JPH0865830A - Gas-insulated switchgear - Google Patents
Gas-insulated switchgearInfo
- Publication number
- JPH0865830A JPH0865830A JP6200698A JP20069894A JPH0865830A JP H0865830 A JPH0865830 A JP H0865830A JP 6200698 A JP6200698 A JP 6200698A JP 20069894 A JP20069894 A JP 20069894A JP H0865830 A JPH0865830 A JP H0865830A
- Authority
- JP
- Japan
- Prior art keywords
- line
- circuit breaker
- bus
- spare
- gis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007689 inspection Methods 0.000 description 13
- 238000010586 diagram Methods 0.000 description 3
- 238000012790 confirmation Methods 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
Landscapes
- Gas-Insulated Switchgears (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、ガス絶縁開閉装置(以
下、「GIS」という。)に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gas insulated switchgear (hereinafter referred to as "GIS").
【0002】[0002]
【従来の技術】従来のGISを図3に示す。図はGIS
の一部を示すもので、甲母線及び乙母線からなる2母線
3,4に対して、複数の回線1,2が接続され、GPT
ユニット5,6が接続されている。各回線1,2は、2
母線3,4に断路器9,10を介して接続された遮断器
8と、この遮断器8に断路器11を介して接続されたケ
ーブルヘッド7と、接地開閉器12,13,14と、避
雷器15を具備している。2. Description of the Related Art A conventional GIS is shown in FIG. The figure shows GIS
A plurality of lines 1 and 2 are connected to two busses 3 and 4 consisting of an A bus and an Otsu bus.
Units 5 and 6 are connected. Each line 1 and 2 is 2
A circuit breaker 8 connected to the busbars 3 and 4 via disconnecting switches 9 and 10; a cable head 7 connected to the circuit breaker 8 via a disconnecting switch 11; and ground switches 12, 13, and 14, The lightning arrester 15 is provided.
【0003】また、GPTユニット5,6は、それぞれ
GPT26と接地開閉器27を具備している。The GPT units 5 and 6 each include a GPT 26 and a ground switch 27.
【0004】[0004]
【発明が解決しようとする課題】このようなGISにお
いて、ある回線例えば回線1の遮断器8が故障したと
き、その復旧の間その回線1は停電となる。また、遮断
器8は事故が発生して初めて動作するものであるため、
1年を通じて1回も動作しない場合がある。このように
遮断器8は希頻度動作機器であるため、1年に1回程度
は点検のために確認動作を行う。さらには、精密点検
や、遮断器のコンタクトの取り替えを行う必要がある。
この点検又は取り替え等の間も同様にその回線1は停電
をさせなければならない。In such a GIS, when the circuit breaker 8 of a certain line, for example, the line 1 fails, the line 1 is out of power during the recovery. Also, since the circuit breaker 8 operates only after an accident occurs,
It may not work even once a year. Since the circuit breaker 8 is an infrequently operating device as described above, the checking operation is performed once a year for inspection. Furthermore, it is necessary to perform a detailed inspection and replace the contacts of the circuit breaker.
During this inspection or replacement, the line 1 must also have a power failure.
【0005】このように、回線の復旧、点検等を行う
際、その期間中は回線を停電とせざるを得なかった。ま
た、復旧、点検作業が終了するまで停電を継続させなけ
ればならないため、停電時間は長時間となっていた。本
発明は、GISにおいて、回線の復旧、点検等を行う際
の回線の停電時間を短くし、或いは、回線の復旧、点検
等を無停電で行えるようにすることを目的とするもので
ある。As described above, when the line is restored or inspected, the line must be shut down during the period. Moreover, the power outage must be continued until the restoration and inspection work is completed, and thus the power outage time is long. It is an object of the present invention to shorten the power outage time of a line when performing line restoration and inspection in GIS, or to enable line restoration and inspection without interruption.
【0006】[0006]
【課題を解決するための手段】本発明は、上記目的を達
成するため、母線に接続された遮断器及びこの遮断器に
接続されたケーブルヘッドを有する回線を具備するガス
絶縁開閉装置において、予備母線と、該予備母線と前記
母線間に接続した遮断器を有する予備回線と、前記予備
母線と前記回線の前記ケーブルヘッド間に接続された断
路器とを設ける。In order to achieve the above object, the present invention provides a gas insulated switchgear having a circuit having a circuit breaker connected to a bus bar and a cable head connected to the circuit breaker. A busbar, a backup line having a circuit breaker connected between the backup busbar and the busbar, and a disconnector connected between the backup busbar and the cable head of the line are provided.
【0007】[0007]
【作用】回線の復旧、点検を行うとき、該当回線のケー
ブルヘッドを、断路器により予備母線に接続することに
より、ケーブルヘッドを予備回線を介して母線に接続す
る。これにより、回線の復旧、点検等を行うための回線
の停電時間を短くし、或いは、回線の復旧、点検等を無
停電で行うことができるようになる。When the line is restored and inspected, the cable head of the corresponding line is connected to the spare busbar by the disconnector so that the cable head is connected to the busbar through the spare line. As a result, it is possible to shorten the power outage time of the line for performing line restoration and inspection, or to perform line restoration and inspection without interruption.
【0008】[0008]
【実施例】以下、本発明のGISを2母線形GISに適
用した例について図を用いて説明する。図1はGISの
一部を示し、甲母線及び乙母線からなる2母線3,4に
対して複数の回線1,2が接続されている。また、2母
線3,4には、それぞれGPTユニット5,6が接続さ
れている。さらに、2母線3,4には、予備回線16が
接続され、この予備回線16に予備母線17が接続され
る。EXAMPLE An example in which the GIS of the present invention is applied to a 2-matrix GIS will be described below with reference to the drawings. FIG. 1 shows a part of GIS, in which a plurality of lines 1 and 2 are connected to two buses 3 and 4 which are an A bus and an O bus. Further, GPT units 5 and 6 are connected to the two buses 3 and 4, respectively. Further, a backup line 16 is connected to the two buses 3 and 4, and a backup bus 17 is connected to the backup line 16.
【0009】各回線1,2は、2母線3,4に断路器
9,10を介して接続された遮断器8と、この遮断器8
に断路器11を介して接続されたケーブルヘッド7と、
接地開閉器12,13と、避雷器15を具備している。
予備回線16は、2母線3,4と断路器20,21を介
して接続され、かつ予備母線17と断路器22を介して
接続された遮断器19と、接地開閉器23,24,25
を有している。Each of the lines 1 and 2 includes a circuit breaker 8 connected to the two buses 3 and 4 via disconnectors 9 and 10, and the circuit breaker 8
A cable head 7 connected to the via a disconnector 11,
The grounding switches 12 and 13 and the lightning arrester 15 are provided.
The backup line 16 is connected to the two buses 3 and 4 via the disconnectors 20 and 21, and is connected to the backup bus 17 via the disconnector 22 and the grounding switch 23, 24, 25.
have.
【0010】また、GPTユニット5,6には、それぞ
れGPT26及び接地開閉器27が収納されている。以
上説明したGISにおいては、常時は、予備回線16の
遮断器19がオフとされ、予備母線17と各ケーブルヘ
ッド7間の断路器18がオフとされる。この状態は、前
述の従来例と同様の結線状態となる。A GPT 26 and a ground switch 27 are housed in the GPT units 5 and 6, respectively. In the GIS described above, the circuit breaker 19 of the protection line 16 is normally turned off, and the disconnector 18 between the protection bus 17 and each cable head 7 is normally turned off. In this state, the wire connection state is the same as the above-mentioned conventional example.
【0011】次に、1つの回線、例えば回線1におい
て、遮断器8が故障した場合、回線1の遮断器8、断路
器9〜11、接地開閉器12,13を適宜オフ又はオン
とする。これにより、回線1においては、ケーブルヘッ
ド7は2母線3,4から切り離されることとなる。その
後、その回線1のケーブルヘッド7と予備母線17間の
断路器18をオンとし、予備回線16の遮断器19をオ
ンとする。これにより、回線1において母線3又は母線
4から切り離されたケーブルヘッド7は、断路器18、
及び予備母線17予備回線16を介して母線3又は母線
4と接続される。遮断器8の復旧作業が終了した後は、
回線1の遮断器8をオンとし、断路器18及び予備回線
16の遮断器19をオフとすることにより、通常の結線
状態に戻す。Next, when the circuit breaker 8 fails in one line, for example, the line 1, the circuit breaker 8, the circuit breakers 9 to 11, and the ground switches 12 and 13 of the line 1 are appropriately turned on or off. As a result, in the line 1, the cable head 7 is separated from the two busbars 3 and 4. After that, the disconnector 18 between the cable head 7 and the backup bus 17 of the line 1 is turned on, and the breaker 19 of the backup line 16 is turned on. As a result, the cable head 7 separated from the bus bar 3 or the bus bar 4 in the line 1 is connected to the disconnector 18,
And the spare bus 17 and the spare bus 16 are connected to the bus 3 or the bus 4. After the work to restore the breaker 8 is completed,
The circuit breaker 8 of the line 1 is turned on, and the circuit breaker 18 and the circuit breaker 19 of the backup line 16 are turned off to restore the normal connection state.
【0012】したがって、遮断器8の故障後は、復旧作
業に入る前に停電を解消することができるから、遮断器
8の復旧作業を行う際の停電時間は短いものになる。ま
た、回線1の遮断器8等の動作確認を行う場合、又は、
精密点検、遮断器コンタクトの取替えを行う場合には、
その回線1のケーブルヘッド7と予備母線17間の断路
器18をオンとし、予備回線16の遮断器19をオンと
する。これにより、回線1においては、母線3とケーブ
ルヘッド7は、回線1と予備回線16の両方を介して接
続されることとなる。Therefore, after the failure of the circuit breaker 8, the power failure can be resolved before the restoration work is started, so that the power failure time for the restoration work of the circuit breaker 8 is short. Also, when confirming the operation of the circuit breaker 8 of the line 1, or
When performing a precision inspection or replacing the breaker contact,
The disconnector 18 between the cable head 7 and the backup bus 17 of the line 1 is turned on, and the breaker 19 of the backup line 16 is turned on. As a result, in the line 1, the bus bar 3 and the cable head 7 are connected via both the line 1 and the protection line 16.
【0013】その後、回線1の遮断器8、断路器9〜1
1、接地開閉器12,13をその作業に応じて適宜オフ
又はオンとすることにより、回線1のケーブルヘッド7
は、断路器18、予備母線17及び予備回線16を介し
て母線3又は母線4と接続される。回線1の点検が終了
した後は、回線1の遮断器8をオンとし、予備回線16
の遮断器19をオフとすることにより、通常の結線状態
に戻す。Thereafter, the circuit breaker 8 and the disconnecting switches 9 to 1 of the line 1
1. The cable head 7 of the line 1 is turned on or off by turning off the grounding switches 12 and 13 as appropriate according to the work.
Is connected to the bus 3 or the bus 4 via the disconnector 18, the backup bus 17, and the backup line 16. After the inspection of the line 1 is completed, the circuit breaker 8 of the line 1 is turned on and the standby line 16
By turning off the circuit breaker 19 of 1, the normal connection state is restored.
【0014】したがって、回線1における、確認動作、
点検、コンタクトの取り替え等の作業は、無停電で行え
ることとなる。また、本実施例においては、回線1,2
を順次予備回線16に切り換えて作業を行うことによ
り、1つの予備回線16を全ての回線1,2に共通に使
用して点検作業等を行うことができる。Therefore, the confirmation operation on the line 1
Inspections and contact replacements can be performed without interruption. Further, in this embodiment, the lines 1 and 2 are
By sequentially switching to the spare line 16 for work, one spare line 16 can be commonly used for all the lines 1 and 2 to perform inspection work and the like.
【0015】〔その他の実施例〕以上本発明の実施例に
ついて説明をしてきたが、本発明は上記実施例に限定さ
れるものではなく、種々変更可能なものである。例え
ば、上記実施例においては、予備回線は専用の予備回線
16を使用しているが、もし複数の回線の内、使用頻度
の少ない回線があれば、専用の予備回線16を設けるこ
となく、使用されていない回線を予備回線として使用す
ることができる。[Other Embodiments] The embodiments of the present invention have been described above, but the present invention is not limited to the above embodiments, and various modifications can be made. For example, in the above embodiment, the dedicated protection line 16 is used as the protection line, but if there is a line that is used less frequently among the plurality of lines, it is used without providing the dedicated protection line 16. An unprotected line can be used as a protection line.
【0016】また、上記実施例においては、予備回線1
6とGPTユニット5を並べて配置しているが、図2に
示すように、GPTユニット5のGPT26及び接地開
閉器27を予備回線16中に組み込むこともできる。こ
の構成によれば、GPTユニットを設置する空間を有効
に利用し、新たに予備回線16用のスペースを確保する
必要がなくなるので、GISを設置するためのスペース
を小さくすることができる。なお、図2に示す他の部分
については、前述の図1と同様であるので、重複する説
明は省略する。Further, in the above embodiment, the protection line 1
Although the GPT unit 6 and the GPT unit 5 are arranged side by side, as shown in FIG. 2, the GPT 26 and the ground switch 27 of the GPT unit 5 can be incorporated in the protection line 16. According to this configuration, the space for installing the GPT unit is effectively used and it is not necessary to newly secure the space for the protection line 16, so that the space for installing the GIS can be reduced. The other parts shown in FIG. 2 are the same as those in FIG. 1 described above, and a duplicate description will be omitted.
【0017】さらに、上記実施例においては、2母線形
GISの例について説明されているが、本発明が単母線
形GISに適用できることは言うまでもない。Further, in the above embodiment, an example of the two generatrix GIS is explained, but it goes without saying that the present invention can be applied to the single generatrix GIS.
【0018】[0018]
【発明の効果】本発明によれば、GISにおいて、回線
の復旧、点検等を行う際の回線の停電時間を短くし、或
いは、回線の復旧、点検等を無停電で行うことができ
る。According to the present invention, in the GIS, it is possible to shorten the power outage time of the line when the line is restored and inspected, or to perform the line restoration and inspection without interruption.
【図1】本発明のGISの第1の実施例の結線図。FIG. 1 is a connection diagram of a first embodiment of a GIS of the present invention.
【図2】本発明のGISの第2の実施例の結線図。FIG. 2 is a connection diagram of a second embodiment of the GIS of the present invention.
【図3】従来のGISの結線図。FIG. 3 is a connection diagram of a conventional GIS.
1,2…回線 3,4…母線 5,6…GPTユニット 7…ケーブルヘッド 8,19…遮断器 9,10,11,20,21,22…断路器 12,13,14,23,24,25,27…接地開閉
器 16…予備回線 17…予備母線 18…断路器 26…GPT1, 2 ... Line 3, 4 ... Busbar 5, 6 ... GPT unit 7 ... Cable head 8, 19 ... Circuit breaker 9, 10, 11, 20, 21, 22 ... Disconnector 12, 13, 14, 23, 24, 25, 27 ... Grounding switch 16 ... Spare line 17 ... Spare bus line 18 ... Disconnector 26 ... GPT
Claims (2)
に接続されたケーブルヘッドを有する回線を具備するガ
ス絶縁開閉装置において、予備母線と、該予備母線と前
記母線間に接続した遮断器を有する予備回線と、前記予
備母線と前記回線の前記ケーブルヘッド間に接続された
断路器とを具備することを特徴とするガス絶縁開閉装
置。1. A gas-insulated switchgear comprising a circuit breaker connected to a bus bar and a line having a cable head connected to the circuit breaker, a spare bus bar, and a circuit breaker connected between the spare bus bar and the bus bar. And a disconnector connected between the spare bus and the cable head of the line.
前記各回線の内、使用頻度の少ない回線を前記予備回線
として使用することを特徴とする請求項1記載のガス絶
縁開閉装置。2. A plurality of the lines are provided for the bus bar,
The gas-insulated switchgear according to claim 1, wherein a line that is used less frequently among the lines is used as the backup line.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6200698A JPH0865830A (en) | 1994-08-25 | 1994-08-25 | Gas-insulated switchgear |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP6200698A JPH0865830A (en) | 1994-08-25 | 1994-08-25 | Gas-insulated switchgear |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0865830A true JPH0865830A (en) | 1996-03-08 |
Family
ID=16428754
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP6200698A Pending JPH0865830A (en) | 1994-08-25 | 1994-08-25 | Gas-insulated switchgear |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0865830A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100665387B1 (en) * | 1998-07-31 | 2007-01-04 | 가부시끼가이샤 히다치 세이사꾸쇼 | Gas Insulated Switchgear |
-
1994
- 1994-08-25 JP JP6200698A patent/JPH0865830A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100665387B1 (en) * | 1998-07-31 | 2007-01-04 | 가부시끼가이샤 히다치 세이사꾸쇼 | Gas Insulated Switchgear |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101098486B1 (en) | Vacuum insulated switch gear | |
| JPH0970112A (en) | Gas insulated switchgear | |
| US6399911B1 (en) | Gas insulated switchgear apparatus | |
| JPH0865830A (en) | Gas-insulated switchgear | |
| JP3119125B2 (en) | Gas insulated transmission line | |
| JPH0217808A (en) | Gas insulated switchgear with single phase auxiliary bus bar | |
| KR102835060B1 (en) | Protection switchboard system | |
| CN223599563U (en) | A device for rapid arc suppression and deployment | |
| EP4521439B1 (en) | Grounding device for high voltage electrical switchgear | |
| JP2000261917A (en) | Power equipment | |
| JPH079531Y2 (en) | Switchgear | |
| JPH01177808A (en) | Gas-insulated switchgear | |
| SU1670742A1 (en) | Two-channel system for power supply | |
| JPS6151492B2 (en) | ||
| JP2591406Y2 (en) | Double bus type gas insulated switchgear | |
| JPH07123543A (en) | Gas insulated switchgear | |
| SU898545A2 (en) | Device for redundancy cutting-off of short-circuiting at failure of protection systems of high-voltage plant connections | |
| JP3122179B2 (en) | Gas insulated switchgear | |
| SU1517095A1 (en) | High-voltage switchgear | |
| JP2000139008A (en) | Gas insulated switchgear | |
| RU1802898C (en) | Two-channel power supply system | |
| JPS5932181Y2 (en) | Double busbar uninterruptible switching device | |
| JPH079533Y2 (en) | Switchgear | |
| JPH0654419A (en) | Gas insulation switchgear | |
| JPH07123540A (en) | Gas insulated switchgear and its extension and maintenance / inspection / repair method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |