JPH08311994A - Earthquake resistant construction of building - Google Patents

Earthquake resistant construction of building

Info

Publication number
JPH08311994A
JPH08311994A JP14000895A JP14000895A JPH08311994A JP H08311994 A JPH08311994 A JP H08311994A JP 14000895 A JP14000895 A JP 14000895A JP 14000895 A JP14000895 A JP 14000895A JP H08311994 A JPH08311994 A JP H08311994A
Authority
JP
Japan
Prior art keywords
floor
bolt
building
base
long bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14000895A
Other languages
Japanese (ja)
Other versions
JP2935411B2 (en
Inventor
Hiroki Kanai
宏樹 金井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP14000895A priority Critical patent/JP2935411B2/en
Publication of JPH08311994A publication Critical patent/JPH08311994A/en
Application granted granted Critical
Publication of JP2935411B2 publication Critical patent/JP2935411B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

PURPOSE: To increase not only the horizontal rigidity of a building but also the vertical rigidity thereof and improve much more the earthquake-resistance. CONSTITUTION: A double-nut 6 is screwed in at the upper end of an anchor bolt 5 embedded in a continuous footing 1 made of placed concrete to fix a sill 2 on the continuous footing 1. A long bolt 10 stretched between the sill 2 and a lateral member 4 positioned above the sill is fastened to the anchor bolt 5 through the double-nut 6.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、より一層の耐震性能を
発揮し得る建造物の耐震構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a seismic resistant structure for a building which can exhibit even greater seismic performance.

【0002】[0002]

【従来の技術】従来より、柱や梁等の主要構造材の他
に、筋かいや火打ち等の補強構造材を軸組して建造物を
構築することで当該建造物の耐力の向上が図られてい
る。
2. Description of the Related Art Conventionally, in addition to main structural materials such as columns and beams, reinforcing structures such as braces and fires are framed to construct a structure to improve the proof stress of the structure. Has been.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、このよ
うに構築された従来からの建造物において布基礎に直接
固定されているのは土台だけであり、土台よりも上に軸
組された構造材は柱等を介して間接的に固定されている
に過ぎず、かかる建造物にあっては、補強構造材の組み
合わせによって水平方向の剛性を高めることはできて
も、その垂直方向の剛性を高めるには限界があった。
However, in the conventional building constructed in this way, only the foundation is directly fixed to the cloth foundation, and the structural material skeletonized above the foundation is Since it is only indirectly fixed through columns, etc., in such a structure, it is possible to increase the rigidity in the vertical direction by increasing the rigidity in the horizontal direction by combining reinforcing structures. There was a limit.

【0004】このため、従来からの建造物は、横揺れの
地震に対してならばある程度の耐震性能を発揮し得るも
のの、縦揺れの地震にみまわれた場合には土台よりも上
の部分が浮き上がる等して不安定な状態になり易いとい
う構造上の不利があり、最悪の場合、これが原因となっ
て建造物が倒壊してしまう虞があった。
Therefore, although a conventional building can exhibit a certain degree of seismic resistance against a rolling earthquake, when a vertical shaking earthquake occurs, the portion above the base is There is a structural disadvantage that it is likely to be in an unstable state due to floating or the like, and in the worst case, this may cause the building to collapse.

【0005】本出願人は上記の点に鑑み、水平方向のみ
ならず、建造物の垂直方向の剛性をも高め、建造物の耐
震性能のより一層の向上を図るべく鋭意研究を重ねた結
果、本発明を完成するに至った。
In view of the above points, the Applicant has conducted diligent research to improve not only the horizontal direction but also the vertical direction rigidity of the building and further improve the seismic performance of the building. The present invention has been completed.

【0006】[0006]

【課題を解決するための手段】即ち、本発明建造物耐震
構造は、アンカーボルトにより布基礎上に固定される土
台の上面に突出せしめた当該アンカーボルトの上端部分
に、二連ナットを介して両端にネジ溝が刻設された長尺
ボルトの一端を緊結するとともに、かかる長尺ボルトを
土台と該土台の上方に位置する横架材との間に張架した
ことを特徴とする。
[Means for Solving the Problems] That is, the seismic resistant structure for building of the present invention has a double nut on the upper end portion of the anchor bolt projecting on the upper surface of the base fixed to the cloth foundation by the anchor bolt. It is characterized in that one end of a long bolt having screw grooves engraved at both ends is tightly connected and the long bolt is stretched between a base and a horizontal member located above the base.

