JPH0967819A - Formation method for sludge solidified wall - Google Patents

Formation method for sludge solidified wall

Info

Publication number
JPH0967819A
JPH0967819A JP22506695A JP22506695A JPH0967819A JP H0967819 A JPH0967819 A JP H0967819A JP 22506695 A JP22506695 A JP 22506695A JP 22506695 A JP22506695 A JP 22506695A JP H0967819 A JPH0967819 A JP H0967819A
Authority
JP
Japan
Prior art keywords
muddy water
mixture
solidifying material
solidified
solidifying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP22506695A
Other languages
Japanese (ja)
Other versions
JP3019752B2 (en
Inventor
Kiyoshige Nishibayashi
清茂 西林
Tatsuyuki Matsuo
龍之 松尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP7225066A priority Critical patent/JP3019752B2/en
Publication of JPH0967819A publication Critical patent/JPH0967819A/en
Application granted granted Critical
Publication of JP3019752B2 publication Critical patent/JP3019752B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PROBLEM TO BE SOLVED: To form a high quality sludge solidified wall. SOLUTION: Sludge 14 filled into a excavated hole 12 is sucked up by a pump 20c and is supplied to an injection nozzle 24b of a jet pump 24. Hardener 22 of powdery grains is supplied from a suction pipe 24e opened to the inside of a negative pressure room 24a formed on the circumference of the ejection nozzle 24b, and the sludge 14 is jetted from the ejection nozzle 24b to produce a mixture 26 mixing the jet water-like sludge 14 with powder grained hardener 22. The produced mixture 26 is filled from the deepest section inside the excavated hole 12 through a drain pipe 24d.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、地盤中に掘削孔
を形成する際に使用した泥水と固化材とを混合させて、
この混合物を固化させることで泥水固化壁を造成する方
法に関し、特に、泥水と固化材とを混合する際の改良技
術に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention mixes mud water and a solidifying material used when forming an excavation hole in the ground,
The present invention relates to a method for forming a muddy water solidifying wall by solidifying this mixture, and more particularly to an improved technique for mixing muddy water and a solidifying material.

【0002】[0002]

【従来の技術】地中連続壁工法の一種である泥水固化工
法は、地盤中に掘削孔を掘削する際に使用するベントナ
イト泥水などにセメント系固化材を添加混合して、泥水
を固化させることで、地盤中に泥水固化壁を造成する方
法である。この種の泥水固化工法には、従来から、以下
に述べるような各種の方法が提供されている。 自硬性安定液方法 掘削用の泥水に最初から固化材を添加しておき、掘削さ
れた掘削孔内にこの泥水をそのまま放置しておくことに
より、泥水を固化させる。 置換方法 地盤掘削時には、通常の泥水を使用して掘削し、掘削完
了後に別の泥水と固化材との混合物を作製し、この混合
物と地盤掘削時の泥水とを置換し、混合物を固化させ
る。 原位置固化方法 地盤掘削時に使用した泥水に、原位置において固化材を
投入し、機械攪拌またはエアー攪拌により混合し、その
まま放置させることで固化させる。
2. Description of the Related Art A mud solidification method, which is a type of underground wall construction method, is to solidify mud by adding cement-based solidifying material to bentonite mud used when excavating a hole in the ground. Then, it is a method of creating a solidified mud wall in the ground. Conventionally, various methods as described below have been provided for this type of mud solidification method. Self-hardening stable liquid method Solidifying material is added to the mud for excavation from the beginning, and the mud is left in the excavated drill hole as it is to solidify the mud. Replacement method During ground excavation, ordinary mud is used for excavation, and after completion of excavation, a mixture of another mud and a solidifying material is prepared, and the mixture is replaced with the mud at the time of excavation of the ground to solidify the mixture. In-situ solidification method Pour the solidifying material into the muddy water used during ground excavation at the in-situ position, mix by mechanical stirring or air stirring, and leave it to solidify.

【0003】しかしながら、このような従来の泥水固化
工法には、以下に説明する技術的な課題が指摘されてい
た。
However, the technical problems described below have been pointed out in such a conventional muddy water solidification method.

【0004】[0004]

【発明が解決しようとする課題】すなわち、の工法で
は、自硬性安定液の比重や粘性が高く、使用できる掘削
機械が、例えば、バケット式のものに制約されるととも
に、自硬性安定液は、時間の経過とともに固化が進行す
るので、長時間の掘削には不向きであった。また、の
工法では、掘削時の泥水とは別の泥水を作製する必要が
あり、そのために泥水作製プラントを設けなければなら
ず、設備が大型化する。さらに、の工法では、泥水と
固化材との比重が大きく異なるため、これらを均一に混
合攪拌することが難しい。
That is, in the construction method (1), the self-hardening stabilizing liquid has a high specific gravity and viscosity, and the usable excavating machine is limited to, for example, the bucket type, and the self-hardening stabilizing liquid is Since solidification progressed over time, it was not suitable for long-time excavation. Further, in the construction method, it is necessary to prepare mud water different from the mud water at the time of excavation, and therefore a mud water production plant must be provided, and the equipment becomes large. Further, in the construction method, since the specific gravity of the muddy water and the solidifying material are greatly different, it is difficult to uniformly mix and stir them.

【0005】本発明は、このような従来の問題点に鑑み
てなされたものであって、その目的とするところは、泥
水と固化材とが均一に混合できるとともに、大型の設備
が不要で、掘削機械に制約を受けない泥水固化壁の造成
方法を提供することにある。
The present invention has been made in view of such conventional problems, and an object of the present invention is to enable muddy water and a solidifying material to be uniformly mixed, and large equipment is not required. An object of the present invention is to provide a method for forming a solidified mud wall that is not restricted by a drilling machine.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、地盤掘削用の泥水と固化材との混合物を
掘削孔内に充填して、前記混合物を前記掘削孔内で固化
させることにより泥水固化壁を造成する方法において、
前記掘削孔内に充満されている前記泥水を吸い上げてジ
ェットポンプの噴射ノズルに供給するとともに、前記噴
射ノズルの外周に形成された負圧室内に開口する吸引管
から粉粒体の前記固化材を供給し、前記泥水を前記噴射
ノズルから噴出させることにより前記混合物を作製する
ようにした。このような造成方法によれば、地盤掘削時
には、通常の泥水を使用するので、自硬性安定液のよう
に時間的および掘削機械に制約を受けることがない。ま
た、掘削孔内に充満されている泥水を吸い上げてジェッ
トポンプの噴射ノズルに供給するとともに、噴射ノズル
の外周に形成された負圧室内に開口する吸引管から粉粒
体の固化材を供給するので、泥水を噴射ノズルの先端か
ら噴射させると、噴出する泥水の流速によって形成され
る負圧により、吸引管を介して、ジェット水流状に噴出
している泥水中に粉粒体状の固化材が混合される。この
場合、固化材は、例えば、セメントであって、粉粒体状
のセメントをそのまま粉粒体状で吸引管に供給するの
で、混合物の水分量が増加することがない。このとき、
固化材を、吸引管に定量ずつ供給するようにすると、泥
水と固化材との配合比を均一に保つことができるととも
に、その制御も可能になる。作製された混合物は、掘削
孔の最深部から充填すると、混合物の天端が掘削孔内で
徐々に上昇し、泥水と混合物との比重差によりスムーズ
な置換が行える。
In order to achieve the above-mentioned object, the present invention fills a mixture of muddy water for ground excavation and a solidifying material into an excavation hole and solidifies the mixture in the excavation hole. In the method of creating a solidified mud wall by
While sucking up the muddy water filled in the excavation hole and supplying the muddy water to the injection nozzle of the jet pump, the solidified material of the granular material is drawn from the suction pipe opening into the negative pressure chamber formed on the outer periphery of the injection nozzle. The mixture was supplied and the muddy water was ejected from the ejection nozzle to prepare the mixture. According to such a construction method, since ordinary muddy water is used at the time of excavating the ground, there is no restriction on time and an excavating machine unlike the self-hardening stabilizing solution. In addition, it sucks up the muddy water filled in the excavation hole and supplies it to the injection nozzle of the jet pump, and also supplies the solidified material of the granular material from the suction pipe that opens into the negative pressure chamber formed on the outer periphery of the injection nozzle. Therefore, when the muddy water is jetted from the tip of the jet nozzle, the negative pressure formed by the velocity of the muddy water jetting causes the solidified material in the form of particles into the muddy water jetted in a jet water flow shape through the suction pipe. Are mixed. In this case, the solidifying material is, for example, cement, and since the cement in the form of powder or granules is directly supplied to the suction pipe in the form of powder or granules, the water content of the mixture does not increase. At this time,
When the solidifying material is supplied to the suction pipe in a fixed amount, the mixing ratio of the muddy water and the solidifying material can be kept uniform, and the solidifying material can be controlled. When the prepared mixture is filled from the deepest part of the drill hole, the top of the mixture gradually rises in the drill hole, and smooth replacement can be performed due to the difference in specific gravity between the mud and the mixture.

