JPH095486A - 核燃料被覆管溶接方法及び溶接装置 - Google Patents
核燃料被覆管溶接方法及び溶接装置Info
- Publication number
- JPH095486A JPH095486A JP7156391A JP15639195A JPH095486A JP H095486 A JPH095486 A JP H095486A JP 7156391 A JP7156391 A JP 7156391A JP 15639195 A JP15639195 A JP 15639195A JP H095486 A JPH095486 A JP H095486A
- Authority
- JP
- Japan
- Prior art keywords
- welding
- nuclear fuel
- fuel cladding
- chamber
- cladding tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
覆管の内圧上昇を溶接欠陥発生の限界圧力以内に制御す
ること。 【構成】 核燃料被覆管2の端栓溶接側端部を溶接チャ
ンバー1内に挿入し、他端側を保持具7によって保持し
て、上記溶接チャンバー内で上記核燃料被覆管2の一開
口端に端栓3を溶接する核燃料被覆管溶接方法におい
て、上記溶接チャンバー1から外部に突出している核燃
料被覆管2の開口端に、その核燃料被覆管2内に連通す
る所定容量の空室21を有する圧力低減装置20を気密
的に装着し、溶接時に上記被覆管2内の圧力上昇を低減
させる。
Description
接方法及び装置に関する。
を挿入溶着する場合には、不活性ガス雰囲気とされた溶
接チャンバー内で行なわれる。
接装置を示す図であって、溶接チャンバー1の一側壁部
には核燃料被覆管2の一開口端側を気密的に挿入し得る
開口が設けられており、この開口と対向する部分には、
上記溶接チャンバー内に挿入された被覆管の開口端に正
対させて端栓3を保持する端栓保持具4が配設され、そ
の外部には上記端栓保持具4に保持された端栓3を被覆
管端に圧接する端栓圧入機構5が設けられ、さらに頂壁
部には溶接トーチ6が垂設されている。
溶接する場合には、その核燃料被覆管2の端栓装着を行
なう側の一開口端側を溶接チャンバー1内に挿入し、他
方の開口端側を気密性の保持具7によって保持した後、
上記溶接チャンバー1内及び核燃料被覆管2内を所定の
真空度まで真空排気する。その後、上記溶接チャンバー
1内に不活性ガスを導入し溶接チャンバー内をほぼ大気
圧状態にする。
先端に端栓3を保持している端栓保持具4が前進せしめ
られ、上記端栓3が核燃料被覆管2の開口端に圧入され
る。
を軸線回りに回転させながら、核燃料被覆管2と端栓3
の突き合わせ面を周溶接する。
装置による溶接においては、その溶接時における熱影響
のため被覆管2内のガスが膨張し若干の内圧上昇を引き
起すことになる。すなわち、図6に示すように、溶接時
間に応じて被覆管内圧が点線で示す限界圧力を超え、図
7(a)に示すように、溶融金属10が内部から押上げ
られ、溶接仕上り外径Dが大きくなったり、或は図7
(b)に示すように溶融金属10の一部に膨れ部11が
生じ、核燃料被覆管2の許容肉厚tが小さくなることが
あり、溶接品質が安定せず収率を低下させる等の問題が
ある。
力を上昇させ上記問題を解決することも提案されている
が、この加圧状態では図8(a)に示すように、溶融金
属10に加圧量が作用し、溶融金属が被覆管2の内部に
溶け落ち、端栓3との間に気泡を取り込み気孔13を発
生させたり、溶融金属に凹部14が発生し溶接部の外観
が損なわれる等の問題がある。
管溶接時における熱影響による被覆管の内圧上昇を溶接
欠陥発生の限界圧力以内に制御し得るようにした核燃料
被覆管溶接方法及び装置を得ることを目的とする。
管の端栓溶接側端部を溶接チャンバー内に挿入し、他端
側を保持具によって保持して、上記溶接チャンバー内で
上記核燃料被覆管の一開口端に端栓を溶接する核燃料被
覆管溶接方法において、上記溶接チャンバーから外部に
突出している核燃料被覆管の開口端に、その核燃料被覆
管内に連通する所定容量の空室を有する圧力低減装置を
気密的に装着し、溶接時に上記被覆管内の圧力上昇を低
減させることを特徴とする。
外部に突出している核燃料被覆管の開口端に、上記核燃
料被覆管内のみに連通し、溶接時に核燃料被覆管の内圧
上昇を低減させる所定容量の空室を有する圧力低減装置
を設けたことを特徴とする。
る所定容量の空室を有する圧力低減装置を気密的に装着
することにより、端栓の溶接時における被覆管内の内圧
の上昇が上記圧力低減装置の容積に応じて低減され、被
覆管の内圧上昇を溶接欠陥が発生する限界圧力以内に制
御することができる。
例について説明する。
あって、その溶接チャンバー1の一側には、上記溶接チ
ャンバー1内に溶接端側が挿入された核燃料被覆管2を
その軸線回りに回転させる回転機構部8が配設されてお
り、また上記溶接チャンバー1の他側壁部には、溶接チ
ャンバー内に挿入された被覆管と同一軸線上に端栓保持
具4が設けられ、その端栓保持具4が端栓圧入機構5に
よって前後動可能としてある。
被覆管2の外端部を気密的に保持する被覆管保持具7が
配設されており、その被覆管保持具7には圧力低減装置
20が連結されている。
通するシリンダ室21を有し、そのシリンダ室21内に
ピストン22が摺動自在に配設され、そのピストン22
に連結され被覆管2と反対方向に突出するピストンロッ
ド23の端部に連結部材を介して雌ねじ部材24が設け
られ、その雌ねじ部材24が、モータ25によって回転
駆動されるねじ軸26に螺合されている。
を溶着する場合には、その核燃料被覆管2の一つの開口
端部を溶接チャンバー1内に挿入し、他方の開口端部を
被覆管保持具7で保持する。そして、溶接チャンバー1
及び被覆管2内を所定の真空度まで真空排気した後、溶
接チャンバー1内に不活性ガスを充填しほぼ大気圧状態
とする。
2に圧入し、その核燃料被覆管2を回転させながら端栓
3と核燃料被覆管2の突き合わせ面を周溶接する。
管2の内圧が上昇するが、この内圧上昇に応じるように
モータ25が駆動され、ねじ軸26、雌ねじ24及びピ
ストンロッド23を介してピストン22が外方(図にお
いて左方)に移動される。
空所の容積が増加する方向に制御され、核燃料被覆管2
内の圧力が溶接欠陥が発生する限界圧力以内におさえら
れ、溶接仕上り径の増大、肉厚不足の発生或は気孔の発
生等が防止される。
の核燃料被覆管2の溶接時の内圧上昇の状況を示す図で
あり、実線で示すように溶接時の内圧は溶接時間に対応
して上昇するけれども、破線Aで示す溶接仕上り径の増
大及び肉厚不足等の溶接欠陥発生に係わる限界圧力と、
破線Bで示す溶接外観及び気孔等の溶接欠陥発生に係わ
る限界圧力以内となっている。
件が一定しており、また核燃料被覆管の内圧上昇も繰り
返し性があることから、図3に示すように、ピストン2
2をねじ軸27により手動により移動させ容量可変とし
てもよく、また図4に示すように、容量が一定の中空室
状の部材21aを圧力低減装置として使用してもよい。
ンバーから外部に突出している核燃料被覆管の開口端
に、その核燃料被覆管内に連通する所定容量の空室を有
する圧力低減装置を気密的に装着したので、その空室に
よって溶接時における被覆管の内圧の上昇を低減させる
ことができ、内圧の影響により溶融金属が内部から押し
上げられ溶接仕上り外径が大きくなったり、或は膨れ部
が生じることを防止することができ、溶接欠陥の発生を
防止し、溶接品質を安定させることができる。
示す図。
の関係を示す図。
す図。
欠陥発生の限界圧力の関係を示す図。
図。
Claims (4)
- 【請求項1】核燃料被覆管の端栓溶接側端部を溶接チャ
ンバー内に挿入し、他端側を保持具によって保持して、
上記溶接チャンバー内で上記核燃料被覆管の一開口端に
端栓を溶接する核燃料被覆管溶接方法において、上記溶
接チャンバーから外部に突出している核燃料被覆管の開
口端に、その核燃料被覆管内に連通する所定容量の空室
を有する圧力低減装置を気密的に装着し、溶接時に上記
被覆管内の圧力上昇を低減させることを特徴とする、核
燃料被覆管溶接方法。 - 【請求項2】核燃料被覆管の端栓溶接側端部を溶接チャ
ンバー内に挿入し、他端側を保持具によって保持して、
上記溶接チャンバー内で上記核燃料被覆管の一開口端に
端栓を溶接する核燃料被覆管溶接装置において、上記溶
接チャンバーから外部に突出している核燃料被覆管の開
口端に、上記核燃料被覆管内のみに連通し、溶接時に核
燃料被覆管の内圧上昇を低減させる所定容量の空室を有
する圧力低減装置を設けたことを特徴とする核燃料被覆
管溶接装置。 - 【請求項3】圧力低減装置は固定容量の気密性容器であ
ることを特徴とする、請求項2記載の核燃料被覆管溶接
装置。 - 【請求項4】圧力低減装置は可変容量の気密性容器であ
ることを特徴とする、請求項3記載の核燃料被覆管溶接
装置。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP07156391A JP3113174B2 (ja) | 1995-06-22 | 1995-06-22 | 核燃料被覆管溶接方法及び溶接装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP07156391A JP3113174B2 (ja) | 1995-06-22 | 1995-06-22 | 核燃料被覆管溶接方法及び溶接装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH095486A true JPH095486A (ja) | 1997-01-10 |
| JP3113174B2 JP3113174B2 (ja) | 2000-11-27 |
Family
ID=15626723
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP07156391A Expired - Lifetime JP3113174B2 (ja) | 1995-06-22 | 1995-06-22 | 核燃料被覆管溶接方法及び溶接装置 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3113174B2 (ja) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102273293B1 (ko) * | 2020-05-11 | 2021-07-06 | 한전원자력연료 주식회사 | 핵연료 집합체의 충격흡수관과 안내관 마개 용접장치 |
-
1995
- 1995-06-22 JP JP07156391A patent/JP3113174B2/ja not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JP3113174B2 (ja) | 2000-11-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO316163B1 (no) | Fremgangsmåte ved buttsveising | |
| GB2245206A (en) | Brazing procedure in an inert atmosphere | |
| JPH07146396A (ja) | 小径の加圧孔をtig溶接する為に溶接点の形状を制御するシステム | |
| JP3113174B2 (ja) | 核燃料被覆管溶接方法及び溶接装置 | |
| US5374800A (en) | Method for welding of fuel rod | |
| GB1497486A (en) | Process for sealing nuclear reactor fuel rods | |
| JPS6151002B2 (ja) | ||
| US4406046A (en) | Process for the production of a sodium-filled valve | |
| JP3250637B2 (ja) | 核燃料棒の密封端栓 | |
| JP3117778B2 (ja) | 管の封緘溶接方法及び装置 | |
| US5192239A (en) | Method and apparatus to make a discharge vessel for a sodium high-pressure discharge lamp | |
| JP2587530Y2 (ja) | 端栓のシーム溶接装置 | |
| EP1025920A2 (en) | A method for producing a multilayer thin-walled bellows of stainless steel | |
| EP0622581B1 (en) | Method for sealing thermal processing apparatus | |
| RU2300153C2 (ru) | Способ герметизации тепловыделяющего элемента ядерного реактора | |
| JP2001239381A (ja) | 燃料棒の上部端栓溶接方法 | |
| JP2807963B2 (ja) | 燃料棒端栓の封詰方法 | |
| JP2000098083A (ja) | 燃料棒端栓溶接方法 | |
| GB2151965A (en) | Brazed joint and method of making | |
| JP2968493B2 (ja) | 核燃料棒用端栓 | |
| JP3093637B2 (ja) | 原子燃料棒溶接装置 | |
| JPH06273580A (ja) | 燃料棒端栓溶接方法 | |
| JPH0215309B2 (ja) | ||
| JPS6356281B2 (ja) | ||
| JPH1147938A (ja) | 核燃料棒の溶接装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070922 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080922 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080922 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090922 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090922 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100922 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110922 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110922 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120922 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120922 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130922 Year of fee payment: 13 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |