JPH0931970A - Ground improvement method and ground improvement device - Google Patents
Ground improvement method and ground improvement deviceInfo
- Publication number
- JPH0931970A JPH0931970A JP18516795A JP18516795A JPH0931970A JP H0931970 A JPH0931970 A JP H0931970A JP 18516795 A JP18516795 A JP 18516795A JP 18516795 A JP18516795 A JP 18516795A JP H0931970 A JPH0931970 A JP H0931970A
- Authority
- JP
- Japan
- Prior art keywords
- screw
- stirring
- stabilizer
- ground
- drive shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
(57)【要約】
【課題】 軟弱地盤を掘削しその掘削土壌中に安定材を
注入し攪拌混合することにより軟弱地盤を改良処理する
地盤改良工法及び地盤改良装置を提供する。
【解決手段】 攪拌翼3と掘削カッター4を有する攪拌
掘削軸2の上端を、正転貫入回転とは逆巻きのスパイラ
ル状にスクリュー1’を取り付けられたスクリュー付駆
動軸1の下端部に接続し、同スクリュー付駆動軸1を正
転貫入回転させつつ軟弱地盤中へ垂直に貫入して安定材
を注入することなく地盤の掘削を行い、掘削が予定深度
に到達した段階で、前記スクリュー付駆動軸1をその位
置で逆回転させて設計された安定材の注入量に相当する
量の原位置土の強制排土を行い、しかる後、前記スクリ
ュー付駆動軸1を貫入時と同じ方向に回転させつつ前記
攪拌掘削軸2上部の注入孔7から安定材を注入して攪拌
混合しながら引き揚げる。
(57) [Abstract] [PROBLEMS] To provide a ground improvement method and a ground improvement device for improving soft ground by excavating soft ground, injecting a stabilizer into the excavated soil, and stirring and mixing. SOLUTION: The upper end of a stirring and excavating shaft 2 having a stirring blade 3 and a excavating cutter 4 is connected to a lower end of a screw-equipped drive shaft 1 to which a screw 1'is attached in a spiral shape in a reverse winding to a forward rotation. , The screw drive shaft 1 is normally rotated and penetrated vertically into the soft ground to excavate the ground without injecting the stabilizer, and when the excavation reaches the planned depth, the screw drive is performed. The shaft 1 is reversely rotated at that position to forcibly discharge the in-situ soil in an amount equivalent to the amount of the stabilizer injected, and then the drive shaft with screw 1 is rotated in the same direction as when the penetration was made. While stirring, the stabilizer is injected from the injection hole 7 in the upper part of the stirring excavation shaft 2 and stirred and mixed, and then lifted.
Description
【0001】[0001]
【発明の属する技術分野】この発明は、軟弱地盤を掘削
しその掘削土壌中に地盤安定材又は硬化材(以下、「安
定材」と総称する。)を注入し攪拌混合することにより
軟弱地盤を改良処理する地盤改良工法、及び同工法の実
施に使用する地盤改良装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention excavates a soft ground, pours a ground stabilizing material or a hardening material (hereinafter collectively referred to as "stabilizing material") into the excavated soil, and stirs and mixes the soft ground. The present invention relates to a ground improvement method for improvement treatment and a ground improvement device used for implementing the method.
【0002】[0002]
【従来の技術】従来、軟弱地盤を掘削してその掘削土壌
中に安定材を注入し攪拌混合することにより軟弱地盤を
改良処理する地盤改良工法及び地盤改良装置は種々開発
され広く実施されている。とりわけ、注入された安定材
により土中の体積が増加して水平方向への地盤変位が発
生し地下構造物へ悪影響が及ぶ問題を解決するため、安
定材の注入量に相当する量の原位置土を排土して土中の
体積増加を防ぐ手段が提案されている。例えば、特公
平5−62167号公報には、先端に攪拌ヘッドを有す
るスクリューロッドを軟弱地盤へ回転貫入し、引抜き攪
拌と同時に排土を行い、且つ当該スクリューロッドの下
端部より安定材を噴出して原位置土中に注入し地盤を改
良する工法及び装置が記載されている。また、特公平
4−57805号公報には、先端に攪拌翼を各々取り付
けた2本の回転軸の外周に排土用スクリューが設けら
れ、軟弱地盤へ回転貫入する際同時にスクリューロッド
で原位置土の排土を行ない、その後回転軸の引抜き時に
回転軸を逆転させながら地盤土壌と安定材の攪拌混合を
行う地盤改良工法及び装置が記載されている。2. Description of the Related Art Conventionally, various ground improvement methods and devices for improving soft ground by excavating soft ground, injecting a stabilizer into the excavated soil and stirring and mixing have been developed and widely implemented. . In particular, in order to solve the problem that the injected stabilizer increases the volume in the soil and causes horizontal ground displacement, which adversely affects the underground structure, in order to solve the problem that the amount of stabilizer injected is equal to the original position. Means have been proposed to remove the soil and prevent an increase in volume in the soil. For example, in Japanese Examined Patent Publication No. 5-62167, a screw rod having a stirring head at its tip is rotationally penetrated into soft ground, and soil is discharged simultaneously with pulling and stirring, and a stabilizer is jetted from the lower end of the screw rod. It describes the construction method and equipment for pouring into the soil in situ to improve the ground. Further, in Japanese Examined Patent Publication No. 4-57805, a screw for earth removal is provided on the outer circumference of two rotary shafts, each of which has a stirring blade attached to the tip thereof. The soil improvement method and apparatus are described, in which the soil is soiled and the stirrer is agitated and mixed while the rotary shaft is reversed while the rotary shaft is pulled out.
【0003】[0003]
【本発明が解決しようとする課題】一般に排土量は、ス
クリューの排土面積と、スクリューのピッチと、単位時
間当たりの回転数と、作業時間とによって変化するとい
われている。しかし、改良する地盤の土質状態は深さ、
場所等によって硬軟様々であり、土質状態に応じて回転
軸の貫入速度は早くなったり遅くなったりして一定しな
いことは周知の事実である。Generally, it is said that the amount of discharged soil changes depending on the discharged area of the screw, the pitch of the screw, the number of rotations per unit time, and the working time. However, the soil condition to be improved is deep,
It is a well-known fact that the penetration speed of the rotating shaft is fast or slow depending on the soil condition and is not constant depending on the place and the like.
【0004】しかるに、上述したの地盤改良工法は、
引抜き攪拌と同時に排土を行う構成なので、排土量を注
入量相当の量に制御することは極めて困難である。ま
た、上記の地盤改良工法は掘削貫入と同時に排土を行
う構成なので、排土量は、スクリューロッドの貫入速度
に直接影響されてしまい、排土量を適正に制御すること
は至難である。また、安定材の必要注入量は、各土質状
態により設定されることが多いので、排土量の増減によ
って注入量を変えることができず、結局、地盤変位が生
じてしまう問題がある。However, the above-mentioned ground improvement method is
It is extremely difficult to control the amount of soil discharged to an amount equivalent to the amount of soil injected because the soil is discharged and discharged at the same time. In addition, since the soil improvement method described above is configured to discharge soil at the same time as excavation and penetration, the amount of soil discharged is directly affected by the penetration speed of the screw rod, and it is extremely difficult to properly control the amount of soil discharged. In addition, since the required injection amount of the stabilizer is often set according to each soil condition, the injection amount cannot be changed by increasing or decreasing the amount of soil discharged, and there is a problem that ground displacement eventually occurs.
【0005】従って、本発明の目的は、安定材を注入し
攪拌混合して軟弱地盤を改良処理するに際し、安定材の
注入量に相当する量の土を正確に排土することができ、
もって地盤変位を確実に防止する地盤改良工法を提供す
ることにある。本発明の更なる目的は、掘削貫入の後、
引き抜き攪拌の前の工程として、単独に排土工程を設け
た地盤改良工法を提供することである。Therefore, it is an object of the present invention to precisely discharge the soil in an amount corresponding to the amount of the stabilizer injected when the stabilizer is injected and mixed by stirring to improve the soft ground.
Therefore, it is to provide a ground improvement method for reliably preventing ground displacement. A further object of the invention is, after excavation penetration,
It is an object of the present invention to provide a ground improvement method in which a soil unloading step is independently provided as a step prior to drawing and stirring.
【0006】[0006]
【課題を解決するための手段】上述の課題を解決するた
めの手段として、請求項1に記載した発明に係る地盤地
盤改良工法は、攪拌翼3と掘削カッター4を有する攪拌
掘削軸2の上端を、正転貫入回転とは逆巻きのスパイラ
ル状にスクリュー1’を取り付けられたスクリュー付駆
動軸1の下端部に接続し、同スクリュー付駆動軸1を正
転貫入回転させつつ軟弱地盤中へ垂直に貫入して安定材
を注入することなく地盤の掘削を行い、掘削が予定深度
に到達した段階で、前記スクリュー付駆動軸1をその位
置で逆回転させて設計された安定材の注入量に相当する
量の原位置土の強制排土を行い、しかる後、前記スクリ
ュー付駆動軸1を貫入時と同じ方向に回転させつつ前記
攪拌掘削軸2上部の注入孔7から安定材を注入して攪拌
混合しながら引き揚げることを特徴とする。As means for solving the above-mentioned problems, the ground improvement method according to the invention described in claim 1 has an upper end of an agitation excavation shaft 2 having an agitation blade 3 and an excavation cutter 4. Is connected to the lower end of the drive shaft with screw 1 in which a screw 1'is attached in a spiral shape that is reverse-wound to the direction of normal rotation, and the drive shaft with screw 1 is rotated in the normal rotation and vertically into soft ground. The ground is excavated without penetrating into the ground and the stabilizer is injected, and when the excavation reaches the planned depth, the screw-equipped drive shaft 1 is rotated in reverse at that position to obtain the amount of the stabilizer injected. A corresponding amount of in-situ soil is forcibly discharged, and then the stabilizer is injected from the injection hole 7 above the stirring excavation shaft 2 while rotating the drive shaft with screw 1 in the same direction as when the penetration was performed. Lift while stirring and mixing It is characterized by
【0007】次に、請求項2に記載した発明に係る地盤
改良装置は、単数又は複数のスクリュー付駆動軸1が垂
直姿勢を高精度に保持して回転可能に支持され、同スク
リュー付駆動軸1には正転貫入回転に対し逆巻きのスパ
イラル状にスクリュー1’が取り付けられており、前記
スクリュー付駆動軸1の下端部には、下端部に軟弱地盤
を掘削する掘削カッター4が取り付けられ、その上方に
攪拌翼3が水平配置に複数取り付けられた攪拌掘削軸2
が一連に接続されており、前記攪拌掘削軸2の先端部及
び上方部に安定材を先端注入及び上部注入する注入孔7
がそれぞれ設けられていることを特徴とする。Next, in the ground improvement device according to a second aspect of the present invention, a single or a plurality of screw drive shafts 1 are rotatably supported while maintaining a vertical posture with high accuracy, and the screw drive shafts are supported. 1, a screw 1'is attached in a spiral shape that is reverse-wound with respect to normal rotation and intrusion rotation, and an excavation cutter 4 for excavating soft ground is attached to the lower end of the drive shaft 1 with screw. Agitating and excavating shaft 2 having a plurality of agitating blades 3 horizontally arranged above it
Are connected in series, and an injection hole 7 for injecting the stabilizer into the tip and the upper part of the stirring and excavating shaft 2 is introduced.
Are respectively provided.
【0008】なお、請求項2に記載した攪拌翼3の上方
であって攪拌掘削軸2の上部位置には、安定材の先端注
入と上部注入の切り換えを可能にする切換バルブ5が設
けられていることも特徴とする。A switching valve 5 is provided at a position above the stirring blade 3 above the stirring blade 3 and above the stirring excavation shaft 2 to enable switching between tip injection and upper injection of the stabilizer. It is also characterized by being present.