【0007】[0007]

【発明の実施の形態】以下、本発明の実施の形態につい
て、添付図面に基づいて詳細に説明する。図1は、本発
明にかかる泥水固化壁の造成方法の一実施例を示してい
る。同図に示す泥水固化壁の造成方法では、まず、地盤
10中に掘削孔12が掘削形成される。この掘削孔12
の形成では、例えば、ベントナイト泥水14を掘削孔1
2内に順次充満することで、掘削孔12の孔壁の崩壊を
防止しながら行われ、掘削孔12の掘削が所定深度まで
行われる。
Embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 shows an embodiment of a method for forming a solidified muddy water wall according to the present invention. In the method for creating a solidified muddy water wall shown in the figure, first, an excavation hole 12 is excavated in the ground 10. This drill hole 12
In the formation of, for example, bentonite muddy water 14
By sequentially filling the inside of the drill hole 2, the hole wall of the drill hole 12 is prevented from collapsing, and the drill hole 12 is drilled to a predetermined depth.

【0008】このとき、泥水14は、掘削孔12内に残
されて、孔壁の自立性を保持させている。この状態で、
掘削孔12の近傍の地上部に混合物作製プラント16が
設置される。混合物作製装置16は、固化材供給装置1
8と、泥水供給装置20と、固化材22と泥水12とを
混合するジェットポンプ24とから構成されている。固
化材供給装置18は、固化材22、例えば、セメント粉
末の投入ホッパ18aと、この投入ホッパ18aが一端
側に設けられたスクリューフィーダー18bと、スクリ
ューフィーダ18bの駆動用モータ18cとから構成さ
れている。
At this time, the muddy water 14 is left inside the excavation hole 12 to maintain the self-supporting property of the hole wall. In this state,
A mixture preparation plant 16 is installed in the aboveground part near the drill hole 12. The mixture producing device 16 is the solidifying material supplying device 1
8, a muddy water supply device 20, and a jet pump 24 for mixing the solidifying material 22 and the muddy water 12. The solidifying material supply device 18 includes a solidifying material 22, for example, a cement hopper charging hopper 18a, a screw feeder 18b having the charging hopper 18a provided on one end side, and a driving motor 18c for the screw feeder 18b. There is.

【0009】泥水供給装置20は、一端側が掘削孔12
内に充満されている泥水14の上部側に浸漬され、先端
にフィルター20aが設けられた泥水吸入管20bと、
泥水吸入管20bの途中に介装されたポンプ20cおよ
び流量調整弁20dとから構成されている。ポンプ20
cは、例えば、高揚程水中ポンプないしはスラリーポン
プが使用される。
The muddy water supply device 20 has a drill hole 12 on one end side.
A muddy water suction pipe 20b having a filter 20a at its tip, which is immersed in the upper side of the muddy water 14 filled in the inside,
It is composed of a pump 20c and a flow rate adjusting valve 20d which are provided in the middle of the muddy water suction pipe 20b. Pump 20
For c, for example, a high-lift submersible pump or a slurry pump is used.

【0010】ジェットポンプ24は、後部側に設けられ
た環状の負圧室24aと、この負圧室24aの中心を貫
通して、先端が負圧室24a内に位置する噴射ノズル2
4bと、この噴射ノズル24bと同じ方向に延長され、
縮径した一端側が負圧室24aと連通する混合管24c
と、混合管24cの拡径した他端側に連通接続される排
出管24dと、一端側が負圧室24a内に開口した吸入
管24eとから構成されている。
The jet pump 24 has an annular negative pressure chamber 24a provided on the rear side, and an injection nozzle 2 which penetrates the center of the negative pressure chamber 24a and has its tip located in the negative pressure chamber 24a.
4b and extended in the same direction as this injection nozzle 24b,
Mixing tube 24c whose one end side having a reduced diameter communicates with the negative pressure chamber 24a
And a discharge pipe 24d that is connected to the other end of the mixing pipe 24c where the diameter of the mixing pipe 24c is increased, and a suction pipe 24e that is open at one end into the negative pressure chamber 24a.

【0011】排出管24dは、その端部が掘削孔12内
の最深部に位置するように、掘削孔12内に延設されて
いる。そして、噴射ノズル24bには、泥水供給装置2
0の泥水吸入管20bの一端が接続されるとともに、吸
入管24eには、固化材供給装置18のスクリューフィ
ーダ18bが連通接続されている。そして、このような
構成の混合物作製プラント16の組立設置が完了する
と、泥水14と固化材22との混合物26を作製して、
混合物26が掘削孔12内に供給される。混合物26の
作製では、まず、固化材22が投入ホッパ18aからス
クリューフィーダ18bに供給され、駆動用モータ18
cを回転駆動することにより、固化材22が吸入管24
eの一端側に供給される。
The discharge pipe 24d is extended in the excavation hole 12 so that its end is located at the deepest portion in the excavation hole 12. The muddy water supply device 2 is connected to the injection nozzle 24b.
No. 0 muddy water suction pipe 20b is connected to one end thereof, and the suction pipe 24e is connected to the screw feeder 18b of the solidifying material supply device 18 in communication therewith. Then, when the assembly and installation of the mixture production plant 16 having such a configuration is completed, a mixture 26 of the muddy water 14 and the solidifying material 22 is produced,
The mixture 26 is fed into the wellbore 12. In producing the mixture 26, first, the solidifying material 22 is supplied from the charging hopper 18a to the screw feeder 18b, and the driving motor 18 is driven.
By rotating c, the solidified material 22 is transferred to the suction pipe 24.
It is supplied to one end side of e.

【0012】この場合、駆動用モータ18cの回転速度
を調整することにより、固化材22が単位時間当たり一
定量ずつ排出されるように、定量供給することが望まし
い。一方、ジェットポンプ24の噴射ノズル24bに
は、泥水供給装置20のポンプ20cを駆動することに
より、掘削孔12内の泥水14を吸引して、加圧しなが
ら供給する。このとき、流量調整弁20dにより泥水1
4の供給流量が調整され、これにより泥水14中に添加
する固化材22の比率を制御することかできる。
In this case, it is desirable to adjust the rotational speed of the drive motor 18c to supply a fixed amount of the solidifying material 22 so that the solidifying material 22 is discharged by a constant amount per unit time. On the other hand, by driving the pump 20c of the muddy water supply device 20, the muddy water 14 in the drill hole 12 is sucked and supplied to the injection nozzle 24b of the jet pump 24 while being pressurized. At this time, muddy water 1
4 is adjusted, so that the ratio of the solidifying material 22 added to the muddy water 14 can be controlled.

【0013】ジェットポンプ24の噴射ノズル24b
に、ポンプ20cにより加圧された泥水14が供給され
ると、泥水14は、噴射ノズル24bの先端から高速で
噴出され、これにより噴射ノズル24bの周囲、すなわ
ち、負圧室24a内の圧力が低下し、これにより吸入管
24eから粉粒体状の固化材22が、引き込まれて泥水
14に混合される。
The jet nozzle 24b of the jet pump 24
When the muddy water 14 pressurized by the pump 20c is supplied to the above, the muddy water 14 is jetted at a high speed from the tip of the injection nozzle 24b, whereby the pressure around the injection nozzle 24b, that is, the pressure in the negative pressure chamber 24a is increased. As a result, the solidified material 22 in the form of powder or granules is drawn from the suction pipe 24e and mixed with the muddy water 14.

