JPH0892959A5 - - Google Patents

Info

Publication number
JPH0892959A5
JPH0892959A5 JP6-233115A JP23311594A JPH0892959A5 JP H0892959 A5 JPH0892959 A5 JP H0892959A5 JP 23311594 A JP23311594 A JP 23311594A JP H0892959 A5 JPH0892959 A5 JP H0892959A5
Authority
JP
Japan
Prior art keywords
corrected
document
procedural amendment
correction
submission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP6-233115A
Other languages
English (en)
Japanese (ja)
Other versions
JPH0892959A (ja
Filing date
Publication date
Application filed filed Critical
Priority to JP23311594A priority Critical patent/JPH0892959A/ja
Priority claimed from JP23311594A external-priority patent/JPH0892959A/ja
Publication of JPH0892959A publication Critical patent/JPH0892959A/ja
Publication of JPH0892959A5 publication Critical patent/JPH0892959A5/ja
Ceased legal-status Critical Current

Links

JP23311594A 1994-09-28 1994-09-28 山留め壁の頭部構造 Ceased JPH0892959A (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23311594A JPH0892959A (ja) 1994-09-28 1994-09-28 山留め壁の頭部構造

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23311594A JPH0892959A (ja) 1994-09-28 1994-09-28 山留め壁の頭部構造

Publications (2)

Publication Number Publication Date
JPH0892959A JPH0892959A (ja) 1996-04-09
JPH0892959A5 true JPH0892959A5 (th) 1998-08-18

Family

ID=16950008

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23311594A Ceased JPH0892959A (ja) 1994-09-28 1994-09-28 山留め壁の頭部構造

Country Status (1)

Country Link
JP (1) JPH0892959A (th)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767186A (zh) * 2012-07-16 2012-11-07 中铁隧道集团有限公司 竖向挡土结构上配有预应力筋的基坑围护结构及施工方法
CN102979101B (zh) * 2012-12-12 2015-08-19 上海强劲地基工程股份有限公司 一种带有预应力加载器的基坑支护用钢筋混凝土内支撑
CN103266615A (zh) * 2013-05-24 2013-08-28 山东科技大学 基坑阳角铰接锚梁支护装置及其使用方法
CN103469798B (zh) * 2013-08-28 2016-01-20 中国建筑第七工程局有限公司 一种基坑支护结构及其施工方法

Similar Documents

Publication Publication Date Title
JPH08121669A5 (th)
JPH0897733A5 (th)
JPH08132560A5 (th)
JPH07205299A5 (th)
JPH0885819A5 (th)
JPH08144078A5 (th)
JPH07270666A5 (th)
JPH08110225A5 (th)
JPH0810847A5 (th)
JPH08121899A5 (th)
JPH07327237A5 (th)
JPH07246610A5 (th)
JPH07206894A5 (th)
JPH08168813A5 (th)
JPH0875652A5 (th)
JPH07275780A5 (th)
JPH0860223A5 (th)
JPH07275406A5 (th)
JPH07211547A5 (th)
JPH07208627A5 (th)
JPH07215288A5 (th)
JPH08101042A5 (th)
JPH081930A5 (th)
JPH07333690A5 (th)
JPH07220776A5 (th)