【0009】[0009]
【発明の実施の形態】本発明の地盤改良工法は、単軸の
地盤改良装置、又は2軸以上の多軸地盤改良装置により
施工される。安定材の先端注入と上部注入の切り換え
は、スクリュー付駆動軸1の回転方向を正逆に切り換え
ることにより、弁体の慣性力を応用して切り換える弁機
構、又は土圧の作用を応用して切り換える弁機構により
行われる。BEST MODE FOR CARRYING OUT THE INVENTION The ground improvement method of the present invention is carried out by a single axis ground improving apparatus or a multi-axis ground improving apparatus having two or more axes. The tip end injection and the upper part injection of the stabilizer are performed by switching the rotation direction of the drive shaft with screw 1 in the forward and reverse directions, thereby applying the inertial force of the valve element to perform switching, or by applying the action of earth pressure. This is done by a switching valve mechanism.
【0010】排土工程は、掘削貫入したスクリュー付駆
動軸1が予定深度に到達した後に、先端改良(根固め)
処理及び引抜き攪拌の前の工程として、スクリュー付駆
動軸1の高さを不動にして回転のみさせることにより設
計排土量を正確に実行する。攪拌掘削軸2及びスクリュ
ー付駆動軸1が予定深度に到達した後、同攪拌掘削軸2
及びスクリュー付駆動軸1を根固め部相当の高さだけ上
昇、下降を繰り返し、それに伴い安定材を注入して根固
め部を形成することもできる。In the earth unloading process, the tip is improved (consolidation) after the drive shaft with screw 1 that has penetrated into the excavation reaches the planned depth.
As a process prior to the treatment and pulling and stirring, the designed earth removal amount is accurately executed by immobilizing the height of the drive shaft 1 with a screw and only rotating it. After the stirring excavation shaft 2 and the drive shaft with screw 1 reach the planned depth, the stirring excavation shaft 2
It is also possible to form the root-consolidated portion by repeatedly raising and lowering the screw-equipped drive shaft 1 by a height corresponding to the root-consolidated portion, and then injecting a stabilizer with it.
【0011】[0011]
【実施例】以下に、本発明の実施例を図面に基づいて説
明する。図1A,Bは、先端部に攪拌掘削軸2を持つス
クリュー付駆動軸1で地上から予定深度へ到達するまで
軟弱地盤を掘削する段階を示している。スクリュー付駆
動軸1の下端部に攪拌掘削軸2が一連に接続されてい
る。Embodiments of the present invention will be described below with reference to the drawings. 1A and 1B show a step of excavating soft ground from the ground to a predetermined depth with a drive shaft 1 with a screw having a stirring excavation shaft 2 at the tip. A stirring excavation shaft 2 is connected in series to the lower end of the drive shaft 1 with a screw.
【0012】図示例の場合、スクリュー付駆動軸は2軸
であり、各軸は下部を連結金具6により相互に拘束して
両軸の関係位置を保ち、垂直姿勢を高精度に保持し回転
可能に支持されている。前記スクリュー付駆動軸1のス
クリュー1’は、正転貫入回転とは逆巻きのスパイラル
状に取り付けられている。従って、貫入掘削時に排土は
発生しない。その理由は、スクリュー付駆動軸1のスク
リュー1’が正転貫入回転とは逆巻きに取り付けられ、
スクリュー1’は掘削土壌を下方へ押し込む作用をする
ので、貫入時の自然盛り上がり土以外の排土は発生しな
い訳である。前記攪拌掘削軸2の下端部に軟弱地盤を掘
削する掘削カッター4が取り付けられ、同掘削カッター
4の上方に掘削土を攪拌し安定材を混合する攪拌翼3が
水平配置に複数取り付けられている。前記攪拌掘削軸2
の先端部及び前記攪拌翼よりも少し上方の位置に、安定
材を注入する注入孔7がそれぞれ設けられている。そし
て、攪拌翼3よりも上方の前記攪拌掘削軸2の上端部付
近に前記二つの注入孔7へ安定材を供給する流路を切り
換える切換バルブ5が設けられている。前記スクリュー
1’の外径は、前記攪拌翼3及び掘削カッター4の外径
より小径とされている。In the case of the illustrated example, the drive shafts with screws are two, and the lower parts of the respective shafts are mutually restrained by the connecting metal fittings 6 to keep the relative positions of both shafts, and the vertical posture can be maintained with high precision and rotatable. Supported by. The screw 1'of the drive shaft with screw 1 is mounted in a spiral shape that is reverse-wound to the forward rotation. Therefore, no soil is discharged during the excavation. The reason is that the screw 1'of the drive shaft with screw 1 is attached in the reverse winding of the normal rotation and the penetration rotation,
Since the screw 1 ′ has a function of pushing the excavated soil downward, no soil is discharged except for the naturally rising soil at the time of intrusion. An excavation cutter 4 for excavating soft ground is attached to the lower end of the agitation excavation shaft 2, and a plurality of agitation blades 3 that agitate excavated soil and mix a stabilizer are horizontally attached above the excavation cutter 4. . The stirring excavation shaft 2
An injection hole 7 for injecting the stabilizer is provided at a position slightly higher than the tip end portion and the stirring blade. A switching valve 5 is provided near the upper end of the stirring excavation shaft 2 above the stirring blade 3 to switch the flow path for supplying the stabilizer to the two injection holes 7. The outer diameter of the screw 1 ′ is smaller than the outer diameters of the stirring blade 3 and the excavation cutter 4.
【0013】図1Aは、スクリュー付駆動軸1を正転方
向へ回転させつつ下向きの押し込み力を与えて軟弱地盤
中へ垂直に貫入させ掘削を進めている。前記スクリュー
付駆動軸1の正転回転に伴い、攪拌掘削軸2の掘削カッ
ター4が同方向に一体的に回転して軟弱地盤を掘削す
る。なお、この段階では安定材は注入しない。必要があ
ればベントナイト泥水等を注出するが、液体を一切供給
しないドライ掘削も行われる。In FIG. 1A, the screw drive shaft 1 is rotated in the normal direction and a downward pushing force is applied to vertically penetrate into the soft ground to advance excavation. With the forward rotation of the drive shaft with screw 1, the excavation cutter 4 of the stirring excavation shaft 2 integrally rotates in the same direction to excavate the soft ground. No stabilizer is injected at this stage. If necessary, bentonite muddy water is poured out, but dry drilling is also performed without supplying any liquid.
【0014】図1Bは、スクリュー付駆動軸1が予定深
度に到達した段階を示している。この段階で一旦回転を
止め、軟弱地盤の掘削を中止する。次に、図2は、予定
深度位置に到達したスクリュー付駆動軸1で掘削した原
位置土を排土する工程を示している。スクリュー付駆動
軸1を貫入時とは反対に逆回転させる。従って、スクリ
ュー1’は回転方向に順巻きとなり、同スクリュー1’
が掘削土壌を地上へ押し出す作用により同掘削土壌は順
調に地上へ排土される。設計された安定材の注入量に相
当する量の土壌が排土された時点で回転を止める。FIG. 1B shows a stage in which the drive shaft with screw 1 reaches a predetermined depth. At this stage, the rotation is stopped once and the excavation of soft ground is stopped. Next, FIG. 2 shows a process of removing the in-situ soil excavated by the drive shaft with screw 1 that has reached the planned depth position. The drive shaft with screw 1 is rotated in the opposite direction to that at the time of penetration. Therefore, the screw 1'is wound in the normal direction of rotation, and the screw 1'is
The excavation soil pushes the excavated soil to the ground, and the excavated soil is smoothly discharged to the ground. The rotation is stopped when the amount of soil equivalent to the designed amount of stabilizer injected is discharged.
【0015】図3A,Bは、前記図2の予定深度位置か
ら、攪拌掘削軸2とスクリュー付駆動軸1を地上へ引抜
くまでの段階を示している。このときは前記スクリュー
付駆動軸1を正転方向に回転させ、前記切換バルブ5は
近傍位置の注入孔7への流路を開き、安定材を上部注入
しつつ攪拌混合を行う。かくしてスクリュー付駆動軸1
を抜いた跡に改良体8が出来る。FIGS. 3A and 3B show the steps from the planned depth position of FIG. 2 until the stirring excavation shaft 2 and the drive shaft with screw 1 are pulled out to the ground. At this time, the drive shaft with screw 1 is rotated in the normal direction, the switching valve 5 opens the flow path to the injection hole 7 at a nearby position, and stirs and mixes while injecting the stabilizer upward. Thus, drive shaft with screw 1
Improving body 8 can be made in the mark of pulling out.
【0016】以上をもって2本の1部ラップした改良体
8,8が完成するのであり、以後軟弱地盤の全域に同様
の工程を繰り返して改良処理が進められる。なお、図2
の強制排土の終了後に、図4Aに示したようにスクリュ
ー付駆動軸1を根固め相当の高さ引き揚げつつ撹拌掘削
軸2の上部に設けられた注入孔7から安定材を上部注入
して撹拌混合を行い、次に図4Bに示したようにスクリ
ュー付駆動軸1の回転方向を逆にして下降させつつ予定
深度まで撹拌掘削軸2の先端部に設けられた注入孔7か
ら安定材を先端注入しつつ撹拌混合を行い、以下同工程
を繰り返して根固め部を形成することも実施される。こ
の場合、図2の強制排土の量は少し多めにして自然排土
の発生を未然に防ぐ配慮も必要である。With the above process, the two partially improved bodies 8, 8 are completed, and thereafter, the same process is repeated over the entire area of the soft ground to carry out the improvement treatment. Note that FIG.
After the forced soil removal of No. 3, as shown in FIG. 4A, while stabilizing the drive shaft with screw 1 and lifting it up to a height equivalent to that of the stirring excavation shaft 2, the stabilizer is top-poured through the pouring hole 7 provided at the top of the stirring excavation shaft 2. After stirring and mixing, as shown in FIG. 4B, the rotating direction of the drive shaft with screw 1 is reversed and lowered, and the stabilizer is fed from the injection hole 7 provided at the tip of the stirring excavation shaft 2 to a predetermined depth. It is also possible to perform stirring and mixing while injecting at the tip, and then repeating the same process to form a root-hardening part. In this case, it is also necessary to consider the amount of forced earth removal in FIG.
【0017】[0017]
【本発明が奏する効果】本発明の地盤改良工法及び地盤
改良装置によれば、掘削貫入又は引揚げ攪拌の作用を伴
うことなくスクリュー付駆動軸の回転のみにより設計し
た安定材の注入量に相当する量の土を正確に強制排土す
るので、周辺地盤へ地盤変位等の悪影響を及ぼすことが
なく、無公害の地盤改良が達成される。According to the ground improvement method and the ground improvement apparatus of the present invention, the amount of the stabilizer injected is designed only by the rotation of the drive shaft with the screw without the action of excavation penetration or lifting stirring. Since the amount of soil that can be removed is forcibly discharged forcibly, there is no adverse effect such as ground displacement on the surrounding ground, and pollution-free ground improvement is achieved.
【図1】A〜Cは、本発明による地上から予定深度到達
までの地盤改良を進める工程を示した説明図である。1A to 1C are explanatory views showing a process of advancing ground improvement from the ground surface to reaching a planned depth according to the present invention.
【図2】本発明による予定深度位置に到達したスクリュ
ー付駆動軸で掘削した原位置土を排土する工程を示した
正面図である。FIG. 2 is a front view showing a step of discharging in-situ soil excavated by the drive shaft with a screw that has reached a planned depth position according to the present invention.
【図3】A,Bは、本発明による予定深度到達状態から
攪拌掘削軸を伴うスクリュー付駆動軸を地上に引抜くま
での工程を示した説明図である。FIG. 3A and FIG. 3B are explanatory views showing steps from the state where the planned depth is reached according to the present invention to the step of pulling out the screw-equipped drive shaft with the stirring excavation shaft to the ground.
【図4】A,Bは、軟弱地盤の根固め部を形成する工程
を示した説明図である。4A and 4B are explanatory views showing a process of forming a root consolidation portion of soft ground.
