Method and device for handling nuclear instrumentation tube in nuclear reactorInfo
- Publication number
- JPH095484A JPH095484A JP7155745A JP15574595A JPH095484A JP H095484 A JPH095484 A JP H095484A JP 7155745 A JP7155745 A JP 7155745A JP 15574595 A JP15574595 A JP 15574595A JP H095484 A JPH095484 A JP H095484A
- Authority
- JP
- Japan
- Prior art keywords
- nuclear instrumentation
- basket
- instrumentation tube
- pressure vessel
- reactor pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
(57)【要約】
【目的】原子炉内核計装管交換作業において、炉内設置
型の核計装管交換装置を導入することで熟練を要する作
業を平易化し、移動ステップを省くことで工程短縮及び
付帯作業の削減を目的とする。
【構成】燃料支持金具と上部格子板1区画に設置できる
形状とフックで構成され、ボディ側面に開口部をもち、
移動する際に収納した核計装管の脱落防止機構を有する
ハンドルを備えた使用済核計装管収納バスケット。炉壁
近くの上部格子板と燃料支持金具及び炉壁構造物とで設
置できる形状を有し、交換対象全数の新核計装管を装着
でき、燃料取替機上から遠隔操作で新核計装管を切り離
せる新核計装管保持具。上記2つの核計装管交換装置を
使用した核計装管交換方法。
(57) [Summary] [Purpose] In the nuclear instrumentation tube exchange work in the reactor, introducing a nuclear instrumentation tube exchange device installed in the reactor simplifies the work requiring skill and shortens the process by eliminating the moving step. And to reduce incidental work. [Structure] A fuel support fitting and a shape that can be installed in one section of the upper lattice plate and a hook, and has an opening on the side surface of the body,
A used nuclear instrumentation tube storage basket equipped with a handle that has a mechanism for preventing the nuclear instrumentation tube stored when moving from falling off. It has a shape that can be installed with the upper lattice plate near the furnace wall, fuel support metal fittings, and furnace wall structure, and can install all the new nuclear instrumentation pipes to be replaced, and the new nuclear instrumentation pipes can be remotely operated from the refueling machine. A new nuclear instrumentation tube holder that can be separated. A nuclear instrumentation tube exchange method using the above two nuclear instrumentation tube exchange devices.
Description
【0001】[0001]
【産業上の利用分野】この発明は、原子炉圧力容器内の
核計装管の交換作業に際する核計装管の取り扱い方法及
びその取り扱いに際して使用される器具に関するもので
ある。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for handling a nuclear instrumentation pipe in the operation of replacing a nuclear instrumentation pipe in a reactor pressure vessel and an instrument used for the handling.
【0002】[0002]
【従来の技術】従来実施している核計装管交換作業は以
下のような作業ステップで実施されていた。2. Description of the Related Art Nuclear instrumentation tube replacement work that has been performed conventionally has been performed in the following work steps.
【0003】(a)使用済核計装管取外し作業(ペデス
タル作業は省く)を図16に、作業概略を図19に、核
計装管の上端/下端拡大図を図17に示し、図16の作
業ステップの内容を以下に示す。(A) Removal of used nuclear instrumentation pipes (omission of pedestal work) is shown in FIG. 16, an outline of the work is shown in FIG. 19, an upper end / lower end enlarged view of the nuclear instrumentation pipes is shown in FIG. The details of the steps are shown below.
【0004】ステップ61で燃料取替機11の回転ジブ
クレーン12に取り付けられた計測器取扱具15を炉内
に吊り降ろす。In step 61, the measuring instrument handling tool 15 attached to the rotary jib crane 12 of the refueling machine 11 is hung in the furnace.
【0005】ステップ62で計測器取扱具15で使用済
核計装管1を掴む。At step 62, the used nuclear instrumentation tube 1 is gripped by the measuring instrument handling tool 15.
【0006】ステップ63で使用済核計装管1のプラン
ジャー52を上部格子板3から外し、使用済核計装管1
を水面から2mの位置まで引き抜く。At step 63, the plunger 52 of the used nuclear instrumentation tube 1 is removed from the upper lattice plate 3, and the used nuclear instrumentation tube 1 is removed.
To 2m above the surface of the water.
【0007】ステップ64で天井クレーンの補巻設備1
4より吊り下げられた水圧クランプ16で燃料取替機1
1から使用済核計装管を掴み替える。In step 64, the auxiliary winding equipment 1 for the overhead crane
Refueling machine 1 with hydraulic clamp 16 suspended from 4
Grab the used nuclear instrumentation tube from 1.
【0008】ステップ65で水圧クランプ16を使用済
燃料プール8まで移動し、核計装管のノーズピース53
側が使用済燃料プールカナル7上に来るようにする。In step 65, the hydraulic clamp 16 is moved to the spent fuel pool 8 and the nose piece 53 of the nuclear instrumentation pipe is moved.
Side to be on spent fuel pool canal 7.
【0009】ステップ66でインコアマニピュレータ1
7でノーズピース53を掴み、水面まで吊り上げる。In step 66, the incore manipulator 1
Grab the nosepiece 53 with 7 and lift to the surface of the water.
【0010】ステップ67で水圧クランプ16で掴んで
いるプランジャー52側を使用済燃料プール8の底まで
降ろしながら、ノーズピース53を手で掴み、使用済燃
料プール8北側壁面に移動する。In step 67, the nosepiece 53 is gripped by hand while the plunger 52 side gripped by the hydraulic clamp 16 is lowered to the bottom of the spent fuel pool 8 and moved to the north side wall surface of the spent fuel pool 8.
【0011】ステップ68でノーズピース53側を使用
済燃料プール8内構造物に固定する。In step 68, the nosepiece 53 side is fixed to the internal structure of the spent fuel pool 8.
【0012】ステップ69で水圧クランプ16を使用済
核計装管1より切り離す。In step 69, the hydraulic clamp 16 is disconnected from the used nuclear instrumentation tube 1.
【0013】ステップ66の作業が終了後、2本目をス
テップ61から同様のステップで取外す。After the work of step 66 is completed, the second one is removed from step 61 in the same step.
【0014】ステップ70で任意の時期に使用済核計装
管1を使用済燃料プール8内で切断する。In step 70, the spent nuclear instrumentation pipe 1 is cut in the spent fuel pool 8 at any time.
【0015】(b)新核計装管取り付け作業ステップを
図20に、作業概略を図21に示し、図20の作業ステ
ップの内容を以下に示す。(B) The new nuclear instrumentation tube installation work step is shown in FIG. 20, the work outline is shown in FIG. 21, and the contents of the work step in FIG. 20 are shown below.
【0016】ステップ71で核計装管据付ガイド19及
び炉内照明他を上部格子板3に設置する。In step 71, the nuclear instrumentation tube installation guide 19, the in-reactor lighting, etc. are installed on the upper grid plate 3.
【0017】ステップ72で新核計装管保持具18に1
日の取り付け予定本数の新核計装管2を装着する。In step 72, the new nuclear instrumentation tube holder 18 is set to 1
Install the new nuclear instrumentation tubes 2 of the number scheduled to be installed daily.
【0018】ステップ73で横向きに吊った新核計装管
保持具18を天井クレーンの補巻設備14で炉上に移動
し、縦方向に引き起こした後、新核計装管保持具18上
端部が水面から3m上方の位置にくるまで吊り降ろす。In step 73, the new nuclear instrumentation pipe holder 18 horizontally hung is moved vertically above the furnace by the auxiliary winding equipment 14 of the overhead crane, and then the upper end of the new nuclear instrumentation pipe holder 18 is brought to the water surface. Hang it down to a position 3 m above.
【0019】ステップ74で新核計装管2を燃料取替機
11の固定補助ホイスト13に取り付けた計測器取扱具
15で掴み、燃料取替機11上から手で新核計装管保持
具18より切り離す。In step 74, the new nuclear instrumentation tube 2 is grasped by the measuring instrument handling tool 15 attached to the fixed auxiliary hoist 13 of the fuel changer 11, and the new nuclear instrumentation tube holder 18 is manually operated from above the fuel changer 11. Detach.
【0020】ステップ75で新核計装管保持具18をド
ライヤ/セパレータピット10へ移動して、次の取り付
けに備える。In step 75, the new nuclear instrumentation tube holder 18 is moved to the dryer / separator pit 10 to prepare for the next installation.
【0021】ステップ76で新核計装管2を核計装管据
付ガイド19にそって挿入する。In step 76, the new nuclear instrumentation tube 2 is inserted along the nuclear instrumentation tube installation guide 19.
【0022】ステップ77でシート部をフラッシングす
る。(ペデスタル作業)ステップ78で計測器取扱具1
5で着座を確認する。In step 77, the seat portion is flushed. (Pedestal work) In step 78, measuring instrument handling tool 1
Check seating with 5.
【0023】ステップ79で計測器取扱具15を切り離
して終了。In step 79, the measuring instrument handling tool 15 is disconnected and the processing ends.
【0024】ステップ80で核計装管据付けガイド19
を移動する。In step 80, the nuclear instrumentation tube installation guide 19
To move.
【0025】ステップ81で新核計装管保持具18をド
ライヤ/セパレータピット10より炉上へ移動する。In step 81, the new nuclear instrumentation tube holder 18 is moved from the dryer / separator pit 10 onto the furnace.
【0026】2本目以降、ステップ74〜81を繰り返
す。After the second line, steps 74 to 81 are repeated.
【0027】ステップ82で取り付け工程終了後、新核
計装管保持具18を炉水中から出し、除染する。After the mounting process is completed in step 82, the new nuclear instrumentation tube holder 18 is taken out of the reactor water and decontaminated.
【0028】新核計装管保持具52の装着可能本数が1
日の取り付け予定本数より少ない場合、途中で新核計装
管保持具18を炉水中から取り出し、除染後、新核計装
管2を取り付ける。The number of new nuclear instrumentation tube holders 52 that can be mounted is 1
If the number of the new nuclear instrumentation tubes is less than the planned number of attachments per day, the new nuclear instrumentation tube holder 18 is taken out of the reactor water on the way and the new nuclear instrumentation tube 2 is attached after decontamination.
【0029】このような交換作業では核計装管の移動や
掴み替えを伴うステップが多く、熟練を要する作業が多
い。In such exchange work, there are many steps involving movement and re-grabbing of the nuclear instrumentation tube, and many operations require skill.
【0030】移動や掴み替えを伴うステップが少ない公
知例として、特開昭60−144695号公報,特開昭56−1267
99号公報,特開昭56−137291号公報に開示されている内
容がある。Known examples in which the number of steps involved in moving and re-grabbing are small are Japanese Patent Laid-Open Nos. 60-144695 and 56-1267.
There are contents disclosed in Japanese Patent Laid-Open No. 99 and Japanese Patent Laid-Open No. 56-137291.
【0031】まず、特開昭60−144695号公報に開示され
ている内容によると、上部格子板上に設置できる収納容
器を持ち、その上に切断機能を持つ使用済核計装管切断
処理装置によって、上部格子板から垂直に引き抜いた核
計装管を順次炉内で切断していき、切断終了後収納容器
に一括して収納し、その収納容器ごと使用済燃料プール
に移動できるとされている。First, according to the contents disclosed in JP-A-60-144695, a used nuclear instrumentation tube cutting processing device having a storage container that can be installed on an upper lattice plate and having a cutting function is provided. It is said that the nuclear instrumentation tubes vertically pulled out from the upper lattice plate are sequentially cut in the furnace, and after the cutting is completed, they are collectively stored in a storage container and can be moved to the spent fuel pool together with the storage container.
【0032】また、特開昭56−126799号公報,特開昭56
−137291号公報に開示されている内容によると、複数の
核計装管が装着される複数の切欠きを外周囲全周に備わ
る複数枚の円盤を多段に組み合わせ、且つその切欠きか
らの核計装管の脱落を防ぐ振れ止め及び押さえ込み手段
が装備された核計装管の保持具が存在し、切欠きに納め
られた複数の核計装管が保持具と同時に一括して原子炉
圧力容器内に搬入され、保持具から原子炉圧力容器内の
核計装管設置位置に移し替えられる。特開昭56−126799
号公報のものは、切欠きの向きは原子炉内では変えられ
ないが、特開昭56−137291号公報のものは円盤を回転さ
せることにより切欠きの向きを変えて核計装管の保持具
からの取り出し位置を一定にできる。Further, JP-A-56-126799 and JP-A-56-126
According to the content disclosed in Japanese Laid-Open Patent Publication No. 137291, a plurality of notches, on which a plurality of nuclear instrumentation tubes are mounted, are combined in a multi-step manner with a plurality of disks provided around the entire outer circumference, and the nuclear instrumentation from the notches There is a holder for the nuclear instrumentation tube equipped with a steadying and pressing means to prevent the tube from falling out, and a plurality of nuclear instrumentation tubes stored in the notches are carried into the reactor pressure vessel at the same time as the holder. It is then transferred from the holder to the nuclear instrumentation tube installation position in the reactor pressure vessel. JP-A-56-126799
In the one disclosed in Japanese Patent Publication No. 56-137291, the orientation of the notch cannot be changed in the reactor, but in the one disclosed in Japanese Patent Publication No. 56-137291 the holder for the nuclear instrumentation tube is changed by rotating the disc. The removal position from can be fixed.
【0033】[0033]
【発明が解決しようとする課題】図16の作業ステップ
を有する従来の核計装管交換作業における使用済核計装
管取外し作業では、使用済核計装管1本ごとに移動ステ
ップ(前述(a)65〜69のステップを指す)を交換
対象分繰り返さなければならないため、交換作業の工程
が長くなり、専従作業員も必要となる。更に、水圧クラ
ンプ16による掴み替え作業(前述(a)64を指す)
は熟練者の技術を要するため、専従作業員が必要とな
る。In the conventional nuclear instrumentation tube removal work in the conventional nuclear instrumentation tube replacement work having the work steps shown in FIG. 16, a step of moving each used nuclear instrumentation tube (see (a) 65 above). (Indicating steps 69 to 69) must be repeated for the replacement target, so that the replacement process becomes long and a dedicated worker is required. Further, the re-gripping work by the hydraulic clamp 16 (refer to the above (a) 64)
Requires expert skills, so full-time workers are required.
【0034】次に、図20のその従来の核計装管交換作
業における新核計装管取り付け作業では、新核計装管1
本ごとに移動ステップ(前述(b)75,81のステッ
プを指す)を交換対象分繰り返すため、専従作業者が必
要となる。また、昼食や予定作業終了等で作業員が現場
を離れる際、新核計装管保持具18を炉水中に吊るして
おけないため、水中より取り出して除染する必要があ
る。Next, in the conventional nuclear instrumentation tube replacement work shown in FIG.
Since the moving steps (referring to the steps (b) 75 and 81 described above (b)) are repeated for each book for the replacement target, a dedicated worker is required. Further, when the worker leaves the site for lunch, scheduled work, or the like, the new nuclear instrumentation pipe holder 18 cannot be hung in the reactor water, so it is necessary to remove it from the water for decontamination.
【0035】他の従来例である特開昭60−144695号公報
に開示されている内容は、核計装管の取外しと切断を炉
内で実施し一括して使用済燃料プールに移動するもので
あるが、以下に示すような問題点がある。The contents disclosed in Japanese Patent Laid-Open No. 60-144695, which is another conventional example, is that the removal and cutting of the nuclear instrumentation pipes are carried out in the furnace, and the nuclear instrumentation pipes are collectively moved to the spent fuel pool. However, there are the following problems.
【0036】(1)炉内で構造物を切断することは実績
がなく、また、仮に炉内で構造物の切断を行った場合、
部分燃料取出し時には炉内に燃料集合体が装荷されてお
り、破片が燃料集合体の隙間に入る可能性があり、大き
な問題となる。(1) There is no record of cutting the structure in the furnace, and if the structure is cut in the furnace,
When the partial fuel is taken out, the fuel assembly is loaded in the furnace, and fragments may enter the gap between the fuel assemblies, which is a serious problem.
【0037】(2)従来の核計装管交換作業では、核計
装管の切断作業は含んでおらず、交換作業終了後定検内
の任意の時期に行えるため、別作業扱いである。そのた
め、核計装管の切断作業を交換作業内で実施すること
は、核計装管交換工程が大幅に延びることを意味する。
なお、核計装管交換作業は定検時のクリティカルパスで
あるため、本作業の遅延は定検工程全体の遅延につなが
る。(2) The conventional operation for exchanging nuclear instrumentation tubes does not include the task of cutting the nuclear instrumentation tube, and can be performed at any time within the regular inspection after the completion of the exchanging operation, and is therefore treated separately. Therefore, performing the cutting operation of the nuclear instrumentation tube within the exchange operation means that the nuclear instrumentation tube exchange step is significantly extended.
Since the nuclear instrumentation tube replacement work is a critical path at the time of regular inspection, the delay of this work leads to the delay of the entire regular inspection process.
【0038】また、特開昭56−126799号公報,特開昭56
−137291号公報に開示されている内容では、複数の核計
装管を保持具で一括して原子炉格納容器内に搬入するこ
とができるので核計装管の一本一本の移動距離が短縮さ
れて作業が楽になるものの、特開昭56−126799号公報の
ものでは、核計装管の取り出し位置が円盤の外周囲に分
散するから、保持具から核計装管を取り出して移動させ
る手段及びその取り出した核計装管を円盤に干渉しない
ように注意深く円盤の廻りを移動させなければならない
し、特開昭56−137291号公報のものでは、重量の大きな
円盤を保持具からの核計装管取り出し位置にまで回転さ
せるわずらわしさがあり、回転位置が合わなければ核計
装管取出し作業ができないので、熟練と手間とが必要と
なる。それらのことは保持具を使用済核計装管を取り除
く場合の保持具に流用する場合にも発生し、特に切欠き
に使用済核計装管を納める作業が、原子炉圧力容器内が
炉水で満たされていることにより、水中作業となるから
熟練と手間がかかる。Further, Japanese Patent Laid-Open Nos. 56-126799 and 56
According to the contents disclosed in the −137291 publication, since a plurality of nuclear instrumentation tubes can be collectively carried into the reactor containment vessel by the holder, the moving distance of each nuclear instrumentation tube can be shortened. However, in JP-A-56-126799, since the take-out positions of the nuclear instrumentation tubes are scattered around the outer periphery of the disk, the means for taking out and moving the nuclear instrumentation tubes from the holder and the removal thereof. It is necessary to carefully move around the disk so that the nuclear instrumentation tube does not interfere with the disk, and in the case of JP-A-56-137291, a heavy disk is placed at the position where the nuclear instrumentation tube is taken out from the holder. Since it is troublesome to rotate up to, and the operation of taking out the nuclear instrumentation tube cannot be done unless the rotation position is matched, skill and labor are required. These problems also occur when the retainer is diverted to the retainer when removing the used nuclear instrumentation pipe, and especially the work of putting the used nuclear instrumentation pipe in the notch is done by using reactor water in the reactor pressure vessel. If it is satisfied, it will be an underwater operation, which requires skill and time.
【0039】従って、本発明の目的は、原子炉圧力容器
内の核計装管の交換作業時における核計装管の取り扱い
を短時間に容易に実施することにある。Therefore, an object of the present invention is to easily carry out the handling of the nuclear instrumentation pipe in the replacement work of the nuclear instrumentation pipe in the reactor pressure vessel.
【0040】[0040]
【課題を解決するための手段】上記の目的を達成する為
の、第1手段は、炉水の存在する原子炉圧力容器内に、
上端にまで至る開口部を側面に有するバスケットを搬入
し、前記バスケットを原子炉圧力容器内の上部格子板に
差し入れて燃料支持金具に底部を設置し、しかる後に、
燃料取替機で前記原子炉圧力容器内の使用済核計装管を
移動させて前記バスケット側面の開口部から前記バスケ
ット内に収納し、前記収納作業を繰り返し行うことで前
記バスケット内に複数の前記使用済核計装管を収納し、
次に前記バスケットと前記複数の前記使用済核計装管と
を一括して保管場所のプール内に移動する原子炉内核計
装管の撤去方法である。[Means for Solving the Problems] A first means for achieving the above object is to provide a reactor pressure vessel in which reactor water is present.
Carrying in a basket having an opening extending to the upper end on the side surface, inserting the basket into the upper lattice plate in the reactor pressure vessel and installing the bottom portion on the fuel support fitting, and thereafter,
The spent nuclear instrumentation pipe in the reactor pressure vessel is moved by the refueling machine to be stored in the basket through the opening on the side surface of the basket, and the plurality of the plurality of the inside of the basket are stored by repeating the storing work. Stores used nuclear instrumentation tubes,
Next, it is a method of removing the nuclear instrumentation pipe in the reactor, in which the basket and the plurality of the used nuclear instrumentation pipes are moved together into the pool at the storage location.
【0041】同じく第2手段は、第1手段において、前
記バスケット内に複数の前記使用済核計装管を収納した
後であって前記原子炉圧力容器内の炉心確認工程前の任
意の時期に前記バスケットと前記複数の前記使用済核計
装管とを一括して保管場所のプール内に移動し、その後
の任意の時期に前記プール内の使用済核計装管を前記プ
ール内で切断して切断した前記使用済核計装管を前記プ
ール内に保管して置く原子炉内核計装管の撤去方法であ
る。Similarly, in the second means, in the first means, the plurality of used nuclear instrumentation tubes are stored in the basket, and at any time before the core confirmation step in the reactor pressure vessel. The basket and the plurality of the used nuclear instrumentation tubes are moved together into the pool at the storage location, and the used nuclear instrumentation tubes in the pool are cut and cut in the pool at any time thereafter. It is a method of removing the nuclear instrumentation pipe in a nuclear reactor which stores the used nuclear instrumentation pipe in the pool.
【0042】同じく第3手段は、炉水の存在する原子炉
圧力容器内に、複数の新核計装管を一側面に着脱自在に
装着した新核計装管保持具を前記原子炉圧力容器内に搬
入してから、前記新核計装管保持具を前記一側面が前記
新核計装管の設置位置に極力向くように前記原子炉圧力
容器内の上部格子板に差し入れて底部を燃料支持金具に
設置し、燃料取替機で前記新核計装管を前記新核計装管
保持具から前記設置位置まで移動させて前記設置位置に
前記新核計装管を設置することを繰り返す原子炉内核計
装管の設置方法である。Similarly, the third means is to install a new nuclear instrumentation pipe holder in which a plurality of new nuclear instrumentation pipes are detachably mounted on one side in the reactor pressure vessel in which reactor water exists in the reactor pressure vessel. After being carried in, the new nuclear instrumentation tube holder is inserted into the upper lattice plate in the reactor pressure vessel so that the one side faces the installation position of the new nuclear instrumentation tube as much as possible, and the bottom portion is installed on the fuel support metal fitting. Of the nuclear instrumentation pipe in the reactor, which is repeated by moving the new nuclear instrumentation pipe from the new nuclear instrumentation pipe holder to the installation position with a refueling machine and installing the new nuclear instrumentation pipe at the installation position. This is the installation method.
【0043】同じく第4手段は、第1手段による原子炉
内核計装管の撤去方法により原子炉圧力容器内から使用
済核計装管を撤去し、前記撤去の跡に第3手段による原
子炉内核計装管の設置方法により新核計装管を設置する
ことにより、前記使用済核計装管を新核計装管に取替え
る原子炉内核計装管交換方法である。Similarly, the fourth means removes the used nuclear instrumentation tube from the reactor pressure vessel by the method of removing the nuclear reactor internal instrumentation pipe by the first means, and after the removal, the nuclear reactor internal core by the third means is removed. It is a nuclear reactor instrumentation pipe replacement method in which the used nuclear instrumentation pipe is replaced with a new nuclear instrumentation pipe by installing a new nuclear instrumentation pipe by the instrumentation pipe installation method.
【0044】同じく第5手段は、下端から上方への途中
までの間が原子炉圧力容器内の上部格子板の格子内を通
過できる外観の太さを有するバスケットボデーと、前記
バスケットボデーの側面に前記バスケットボデーの途中
から上端に至る迄開口されて核計装管の太さ寸法よりも
大きな寸法の幅を有する側面開口部と、前記バスケット
ボデーの他の側面に前記バスケットボデーの上下方向に
移動自在に且つ少なくとも移動上端で回転自在にして装
着されたスライドロッドと、前記スライドロッドに回転
自在に取り付けられたハンドルと、前記バスケットボデ
ー内に配置されて前記スライドロッドに前記スライドロ
ッドと角度を持って固定取り付けされたサポートと、前
記バスケットボデーの前記側面に取り付けられた移動用
フックを備えた使用済核計装管の収納バスケットであ
る。Similarly, the fifth means is a basket body having an external thickness that allows passage through the lattice of the upper lattice plate in the reactor pressure vessel from the lower end to the middle of the upward direction, and A side opening having a width larger than the thickness of the nuclear instrumentation tube, which is opened from the middle to the upper end of the basket body, and is movable on the other side of the basket body in the vertical direction of the basket body. A slide rod rotatably mounted at least at the upper end of the movement, a handle rotatably attached to the slide rod, and a slide rod disposed in the basket body and having an angle with the slide rod. Use with a fixedly mounted support and a transfer hook mounted on the side of the basket body. It is a storage basket of Sumikakukei Sokan.
【0045】同じく第6手段は、第5手段において、前
記バスケットボデーの側面には上部格子板にひっかかる
固定用フックを備え、前記バスケットボデーの底面には
原子炉圧力容器内の燃料支持金具の丸孔に設置される下
方へ突き出されたバスケット据付ガイドとを備えている
ことを特徴とした使用済核計装管の収納バスケットであ
る。Similarly, in the sixth means, in the fifth means, a fixing hook hooked on the upper lattice plate is provided on the side surface of the basket body, and the bottom of the basket body is provided with a circle of a fuel support fitting in the reactor pressure vessel. A storage basket for used nuclear instrumentation pipes, characterized in that it has a basket installation guide projecting downwardly installed in the hole.
【0046】同じく第7手段は、保持具ボデーの一側面
に装備されて核計装管を囲う複数の凹部と、前記凹部に
隣接する凸部に前記凹部の開放口を塞ぐ位置と開放する
位置との間で回転自在に装着された核計装管保持板と、
前記保持具ボデーの下部に設けられて原子炉圧力容器内
の上部格子板を通すスリットと、前記保持具ボデーに上
下方向に間隔をあけて装着された複数のフックとを備え
た核計装管保持具である。Similarly, the seventh means includes a plurality of recesses provided on one side surface of the holder body to surround the nuclear instrumentation tube, and a position adjacent to the recesses for closing the opening of the recesses and a position for opening the recesses. A nuclear instrumentation tube holding plate mounted rotatably between
Nuclear instrumentation tube holding provided with a slit provided in the lower part of the holder body for passing an upper lattice plate in the reactor pressure vessel, and a plurality of hooks attached to the holder body at intervals in the vertical direction It is a tool.
【0047】同じく第8手段は、第7手段において、前
記保持具ボデーには他側面方向に突き出されて原子炉圧
力容器に係合する固定用ステーを備え、前記保持具ボデ
ーの底面には原子炉圧力容器内の燃料支持金具の丸孔に
設置される下方へ突き出された保持具据付ガイドを備え
ていることを特徴とした使用済核計装管の収納バスケッ
トである。Similarly, in the eighth means, in the seventh means, the retainer body is provided with a fixing stay projecting in the other side direction to engage with the reactor pressure vessel, and the bottom surface of the retainer body is provided with an atom. A storage basket for used nuclear instrumentation pipes, characterized in that it is provided with a downwardly projecting holder installation guide installed in a round hole of a fuel support fitting in a reactor pressure vessel.
【0048】[0048]
【作用】第1手段によれば、バスケットを燃料支持金具
と上部格子板で確実に支持した上で、使用済核計装管を
燃料取替機でバスケット側に搬送し、その使用済核計装
管をバスケット側面の開口部を通過させてバスケット内
に搬入させて収納する。この収納作業は、使用済核計装
管の下端がバスケット側面の開口部を通過すれば吊り降
ろすだけで使用済核計装管はバスケット内に収納され、
互いに離れた複数箇所の切欠きに使用済核計装管を嵌め
るように納めることに比べて収納作業が容易である。こ
のような収納作業を繰り返し実施してバスケット内に複
数の使用済核計装管を収納する。その後にバスケットご
と複数の使用済核計装管を一括して保管場所のプール内
に移動して新核計装管と交換すべき使用済核計装管を原
子炉圧力容器内から撤去し、新核計装管の設置作業に迅
速に移行することができる作用が得られる。すぐに移行
してもよいが、炉心確認以前の任意の時期に移行可。
(新核計装管取付作業には影響しない。)第2手段によ
れば、第1手段において、使用済核計装管の分断作業を
原子炉圧力容器外のプールで行い分断に伴う切断屑が原
子炉圧力容器内に残らないようにし、その分断作業は原
子炉圧力容器外で行うから、原子炉圧力容器内の作業と
切り離して任意の時期に行え、原子炉圧力容器内の作業
を伴う定検作業の工程を遅延させない。また、すぐにで
も分断作業したい場合には、複数の使用済核計装管を原
子炉圧力容器外の分断作業場へ一気に持ち込むから、分
断作業が継続して行えて効率が良くなる作用が得られ
る。According to the first means, the basket is securely supported by the fuel support fitting and the upper lattice plate, and the spent nuclear instrumentation pipe is conveyed to the basket side by the fuel changer, and the spent nuclear instrumentation pipe is Is passed through the opening on the side of the basket and carried into the basket for storage. In this storage work, if the lower end of the used nuclear instrumentation tube passes through the opening on the side surface of the basket, it is simply hung and the used nuclear instrumentation tube is stored in the basket.
The storage operation is easier than storing the used nuclear instrumentation pipe in a plurality of notches that are separated from each other. By repeating this storage operation, a plurality of used nuclear instrumentation tubes are stored in the basket. After that, all the used nuclear instrumentation pipes together with the basket are moved into the pool at the storage location, and the used nuclear instrumentation pipes that should be replaced with the new nuclear instrumentation pipes are removed from the reactor pressure vessel. It is possible to obtain the effect of being able to quickly shift to the installation work of the pipe. You can move immediately, but you can move at any time before the core confirmation.
(It does not affect the work of installing new nuclear instrumentation pipes.) According to the second means, the cutting work of the used nuclear instrumentation pipes is carried out in the pool outside the reactor pressure vessel by the first means, and the cutting debris accompanying Since it is not left in the reactor pressure vessel and the cutting work is performed outside the reactor pressure vessel, it can be performed at any time separately from the work inside the reactor pressure vessel, and the periodic inspection that involves the work inside the reactor pressure vessel. Do not delay the work process. Further, if it is desired to perform the cutting work immediately, a plurality of used nuclear instrumentation pipes are brought into the cutting work site outside the reactor pressure vessel at once, so that the cutting work can be continued and the efficiency can be improved.
【0049】第3手段によれば、新核計装管保持具に複
数の新核計装管を装着する。その保持具を原子炉圧力容
器内の上部格子板へ、(装着面を炉心に向けて、すなわ
ち)新核計装管の設置位置に装着面が向くようにして差
し込み、上部格子板と燃料支持金具で確実に保持具を支
持する。その後に燃料取替機で保持具から新核計装管を
新核計装管の設置位置に移送して設置する。この設置作
業を保持具と新核計装管の設置位置との間で繰り返し行
う。この設置作業における新核計装管の移動において
は、装着面が新核計装管の設置位置に向けられているか
ら、保持具と移動中の新核計装管の干渉事故が起こら
ず、最短経路で干渉回避操作の熟練技能をなくして交換
作業に伴う新核計装管の設置作業ができるという作用が
得られる。According to the third means, a plurality of new nuclear instrumentation tubes are attached to the new nuclear instrumentation tube holder. Insert the holder into the upper grid plate in the reactor pressure vessel (with the mounting surface facing the reactor core, that is, at the installation position of the new nuclear instrumentation tube with the mounting surface facing), and insert the upper grid plate and fuel support bracket. Securely support the holder with. After that, the refueling machine transfers the new nuclear instrumentation pipe from the holder to the installation position of the new nuclear instrumentation pipe and installs it. This installation work is repeated between the holder and the installation position of the new nuclear instrumentation tube. In the movement of the new nuclear instrumentation tube during this installation work, since the mounting surface is oriented to the installation position of the new nuclear instrumentation tube, there is no interference between the holder and the new nuclear instrumentation tube during movement, and the shortest route is possible. The effect is that the new nuclear instrumentation tube installation work that accompanies the replacement work can be performed without the skilled skill of interference avoidance operation.
【0050】第4手段によれば、第1手段による作用と
第3手段による作用との組み合わせで使用済核計装管の
撤去と、その撤去の跡への新核計装管の設置との交換作
業全体にわたる作業が短時間に且つ楽に実施できるとい
う作用が得られる。According to the fourth means, by the combination of the action of the first means and the action of the third means, the spent nuclear instrumentation pipe is removed, and the replacement work with the installation of the new nuclear instrumentation pipe on the trace of the removal. It is possible to obtain the effect that the entire work can be performed easily in a short time.
【0051】第5手段によれば、バスケットボデーはハ
ンドルと移動用フックにワイヤやロープを接続して吊り
上げられる。吊り上げ姿勢は吊点が2点あるから、バス
ケットボデーはボデー側面開口部が上向きとなる水平姿
勢と垂直との吊り姿勢とに変えられる。バスケットボデ
ーは垂直な吊り姿勢のまま上部格子板に途中まで差し入
れられて原子炉圧力容器内に設置される。バスケットボ
デー内には、そのボデーの側面開口部から使用済核計装
管を受け入れて収納できる。その収納の際には、ハンド
ルは回転して倒れ、バスケットボデーの上端開口上方か
ら退避し、収納作業時に使用済核計装管とハンドルとの
干渉事故を避ける。更には、その収納時には、スライド
ロッドが下方に降下してサポートも連動して降下し、ボ
デーは側面開口部をサポートで塞ぐことがないようにす
る。このため、ボデーの側面開口部をサポートに邪魔さ
れることなく使用済核計装管は通過してボデー内に収納
される。この収納作業は、使用済核計装管の下端がボデ
ーの側面開口部を通過してしまえば吊り降ろすだけで使
用済核計装管はボデー内に収納される。使用済核計装管
を収納したボデーはハンドルを吊り上げることで上部格
子板から抜き出される。この際、ハンドルは回転して起
立し、更にはスライドロッドとともに上昇してハンドル
と収納された使用済核計装管上端との干渉を避ける。ス
ライドロッドの上昇に伴って、サポートもボデー側面開
口部にまで上昇して収納された使用済核計装管がボデー
側面開口部から外に倒れたり大きくはみでることを防止
する。ボデーを水平に吊った場合には、スライドロッド
は水平なボデーに対して垂直に回転した状態にあるか
ら、ボデーに対して相対的にスライドロッドが回転する
ことに伴いスライドロッドと一体のサポートもボデーに
対して相対的に回転してサポートが収納されている使用
済核計装管に押当たって使用済核計装管がボデーから脱
落乃至はずれるということを防止するという作用が得ら
れる。According to the fifth means, the basket body is lifted by connecting a wire or rope to the handle and the moving hook. Since the lifting posture has two hanging points, the basket body can be changed between a horizontal posture in which the side surface opening of the body faces upward and a vertical posture. The basket body is inserted in the upper lattice plate halfway with the vertical suspension posture and installed in the reactor pressure vessel. A spent nuclear instrumentation tube can be received and stored in the basket body through the side opening of the body. During storage, the handle rotates and falls, retracts from above the upper opening of the basket body, and avoids accidents of interference between the used nuclear instrumentation pipe and the handle during storage work. Furthermore, during storage, the slide rod descends downward and the support also interlocks, so that the body does not block the side opening with the support. Therefore, the used nuclear instrumentation tube passes through the side opening of the body without being hindered by the support and is accommodated in the body. In this storage operation, if the lower end of the used nuclear instrumentation pipe has passed through the side opening of the body, the used nuclear instrumentation pipe is stored in the body simply by hanging it down. The body containing the used nuclear instrumentation tube is pulled out from the upper lattice plate by lifting the handle. At this time, the handle rotates and stands up, and further rises together with the slide rod to avoid interference between the handle and the upper end of the stored nuclear instrumentation tube. As the slide rod rises, the support also rises up to the body side opening to prevent the stored nuclear instrumentation tube from falling down or largely protruding from the body side opening. When the body is hung horizontally, the slide rod rotates vertically with respect to the horizontal body.Therefore, as the slide rod rotates relative to the body, the support integrated with the slide rod is also provided. It is possible to obtain an effect of preventing the used nuclear instrumentation tube from falling off or coming off the body by being pressed against the used nuclear instrumentation tube in which the support is housed by rotating relative to the body.
【0052】第6手段によれば、第5手段による作用に
加えて、固定用フックが上部格子板にひっかかり、更に
はボデー底部のバスケット据付ガイドが燃料支持金具の
丸孔とはまりあうから、原子炉圧力容器内でのボデーの
設置状態が強固になり、収納作業時のボデーのふらつき
や倒れが防止され、作業の円滑な促進が可能となるとい
う作用が得られる。According to the sixth means, in addition to the action of the fifth means, the fixing hook is caught on the upper lattice plate, and further, the basket installation guide at the bottom of the body fits into the round hole of the fuel support fitting. The effect is that the body is firmly installed in the furnace pressure vessel, the body is prevented from wobbling and falling during storage work, and the work can be smoothly promoted.
【0053】第7手段によれば、保持具ボデーの一側面
(新核計装管の装着面)に形成された複数の凹部には新
核計装管が収納され、脱落しないように凹部の突端側開
口部は核計装管保持板を回転させて塞ぐ。この状態で複
数のフックを吊点として保持具ボデーを複数の新核計装
管ごと吊って原子炉圧力容器内に吊り降ろし、保持具ボ
デーのスリットに上部格子板の格子板を通して保持具ボ
デーと上部格子板を係合させて保持具ボデーを原子炉圧
力容器内に設置する。その設置に当たっては、交換作業
位置に前述の一側面(新核計装管の装着面)が向くよう
に向きを決める。その後に、核計装管保持板の位置を凹
部の突端側開口部が開放されるように回転させて、新核
計装管を保持具ボデーから新核計装管の設置位置(交換
作業位置)に移動させて交換作業に供する。その移動に
際しては、前述の装着面が交換作業位置に面しているか
ら、保持具ボデーの向きを途中で変えることなく移動が
最短経路でなされ、且つ保持具ボデーの干渉回避操作を
伴わないという作用が得られる。According to the seventh means, the new nuclear instrumentation tube is housed in the plurality of recesses formed on one side surface (mounting surface of the new nuclear instrumentation tube) of the holder body, and the tip end side of the recessed portion is prevented from falling off. The opening is closed by rotating the nuclear instrumentation tube holding plate. In this state, using the multiple hooks as suspension points, suspend the retainer body together with the multiple new instrumentation tubes and hang it down in the reactor pressure vessel.Pass the lattice plate of the upper lattice plate through the slit of the retainer body and the retainer body and the upper part. The retainer body is installed in the reactor pressure vessel by engaging the lattice plate. When installing it, orient it so that the one side face (mounting face of the new nuclear instrumentation tube) faces the replacement work position. After that, the position of the nuclear instrumentation tube holding plate is rotated so that the tip side opening of the recess is opened, and the new nuclear instrumentation tube is moved from the holder body to the installation position (replacement work position) of the new nuclear instrumentation tube. To be used for replacement work. At the time of the movement, since the above-mentioned mounting surface faces the replacement work position, the movement can be made in the shortest path without changing the orientation of the holder body in the middle, and the avoidance operation of the interference of the holder body is not involved. The action is obtained.
【0054】第8手段によれば、第7手段による作用に
加えて、保持具ボデー底部の保持具据付ガイドが燃料支
持金具の丸孔とはまりあう上、固定用ステーが原子炉圧
力容器に係合するから、原子炉圧力容器内での保持具ボ
デーの設置状態が強固になり、作業時のボデーのふらつ
きや倒れが防止され、作業の円滑な促進が可能となると
いう作用が得られる。According to the eighth means, in addition to the action of the seventh means, the retainer installation guide at the bottom of the retainer body fits into the round hole of the fuel support fitting, and the fixing stay engages with the reactor pressure vessel. As a result, the holding body in the reactor pressure vessel can be installed in a stronger state, and the body can be prevented from wobbling and collapsing at the time of work, and the work can be smoothly promoted.
【0055】[0055]
【実施例】本使用済核計装管収納バスケット27は図7
に示すように、全体がステンレス鋼製で水中保管に対応
している。[Embodiment] This used nuclear instrumentation tube storage basket 27 is shown in FIG.
As shown in, the entire product is made of stainless steel and can be stored in water.
【0056】炉水で満たされた原子炉圧力容器A内の上
部格子板3に設置するため軽量化する必要があり、強度
がさほど要求されない部位にはステンレス鋼製ネット3
1か、機械加工で軽量化したステンレス鋼板を使用す
る。Since it is installed on the upper lattice plate 3 in the reactor pressure vessel A filled with reactor water, it is necessary to reduce the weight, and the stainless steel net 3 is used for a portion where strength is not so required.
1 or use a stainless steel plate lightened by machining.
【0057】アルミニウムやチタン鋼等軽量且つ耐水性
のある材料を使用しても良い。A light and water resistant material such as aluminum or titanium steel may be used.
【0058】核計装管全体を収納する必要はないため、
上蓋がない格子板1区間に設置できる形状とする。Since it is not necessary to store the entire nuclear instrumentation tube,
The shape is such that it can be installed in one section of the grid plate without the top lid.
【0059】全長13mを越える核計装管を長手方向に
引き抜いたとき水面から露出しないよう、使用済核計装
管収納バスケット27側面に上面から見て90°以内の
角度で側面開口部37を設ける。A side opening 37 is provided on the side surface of the used nuclear instrumentation tube storage basket 27 at an angle of 90 ° or less when viewed from the top so that the nuclear instrumentation tube having a total length of more than 13 m is not exposed from the water surface when pulled out in the longitudinal direction.
【0060】これにより使用済核計装管1の垂直方向の
移動距離を減らし、収納しやすくする。As a result, the moving distance of the used nuclear instrumentation tube 1 in the vertical direction is reduced to facilitate storage.
【0061】原子炉圧力容器A内の炉心支持板4上の燃
料支持金具6(図18参照)及び上部格子板3に固定す
るため、バスケットボディ底部29は燃料支持金具6に
安定して乗せられるバスケット据付ガイド30(図10
参照)を有し、また、図9に示すように、上面から見て
4方向のバスケットボディ28側面に、上部格子板3に
固定できる固定用フック39を取り付ける。In order to fix the fuel support fitting 6 on the core support plate 4 (see FIG. 18) and the upper lattice plate 3 in the reactor pressure vessel A, the bottom 29 of the basket body can be stably placed on the fuel support fitting 6. Basket installation guide 30 (Fig. 10
As shown in FIG. 9, fixing hooks 39 that can be fixed to the upper lattice plate 3 are attached to the side surfaces of the basket body 28 in four directions when viewed from above.
【0062】使用済核計装管収納バスケット27を移動
する際に必要な移動用フック38は、使用済核計装管収
納バスケット27を燃料取替機11に取り付けたバスケ
ット掴み具21で吊り上げ横転させたときに、収納物落
下防止のため、側面開口部37が上向きにくる位置に取
り付ける。The moving hook 38 required for moving the spent nuclear instrumentation tube storage basket 27 was lifted by the basket grasping tool 21 attached to the fuel changer 11 and rolled over. At this time, in order to prevent the stored items from falling, the side opening 37 is attached at a position that faces upward.
【0063】この移動用フック38は使用済核計装管収
納バスケット27を上部格子板3へ設置するとき、格子
板に干渉しない程度の大きさとする。The moving hook 38 has such a size that it does not interfere with the lattice plate when the used nuclear instrumentation tube storage basket 27 is installed on the upper lattice plate 3.
【0064】移動用フック38をワイヤーでつなぐと、
使用済核計装管1を収納する際に側面開口部37を塞ぐ
恐れがあるため、上部格子板3上に緩めておけるロープ
でつなぐものとする。When the moving hook 38 is connected with a wire,
Since the side opening 37 may be closed when the used nuclear instrumentation tube 1 is stored, it is connected by a rope that can be loosened on the upper lattice plate 3.
【0065】バスケットボディ28には燃料取替機11
に取り付けたバスケット掴み具21で掴めるようなハン
ドル32を設置する。The basket body 28 has a fuel changer 11
A handle 32 that can be grasped by the basket grasping tool 21 attached to is installed.
【0066】このハンドル32は、スライドロッド3
3,サポート36及びバスケットボディ28側面にあけ
られたガイドレール35によって構成され、使用済核計
装管収納作業時には最も縮めた状態にしてハンドル32
は倒しておく。This handle 32 corresponds to the slide rod 3
3, the support 36 and the guide rail 35 formed on the side surface of the basket body 28, and the handle 32 is in the most contracted state when the used nuclear instrumentation tube is stored.
Defeat him.
【0067】バスケット掴み具21は図8に示すように
側面からハンドル32を入れられる構造とし、移動時に
ハンドル32が脱落するのを防止するためホース24で
供給された空気圧で作動するシリンダー43aの動きで
上下方向に作動するストッパー23をもち、燃料取替機
11の回転ジブクレーン12に取り付けられる取合構造
25を備えている。As shown in FIG. 8, the basket gripper 21 has a structure in which the handle 32 can be inserted from the side, and the movement of the cylinder 43a operated by the air pressure supplied by the hose 24 in order to prevent the handle 32 from falling off during movement. It has a stopper 23 that operates in the vertical direction, and is provided with an attachment structure 25 that is attached to the rotary jib crane 12 of the fuel changer 11.
【0068】図22のように、バスケットボデー側面に
あけられた縦長(図7における上下方向)の長孔の縁は
ガイドレール35として利用され、スライドロッド33
にサポート36とともに固定されたスライダー33aが
ガイドレール35から外れることなく上下に移動可能に
ガイドされる。As shown in FIG. 22, the edge of the vertically long slot (vertical direction in FIG. 7) formed in the side surface of the basket body is used as the guide rail 35, and the slide rod 33 is used.
The slider 33 a fixed together with the support 36 is guided so as to be movable up and down without coming off from the guide rail 35.
【0069】スライドロッド33の上端部にはハンドル
32が取り付けられるのであるが、その取付は回転軸3
2aにより回転自在に取り付けられる。The handle 32 is attached to the upper end of the slide rod 33.
It is rotatably attached by 2a.
【0070】使用済核計装管収納バスケット27を移動
するとき燃料取替機11に装着されたバスケット掴み具
21を用いてハンドル32を引き上げると、図11
(a)に示すようにガイドレール35に沿ってサポート
36も引き上げられ側面開口部37をふさぐため、使用
済核計装管1の脱落を防止できる。When the spent nuclear instrumentation tube storage basket 27 is moved, the handle 32 is pulled up by using the basket grip 21 attached to the refueling machine 11.
As shown in (a), the support 36 is also pulled up along the guide rail 35 to close the side opening 37, so that the used nuclear instrumentation tube 1 can be prevented from falling off.
【0071】スライドロッド33が伸びきった後、移動
用フック38に取り付けてあるロープを巻上げて横向き
に吊ると、図11(b)に示すようにサポート36が上
から使用済核計装管1を押さえ付けるようになるため、
移動中の計装管脱落を防止することができる。After the slide rod 33 is fully extended, the rope attached to the moving hook 38 is wound up and hung horizontally, and the support 36 fixes the used nuclear instrumentation tube 1 from above as shown in FIG. 11 (b). Because it comes to hold down,
It is possible to prevent the instrumentation pipe from falling off during movement.
【0072】本発明の原子炉圧力容器A内設置型新核計
装管保持具40は図12に示すように全体をステンレス
鋼製とし、原子炉圧力容器A水中での使用に対応してい
る。原子炉圧力容器A内の上部格子板3及び燃料支持金
具6上に設置するため、従来のものに比べ軽量化を図
る。The new nuclear instrumentation tube holder 40 installed in the reactor pressure vessel A of the present invention is made entirely of stainless steel as shown in FIG. 12, and is compatible with use in the reactor pressure vessel A in water. Since it is installed on the upper lattice plate 3 and the fuel support fitting 6 in the reactor pressure vessel A, the weight is reduced as compared with the conventional one.
【0073】アルミニウムやチタン鋼等軽量且つ耐水性
のある材料を使用しても良い。A lightweight and water resistant material such as aluminum or titanium steel may be used.
【0074】原子炉圧力容器A内設置型新核計装管保持
具40は、図12に示すように定検時の交換対象核計装
管全数を装着でき、原子炉圧力容器A壁近くの上部格子
板3に設置できる形状とし、原子炉圧力容器A壁と向か
いあう面は新核計装管2の切り離しがしにくく作業性が
悪いため、その面を除く他の面に装着する。As shown in FIG. 12, the new nuclear instrumentation pipe holder 40 installed in the reactor pressure vessel A can accommodate all the nuclear instrumentation pipes to be replaced at the time of regular inspection, and the upper lattice near the wall of the reactor pressure vessel A can be installed. The shape that can be installed on the plate 3 is used, and the surface facing the wall of the reactor pressure vessel A is difficult to separate the new nuclear instrumentation tube 2 and the workability is poor, so it is mounted on other surfaces except that surface.
【0075】この原子炉圧力容器A内設置型新核計装管
保持具40は上部格子板3をまたぐためのスリット49
と燃料支持金具6上に安定して乗せられる保持具据付ガ
イド48を有する底部(図13参照)によって原子炉圧
力容器A内に設置する。The new nuclear instrumentation tube holder 40 installed inside the reactor pressure vessel A has a slit 49 for straddling the upper lattice plate 3.
And a bottom part (see FIG. 13) having a holder installation guide 48 which can be stably placed on the fuel support fitting 6 and is installed in the reactor pressure vessel A.
【0076】このとき、上部格子板3で固定している位
置より上が長くなるため、転倒防止策として原子炉圧力
容器A壁の構造物(ヘッドボルト穴等)と保持具ボディ
41上部を固定できる固定用ステー44を取り付ける。At this time, since the position above the position fixed by the upper lattice plate 3 becomes longer, the structure (head bolt hole etc.) on the wall of the reactor pressure vessel A and the upper part of the holder body 41 are fixed as a fall prevention measure. The fixing stay 44 that can be attached is attached.
【0077】この固定用ステー44は図1のごとく、原
子炉圧力容器A壁の既存ヘッドボルト穴へボルト44a
により固定される。This fixing stay 44 is, as shown in FIG. 1, a bolt 44a to the existing head bolt hole on the wall of the reactor pressure vessel A.
Fixed by.
【0078】従来は天井クレーンの補巻設備14で新核
計装管保持具18を吊り、水面上で計測器取扱具15で
掴み、新核計装管2の切り離しを行っていたが、本発明
の原子炉圧力容器A内設置型核計装管保持具40は燃料
取替機11との干渉を避けるべく従来より下方に置くた
め、遠隔操作をしやすくする必要がある。Conventionally, the new nuclear instrumentation pipe holder 18 was hung by the auxiliary winding equipment 14 of the overhead crane, and the instrument handling tool 15 was used to grasp the new nuclear instrumentation pipe 2 on the surface of the water to disconnect the new nuclear instrumentation pipe 2. Since the nuclear instrumentation pipe holder 40 installed in the reactor pressure vessel A is placed lower than the conventional one in order to avoid interference with the refueling machine 11, it is necessary to facilitate remote operation.
【0079】新核計装管切離しレバー42の頭部43
は、図14のような角のある形状で、これと同形状のソ
ケット型をした先端を持つ切離し治具20(図14参
照)を燃料取替機11上から切離しレバー頭部43に装
着し、回転することで新核計装管2を固定している核計
装管保持板45を簡単に回すことができる。Head 43 of new nuclear instrumentation tube disconnect lever 42
14 is a cornered shape as shown in FIG. 14, and a disconnecting jig 20 (see FIG. 14) having a socket-shaped tip having the same shape as that of the same is attached to the disconnecting lever head 43 from the top of the fuel changer 11. By rotating, the nuclear instrumentation tube holding plate 45 fixing the new nuclear instrumentation tube 2 can be easily rotated.
【0080】核計装管保持板45の回転機構は、図2
4,図25のごとく、新核計装管切離しレバー42の頭
部43は操作上保持具ボデー41の上端から上方につき
でているが、他の部分は保持具ボデー41の内側にとお
されて回転自在に支持されている。The rotation mechanism of the nuclear instrumentation tube holding plate 45 is shown in FIG.
As shown in FIG. 4 and FIG. 25, the head 43 of the new instrumentation tube disconnecting lever 42 is located above the upper end of the holder body 41 in operation, but the other portions are rotated inside the holder body 41. It is supported freely.
【0081】その新核計装管切離しレバー42の途中に
はウォームギヤ42a,42bが取り付けられており、
そのウォームギヤ42a,42bに噛み合って回転する
ギヤ46a,46bが回転軸45a,45bに上下に個
々に配置された各核計装管保持板45とともに固定さ
れ、回転軸45a,45bは保持具ボデー41に回転自
在に設置される。Worm gears 42a and 42b are attached in the middle of the new nuclear instrumentation tube disconnecting lever 42,
Gears 46a, 46b that rotate by meshing with the worm gears 42a, 42b are fixed to the rotary shafts 45a, 45b together with the respective nuclear instrumentation tube holding plates 45, and the rotary shafts 45a, 45b are attached to the holder body 41. It is rotatably installed.
【0082】そのため、切離し治具20を新核計装管切
離しレバー42の頭部43に嵌めて回転することで、ウ
ォームギヤ42a,42bとギヤ46a,46bと回転
軸45a,45bとが連動して回転して、真上と真下と
の関係にある各核計装管保持板45が同時に回転でき
る。Therefore, by mounting the separating jig 20 on the head 43 of the new nuclear instrumentation tube separating lever 42 and rotating it, the worm gears 42a and 42b, the gears 46a and 46b, and the rotating shafts 45a and 45b rotate in conjunction with each other. Then, the respective nuclear instrumentation tube holding plates 45, which are in a relationship of directly above and below, can rotate simultaneously.
【0083】図15に示すようにこの核計装管保持板4
5は扇形のプレートで、1枚で保持板両側の新核計装管
2を保持でき、切離しレバー42の回転方向によって保
持板45の回転方向が変わり、どちらか一方の新核計装
管2を切り離せる。As shown in FIG. 15, this nuclear instrumentation tube holding plate 4
Reference numeral 5 denotes a fan-shaped plate that can hold the new nuclear instrumentation tubes 2 on both sides of the holding plate, and the rotation direction of the holding plate 45 changes depending on the rotation direction of the separation lever 42, so that either one of the new nuclear instrumentation tubes 2 can be separated It
【0084】この操作は燃料取替機11上から切離し治
具20を炉水中に突っ込んで容易に行えるようにする。This operation can be easily carried out by separating the jig 20 from the refueling machine 11 and thrusting it into the reactor water.
【0085】原子炉圧力容器A内設置型新核計装管保持
具40を原子炉圧力容器A内に設置、あるいは取り出す
とき、保持具ボディ41上端部に取り付けられた上部フ
ック50と下端に取り付けられた下部フック51を用い
て吊り上げる。When the new nuclear instrumentation tube holder 40 installed in the reactor pressure vessel A is set in or taken out from the reactor pressure vessel A, it is attached to the upper hook 50 attached to the upper end of the holder body 41 and the lower end. It is lifted using the lower hook 51.
【0086】上部フック50はボディ中心にあるが、下
部フック51はスリット49が中央にあるため、全体の
重量バランスを十分考慮した上でわずかに中心よりずら
して取り付ける。The upper hook 50 is at the center of the body, but the lower hook 51 has the slit 49 at the center. Therefore, the upper hook 50 is mounted slightly offset from the center in consideration of the overall weight balance.
【0087】上部フック50を燃料取替機11の回転ジ
ブクレーン12で吊り、下部フック51を天井クレーン
の補巻設備14で吊る。The upper hook 50 is hung by the rotary jib crane 12 of the refueling machine 11, and the lower hook 51 is hung by the auxiliary winding equipment 14 of the overhead crane.
【0088】原子炉圧力容器A外で核計装管装着面を上
に向けた状態で横向きに吊り、原子炉圧力容器A内の所
定の位置で燃料取替機11の回転ジブクレーン12の吊
りロープを緩めていき、直立にした後真直に下方へ降ろ
して設置する。Outside the reactor pressure vessel A, the suspension tube is horizontally hung with the mounting surface of the nuclear instrumentation pipe facing upward, and the suspension rope of the rotary jib crane 12 of the refueling machine 11 is placed at a predetermined position in the reactor pressure vessel A. Loosen it, set it upright, and then hang it straight down.
【0089】取り外しはこの逆で行われる。Removal is done in reverse.
【0090】これらをそれぞれ単体で使用した場合の作
業ステップを以下に示す。The work steps when each of these is used alone are shown below.
【0091】(*付数字は従来から追加,変更されたス
テップ。) (a)使用済核計装管取り外し作業ステップを図2に示
す。(The numbers marked with * have been added or changed from the past.) (A) Fig. 2 shows the steps for removing used nuclear instrumentation pipes.
【0092】ステップ*91で移動用フック38に取り
付けたロープを、天井クレーンの補巻設備14から吊り
降ろしたものと燃料取替機11に取り付けたバスケット
掴み具21で掴んだハンドル32とで水平に吊り上げた
使用済核計装管収納バスケット27を原子炉圧力容器A
上にもってゆき、そこでロープをゆるめて直立させ、原
子炉圧力容器A内上部格子板3に設置する。In step * 91, the rope attached to the moving hook 38 is hung from the auxiliary winding equipment 14 of the overhead crane, and the handle 32 held by the basket grip 21 attached to the fuel changer 11 is leveled. The used nuclear instrumentation tube storage basket 27 that has been lifted to the reactor pressure vessel A
Take it to the top, loosen the rope there and stand upright, and install it on the upper lattice plate 3 in the reactor pressure vessel A.
【0093】ステップ92で燃料取替機11に取り付け
られた計測器取扱具15を原子炉圧力容器A内に吊り降
ろす。In step 92, the measuring instrument handling tool 15 attached to the refueling machine 11 is suspended in the reactor pressure vessel A.
【0094】ステップ93で計測器取扱具15で使用済
核計装管1を掴む。In step 93, the used nuclear instrumentation tube 1 is grasped by the measuring instrument handling tool 15.
【0095】ステップ94で使用済核計装管1を垂直に
引き抜く。At step 94, the used nuclear instrumentation tube 1 is pulled out vertically.
【0096】ステップ*95で使用済核計装管収納バス
ケット27に収納する。In step * 95, the used nuclear instrumentation tube storage basket 27 is stored.
【0097】2本目以降は、ステップ92〜*95を繰
り返す。After the second line, steps 92 to * 95 are repeated.
【0098】ステップ*96で上記作業完了後、バスケ
ット掴み具21を燃料取替機11に付け替え、ハンドル
32を掴んで垂直に引上げ、使用済核計装管1の脱落を
防止した後、垂直に吊り上げる。After the above work is completed in step * 96, the basket gripping tool 21 is replaced with the refueling machine 11, the handle 32 is gripped and pulled up vertically to prevent the spent nuclear instrumentation tube 1 from falling off, and then lifted up vertically. .
【0099】ステップ*97でバスケット27を水平に
し、使用済燃料プール8へ移動する。At step * 97, the basket 27 is leveled and moved to the spent fuel pool 8.
【0100】一括して使用済核計装管収納バスケット2
7を使用済燃料プール8に移動するときの概略を図4に
示す。Collectively used nuclear instrumentation tube storage basket 2
FIG. 4 shows an outline of moving 7 to the spent fuel pool 8.
【0101】(b)新核計装管取り付け作業ステップを
図3に示す。(B) The steps for installing the new nuclear instrumentation tube are shown in FIG.
【0102】ステップ*101で原子炉圧力容器A内設
置型核計装管保持具40に交換対象核計装管2を全数装
着する。At step * 101, all the nuclear instrumentation tubes 2 to be replaced are mounted on the nuclear instrumentation tube holders 40 installed in the reactor pressure vessel A.
【0103】ステップ*102で横向きに吊った原子炉
圧力容器A内設置型核計装管保持具40を原子炉圧力容
器A上に移動し、引き起こした後上部格子板3及び原子
炉圧力容器A壁の一部で固定する。The nuclear instrumentation pipe holder 40 installed inside the reactor pressure vessel A hung horizontally in step * 102 was moved to the reactor pressure vessel A and caused to wake up, and then the upper lattice plate 3 and the wall of the reactor pressure vessel A were moved. Fixed with a part of.
【0104】ステップ*103で原子炉圧力容器A内照
明54,原子炉圧力容器A内テレビカメラ26他を交換
対象座標の上部格子板3付近に設置する(テレビカメラ
26で据付確認を行うため、核計装管据付ガイド19は
使用しない。)。In step * 103, the illumination 54 inside the reactor pressure vessel A, the television camera 26 inside the reactor pressure vessel A, etc. are installed in the vicinity of the upper lattice plate 3 of the coordinates to be replaced (in order to confirm the installation by the television camera 26, The nuclear instrumentation tube installation guide 19 is not used.)
【0105】ステップ104で新核計装管2を計測器取
扱具15で掴み、燃料取替機11上より切離しレバーを
回し、新核計装管保持具40より切り離す。In step 104, the new nuclear instrumentation tube 2 is grasped by the measuring instrument handling tool 15, and the lever is turned off from above the refueling machine 11 and is turned off from the new nuclear instrumentation tube holding tool 40.
【0106】ステップ105で新核計装管2を原子炉圧
力容器A内テレビカメラ26で確認しながら挿入する。In step 105, the new nuclear instrumentation tube 2 is inserted while checking the television camera 26 in the reactor pressure vessel A.
【0107】ステップ106でシート部をフラッシング
する。(ペデスタル作業) ステップ107で計測器取扱具15で着座を確認する。In step 106, the sheet portion is flushed. (Pedestal work) In step 107, the seating is confirmed by the measuring instrument handling tool 15.
【0108】ステップ108で計測器取扱具15を切り
離して終了。In step 108, the measuring instrument handling tool 15 is disconnected and the process ends.
【0109】2本目以降は、ステップ*103〜108
を繰り返す。For the second and subsequent steps, steps * 103 to 108
repeat.
【0110】ステップ109で核計装管交換作業全工程
終了後、原子炉圧力容器A内設置型新核計装管保持具4
0を原子炉圧力容器A外に取り出し、除染する。After the completion of all steps of the nuclear instrumentation tube replacement work in step 109, the new nuclear instrumentation tube holder 4 installed inside the reactor pressure vessel A
0 is taken out of the reactor pressure vessel A and decontaminated.
【0111】原子炉圧力容器A内設置型新核計装管保持
具40の設置/取り出し方法の概略を図5に示す。FIG. 5 shows an outline of a method of installing / removing the new nuclear instrumentation tube holder 40 installed inside the reactor pressure vessel A.
【0112】以上のように、2つの装置を使用すること
で作業ステップが簡略化される。As described above, the work steps are simplified by using the two devices.
【0113】この作業の概略図を図1に示す。A schematic diagram of this work is shown in FIG.
【0114】この実施例によると、原子炉圧力容器A内
核計装管取り外し作業において、上部格子板3の1格子
内に設置できる形状で、そのボディ側面部に開口部37
を設けたバスケットボディ28と、燃料支持金具6上に
安定して設置できるバスケット据付ガイド30をもつバ
スケットボディ底部29と、上部格子板3上に固定する
ための固定用フック39と、バスケット移動時にロープ
で吊り上げ水平を保つための移動用フック38と、バス
ケット掴み具21で取り扱える形状で、バスケットボデ
ィ28上部に使用済核計装管1を固定できる構造を有す
るハンドル32を備えた使用済核計装管収納バスケット
27を用いることで、原子炉圧力容器A水中で水圧クラ
ンプ16による掴み替え作業がなくなり、作業が平易に
なった結果熟練作業者が不要になる。According to this embodiment, in the operation of removing the nuclear instrumentation tube in the reactor pressure vessel A, the opening 37 is formed in the side surface of the body so as to be installed in one lattice of the upper lattice plate 3.
, A basket body 28 having a basket body 28, a basket body bottom 29 having a basket installation guide 30 that can be stably installed on the fuel support fitting 6, a fixing hook 39 for fixing on the upper grid plate 3, and a basket movement at the time of moving the basket. A spent nuclear instrumentation tube provided with a moving hook 38 for suspending with a rope and keeping it horizontal, and a handle 32 having a shape that can be handled by the basket gripping tool 21 and having a structure capable of fixing the spent nuclear instrumentation tube 1 to the upper portion of the basket body 28. The use of the storage basket 27 eliminates the work of re-grabbing by the water pressure clamp 16 in the water of the reactor pressure vessel A, and as a result of simplifying the work, a skilled worker becomes unnecessary.
【0115】また、使用済核計装管1を1本ずつ使用済
燃料プール8へ移動するステップがなくなることで、移
動に要する時間と専従作業者を削減することができ、取
り外した使用済核計装管1を一括して使用済燃料プール
8へ移動するのは、図6に示すように核計装管交換作業
終了後、燃料装荷までの任意の時期でよいため、工程短
縮及び付帯作業削減に効果がある。Further, by eliminating the step of moving the spent nuclear instrumentation pipes 1 to the spent fuel pool 8 one by one, it is possible to reduce the time required for the movement and the number of dedicated workers. As shown in FIG. 6, it is sufficient to move the pipes 1 to the spent fuel pool 8 all together at any time after the nuclear instrumentation pipe replacement work and before the fuel loading, which is effective in shortening the process and reducing the incidental work. There is.
【0116】使用済核計装管収納バスケット27を使用
しないときは、使用済燃料プール8内にそのまま保管で
きるため、取り出して除染する作業も削除できる。When the spent nuclear instrumentation tube storage basket 27 is not used, it can be stored in the spent fuel pool 8 as it is, and therefore the work of taking out and decontaminating can be eliminated.
【0117】原子炉圧力容器A内核計装管取り付け作業
において、原子炉圧力容器A壁近くの上部格子板3に設
置できる形状で、上部格子板3をまたぐためのスリット
49を有し、燃料支持金具6上に安定して設置できる保
持具据付ガイド48を有する保持具ボディ底部47と、
交換対象の新核計装管2全数を原子炉圧力容器A壁と向
かいあわない面に装着できる保持具ボディ41と、保持
具ボディ41の転倒防止のため原子炉圧力容器A壁の構
造物と固定できる固定用ステー44をもち、燃料取替機
11上部から切離し治具20を用い遠隔操作で新核計装
管2を取り外せる切離しレバー42と、新核計装管2を
装着し原子炉圧力容器A内へ移動する際横向きに吊り、
上部格子板3上に設置するために真直に吊れる上部フッ
ク50及び下部フック51を備えた原子炉圧力容器A内
設置型新核計装管保持具40を用いることで、新核計装
管保持具をドライヤ/セパレータピット10から原子炉
圧力容器A内へ移動,待機させるための時間と専従作業
者が不要となり、時間短縮と付帯作業削減に効果があ
る。In the reactor pressure vessel A inner core instrumentation pipe installation work, the reactor pressure vessel A has a slit 49 for straddling the upper lattice plate 3 and has a shape that can be installed on the upper lattice plate 3 near the wall of the reactor pressure vessel A. A holder body bottom 47 having a holder installation guide 48 that can be stably installed on the metal fitting 6,
A holder body 41 that can mount all the new nuclear instrumentation tubes 2 to be replaced on a surface that does not face the reactor pressure vessel A wall, and is fixed to the structure of the reactor pressure vessel A wall to prevent the holder body 41 from falling. In the reactor pressure vessel A, which has a fixing stay 44 that can be attached, and which is equipped with the disconnection lever 42 that can remotely remove the new nuclear instrumentation pipe 2 from the upper part of the fuel refiller 11 and the new nuclear instrumentation pipe 2 and the new nuclear instrumentation pipe 2 Suspend sideways when moving to
By using the new nuclear instrumentation pipe holder 40 installed in the reactor pressure vessel A having the upper hook 50 and the lower hook 51 that are hung straight to be installed on the upper lattice plate 3, the new nuclear instrumentation pipe holder The time for moving and waiting from the dryer / separator pit 10 into the reactor pressure vessel A and the need for a full-time operator are not required, which is effective in reducing the time and incidental work.
【0118】また、昼食や作業終了で作業員が現場を離
れる場合、原子炉圧力容器A内に設置したままでよく、
その都度除染する必要がなくなる。When the worker leaves the work site for lunch or after the work is completed, it may be installed in the reactor pressure vessel A,
There is no need to decontaminate each time.
【0119】従来のように交換対象全数を取り外した後
全数取り付けるようにすると、同座標に2回原子炉圧力
容器A内テレビカメラと原子炉圧力容器A内照明を設置
することになるが、この2つの装置を同時に使用するこ
とで当該座標に原子炉圧力容器A内照明灯54と原子炉
圧力容器A内テレビカメラ26を置いたままで取り外
し、取り付けができるため、原子炉圧力容器A内テレビ
カメラと原子炉圧力容器A内照明の移動ステップが半分
になり、上記の効果と併せると作業効率が大幅に向上
し、現在定検作業の大きな課題であるクリティカル工程
短縮へ大きく寄与する。When all the objects to be replaced are removed and then all are mounted as in the conventional case, the television camera in the reactor pressure vessel A and the illumination in the reactor pressure vessel A are installed twice at the same coordinates. By using the two devices at the same time, the illumination lamp 54 in the reactor pressure vessel A and the television camera 26 in the reactor pressure vessel A can be removed and installed at the coordinates, so that the television camera in the reactor pressure vessel A can be attached. The number of steps for moving the illumination inside the reactor pressure vessel A is halved, and when combined with the above effects, work efficiency is significantly improved, and it greatly contributes to the shortening of the critical process, which is currently a major issue of regular inspection work.
【0120】使用済核計装管1の切断作業は原子炉圧力
容器A内では実施せず、図6に示すように原子炉圧力容
器A内核計装管交換作業終了後から定検終了までに使用
済燃料プール8で行うため、原子炉圧力容器A内にある
燃料集合体に与える影響は一切なく、また交換作業の工
程を遅延することもない。The cutting operation of the used nuclear instrumentation tube 1 is not carried out in the reactor pressure vessel A, but is used after the completion of the nuclear instrumentation tube exchange operation in the reactor pressure vessel A until the completion of the regular inspection as shown in FIG. Since it is performed in the spent fuel pool 8, there is no influence on the fuel assemblies in the reactor pressure vessel A, and the process of replacement work is not delayed.
【0121】[0121]
【発明の効果】請求項1の発明によれば、バスケットに
使用済核計装管を分断することなく側面から容易に収納
して複数の使用済核計装管をバスケット後と一括して撤
去できるから、原子炉圧力容器内に分断屑を残すことな
く迅速に撤去作業ができ、水中での収納作業も互いに離
れた複数箇所の切欠き部に使用済核計装管を納めて収納
するのに比べても熟練を要することなく楽であって、撤
去作業がより一層迅速に行われ、交換作業時の撤去作業
に利用すれば交換作業の作業工程が短縮できる。請求項
2の発明によれば、使用済核計装管の切断作業時期が任
意の時期に行える効果が得られる。According to the invention of claim 1, the used nuclear instrumentation pipes can be easily accommodated from the side without dividing the basket and the plurality of used nuclear instrumentation pipes can be collectively removed after the basket. In comparison with storing spent nuclear instrumentation pipes in a plurality of notches that are separated from each other, it is possible to quickly remove work without leaving cutting waste in the reactor pressure vessel and store it in water. Is easy without requiring skill, the removal work can be performed more quickly, and the work process of the replacement work can be shortened if it is used for the removal work during the replacement work. According to the invention of claim 2, the effect of cutting the used nuclear instrumentation pipe at any time can be obtained.
【0122】請求項3の発明によれば、新核計装管を据
付ける際に新核計装管の新核計装管保持具からの移送時
に新核計装管保持具と移送中の新核計装管の干渉回避操
作及び保持具を新核計装管を保持具から取り出すごとに
回転させることを避けることができるから、新核計装管
を据付ける作業が熟練を要することなく迅速になされ、
交換作業時の据付作業に利用すれば交換作業の作業工程
が短縮できる。According to the invention of claim 3, when installing the new nuclear instrumentation tube, the new nuclear instrumentation tube holder and the new nuclear instrumentation tube being transferred at the time of transferring the new nuclear instrumentation tube from the new nuclear instrumentation tube holder. Since it is possible to avoid the interference avoiding operation and rotating the holder each time the new nuclear instrumentation tube is taken out from the holder, the work of installing the new nuclear instrumentation tube can be done quickly without requiring skill,
If used for installation work during replacement work, the work process of replacement work can be shortened.
【0123】請求項4の発明によれば、核計装管の交換
作業が使用済核計装管の撤去と新核計装管の据付けとを
迅速になせるから、その全体の交換作業工程が短縮でき
る。請求項5の発明によれば、バスケットに使用済核計
装管を分断することなく側面から容易に収納して複数の
使用済核計装管をバスケット後と一括して撤去できるか
ら、原子炉圧力容器内に分断屑を残すことなく迅速に撤
去作業ができ、水中での収納作業も互いに離れた複数箇
所の切欠き部に使用済核計装管を納めて収納するのに比
べても熟練を要することなく楽であって、撤去作業がよ
り一層迅速に行われ、交換作業時の撤去作業に利用すれ
ば交換作業の作業工程が短縮するに貢献する核計装管撤
去用の移送収納手段を提供できる。According to the invention of claim 4, the replacement work of the nuclear instrumentation pipe can promptly remove the used nuclear instrumentation pipe and install the new nuclear instrumentation pipe, so that the whole replacement work process can be shortened. . According to the invention of claim 5, the spent nuclear instrumentation pipes can be easily stored from the side without dividing the spent nuclear instrumentation pipes into the basket, and a plurality of the spent nuclear instrumentation pipes can be collectively removed after the basket. It can be removed quickly without leaving any debris inside, and storage work in water also requires skill compared to storing used nuclear instrumentation tubes in multiple notches that are separated from each other. Therefore, it is possible to provide a transfer and storage means for removing the nuclear instrumentation pipe, which is easy and easy, and can be used for the removal work during the replacement work, which contributes to shortening the work process of the replacement work.
【0124】請求項6の発明によれば、請求項5の発明
による効果に加えて、バスケットボデーを原子炉圧力容
器内で姿勢を安定して維持でき、作業の促進に貢献でき
る。請求項7の発明によれば、新核計装管を据付ける際
に新核計装管の新核計装管保持具からの移送時に新核計
装管保持具と移送中の新核計装管の干渉回避操作及び保
持具を新核計装管を保持具から取り出すごとに回転させ
ることを避けることができるから、新核計装管を据付け
る作業が熟練を要することなく迅速になされ、交換作業
時の据付作業に利用すれば交換作業の作業工程が短縮す
るのに貢献できる核計装管の保持手段が提供できる。According to the invention of claim 6, in addition to the effect of the invention of claim 5, the posture of the basket body can be stably maintained in the reactor pressure vessel, which contributes to the promotion of the work. According to the invention of claim 7, when installing the new nuclear instrumentation tube, avoiding interference between the new nuclear instrumentation tube holder and the new nuclear instrumentation tube during the transfer when the new nuclear instrumentation tube is transferred from the new nuclear instrumentation tube holder. Since it is possible to avoid rotating the operation and holding tool every time the new nuclear instrumentation tube is taken out from the holding tool, the work of installing the new nuclear instrumentation tube can be done promptly without requiring skill, and the installation work at the time of replacement work When used for, it is possible to provide a means for holding the nuclear instrumentation tube that can contribute to shortening the work process of the replacement work.
【0125】請求項8の発明によれば、請求項7の発明
による効果に加えて、原子炉圧力容器内で核計装管の保
持手段の姿勢が安定に維持され、作業の促進に貢献でき
る。According to the invention of claim 8, in addition to the effect of the invention of claim 7, the posture of the holding means of the nuclear instrumentation pipe is maintained stable in the reactor pressure vessel, which can contribute to the promotion of the work.
【図1】本発明の一実施例による核計装管交換作業を施
工している状態の作業現場の縦断面図である。FIG. 1 is a vertical cross-sectional view of a work site where a nuclear instrumentation tube replacement work is being performed according to an embodiment of the present invention.
【図2】本発明の一実施例による使用済核計装管取り外
し作業の作業ステップ図である。FIG. 2 is a work step diagram of a used nuclear instrumentation tube removal work according to an embodiment of the present invention.
【図3】本発明の一実施例による新核計装管取付作業の
作業ステップ図である。FIG. 3 is a work step diagram of a new nuclear instrumentation tube mounting work according to an embodiment of the present invention.
【図4】本発明の一実施例による使用済核計装管収納バ
スケットの一括移動概略図である。FIG. 4 is a schematic view of a collective movement of a used nuclear instrumentation tube storage basket according to an embodiment of the present invention.
【図5】本発明の一実施例による新核計装管保持具の設
置/取出概略図である。FIG. 5 is a schematic view of installation / removal of a new nuclear instrumentation tube holder according to an embodiment of the present invention.
【図6】本発明の一実施例による原子炉クリティカル工
程における使用済核計装管の移動/切断可能期間説明図
である。FIG. 6 is an explanatory diagram of a movable / cuttable period of a used nuclear instrumentation pipe in a reactor critical process according to an embodiment of the present invention.
【図7】本発明の一実施例による使用済核計装管収納バ
スケットの斜視図である。FIG. 7 is a perspective view of a used nuclear instrumentation tube storage basket according to an embodiment of the present invention.
【図8】本発明の一実施例によるバスケット掴み具の外
観図である。FIG. 8 is an external view of a basket gripping tool according to an embodiment of the present invention.
【図9】本発明の一実施例による使用済核計装管収納バ
スケット上面図である。FIG. 9 is a top view of a used nuclear instrumentation tube storage basket according to an embodiment of the present invention.
【図10】本発明の一実施例による使用済核計装管収納
バスケット底面図である。FIG. 10 is a bottom view of a used nuclear instrumentation tube storage basket according to an embodiment of the present invention.
【図11】(a)図は本発明の一実施例による使用済核
計装管収納バスケット移動時の核計装管脱落防止機構に
おけるハンドル引上げ時外観図であり、(b)図は本発
明の一実施例による使用済核計装管収納バスケット移動
時の核計装管脱落防止機構におけるハンドル横倒し外観
図である。11 (a) is an external view of the nuclear instrumentation tube dropout prevention mechanism when the used nuclear instrumentation tube storage basket is moved according to an embodiment of the present invention when the handle is pulled up, and FIG. 11 (b) is an illustration of the present invention. FIG. 7 is an external view of the handle of the nuclear instrumentation tube dropout prevention mechanism when the used nuclear instrumentation tube storage basket is moved according to the embodiment.
【図12】本発明の一実施例による炉内設置型新核計装
管保持具の斜視図である。FIG. 12 is a perspective view of a reactor-installed new nuclear instrumentation tube holder according to an embodiment of the present invention.
【図13】本発明の一実施例による炉内設置型新核計装
管保持具の底面図である。FIG. 13 is a bottom view of the in-reactor-type new nuclear instrumentation tube holder according to an embodiment of the present invention.
【図14】本発明の一実施例による切離し治具の外観図
である。FIG. 14 is an external view of a separating jig according to an embodiment of the present invention.
【図15】本発明の一実施例による核計装管保持板の立
面図である。FIG. 15 is an elevation view of a nuclear instrumentation tube holding plate according to an embodiment of the present invention.
【図16】従来の使用済核計装管取り外し作業ステップ
図である。FIG. 16 is a conventional step diagram for removing used nuclear instrumentation pipes.
【図17】核計装管上端,下端拡大立面図である。FIG. 17 is an enlarged elevation view of the upper and lower ends of the nuclear instrumentation tube.
【図18】燃料支持金具の斜視図である。FIG. 18 is a perspective view of a fuel support fitting.
【図19】従来の使用済核計装管取り外し作業現場の縦
断面図である。FIG. 19 is a vertical sectional view of a conventional used nuclear instrumentation tube removal work site.
【図20】従来の新核計装管取付作業ステップ図であ
る。FIG. 20 is a conventional work step diagram for installing a new nuclear instrumentation tube.
【図21】従来の新核計装管取付作業現場の縦断面図で
ある。FIG. 21 is a vertical cross-sectional view of a conventional new nuclear instrumentation tube installation work site.
【図22】図7のX−X矢視断面図である。22 is a sectional view taken along line XX of FIG. 7.
【図23】図22のY−Y矢視断面図である。23 is a cross-sectional view taken along the line YY of FIG.
【図24】本発明の一実施例による炉内設置型新核計装
管保持具に装備された核計装管保持板の回転駆動機構の
斜視図である。FIG. 24 is a perspective view of a rotary drive mechanism of a nuclear instrumentation tube holding plate provided in a reactor-installed new nuclear instrumentation tube holder according to an embodiment of the present invention.
【図25】図15のZ−Z矢視断面図である。25 is a cross-sectional view taken along the line ZZ of FIG.
1…使用済核計装管、2…新核計装管、3…上部格子
板、4…炉心支持板、5…下部格子板、6…燃料支持金
具、7…使用済燃料プールカナル、8…使用済燃料プー
ル、9…ドライヤ/セパレータピットカナル、10…ド
ライヤ/セパレータピット、11…燃料取替機、12…
回転ジブクレーン、13…固定補助ホイスト、14…天
井クレーンの補巻設備、15…計測器取扱具、16…水
圧クランプ、17…インコアマニピュレータ、18…新
核計装管保持具、19…核計装管据付ガイド、20…切
離し治具、21…バスケット掴み具、22…掴み具ボデ
ィ、23…ストッパー、24…ホース、25…掴み具取
合、26…炉内テレビカメラ、27…使用済核計装管収
納バスケット、28…バスケットボディ、29…バスケ
ットボディ底部、30…バスケット据付ガイド、31…
ネット、32…可倒式ハンドル、33…スライドロッ
ド、34…ロッドガイド、35…ガイドレール、36…
サポート、37…側面開口部、38…移動用フック、3
9…固定用フック、40…炉内設置型新核計装管保持
具、41…保持具ボディ、42…切離しレバー、43…
切離しレバー頭部、44…固定用ステー、45…核計装
管保持板、46…保持板支点、47…保持具ボディ底
部、48…保持具据付ガイド、49…スリット、50…
上部フック、51…下部フック、52…プランジャー、
53…ノーズピース、54…炉内照明灯、61〜70…
従来の使用済原子炉内核計装管取り外し作業ステップ、
71〜82…従来の新核計装管取り付け作業ステップ、
91〜97…核計装管収納バスケットを使用した使用済
核計装管取り外し作業ステップ、101〜109…炉内
設置型核計装管保持具を使用した新核計装管取り付け作
業ステップ。1 ... spent nuclear instrumentation tube, 2 ... new nuclear instrumentation tube, 3 ... upper lattice plate, 4 ... core support plate, 5 ... lower lattice plate, 6 ... fuel support metal fitting, 7 ... spent fuel pool canal, 8 ... used Used fuel pool, 9 ... Dryer / separator pit canal, 10 ... Dryer / separator pit, 11 ... Fuel changer, 12 ...
Rotating jib crane, 13 ... Fixed auxiliary hoist, 14 ... Auxiliary winding equipment for overhead crane, 15 ... Measuring instrument handling tool, 16 ... Hydraulic clamp, 17 ... Incore manipulator, 18 ... New nuclear instrumentation pipe holder, 19 ... Nuclear instrumentation pipe installation Guide, 20 ... Separation jig, 21 ... Basket gripping tool, 22 ... Gripper tool body, 23 ... Stopper, 24 ... Hose, 25 ... Gripper fitting, 26 ... Reactor TV camera, 27 ... Spent nuclear instrument tube storage Basket, 28 ... Basket body, 29 ... Basket body bottom, 30 ... Basket installation guide, 31 ...
Net, 32 ... Retractable handle, 33 ... Slide rod, 34 ... Rod guide, 35 ... Guide rail, 36 ...
Support, 37 ... Side opening, 38 ... Moving hook, 3
9 ... Fixing hook, 40 ... New nuclear instrumentation tube holder in reactor, 41 ... Holder body, 42 ... Separation lever, 43 ...
Separation lever head, 44 ... Fixing stay, 45 ... Nuclear instrumentation tube holding plate, 46 ... Holding plate fulcrum, 47 ... Holder body bottom part, 48 ... Holder installation guide, 49 ... Slit, 50 ...
Upper hook, 51 ... Lower hook, 52 ... Plunger,
53 ... nose piece, 54 ... furnace lighting, 61-70 ...
Steps to remove the conventional instrumentation tube from the used nuclear reactor,
71-82 ... Conventional new nuclear instrumentation tube installation work step,
91-97 ... Used nuclear instrumentation tube removal work step using the nuclear instrumentation tube storage basket, 101-109 ... New nuclear instrumentation tube attachment work step using the reactor-installed nuclear instrumentation tube holder.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 綿引 直明 茨城県日立市幸町三丁目2番2号 株式会 社日立エンジニアリングサービス内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Naoaki Watabiki 3-2-2, Saiwaicho, Hitachi City, Ibaraki Prefecture Hitachi Engineering Service Co., Ltd.
Claims (8)
にまで至る開口部を側面に有するバスケットを搬入し、
前記バスケットを原子炉圧力容器内の上部格子板に差し
入れて燃料支持金具に底部を設置し、しかる後に、燃料
取替機で前記原子炉圧力容器内の使用済核計装管を移動
させて前記バスケット側面の開口部から前記バスケット
内に収納し、前記収納作業を繰り返し行うことで前記バ
スケット内に複数の前記使用済核計装管を収納し、次に
前記バスケットと前記複数の前記使用済核計装管とを一
括して保管場所のプール内に移動する原子炉内核計装管
の撤去方法。1. A basket having an opening extending to the upper end on the side surface thereof is carried into a reactor pressure vessel in which reactor water exists.
Insert the basket into the upper lattice plate in the reactor pressure vessel and set the bottom portion on the fuel support fitting, and then move the spent nuclear instrumentation pipe in the reactor pressure vessel with the fuel changer to move the basket. The plurality of used nuclear instrumentation tubes are stored in the basket by storing the plurality of used nuclear instrumentation tubes in the basket by accommodating them in the basket through the side opening, and then repeating the storage operation. A method of removing the nuclear instrumentation pipes inside the reactor, which moves all of the above together with the pool in the storage location.
数の前記使用済核計装管を収納した後であって前記原子
炉圧力容器内の炉心確認工程前の任意の時期に前記バス
ケットと前記複数の前記使用済核計装管とを一括して保
管場所のプール内に移動し、その後の任意の時期に前記
プール内の使用済核計装管を前記プール内で切断して切
断した前記使用済核計装管を前記プール内に保管して置
く原子炉内核計装管の撤去方法。2. The basket and the plurality of containers according to claim 1, after the plurality of used nuclear instrumentation tubes are housed in the basket, and at any time before the core confirmation step in the reactor pressure vessel. Of the used nuclear instrumentation pipe, which has been moved together with the used nuclear instrumentation pipe of, into the pool at the storage location, and which has been cut by cutting the used nuclear instrumentation pipe in the pool at any time thereafter. A method for removing the nuclear instrumentation pipes in a nuclear reactor, in which the pipes are stored in the pool.
の新核計装管を一側面に着脱自在に装着した新核計装管
保持具を前記原子炉圧力容器内に搬入してから、前記新
核計装管保持具を前記一側面が前記新核計装管の設置位
置に極力向くように前記原子炉圧力容器内の上部格子板
に差し入れて底部を燃料支持金具に設置し、燃料取替機
で前記新核計装管を前記新核計装管保持具から前記設置
位置まで移動させて前記設置位置に前記新核計装管を設
置することを繰り返す原子炉内核計装管の設置方法。3. A new nuclear instrumentation pipe holder in which a plurality of new nuclear instrumentation pipes are detachably mounted on one side of the reactor pressure vessel in which reactor water exists is carried into the reactor pressure vessel. , The new nuclear instrumentation tube holder is inserted into the upper lattice plate in the reactor pressure vessel so that the one side faces as much as possible to the installation position of the new nuclear instrumentation tube, and the bottom part is installed on the fuel support metal fitting, A method for installing a nuclear instrumentation pipe in a nuclear reactor, which comprises repeatedly moving the new nuclear instrumentation pipe from the new nuclear instrumentation pipe holder to the installation position with a replacement machine and installing the new nuclear instrumentation pipe at the installation position.
法により原子炉圧力容器内から使用済核計装管を撤去
し、前記撤去の跡に請求項3による原子炉内核計装管の
設置方法により新核計装管を設置することにより、前記
使用済核計装管を新核計装管に取替える原子炉内核計装
管交換方法。4. The used nuclear instrumentation tube according to claim 3 is used to remove a used nuclear instrumentation tube from the inside of a reactor pressure vessel by the method for removing a nuclear instrumentation tube according to claim 1. A method for replacing a used nuclear instrumentation tube by replacing the used nuclear instrumentation tube with a new nuclear instrumentation tube by installing a new nuclear instrumentation tube according to the installation method.
力容器内の上部格子板の格子内を通過できる外観の太さ
を有するバスケットボデーと、前記バスケットボデーの
側面に前記バスケットボデーの途中から上端に至る迄開
口されて核計装管の太さ寸法よりも大きな寸法の幅を有
する側面開口部と、前記バスケットボデーの他の側面に
前記バスケットボデーの上下方向に移動自在に且つ少な
くとも移動上端で回転自在にして装着されたスライドロ
ッドと、前記スライドロッドに回転自在に取り付けられ
たハンドルと、前記バスケットボデー内に配置されて前
記スライドロッドに前記スライドロッドと角度を持って
固定取り付けされたサポートと、前記バスケットボデー
の前記側面に取り付けられた移動用フックを備えた使用
済核計装管の収納バスケット。5. A basket body having a thickness of an external appearance capable of passing through a lattice of an upper lattice plate in a reactor pressure vessel from a lower end to an upper part thereof, and a basket body on a side surface of the basket body. A side opening having a width larger than the thickness of the nuclear instrumentation tube opened from the middle to the upper end, and movably and at least movable in the vertical direction of the basket body on the other side surface of the basket body. A slide rod rotatably mounted on the upper end, a handle rotatably attached to the slide rod, and a slide rod fixedly attached to the slide rod at an angle with the slide rod disposed in the basket body. Storage of used nuclear instrumentation tubes with supports and transfer hooks attached to the sides of the basket body Basket.
の側面には上部格子板にひっかかる固定用フックを備
え、前記バスケットボデーの底面には原子炉圧力容器内
の燃料支持金具の丸孔に設置される下方へ突き出された
バスケット据付ガイドとを備えていることを特徴とした
使用済核計装管の収納バスケット。6. The basket body according to claim 5, wherein a side surface of the basket body is provided with a fixing hook hooked on an upper lattice plate, and a bottom surface of the basket body is installed in a round hole of a fuel support fitting in a reactor pressure vessel. A storage basket for used nuclear instrumentation pipes, characterized by having a basket installation guide protruding downward.
管を囲う複数の凹部と、前記凹部に隣接する凸部に前記
凹部の開放口を塞ぐ位置と開放する位置との間で回転自
在に装着された核計装管保持板と、前記保持具ボデーの
下部に設けられて原子炉圧力容器内の上部格子板を通す
スリットと、前記保持具ボデーに上下方向に間隔をあけ
て装着された複数のフックとを備えた核計装管保持具。7. A rotating member between a plurality of recesses provided on one side of a holder body and surrounding a nuclear instrumentation tube, and a position at which a projection adjacent to the recess closes an opening of the recess and a position at which the opening is opened. A freely mounted nuclear instrumentation tube holding plate, a slit provided in the lower part of the holder body for passing an upper lattice plate in the reactor pressure vessel, and a vertically mounted space attached to the holder body. A nuclear instrumentation tube holder with a plurality of hooks.
他側面方向に突き出されて原子炉圧力容器に係合する固
定用ステーを備え、前記保持具ボデーの底面には原子炉
圧力容器内の燃料支持金具の丸孔に設置される下方へ突
き出された保持具据付ガイドを備えていることを特徴と
した核計装管保持具。8. The retainer body according to claim 7, further comprising a fixing stay protruding toward the other side of the retainer body to engage with the reactor pressure vessel. The nuclear instrumentation tube holder characterized in that it is provided with a downwardly projecting holder installation guide which is installed in the round hole of the fuel support fitting.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15574595A JP3554609B2 (en) | 1995-06-22 | 1995-06-22 | Method and apparatus for handling nuclear instrumentation tube in reactor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15574595A JP3554609B2 (en) | 1995-06-22 | 1995-06-22 | Method and apparatus for handling nuclear instrumentation tube in reactor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH095484A true JPH095484A (en) | 1997-01-10 |
| JP3554609B2 JP3554609B2 (en) | 2004-08-18 |
Family
ID=15612508
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP15574595A Expired - Fee Related JP3554609B2 (en) | 1995-06-22 | 1995-06-22 | Method and apparatus for handling nuclear instrumentation tube in reactor |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3554609B2 (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100567844B1 (en) * | 2003-12-30 | 2006-04-05 | 한전기공주식회사 | Neutron source handling equipment |
| KR100872143B1 (en) * | 2007-07-19 | 2008-12-08 | 한국전력공사 | Reactor nuclear measurement detector guide tube handling device |
| KR100880398B1 (en) * | 2007-07-31 | 2009-01-23 | 한국전력공사 | Nuclear reactor nuclear detector detector control system |
| JP2012058143A (en) * | 2010-09-10 | 2012-03-22 | Chugoku Electric Power Co Inc:The | Radioactive waste storage basket |
| CN110246600A (en) * | 2019-07-11 | 2019-09-17 | 上海核工程研究设计院有限公司 | A kind of full underground type compact reactor refuling device |
-
1995
- 1995-06-22 JP JP15574595A patent/JP3554609B2/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100567844B1 (en) * | 2003-12-30 | 2006-04-05 | 한전기공주식회사 | Neutron source handling equipment |
| KR100872143B1 (en) * | 2007-07-19 | 2008-12-08 | 한국전력공사 | Reactor nuclear measurement detector guide tube handling device |
| KR100880398B1 (en) * | 2007-07-31 | 2009-01-23 | 한국전력공사 | Nuclear reactor nuclear detector detector control system |
| JP2012058143A (en) * | 2010-09-10 | 2012-03-22 | Chugoku Electric Power Co Inc:The | Radioactive waste storage basket |
| CN110246600A (en) * | 2019-07-11 | 2019-09-17 | 上海核工程研究设计院有限公司 | A kind of full underground type compact reactor refuling device |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3554609B2 (en) | 2004-08-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS6148118B2 (en) | ||
| JP2013019875A (en) | Carry-out method of nuclear fuel material in nuclear power plant | |
| MX2011005341A (en) | Transport and storage device for ladle pipe for transferring liquid metal. | |
| JP3554609B2 (en) | Method and apparatus for handling nuclear instrumentation tube in reactor | |
| JP2001523009A (en) | Loaders for repositioning closely spaced long objects, especially fuel elements | |
| JPH09159788A (en) | Remote working device in reactor and working method thereof | |
| CN101740146B (en) | Double-station gripping apparatus | |
| JP5905947B2 (en) | Method for carrying out nuclear fuel material in a nuclear power plant | |
| JP3172328B2 (en) | Protective cap handling device for foundation bolts | |
| JP2003227895A (en) | Fuel exchange control device and fuel exchange control system | |
| JP2685587B2 (en) | Neutron measuring tube cutting processing system | |
| RU2171508C2 (en) | Method and chamber for separating spent two- bundle fuel assembly of nuclear reactor for its further disposal | |
| JP2000065981A (en) | Furnace instrument tube loading / unloading device | |
| JPH0584478B2 (en) | ||
| JP5752613B2 (en) | Fuel handling equipment | |
| JP2017181522A (en) | Carrying-out method for in-reactor structure of nuclear power plant | |
| JP6158972B2 (en) | Method for carrying out nuclear fuel material in a nuclear power plant | |
| JPS63180887A (en) | How to attach and detach the top cover of the reactor pressure vessel | |
| JPS6328589A (en) | Gripper for long-size article | |
| JPH1184066A (en) | Channel bolt wrench | |
| JPS62130393A (en) | Fuel channel detaching machine | |
| CN118597778A (en) | Inverted source system and use method of recycled industrial cobalt 60 source rod | |
| JPS63315992A (en) | Method and device for handling sensor for measurement of nuclear reactor | |
| JPS6143675B2 (en) | ||
| JPH01158398A (en) | Fuel bucket mounting/dismounting device of nuclear reactor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040427 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040510 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |