JPH0932351A - Pole for erecting column - Google Patents

Pole for erecting column

Info

Publication number
JPH0932351A
JPH0932351A JP20136695A JP20136695A JPH0932351A JP H0932351 A JPH0932351 A JP H0932351A JP 20136695 A JP20136695 A JP 20136695A JP 20136695 A JP20136695 A JP 20136695A JP H0932351 A JPH0932351 A JP H0932351A
Authority
JP
Japan
Prior art keywords
pole
pillar
rope
column
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20136695A
Other languages
Japanese (ja)
Other versions
JP2879316B2 (en
Inventor
Naomasa Sato
尚正 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOEI KENSETSU KOGYO KK
Original Assignee
TOEI KENSETSU KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOEI KENSETSU KOGYO KK filed Critical TOEI KENSETSU KOGYO KK
Priority to JP20136695A priority Critical patent/JP2879316B2/en
Publication of JPH0932351A publication Critical patent/JPH0932351A/en
Application granted granted Critical
Publication of JP2879316B2 publication Critical patent/JP2879316B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To safely and easily carry out work for erecting and removing a joint type simple column by worker oneself and to facilitate the conveyance thereof to a construction field. SOLUTION: A pole for erecting a column is constituted of a lower pole 5 and an upper pole 6, and the pole is equipped with a pole main body 1 provided so as to make it possible to raise and lower the upper pole 6, fixed bands 2 fixing the pole main body 1 to the lower end side of a lower column, an upper column fitting guide 3, and a hanging up device 4 fastening one end of a rope 23 built between a fixed pulley 21 mounted to the upper end of the upper pole 6 and a moving pulley 22 and pulling the moving pulley 22 upward by pulling the other end on the ground. One end of the rope 12 fastening the other end to the side near to the upper end of the upper pole 6 and passing through the inside of the lower pole 5 is led to the outside from the side opposed to a fastened section of the lower pole, the rope in the lower pole 5 is made to pass through the pulley provided to the lower end of the upper pole, and the upper pole 6 can be raised and lowered by operating the end 12b of the rope to be led to the outside of the lower pole 5.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建設現場などで電線の
簡易引き込み柱や防犯灯用の柱などとして用いられるジ
ョイントタイプの簡易柱を建てるために使用する建柱用
ポールに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pole for a building column used for constructing a joint type simple column used as a simple lead-in column for electric wires or a column for crime prevention light at a construction site.

【0002】[0002]

【従来の技術】建設現場などでは、電線を簡易的に引き
込んだり、防犯灯を簡易的に設置するための簡易柱とし
て、上部柱と下部柱とを現場で接続するジョイントタイ
プの柱を建てることが多い。
2. Description of the Related Art At a construction site, as a simple pillar for simply pulling in an electric wire or simply installing a crime prevention light, a joint-type pillar for connecting an upper pillar and a lower pillar on site is to be built. There are many.

【0003】従来、小型クレーン等の建設機械を使用せ
ずにジョイントタイプの柱を建てるには、予め下端部を
埋設した下部柱に梯子を立てかけ、上部柱の上端側に一
端を締結したロープの他端を梯子の上から作業員が引き
上げ、上部柱の下端部を下部柱の上端部に嵌合させて建
柱していた。
Conventionally, in order to build a joint type pillar without using a construction machine such as a small crane, a ladder is leaned against a lower pillar having a lower end embedded in advance, and one end is fastened to the upper end of the upper pillar. A worker raised the other end from above the ladder, and the lower end of the upper pillar was fitted to the upper end of the lower pillar to build the pillar.

【0004】[0004]

【発明が解決しようとする課題】上述した従来の方法で
は、例えば全長6mの柱を建てる場合には作業員が梯子
に登って地上から3〜4m程度の高さの位置で作業をし
なければならないので危険を伴い、しかも梯子の上から
上部柱を引き上げるには相当な力を要し、作業員の労力
負担も大きい。
In the above-mentioned conventional method, for example, when a pillar having a total length of 6 m is to be built, an operator must climb a ladder and work at a height of about 3 to 4 m from the ground. Since it does not happen, it is dangerous, and it takes a considerable force to pull up the upper pillar from the top of the ladder, and the labor burden on the worker is large.

【0005】また、電線や防犯灯の仮設に使用する簡易
柱は建物等が竣工した後には撤去しなければならない
が、従来は建柱時と同様に柱へ梯子を立てかけて上部柱
を引き上げて下部柱から外し、下部柱は作業員が柱を抱
えて引き抜かなければならず、建柱時と同様の危険や労
力を伴う。特に、下部柱は柱の設置期間が長ければ長い
ほど周囲からの地圧で引き抜きにくくなっていて作業員
の労力負担が大きく、しかも引き抜き作業は作業員が腰
を屈めた状態で行うので、作業員の腰痛等の原因にもな
っている。
Further, the simple pillars used for temporary installation of electric wires and crime prevention lights must be removed after the building is completed, but conventionally, a ladder is erected on the pillar and the upper pillar is pulled up as in the case of a building pillar. The lower pillar is removed from the lower pillar, and the lower pillar must be pulled out by the worker while holding the pillar, and the risk and labor are the same as when building a pillar. In particular, the lower the pillar is, the longer the installation period of the pillar becomes, the more difficult it is to pull out due to the ground pressure from the surroundings, and the labor load on the worker is large, and the pulling out work is done with the worker bent down. It is also a cause of backache and other problems.

【0006】本発明は建設現場などで電線の簡易引き込
み柱などとしてジョイントタイプの簡易柱を建てるにあ
たって、安全かつ容易に建柱が行えるようにすることを
目的としている。
An object of the present invention is to enable a safe and easy construction pillar when constructing a joint type simple pillar such as a simple lead-in pillar for electric wires at a construction site or the like.

【0007】[0007]

【課題を解決するための手段】上述した目的を達成する
ために、本発明の建柱用ポールは上端が開口する中空パ
イプよりなる下部ポールと下部ポールの内径よりも外径
がひとまわり小にして下端側が下部ポール内に挿入され
た上部ポールとよりなり、上部ポールが下部ポールの開
口上端から昇降できるように設けられたポール本体と、
下端側を地中に埋設して立てた下部柱に前記ポール本体
を固定する固定バンドと、ポール本体の前記下部ポール
の上端部に取り付けられ、下部柱の上端部に連結される
上部柱の下部柱への嵌合を案内するための、上部が拡径
するテーパー筒状の上部柱嵌合用のガイドと、前記上部
ポールの上端部に取り付けられた定滑車と、吊り上げよ
うとする柱の上端側に接続する動滑車との間に掛け渡し
た索条の一端を定滑車に止着し、他端を地上で引くこと
により動滑車が上方へ引き上げられるようにした吊上手
段を備え、下部ポールの上端部寄りの側面に一端が止着
されて下部ポール内を通る索条の他端を下部ポールの前
記止着部と反対側の側面から外部に導出し、下部ポール
内の索条を上部ポールの下端に設けた滑車に通し、下部
ポールの外部に導出された索条の端部を操作することに
より上部ポールを昇降可能に設けてなる建柱用ポール。
In order to achieve the above object, a pole for a building column of the present invention has a lower pole made of a hollow pipe having an open upper end and an outer diameter slightly smaller than an inner diameter of the lower pole. And a lower pole side is composed of an upper pole inserted into the lower pole, and the upper pole is provided so that the upper pole can move up and down from the upper opening of the lower pole,
A fixing band that fixes the pole body to a lower pillar that is erected in the ground at the lower end side, and a lower portion of the upper pillar that is attached to the upper end portion of the lower pole of the pole body and is connected to the upper end portion of the lower pillar. A guide for fitting an upper column of a tapered cylindrical shape whose upper portion expands to guide the fitting to the column, a fixed pulley attached to the upper end of the upper pole, and the upper end side of the column to be lifted The lower pole is equipped with hoisting means that fastens the movable pulley to the upper side by fixing one end of the rope suspended between the movable pulley and the fixed pulley to the fixed pulley and pulling the other end on the ground. One end is fastened to the side surface near the upper end of the lower pole, and the other end of the rope that passes through the inside of the lower pole is led out to the outside from the side surface of the lower pole opposite to the fastening portion, and the rope in the lower pole is moved to the upper side. Guide it to the outside of the lower pole by passing it through the pulley installed at the bottom of the pole. Kenbashira pole for formed by providing the upper pole to be movable up and down by operating the end of the rope that is.

【0008】[0008]

【実施例】以下、本発明の具体例を図1〜8に基づいて
詳細に説明する。本発明の建柱用ポールは伸縮可能なポ
ール本体1と、ポール本体を建てようとする柱の下部柱
に締結するための固定バンド2、2と、固定バンド上方
のポール本体に取り付けられる上部柱嵌合用のガイド3
と、上部柱を吊り上げるための吊上手段とで大略構成さ
れている。
EXAMPLES Specific examples of the present invention will now be described in detail with reference to FIGS. The pole for a building pole according to the present invention includes an extendable pole body 1, fixing bands 2 and 2 for fastening to a lower column of a column on which the pole body is to be built, and an upper column attached to the pole body above the fixing band. Mating guide 3
And a hoisting means for hoisting the upper pillar.

【0009】ポール本体1は中空パイプよりなる下部ポ
ール5と下部ポールの内径よりも外径がひとまわり小な
る上部ポール6とよりなり、下部ポールの上端に取り付
けられた段付き筒状のガイドスリーブ7に上部ポールが
案内されて下部ポール5の上端部から昇降自在に突出で
きるようにしたものとしてある。この下部ポール5は内
部に上部ポール6を収納できるよう中空パイプで構成す
るが、上部ポールは中空パイプでも実体ものの棒材でも
よい。
The pole body 1 comprises a lower pole 5 made of a hollow pipe and an upper pole 6 having an outer diameter slightly smaller than the inner diameter of the lower pole, and a stepped tubular guide sleeve attached to the upper end of the lower pole. The upper pole is guided by 7 so that it can be raised and lowered from the upper end of the lower pole 5. The lower pole 5 is formed of a hollow pipe so that the upper pole 6 can be housed therein, but the upper pole may be a hollow pipe or a solid bar.

【0010】ガイドスリーブ7は図2に示すように、大
径部7aが下部ポール5の上端にねじ止めされ、小径部
7bの内面に上部ポール6の外周が摺接するようになっ
ている。
As shown in FIG. 2, a large diameter portion 7a of the guide sleeve 7 is screwed to the upper end of the lower pole 5, and the outer surface of the upper pole 6 is slidably contacted with the inner surface of the small diameter portion 7b.

【0011】上部ポール6は図3に示すような構成によ
り昇降できるようにしてある。上部ポール6の下端部に
は上部ポールの外径よりも車輪の径が若干大なる滑車8
を取り付けてあり、また、下部ポール5の上端寄り側面
にあけた窓9には固定滑車10を設けてある。
The upper pole 6 can be raised and lowered by the structure shown in FIG. At the lower end of the upper pole 6, a pulley 8 having a wheel diameter slightly larger than the outer diameter of the upper pole.
A fixed pulley 10 is provided in a window 9 opened on the side surface of the lower pole 5 near the upper end.

【0012】この固定滑車10と反対側の下部ポール5
側面には孔11をあけてあって、この孔に上部ポール昇
降操作用の索条12の一端をポール内から通し、ポール
外で結び目を作って固定端12aとしてある。索条12
は柔軟性及び引張耐力に富む、例えば合成樹脂繊維を撚
り合わせてなるロープを使用する。この索条12は上部
ポール下端の滑車8、固定滑車10を順に通されて、下
部ポール外に導出されている。
The lower pole 5 on the side opposite to the fixed pulley 10
A hole 11 is formed in the side surface, and one end of a rope 12 for lifting and lowering an upper pole is passed through the hole from inside the pole, and a knot is formed outside the pole to form a fixed end 12a. Line 12
Uses a rope that is rich in flexibility and tensile strength, for example, made by twisting synthetic resin fibers. The cord 12 is led out to the outside of the lower pole by passing through the pulley 8 and the fixed pulley 10 at the lower end of the upper pole in order.

【0013】索条12の遊端12bを引っ張ると、滑車
8を介して上部ポール6が引き上げられ、また、索条を
緩めると上部ポール6は自重で下部ポール内を降下して
索条12を下部ポール内へ引き込むようになっていて、
上部ポールを伸ばした状態で固定したい場合には、索条
の遊端12bを固定バンド2に絡ませて止める。
When the free end 12b of the rope 12 is pulled, the upper pole 6 is pulled up via the pulley 8, and when the rope is loosened, the upper pole 6 descends in the lower pole by its own weight to move the rope 12 up. It is designed to be pulled into the lower pole,
When it is desired to fix the upper pole in a stretched state, the free end 12b of the cord is entwined with the fixed band 2 and stopped.

【0014】なお、固定滑車10の車輪の一部は下部ポ
ール5内に突出していて、索条12が窓9の下縁に触れ
て損傷することがないようになっており、また、滑車8
及び固定滑車10にはそれぞれ索条12が車輪から脱落
しないように外れ止め金具8a、10aを取り付けてあ
る。
A part of the wheels of the fixed pulley 10 projects into the lower pole 5 so that the rope 12 does not come into contact with the lower edge of the window 9 and is damaged.
The stationary pulley 10 is provided with slip-off preventing metal fittings 8a and 10a so that the cord 12 does not drop from the wheel.

【0015】固定バンド2は図4に示すように下部ポー
ル5に取り付けられる固定金具13と、建てようとする
柱の下部柱に固着される締結金具14とよりなり、これ
ら固定金具13及び締結金具14の両側には締付板13
a、13b、14a、14bが突設され、これら締付板
をボルト15、15で締め付けることにより固定金具が
下部ポール5に固定されるとともに、固定金具13と締
結金具14が一体に連結されるようになっている。
As shown in FIG. 4, the fixing band 2 is composed of a fixing metal fitting 13 attached to the lower pole 5 and a fastening metal fitting 14 fixed to the lower pillar of the column to be built. Tightening plates 13 on both sides of 14
a, 13b, 14a, 14b are provided in a protruding manner, and the fastening metal is fixed to the lower pole 5 by tightening these fastening plates with bolts 15, 15, and the fastening metal 13 and the fastening metal 14 are integrally connected. It is like this.

【0016】上部柱嵌合用のガイド3は建てようとする
柱の上部柱を下部柱へ嵌め合わせる際に上部柱の下部を
案内するものとしてあって、下部ポール5に取り付ける
固定金具16と上部柱を案内する受け金具17とよりな
り、受け金具17の両側には締付板16a、16b、1
7a、17bが突設され、これら締付板をボルト18、
18で締め付けることにより固定金具16が下部下部ポ
ール5に固定されるとともに、固定金具16と受け金具
17が一体に連結されるようになっている。
The upper pillar fitting guide 3 guides the lower part of the upper pillar when the upper pillar of the pillar to be built is fitted to the lower pillar. And a tightening plate 16a, 16b, 1
7a and 17b are projected, and these tightening plates are attached to bolts 18,
By fastening with 18, the fixing member 16 is fixed to the lower lower pole 5, and the fixing member 16 and the receiving member 17 are integrally connected.

【0017】吊上手段4は上部ポール6の上端部に固定
された支持板19に取り付けられていて、この支持板1
9は図6、7に示すように固定部19aがボルト止めに
より上部ポールに締結されるようになっており、上部ポ
ールの上端に一端が止着されたステー20によって補強
されている。
The lifting means 4 is attached to a support plate 19 fixed to the upper end of the upper pole 6, and this support plate 1
As shown in FIGS. 6 and 7, the fixing portion 19a of the member 9 is fastened to the upper pole by bolting, and is reinforced by a stay 20 having one end fixed to the upper end of the upper pole.

【0018】吊上手段4はそれぞれ二輪滑車よりなる定
滑車21と動滑車22間に吊上用の索条23を掛け渡し
たものとしてあって、索条23は固定端23aが定滑車
21のホルダ21aに固定され、動滑車22、定滑車2
1をこの順に二往復して下方に延び、遊端23bを引き
下げることにより動滑車22が上方へ引き上げられるよ
うになっている。
The hoisting means 4 comprises a fixed pulley 21 and a moving pulley 22 each of which is a two-wheel pulley, and a rope 23 for hanging is hung between the pulleys 23. The fixed end 23a of the rope 23 is the fixed pulley 21. The movable pulley 22 and the fixed pulley 2 are fixed to the holder 21a.
The movable pulley 22 is pulled upward by reciprocating 1 in this order twice and extending downward, and pulling down the free end 23b.

【0019】この索条23も前述した上部ポール昇降操
作用の索条12と同様に、柔軟性及び引張耐力に富む、
例えば合成樹脂繊維を撚り合わせてなるロープを使用す
る。動滑車22のホルダ22aには上部柱P2を吊り下
げるための接続具24を着脱自在に取り付けてあり、こ
の接続具は図6、8に示すように上部柱P2の外径より
も内径がひとまわり大なる保持環25の両側に突出板部
25a、25bが形成され、これら各突出板部に固定さ
れたリング26、26に紐27の両端を結び付け、ま
た、紐27には連結環28を通してある。この連結環2
8は環の一部が開閉自在なものとしてあって、動滑車2
2のホルダ22aに着脱自在に取り付けられる。
Like the above-mentioned rope 12 for lifting and lowering the upper pole, the rope 23 is also excellent in flexibility and tensile strength.
For example, a rope formed by twisting synthetic resin fibers is used. A connecting tool 24 for suspending the upper pillar P2 is detachably attached to the holder 22a of the movable pulley 22, and this connecting tool has an inner diameter larger than the outer diameter of the upper pillar P2 as shown in FIGS. Protruding plate portions 25a and 25b are formed on both sides of the holding ring 25 that is large, and both ends of the string 27 are tied to the rings 26 and 26 fixed to these projecting plate portions, and the connecting ring 28 is passed through the string 27. is there. This connecting ring 2
8 is a part of the ring that can be opened and closed.
It is detachably attached to the second holder 22a.

【0020】上部柱P2を吊り上げる際には、上部柱の
上端部に予め取り付けられた電線配設用の引留金具30
に保持環25が下方から引っ掛かって上部P2を吊り上
げるようになっている。
When the upper pillar P2 is hoisted, the straining fitting 30 for arranging the electric wire, which is previously attached to the upper end portion of the upper pillar, is provided.
The holding ring 25 is hooked from below to lift the upper part P2.

【0021】次に上述のように構成された建柱用ポール
を用いてジョイントタイプの柱を建てる際の建柱用ポー
ルの操作及び動作を図9〜12に基づいて建柱工程順に
説明する。
Next, the operation and operation of the building pole for constructing a joint type pillar using the pole for the building pillar constructed as described above will be explained in the order of the building pillar process with reference to FIGS.

【0022】<建柱工程1>地面29に穴を掘って下部
柱P1の下部を埋め、下部柱を垂直に立て、この下部柱
P1の側部に上部ポールが収納された状態の建柱用ポー
ルを立てて固定バンド2、2を締結する(図9)。
<Building pillar process 1> For a building pillar in which a hole is dug in the ground 29 to fill the lower part of the lower pillar P1, the lower pillar is erected vertically, and the upper pole is housed on the side of the lower pillar P1. Set up the pole and fasten the fixed bands 2 and 2 (Fig. 9).

【0023】<建柱工程2>上部ポール昇降操作用の索
条の遊端12bを引き下げると、上部ポールが上方へ伸
ばされ、上部ポールがいっぱいに伸びた状態でこの索条
の遊端12bを上側の固定バンド2の固定金具13と締
結金具14の間に絡めて止める。次いで吊上手段4の索
条23を緩めると動滑車22が降下させられ、上部柱P
2に接続具24の保持環25を嵌めた接続具の連結環2
8を、降下した動滑車22のホルダ22aに接続する
(図10)。
<Construction column process 2> When the free end 12b of the rope for lifting and lowering the upper pole is pulled down, the upper pole is extended upward, and the free end 12b of the rope is extended with the upper pole fully extended. Tighten between the fixing metal fitting 13 and the fastening metal fitting 14 of the upper fixing band 2 and stop. Then, when the rope 23 of the lifting means 4 is loosened, the moving pulley 22 is lowered, and the upper pillar P
A connecting ring 2 of a connecting tool in which a retaining ring 25 of the connecting tool 24 is fitted to the 2
8 is connected to the holder 22a of the moving pulley 22 which has been lowered (FIG. 10).

【0024】なお、動滑車に軽量のものを使用した場合
には動滑車22を降下させる際、索条23を緩めただけ
では動滑車が降りてこないことがあるが、この場合には
動滑車のホルダから引き降ろし用の紐を下げておいて、
この紐を引っ張って動滑車を降ろすようにする。
When a lightweight pulley is used as the movable pulley, when the movable pulley 22 is lowered, the movable pulley may not come down only by loosening the rope 23. In this case, however, the movable pulley is not lowered. Put down the string for pulling down from the holder of
Try pulling this string and letting down the moving pulley.

【0025】<建柱工程3>索条23を引っ張ると、動
滑車が上方へ引き上げられ、上部柱P2は接続具24に
保持されて下部柱P1の上方へ吊り上げられる(図1
1)。
<Building column process 3> When the rope 23 is pulled, the movable pulley is pulled up, the upper column P2 is held by the connector 24, and is hung above the lower column P1 (FIG. 1).
1).

【0026】<建柱工程4>上部柱P2を下部柱P1の
上方に吊り上げたら索条23を緩めて上部柱P2を徐々
に降ろす。上部柱の下端部はガイド3に案内されて下部
柱の上端部へ導かれ、上部柱下端部の嵌合穴部P2aと
下部柱P1の上端部の連結凸部P1aとが嵌合する(図
12)。
<Construction Column Step 4> After the upper pillar P2 is lifted above the lower pillar P1, the rope 23 is loosened and the upper pillar P2 is gradually lowered. The lower end of the upper pillar is guided by the guide 3 and guided to the upper end of the lower pillar, and the fitting hole P2a at the lower end of the upper pillar and the connecting projection P1a at the upper end of the lower pillar P1 are fitted to each other (Fig. 12).

【0027】<建柱工程5>建柱が終了した後は索条2
3を完全に緩め、接続具24を上部柱に沿って降ろして
柱から外し、次いで固定バンド2、2を下部柱P1から
外す。固定バンドを外したらポール本体1を立てた状態
のままで索条12を緩め、上部ポール6を降ろして下部
ポール5内に収納する。
<Building pillar process 5> After the building pillar is finished, the rope 2
3 is completely loosened, the fitting 24 is lowered along the upper column and removed from the column, and then the fixing bands 2, 2 are removed from the lower column P1. After removing the fixing band, the rope 12 is loosened while the pole body 1 is standing upright, and the upper pole 6 is lowered and stored in the lower pole 5.

【0028】本発明の建柱用ポールは上述した操作によ
りジョイントタイプの柱を容易に建柱することができる
が、本発明のものは建柱時だけでなく、柱を撤去する際
にも使用でき、以下柱を撤去する際の建柱用ポールの操
作及び動作を図13、14に基づいて撤去工程順に説明
する。なお、撤去工程においては上部柱嵌合用のガイド
3は不要なので、予めポール本体から取り外しておく。
The building pole of the present invention allows a joint type pillar to be easily erected by the above-mentioned operation. However, the present invention pole is used not only for building a pillar but also for removing a pillar. The operation and operation of the building pole when removing the pillar will be described below in the order of the removing process with reference to FIGS. Since the guide 3 for fitting the upper column is unnecessary in the removing process, it is removed from the pole body in advance.

【0029】<撤去工程1>建柱工程時と同様に固定バ
ンド2、2を下部柱P1に締結固定し、上部ポール昇降
用の索条12の遊端12bを引き、上部ポールを伸ばし
て遊端12bを固定バンド2に絡めて止着する。次いで
吊上手段4の索条23を緩め、動滑車22に上部柱P2
に嵌めた接続具24を接続して索条23を引く。
<Removal Step 1> As in the building pillar step, the fixing bands 2 and 2 are fastened and fixed to the lower pillar P1, the free end 12b of the rope 12 for lifting the upper pole is pulled, and the upper pole is extended to play. The end 12b is entwined with the fixing band 2 and fixed. Next, the rope 23 of the lifting means 4 is loosened, and the moving pulley 22 is attached to the upper pillar P2.
The connection tool 24 fitted to the above is connected and the cord 23 is pulled.

【0030】上部柱P2が吊り上げられて、嵌合穴部P
2aが下部柱の嵌合凸部P1aから外れたら索条23を
揺らして上部柱の下端部を下部柱の上方からずらし、索
条23を緩めて上部柱を地上に降ろす。上部柱を地上に
降ろしたら上部柱から接続具24及び電線配設用の引留
金具29を取り外す。
The upper pillar P2 is lifted up and the fitting hole P is
When 2a is disengaged from the fitting protrusion P1a of the lower pillar, the rope 23 is shaken to shift the lower end of the upper pillar from above the lower pillar, loosen the rope 23, and lower the upper pillar to the ground. When the upper pillar is lowered to the ground, the connector 24 and the electric wire disposing anchor 29 are removed from the upper pillar.

【0031】なお、この上部柱を撤去する工程は、前述
した建柱工程2〜5の上部柱を下部柱に嵌合させる工程
と逆の手順である。
The step of removing the upper pillar is the reverse of the step of fitting the upper pillar to the lower pillar in the building pillar steps 2 to 5 described above.

【0032】<撤去工程2>前工程で上部柱から取り外
した接続具の保持環25を下部柱P1に嵌め、同じく上
部柱から取り外した引留金具30を保持環25の上方に
固定する(図13)。
<Removal Step 2> The retaining ring 25 of the connector removed from the upper column in the previous step is fitted to the lower column P1, and the retractable metal fitting 30 also removed from the upper column is fixed above the retaining ring 25 (FIG. 13). ).

【0033】<撤去工程3>固定バンド2、2の締結金
具14側のボルト15を緩め、索条23を引いて下部柱
P1を引き抜く(図14)。
<Removal Step 3> Loosen the bolts 15 of the fixing bands 2 and 2 on the side of the fastener 14 and pull out the cord 23 to pull out the lower pillar P1 (FIG. 14).

【0034】下部柱を引き抜いたらポール本体1と下部
柱P1を作業員が抱え、上部ポール昇降操作用の索条1
2を緩めて上部ポール6を下部ポール5内に収納し、ポ
ール本体1と下部柱P1をともに地上に倒す。
After pulling out the lower pillar, the operator holds the pole body 1 and the lower pillar P1 and the rope 1 for lifting and lowering the upper pole.
2 is loosened, the upper pole 6 is stored in the lower pole 5, and the pole body 1 and the lower pillar P1 are both laid down on the ground.

【0035】上述した撤去工程により、地圧によって引
き抜きにくくなった下部柱をも容易に引き抜くことがで
き、しかも作業員一人で撤去作業を行える。また、引き
抜き作業は作業員が腰を伸ばした状態で行えるので、作
業員の労力負担を格段に軽減することができる。
By the above-described removal process, the lower pillar, which is difficult to pull out due to the ground pressure, can be easily pulled out, and the removal work can be performed by one worker. Further, since the pulling out work can be performed with the worker's waist extended, the labor load on the worker can be remarkably reduced.

【0036】なお、上述した実施例では上部ポール昇降
操作用の索条12や吊上手段4の索条23を作業員が手
で引っ張るようにしてあるが、ポール本体1に小型の手
動または電動のウインチ等の巻上機を取り付け、この巻
上機により索条を引っ張るようにしてもよい。
Although the operator pulls the rope 12 for lifting and lowering the upper pole and the rope 23 of the hoisting means 4 by hand in the above-described embodiment, the pole main body 1 is provided with a small manual or electric motor. A winch or other hoisting machine may be attached and the rope may be pulled by this hoisting machine.

【0037】また、上述した実施例では吊上手段4の動
滑車22及び定滑車21を二輪滑車で構成してあるが、
これらの滑車の車輪の数によって索条23を引っ張る力
と長さが決まるので、例えば建てようとする柱が軽量の
ものであって吊り上げを素早く行いたい場合には一輪の
滑車を使用してもよいし、逆に建てようとする柱の重量
が大であったり、柱の撤去の際、下部柱が引き抜きにく
かったりした場合にはこれらの滑車に三輪や四輪のもの
使用して吊上操作を軽快に行えるようにしてもよい。
In the above-mentioned embodiment, the moving pulley 22 and the constant pulley 21 of the lifting means 4 are two-wheel pulleys.
The number of wheels of these pulleys determines the pulling force and length of the rope 23. For example, if the column to be built is lightweight and you want to lift it quickly, use a single pulley. On the contrary, if the weight of the pillar to be built is heavy, or if the lower pillar is difficult to pull out when removing the pillar, use a three-wheel or four-wheel pulley for these hoisting operations. May be performed lightly.

【0038】[0038]

【発明の効果】本発明に係る建柱用ポールは上述した構
成のものとしてあるので、次の効果を奏し得る。本発明
の建柱用ポールは、建柱作業、撤去作業ともに操作は作
業員が地上で行うことができ、従来のように作業員が高
所に登る必要がないので、安全かつ容易に建柱、撤去を
行うことができる。
Since the pole for a building pillar according to the present invention has the above-mentioned structure, the following effects can be obtained. The pole for a building pillar of the present invention allows the operator to perform both the building pillar work and the removal work on the ground, and it is not necessary for the worker to climb to a high place as in the past, so the pillar can be safely and easily installed. , Can be removed.

【0039】また、建柱、撤去時の上部柱の吊り上げ操
作や撤去時の下部柱の引き抜き操作は動滑車を介した索
条を引くことによって行うので、索条を引くのに要する
力は、例えば動滑車及び定滑車が二輪のものである場合
には柱の重量の4分の1で済み、また、作業員は地上に
真っ直ぐ立った姿勢で索条を引くことにより建柱及び撤
去の作業を行うことができるので腰に負担が掛からず、
作業員の労力負担を格段に軽減することができる。さら
に、これらの建柱、撤去作業を行うのに一人の作業員で
事が足り、施工コストを低減できる。
Further, since the lifting operation of the building pillar and the upper pillar at the time of removal and the pulling operation of the lower pillar at the time of removal are performed by pulling the rope through the movable pulley, the force required to pull the rope is For example, if the movable pulley and the fixed pulley are two-wheeled ones, the weight of the pillar is one-fourth, and the worker pulls the rope in a straight standing position on the ground to remove the building pillar and remove it. Can be done without straining the waist,
The labor burden on workers can be significantly reduced. Furthermore, one worker is sufficient to perform these building pillars and removal work, and the construction cost can be reduced.

【0040】また、本発明の建柱用ポールは上部ポール
が昇降できるようにしてあり、上部ポールを下部ポール
内に収納できるので、作業現場への運搬や狭い作業現場
への搬入が容易である。しかも上部ポールを昇降させる
ための構成要素は操作用の索条を除いて下部ポール内に
設けてあるので、これら上部ポール昇降用の構成要素が
吊上手段の索条を操作する際に邪魔にならず、操作が容
易である。
Further, in the pole for a building pillar of the present invention, the upper pole can be moved up and down, and the upper pole can be stored in the lower pole, so that it can be easily transported to a work site or a narrow work site. . Moreover, since the components for raising and lowering the upper pole are provided inside the lower pole except for the rope for operation, these components for raising and lowering the upper pole interfere with the operation of the rope of the lifting means. In addition, the operation is easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る建柱用ポールの正面図。FIG. 1 is a front view of a building pole according to the present invention.

【図2】ポール本体のガイドスリーブ部を拡大して示す
一部破断正面図。
FIG. 2 is a partially cutaway front view showing an enlarged guide sleeve portion of the pole body.

【図3】上部ポールの昇降機構を示す縦断正面図。FIG. 3 is a vertical sectional front view showing a lifting mechanism for an upper pole.

【図4】固定バンドを示す平面図。FIG. 4 is a plan view showing a fixing band.

【図5】上部柱嵌合用のガイドを示す平面図。FIG. 5 is a plan view showing a guide for fitting an upper column.

【図6】吊上手段を示す側面図。FIG. 6 is a side view showing a lifting means.

【図7】吊上手段をポール本体に取り付ける支持板の平
面図。
FIG. 7 is a plan view of a support plate for attaching the lifting means to the pole body.

【図8】接続具の保持環を示す(a) は正面図、(b) は平
面図。
FIG. 8A is a front view and FIG. 8B is a plan view showing a retaining ring of a connector.

【図9】建柱工程1における本発明の建柱用ポールの状
態を示す正面図。
FIG. 9 is a front view showing a state of the building pole of the present invention in the building pillar process 1.

【図10】建柱工程2における本発明の建柱用ポールの
状態を示す正面図。
FIG. 10 is a front view showing a state of a pole for a building pillar of the present invention in a building pillar process 2.

【図11】建柱工程3における本発明の建柱用ポールの
状態を示す正面図。
FIG. 11 is a front view showing a state of the building pole of the present invention in the building pillar process 3.

【図12】建柱工程4における本発明の建柱用ポールの
状態を示す正面図。
FIG. 12 is a front view showing a state of a pole for a building column of the present invention in a building column process 4.

【図13】撤去工程2における本発明の建柱用ポールの
状態を示す正面図。
FIG. 13 is a front view showing a state of the building pole of the present invention in the removing step 2.

【図14】撤去工程3における本発明の建柱用ポールの
状態を示す正面図。
FIG. 14 is a front view showing the state of the building pole of the present invention in the removing step 3.

【符号の説明】[Explanation of symbols]

1 ポール本体 2 固定バンド 3 ガイド 4 吊上手段 5 下部ポール 6 上部ポール 7 ガイドスリーブ 8 滑車 8a 外れ止め金具 9 窓 10 固定滑車 10a 外れ止め金具 11 孔 12 索条 12a 固定端 12b 遊端 13 固定金具 13a、13b 締付板 14 締結金具 14a、14b 締付板 15 ボルト 16 固定金具 16a、16b 締付板 17 受け金具 17a、17b 締付板 18 ボルト 19 支持板 20 ステー 21 定滑車 21a ホルダ 22 動滑車 22a ホルダ 23 索条 23a 固定端 23b 遊端 24 接続具 25 保持環 25a 突出板 26 リング 27 紐 28 連結環 29 地面 30 引留金具 P1 下部柱 P1a 嵌合用凸部 P2 上部柱 P2a 嵌合用穴部 1 Pole Main Body 2 Fixed Band 3 Guide 4 Lifting Means 5 Lower Pole 6 Upper Pole 7 Guide Sleeve 8 Pulley 8a Detachment Metal Fitting 9 Window 10 Fixed Pulley 10a Detachment Metal Fitting 11 Hole 12 Rope 12a Fixed End 12b Free End 13 Fixing Metal Fitting 13a, 13b Tightening plate 14 Tightening metal fittings 14a, 14b Tightening metal plate 15 Bolts 16 Fixing metal fittings 16a, 16b Tightening plates 17 Receiving metal fittings 17a, 17b Tightening plates 18 Bolts 19 Support plates 20 Stays 21 Constant pulleys 21a Holders 22 Moving pulleys 22a holder 23 rope 23a fixed end 23b free end 24 connector 25 retaining ring 25a protruding plate 26 ring 27 string 28 connecting ring 29 ground 30 retaining metal P1 lower pillar P1a fitting convex portion P2 upper pillar P2a fitting hole portion

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】(a) 上端が開口する中空パイプよりなる下
部ポールと下部ポールの内径よりも外径がひとまわり小
にして下端側が下部ポール内に挿入された上部ポールと
よりなり、上部ポールが下部ポールの開口上端から昇降
できるように設けられたポール本体 (b) 下端側を地中に埋設して立てた下部柱に前記ポール
本体を固定する固定バンド (c) ポール本体の前記下部ポールの上端部に取り付けら
れ、下部柱の上端部に連結される上部柱の下部柱への嵌
合を案内するための、上部が拡径するテーパー筒状の上
部柱嵌合用のガイド (d) 前記上部ポールの上端部に取り付けられた定滑車
と、吊り上げようとする柱の上端側に接続する動滑車と
の間に掛け渡した索条の一端を定滑車に止着し、他端を
地上で引くことにより動滑車が上方へ引き上げられるよ
うにした吊上手段を備え、 (e) 下部ポールの上端部寄りの側面に一端が止着されて
下部ポール内を通る索条の他端を下部ポールの前記止着
部と反対側の側面から外部に導出し、下部ポール内の索
条を上部ポールの下端に設けた滑車に通し、下部ポール
の外部に導出された索条の端部を操作することにより上
部ポールを昇降可能に設けてなる建柱用ポール。
1. An upper pole, comprising: (a) a lower pole made of a hollow pipe having an open upper end, and an upper pole having an outer diameter slightly smaller than the inner diameter of the lower pole and the lower end inserted into the lower pole. The pole body is provided so that it can move up and down from the upper end of the lower pole opening. (B) A fixed band that secures the pole body to the lower pillar that is erected by burying the lower end side in the ground. (C) The lower pole of the pole body. A guide for fitting the upper pillar, which is attached to the upper end of the upper pillar and is connected to the upper end of the lower pillar, to the fitting of the upper pillar to the lower pillar. (D) Fasten one end of the rope suspended between the fixed pulley attached to the upper end of the upper pole and the moving pulley connected to the upper end of the column to be hoisted to the fixed pulley, and the other end on the ground. Pull the movable pulley upward by pulling (E) One end of the rope is fastened to the side surface near the upper end of the lower pole and the other end of the line passing through the lower pole is located on the side opposite to the fastening portion of the lower pole. The upper pole so that it can be moved up and down by operating the end of the rope that is led to the outside of the lower pole. The pole for the building pillar.
JP20136695A 1995-07-14 1995-07-14 Pole for building pole Expired - Lifetime JP2879316B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20136695A JP2879316B2 (en) 1995-07-14 1995-07-14 Pole for building pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20136695A JP2879316B2 (en) 1995-07-14 1995-07-14 Pole for building pole

Publications (2)

Publication Number Publication Date
JPH0932351A true JPH0932351A (en) 1997-02-04
JP2879316B2 JP2879316B2 (en) 1999-04-05

Family

ID=16439871

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20136695A Expired - Lifetime JP2879316B2 (en) 1995-07-14 1995-07-14 Pole for building pole

Country Status (1)

Country Link
JP (1) JP2879316B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19946060A1 (en) * 1999-09-25 2001-04-26 Abb Patent Gmbh Method and device for raising and / or restoring masts
CN102425328A (en) * 2011-09-23 2012-04-25 四川省电力公司自贡电业局 Special wire taking hook for assembled electric pole
JP2012209989A (en) * 2011-03-29 2012-10-25 Sanki Eng Co Ltd Lightning rod removing method and lightning rod removing jig
KR200497261Y1 (en) * 2023-02-16 2023-09-13 한전케이피에스 주식회사 Lift Device of Transmission line Powered Spacer Car

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19946060A1 (en) * 1999-09-25 2001-04-26 Abb Patent Gmbh Method and device for raising and / or restoring masts
JP2012209989A (en) * 2011-03-29 2012-10-25 Sanki Eng Co Ltd Lightning rod removing method and lightning rod removing jig
CN102425328A (en) * 2011-09-23 2012-04-25 四川省电力公司自贡电业局 Special wire taking hook for assembled electric pole
KR200497261Y1 (en) * 2023-02-16 2023-09-13 한전케이피에스 주식회사 Lift Device of Transmission line Powered Spacer Car

Also Published As

Publication number Publication date
JP2879316B2 (en) 1999-04-05

Similar Documents

Publication Publication Date Title
KR102172332B1 (en) Safety device for electric pole work
CN101436764B (en) Crossover stringing method for overhead line and stringing sheave pulley
CN103470093B (en) Concrete chimney dismantling method
JP2021046781A (en) Assembled frame of temporary building
CN116969352A (en) Self-climbing lifting device and lifting method
JPH0932351A (en) Pole for erecting column
CN106245984B (en) Jack up Multifunctional creeping gin pole
JPH1066214A (en) Device and method for fitting metallic wheel for supporting wire
JPH0769585A (en) Crane boom assembly
JP2002061420A (en) Device for erecting and recovering temporary utility pole
JP3889357B2 (en) Concrete pole lifting base device and concrete column cutting and recovery method using the same
JP3069315B2 (en) Work method and device for leaderless auger
JP2981729B2 (en) Pillar removal tool
JPH1094125A (en) Support device for sheave device
JPH09279518A (en) King post used for cable trust bridge and its construction method
KR200294095Y1 (en) a connection structure of crane hook
CN218124155U (en) Draw gear for laying indoor high-place cable
JP3822868B2 (en) Shaft handling equipment
JP2016023021A (en) Column lifting tool and method of using the same
JPH04210710A (en) Concurrently removing method for hanging wire on post and aerial cable, and hanging wire removing tool
CN211496683U (en) Electric and manual dual-purpose mounting crane for railway signal machine
JP3079159U (en) Cylindrical safety fence for construction holes
JP2903394B2 (en) Pillar holding device
JPH06261430A (en) Stretching method for cable, etc., and fitting device for metal pulley for stretching cable, etc.
JP2591690B2 (en) Hoisting winch for reinforcement ring