain guide tube in the ground. A method of continuously forming walls.
【請求項5】 請求項1〜4のいずれかにおいて、堤
体の横断方向に沿って複数の板状排水材を配列すること
を特徴とする、地中に排水壁を連続して形成する方法。
5. The method for continuously forming a drainage wall in the ground according to any one of claims 1 to 4, characterized in that a plurality of plate-shaped drainage materials are arranged along the transverse direction of the bank. .
【請求項6】 板状排水材を内挿して地中に打設する
板状排水材打設用ケーシングにおいて、 板状排水材の断面形を呈し、上下を開放した筒体と、 前記筒体の両端に設けられ、地中の板状排水材に隣接さ
せて打設した棒状のガイド部材に係合可能なガイド材を
具備することを特徴とする、 板状排水材打設用ケーシング。
6. A plate-shaped drainage material placing casing in which a plate-shaped drainage material is inserted and placed in the ground, and a tubular body having a cross-sectional shape of the plate-like drainage material and having an open top and bottom, and the tubular body. A plate-like drainage material casting casing, characterized in that it is provided with guide members that are provided at both ends of the plate-like guide member and that are engaged adjacent to the plate-like drainage material in the ground.
JP18177794A 1994-07-11 1994-07-11 Method of forming drainage wall continuously in the ground and casing for placing plate-like drainage material Expired - Fee Related JP3407066B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18177794A JP3407066B2 (en) 1994-07-11 1994-07-11 Method of forming drainage wall continuously in the ground and casing for placing plate-like drainage material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18177794A JP3407066B2 (en) 1994-07-11 1994-07-11 Method of forming drainage wall continuously in the ground and casing for placing plate-like drainage material

Publications (2)

Publication Number Publication Date
JPH0820942A true JPH0820942A (en) 1996-01-23
JP3407066B2 JP3407066B2 (en) 2003-05-19

Family

ID=16106705

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18177794A Expired - Fee Related JP3407066B2 (en) 1994-07-11 1994-07-11 Method of forming drainage wall continuously in the ground and casing for placing plate-like drainage material

Country Status (1)

Country Link
JP (1) JP3407066B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998037279A1 (en) * 1997-02-19 1998-08-27 Yuy Architects And Engineers Co., Ltd. Method for constructing an underground structure, excavating method, an excavating tool and a reinforceing bar fixing tool therefor
JP2017020187A (en) * 2015-07-07 2017-01-26 ジオスター株式会社 Liquefaction prevention underground object and seismic ground deformation prevention structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998037279A1 (en) * 1997-02-19 1998-08-27 Yuy Architects And Engineers Co., Ltd. Method for constructing an underground structure, excavating method, an excavating tool and a reinforceing bar fixing tool therefor
JP2017020187A (en) * 2015-07-07 2017-01-26 ジオスター株式会社 Liquefaction prevention underground object and seismic ground deformation prevention structure

Also Published As

Publication number Publication date
JP3407066B2 (en) 2003-05-19

Similar Documents

Publication Publication Date Title
CN106351230B (en) Soft clay area basement construction method for supporting
KR101840226B1 (en) The guide holes of the form for soil auger dredges
KR20140055639A (en) A execution method of architecture beam
KR20040097967A (en) Construction method of three arch excavation tunnel
CN107700507B (en) Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank
KR100618597B1 (en) Cast-in-place concrete pile using inner tube and concrete rise prevention device and construction method
KR100877452B1 (en) Intermediate wall construction method of 3ric excavation tunnel
JP3407066B2 (en) Method of forming drainage wall continuously in the ground and casing for placing plate-like drainage material
JP3192661B2 (en) Novel sewage wall, method of forming the sewage wall, and members used therefor
KR200296444Y1 (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method
JP2002061166A (en) Underground cavity filling method and filling bag
JP2900842B2 (en) Earth retaining wall structure with water permeability
KR20040023915A (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof
JP2634442B2 (en) Underground wall
JPH03206211A (en) Drain material, soft ground improving structure using drain material and foundation pillar using the same structure
CN207062996U (en) Cross the constructing structure of urban road underpass
JP2876265B2 (en) Sheet pile for underground continuous wall and underground continuous wall method
JP7566235B1 (en) Ground improvement methods
JP2611104B2 (en) Water passing method for continuous underground wall
JP3066672B2 (en) Groundwater condensing method for underground diaphragm wall
JPH10153079A (en) How to install a shaft in pressurized groundwater
JP2985736B2 (en) Soil retaining wall with water permeability and construction method
JP2002201634A (en) Construction of continuous underground wall and construction method
JPS62117911A (en) Setting of pipe for well
JP5017528B2 (en) Cast-in-place concrete earth retaining method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090314

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090314

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100314

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100314

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110314

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110314

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120314

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130314

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140314

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees