JPH0932452A - Earth anchor construction method - Google Patents
Earth anchor construction methodInfo
- Publication number
- JPH0932452A JPH0932452A JP18409395A JP18409395A JPH0932452A JP H0932452 A JPH0932452 A JP H0932452A JP 18409395 A JP18409395 A JP 18409395A JP 18409395 A JP18409395 A JP 18409395A JP H0932452 A JPH0932452 A JP H0932452A
- Authority
- JP
- Japan
- Prior art keywords
- casing
- water
- tip
- pipe
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 72
- 238000000034 method Methods 0.000 claims description 10
- 238000007596 consolidation process Methods 0.000 claims description 2
- 238000005507 spraying Methods 0.000 claims description 2
- 238000007599 discharging Methods 0.000 claims 1
- 238000005553 drilling Methods 0.000 abstract description 20
- 239000004576 sand Substances 0.000 abstract description 13
- 238000005243 fluidization Methods 0.000 abstract 1
- 238000009412 basement excavation Methods 0.000 description 5
- 239000003673 groundwater Substances 0.000 description 5
- 238000007664 blowing Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000003809 water extraction Methods 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明はアースアンカー施工
法に関し、更に詳細には例えば山留め支保工とするアー
スアンカーを形成する方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of constructing an earth anchor, and more particularly to a method of forming an earth anchor for a mountain retaining support.
【0002】[0002]
【従来の技術】大規模掘削に伴う山留めの支保工とし
て、近年、アースアンカー工法が用いられることが多
い。このアースアンカー工法には多種多様な工法があ
る。その中でも被圧(地下水圧)下でのアンカー工法と
しては、単管式削孔掘削工法が主である。2. Description of the Related Art In recent years, an earth anchor construction method has been often used as a support for a mountain cleat associated with large-scale excavation. There are various construction methods for this earth anchor construction method. Among them, the single pipe drilling method is the main anchor method under pressure (groundwater pressure).
【0003】この単管式削孔掘削工法では、図2に示さ
れるように先端部にビット1が設けられた筒状のケーシ
ング2を回転させて掘削し、ケーシング2内部へポンプ
(図示せず)を使って圧送した水をケーシング先端のビ
ット1から噴出させ、削孔水をケーシング2外側周囲の
余掘り3を通って排出させるようにしていた。In this single pipe drilling excavation method, as shown in FIG. 2, a cylindrical casing 2 having a bit 1 at its tip is rotated for excavation, and a pump (not shown) is inserted into the casing 2. ) Was used to eject water from the bit 1 at the tip of the casing, and the drilling water was discharged through the overditch 3 around the outside of the casing 2.
【0004】[0004]
【発明が解決しようとする課題】前述した従来の単管式
削孔掘削工法は、被圧の低い地盤では能率も上がり有効
である。しかしながら、単管式削孔掘削工法では余堀り
が大きいことから高被圧下で砂層又は砂礫層に遭遇する
と地盤の流動性が極めて高いため土砂の流出を止められ
なくなると言う問題が起こる。そのため、単管式削孔掘
削工法は、高被圧下ではあまり使用されていない。ま
た、被圧が低くても地盤が砂層又は砂礫層である場合は
あまり使用されない。The above-mentioned conventional single pipe drilling method is effective and effective in the ground where the pressure is low. However, in the single pipe drilling method, there is a problem that the outflow of earth and sand cannot be stopped when the sand layer or gravel layer is encountered under high pressure due to the large amount of excess excavation because the ground fluidity is extremely high. Therefore, the single pipe drilling method is not often used under high pressure. Further, even if the pressure is low, it is not often used when the ground is a sand layer or a gravel layer.
【0005】そこで、被圧が大きい場合、或いは地盤が
砂層又は砂礫層の場合でも土砂の流出が起こらない二重
管式の削孔掘削機を用いたアースアンカー施工法が考え
られた。この二重管式削孔掘削機は、図3に示されるよ
うに先端部にビット4が設けられた筒状のケーシング5
と、このケーシング5の中心軸線上に配置され、且つ水
を噴射させる先端開口部6aがケーシング5の先端ビッ
ト4とほぼ同じ面に位置するように設置された送水管6
とから概略的に構成されている。Therefore, a ground anchor construction method using a double pipe type drilling excavator in which no outflow of sediment occurs even when the pressure is large or the ground is a sand layer or a gravel layer has been considered. As shown in FIG. 3, this double-pipe type drilling excavator has a cylindrical casing 5 having a bit 4 at its tip.
And a water supply pipe 6 arranged on the central axis of the casing 5 and installed such that a tip opening 6a for injecting water is located on substantially the same plane as the tip bit 4 of the casing 5.
It is composed of and.
【0006】ケーシング5の後端部には閉塞端板7が連
結されており、この閉塞端板7には泥水取出管8が形成
されている。送水管6は閉塞端板7を通過して外部へ伸
長し、送水ポンプ等の送水源(図示せず)に接続されて
いる。A closed end plate 7 is connected to the rear end of the casing 5, and a muddy water discharge pipe 8 is formed in the closed end plate 7. The water supply pipe 6 extends through the closed end plate 7 to the outside and is connected to a water supply source (not shown) such as a water supply pump.
【0007】このような二重管式の削孔掘削機を用いた
アースアンカー施工法によると、ケーシング5を回転し
て先端のビット4で地盤Gを掘削し、切り崩した土砂に
送水管6の先端開口部6aから噴射した水を吹き付けて
泥水とし、この泥水をケーシング5の後端部の閉塞端板
7に設けられた泥水取出管8で外へ取り出し、これによ
り土砂の実質的搬出を行う。一般に、アースアンカーは
約20m〜30mの長さであり、ケーシングを複数本継
ぎ足して行くことで所定長さの削孔を掘削する。このよ
うにして所定長さの削孔が形成された後、削孔掘削機を
撤去してコンクリートを充填しアースアンカーを形成す
る。According to the earth anchor construction method using such a double pipe type drilling excavator, the casing 5 is rotated to excavate the ground G with the bit 4 at the tip, and the water pipe 6 is cut into the cut soil. Water sprayed from the tip opening 6a is sprayed into muddy water, and this muddy water is taken out by a muddy water discharge pipe 8 provided in the closed end plate 7 at the rear end of the casing 5, thereby substantially carrying out earth and sand. . Generally, the earth anchor has a length of about 20 m to 30 m, and a plurality of casings are added to drill a drilling hole having a predetermined length. After the drilling of a predetermined length is formed in this way, the drilling excavator is removed and concrete is filled to form a ground anchor.
【0008】このような二重管式削孔掘削機を用いたア
ースアンカー施工法によれば、当然ながら単管式のよう
にケーシング回りからの土砂噴出はなく、砂層又は砂礫
層でも削孔掘削が可能となる。しかし、従来の二重管式
削孔掘削機を用いたアースアンカー施工法では、高被圧
の砂層や砂礫層に遭遇した場合において、例えばケーシ
ング5を継ぎ足す時に閉塞端板7を取り外すと、被圧が
高いために先行ケーシング5の先端開放部から砂礫が土
砂となって吹き出し、容易に止められないと言う問題が
あった。According to the earth anchor construction method using such a double pipe type hole excavator, naturally, unlike the single pipe type, there is no spouting of earth and sand around the casing, and the sand layer or gravel layer is used for excavating holes. Is possible. However, in the conventional ground anchor construction method using the double pipe type drilling excavator, when the sand layer or the gravel layer of high pressure is encountered, for example, when the closed end plate 7 is removed when the casing 5 is added, Since the pressure is high, there is a problem that the gravel becomes blown out from the open end portion of the preceding casing 5 and is not easily stopped.
【0009】本発明の目的は、かかる従来の問題点を解
決するためになされたもので、砂層や砂礫層の高被圧地
盤に削孔を掘削する場合においても、ケーシングを継ぎ
足す時に先行ケーシングから砂礫が土砂となって吹き出
すことのないアースアンカー施工法を提供することにあ
る。The object of the present invention is to solve the above-mentioned conventional problems. Even when excavating a hole in a high pressure ground of a sand layer or a gravel layer, the preceding casing is added when the casing is replenished. The purpose is to provide a method of constructing an earth anchor that prevents gravel from becoming sand and blowing out.
【0010】[0010]
【課題を解決するための手段】本発明はアースアンカー
施工法であり、前述した技術的課題を解決するために以
下のように構成されている。すなわち、本発明のアース
アンカー施工法は、先端にビットを設けたケーシングを
回転させながら地中を前進させること、前記ケーシング
の前進中このケーシング内に配置された送水管もその先
端の水噴出開口が前記ケーシングの前記先端ビットより
軸方向内方に位置するようにして共に前進させ、前記ケ
ーシングの先端内部に常時地盤の圧密部を形成するこ
と、前記送水管先端の前記水噴出開口から水を噴射し、
前記圧密部の内表面に吹き付けて順次崩して流動化する
こと、流動化された泥水を前記ケーシング内における送
水管外周空間部を通って外部へ排出すること、このよう
にして削孔を形成する際、必要に応じてケーシング及び
送水管を継ぎ足して所定の長さのアースアンカー用削孔
を形成すること、次いで前記ケーシング内から前記送水
管を除去してコンクリートを充填することから構成され
る。The present invention is a ground anchor construction method, and is configured as follows in order to solve the above-mentioned technical problems. That is, according to the earth anchor construction method of the present invention, the casing having a bit at the tip is rotated to advance in the ground, and the water pipe arranged in this casing is also water jetting opening at the tip during the advance of the casing. Are forwarded together so as to be located axially inward of the tip bit of the casing to constantly form a consolidating part of the ground inside the tip of the casing, and water is discharged from the water ejection opening at the tip of the water pipe. Jetting,
Spraying on the inner surface of the consolidating portion to sequentially collapse and fluidize, and fluidized mud water is discharged to the outside through the outer space of the water pipe in the casing, thus forming a hole. At this time, if necessary, the casing and the water supply pipe are replenished to form a ground anchor drilling hole of a predetermined length, and then the water supply pipe is removed from the inside of the casing and filled with concrete.
【0011】このように構成される本発明のアースアン
カー施工法によると、ケーシングの先端部が送水管先端
の水噴出開口位置より突出しているため、ケーシングを
回転しながら地盤に削孔を形成しつつ送水管から水を噴
出して土砂を閉塞端板に設けられた泥水取出管から排出
する時、ケーシング先端内部には圧密部が形成されてい
る。According to the earth anchor construction method of the present invention thus constructed, since the tip of the casing projects from the water ejection opening position at the tip of the water pipe, a hole is formed in the ground while rotating the casing. Meanwhile, when water is ejected from the water supply pipe and the earth and sand are discharged from the muddy water extraction pipe provided in the closed end plate, a compacted portion is formed inside the tip of the casing.
【0012】従って、高い被圧下の砂礫層などにおける
削孔の掘削の場合でも、ケーシングの継ぎ足しの際、地
下水圧により吹き出そうとする砂礫は圧密部によって阻
止されることになる。そのため、先行ケーシングから砂
礫の吹き出しもなく、ケーシングの継ぎ足しが行われ
る。Therefore, even in the case of excavating a hole in a gravel layer under a high pressure, when the casing is replenished, the gravel which is about to be blown out by the groundwater pressure is blocked by the consolidating portion. Therefore, the casing is replenished without blowing out the gravel from the preceding casing.
【0013】その後、削孔が所定長さに形成されると、
ケーシング及び送水管などが撤去され、削孔内にコンク
リートが充填され、アースアンカーが形成される。After that, when the drilled holes are formed to a predetermined length,
The casing and the water pipe are removed, and the drill hole is filled with concrete to form the earth anchor.
【0014】[0014]
【発明の実施の形態】以下、本発明のアースアンカー施
工法を図に示された実施形態について更に詳細に説明す
る。図1には本発明の一実施形態に係るアースアンカー
施工法に使用する削孔掘削機10が示されている。この
削孔掘削機10は、先端部にビット11が設けられ且つ
回転可能に支持された筒状のケーシング12を含む。BEST MODE FOR CARRYING OUT THE INVENTION The ground anchor construction method of the present invention will now be described in more detail with reference to the embodiments shown in the drawings. FIG. 1 shows a drilling excavator 10 used in a ground anchor construction method according to an embodiment of the present invention. The boring machine 10 includes a cylindrical casing 12 having a bit 11 provided at its tip and rotatably supported.
【0015】このケーシング12の後端部には閉塞端板
13が着脱可能に連結され、この閉塞端板13には泥水
取出管14が設けられている。このケーシング12の内
部にはその長手方向軸線に沿って送水管15が配置さ
れ、この送水管15の先端は水噴出するために開口され
ていて、水噴出開口16を形成している。この送水管1
5は閉塞端板13を通って外部の送水ポンプ(図示せ
ず)に接続されている。A closed end plate 13 is detachably connected to the rear end portion of the casing 12, and a muddy water discharge pipe 14 is provided on the closed end plate 13. A water supply pipe 15 is arranged inside the casing 12 along the longitudinal axis thereof, and a tip of the water supply pipe 15 is opened for ejecting water to form a water ejection opening 16. This water pipe 1
5 is connected to an external water feed pump (not shown) through the closed end plate 13.
【0016】ケーシング12は、その先端部が送水管1
5の先端即ち水噴出開口16の位置より突出され、ケー
シング12の先端内部に地盤の圧密部17が形成される
ようにされている。The casing 12 has a water pipe 1 at its tip.
5 is projected from the tip of the water, that is, the position of the water ejection opening 16, and a compacted portion 17 of the ground is formed inside the tip of the casing 12.
【0017】このように構成された削孔掘削機10を用
いて実施する本発明のアースアンカー施工法を次に説明
する。アースアンカーを形成するために例えば砂礫層の
地盤G中を、先端にビット11を設けたケーシング12
を回転させながら前進させる。そして、ケーシング12
の前進中このケーシング12内に配置された送水管15
もその先端の水噴出開口16がケーシング12の先端ビ
ット11より軸方向内方に位置するようにして共に前進
させられる。The earth anchor construction method of the present invention, which is carried out by using the boring machine 10 thus constructed, will be described below. In order to form an earth anchor, for example, in a ground G of a gravel layer, a casing 12 having a bit 11 at its tip
Rotate to move forward. And the casing 12
Water pipe 15 arranged in this casing 12 during forward movement of
Is also advanced so that the water ejection opening 16 at its tip is located axially inward of the tip bit 11 of the casing 12.
【0018】これにより、ケーシング12内に配置され
た送水管15の先端である水噴出開口16がケーシング
12の先端ビット11より後方即ち軸方向内方に位置し
ているためケーシング12の先端内部に詰まった砂礫は
圧密された状態となる。As a result, since the water ejection opening 16 which is the tip of the water supply pipe 15 arranged in the casing 12 is located rearward of the tip bit 11 of the casing 12, that is, inward in the axial direction, inside the tip of the casing 12. The clogged gravel is in a compacted state.
【0019】ケーシング12の先端内部に詰まった圧密
部17は、送水管15の先端である水噴出開口16から
噴出する水により流動化されてその表面から順次崩さ
れ、ケーシング12内における送水管15外周空間部を
通って泥水取出管14から排出される。The compacted portion 17 clogged inside the tip of the casing 12 is fluidized by the water jetted from the water jetting opening 16 which is the tip of the water pipe 15, and is gradually broken from the surface thereof. It is discharged from the muddy water discharge pipe 14 through the outer peripheral space.
【0020】その時、送水管15の水噴出開口16から
噴出する水によって圧密部17がその表面から順次崩さ
れて流動化される速度とケーシング12が掘進する速度
はほぼ等しくなるように制御される。そのため、ケーシ
ング12の先端内部には常に所定長さLの圧密部17が
存在することになる。At this time, the speed at which the compacted portion 17 is sequentially collapsed from its surface by the water jetted from the water jet opening 16 of the water supply pipe 15 to be fluidized and the speed at which the casing 12 is dug are controlled to be substantially equal. . Therefore, the compacted portion 17 having the predetermined length L always exists inside the tip of the casing 12.
【0021】このようにケーシング12の先端内部に地
盤の圧密部17が常時存在すると、例えば被圧の高い砂
礫層等の地盤Gに削孔を形成している時、別なケーシン
グを先行ケーシング12に継ぎ足すために閉塞端板13
を外した場合でも、ケーシング12内へ先端から進入し
ようとする地下水圧は圧密部17により阻止される。If the compacted portion 17 of the ground is always present inside the tip of the casing 12 in this manner, for example, when a hole is formed in the ground G such as a gravel layer having a high pressure, another casing is used as the preceding casing 12 Closed end plate 13 to add to
Even when the pressure is removed, the groundwater pressure that attempts to enter the casing 12 from the tip is blocked by the consolidating portion 17.
【0022】このようにして、必要に応じてケーシング
12及び送水管15を継ぎ足して所定の長さのアースア
ンカー用削孔が形成されると、次いでケーシング12内
から送水管15を引き抜いてモルタル置換を行う。その
後、PC鋼線を挿入後、先端ビットの切離しを行い、こ
れによりアースアンカーが形成される。。In this way, when the casing 12 and the water supply pipe 15 are added as necessary to form a ground anchor drilling hole of a predetermined length, the water supply pipe 15 is then pulled out from the casing 12 to replace the mortar. I do. Then, after inserting the PC steel wire, the tip bit is cut off, thereby forming a ground anchor. .
【0023】ところで、図3に示されるような従来の二
重管式削孔掘削機でケーシングを継ぎ足す際に泥水が吹
き出す理由は、前述したような削孔掘削機10の動作か
ら推察すると、外管であるケーシング5の先端と内管で
ある送水管6の先端とがほぼ同じ面に位置するように構
成されているため、内管と外管との間は地盤に対して開
放状態になっていることから地下水圧はケーシング5後
端に連結した閉塞端板7を取り外した途端にケーシング
5内に容易に進入するためであると考えられる。Incidentally, the reason why the muddy water is blown out when the casing is replenished in the conventional double pipe type hole excavator as shown in FIG. 3 is inferred from the operation of the hole excavator 10 as described above. Since the tip of the casing 5 which is the outer pipe and the tip of the water pipe 6 which is the inner pipe are configured to be located on substantially the same plane, the space between the inner pipe and the outer pipe is open to the ground. Therefore, it is considered that the groundwater pressure easily enters the casing 5 as soon as the closed end plate 7 connected to the rear end of the casing 5 is removed.
【0024】[0024]
【実施例】なお、本発明のアースアンカー施工法につい
ての一実施例としては、圧密部17を形成するケーシン
グ12先端内部の長さL即ち送水管15の水噴出開口1
6の位置より突出するケーシング12の先端長さは地盤
Gの性質にもよるが約50cm程度が好ましい。EXAMPLE As one example of the earth anchor construction method of the present invention, the length L inside the tip of the casing 12 forming the compacted portion 17, that is, the water ejection opening 1 of the water pipe 15 is shown.
The tip length of the casing 12 protruding from the position 6 depends on the nature of the ground G, but is preferably about 50 cm.
【0025】[0025]
【発明の効果】以上説明したように、本発明のアースア
ンカー施工法によれば、先端にビットを設けたケーシン
グを回転させながら地中を前進させると同時にケーシン
グの前進中このケーシング内に配置された送水管もその
先端の水噴出開口がケーシングの先端ビットより軸方向
内方に位置するようにして共に前進させることにより、
ケーシングの先端内部に常時地盤の圧密部を形成するよ
うにしたことから、例えば被圧の高い砂礫層等の地盤に
削孔を形成してアースアンカーを施工する時、別なケー
シングを先行ケーシングに継ぎ足すために閉塞端板を外
した場合でも、ケーシング内へ先端から進入しようとす
る地下水圧は圧密部により阻止され、その結果ケーシン
グからの泥水の吹き出しを防止することができる。As described above, according to the earth anchor construction method of the present invention, the casing having the bit at the tip thereof is moved forward in the ground while rotating, and at the same time, the casing is arranged in the casing during the forward movement of the casing. As for the water pipe, by advancing together, the water ejection opening at the tip of the water pipe is positioned axially inward of the tip bit of the casing,
Since the compacted part of the ground is always formed inside the tip of the casing, for example, when forming a ground hole by forming a hole in the ground such as a gravel layer with high pressure, another casing is used as the preceding casing. Even if the closed end plate is removed for replenishment, the groundwater pressure that tries to enter the casing from the tip is blocked by the consolidating unit, and as a result, muddy water can be prevented from blowing out from the casing.
【図1】本発明の一実施形態に係るアースアンカー施工
法による地盤の掘削状態を概略的に示す構成説明図であ
る。FIG. 1 is a structural explanatory view schematically showing a ground excavation state by a ground anchor construction method according to an embodiment of the present invention.
【図2】アースアンカーを形成する従来の単管式削孔掘
削機を概略的に示す構成説明図である。FIG. 2 is a structural explanatory view schematically showing a conventional single pipe drilling excavator forming an earth anchor.
【図3】アースアンカーを形成する従来の二重管式削孔
掘削機を概略的に示す構成説明図である。FIG. 3 is a structural explanatory view schematically showing a conventional double pipe type drilling excavator forming an earth anchor.
G 地盤 10 削孔掘削機 11 ビット 12 ケーシング 13 閉塞端板 14 泥水取出管 15 送水管 16 水噴出開口 17 圧密部 G Ground 10 Drilling excavator 11 Bit 12 Casing 13 Closing end plate 14 Mud extraction pipe 15 Water pipe 16 Water ejection opening 17 Consolidation part
Claims (1)
させながら地中を前進させること、前記ケーシングの前
進中このケーシング内に配置された送水管もその先端の
水噴出開口が前記ケーシングの前記先端ビットより軸方
向内方に位置するようにして共に前進させ、前記ケーシ
ングの先端内部に常時地盤の圧密部を形成すること、前
記送水管先端の前記水噴出開口から水を噴射し、前記圧
密部の内表面に吹き付けて順次崩して流動化すること、
流動化された泥水を前記ケーシング内における送水管外
周空間部を通って外部へ排出すること、このようにして
削孔を形成する際、必要に応じてケーシング及び送水管
を継ぎ足して所定の長さのアースアンカー用削孔を形成
すること、次いで前記ケーシング内から前記送水管を除
去してコンクリートを充填することから構成されるアー
スアンカー施工法。1. A casing having a bit at its tip is rotated to move forward in the ground, and a water pipe arranged in the casing also has a water jet opening at its tip when the casing is moving forward. By advancing together so as to be positioned axially inward from the bit, always forming a consolidation part of the ground inside the tip of the casing, injecting water from the water ejection opening at the tip of the water pipe, Spraying on the inner surface of the and breaking down one after another to fluidize,
Discharging the fluidized muddy water to the outside through the outer space of the water supply pipe in the casing, and when forming a hole in this way, the casing and the water supply pipe are replenished as necessary to have a predetermined length. A method of constructing an earth anchor, which comprises forming a hole for earth anchor, and then removing the water pipe from the inside of the casing and filling with concrete.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP18409395A JPH0932452A (en) | 1995-07-20 | 1995-07-20 | Earth anchor construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP18409395A JPH0932452A (en) | 1995-07-20 | 1995-07-20 | Earth anchor construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH0932452A true JPH0932452A (en) | 1997-02-04 |
Family
ID=16147279
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP18409395A Pending JPH0932452A (en) | 1995-07-20 | 1995-07-20 | Earth anchor construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0932452A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007255062A (en) * | 2006-03-23 | 2007-10-04 | Daiichi Cutter Kogyo Kk | Drilling device, drilling method and pile construction method |
-
1995
- 1995-07-20 JP JP18409395A patent/JPH0932452A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007255062A (en) * | 2006-03-23 | 2007-10-04 | Daiichi Cutter Kogyo Kk | Drilling device, drilling method and pile construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH079088B2 (en) | Large diameter ground improvement method | |
| CN106948790A (en) | Rig, shield machine churning breast wall apparatus and construction method | |
| JPH0932452A (en) | Earth anchor construction method | |
| KR101031603B1 (en) | Method and device for discharge of perforated rod for soft ground improvement | |
| JP2821712B2 (en) | Ground improvement method by hardening material injection using high pressure jet water | |
| JP2009249903A (en) | Construction method for establishing subterranean solidified body and apparatus for establishing solidified body using the same | |
| KR101643908B1 (en) | The tilting machine with the advanced nozzle and SPP method using it | |
| JP3528986B2 (en) | Fore pile construction method | |
| JP3547094B2 (en) | Drilling equipment | |
| JPH0860976A (en) | Construction method of fore pile and drilling device used for it | |
| JP2003247233A (en) | Construction method for hollow pipe pile and construction device thereof | |
| JPH08270351A (en) | Drilling machine | |
| CN114164825A (en) | High-pressure rotary jet grouting machine and application method thereof | |
| JP2585137B2 (en) | Ground improvement method using solidified columns and drilling equipment for ground improvement | |
| EP0437262B2 (en) | Method for preventive consolidation of the soil for underground minings | |
| JPH05156892A (en) | Method and apparatus for tunnelling | |
| JP2019090207A (en) | Drilling method | |
| JPH10183599A (en) | Ground improvement method | |
| JP2003278490A (en) | Tunnel excavator | |
| JP2002364284A (en) | Excavator and excavation method | |
| JPH0882186A (en) | Horizontal mortar pile construction method | |
| JP2002155690A (en) | Drilling method and drilling machine | |
| JP2006070517A (en) | Ground improvement method | |
| JPH0765478B2 (en) | Driving method such as lock bolt | |
| JP2004044294A (en) | Leading cutter device for backfill injection device of shield machine |