JPH09170232A - Highly reliable pile and its manufacturing method - Google Patents
Highly reliable pile and its manufacturing methodInfo
- Publication number
- JPH09170232A JPH09170232A JP33308295A JP33308295A JPH09170232A JP H09170232 A JPH09170232 A JP H09170232A JP 33308295 A JP33308295 A JP 33308295A JP 33308295 A JP33308295 A JP 33308295A JP H09170232 A JPH09170232 A JP H09170232A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- core
- steel pipe
- resistance force
- viscoelastic body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】この発明は、主として建造物
の基礎を構成する支持杭として利用される高信頼性の杭
と、その製造方法(構築方法)に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a highly reliable pile mainly used as a support pile which constitutes a foundation of a building, and a manufacturing method (construction method) thereof.
【0002】[0002]
【従来の技術】従来、建造物の支持杭の静的支持力の計
算法は、図2に例示したように、杭体aの先端を支持層
bに到達させ、上載荷重Pを先端抵抗力QP と周面摩擦
抵抗力QF との合力Rで支持するものとして設計、施工
されている。即ち、R=QP +QF とし、 Ra >P
の条件を満足するように、極限設計法では安全係数F
を考慮して P≦1/F(QP +QF ) の条件を満た
すように設計、施工されている。2. Description of the Related Art Conventionally, as shown in FIG. 2, the method of calculating the static bearing force of a support pile of a building is such that the tip of the pile body a reaches the support layer b and the top load P is applied to the tip resistance force. It is designed and constructed so that it is supported by the resultant force R of Q P and the frictional resistance Q F of the peripheral surface. That is, R = Q P + Q F, and R a > P
In the limit design method, the safety factor F
In consideration of the above, it is designed and constructed so as to satisfy the condition of P ≦ 1 / F (Q P + Q F ).
【0003】[0003]
【本発明が解決しようとする課題】従来の支持杭に関す
る極限設計法では、力の大きさにのみに注目して、地盤
の歪と応力に基づく計算をしていないから合理性、信頼
性に欠ける。と云うのも、長い杭の支持力を先端抵抗力
と周面摩擦抵抗力の二面から検証してゆくと、杭の上載
荷重は、地表面から始まる地盤の歪と応力に起因する周
面摩擦抵抗力の働きによって大部分を支持するメカニズ
ムになっており、先端抵抗力はほとんど働いていない
(図3参照)。具体的に云えば、図3に応力−歪特性を
示しているように、杭の周面摩擦抵抗力QF は零点から
急勾配で上昇して、杭径とは無関係に杭の周面と地盤の
ずれが10〜20mmで極大(ピーク)に達する。他方、
先端抵抗力QP は極めて緩やかな上昇勾配を描き、かな
り大きな変形量(0.1D〜0.25D)でやっと極大
に達する。従って、例えば変形量0.1Dを基準にとっ
た場合の抵抗合力Ra は、Ra =QFa+QPa というこ
とになり、QFaはもとより、QPaは極大値QF ,QP に
比較すると数分の一の大きさでしかない。In the conventional ultimate design method for supporting piles, attention is paid only to the magnitude of the force, and the calculation based on the strain and stress of the ground is not performed, so that the rationality and reliability are improved. Lack. This means that, when verifying the bearing capacity of a long pile from the two aspects of tip resistance and peripheral friction resistance, the pile top load is the peripheral surface caused by ground strain and stress starting from the ground surface. The mechanism that supports most of it by the action of frictional resistance, and the tip resistance hardly acts (see Fig. 3). Specifically, as shown in the stress-strain characteristics in FIG. 3, the peripheral frictional resistance Q F of the pile rises at a steep slope from the zero point, and the peripheral surface of the pile is irrespective of the diameter of the pile. When the ground displacement is 10 to 20 mm, the maximum value (peak) is reached. On the other hand,
Tip resistance Q P draws a very gentle rise gradient, finally reaching a maximum fairly large amount of deformation (0.1D~0.25D). Thus, for example, the resistance force R a when taking a deformation amount 0.1D based the comparison results in that R a = Q Fa + Q Pa , Q Fa as well, Q Pa is the maximum value Q F, the Q P Then it is only a fraction of the size.
【0004】にもかかわらず、現状の設計手法は、極大
値QF ,QP を前提とした合力R=QF +QP に安全係
数1/Fを乗じて信頼性を確保しているので、大変大雑
把で合理性、信頼性に欠ける設計、施工になっている。
従って、本発明の目的は、応力と歪の挙動に基づいた杭
の周面摩擦抵抗力及び先端抵抗力を可及的に有効に重畳
的に働かせることにより高信頼性を発揮する杭とその製
造方法を提供することである。Nevertheless, the current design method ensures reliability by multiplying the resultant force R = Q F + Q P based on the maximum values Q F and Q P by the safety factor 1 / F. The design and construction is very rough and lacks rationality and reliability.
Therefore, an object of the present invention is to provide a pile exhibiting high reliability by making the peripheral frictional resistance and the tip resistance of the pile based on the behavior of stress and strain work as effectively and effectively as possible in superposition, and manufacturing thereof. Is to provide a method.
【0005】本発明の次の目的は、杭の実際的な荷重支
持機能に有効で経済的な設計、施工が可能な高信頼性の
杭及びその製造方法を提供することである。A further object of the present invention is to provide a highly reliable pile which is effective for a practical load bearing function of the pile and can be economically designed and constructed, and a manufacturing method thereof.
【0006】[0006]
【課題を解決するための手段】上記従来技術の課題を解
決するための手段として、請求項1に記載した発明に係
る高信頼性の杭は、鋼管杭の中心部に、支持層に到達し
て先端抵抗力を受ける芯杭が前記鋼管杭との間に若干の
間隙をあけて設置され、プレロードを与えられた芯杭と
鋼管杭との間隙に粘弾性体が充填されており、芯杭が上
載荷重を受けた際の周面摩擦抵抗力は粘弾性体及び鋼管
杭を介して地面に伝達されることを特徴とする。As means for solving the above-mentioned problems of the prior art, the highly reliable pile according to the invention described in claim 1 reaches the support layer at the center of the steel pipe pile. A core pile that receives tip resistance is installed with a slight gap between the core pile and the steel pipe pile, and the gap between the preloaded core pile and the steel pipe pile is filled with a viscoelastic body. The frictional force of the peripheral surface when the bearing is loaded is transmitted to the ground through the viscoelastic body and the steel pipe pile.
【0007】また、請求項2の発明に係る高信頼性の杭
の製造方法は、中掘り工法により鋼管杭を地中に建込
み、前記鋼管杭の中空部内の中心部に前記鋼管杭との間
に若干の間隙をあける直径の芯杭を支持層に到達する状
態に設置し、前記芯杭にプレロードを与えた後に、芯杭
と鋼管杭との隙間に粘弾性体を充填する工程から成るこ
とを特徴とする。Further, in the method for manufacturing a highly reliable pile according to the invention of claim 2, the steel pipe pile is built in the ground by the hollow excavation method, and the steel pipe pile is formed in the center of the hollow portion of the steel pipe pile. A step of installing a core pile having a diameter with a slight gap between the core pile and the support layer, preloading the core pile, and filling a viscoelastic body in the gap between the core pile and the steel pipe pile It is characterized by
【0008】前記請求項1に記載した粘弾性体は、シー
ル材、砂、又はベントナイトであることを特徴とする。
また、前記請求項1に記載した芯杭は、プレキャストコ
ンクリート杭又は鉄筋コンクリート造乃至鉄骨鉄筋コン
クリート造の杭又は鋼管巻き場所打ちコンクリート杭で
あることも特徴とする。The viscoelastic body according to claim 1 is characterized in that it is a sealing material, sand, or bentonite.
The core pile described in claim 1 is also characterized in that it is a precast concrete pile, a reinforced concrete structure or a steel frame reinforced concrete structure, or a steel pipe wound cast-in-place concrete pile.
【0009】本発明のように、鋼管杭の中に設置した芯
杭にプレロード(上載荷重)を与えると、このプレロー
ドは杭体を通じて先端の支持層へ直接的に伝達され、支
持層から受ける先端抵抗力によって支持される。従っ
て、この時の先端抵抗力Q´Pは図3中に示したように
周面摩擦抵抗力が働く以前に急勾配で上昇する。 プレ
ロードは芯杭が0.03D程度の歪を発生する大きさま
で付与される。その後、鋼管杭と芯杭との隙間に粘弾性
体が充填されるので、芯杭が上載荷重を受けると、同芯
杭の沈下に伴い周面の粘弾性体の歪に伴って発生する応
力に起因する周面摩擦抵抗力QF が増大してゆき、両者
の合力(Q´P +QF )で前記上載荷重を支持すること
になる。この場合、先端抵抗力Q´P が卓越した内容で
あり、基準となる変形量0.1Dの近辺で先端抵抗力Q
´P 及び周面摩擦抵抗力QF がピークを迎えるので、両
者の合力Ra =Q´P +QFa は実質的な働きとして発
揮され、もって高い信頼性の杭となる。When a preload (overload) is applied to the core pile installed in the steel pipe pile as in the present invention, this preload is directly transmitted to the support layer at the tip through the pile body and received from the support layer. Supported by resistance. Accordingly, the tip resistance Q'P at this time rises steeply before the peripheral surface frictional resistance force acts as shown in FIG. The preload is applied to a size at which the core pile generates a strain of about 0.03D. After that, because the viscoelastic body is filled in the gap between the steel pipe pile and the core pile, when the core pile receives a top load, the stress generated due to the strain of the viscoelastic body on the peripheral surface as the core pile sinks. The frictional force Q F on the peripheral surface resulting from the increase in the frictional force increases, and the resultant load (Q ′ P + Q F ) of both supports the above-mentioned load. In this case, a tip resistance Q'P is outstanding contents, the tip resistance in the vicinity of the deformation amount 0.1D as a reference Q
′ P and the peripheral frictional resistance Q F reach their peaks, and the resultant force R a = Q ′ P + Q Fa of both is exerted as a substantial function, and thus a highly reliable pile is provided.
【0010】[0010]
【発明の実施の形態、実施例】以下に、図示した本発明
の実施例を説明する。図1に示した支持杭1は、中心部
の芯杭2が、粘弾性体を充填する以前に、杭先端を地下
の支持層5に到達させられ、直接先端抵抗力を受ける
(支持される)状態で設置される。鋼管杭3は、前記芯
杭2の外周に20cm〜30cm程度の均等な隙間をあける
内径のものとされ、地中に必要十分な深さまで設置され
ている。芯杭2には、それが0.03D程度歪む大きさ
のプレロード(上載荷重)を付与される。プレロードの
付与後に、前記芯杭2と鋼管杭3との隙間中にシール
材、砂、ベントナイト等の粘弾性体4が密実に充填され
る。従って、芯杭2の外周面と粘弾性体4及び鋼管杭3
の間に摩擦抵抗力が発生し、該抵抗力は粘弾性体4から
鋼管杭3を経て周辺地盤へ伝達する構成とされる。粘弾
性体4の材質、性能は前記の機能を奏する物質であれば
よく、特に前記例示のものに限らない。この高支持力杭
1を構成する芯杭2の外径は一般的に2.5m、鋼管杭
3の外径は3.0mぐらいの大きさとされる。芯杭2に
はプレキャストコンクリート杭、又は鉄筋コンクリート
造乃至鉄骨鉄筋コンクリート造の場所打ち杭、又は鋼管
巻き場所打ちコンクリート杭などが適用される。鋼管杭
3の深さは、粘弾性体4を介して伝達される芯杭2の周
面摩擦抵抗力を周辺地盤へ伝達するのに有効な深さであ
れば足り、必ずしも図示例のように支持層5へ到達させ
ることを要しない。BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention shown in the drawings will be described below. In the support pile 1 shown in FIG. 1, before the core pile 2 in the central portion is filled with the viscoelastic body, the pile tip reaches the underground support layer 5 and directly receives the tip resistance force (supported). ) Is installed in the state. The steel pipe pile 3 has an inner diameter that allows a uniform gap of about 20 cm to 30 cm on the outer periphery of the core pile 2, and is installed to a necessary and sufficient depth in the ground. The core pile 2 is given a preload (overlay load) of such a magnitude that it distorts about 0.03D. After the preload is applied, the gap between the core pile 2 and the steel pipe pile 3 is densely filled with a viscoelastic body 4 such as a sealing material, sand or bentonite. Therefore, the outer peripheral surface of the core pile 2, the viscoelastic body 4, and the steel pipe pile 3
A frictional resistance force is generated between them, and the resistance force is transmitted from the viscoelastic body 4 to the surrounding ground through the steel pipe pile 3. The material and performance of the viscoelastic body 4 may be any substance as long as it has the above-mentioned function, and is not particularly limited to those exemplified above. The outer diameter of the core pile 2 constituting the high bearing pile 1 is generally 2.5 m, and the outer diameter of the steel pipe pile 3 is about 3.0 m. As the core pile 2, a precast concrete pile, a cast-in-place pile made of reinforced concrete or steel-framed reinforced concrete, a steel pipe wound cast-in-place concrete pile, or the like is applied. The depth of the steel pipe pile 3 is sufficient as long as it is effective for transmitting the peripheral frictional resistance force of the core pile 2 transmitted through the viscoelastic body 4 to the surrounding ground. It is not necessary to reach the support layer 5.
【0011】上記高信頼性の杭1を製造する方法は、ま
ずドリリングバケット等の掘削機を使用した中掘り工法
により、鋼管杭3の建込みを行う。鋼管杭3を所要の深
さに設置した後に、その中空部内の中心部へ芯杭2を設
置して、その先端を支持層5へ到達させ、所定大きさの
プレロード(上載荷重)を付与する。かくして芯杭2に
先端抵抗力が発生する状態とした上で、該芯杭2と鋼管
杭3との隙間へ粘弾性体4を密実に充填する工程が実施
される。In the method for manufacturing the highly reliable pile 1, first, the steel pipe pile 3 is built by a medium excavation method using an excavator such as a drilling bucket. After the steel pipe pile 3 is installed at a required depth, the core pile 2 is installed in the center of the hollow part of the steel pipe pile 3 so that the tip of the core pile 2 reaches the support layer 5 and a predetermined amount of preload (upload) is applied. . Thus, after the core pile 2 is brought into a state in which a tip resistance force is generated, a step of densely filling the gap between the core pile 2 and the steel pipe pile 3 with the viscoelastic body 4 is carried out.
【0012】芯杭2の先端部に受ける先端抵抗力を可及
的に大きくする手段として、芯杭先端面を水平な大径面
として形成すること、そして、芯杭2と粘弾性体4との
間の周面摩擦抵抗力、及び鋼管杭と粘弾性体及び周辺地
盤との間の周面摩擦抵抗力を可及的に増大する手段とし
て、芯杭2の外周面、及び鋼管杭の内・外周面の水平方
向に環状(フランジ状)の凸条又は溝状(凹状)を形成
し、あるいは凹凸を設けることも好適に実施される。As a means for increasing the tip resistance force applied to the tip of the core pile 2 as much as possible, the tip end surface of the core pile is formed as a horizontal large-diameter surface, and the core pile 2 and the viscoelastic body 4 are formed. Between the outer peripheral surface of the core pile 2 and the steel pipe pile as means for increasing the peripheral friction resistance force between the steel pipe pile and the viscoelastic body and the surrounding ground as much as possible. -It is also preferable to form an annular (flange-shaped) convex strip or groove (concave) in the horizontal direction of the outer peripheral surface, or to provide irregularities.
【0013】[0013]
【本発明が奏する効果】本発明に係る高信頼性の杭及び
その製造方法によれば、先端抵抗力が卓越した支持力を
期待できると共に、地盤の歪と応力に基づいて先端抵抗
力と周面摩擦抵抗力とが重畳、重複して確実に働くこと
を期待でき、合理的で高信頼性の支持杭等として利用で
きるのである。EFFECTS OF THE INVENTION According to the highly reliable pile and the manufacturing method thereof according to the present invention, the tip resistance can be expected to have excellent bearing capacity, and the tip resistance and the circumference can be expected based on the strain and stress of the ground. It can be expected that the surface friction resistance force will overlap and work reliably in an overlapping manner, and it can be used as a rational and highly reliable support pile or the like.
【図1】本発明の高信頼性の杭の実施例を簡単に示した
断面図である。FIG. 1 is a sectional view simply showing an embodiment of a highly reliable pile of the present invention.
【図2】従来の杭及びその支持機能を示した断面図であ
る。FIG. 2 is a cross-sectional view showing a conventional pile and its supporting function.
【図3】杭に働く先端抵抗力と周面摩擦抵抗力の働きを
応力−変形で示した特性図である。FIG. 3 is a characteristic diagram showing, by stress-deformation, functions of a tip resistance force and a peripheral surface friction resistance force that act on a pile.
1 高信頼性の杭 2 芯杭 3 鋼管杭 4 粘弾性体 5 支持層 1 Highly reliable pile 2 Core pile 3 Steel pipe pile 4 Viscoelastic body 5 Support layer
Claims (4)
端抵抗力を受ける芯杭が前記鋼管杭との間に若干の間隙
をあけて設置され、プレロードを与えられた芯杭と鋼管
杭との間隙に粘弾性体が充填されており、芯杭が上載荷
重を受けた際の周面摩擦抵抗力は粘弾性体及び鋼管杭を
介して地面に伝達されることを特徴とする、高信頼性の
杭。1. A core pile provided with a preload, wherein a core pile that reaches a supporting layer and receives a tip resistance force is installed at a central portion of the steel pipe pile with a slight gap between the core pile and the steel pipe pile. A viscoelastic body is filled in the gap with the steel pipe pile, and the frictional resistance of the peripheral surface when the core pile receives a top load is transmitted to the ground through the viscoelastic body and the steel pipe pile. , High reliability pile.
み、前記鋼管杭の中空部内の中心部に前記鋼管杭との間
に若干の間隙をあける直径の芯杭を支持層に到達する状
態に設置し、前記芯杭にプレロードを与えた後に、芯杭
と鋼管杭との隙間に粘弾性体を充填する工程から成るこ
とを特徴とする、高信頼性の杭を製造する方法。2. A steel pipe pile is laid in the ground by the underground digging method, and a core pile having a diameter with a slight gap between the steel pipe pile and the steel pipe pile reaches the support layer in the center of the hollow portion of the steel pipe pile. A method for producing a highly reliable pile, comprising a step of placing the core pile in a state and preloading the core pile, and then filling a gap between the core pile and the steel pipe pile with a viscoelastic body.
材、砂、又はベントナイトであることを特徴とする、高
信頼性の杭。3. The highly reliable pile, wherein the viscoelastic body according to claim 1 is a sealing material, sand, or bentonite.
トコンクリート杭又は鉄筋コンクリート造乃至鉄骨鉄筋
コンクリート造の杭又は鋼管巻き場所打ちコンクリート
杭であることを特徴とする、高信頼性の杭。4. A highly reliable pile, wherein the core pile according to claim 1 is a precast concrete pile, a reinforced concrete construction or a steel reinforced concrete construction pile, or a steel pipe wound cast-in-place concrete pile.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP33308295A JP3600885B2 (en) | 1995-12-21 | 1995-12-21 | Highly reliable pile and manufacturing method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP33308295A JP3600885B2 (en) | 1995-12-21 | 1995-12-21 | Highly reliable pile and manufacturing method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH09170232A true JPH09170232A (en) | 1997-06-30 |
| JP3600885B2 JP3600885B2 (en) | 2004-12-15 |
Family
ID=18262077
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP33308295A Expired - Fee Related JP3600885B2 (en) | 1995-12-21 | 1995-12-21 | Highly reliable pile and manufacturing method thereof |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3600885B2 (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108532651A (en) * | 2018-04-19 | 2018-09-14 | 东南大学 | The device of frictional resistance inside and outside a kind of detection steel-pipe pile |
| CN111702132A (en) * | 2020-06-11 | 2020-09-25 | 江苏威尔森环保设备有限公司 | Preparation process for annular reinforcing rib |
-
1995
- 1995-12-21 JP JP33308295A patent/JP3600885B2/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108532651A (en) * | 2018-04-19 | 2018-09-14 | 东南大学 | The device of frictional resistance inside and outside a kind of detection steel-pipe pile |
| CN111702132A (en) * | 2020-06-11 | 2020-09-25 | 江苏威尔森环保设备有限公司 | Preparation process for annular reinforcing rib |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3600885B2 (en) | 2004-12-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5265500B2 (en) | Pile digging method, foundation pile structure | |
| Zhu et al. | Field study of pile–prefabricated vertical drain (PVD) interaction in soft clay | |
| Long et al. | Retaining walls in dublin boulder clay, Ireland | |
| JPH11107273A (en) | Construction method of cast-in-place pile | |
| JP3600885B2 (en) | Highly reliable pile and manufacturing method thereof | |
| Vinothkumar et al. | Ground improvement by controlled modulus Columns—A West Africa case study | |
| JP2001098542A (en) | Soil cement synthetic taper pile | |
| JP4202548B2 (en) | Pile foundation | |
| JP3740600B2 (en) | Structure for preventing settlement of underground structures | |
| JPH11350433A (en) | Piles for preventing falling objects | |
| JP2004211502A (en) | Foundation reinforcing structure | |
| JP2741374B2 (en) | Ready-made piles with negative friction reduction measures | |
| CN111455985A (en) | A kind of steel pipe composite rock-socketed pile foundation structure and construction method | |
| JPH11293669A (en) | Pile anchoring method | |
| JPH10183660A (en) | Foundation structure of building | |
| JP2884266B2 (en) | Compacted piles such as cast-in-place concrete piles | |
| JP2589073Y2 (en) | Concrete cast-in-place pile | |
| JPH0121288B2 (en) | ||
| JP3834575B2 (en) | Steel pipe pile driving method | |
| CN201495554U (en) | An Anchor Combined Excavation and Excavation Composite Foundation | |
| JPS61155519A (en) | Settlement work of caisson | |
| JPH1060912A (en) | Ground formation structure | |
| JP2003074056A (en) | Construction method of steel pipe pile | |
| JPH02243819A (en) | Rotary press-in steel pipe pile | |
| Krishnanunni et al. | Forensic geotechnical analysis of sinking of large concrete slurry tanks |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20040217 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20040402 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20040402 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040518 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040610 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040831 |
|
| R150 | Certificate of patent (=grant) or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081001 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091001 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101001 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111001 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121001 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131001 Year of fee payment: 9 |
|
| LAPS | Cancellation because of no payment of annual fees |