JPH0915380A - Compressed air supply equipment for instrumentation at nuclear power plants - Google Patents
Compressed air supply equipment for instrumentation at nuclear power plantsInfo
- Publication number
- JPH0915380A JPH0915380A JP7163971A JP16397195A JPH0915380A JP H0915380 A JPH0915380 A JP H0915380A JP 7163971 A JP7163971 A JP 7163971A JP 16397195 A JP16397195 A JP 16397195A JP H0915380 A JPH0915380 A JP H0915380A
- Authority
- JP
- Japan
- Prior art keywords
- pressure
- valve
- air
- load
- header
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
Landscapes
- Pipeline Systems (AREA)
Abstract
(57)【要約】
【目的】原子炉の自動停止に至るトラブルを回避し、安
定運転を確保する。
【構成】空気圧縮機1,空気貯槽2および空気除湿機3
が直列接続し、空気除湿機3は圧力ヘッダー4に接続す
る。圧力ヘッダー4には主圧力変換器15と原子炉系圧力
ヘッダー5,R/W系圧力ヘッダー6およびタービン系
圧力ヘッダー7に接続するヘッダー止め弁8を接続す
る。R/W系圧力ヘッダー6とタービン系圧力ヘッダー
7には非重要止弁10,自動遮断弁11,流量制限器13,圧
力スイッチおよび局所空気貯槽14を接続する。原子炉系
圧力ヘッダー5には原子炉系重要止弁9と非重要弁10が
接続し、原子炉系重要止弁9の下流側には自動遮断弁1
1,流量制限器13,圧力スイッチ12,局部空気貯槽14お
よび三方弁21が接続する。三方弁21には所内用圧縮空気
系23からの減圧弁24と局部除湿機22が接続する。非重要
負荷17,18,19等で圧力を下げる流量増大が発生する
と、流量制限器13で流量制限し、圧力スイッチ12が圧力
低下を感知して自動遮断弁11を閉じる。
(57) [Summary] [Purpose] To avoid troubles leading to automatic shutdown of the reactor and to ensure stable operation. [Structure] Air compressor 1, air storage tank 2 and air dehumidifier 3
Are connected in series, and the air dehumidifier 3 is connected to the pressure header 4. A header stop valve 8 connected to the main pressure converter 15, the reactor pressure header 5, the R / W pressure header 6 and the turbine pressure header 7 is connected to the pressure header 4. An unimportant stop valve 10, an automatic shutoff valve 11, a flow restrictor 13, a pressure switch and a local air storage tank 14 are connected to the R / W system pressure header 6 and the turbine system pressure header 7. A reactor system important stop valve 9 and a non-important valve 10 are connected to the reactor system pressure header 5, and an automatic shutoff valve 1 is provided downstream of the reactor system important stop valve 9.
1, flow limiter 13, pressure switch 12, local air storage tank 14 and three-way valve 21 are connected. A three-way valve 21 is connected to a pressure reducing valve 24 from a local compressed air system 23 and a local dehumidifier 22. When the flow rate increases to decrease the pressure due to the non-important loads 17, 18, 19, etc., the flow rate limiter 13 limits the flow rate, and the pressure switch 12 detects the pressure drop and closes the automatic shutoff valve 11.
Description
【0001】[0001]
【産業上の利用分野】本発明は自己隔離機能と事故防御
機能を併せ持つ原子力発電所の計装用圧縮空気供給設備
に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a compressed air supply facility for instrumentation in a nuclear power plant, which has both a self-isolation function and an accident protection function.
【0002】[0002]
【従来の技術】計装用圧縮空気系(以降IA系)はプラ
ントの安定運転には欠くことのできない重要設備であ
る。IA系は空気圧縮機,空気貯槽,空気除湿機,空気
配管および弁の組み合わせで構成されており、プラント
の中を動脈のように張り巡らされ圧縮空気を必要とする
計装品,調整弁および空気作動弁に圧縮空気を供給して
いる。2. Description of the Related Art A compressed air system for instrumentation (hereinafter referred to as IA system) is an important facility essential for stable operation of a plant. The IA system consists of a combination of an air compressor, an air storage tank, an air dehumidifier, an air pipe and a valve. Compressed air is supplied to the air operated valve.
【0003】また、原子炉を自動停止させるスクラム弁
にも圧縮空気を供給している。IA系が何等かの原因に
より圧縮空気の供給が満足されなくなると、スクラム弁
に加わる空気圧が減少し、一定の圧力値以下になればス
クラム弁が開き制御棒が炉心に挿入され原子炉が自動停
止することになる。Compressed air is also supplied to a scrum valve for automatically stopping the nuclear reactor. When the supply of compressed air becomes unsatisfactory for some reason in the IA system, the air pressure applied to the scrum valve decreases, and when it falls below a certain pressure value, the scrum valve opens and the control rod is inserted into the core to automatically start the reactor. Will stop.
【0004】IA系は空気圧縮機の故障などで圧縮空気
の供給ができなくなると、所内用圧縮空気系(以下SA
系)から圧縮空気を受け入れバックアップされる多重防
衛機構を持っている。In the IA system, when compressed air cannot be supplied due to an air compressor failure or the like, a compressed air system for internal use (hereinafter SA
It has a multiple defense mechanism that receives compressed air from the system and is backed up.
【0005】[0005]
【発明が解決しようとする課題】上述したように、IA
系は何等かの原因により圧縮空気の供給が満足されなく
なると、原子炉を自動停止に至らせることになるプラン
トの安定運転に欠かせない重要な系統である。As mentioned above, the IA
The system is an important system that is indispensable for stable operation of the plant, which will automatically shut down the reactor if the supply of compressed air becomes unsatisfactory for some reason.
【0006】IA系負荷はプラント内に非常に多く存在
し、IA系の空気供給配管は網の目のようにプラント内
を張り巡らされている。しかし、IA系の配管または負
荷に何等かの不具合が発生し空気の漏洩あるいは噴出が
生じると、空気は流失し続けることになる。[0006] The IA system load is very large in the plant, and the IA system air supply pipe is laid all over the plant like a mesh. However, if some trouble occurs in the IA system piping or load and air leaks or jets, the air will continue to flow away.
【0007】このとき、不具合による流失量が空気圧縮
機の供給能力以下であればIA系は一定の圧力を維持し
IA系の機能は維持されるが、供給能力を上回る流失に
なればIA系統圧力が下がり機能を失うことになる。At this time, the IA system maintains a constant pressure and the function of the IA system is maintained if the amount of loss due to a malfunction is less than the supply capacity of the air compressor, but if the loss exceeds the supply capacity, the IA system is maintained. The pressure drops and the function is lost.
【0008】IA系の空気使用量はプラントの通常運転
時では約5〜10Nm3 /min であり、これを各負荷に配る
ための配管は口径50mmΦ以下のステンレス鋼か銅合金の
細い配管である。設計上、内部圧力には十分耐えられる
が、配管を損なうような外力には強いとは言えない。こ
こでいう外力とは、機械的な力を受ける場合とか外部環
境要因による腐食などである。このように、比較的脆弱
な設備である面も持っている。The amount of air used in the IA system is about 5 to 10 Nm 3 / min during normal operation of the plant, and the pipe for distributing this to each load is a thin pipe of stainless steel or copper alloy with a diameter of 50 mm or less. . By design, it can sufficiently withstand internal pressure, but it cannot be said to be strong against external force that damages piping. The external force referred to here is a case where a mechanical force is applied or corrosion caused by an external environmental factor. In this way, it also has the aspect of being relatively fragile equipment.
【0009】生物における血管などの配管系は自己保修
能力を持っている。血管に例えれば、血管が切れると止
血作用が働いて血液の流失を止め、その後時間をかけて
血管を補修する。A piping system such as a blood vessel in an organism has a self-repair ability. When compared to blood vessels, when the blood vessels are cut off, the hemostatic action works to stop the blood loss and repair the blood vessels over time.
【0010】IA系では自己完全補修能力は無理として
も、流失場所とその重要性を判断し、必要により当該負
荷を切り離してでもIA系の機能を持続させることが望
ましいが、現状設備ではこのような機能は持っていな
い。Even if the self-repair capability is impossible in the IA system, it is desirable to judge the place where it is washed away and its importance, and to keep the function of the IA system by disconnecting the load if necessary. Does not have such a function.
【0011】IA系で圧縮空気の供給ができなくなる
と、SA系からバックアップされるが、これはあくまで
もIA系の源のトラブルに対する自己防衛機能であり、
負荷側に張り巡らされた配管系の破断のようなトラブル
にはSA系がバックアップしても源の配管径で決まる供
給能力が限られ対応しきれない課題がある。When the IA system cannot supply compressed air, it is backed up from the SA system, but this is only a self-defense function against the trouble of the source of the IA system.
Even if the SA system backs up, there is a problem that the supply capacity determined by the pipe diameter of the source is limited and cannot be dealt with for a trouble such as breakage of the piping system stretched around the load side.
【0012】本発明は上記課題を解決するためになされ
たもので、IA系の配管あるいは負荷の空気流失トラブ
ルによる機能喪失でプラントが自動停止することを極力
防止し、プラントの安定運転を確保することができる計
装用圧縮空気供給装置を提供することにある。The present invention has been made to solve the above-mentioned problems, and prevents the plant from being automatically stopped due to the loss of function due to the loss of air flow in the IA system piping or load to ensure stable operation of the plant. The object is to provide a compressed air supply device for instrumentation.
【0013】[0013]
【課題を解決するための手段】本発明は、空気圧縮機,
空気貯槽,空気除湿機,圧力ヘッダー,空気配管および
弁類の組み合わせで構成され、原子力発電所内の圧縮空
気を必要とする計装品,調整弁および空気作動弁に圧縮
空気を供給する原子力発電所の計装用圧縮空気供給設備
において、前記圧力ヘッダーに主圧力変換器を設け、前
記圧力ヘッダーから下流側の空気配管に自動遮断弁,圧
力スイッチおよび局部空気貯槽を設けてなることを特徴
とする。The present invention provides an air compressor,
A nuclear power plant that is composed of a combination of an air storage tank, an air dehumidifier, a pressure header, air piping, and valves, and that supplies compressed air to instrumentation equipment, regulating valves, and air operated valves that require compressed air in the nuclear power plant. In the compressed air supply equipment for instrumentation, a main pressure converter is provided in the pressure header, and an automatic shutoff valve, a pressure switch, and a local air storage tank are provided in an air pipe downstream from the pressure header.
【0014】また、本発明は前記自動遮断弁の下流側と
前記圧力スイッチおよび前記局部空気貯槽との間に流量
制限器を設けてなるか、または前記流量制限器の下流側
に三方弁を接続し、この三方弁の下流負荷側と反対側接
続口に局部除湿機と減圧弁を接続してなることを特徴と
する。Further, according to the present invention, a flow restrictor is provided between the downstream side of the automatic shutoff valve and the pressure switch and the local air storage tank, or a three-way valve is connected downstream of the flow restrictor. However, a local dehumidifier and a pressure reducing valve are connected to a connection port on the side opposite to the downstream load side of the three-way valve.
【0015】[0015]
【作用】本発明はIA系に自己隔離機能と自己防御機能
をもたせ、重要負荷に対しては局部SA系でバックアッ
プすることで原子力発電所のプラントの安定運転を確保
する。すなわち、原子炉系非重要負荷およびR/W系,
換気空調系,タービン系等で破断等圧力を急激に下げる
流量増大が発生すると流量制限器により流量を制限する
とともにその近傍の圧力スイッチが圧力低下を感知し、
そのグループの自動遮断弁を閉じる。According to the present invention, the IA system is provided with the self-isolation function and the self-defense function, and the important SA is backed up by the local SA system to ensure the stable operation of the plant of the nuclear power plant. That is, the reactor system unimportant load and the R / W system,
When a flow rate increase such as breakage that causes a sudden decrease in pressure occurs in a ventilation air conditioning system, turbine system, etc., the flow rate limiter limits the flow rate and a pressure switch in the vicinity detects the pressure drop,
Close the group's automatic shutoff valves.
【0016】さらに圧力低下が続いた場合、IAヘッダ
ーの圧力スイッチが圧力低で作動すると、予め重要度に
応じ決められた順序で各自動遮断を閉じHCU系(水圧
制御ユニット)の圧力低下を防止する。If the pressure switch of the IA header is operated at a low pressure when the pressure continues to drop, the automatic shutoff is closed in the order determined in advance according to the degree of importance to prevent the pressure drop of the HCU system (water pressure control unit). To do.
【0017】この際、破断したグループでない負荷グル
ープは局部空気貯槽つまりアキュムレータにより機能を
しばらく維持する。破断グループが隔離されたことによ
り遮断弁を開くことにより不具合グループだけと隔離す
る。At this time, the load group which is not the broken group maintains its function for a while by the local air storage tank, that is, the accumulator. Isolation of the broken group only by opening the shutoff valve.
【0018】[0018]
【実施例】図1から図3を参照しながら本発明に係る原
子力発電所の計装用圧縮空気供給設備の一実施例を説明
する。図1において空気圧縮機1は空気貯槽2に接続
し、空気貯槽2は空気除湿機3に接続し、空気除湿機3
は圧力ヘッダー4に接続している。圧力ヘッダー4には
主圧力変換器15が接続している。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of compressed air supply equipment for instrumentation of a nuclear power plant according to the present invention will be described with reference to FIGS. In FIG. 1, the air compressor 1 is connected to the air storage tank 2, the air storage tank 2 is connected to the air dehumidifier 3, and the air dehumidifier 3 is connected.
Is connected to the pressure header 4. A main pressure transducer 15 is connected to the pressure header 4.
【0019】圧力ヘッダー4はヘッダー止弁8を介して
原子炉系圧力ヘッダー5,放射性廃棄物処理(R/W)
系圧力ヘッダーおよびタービン系圧力ヘッダー7がそれ
ぞれ並列接続し、これらの圧力ヘッダー5,6,7には
HCUスクラム弁負荷20,原子炉系重要負荷16,原子炉
系非重要負荷17,R/W系非重要負荷18およびタービン
系非重要負荷19の負荷グループが接続している。また、
原子炉系重要弁9のうちの一つは水圧制御ユニット(H
CU)スクラム弁負荷20に接続している。The pressure header 4 is connected to the reactor pressure header 5 via the header stop valve 8 to treat radioactive waste (R / W).
The system pressure header and the turbine system pressure header 7 are connected in parallel, and the HCU scram valve load 20, the reactor system important load 16, the reactor system non-important load 17, and the R / W are connected to these pressure headers 5, 6 and 7, respectively. The load groups of the system non-critical load 18 and the turbine system non-critical load 19 are connected. Also,
One of the reactor system important valves 9 is a water pressure control unit (H
CU) Connected to scram valve load 20.
【0020】つまり、原子炉系圧力ヘッダー5には複数
の原子炉系重要止弁9のグループと複数の非重要止弁10
のグループが並列接続し、R/W系圧力ヘッダー6とタ
ービン系圧力ヘッダー7には複数の非重要止弁10のグル
ープが配列接続している。各々の止弁9,10の下流側に
は自動遮断弁11,流量制限器13および圧力スイッチ12と
局部空気貯槽14が接続している。That is, the reactor pressure header 5 includes a group of a plurality of reactor system important stop valves 9 and a plurality of unimportant stop valves 10.
Groups are connected in parallel, and the R / W system pressure header 6 and the turbine system pressure header 7 are connected in series with a group of a plurality of non-important stop valves 10. An automatic shutoff valve 11, a flow restrictor 13, a pressure switch 12 and a local air storage tank 14 are connected to the downstream side of each stop valve 9, 10.
【0021】原子炉系重要止弁9の流量制限器13の下流
側は三方弁21を介して原子炉系重要負荷16とHCUスク
ラム弁負荷20に接続している。三方弁21の他方側には所
内用圧縮空気系23からの減圧弁24および局部除湿機22に
接続している。The downstream side of the flow restrictor 13 of the reactor system important stop valve 9 is connected to the reactor system important load 16 and the HCU scrum valve load 20 via a three-way valve 21. The other side of the three-way valve 21 is connected to the pressure reducing valve 24 and the local dehumidifier 22 from the internal compressed air system 23.
【0022】つぎに上記実施例の各機器について圧縮空
気の流れに沿って説明する。空気圧縮機1は吸い込んだ
大気を約7気圧に圧縮する。吐出はかなり圧力,流量と
もに、脈動が大きい。空気貯槽2は圧縮空気を貯蔵す
る。空気圧縮機吐出および負荷側の圧力,流量の脈動を
吸収する。空気除湿機3は圧縮空気中の湿分を吸収す
る。出口の湿度は露点約マイナス70度程である。Next, each device of the above embodiment will be described along the flow of compressed air. The air compressor 1 compresses the sucked air into about 7 atmospheres. The discharge has considerable pulsation in both pressure and flow rate. The air storage tank 2 stores compressed air. Absorbs pulsation of air compressor discharge and load side pressure and flow rate. The air dehumidifier 3 absorbs moisture in compressed air. Humidity at the outlet is about minus 70 degrees dew point.
【0023】圧力ヘッダー4は空気の分配器であり、圧
縮空気を各建屋圧力ヘッダーに分配する。圧力ヘッダー
と各建屋圧力ヘッダー間にヘッダー止弁8が入り、それ
ぞれのアイソレーションを可能にしている。The pressure header 4 is an air distributor and distributes compressed air to each building pressure header. A header stop valve 8 is inserted between the pressure header and each building pressure header to enable each isolation.
【0024】原子炉系圧力ヘッダー5は原子炉建屋の各
負荷に圧縮空気を分配し、R/W系圧力ヘッダー6はR
/W建屋の各負荷に圧縮空気を分配し、タービン系圧力
ヘッダ−7はタービン建屋の各負荷に圧縮空気を分配す
る。The reactor pressure header 5 distributes compressed air to each load of the reactor building, and the R / W system pressure header 6 distributes R.
Compressed air is distributed to each load of the / W building, and the turbine system pressure header-7 distributes compressed air to each load of the turbine building.
【0025】原子炉系重要止弁9は原子炉系の重要負荷
16グループの止弁であり、非重要負荷止弁10は原子炉
系,R/W系,タービン系の非重要負荷17,18,19グル
ープの止弁である。The reactor system important stop valve 9 is an important load of the reactor system.
The non-important load stop valve 10 is a stop valve of 16 groups, and the non-important load stop valve 10 is a stop valve of non-important loads 17, 18, and 19 groups of the reactor system, the R / W system, and the turbine system.
【0026】HCUスクラム弁負荷20は制御棒駆動系お
よび水圧制御系ユニットの負荷である。IAの圧力が低
下すると空気作動弁が動き制御棒を挿入させ原子炉を自
動停止させる。原子炉系重要負荷の1つである。The HCU scrum valve load 20 is the load of the control rod drive system and hydraulic control system unit. When the IA pressure drops, the air operated valve moves to insert the control rod and automatically shut down the reactor. This is one of the important loads in the nuclear reactor system.
【0027】原子炉系重要負荷16はプラントの安定運転
に必要不可欠な負荷である。例えば主蒸気隔離弁,PL
R,MGセット油クーラー温度調整弁,CUW・F/D
流量調整弁および非再生熱交温度調整弁,RCW熱交温
度調整弁,HVAC隔離弁など。The nuclear reactor system important load 16 is an essential load for stable operation of the plant. Main steam isolation valve, PL
R, MG set oil cooler temperature control valve, CUW / F / D
Flow rate control valve, non-regenerative heat exchange temperature control valve, RCW heat exchange temperature control valve, HVAC isolation valve, etc.
【0028】原子炉系非重要負荷17はプラントの運転に
直接の影響のない負荷および短時間であればIAを止め
ても影響の少ない負荷である。R/W系非重要負荷18は
原子炉系非重要負荷17と同じ定義である。基本的にR/
W系はプラントの発電には関係がない。The reactor system non-important load 17 is a load that does not directly affect the operation of the plant and is a load that has a small effect even if the IA is stopped for a short time. The R / W system unimportant load 18 has the same definition as the reactor system unimportant load 17. Basically R /
The W system has nothing to do with the power generation of the plant.
【0029】タービン系非重要負荷19は原子炉系非重要
負荷17と同じ定義である。基本的にタービン系のIAを
必要とする機器はプラントの発電には直接関係がない。
流量制限器13は逆止弁と絞り弁の機能を兼ね備えてい
る。絞り量(制限量は夫々の負荷グループの圧縮空気の
必要量によって決められる。The turbine system non-critical load 19 has the same definition as the reactor system non-critical load 17. Basically, equipment that requires IA of the turbine system is not directly related to power generation in the plant.
The flow rate limiter 13 has the functions of a check valve and a throttle valve. Throttling amount (the limiting amount is determined by the required amount of compressed air for each load group.
【0030】圧力スイッチ12は圧力値を設定し、設定値
以下になると自動遮断弁11を閉じる信号を出す。HCU
スクラム弁負荷20の圧力設定値は空気圧低でスクラム弁
が開く圧力より低い値に設定しておく。The pressure switch 12 sets a pressure value, and outputs a signal to close the automatic shutoff valve 11 when the pressure value becomes less than the set value. HCU
The pressure set value of the scrum valve load 20 is set to a value lower than the pressure at which the scrum valve opens due to low air pressure.
【0031】自動遮断弁11は通常状態は開であり、圧力
スイッチ12の信号を受け閉じる作動時間の短い空気作動
弁である。空気源は非重要止弁10の上流から得る。この
弁は作動空気の喪失時は開状態とする。主圧力変換器15
は圧力スイッチ機能を合せ持つ。圧力設定値は自動遮断
弁11閉、順次開のための複数の設定値を持つ。The automatic shutoff valve 11 is an air-operated valve which is normally open and receives a signal from the pressure switch 12 and is closed for a short operating time. The air source is obtained upstream of the non-critical stop valve 10. This valve is open when operating air is lost. Main pressure transducer 15
Also has a pressure switch function. The pressure set value has a plurality of set values for closing the automatic shutoff valve 11 and sequentially opening it.
【0032】局部空気貯槽14は所属する負荷グループの
必要空気量と必要持続時間により容量を決定する。三方
弁21は通常はIA圧縮空気が通り、圧力スイッチ12の圧
力低信号により、負荷側とSAがつながる。The local air storage tank 14 determines the capacity according to the required air amount and the required duration of the load group to which it belongs. Normally, IA compressed air passes through the three-way valve 21, and the low pressure signal of the pressure switch 12 connects the load side and SA.
【0033】局部除湿機22は属する重要負荷系の必要流
量をIAと同じ乾燥度にすることのできる能力を持つ
(SA系は乾燥度が低く計装品に対し良くない影響を与
える)。減圧弁24はIA系の圧力より僅かに低い負荷圧
力になるように設定した減圧弁で負荷側の圧力を一定に
保つように圧力を制御する。The local dehumidifier 22 has the ability to bring the required flow rate of the important load system to which it belongs to the same degree of dryness as IA (SA system has a low degree of dryness and adversely affects the instrumentation). The pressure reducing valve 24 is a pressure reducing valve set to have a load pressure slightly lower than the pressure of the IA system, and controls the pressure so as to keep the pressure on the load side constant.
【0034】つぎに、本発明の実施例の作用を説明す
る。上記IA系の動脈のように張り巡らされた配管ある
いは負荷に何等かの不具合が発生し圧縮空気が噴出した
場合を想定すると、従来の設備では噴出量が多く空気圧
縮機1がフル回転し、さらにSA系からバックアップを
受けても供給が追い付かない場合にはIA系統圧力が下
がり始め、ある圧力値以下になるとスクラム弁が通常運
転状態を保持できなくなり、原子炉を自動停止させるこ
とになる。Next, the operation of the embodiment of the present invention will be described. Assuming a case where compressed air is jetted out due to some trouble in the piping or load stretched around like the IA artery, the conventional equipment produces a large amount of jetted air, and the air compressor 1 fully rotates. Further, if the supply cannot catch up even if the backup is received from the SA system, the IA system pressure starts to fall, and when the pressure falls below a certain pressure value, the scrum valve cannot maintain the normal operating state, and the reactor is automatically stopped.
【0035】噴出が原子炉系の重要負荷であればプラン
トの安定運転条件が損なわれたことになり、原子炉の自
動停止は止むを得ないとすることができるが、非重要負
荷の噴出であればこれを回避することにより、プラント
の不必要な停止を回避することができる。If the jet is an important load of the reactor system, it means that the stable operating conditions of the plant are impaired, and the automatic shutdown of the reactor is unavoidable. If this is avoided, unnecessary stoppage of the plant can be avoided.
【0036】ここで、非重要負荷グループで想定破断箇
所から圧縮空気の噴出があった場合について説明する。
当該負荷グループの非重要負荷止弁10の下流側に流量制
限器13が設けてあると噴出量を制限することができ、I
A系の過度の圧力低下を阻止することができる。この効
果により不必要な原子炉の自動停止を阻止できる可能性
が高くなる。これが自己防御機能である。Here, a case where the compressed air is ejected from the assumed breakage point in the non-important load group will be described.
If the flow restrictor 13 is provided on the downstream side of the non-important load stop valve 10 of the load group, the ejection amount can be restricted, and I
It is possible to prevent excessive pressure drop in the A system. This effect increases the possibility of preventing unnecessary automatic shutdown of the reactor. This is the self-defense function.