【0007】このような本発明建造物耐震構造は、複数
階層式の建造物にも適用することができ、この場合に
は、二階層以上の各階層において、当該階層の下階の床
側と天井側の両横架材間に張架した長尺ボルトの端部を
当該階層の床側の横架材(即ち、当該階層の下階の天井
側の横架材)の上面に突出せしめ、これに二連ナットを
介して別の長尺ボルトの一端を緊結するとともに、かか
る長尺ボルトを当該階層の床側の横架材と該横架材の上
方に位置する天井側の横架材との間に張架すれば良い。
The seismic resistant structure of the present invention as described above can also be applied to a multi-story building. In this case, in each of two or more floors, the floor side of the floor below The end of the long bolt stretched between the ceiling-side horizontal members is projected onto the upper surface of the floor-side horizontal member of the floor (that is, the ceiling-side horizontal member of the lower floor of the floor). One end of another long bolt is tightly connected to this through a double nut, and the long bolt is attached to the horizontal member on the floor of the floor and the horizontal member on the ceiling above the horizontal member. You just have to stretch it between and.

【0008】また、本発明建造物耐震構造にあっては、
両端にネジ溝が刻設された複数の短尺ボルトを連結した
ものを長尺ボルトとして用いることができる。
Further, in the building earthquake-proof structure of the present invention,
A long bolt can be used by connecting a plurality of short bolts having thread grooves on both ends.

【0009】[0009]

【実施例】以下、本発明建造物耐震構造の実施例を図面
に基づき詳細に説明する。ここで、図1は本発明建造物
耐震構造の一例を示す斜視図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the building seismic resistant structure of the present invention will be described in detail below with reference to the drawings. Here, FIG. 1 is a perspective view showing an example of the structure for earthquake-proofing of the present invention.

【0010】本発明建造物耐震構造では、アンカーボル
ト5がその上端部分を残してコンクリートを打設してな
る布基礎1中に埋設されており、当該アンカーボルト5
の上端部分が土台2に穿設したボルト孔2′に挿通さ
れ、且つネジ溝が刻設された当該アンカーボルト5の上
端部分が土台2の上面に突出するように、かかる土台2
を布基礎1上に載置した後、土台2の上面に突出するア
ンカーボルト5の上端部分に二連ナット6を螺着するこ
とによって布基礎1上に土台2が固定されている。尚、
図中7は二連ナット6と土台2との間に介装せしめた座
金である。
In the seismic resistant structure of the present invention, the anchor bolt 5 is embedded in the cloth foundation 1 made of concrete, leaving the upper end portion thereof, and the anchor bolt 5 is
The upper end portion of the anchor bolt 5 is inserted into a bolt hole 2 ′ formed in the base 2, and the upper end portion of the anchor bolt 5 in which a screw groove is engraved protrudes above the upper surface of the base 2.
The base 2 is fixed on the cloth base 1 by screwing a double nut 6 onto the upper end portion of the anchor bolt 5 projecting on the upper surface of the base 2 after placing the base 2 on the cloth base 1. still,
Reference numeral 7 in the figure denotes a washer interposed between the double nut 6 and the base 2.

【0011】そして、本願発明にあっては、両端にネジ
溝が刻設されている長尺ボルト10の一端を、アンカー
ボルト5の上端部分に螺着された二連ナット6を介して
当該アンカーボルト5に緊結するとともに、かかる長尺
ボルト10が土台2と該土台2の上方に位置する横架材
4との間に張架されている。尚、本発明耐震構造を適用
して構築された建造物において、アンカーボルト5に緊
結され、且つ2つの横架材2、4間に張架される長尺ボ
ルト10の数は必要に応じて適宜選択され、かかる建造
物において用いられている全てのアンカーボルト5に対
応させる必要は必ずしもない。
In the present invention, one end of the long bolt 10 having thread grooves formed on both ends thereof is inserted into the anchor nut 5 through a double nut 6 screwed to the upper end portion of the anchor bolt 5. The long bolt 10 is tightly connected to the bolt 5, and is stretched between the base 2 and the horizontal member 4 located above the base 2. In the structure constructed by applying the seismic resistant structure of the present invention, the number of the long bolts 10 tightly connected to the anchor bolts 5 and stretched between the two horizontal members 2 and 4 may be as necessary. It does not necessarily have to correspond to all anchor bolts 5 that are appropriately selected and used in such a structure.

【0012】本発明建造物耐震構造は、土台2と該土台
2の上方に位置する横架材4との間に張架せしめた長尺
ボルト10をアンカーボルト5に緊結した点が特に重要
であり、このような構成を採用した本願発明耐震構造に
よれば、水平方向のみならず、建造物の垂直方向の剛性
をも高めることが可能となり、建造物の耐震性能をより
一層向上させることができる。
The seismic resistant structure of the present invention is particularly important in that the long bolt 10 stretched between the base 2 and the horizontal member 4 located above the base 2 is tightly connected to the anchor bolt 5. According to the seismic resistant structure of the present invention which adopts such a configuration, it becomes possible to enhance not only the rigidity in the horizontal direction but also in the vertical direction of the building, and it is possible to further improve the seismic performance of the building. it can.

【0013】つまり、本発明耐震構造では、土台2と該
土台2の上方に位置する横架材4との間に張架せしめた
長尺ボルト10によってかかる2つの横架材2、4が引
き寄せられており、その間に組まれている筋かい3と相
俟って、水平荷重に対して建造物が変形するのをより効
果的に防ぐことができるばかりか、かかる長尺ボルト1
0は布基礎1に埋設されたアンカーボルト5に緊結され
ているため、たとえ、縦揺れの地震にみまわれた場合で
あっても、土台2よりも上の部分が浮き上がったりする
ことがなく建造物の構造をより安定な状態に維持するこ
とが可能となり、その垂直方向の剛性を格段に高めるこ
とができるのである。
That is, in the seismic resistant structure of the present invention, the two horizontal members 2 and 4 are attracted by the long bolt 10 stretched between the base 2 and the horizontal member 4 located above the base 2. Not only can the structure be prevented from being deformed by horizontal load in cooperation with the braces 3 that are assembled between them, but the long bolt 1
No. 0 is tightly connected to the anchor bolts 5 embedded in the cloth foundation 1, so even if a vertical shaking earthquake occurs, the parts above the base 2 do not rise and are constructed. The structure of the object can be maintained in a more stable state, and the rigidity in the vertical direction can be significantly increased.

【0014】更に、本発明耐震構造は、布基礎1に埋設
されているアンカーボルト5を利用するものであるた
め、新規に構築する建造物のみならず、既存の建造物で
あっても、その壁の一部を取り外すとともに横架材4の
所定箇所にボルト孔2′を穿設する等するだけで本発明
耐震構造を適用することができる。
Further, since the seismic resistant structure of the present invention utilizes the anchor bolts 5 embedded in the cloth foundation 1, not only the newly constructed structure but also the existing structure can be obtained. The seismic resistant structure of the present invention can be applied only by removing a part of the wall and forming a bolt hole 2 ′ at a predetermined position of the horizontal member 4.

【0015】また、本発明建造物耐震構造は、複数階層
式の建造物にも適用することができる。尚、図2は本発
明建造物耐震構造を複数階層式の建造物に適用した一例
を示している。
The building seismic resistant structure of the present invention can also be applied to a multi-story building. Note that FIG. 2 shows an example in which the building earthquake-resistant structure of the present invention is applied to a multi-story building.

【0016】このような場合には、図示するように、二
階層以上の各階層において、当該階層の下階の床側と天
井側の両横架材間に張架した長尺ボルト10の上方側の
端部を当該階層の床側の横架材(即ち、当該階層の下階
の天井側の横架材)4の上面に突出せしめ、これに二連
ナット6を介して別の長尺ボルト10の一端を緊結する
とともに、かかる長尺ボルト10を当該階層の床側の横
架材4と該横架材4の上方に位置する天井側の横架材
4′との間に張架するようにすれば良く、これによっ
て、二階建てや三階建て等の複数階層式の建造物におい
ても、その耐震性能をより一層向上させることができ
る。
In such a case, as shown in the figure, in each of two or more floors, above the long bolt 10 stretched between the floor-side and ceiling-side horizontal members on the lower floor of the floor. Side end portion is made to project on the upper surface of the floor-side horizontal member (that is, the ceiling-side horizontal member on the lower floor of the layer) of the floor, and another long piece is attached to this by a double nut 6. The one end of the bolt 10 is tightly connected, and the long bolt 10 is stretched between the floor-side horizontal member 4 of the floor and the ceiling-side horizontal member 4 ′ located above the horizontal member 4. Therefore, even in a multi-story building such as a two-story building or a three-story building, the seismic performance can be further improved.

【0017】本発明においてアンカーボルト5と長尺ボ
ルト10とを緊結する二連ナット6としては、例えば、
図3に示すように二つの六角ナットを溶接等の適宜手段
を用いて接合したもの等が用いられる。また、かかる二
連ナット6は、図示するように、一方のナットの高さが
他方のナットよりも高くなっているのが好ましく、二連
ナット6をこのように構成することによって、その高く
なっている部位に通常の六角ナットをレンチでネジ締め
するのと同じように六方向からレンチをかみ合わせてネ
ジ締めしたり、メガネレンチやボックスレンチ等をかみ
合わせてネジ締めしたりすることができる。尚、図4は
図3のIV−IV線における断面図である。
In the present invention, the double nut 6 for tightly connecting the anchor bolt 5 and the long bolt 10 is, for example,
As shown in FIG. 3, two hexagon nuts that are joined by using an appropriate means such as welding are used. Further, as shown in the drawing, it is preferable that the height of one nut of the double nut 6 is higher than that of the other nut. It is possible to engage the wrench from six directions and tighten the screw, or to engage the box wrench or box wrench with the wrench to tighten the screw. 4 is a cross-sectional view taken along the line IV-IV in FIG.

【0018】また、このような二連ナット6を介してア
ンカーボルト5の上端部分に長尺ボルト10を緊結する
ことにより、アンカーボルト5を布基礎1に埋設する際
に、その埋設位置が布基礎1の幅方向中央からずれてし
まった場合であっても(通常、布基礎1の幅方向中央に
は鉄骨が埋設されており、かかる布基礎1の幅方向中央
にアンカーボルト5を埋設するのは困難である)、図5
に示すように、二連ナット6を構成する2つのナット6
a、6bのうちアンカーボルト5に螺着されてない方の
ナット6bを土台2の中心線上に位置せしめ、これに長
尺ボルト10を螺着することによって土台2の中心線上
に長尺ボルト10が位置するようにすることができ、長
尺ボルト10が2つの横架材2、4に及ぼす張力が偏ら
ないようにすることができる。尚、図中に示す2点鎖線
は土台2の中心線である。
Also, when the long bolt 10 is tightly connected to the upper end portion of the anchor bolt 5 via the double nut 6 as described above, when the anchor bolt 5 is embedded in the cloth foundation 1, the embedding position is a cloth. Even when it is displaced from the center of the foundation 1 in the width direction (usually, a steel frame is embedded in the center of the cloth foundation 1 in the width direction, and the anchor bolt 5 is embedded in the center of the cloth foundation 1 in the width direction. Is difficult), Fig. 5
As shown in, the two nuts 6 that make up the double nut 6
One of the nuts a and 6b, which is not screwed to the anchor bolt 5, is positioned on the center line of the base 2, and the long bolt 10 is screwed to the nut 6b. Can be positioned so that the tension that the long bolt 10 exerts on the two horizontal members 2 and 4 is not biased. The two-dot chain line shown in the figure is the center line of the base 2.

【0019】また、本発明建造物耐震構造において、そ
の長尺ボルト10は、少なくとも天井高よりも長くする
必要があるが、このような長さの長尺ボルト10は保管
や運搬に不便であるため、本発明にあっては、その取り
扱いが容易になるように、両端にネジ溝が刻設された複
数の短尺ボルト8を長ナット9やターンバックル等を用
いて、少なくとも天井高よりも長くなるように連結した
ものを長尺ボルト10として用いることもできる。
Further, in the seismic resistant structure for construction of the present invention, the long bolt 10 needs to be at least longer than the ceiling height, but the long bolt 10 having such a length is inconvenient for storage and transportation. Therefore, in the present invention, a plurality of short bolts 8 having thread grooves formed at both ends are used to make it easier to handle by using a long nut 9, a turnbuckle, or the like to make the length at least longer than the ceiling height. It is also possible to use the long bolts 10 connected in such a manner that they are connected.

【0020】[0020]

【発明の効果】以上説明したように、本発明建造物耐震
構造によれば、土台と該土台の上方に位置する横架材と
の間に張架せしめた長尺ボルトをアンカーボルトに緊結
することにより、水平方向のみならず、建造物の垂直方
向の剛性をも高めることが可能となり、建造物の耐震性
能をより一層向上させることができる。更に、本発明耐
震構造は、新規に構築する建造物のみならず、既存の建
造物であっても、これを適用することができる。
As described above, according to the structure for earthquake-proofing of the present invention, the long bolt which is stretched between the base and the horizontal member located above the base is tightly connected to the anchor bolt. As a result, not only the rigidity in the horizontal direction but also in the vertical direction of the building can be enhanced, and the seismic performance of the building can be further improved. Further, the seismic resistant structure of the present invention can be applied not only to newly constructed structures but also to existing structures.

【0021】また、二連ナットを介してアンカーボルト
に長尺ボルトを緊結することにより、アンカーボルトを
布基礎に埋設する際に、その埋設位置が布基礎の幅方向
中央からずれてしまった場合であっても、土台の中心線
上に長尺ボルトが位置するようにこれをアンカーボルト
に螺着することができるため、長尺ボルトが2つの横架
材に及ぼす張力が偏らないようにすることができる。ま
た、両端にネジ溝が刻設された複数の短尺ボルトを連結
したものを長尺ボルトとして用いれば、その取り扱いが
容易になる。
Further, when the long bolt is tightly connected to the anchor bolt through the double nut, when the anchor bolt is embedded in the cloth foundation, the embedding position is displaced from the center of the cloth foundation in the width direction. However, since the long bolt can be screwed to the anchor bolt so that the long bolt is located on the center line of the base, the tension applied to the two horizontal members by the long bolt should not be biased. You can Further, if a plurality of short bolts having thread grooves formed on both ends are connected to each other and used as a long bolt, the handling becomes easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明建造物耐震構造の一例を示す斜視図であ
る。
FIG. 1 is a perspective view showing an example of a building earthquake-resistant structure of the present invention.

【図2】本発明建造物耐震構造の他の一例を示す斜視図
である。
FIG. 2 is a perspective view showing another example of the building earthquake-resistant structure of the present invention.

【図3】本発明建造物耐震構造において用いる二連ナッ
トの一例を示す図面である。
FIG. 3 is a view showing an example of a double nut used in the building earthquake-resistant structure of the present invention.

【図4】図3のIV−IV線における断面図である。FIG. 4 is a sectional view taken along line IV-IV in FIG.

【図5】本発明建造物耐震構造においてアンカーボルト
の上端部分に二連ナットを螺着した状態を説明する図面
である。
FIG. 5 is a view for explaining a state in which a double nut is screwed to the upper end portion of the anchor bolt in the building earthquake-resistant structure of the present invention.

【符号の説明】[Explanation of symbols]

1 布基礎 2 土台 5 アンカーボルト 4、4′ 横架材 6 二連ナット 8 短尺ボルト 10 長尺ボルト 1 Fabric foundation 2 Base 5 Anchor bolt 4, 4'Horizontal material 6 Double nut 8 Short bolt 10 Long bolt

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成7年11月28日[Submission date] November 28, 1995

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図5[Name of item to be corrected] Figure 5

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図5】 [Figure 5]

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】アンカーボルトにより布基礎上に固定され
る土台の上面に突出せしめた当該アンカーボルトの上端
部分に、二連ナットを介して両端にネジ溝が刻設された
長尺ボルトの一端を緊結するとともに、かかる長尺ボル
トを土台と該土台の上方に位置する横架材との間に張架
したことを特徴とする建造物耐震構造。
1. An end of a long bolt having a thread groove formed on both ends thereof via a double nut at an upper end portion of the anchor bolt projecting on an upper surface of a base fixed to a cloth foundation by an anchor bolt. A structure earthquake-proof structure characterized in that the long bolts are tightened between a base and a horizontal member located above the base.
【請求項2】複数階層式の建造物における二階層以上の
各階層において、当該階層の下階の床側と天井側の両横
架材間に張架した長尺ボルトの端部を当該階層の床側の
横架材(即ち、当該階層の下階の天井側の横架材)の上
面に突出せしめ、これに二連ナットを介して別の長尺ボ
ルトの一端を緊結するとともに、かかる長尺ボルトを当
該階層の床側の横架材と該横架材の上方に位置する天井
側の横架材との間に張架した請求項1記載の建造物耐震
構造。
2. In each of two or more floors of a multi-story building, the end of a long bolt stretched between the floor-side and ceiling-side horizontal members on the lower floor of the floor is connected to the floor. Of the horizontal bolt on the floor side (that is, the horizontal bridge on the ceiling of the lower floor of the floor), and one end of another long bolt is tightly connected to this with a double nut and The building seismic resistant structure according to claim 1, wherein a long bolt is stretched between a horizontal member on the floor of the floor and a horizontal member on the ceiling located above the horizontal member.
【請求項3】両端にネジ溝が刻設された複数の短尺ボル
トを連結したものを長尺ボルトとして用いた請求項1、
又は2記載の建造物耐震構造。
3. A long bolt which is formed by connecting a plurality of short bolts having thread grooves formed on both ends thereof.
Or the building seismic resistant structure described in 2.
JP14000895A 1995-05-15 1995-05-15 Building seismic structure Expired - Lifetime JP2935411B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14000895A JP2935411B2 (en) 1995-05-15 1995-05-15 Building seismic structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14000895A JP2935411B2 (en) 1995-05-15 1995-05-15 Building seismic structure

Publications (2)

Publication Number Publication Date
JPH08311994A true JPH08311994A (en) 1996-11-26
JP2935411B2 JP2935411B2 (en) 1999-08-16

Family

ID=15258793

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14000895A Expired - Lifetime JP2935411B2 (en) 1995-05-15 1995-05-15 Building seismic structure

Country Status (1)

Country Link
JP (1) JP2935411B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100451258C (en) * 2005-04-18 2009-01-14 德胜(苏州)洋楼有限公司 Improvement of windproof and antiknocking performances of wooden-structure house
JP2013194414A (en) * 2012-03-19 2013-09-30 Hokoku Eng Kk Earthquake strengthening structure and earthquake strengthening of wooden house

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100451258C (en) * 2005-04-18 2009-01-14 德胜(苏州)洋楼有限公司 Improvement of windproof and antiknocking performances of wooden-structure house
JP2013194414A (en) * 2012-03-19 2013-09-30 Hokoku Eng Kk Earthquake strengthening structure and earthquake strengthening of wooden house

Also Published As

Publication number Publication date
JP2935411B2 (en) 1999-08-16

Similar Documents

Publication Publication Date Title
US5168681A (en) Prestressed wood floor system
CN103628587B (en) Self-reset girder-grid friction wall structural system
US3899152A (en) Concrete form including extruded aluminum support structure
DE2519664A1 (en) SPATIAL FRAMEWORK
US20080016793A1 (en) Web hole reinforcing for metal wall stubs
JP3842865B2 (en) Seismic reinforcement method for buildings
JP2935411B2 (en) Building seismic structure
KR200231044Y1 (en) Sag prevention device for deck panel of reinforced concrete slab
JP3139980U (en) Wooden frame structure corner bearing wall
JPH10292490A (en) Reinforcing structure for wooden house
PT1346111E (en) Flat soffit, doubly prestressed, composite, roof-ceiling construction for large span industrial buildings
JPH09189076A (en) Connection device of structural member for wooden building
JP2005344492A (en) Earthquake resistance reinforcing method for wooden house, metal fitting used for the same and device for preventing pillar from falling out
JPH06173342A (en) Wooden house frame construction method
JPS5819210Y2 (en) Bracing for wooden structures
JPS6029543Y2 (en) wooden arch truss
JPH11100898A (en) Fitting structure for wooden column
JPS5836728Y2 (en) lightweight steel buildings
EP0042101A2 (en) Roof-truss comprising a tension member
US621091A (en) Floor
RU2070257C1 (en) Exterior wall panel
JP2005226422A (en) Aseismatic reinforcing construction method of wooden building
JPS6092531A (en) Building skeletal structure
AU739630B2 (en) Hold down bracket
AU716283B1 (en) Hold down bracket

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110604

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110604

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140604

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term