3 攪拌翼 4 掘削カッター 2 攪拌掘削軸 1’ スクリュー 1 スクリュー付駆動軸 7 注入孔 5 切換バルブ 3 stirring blade 4 excavation cutter 2 stirring excavation shaft 1'screw 1 drive shaft with screw 7 injection hole 5 switching valve
─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───
【手続補正書】[Procedure amendment]
【提出日】平成7年11月13日[Submission date] November 13, 1995
【手続補正1】[Procedure amendment 1]
【補正対象書類名】明細書[Document name to be amended] Statement
【補正対象項目名】図1[Correction target item name] Fig. 1
【補正方法】変更[Correction method] Change
【補正内容】[Correction contents]
【図1】A,Bは、本発明による地上から予定深度到達
までの地盤改良を進める工程を示した説明図である。[1] A, B is an explanatory view showing a step of advancing the soil improvement from the ground according to the invention the scheduled depth reached.
Claims (3)
に安定材を注入し該土壌と攪拌混合して軟弱地盤を改良
処理する地盤改良工法において、 攪拌翼と掘削カッターを有する攪拌掘削軸の上端を、正
転貫入回転とは逆巻きのスパイラル状にスクリューを取
り付けられたスクリュー付駆動軸の下端部に接続し、同
スクリュー付駆動軸を正転貫入回転させつつ軟弱地盤中
へ垂直に貫入して安定材を注入することなく地盤の掘削
を行い、掘削が予定深度に到達した段階で、前記スクリ
ュー付駆動軸をその位置で逆回転させて設計された安定
材の注入量に相当する量の原位置土の強制排土を行い、
しかる後、前記スクリュー付駆動軸を貫入時と同じ方向
に回転させつつ前記攪拌掘削軸上部の注入孔から安定材
を注入して攪拌混合しながら引き揚げることを特徴とす
る地盤改良工法。1. A ground improvement method for excavating a soft ground, injecting a stabilizer into an in-situ excavated soil, stirring and mixing with the soil to improve the soft ground, and stirring agitation having a stirring blade and a drilling cutter. The upper end of the shaft is connected to the lower end of a screw-equipped drive shaft that has a screw that is spirally wound in the direction opposite to that of the normal rotation intrusion rotation, and the drive shaft with screw is rotated vertically in the normal rotation and penetrates into soft ground. The ground is excavated without penetrating and injecting stabilizer, and when the excavation reaches the planned depth, it corresponds to the amount of stabilizer injected designed by rotating the drive shaft with screw in reverse at that position. The amount of in-situ soil is forcibly discharged,
Then, the ground improvement method is characterized in that while the drive shaft with screw is rotated in the same direction as when it is penetrated, a stabilizer is injected from an injection hole in the upper part of the stirring excavation shaft, and the mixture is lifted while stirring and mixing.
に安定材を注入し該土壌と攪拌混合して軟弱地盤を改良
処理する地盤改良装置において、 単数又は複数のスクリュー付駆動軸が垂直姿勢を高精度
に保持して回転可能に支持され、同スクリュー付駆動軸
には正転貫入回転に対し逆巻きのスパイラル状にスクリ
ューが取り付けられており、前記スクリュー付駆動軸の
下端部には、下端部に軟弱地盤を掘削する掘削カッター
が取り付けられ、その上方に攪拌翼が水平配置に複数取
り付けられた攪拌掘削軸が一連に接続されており、前記
攪拌掘削軸の先端部及び上方部に安定材を先端注入及び
上部注入する注入孔がそれぞれ設けられていることを特
徴とする、地盤改良装置。2. A ground improvement device for excavating soft ground, injecting a stabilizer into excavated soil at an in-situ position, stirring and mixing with the soil to improve the soft ground, wherein a drive shaft with a screw or screws is provided. It is supported rotatably while maintaining a vertical posture with high precision, and a screw is attached to the same drive shaft with a screw in a spiral shape that is reverse-wound with respect to the forward rotation, and at the lower end of the drive shaft with a screw. , An excavation cutter for excavating soft ground is attached to the lower end, and a plurality of stirring blades with a plurality of stirring blades attached in a horizontal arrangement are connected in series thereabove, at the tip and the upper portion of the stirring excavation shaft. A ground improvement device, characterized in that it is provided with injection holes for injecting the stabilizer at the tip and at the top, respectively.
て攪拌掘削軸の上部位置に、安定材の先端注入と上部注
入の切り換えを可能にする切換バルブが設けられている
ことを特徴とする、地盤改良装置。3. A switching valve is provided above the stirring blade according to claim 2 and above the stirring excavation shaft, the switching valve being capable of switching between tip injection and upper injection of the stabilizer. The ground improvement device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7185167A JP3072409B2 (en) | 1995-07-21 | 1995-07-21 | Ground improvement method and ground improvement device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP7185167A JP3072409B2 (en) | 1995-07-21 | 1995-07-21 | Ground improvement method and ground improvement device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0931970A true JPH0931970A (en) | 1997-02-04 |
| JP3072409B2 JP3072409B2 (en) | 2000-07-31 |
Family
ID=16166011
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP7185167A Expired - Fee Related JP3072409B2 (en) | 1995-07-21 | 1995-07-21 | Ground improvement method and ground improvement device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3072409B2 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000328554A (en) * | 1999-03-17 | 2000-11-28 | Takenaka Doboku Co Ltd | Ground improvement method and ground improvement device |
| US6763335B1 (en) | 1998-09-01 | 2004-07-13 | Canon Kabushiki Kaisha | Purchase request apparatus and system |
| JP2019090261A (en) * | 2017-11-15 | 2019-06-13 | 清水建設株式会社 | Earth removing three-shaft deep mixing treatment device, and three-shaft deep mixing treatment method |
-
1995
- 1995-07-21 JP JP7185167A patent/JP3072409B2/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6763335B1 (en) | 1998-09-01 | 2004-07-13 | Canon Kabushiki Kaisha | Purchase request apparatus and system |
| JP2000328554A (en) * | 1999-03-17 | 2000-11-28 | Takenaka Doboku Co Ltd | Ground improvement method and ground improvement device |
| JP2019090261A (en) * | 2017-11-15 | 2019-06-13 | 清水建設株式会社 | Earth removing three-shaft deep mixing treatment device, and three-shaft deep mixing treatment method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3072409B2 (en) | 2000-07-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101824049B1 (en) | Ground Improving Devive and Ground Improving Method Using The Same | |
| JP4796197B2 (en) | Ground improvement body construction apparatus and ground improvement body construction method | |
| JP3158053U (en) | Ground improvement body construction equipment | |
| JP3024353U (en) | Coexistence prevention structure of excavated soil in ground improvement excavator | |
| JP2003313857A (en) | Agitation equipment for ground improvement machines | |
| JP3072409B2 (en) | Ground improvement method and ground improvement device | |
| JP2576046B2 (en) | Method of forming cured soil | |
| JPH05280035A (en) | Method of improving weak ground and device therefor | |
| JP2014047482A (en) | Ground improvement device, surplus soil discharge inhibitor of ground improvement device, and ground improvement method | |
| JP2002275884A (en) | Soft ground improvement method and pile construction equipment | |
| JP2756870B2 (en) | Soft ground improvement equipment | |
| JP3747338B2 (en) | Ground improvement method | |
| JP3046256B2 (en) | Ground reinforcement method | |
| JPH01310015A (en) | Excavation device | |
| JP3383887B2 (en) | Sediment agitator in the borehole | |
| JP3500415B2 (en) | Ground improvement equipment | |
| JPH08144263A (en) | Ground improvement method | |
| JP4993719B2 (en) | Soil columnar improvement equipment and its control program. | |
| JP3608119B2 (en) | Excavation stirrer for ground improvement | |
| JP3168918B2 (en) | Ground improvement apparatus and method | |
| JP3686252B2 (en) | Drilling and stirring equipment | |
| JPH08158355A (en) | Ground improvement method and ground improvement device | |
| JPH09296440A (en) | Ground improvement equipment | |
| JPH07197445A (en) | Deep mixing processing method | |
| JPH046812B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090602 Year of fee payment: 9 |
|
| LAPS | Cancellation because of no payment of annual fees |