【0037】流量制限器13の構造は流量制限オリフィス
とリフト型逆止弁を組み合わせたものである。流量制限
器13に逆止弁の機能を持たせることにより、自分の属す
る負荷グループ以外で噴出があり上流側の圧力が低下し
た場合に逆止弁機能が働き、健全である自分の属する負
荷グループの圧縮空気が上流側に逃げ出すことを阻止し
局部空気貯槽14と組み合わせることにより短時間ではあ
れ自分の属する負荷グループの機能を維持する防御機能
を持っている。The structure of the flow restrictor 13 is a combination of a flow restricting orifice and a lift type check valve. By providing the flow restrictor 13 with a check valve function, the check valve function works when there is jetting outside the load group to which it belongs and the pressure on the upstream side drops, and the load group that belongs to a healthy one By preventing the compressed air from escaping to the upstream side and combining it with the local air storage tank 14, it has a protective function to maintain the function of the load group to which it belongs for a short time.
【0038】流量制限器13だけでも従来例の欠点に対し
ての改良になるが、IA系としては噴出したままでプラ
ント運転を続けなければならないことになり、さらにつ
ぎの機器が追加されることにより、安定運転に対する寄
与が増大する。The flow restrictor 13 alone is an improvement over the drawbacks of the conventional example, but as the IA system, the plant operation must be continued with jetting, and the following equipment is added. This increases the contribution to stable operation.
【0039】流量制限器13の下流側に圧力スイッチ12を
設け各負荷グループの圧力を監視し所定の圧力以下にな
るとスイッチが働き当該負荷グループの自動遮断弁11を
閉じさせ、当該負荷グループからの圧縮空気の漏出ある
いは噴出を防止すると、重要負荷でなければ不必要な原
子炉の停止を回避できる。A pressure switch 12 is provided on the downstream side of the flow restrictor 13, and the pressure of each load group is monitored. When the pressure falls below a predetermined pressure, the switch operates to close the automatic shutoff valve 11 of the load group, Preventing the leakage or ejection of compressed air can avoid unnecessary shutdown of the reactor unless the load is significant.
【0040】当該負荷グループの範囲内で対応がとれれ
ば最も好ましいといえるが、想定破断箇所の圧縮空気の
喪失が大きくIA系全体が圧力降下を起こしている場合
は更なる圧力降下を防止する方法を講ずる必要がある。
この場合、IA系空気貯槽2の圧力を検知して圧力が下
がればSA系がバックアップに入り、IA系の圧力を回
復させようとする。しかし、破断口が大きく急激な圧力
低下を起こしている場合は更なる対応を取り原子炉の停
止を回避する方法を講ずる必要が出てくる。It can be said that it is most preferable if the countermeasure can be taken within the range of the load group, but a method of preventing further pressure drop when the loss of compressed air at the assumed breakage point is large and a pressure drop occurs in the entire IA system. Need to take.
In this case, the pressure of the IA system air storage tank 2 is detected, and if the pressure drops, the SA system goes into backup to try to recover the pressure of the IA system. However, if the breakage port is large and the pressure drops suddenly, it will be necessary to take further measures to prevent the reactor from shutting down.
【0041】この方法として、圧力ヘッダー4に主圧力
変換器15を設けIA系全体の圧力を監視する。この圧力
が設置値を下回ったとき、全ての負荷グループの自動遮
断弁11を閉める。この結果、IAの使用量が減少すると
圧力降下が止まる。ついで、圧力が回復し始めたら重要
度に応じてあらかじめ設定された順序で要負荷グループ
の自動遮断弁11を開いていく。As this method, the pressure header 4 is provided with the main pressure converter 15 to monitor the pressure of the entire IA system. When this pressure falls below the set value, the automatic shutoff valves 11 of all load groups are closed. As a result, the pressure drop stops when the amount of IA used decreases. Then, when the pressure starts to recover, the automatic shutoff valve 11 of the load required group is opened in a preset order according to the importance.
【0042】自動遮断弁11は圧力スイッチ12と主圧力変
換器15の両方から制御されるが、開く場合は両方の自動
遮断弁11閉信号がクリアーしている必要がある。このシ
ーケンスについての詳細は後述する。The automatic shutoff valve 11 is controlled by both the pressure switch 12 and the main pressure converter 15. However, when the automatic shutoff valve 11 is opened, both of the automatic shutoff valve 11 closing signals must be cleared. Details of this sequence will be described later.
【0043】局部空気貯槽14は負荷グループの全てに設
置される。この機器は自動遮断弁11が閉じた後、貯えら
れた圧縮空気を短時間各負荷に供給することにより、プ
ラントの安定運転に寄与する。Local air reservoirs 14 are installed in all load groups. This device contributes to the stable operation of the plant by supplying the stored compressed air to each load for a short time after the automatic shutoff valve 11 is closed.
【0044】重要負荷に対してはIA系負荷配管の途中
に三方弁21を配置しこの弁の一方に減圧弁24を通し局部
除湿機22でIA並みに乾燥させたSA系圧縮空気を送り
込める設備を接続する。この三方弁21は重要負荷系に設
けた圧力スイッチ12が自動遮断弁11を閉動作させるとき
に同時にSA供給側に切り替えられSAが入るように制
御される。For an important load, a three-way valve 21 is arranged in the middle of the IA system load pipe, and a pressure reducing valve 24 is passed through one of the valves to allow the SA system compressed air dried by the local dehumidifier 22 to be equal to IA. Connect the equipment. The three-way valve 21 is controlled so that SA is turned on by switching to the SA supply side at the same time when the pressure switch 12 provided in the important load system closes the automatic shutoff valve 11.
【0045】図2により自動遮断弁11と圧力スイッチ12
と主圧力変換器15および三方弁21の制御について説明す
る。図2は自動遮断弁11を制御する理論構成で、図2
(a)は自動遮断弁11が自動閉塞する論理構成である。
自動遮断弁11の閉信号は2つある。圧力スイッチ12から
出力するPS1指示低〜PS4指示低で示す圧力スイッ
チ低信号26または主圧力変換器15から出力するPT指示
低で示す主圧力変換器低信号25が判断回路OR論理27に
入出する。According to FIG. 2, the automatic shutoff valve 11 and the pressure switch 12
The control of the main pressure converter 15 and the three-way valve 21 will be described. FIG. 2 shows a theoretical configuration for controlling the automatic shutoff valve 11.
(A) is a logical configuration in which the automatic shutoff valve 11 is automatically closed.
There are two closing signals for the automatic shutoff valve 11. The pressure switch low signal 26 indicated by PS1 indicating low to PS4 indicating low output from the pressure switch 12 or the main pressure converter low signal 25 indicating by PT indicating low output from the main pressure converter 15 enters and exits the decision circuit OR logic 27. .
【0046】判断回路OR論理27に入ったどちらか1方
の圧力低信号でNO1から4の遮断弁閉28の信号が出力
して自動遮断弁11を閉じさせる。圧力設定値は圧力スイ
ッチ低信号26が主圧力変換器低信号25より高く、当該負
荷グループの遮断が全負荷の遮断より先行し、影響を局
限させるように設定される。また、重要負荷に対しては
圧力スイッチ12から出力する圧力スイッチ低信号26で三
方弁21が負荷側に対しIAからSAに切替わる〔三方弁
切替(重要負荷)〕。One of the low-pressure signals input to the judgment circuit OR logic 27 outputs the shut-off valve closing signals 28 of NO1 to NO4 to close the automatic shut-off valve 11. The pressure set point is set so that the pressure switch low signal 26 is higher than the main pressure transducer low signal 25, and the interruption of the load group in question precedes the interruption of the full load, limiting the effect. For important loads, the pressure switch low signal 26 output from the pressure switch 12 causes the three-way valve 21 to switch from IA to SA for the load side (three-way valve switching (important load)).
【0047】図2(b)は自動遮断弁11を自動開放する
論理構成を示している。自動遮断弁11を開く場合はPS
1〜PS4指示正常で示す圧力スイッチ正常信号32とP
T指示正常で示す主圧力変換器正常信号30の2つが判断
回路AND論理33に入ることによりAND論理回路から
遮断弁開NO1〜4で示す遮断弁開34の信号が出力して
自動遮断弁11を開けさせる。主圧力変換器正常信号30は
圧力ヘッダー4が設定値まで戻ると主圧力変換器15から
発せられる。主圧力変換器正常信号30は複数個の設定値
を持ち、夫々の設定値はあらかじめ負荷の重要度を分類
して負荷グループ毎に決めてある。FIG. 2B shows a logical configuration for automatically opening the automatic shutoff valve 11. PS when opening the automatic shutoff valve 11
1 to PS4 pressure switch normal signal 32 and P indicating normal indication
When the two main pressure converter normal signals 30 indicating normal T indication enter the judgment circuit AND logic 33, the AND logic circuit outputs the signals of the shutoff valve open NO 1 to shutoff valve open 34 to output the automatic shutoff valve 11 To open. The main pressure transducer normal signal 30 is emitted from the main pressure transducer 15 when the pressure header 4 returns to the set value. The main pressure converter normal signal 30 has a plurality of set values, and each set value is determined for each load group by classifying the importance of the load in advance.
【0048】主圧力変換器15は圧力値をシーケンス制御
器31に入力する。シーケンス制御器31はあらかじめ負荷
の重要度を分類して生かす順序を決めてあり、圧量値に
応じて各負荷グループに対応する主圧力変換器正常信号
30値を対応する負荷グループに発信する。各負荷グルー
プは自信の属する圧力スイッチ正常信号32と主圧力変換
器正常信号30の2つの信号が揃ったところで自動遮断弁
11を開く。The main pressure converter 15 inputs the pressure value to the sequence controller 31. The sequence controller 31 classifies the importance of loads in advance and determines the order in which they are used.The main pressure converter normal signal corresponding to each load group is determined according to the pressure value.
Send 30 values to the corresponding load group. Each load group has an automatic shutoff valve when the two signals of the pressure switch normal signal 32 and the main pressure converter normal signal 30 to which it belongs are aligned.
Open 11
【0049】したがって、想定破断箇所のある当該負荷
グループでは、圧力スイッチ正常信号32が入らないから
自動遮断弁11は開かず不具合箇所を隔離したままプラン
ト運転が継続できる。また、重要負荷に対しては圧力ス
イッチ正常信号32により三方弁21が負荷に対しSAから
IAに切替わる〔三方弁切替戻(重要負荷)35〕。Therefore, in the load group having the assumed breakage point, since the pressure switch normal signal 32 is not input, the automatic shutoff valve 11 is not opened and the plant operation can be continued with the defective point being isolated. Further, for an important load, the pressure switch normal signal 32 causes the three-way valve 21 to switch from SA to IA for the load [three-way valve switching back (important load) 35].
【0050】図3に各負荷グループに属する自動遮断弁
11を開いて行く圧力と時間の関係を示す。縦軸に圧力、
横軸に時間を表す。主圧力変換器15の働きにより全ての
負荷グループの自動遮断弁11が閉じた後、徐々に圧力が
回復してくると主圧力変換器15の圧力は図3の圧力曲線
を描いて上昇していく。時間軸のNO1遮断弁開信号発
生fの時刻にNO1正常圧力a信号が発せられる。この
段階ではNO1負荷グループの自動遮断弁11を開く2つ
の条件のうちの1つが満たされる。FIG. 3 shows an automatic shutoff valve belonging to each load group.
Fig. 11 shows the relationship between pressure and time when opening 11. Pressure on the vertical axis,
The horizontal axis represents time. After the automatic shutoff valves 11 of all load groups are closed by the action of the main pressure converter 15, when the pressure gradually recovers, the pressure of the main pressure converter 15 rises according to the pressure curve shown in FIG. Go. The NO1 normal pressure a signal is issued at the time of NO1 shutoff valve open signal generation f on the time axis. At this stage, one of the two conditions for opening the automatic shutoff valve 11 of the NO1 load group is satisfied.
【0051】これとは別にNO1負荷グループの圧力ス
イッチ12の指示値が自動遮断弁11を閉じる圧力以上には
想定破断箇所21によれば自動遮断弁11を開く条件のもう
1つを満たしていることになる。この2つの条件が揃っ
たところで、自動遮断弁11開の信号が判断回路AND論
理33から発せられNO1負荷グループの自動遮断弁11が
実際に開くことになる。Separately from this, if the indicated value of the pressure switch 12 of the NO1 load group is equal to or higher than the pressure at which the automatic shutoff valve 11 is closed, the assumed breakage point 21 satisfies another condition for opening the automatic shutoff valve 11. It will be. When these two conditions are met, a signal for opening the automatic shutoff valve 11 is issued from the decision circuit AND logic 33, and the automatic shutoff valve 11 of the NO1 load group is actually opened.
【0052】順次NO2,NO3と条件が整い次第自動
遮断弁11が開いていき、想定破断箇所以外は正常に復す
ることができる。想定破断箇所の属する負荷の重要度,
回復に要する時間,影響などを考慮して事後の方針を定
めることになる。As soon as the conditions of NO2 and NO3 are met, the automatic shutoff valve 11 opens, and normal recovery can be achieved except for the assumed breakage point. Importance of the load to which the assumed fracture point belongs,
After-the-fact policies will be determined in consideration of the time required for recovery and the impact.
【0053】つぎに、負荷の重要度の順序について記
す。この負荷の重要度に合わせてIA系の自己隔離から
の回復を計りプラントの安定運転を確保する。 第1順位・CRD,HCU系(スクラム系,スクラム関
係弁) この系統は自分のグループ内に破断があれば原
子炉は自動停止するし、他の破断でも圧力が下がれば原
子炉が自動停止してしまう最も重要な負荷である。Next, the order of importance of load will be described. According to the importance of this load, recovery from self-isolation of the IA system is measured to ensure stable operation of the plant. First order ・ CRD, HCU system (scrum system, scrum related valve) This system automatically shuts down the reactor if there is a break in its own group, and automatically shuts down if the pressure drops in other breaks. It is the most important load.
【0054】主蒸気(MS)系 (MSIV) この系
統は自分のグループ内に破断がある場合、自ら空気貯槽
を持っているため急速に閉鎖し原子炉が自動停止する可
能性は低いが、空気圧力が低下すれば原子炉が自動停止
するため最も重要な負荷の1つである。Main Steam (MS) System (MSIV) This system has a low possibility of shutting down rapidly and automatically shutting down the reactor because it has its own air storage tank if there is a break in its own group. This is one of the most important loads because the reactor automatically shuts down when the pressure drops.
【0055】第2順位・空調系(原子炉建屋,タービン
建屋,R/W建屋換気系仕切り弁)、原子炉補機冷却
(RCW)系(緊急閉鎖弁) この系統は自分のグルー
プ内に破断がある場合、プラント通常運転時に冷却水を
必要としている負荷の冷却水を断つためプラントの運転
を制限する重要な負荷である。Second order ・ Air conditioning system (reactor building, turbine building, R / W building ventilation system sluice valve), reactor auxiliary cooling (RCW) system (emergency shutoff valve) This system broke within its own group If there is, it is an important load that limits the operation of the plant because it cuts off the cooling water of the load that requires cooling water during normal operation of the plant.
【0056】第3順位・原子炉再循環(PLR)系(M
Gセット油クーラー温度調整弁)、原子炉冷却材浄化
(CUW)系(非再生熱交換器・温度調整弁)、RCW
系(熱交換器・温度調整弁) いずれも空気消費型の負
荷であり、短時間で機能を失う。両系統ともプラント安
定運転には不可欠である。素早い復旧が必要である。こ
のグループの負荷は大きな空気貯槽を設けるか所内空気
系の圧縮空気でバックアップされる。Third-rank Reactor Recirculation (PLR) system (M
G set oil cooler temperature control valve), Reactor coolant purification (CUW) system (non-regenerative heat exchanger / temperature control valve), RCW
The system (heat exchanger / temperature control valve) is an air-consuming load and loses its function in a short time. Both systems are essential for stable plant operation. Quick recovery is needed. The load of this group is backed up by a large air storage tank or compressed air in the in-house air system.
【0057】第4順位・その他の原子炉系負荷,タービ
ン系負荷,R/W系負荷 これらはIA系が失われる場
合は、それぞれ影響が大きいがプラントを速やかに停止
したり、自動停止させる負荷ではない。重要負荷は第3
順位までであり、第4順位は非重要負荷である。4th rank ・ Other reactor system load, turbine system load, R / W system load These have a great influence when the IA system is lost, but loads that cause the plant to stop immediately or automatically stop. is not. 3rd important load
Up to the rank, and the fourth rank is the non-important load.
【0058】[0058]
【発明の効果】本発明によれば、IA系の配管あるいは
負荷の圧縮空気の噴出などのトラブル時、HCUスクラ
ム弁にかかる空気圧力が減少し、スクラム弁が開いて不
必要な原子炉の自動停止に至る可能性を事故防御能力お
よび自己隔離機能を持たせることにより回避することが
できる。その結果、信頼性が向上し、プラントの安定運
転により大きく寄与する。According to the present invention, the air pressure applied to the HCU scrum valve is reduced in the event of a trouble such as the injection of compressed air in the IA system piping or the load, and the scram valve is opened to automatically remove unnecessary reactors. The possibility of suspension can be avoided by providing accident protection capability and self-isolation function. As a result, the reliability is improved and it contributes greatly to the stable operation of the plant.
【図1】本発明に係る計装用圧縮空気供給装置の一実施
例を示す系統図。FIG. 1 is a system diagram showing an embodiment of a compressed air supply device for instrumentation according to the present invention.
【図2】図1における自動遮断弁を制御する論理構成
で、(a)は自動遮断弁を自動閉塞する論理構成を示す
ブロック図、(b)は自動遮断弁を自動開放する論理構
成を示すブロック図。2 is a block diagram showing a logical configuration for controlling the automatic shutoff valve in FIG. 1, (a) showing a logical configuration for automatically closing the automatic shutoff valve, and (b) showing a logical configuration for automatically opening the automatic shutoff valve. Block Diagram.
【図3】図1において、自動遮断弁を自動開放するIA
系統圧力と時間の関係を示す圧力曲線図。FIG. 3 is an IA for automatically opening an automatic shutoff valve in FIG.
The pressure curve figure which shows the relationship between system pressure and time.
1…空気圧縮機、2…空気貯槽、3…空気除湿機、4…
圧力ヘッダー、5…原子炉系圧力ヘッダー、6…R/W
系圧力ヘッダー、7…タービン系圧力ヘッダー、8…ヘ
ッダー止弁、9…原子炉系重要止弁、10…非重要止弁、
11…自動遮断弁、12…圧力スイッチ、13…流量制限器、
14…局部空気貯槽、15…主圧力変換器、16…原子炉系重
要負荷、17…原子炉系非重要負荷、18…R/W系非重要
負荷、19…タービン系非重要負荷、20…HCUスクラム
弁負荷、21…三方弁、22…局部除湿機、23…所内用圧縮
空気系、24…減圧弁、25…主圧力変換器低信号、26…圧
力スイッチ低信号、27…判断回路OR論理、28…自動遮
断弁閉信号、29…三方弁切替信号、30…主圧力変換器正
常信号、31…シーケンス制御器制御信号、32…圧力スイ
ッチ正常信号、33…判断回路AND論理、34…自動遮断
弁開信号、35…三方弁切替戻信号、a…主圧力変換器正
常圧力、b…PS1正常圧力、c…PS2正常圧力、d
…PS3正常圧力、e…PS4正常圧力、f…PT正常
指示、g…NO1遮断弁開、h…NO2遮断弁開、i…
NO3遮断弁開、j…NO4遮断弁開。1 ... Air compressor, 2 ... Air storage tank, 3 ... Air dehumidifier, 4 ...
Pressure header, 5 ... Reactor system pressure header, 6 ... R / W
System pressure header, 7 ... Turbine system pressure header, 8 ... Header stop valve, 9 ... Reactor system important stop valve, 10 ... Unimportant stop valve,
11 ... Automatic shutoff valve, 12 ... Pressure switch, 13 ... Flow restrictor,
14 ... Local air storage tank, 15 ... Main pressure converter, 16 ... Reactor system important load, 17 ... Reactor system non-important load, 18 ... R / W system non-important load, 19 ... Turbine system non-important load, 20 ... HCU scrum valve load, 21 ... 3-way valve, 22 ... Local dehumidifier, 23 ... Local compressed air system, 24 ... Pressure reducing valve, 25 ... Main pressure transducer low signal, 26 ... Pressure switch low signal, 27 ... Judgment circuit OR Logic, 28 ... Automatic shutoff valve closing signal, 29 ... Three-way valve switching signal, 30 ... Main pressure converter normal signal, 31 ... Sequence controller control signal, 32 ... Pressure switch normal signal, 33 ... Judgment circuit AND logic, 34 ... Automatic shut-off valve open signal, 35 ... 3-way valve switching return signal, a ... Main pressure transducer normal pressure, b ... PS1 normal pressure, c ... PS2 normal pressure, d
... PS3 normal pressure, e ... PS4 normal pressure, f ... PT normal instruction, g ... NO1 shutoff valve open, h ... NO2 shutoff valve open, i ...
NO3 shutoff valve open, j ... NO4 shutoff valve open.
Claims (3)
力ヘッダー,空気配管および弁類の組み合わせで構成さ
れ、原子力発電所内の圧縮空気を必要とする計装品,調
整弁および空気作動弁に圧縮空気を供給する原子力発電
所の計装用圧縮空気供給設備において、前記圧力ヘッダ
ーに主圧力変換器を設け、前記圧力ヘッダーから下流側
の空気配管に自動遮断弁,圧力スイッチおよび局部空気
貯槽を設けてなることを特徴とする原子力発電所の計装
用圧縮空気供給設備。1. An instrument comprising a combination of an air compressor, an air storage tank, an air dehumidifier, a pressure header, an air pipe and valves, which requires compressed air in a nuclear power plant, a regulating valve and an air actuated valve. In a compressed air supply facility for instrumentation of a nuclear power plant that supplies compressed air to a main pressure converter provided in the pressure header, an automatic shutoff valve, a pressure switch and a local air storage tank are provided in the air pipe downstream from the pressure header. A compressed air supply facility for instrumentation of a nuclear power plant, which is characterized by being provided.
ッチおよび前記局部空気貯槽との間に流量制限器を設け
てなることを特徴とする請求項1記載の発電所の計装用
圧縮空気供給設備。2. The compressed air supply for instrumentation of a power plant according to claim 1, further comprising a flow restrictor provided between the downstream side of the automatic shutoff valve and the pressure switch and the local air storage tank. Facility.
し、この三方弁の下流負荷側と反対側接続口に局部除湿
機と減圧弁を接続してなることを特徴とする請求項1記
載の発電所の計装用圧縮空気供給設備。3. A three-way valve is connected to the downstream side of the flow restrictor, and a local dehumidifier and a pressure reducing valve are connected to a connection port on the side opposite to the downstream load side of the three-way valve. 1. Compressed air supply equipment for instrumentation of a power plant according to 1.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7163971A JPH0915380A (en) | 1995-06-29 | 1995-06-29 | Compressed air supply equipment for instrumentation at nuclear power plants |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7163971A JPH0915380A (en) | 1995-06-29 | 1995-06-29 | Compressed air supply equipment for instrumentation at nuclear power plants |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0915380A true JPH0915380A (en) | 1997-01-17 |
Family
ID=15784303
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP7163971A Pending JPH0915380A (en) | 1995-06-29 | 1995-06-29 | Compressed air supply equipment for instrumentation at nuclear power plants |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0915380A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014186415A (en) * | 2013-03-22 | 2014-10-02 | Chugoku Electric Power Co Inc:The | Backup system for control air system |
-
1995
- 1995-06-29 JP JP7163971A patent/JPH0915380A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014186415A (en) * | 2013-03-22 | 2014-10-02 | Chugoku Electric Power Co Inc:The | Backup system for control air system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107166081B (en) | A butterfly valve pneumatic redundancy system for rocket launching water spray and its control method | |
| JP4768855B2 (en) | Safety valve drive system | |
| JPH05307094A (en) | Reactor cooling system of boiling water reactor | |
| JP2502224B2 (en) | Air operated valve | |
| CN113605998B (en) | Thermal power plant generator set operation fault processing method and system | |
| US6643348B2 (en) | Steam turbine control device of nuclear power plant | |
| CN113517115A (en) | Oil-water cooler, operation control method thereof and cooling system constructed by using same | |
| JP2001289989A (en) | Steam turbine controller for a nuclear power plant | |
| JPS6082994A (en) | Instrumentation air piping system | |
| CN117490811A (en) | A load test system for liquid level switch of heat exchanger in nuclear power plant | |
| CN113571211A (en) | Reactor overpressure protection system and method, nuclear power system and primary circuit system thereof | |
| JPS61128043A (en) | Air conditioner having heat accumulating circuit | |
| CN214501307U (en) | Cooling air device for fire detection | |
| CN121916051A (en) | Oil temperature cooling system and method | |
| JPH03597B2 (en) | ||
| CN120946421A (en) | A steam turbine emergency shutdown device | |
| KR100436979B1 (en) | Cooling system of newclear power plant | |
| KR19990011588A (en) | Control Method and System of Air Conditioning Piping System for High-rise Buildings | |
| CN119802719A (en) | A heat exchange station automatic control system | |
| JPS59180492A (en) | Auxiliary machine cooling facility of atomic power plant | |
| CN121576630A (en) | A modular nuclear small reactor high-efficiency cogeneration heating system | |
| JPS62196505A (en) | Feedwater flow controller | |
| JP2004132779A (en) | Nuclear plant make-up water equipment | |
| CN117423484A (en) | Pressurized water reactor cooling control system and pressurized water reactor | |
| JPS62259091A (en) | Compressed gas feeder for hydraulic control unit |