【0014】泥水14と固化材22との混合物26は、
負圧室24aと混合管24cとの接続部分で径が絞られ
ているので、この部分でさらに流速が増し、この状態で
混合管24c内に送り込まれる。混合管24cは、順次
径が拡大するホーン状になっているので、混合物26
は、その内部を通過する際に、図1に矢印で示すよう
に、旋回流などの乱流が発生し、この乱流による攪拌作
用で、泥水14と固化材22とが均一に攪拌混合され、
このようにして攪拌混合された混合物26が、排出管2
4dから掘削孔12内に供給される。
The mixture 26 of the muddy water 14 and the solidifying material 22 is
Since the diameter is narrowed at the connecting portion between the negative pressure chamber 24a and the mixing pipe 24c, the flow velocity further increases at this portion and is fed into the mixing pipe 24c in this state. Since the mixing pipe 24c has a horn shape whose diameter gradually increases, the mixture 26
When passing through the inside thereof, a turbulent flow such as a swirling flow is generated as shown by the arrow in FIG. 1, and the mud water 14 and the solidifying material 22 are uniformly stirred and mixed by the stirring action by this turbulent flow. ,
The mixture 26 thus stirred and mixed is discharged into the discharge pipe 2.
It is supplied into the drill hole 12 from 4d.

【0015】排出管24dから排出された混合物26
は、排出管24dの先端が掘削孔12の最深部に設けら
れており、泥水14に固化材22か添加されている混合
物26は、泥水14よりも比重が大きいので、泥水14
を押し上げるようにして、掘削孔12の最底部から順次
流動堆積される。この場合、混合物26の充填により泥
水14の液面は、上昇しようとするが、泥水14は、ポ
ンプ20cにより順次くみ上げられているので、泥水1
4の液面は、殆ど変化しない。
Mixture 26 discharged from discharge pipe 24d
Is provided with the tip of the discharge pipe 24d at the deepest part of the drill hole 12, and the mixture 26 in which the solidifying material 22 is added to the muddy water 14 has a larger specific gravity than the muddy water 14, so the muddy water 14
Is pushed up to sequentially fluidize and deposit from the bottom of the drill hole 12. In this case, the liquid level of the muddy water 14 tries to rise due to the filling of the mixture 26, but the muddy water 14 is sequentially pumped up by the pump 20c.
The liquid level of 4 hardly changed.

【0016】そして、掘削孔12内の泥水14が混合物
26と置換されると、混合物作製プラント16の駆動が
停止され、時間が経過して掘削孔12内の混合物26が
固化すると、地盤中に泥水固化壁が造成される。さて、
以上のような方法で泥水固化壁を造成すると、地盤掘削
時には、通常の泥水14を使用するので、自硬性安定液
のように時間的および掘削機械に制約を受けることがな
い。
When the muddy water 14 in the drill hole 12 is replaced with the mixture 26, the driving of the mixture producing plant 16 is stopped, and when the mixture 26 in the drill hole 12 solidifies after a lapse of time, the mixture 26 remains in the ground. A muddy water solidification wall is created. Now,
When the muddy water solidifying wall is formed by the above-described method, the normal muddy water 14 is used at the time of excavating the ground, so that there is no restriction on the time and the excavating machine unlike the self-hardening stabilizing liquid.

【0017】また、掘削孔12内に充満されている泥水
14を吸い上げてジェットポンプ24の噴射ノズル24
bに供給するとともに、噴射ノズル24bの外周に形成
された負圧室24a内に開口する吸引管24eから粉粒
体の固化材22を供給するので、泥水14を噴射ノズル
24bの先端から噴射させると、噴出する泥水14の流
速によって形成される負圧により、吸引管24eを介し
て、ジェット水流状に噴出している泥水14中に粉粒体
状の固化材22が混合される。
Further, the muddy water 14 filled in the drill hole 12 is sucked up to inject the jet nozzle 24 of the jet pump 24.
b, and the solidification material 22 of the granular material is supplied from the suction pipe 24e opened in the negative pressure chamber 24a formed on the outer periphery of the injection nozzle 24b, so that the muddy water 14 is injected from the tip of the injection nozzle 24b. Then, due to the negative pressure formed by the flow velocity of the jetted muddy water 14, the solidified material 22 in the form of powder or granules is mixed into the muddy water 14 jetted in the form of jet water through the suction pipe 24e.

【0018】この場合、固化材22は、例えば、粉粒体
状のセメントをそのまま粉粒体状で吸引管24eに供給
するので、混合物26の水分量、すなわち、泥水14の
量が増加することもない。このとき、固化材22を、吸
引管24eに駆動モータ18cを制御して定量ずつ供給
するようにすると、泥水14と固化材22との配合比を
均一にたもつことができるとともに、その制御も可能に
なる。作製された混合物26は、掘削孔12の最深部か
ら充填すると、混合物26の天端が掘削孔12内で徐々
に上昇し、泥水14と混合物26との比重さによりスム
ーズな置換が行える。
In this case, since the solidifying material 22 supplies, for example, powdery cement as it is to the suction pipe 24e, the water content of the mixture 26, that is, the amount of the muddy water 14 increases. Nor. At this time, if the solidifying material 22 is supplied to the suction pipe 24e by a constant amount by controlling the drive motor 18c, the mixing ratio of the muddy water 14 and the solidifying material 22 can be kept uniform, and the control thereof can be performed. It will be possible. When the prepared mixture 26 is filled from the deepest part of the drill hole 12, the top of the mixture 26 gradually rises in the drill hole 12, and smooth replacement can be performed by the specific gravity of the mud water 14 and the mixture 26.

【0019】なお、上記実施例で示した固化材供給装置
18のスクリューフィーダ18bは、ロータリフィーダ
に代えることができる。
The screw feeder 18b of the solidified material supplying device 18 shown in the above embodiment can be replaced with a rotary feeder.

【0020】[0020]

【発明の効果】以上、実施例で詳細に説明したように、
本発明にかかる泥水固化壁の造成方法によれば、ジェッ
トポンプにより、霧状の泥水と粉粒体状の固化材とが均
一に混合されるので、高品質の泥水固化壁が構築でき
る。また、混合物作製プラントは、ジェットポンプやス
クリューフィーダなどで構成され、比較的小型なので、
狭い場所での施工が可能になる。
As described above in detail in the embodiments,
According to the method for producing a solidified muddy water wall of the present invention, the muddy water in the form of mist and the solidified material in the form of particles are uniformly mixed by the jet pump, so that the solidified wall in the muddy water can be constructed with high quality. In addition, the mixture production plant is composed of jet pumps, screw feeders, etc.
Allows construction in narrow spaces.

【0021】さらに、混合物の作製と泥水との置換が一
連の連続した作業で行えるので、施工能率もよい。ま
た、掘削孔を掘削する際には、通常の泥水を使用するの
で、掘削機械や掘削時間に制約を受けることがない。ま
たさらに、粉粒体状の固化材と泥水とを混合するので、
例えば、固化材にセメントミルクを使用する場合のよう
に、余剰泥水が発生することもない。
Further, the production of the mixture and the replacement with the muddy water can be performed by a series of continuous operations, so that the construction efficiency is also good. In addition, since normal mud is used when excavating the excavation hole, there is no restriction on the excavation machine or the excavation time. Furthermore, since the solidified material in the form of powder and muddy water is mixed,
For example, unlike the case where cement milk is used as the solidifying material, excess muddy water does not occur.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明にかかる泥水固化壁の造成方法の一実施
例を示す施工状態の説明図である。
FIG. 1 is an explanatory view of a construction state showing an embodiment of a method for forming a solidified muddy water wall according to the present invention.

【符号の説明】[Explanation of symbols]

10 地盤 12 掘削孔 14 泥水 16 混合物作製プラント 18 固化材供給装置 18a ポッパ 18b スクリューフィーダ 18c 駆動用モータ 20 泥水供給装置 20a フィルター 20b 泥水吸入管 20c ポンプ 20d 流量調整弁 22 固化材 24 ジェットポンプ 24a 負圧室 24b 噴射ノズル 24c 混合管 24d 排出管 24e 吸入管 10 Ground 12 Drilling Hole 14 Mud 16 Mixture Production Plant 18 Solidifying Material Supply Device 18a Popper 18b Screw Feeder 18c Drive Motor 20 Mud Water Supply Device 20a Filter 20b Mud Water Intake Pipe 20c Pump 20d Flow Control Valve 22 Solidifying Material 24 Jet Pump 24a Negative Pressure Chamber 24b Injection nozzle 24c Mixing pipe 24d Discharge pipe 24e Suction pipe

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 地盤掘削用の泥水と固化材との混合物を
掘削孔内に充填して、前記混合物を前記掘削孔内で固化
させることにより泥水固化壁を造成する方法において、 前記掘削孔内に充満されている前記泥水を吸い上げてジ
ェットポンプの噴射ノズルに供給するとともに、前記噴
射ノズルの外周に形成された負圧室内に開口する吸引管
から粉粒体の前記固化材を供給し、前記泥水を前記噴射
ノズルから噴出させることにより前記混合物を作製する
ことを特徴とする泥水固化壁の造成方法。
1. A method of filling a mixture of muddy water for ground excavation and a solidifying material into an excavation hole and solidifying the mixture in the excavation hole to form a solidified mud wall, wherein the inside of the excavation hole is formed. While sucking up the muddy water filled in the jet nozzle and supplying it to the jet nozzle of the jet pump, the solidified material of the granular material is supplied from the suction pipe opening into the negative pressure chamber formed on the outer periphery of the jet nozzle, A method for producing a solidified muddy water wall, which comprises producing the mixture by ejecting muddy water from the injection nozzle.
【請求項2】 前記固化材は、前記吸引管に定量ずつ供
給されることを特徴とする請求項1記載の泥水固化壁の
造成方法。
2. The method for forming a muddy water solidifying wall according to claim 1, wherein the solidifying material is supplied to the suction pipe in a fixed amount.
JP7225066A 1995-09-01 1995-09-01 Construction method of mud solidified wall Expired - Fee Related JP3019752B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7225066A JP3019752B2 (en) 1995-09-01 1995-09-01 Construction method of mud solidified wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7225066A JP3019752B2 (en) 1995-09-01 1995-09-01 Construction method of mud solidified wall

Publications (2)

Publication Number Publication Date
JPH0967819A true JPH0967819A (en) 1997-03-11
JP3019752B2 JP3019752B2 (en) 2000-03-13

Family

ID=16823509

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7225066A Expired - Fee Related JP3019752B2 (en) 1995-09-01 1995-09-01 Construction method of mud solidified wall

Country Status (1)

Country Link
JP (1) JP3019752B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100476905B1 (en) * 2002-08-30 2005-03-17 주식회사 제일종합통상 Apparatus for transferring slime for a slime pump and method for transferring slime using the same
JP2023085978A (en) * 2021-12-09 2023-06-21 横浜ライト工業株式会社 Stirring system and stirring method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100476905B1 (en) * 2002-08-30 2005-03-17 주식회사 제일종합통상 Apparatus for transferring slime for a slime pump and method for transferring slime using the same
JP2023085978A (en) * 2021-12-09 2023-06-21 横浜ライト工業株式会社 Stirring system and stirring method

Also Published As

Publication number Publication date
JP3019752B2 (en) 2000-03-13

Similar Documents

Publication Publication Date Title
JP5421206B2 (en) Ground improvement method and equipment
JP3019752B2 (en) Construction method of mud solidified wall
JPH04347206A (en) Land improvement method
JP3003538B2 (en) Construction method of mud solidification wall
CN213653438U (en) Deep cement mixing pile machine with uniform and compact mixing
JPH0967566A (en) Apparatus for producing stabilizing fluid for ground excavation and production of the fluid
JP3338346B2 (en) Mud type propulsion drilling rig
EP0502218A1 (en) Apparatus for producing stabilizing mixture
JP3359027B2 (en) Construction method of ground improvement body
JPS6353327B2 (en)
CN215518732U (en) Stirring pile adds husky construction system
KR102185418B1 (en) GROUND IMPROVEMENT AND SOLIDIFICATION METHOD FOR MIDDLE AND DEEP LAYER USING SGM(Soil Geolead Mixed)
JP2002263463A (en) Mixing equipment for soil improvement
JP3359028B2 (en) Construction equipment for ground improvement
JP2879386B2 (en) Ground improvement or reinforcement method
CN210564537U (en) Slurry shield machine based on automatic stirring device
CN210097561U (en) Mixing equipment for oil well drilling
JP2004150073A (en) High-pressure jet mixing method
JPH04306394A (en) Stabilizer manufacturing device
JPH06299538A (en) Creation of solidified soil
JPH07111052B2 (en) Ground improvement or strengthening method
JP3392407B2 (en) Construction method of soil cement continuous wall
JP3150298B2 (en) Tunnel excavation method and shield machine
JPS6157797A (en) Shield type tunnel drilling machine
JPH08296226A (en) Underground pile forming method using cement type filling material and cement type filling material mixing device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees