JPH086869Y2 - Shield machine - Google Patents

Shield machine

Info

Publication number
JPH086869Y2
JPH086869Y2 JP1989043087U JP4308789U JPH086869Y2 JP H086869 Y2 JPH086869 Y2 JP H086869Y2 JP 1989043087 U JP1989043087 U JP 1989043087U JP 4308789 U JP4308789 U JP 4308789U JP H086869 Y2 JPH086869 Y2 JP H086869Y2
Authority
JP
Japan
Prior art keywords
shield
excavation
curvature
hull
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1989043087U
Other languages
Japanese (ja)
Other versions
JPH02136193U (en
Inventor
清 土屋
泰昭 石川
文哉 高野
英嗣 山▲崎▼
均 高橋
泰雄 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Kajima Corp
Hitachi Construction Machinery Co Ltd
Central Research Institute of Electric Power Industry
Fujita Corp
Komatsu Ltd
Kumagai Gumi Co Ltd
Shimizu Corp
Original Assignee
Taisei Corp
Kajima Corp
Hitachi Construction Machinery Co Ltd
Central Research Institute of Electric Power Industry
Fujita Corp
Komatsu Ltd
Kumagai Gumi Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Kajima Corp, Hitachi Construction Machinery Co Ltd, Central Research Institute of Electric Power Industry, Fujita Corp, Komatsu Ltd, Kumagai Gumi Co Ltd, Shimizu Corp filed Critical Taisei Corp
Priority to JP1989043087U priority Critical patent/JPH086869Y2/en
Publication of JPH02136193U publication Critical patent/JPH02136193U/ja
Application granted granted Critical
Publication of JPH086869Y2 publication Critical patent/JPH086869Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 本考案は、地下ドーム築造などに利用される、同方向
の曲線施工を連続して行うシールド掘進機に関する。
[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a shield machine for continuously performing curved construction in the same direction, which is used for construction of an underground dome.

〔従来の技術〕[Conventional technology]

地下空間利用構想の一つとして、シールド工法を利用
した地下ドームの築造が提案されている(河野吉彦:地
下空間の利用と建設技術、建設機械1989.1)。この提案
は、同方向の曲線施工により環状またはらせん状のシー
ルドトンネルを構築し、これをもとにドーム状の地下空
間を作ろうとするものである。
Construction of an underground dome using the shield method has been proposed as one of the ideas for using underground space (Yoshihiko Kono: Utilization of underground space and construction technology, construction machinery 1989.1). This proposal is to construct a circular or spiral shield tunnel by curving in the same direction, and to make a dome-shaped underground space based on this.

従来、シールド工事における曲線施工技術としては、
(1)余掘りとシールドジャッキの片押しによる方法、
(2)1段ないし2段の中折れ式構造のシールド掘進機
を用いる方法があるが、地下ドーム築造などに必要とさ
れる急曲線施工技術として最も進んだ方法は、(1)と
(2)を組合せた、中折れ式シールド掘進機を用い余掘
り量を減らす方法である。
Conventionally, as a curve construction technology in shield construction,
(1) Method of over-digging and one-sided pushing of the shield jack,
(2) There is a method of using a shield excavator with a one- or two-stage intermediate-breaking structure, but the most advanced methods of sharp curve construction required for underground dome construction are (1) and (2 This is a method of reducing the amount of excess digging by using a middle-break type shield machine.

第4図は従来の中折れ式シールド掘進機の一例を示す
水平断面図、第5図はそのア部詳細図で、直線状のシー
ルドハル1A′を持つ前部シールドA′と、同じく直線状
のシールドハル1B′を持つ後部シールドB′とを、シー
ルドハル1A′、1B′の内周に沿って配置した複数本の中
折れジャッキ2を介して伸縮自在に連結し、前部シール
ドA′に装備したカッタホイル3とカッタ駆動装置4に
より掘削を行い、後部シールドB′に装備したシールド
ジャッキ5とエレクタ6によりセグメント組立とシール
ドの推進を行う構造となっている。図中、7は余掘りカ
ッタ、8はテールシール、9はテールシール取付板、10
はセグメントである。
FIG. 4 is a horizontal cross-sectional view showing an example of a conventional center-breaking shield machine, and FIG. 5 is a detailed view of its part A, which has a straight shield hull 1A 'and a front shield A'. The rear shield B'having the shield hull 1B 'is elastically connected via a plurality of middle folding jacks 2 arranged along the inner circumference of the shield hulls 1A', 1B ', and the front shield A' The cutter wheel 3 and the cutter driving device 4 mounted on the rear part excavate, and the shield jack 5 and the erector 6 mounted on the rear shield B'perform segment assembly and shield propulsion. In the figure, 7 is an overcutting cutter, 8 is a tail seal, 9 is a tail seal mounting plate, and 10
Is a segment.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

上記従来技術は次に述べるような問題点を有してい
る。
The above-mentioned prior art has the following problems.

(I)中折れ式シールド掘進機は構造が複雑になり、中
折れ段数をふやすことが困難である。
(I) The structure of the center-break type shield machine is complicated, and it is difficult to increase the number of center-break stages.

(II)中折れ式構造としてもシールドハル自体は直線状
であるため、急曲線施工では余掘り量が増大する。
(II) Since the shield hull itself has a straight shape even with a center-folding structure, the amount of overdue increases when a sharp curve is constructed.

(III)急曲線施工では、セグメントとテールシール取
付板またはテールプレートとが接触しやすくなるため、
テールクリアランスxを大きくすることが必要となる
(第5図参照)。特に大深度、高水圧下の施工では、テ
ールシール段数が多くなり、これに伴いテールシール取
付板部が長くなるので、なおさらテールクリアランスが
増大する。
(III) In the case of a sharp curve, it is easy for the segment to contact the tail seal mounting plate or tail plate.
It is necessary to increase the tail clearance x (see FIG. 5). In particular, when the construction is performed at a large depth and under high water pressure, the number of steps of the tail seal increases, and the tail seal mounting plate portion increases accordingly, so that the tail clearance further increases.

(IV)テールクリアランスの増大により、掘進予定路線
の曲線の外側ではテールシールが伸びきった状態となる
ため、外圧による反転が起こって、シール性を保持でき
なくなることがある(第5図参照)。
(IV) Due to the increase in the tail clearance, the tail seal becomes fully extended outside the curve of the planned excavation route, so reversal due to external pressure may occur and the sealability may not be maintained (see Fig. 5). .

(V)急曲線施工では、上述した余掘り量とテールクリ
アランスの増大により、シールド掘進機とセグメントは
既掘削トンネル内で浮いた状態にあるためシールド掘進
機の方向制御が困難となる。特にシールドジャッキによ
りセグメントを反力受として推進する際、反力受となる
セグメント自体が大きく移動すると、方向制御は不能と
なる。
(V) In sharp curve construction, the shield machine and the segment are in a floating state in the already-excavated tunnel due to the increase in the excess digging amount and the tail clearance described above, which makes it difficult to control the direction of the shield machine. In particular, when the segment is propelled as a reaction force reception by the shield jack and the segment itself which receives the reaction force largely moves, direction control becomes impossible.

本考案の目的は、上記した従来技術の問題点を解消
し、地下ドーム築造などのような同方向の急曲線施工を
連続して行う用途に適したシールド掘進機を提供するこ
とにある。
An object of the present invention is to solve the above-mentioned problems of the prior art and to provide a shield machine suitable for applications such as underground dome construction in which continuous sharp curve construction in the same direction is continuously performed.

〔課題を解決するための手段〕[Means for solving the problem]

上記目的を達成するために本考案は、シールドハルの
長さ方向の形状を、掘進予定路線の曲率とほぼ一致した
曲率を持つ円弧状または疑似円弧状としたことを特徴と
する。
In order to achieve the above object, the present invention is characterized in that the shape of the shield hull in the longitudinal direction is an arc shape or a pseudo arc shape having a curvature substantially matching the curvature of the planned excavation route.

〔作用〕[Action]

本考案のシールド掘進機は、シールドハルの中心線が
掘進予定路線(トンネル中心線)に沿うようにシールド
ジャッキの片押しにより推進する。シールドハルの長さ
方向の形状が掘進予定路線の曲率とほぼ一致した曲率を
持つ円弧状または疑似円弧状であるため、急曲線施工時
にも余掘り量は直線掘進時とほぼ同程度でよく、またシ
ールドハルがセグメントに沿った位置にあるので、テー
ルシール取付板とセグメントとのすきま寸法がほゞ一定
に保たれ、テールクリアランスも小さくてよい。
The shield machine of the present invention is propelled by pushing the shield jack one-sided so that the center line of the shield hull is along the planned excavation line (tunnel center line). Since the shape of the shield hull in the lengthwise direction is an arc shape or a pseudo arc shape with a curvature that substantially matches the curvature of the planned excavation route, the amount of excess digging may be approximately the same as during straight line digging even during sharp curve construction, Further, since the shield hull is located along the segment, the clearance between the tail seal mounting plate and the segment can be kept substantially constant, and the tail clearance can be small.

〔実施例〕〔Example〕

以下、本考案の実施例を第1図〜第3図により説明す
る。
An embodiment of the present invention will be described below with reference to FIGS.

第1図は本考案の第1実施例の掘進状態を示す水平断
面図である。本実施例は、シールドハル1を、その長さ
方向の形状が掘進予定路線(トンネル中心線)11と同一
曲率の円弧状をなす一体構造とし、このシールドハル1
にカッタホイル3、カッタ駆動装置4、シールドジャッ
キ5、セグメント組立用エレクタ6を装備した例で、伸
縮可能な余掘りカッタ7による余掘りとシールドジャッ
キ5の片押しによって同方向の曲線施工が連続して行え
るものである。このシールド掘進機を無勾配で曲線掘進
させると半径Rの環状のトンネルが構築される。また、
ある一定勾配で曲線掘進させることにより、半径Rのら
せん状のトンネルを構築できる。
FIG. 1 is a horizontal sectional view showing the excavation state of the first embodiment of the present invention. In this embodiment, the shield hull 1 has an integral structure in which the shape in the lengthwise direction has an arcuate shape with the same curvature as the planned excavation route (tunnel center line) 11, and the shield hull 1
In the example in which the cutter wheel 3, the cutter driving device 4, the shield jack 5, and the segment assembling erector 6 are installed, the curving in the same direction is continuously performed by the digging by the extendable digging cutter 7 and the pushing of the shield jack 5 by one side. It can be done by If this shield machine is curved without any gradient, an annular tunnel with a radius R will be constructed. Also,
A spiral tunnel with a radius R can be constructed by excavating a curve at a certain gradient.

本実施例によれば、下記の効果が得られる。 According to this embodiment, the following effects can be obtained.

(i)中折れ機構がないため、構造が簡単である。(I) The structure is simple because there is no center bending mechanism.

(ii)本例ではカッタ中心が掘進予定路線より若干ずれ
ているため、その分方向修正用の余掘りが必要である
が、基本的には、余掘り量は直線掘進時と同程度でよい
(微小な方向修正にのみ使用する)。
(Ii) In this example, the center of the cutter is slightly displaced from the planned excavation line, so extra excavation for direction correction is required, but basically the amount of extra excavation may be about the same as when straight excavation. (Use only for minute direction correction).

(iii)シールドハル1がセグメント10に沿った位置に
あるので、テールクリアランスは小さくてよい。
(Iii) Since the shield hull 1 is located along the segment 10, the tail clearance may be small.

(iv)テールシール取付板9とセグメント10とのすきま
寸法がほぼ一定に保たれるので、テールシール8の反転
が起こりにくく、シール性を確保できる。
(Iv) Since the clearance between the tail seal mounting plate 9 and the segment 10 is kept substantially constant, the tail seal 8 is unlikely to be inverted and the sealing performance can be secured.

(v)急曲線施工においても、余掘り量とテールクリア
ランスが小さくてよいので、シールド掘進時の反力受と
なるセグメントの振れ量が小さく、シールド掘進機の方
向制御が容易である。
(V) Since the excess excavation amount and the tail clearance may be small even in the case of sharp curve construction, the deflection amount of the segment that receives the reaction force during the shield excavation is small, and the direction control of the shield excavator is easy.

上記構成において、シールドハルの長さ方向の曲率と
掘進予定路線の曲率とは必ずしも一致しなくてもよい。
掘進予定路線の曲率が途中で変化する場合もあるが、そ
の場合は、シールドハルの長さ方向の曲率を掘進予定路
線の平均曲率が最小曲率に合わせておき、曲率の違う箇
所を施工するときは、シールドジャッキの片押しと余掘
りにより対処することができる。
In the above configuration, the curvature of the shield hull in the length direction and the curvature of the planned excavation route do not necessarily have to match.
The curvature of the planned excavation route may change on the way, but in that case, when the average curvature of the planned excavation route is adjusted to the minimum curvature in the length direction of the shield hull, when constructing parts with different curvatures Can be dealt with by pushing the shield jack on one side and over digging.

また、上記実施例ではシールドハルの長さ方向の形状
を円弧状としているが、多角形形状などの疑似円弧状で
あってもよい。
Further, in the above embodiment, the shape of the shield hull in the lengthwise direction is an arc shape, but it may be a pseudo arc shape such as a polygonal shape.

第2図は本考案の第2実施例の掘進状態を示す水平断
面図である。
FIG. 2 is a horizontal sectional view showing the excavation state of the second embodiment of the present invention.

本実施例は、第1実施例のシールド掘進機を前部シー
ルドAと後部シールドBに分割した中折れ式構造とした
ものであるが、前部シールドのシールドハル1A、後部シ
ールドのシールドハル1Bのそれぞれの長さ方向の形状
は、第1実施例と同じく掘進予定路線11の曲率とほぼ一
致した曲率を持つ円弧状としてある。それ以外の構成は
第4図の中折れ式シールド掘進機と同じであり、対応す
る部分に同一符号を付して示すのみで説明を省略する。
In this embodiment, the shield machine of the first embodiment is divided into a front shield A and a rear shield B, and has a center-folding structure. However, the shield hull 1A of the front shield and the shield hull 1B of the rear shield are formed. The shape of each of the lengthwise directions is an arc shape having a curvature substantially matching the curvature of the planned excavation route 11 as in the first embodiment. Otherwise, the structure is the same as that of the center-breaking shield machine shown in FIG. 4, and the corresponding parts are indicated by the same reference numerals and the description thereof is omitted.

本実施例の効果は第1実施例とほぼ同じであるが、掘
進予定路線の曲率が大きく変化する場合、中折れ機構を
使用することにより余掘り量を小さくし、掘進予定路線
の曲率の変化に対応しやすくすることができる。
The effect of the present embodiment is almost the same as that of the first embodiment, but when the curvature of the planned excavation route changes greatly, the amount of excess digging is reduced by using the center bending mechanism, and the curvature of the planned excavation route changes. Can be made easier to deal with.

第3図は本考案の第3実施例の掘進状態を示す平面図
である。
FIG. 3 is a plan view showing the excavation state of the third embodiment of the present invention.

第1実施例と同様に、シールドハル1の長さ方向の形
状は掘進予定路線11と同一曲率の円弧状である。さらに
本実施例では、カッタホイルの切羽掘削面3aが路線のカ
ーブ中心を通る法線方向と一致するような角度にカッタ
ホイル3を取り付けている。したがって、切羽掘削面3a
は掘進予定路線11に対して垂直に向くことになり、路線
の曲率が一定の場合は直線掘進時と同様な関係となるた
め、余掘り量は掘進摺動抵抗をなくす程度の微小量でよ
く、基本的には余掘り無しでもよい。
Similar to the first embodiment, the shape of the shield hull 1 in the longitudinal direction is an arc shape having the same curvature as the planned excavation route 11. Further, in the present embodiment, the cutter wheel 3 is attached at an angle such that the face excavation surface 3a of the cutter wheel coincides with the normal direction passing through the curve center of the route. Therefore, the face excavation surface 3a
Will be oriented vertically to the planned excavation route 11, and if the curvature of the route is constant, it will have the same relationship as during straight excavation, so the amount of excess excavation may be a minute amount to eliminate excavation sliding resistance. , Basically, there is no need to dig.

〔考案の効果〕 以上説明したように本考案によれば、構造を複雑化す
ることなく、急曲線施工時の余掘り量およびテールクリ
アランスを直線掘進時とほぼ同程度に小さくでき、掘削
土量、裏込注入量を減らして工事費を節減できるととも
に、テールシールのシール性の確保、シールド掘進機の
方向制御が容易となる効果があり、地下ドーム築造など
のような同方向の曲線施工を連続して行う用途に適した
シールド掘進機を実現することができる。
[Effects of the Invention] As described above, according to the present invention, the amount of excess digging and the tail clearance at the time of sharp curve construction can be reduced to about the same level as the straight digging without complicating the structure. In addition, the backfill injection amount can be reduced to reduce the construction cost, the sealing property of the tail seal can be secured, and the direction of the shield machine can be easily controlled.Therefore, the curved construction in the same direction such as underground dome construction can be performed. It is possible to realize a shield machine suitable for continuous use.

【図面の簡単な説明】[Brief description of drawings]

第1図は本考案の第1実施例の掘進状態を示す水平断面
図、第2図は本考案の第2実施例の掘進状態を示す水平
断面図、第3図は本考案の第3実施例の掘進状態を示す
平面図、第4図は従来の中折れ式シールド掘進機の掘進
状態を示す水平断面図、第5図はそのア部詳細図であ
る。 1、1A、1B…円弧状シールドハル、11…掘進予定路線、
3…カッタホイル、4…カッタ駆動装置、5…シールド
ジャッキ、6…セグメント組立用エレクタ、8…テール
シール、10…セグメント。
1 is a horizontal sectional view showing the excavation state of the first embodiment of the present invention, FIG. 2 is a horizontal sectional view showing the excavation state of the second embodiment of the present invention, and FIG. 3 is a third embodiment of the present invention. FIG. 4 is a plan view showing an example of the excavation state, FIG. 4 is a horizontal sectional view showing the state of excavation of a conventional center-folding shield excavator, and FIG. 1, 1A, 1B ... Arc-shaped shield hull, 11 ... Expected excavation route,
3 ... Cutter wheel, 4 ... Cutter drive device, 5 ... Shield jack, 6 ... Electa for segment assembly, 8 ... Tail seal, 10 ... Segment.

───────────────────────────────────────────────────── フロントページの続き (71)出願人 999999999 株式会社小松製作所 東京都港区赤坂2丁目3番6号 (71)出願人 999999999 清水建設株式会社 東京都中央区京橋2丁目16番1号 (71)出願人 999999999 大成建設株式会社 東京都新宿区西新宿1丁目25番1号 (71)出願人 999999999 財団法人電力中央研究所 東京都千代田区大手町1丁目6番1号 (71)出願人 999999999 株式会社フジタ 東京都渋谷区千駄ヶ谷4丁目6番15号 (72)考案者 土屋 清 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)考案者 石川 泰昭 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)考案者 高野 文哉 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)考案者 山▲崎▼ 英嗣 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)考案者 高橋 均 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (72)考案者 森 泰雄 茨城県土浦市神立町650番地 日立建機株 式会社土浦工場内 (56)参考文献 特開 昭58−13898(JP,A) 特開 昭63−251598(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (71) Applicant 999999999 Komatsu Ltd. 2-3-6 Akasaka, Minato-ku, Tokyo (71) Applicant 999999999 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Corporation ( 71) Applicant 999999999 Taisei Corporation 1-25-1 Nishishinjuku, Shinjuku-ku, Tokyo (71) Applicant 999999999 Central Research Institute of Electric Power Industry 1-16-1 Otemachi, Chiyoda-ku, Tokyo (71) Applicant 999999999 FUJITA Co., Ltd. 4-6-15 Sendagaya, Shibuya-ku, Tokyo (72) Inventor Kiyoshi Tsuchiya 650 Kuchidachi-cho, Tsuchiura-shi, Ibaraki Hitachi Construction Machinery Co., Ltd. Tsuchiura factory (72) Inventor, Yasushi Ishikawa Tsuchiura-shi, Ibaraki 650 Kandomachi, Tsuchiura Plant, Hitachi Construction Machinery Co., Ltd. (72) Fumiya Takano, 650, Kachimachi, Tsuchiura City, Ibaraki Prefecture, Tsuchiura Plant, Hitachi Construction Machinery Co., Ltd. (72) Inventor Yama-saki Eiji 650 Kazutachi-cho, Tsuchiura-shi, Ibaraki Hitachi Construction Machinery Co., Ltd. Tsuchiura Plant (72) Inventor Hitoshi Takahashi 650, Jinmachi-cho, Tsuchiura-shi, Ibaraki Hitachi Construction Machinery Co., Ltd. Tsuchiura Plant (72) Inventor, Yasuo Mori, 650, Jinrachi-cho, Tsuchiura, Ibaraki Prefecture, Tsuchiura Plant, Hitachi Construction Machinery Co., Ltd. (56) References JP58-13898 (JP, A) JP63-251598 (JP, A)

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】シールドハルの前面に装備したカッタホイ
ルにより切羽を掘削すると共に、トンネル内に組立てら
れたセグメントを反力受としてシールドジャッキにより
推進し、かつ、シールドハルの後尾にセグメントとの間
のテールシールを設けたシールド掘進機であって、前記
シールドハルの長さ方向の形状を、掘進予定路線の曲率
とほぼ一致した曲率を持つ円弧状または疑似円弧状とし
たことを特徴とするシールド掘進機。
Claims: 1. A face is excavated by a cutter wheel mounted on the front surface of a shield hull, and a segment assembled in a tunnel is propelled by a shield jack as a reaction force receiving. A shield machine having a tail seal, wherein the shape of the shield hull in the longitudinal direction is an arc shape or a pseudo arc shape having a curvature substantially matching the curvature of the planned excavation route. Machine.
JP1989043087U 1989-04-14 1989-04-14 Shield machine Expired - Lifetime JPH086869Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1989043087U JPH086869Y2 (en) 1989-04-14 1989-04-14 Shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1989043087U JPH086869Y2 (en) 1989-04-14 1989-04-14 Shield machine

Publications (2)

Publication Number Publication Date
JPH02136193U JPH02136193U (en) 1990-11-13
JPH086869Y2 true JPH086869Y2 (en) 1996-02-28

Family

ID=31555202

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1989043087U Expired - Lifetime JPH086869Y2 (en) 1989-04-14 1989-04-14 Shield machine

Country Status (1)

Country Link
JP (1) JPH086869Y2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2830247B2 (en) * 1989-12-26 1998-12-02 石川島播磨重工業株式会社 Shield machine
JP6480773B2 (en) * 2015-03-24 2019-03-13 株式会社フジタ Shield machine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5813898A (en) * 1981-07-17 1983-01-26 新日本製鐵株式会社 Underground constructing method of curved pipe
JPS63251598A (en) * 1987-04-06 1988-10-19 日本鋼管株式会社 shield excavator

Also Published As

Publication number Publication date
JPH02136193U (en) 1990-11-13

Similar Documents

Publication Publication Date Title
CN114135305B (en) A zero-blind zone special-shaped tunnel boring machine and its construction method
JP2860047B2 (en) Cutter swinging device for rectangular shield excavator
JP2681741B2 (en) Vertical shaft construction method and composite soil retaining material used for it
JP3052070B2 (en) Tunnel excavator
JPS60173289A (en) Drilling apparatus in pipe embedding construction method
JP3809592B2 (en) Rolling correction device for shield machine
JPS5873692A (en) Shield drilling machine
JPH10317885A (en) Shield machine
JP2708142B2 (en) Hard rock tunnel excavator
JPS63251598A (en) shield excavator
JP2001200689A (en) Buried pipe for propulsion method and combined propulsion and shield method
JP3388386B2 (en) Tail seal of shield machine
JPH0417669Y2 (en)
JP2996620B2 (en) Rectangular shield machine
JP2802580B2 (en) Bent shield excavator for sharp curves
JP2860368B2 (en) Shield excavator and shield construction method using the same
JPH0645996B2 (en) Shield excavator
JPS58213995A (en) Shield excavator
JPH0431350Y2 (en)
JPS621997A (en) Method of curve propulsion construction of propulsion pipe
JP3077070B2 (en) Shield machine
JPH0828177A (en) Shield machine
JPH03176592A (en) Construction of spiral tunnel and shield machine therefor
JPH0359239B2 (en)
JPH042239Y2 (en)