Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP22662995A
Other languages
Japanese (ja)
Inventor
Shinichi Takemoto
信一 竹本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAKEMOTO KISO KOJI KK
Original Assignee
TAKEMOTO KISO KOJI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAKEMOTO KISO KOJI KK filed Critical TAKEMOTO KISO KOJI KK
Priority to JP22662995A priority Critical patent/JPH0972183A/en
Publication of JPH0972183A publication Critical patent/JPH0972183A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

PROBLEM TO BE SOLVED: To facilitate the excavation of a shaft with large caliber and great depth by pouring lubricant supplied from a channel provided to a side wall of a casing during the excavation between the circumferential surface of the casing from a required part on the circumferential surface of the front end of the casing and excavated wall surface. SOLUTION: A following casing 5 connecting an antecedent casing 2 to a ring joint 4 is driven into the ground by a full-swivel type casing rotary press-in machine to excavate, and when the length of an excavated hole becomes deep to a certain extent, earth pressure applied to the circumferential surface of the casing 5 is suddenly increased to increase the circumferential frictional resistance, and the press-in machine is in an incapable state. Then, lubricant led to a ring-shaped space section 16 of the casing 5 on the upper stage is sent to the space section 16 from a linked hole 18 of the lower end casing 15 through a linked hole 17 of the casing 5 on the lower stage, it is led to the inside of an internal passage 21 of the ring joint 4 through a linked hole 20 from the linked hole 18, it is extracted from an extraction outlet 22, and the circumferential frictional resistance is reduced to stat the driving of the casing rotary press-in machine again.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建築基礎、橋梁基礎等
の基礎工事に伴う場所打ちコンクリート杭の造成にあた
り、地盤を掘削して大口径大深度竪孔を掘削形成するの
に利用される地盤の掘削工法及び掘削装置に関する。
BACKGROUND OF THE INVENTION The present invention is used to excavate the ground and excavate a large-diameter and deep-deep vertical hole when constructing cast-in-place concrete piles associated with foundation works such as building foundations and bridge foundations. The present invention relates to a ground excavation method and excavation equipment.

【0002】[0002]

【従来の技術】上記場所打ちコンクリート杭造成用の竪
孔を掘削するのに、従来より、全旋回竪型掘削機を使用
してケーシングを回転させながら地盤中に圧入し、ケー
シング内部の土砂をハンマーグラブ等にて排出しつつ掘
削を行う工法が広く実施されている。
2. Description of the Related Art Conventionally, in order to excavate a vertical hole for forming a cast-in-place concrete pile, a full-swivel vertical excavator is used to press the soil into the ground while rotating the casing to remove the earth and sand inside the casing. A method of excavating while discharging with a hammer grab is widely practiced.

【0003】[0003]

【発明が解決しようとする課題】上記全旋回竪型掘削機
の使用による掘削においては、掘孔の長さが長くなる
程、またその孔径が大きい程、地盤土圧によりケーシン
グにかかる外周圧が大きく、ケーシング周面摩擦抵抗が
大きくなる。しかして、孔径が1000mm前後の比較
的小口径の場合には、掘孔長さが相当長くても、ケーシ
ング周面摩擦抵抗はそれ程問題にならないが、孔径が2
000〜3000mmといった大口径の場合には、掘孔
長が例えば10mを越えるようになると、ケーシングの
外周面にかかる土圧が急激に増大してその周面摩擦抵抗
が異常に高くなり、ケーシングの圧入が進まなくなり、
回転押し込み引き抜きができず、施工不能に陥る。
In the excavation using the above-described full swing vertical excavator, the longer the length of the hole and the larger the hole diameter, the more the peripheral pressure applied to the casing by the ground soil pressure. The friction resistance of the casing peripheral surface becomes large. However, in the case of a relatively small bore diameter of around 1000 mm, even if the bore length is considerably long, the casing circumferential surface friction resistance does not become a problem, but the bore diameter is 2
In the case of a large diameter of 000 to 3000 mm, when the drill hole length exceeds, for example, 10 m, the earth pressure applied to the outer peripheral surface of the casing abruptly increases and the peripheral frictional resistance thereof becomes abnormally high. Press-fitting does not proceed,
It cannot be pushed in and out by rotation, which makes it impossible to construct.

【0004】本発明は、上記の課題に鑑み、大口径大深
度での掘削時にケーシングにかかる過大な周面摩擦抵抗
を低減し、それにより大口径大深度竪孔を容易に掘削可
能となる共に、施工能率を大幅に向上できる掘削方法及
び掘削装置を提供することを目的とする。
In view of the above problems, the present invention reduces excessive circumferential frictional resistance applied to the casing during excavation at a large diameter and a large depth, thereby making it possible to easily excavate a large diameter and a large depth vertical hole. An object of the present invention is to provide an excavation method and an excavation device that can significantly improve the construction efficiency.

【0005】[0005]

【課題を解決するための手段】本発明の請求項1に係る
掘削方法は、先端に掘削刃を備えたケーシングをケーシ
ング回転圧入機によって回転させながら地盤中に圧入
し、ケーシング内部の土砂を排出しつつ地盤の掘削を行
う掘削工法であって、上記掘削の途上において、ケーシ
ングの側壁に形成された流路より供給される滑剤をケー
シングの先端側外周面所要部からケーシング外周面と掘
孔壁面との間に注出するようにしたものである。
According to a first aspect of the present invention, there is provided a method for excavating a casing having an excavating blade at a tip thereof, which is press-fitted into the ground while being rotated by a casing rotary press-fitting machine to discharge earth and sand inside the casing. In the excavation method of excavating the ground while performing the excavation, the lubricant supplied from the flow path formed in the side wall of the casing is supplied from the required portion of the outer peripheral surface of the casing to the outer peripheral surface of the casing and wall surface It was designed to be poured out between and.

【0006】請求項2は、請求項1に記載の掘削工法に
おいて、前記滑剤を注出しながらケーシングを回転及び
上下動させるようにしたものである。
A second aspect of the present invention is the excavation method according to the first aspect, wherein the casing is rotated and vertically moved while pouring out the lubricant.

【0007】請求項3に係る掘削装置は、ケーシング回
転圧入機1、掘削刃3を有する先行ケーシング2、該先
行ケーシング2に接続されるリングジョイント4、該リ
ングジョイント4に接続され、互いに接続可能な複数の
後続ケーシング5、及び最後端の後続ケーシング5に着
脱可能に装着されるスイベル装置6からなり、上記各後
続ケーシング5の側壁には、後続ケーシング5相互が接
続された状態で互いに連通可能な流路を設け、上記リン
グジョイント4には、該リングジョイント4に接続され
る後続ケーシング5の流路と接続可能な注出口22を外
周面に開口するように設けると共に、該注出口22に逆
止弁23を設け、最後端の後続ケーシング5の流路に上
記スイベル装置6を介して滑剤を加圧供給するように構
成してなるものである。
The excavating device according to a third aspect of the invention is connected to the casing rotary press-fitting machine 1, the preceding casing 2 having the excavating blade 3, the ring joint 4 connected to the preceding casing 2, the ring joint 4 and being connectable to each other. A plurality of subsequent casings 5 and a swivel device 6 detachably attached to the rearmost rearmost casing 5, and the sidewalls of the respective subsequent casings 5 can communicate with each other in a state where the subsequent casings 5 are connected to each other. A flow channel is provided, and the ring joint 4 is provided with a spout 22 that is connectable to the flow channel of the subsequent casing 5 connected to the ring joint 4 so that the spout 22 is open to the outer peripheral surface. A check valve 23 is provided, and the lubricant is pressurized and supplied to the flow path of the rearmost casing 5 at the rear end through the swivel device 6. That.

【0008】請求項4は、請求項3に記載の掘削装置に
おいて、前記逆止弁23は、前記リングジョイント4の
内部通路21と前記注出口22との間に設けられた弁孔
28と、該弁孔28の内径より径小で該弁孔の孔長より
も長い弁軸29と、前記注出口22内に位置するように
弁軸29の外端に突設され、土圧によって弁孔28を閉
止する弁体30と、上記弁軸29の内端に放射状に突設
され、上記弁体30を開放位置に保持するように上記弁
孔28の内端面に当接される保持部片31とからなり、
上記内部通路21に導入される滑剤の圧力により弁体3
0が土圧に抗して開放されるようになっている。
According to a fourth aspect of the present invention, in the excavating device according to the third aspect, the check valve 23 includes a valve hole 28 provided between the internal passage 21 of the ring joint 4 and the spout 22. A valve shaft 29 having a diameter smaller than the inner diameter of the valve hole 28 and longer than the hole length of the valve hole 28, and a valve shaft 29 projecting from the outer end of the valve shaft 29 so as to be positioned inside the spout 22, and the valve hole 29 A valve body 30 for closing the valve 28, and a retaining piece radially provided on the inner end of the valve shaft 29 and abutting against the inner end surface of the valve hole 28 so as to retain the valve body 30 in the open position. It consists of 31 and
The valve body 3 is caused by the pressure of the lubricant introduced into the internal passage 21.
0 is open against earth pressure.

【0009】[0009]

【発明の実施の形態】図1は本発明に係る掘削装置を示
しており、この図において、1は全旋回型ケーシング回
転圧入機、2は掘削刃3を有する先行ケーシング、4は
先行ケーシング2に接続されるリングジョイントであ
る。5は、リングジョイント4に着脱可能に接続される
と共に、互いに接続可能な複数の後続ケーシングであ
り、6は最後端(最上端)の後続ケーシング5に着脱可
能に装着されるスイベル装置である。全旋回型ケーシン
グ回転圧入機1は、従来より使用されている周知構造の
もので、ケーシング5を機枠7の中央部内に貫通させ、
ケーシング5の外周面をチャック8で把持して油圧モー
ター(図示せず)により回転させながら、このケーシン
グ5を圧入引抜用油圧シリンダ9によって圧入及び引き
抜きを行わせるようになっている。また、図1におい
て、10、コンクリート杭を形成するグラウトの注入時
に使用されるグラウトミキサー、11は、このミキサー
10に接続されたモルタルポンプで、ポンプ11はホー
ス12を介してスイベル装置6に接続される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows an excavating device according to the present invention, in which 1 is a fully swiveling casing rotary press-fitting machine, 2 is a preceding casing having an excavating blade 3, and 4 is a preceding casing 2. Is a ring joint connected to. Reference numeral 5 denotes a plurality of subsequent casings that are detachably connected to the ring joint 4 and can be connected to each other. Reference numeral 6 denotes a swivel device that is detachably attached to the rearmost casing 5 (the uppermost end). The fully swiveling casing rotary press-fitting machine 1 has a well-known structure which has been conventionally used, and the casing 5 is penetrated into the central portion of the machine frame 7,
While the outer peripheral surface of the casing 5 is gripped by the chuck 8 and rotated by a hydraulic motor (not shown), the casing 5 is press-fitted and withdrawn by a hydraulic cylinder 9 for press-fitting and withdrawing. Further, in FIG. 1, 10, a grout mixer used when pouring grout for forming a concrete pile, 11 is a mortar pump connected to this mixer 10, and the pump 11 is connected to the swivel device 6 via a hose 12. To be done.

【0010】図2及び図3は、先行ケーシング3、リン
グジョイント4及び各後続ケーシング5の拡大詳細縦断
面図、図4及び図5は、それぞれ後続ケーシング5の横
断面図を示している。これらの図から明らかなように、
各後続ケーシング5は、内筒部材13a、これより若干
径大の外筒部材13b、及びこれら両筒部材13a,1
3b間の環状空間部16に周方向所要間隔おきに介装さ
れた複数の補強部材13cからなるケーシング本体13
と、このケーシング本体13の上端に溶接で一体に連設
された上端ケーシング部14と、ケーシング本体13の
下端に同様に溶接で一体に連設された下端ケーシング部
15とによって構成され、そして上端ケーシング部14
には接続用雄部14aが、下端ケーシング部15には接
続用雌部15aが形成され、また上端及び下端ケーシン
グ部14,15には連通孔17,18がそれぞれ周方向
45度の間隔で4個ずつ縦に貫設されている。尚、ケー
シング本体13の内外両筒部材13a,13b間の環状
空間部16は、図4に示すように、複数の補強部材13
cにより仕切られて複数の小空間部16aに区画されて
いるが、各小空間部16aは、例えば補強部材13cに
横孔を設ける等の手段を講じることによって互いに連通
されているものとする。
2 and 3 are enlarged detailed vertical sectional views of the preceding casing 3, the ring joint 4 and each succeeding casing 5, and FIGS. 4 and 5 are transverse sectional views of the succeeding casing 5, respectively. As you can see from these figures,
Each subsequent casing 5 includes an inner tubular member 13a, an outer tubular member 13b having a diameter slightly larger than the inner tubular member 13a, and both tubular members 13a, 1a.
A casing body 13 composed of a plurality of reinforcing members 13c interposed in an annular space 16 between 3b at required circumferential intervals.
And an upper end casing part 14 integrally connected by welding to the upper end of the casing body 13, and a lower end casing part 15 similarly integrally connected by welding to the lower end of the casing body 13, and the upper end Casing part 14
Is formed with a connecting male portion 14a, the lower end casing portion 15 is formed with a connecting female portion 15a, and the upper and lower casing portions 14, 15 are provided with communication holes 17, 18 at intervals of 45 degrees in the circumferential direction. They are laid vertically one by one. The annular space portion 16 between the inner and outer tubular members 13a and 13b of the casing body 13 has a plurality of reinforcing members 13 as shown in FIG.
The small spaces 16a are partitioned by c and are divided into a plurality of small spaces 16a. The small spaces 16a are communicated with each other by, for example, providing a lateral hole in the reinforcing member 13c.

【0011】しかして、各後続ケーシング5相互を接続
するにあたっては、例えば図2に示すように、下段側後
続ケーシング5の上端ケーシング部14の接続用雄部1
4aに、上段側後続ケーシング5の下端ケーシング部1
5の接続用雌部15aを係合させると共に、上記上端ケ
ーシング部14の連通孔17と上記下端ケーシング部1
5の連通孔18とが重合するようにし、斯かる状態で接
続用雄部14aと接続用雌部15aとに複数のジョイン
トピン19(図1及び図5参照)を貫通させて両者を結
合すればよい。こうして両ケーシング5,5を接合する
ことにより、両ケーシング5,5の環状空間部16,1
6が連通孔17,18を通じて互いに連通される。
When connecting the succeeding casings 5 to each other, however, as shown in FIG. 2, for example, the connecting male portion 1 of the upper end casing portion 14 of the lower succeeding casing 5 is connected.
4a includes a lower end casing portion 1 of the upper-stage side subsequent casing 5
5 is engaged with the connecting female portion 15a, and the lower end casing portion 1 and the communication hole 17 of the upper end casing portion 14 are engaged.
5 so that the communication holes 18 of the connection member 5 overlap with each other, and in such a state, a plurality of joint pins 19 (see FIG. 1 and FIG. 5) are passed through the connecting male portion 14a and the connecting female portion 15a to connect them. Good. By joining the two casings 5 and 5 in this manner, the annular space portions 16 and 1 of the two casings 5 and 5 are joined together.
6 are communicated with each other through the communication holes 17 and 18.

【0012】また図2に示すように、リングジョイント
4は、後続ケーシング5と同じ厚みの円筒体からなるも
ので、上端部には後続ケーシング5の接続用雌部15a
と係合する接続用雄部4aが形成され、下端部には先行
ケーシング2に設けられた接続用雄部2aと係合する接
続用雌部4bが形成されている。また、このリングジョ
イント4の上端部側には後続ケーシング5の連通孔18
と対応する位置に連通孔20が設けられ、この連通孔2
0は、当該リングジョイント4の内部通路21(連通孔
20の真下に位置する)と連通し、この内部通路21
は、リングジョイント4の外周面に開口する注出口22
に通じている。この注出口22は、前記連通孔17,1
8,20と同様に、リングジョイント4の周方向45度
の間隔で4箇所に形成され、そして各注出口22には逆
止弁23が設けられている。
Further, as shown in FIG. 2, the ring joint 4 is made of a cylindrical body having the same thickness as the subsequent casing 5, and the upper end portion thereof has a female portion 15a for connection of the subsequent casing 5.
A connecting male portion 4a that engages with the connecting male portion 4a is formed at the lower end portion, and a connecting female portion 4b that engages with the connecting male portion 2a provided in the preceding casing 2 is formed. Further, the communication hole 18 of the succeeding casing 5 is provided on the upper end side of the ring joint 4.
A communication hole 20 is provided at a position corresponding to
0 communicates with the internal passage 21 of the ring joint 4 (located directly below the communication hole 20), and the internal passage 21
Is a spout 22 that opens to the outer peripheral surface of the ring joint 4.
Leads to. The spout 22 has the communication holes 17, 1
Similar to Nos. 8 and 20, check valves 23 are provided at four positions at intervals of 45 degrees in the circumferential direction of the ring joint 4, and each spout 22 is provided with a check valve 23.

【0013】上記リングジョイント4と後続ケーシング
5との接続は、リングジョイント4側の接続用雄部4a
と後続ケーシング5側の接続用雌部15aとを係合させ
ると共に、後続ケーシング5側の連通孔18とリングジ
ョイント4側の連通孔20とが重合するようにして、両
係合部間にジョイントピン19(図1参照)を貫通させ
ればよく、また、リングジョイント4と先行ケーシング
2との接続は、リングジョイント4側の接続用雌部4b
と先行ケーシング2側の接続用雄部2aとを係合させ
て、両係合部に上記同様なジョイントピン(図示省略)
を貫通させるだけでよい。従って、リングジョイント4
と後続ケーシング5との接続により、後続ケーシング5
の環状空間部16とリングジョイント4の内部通路21
とが連通孔18,20を通じて連通される。
The ring joint 4 and the subsequent casing 5 are connected to each other by connecting male portion 4a on the ring joint 4 side.
And the female part 15a for connection on the side of the subsequent casing 5 are engaged with each other, and the communication hole 18 on the side of the subsequent casing 5 and the communication hole 20 on the side of the ring joint 4 are overlapped with each other so that a joint is formed between both engagement parts. The pin 19 (see FIG. 1) may be passed through, and the ring joint 4 and the preceding casing 2 may be connected by the female portion 4b for connection on the ring joint 4 side.
And the connecting male portion 2a on the side of the preceding casing 2 are engaged with each other, and joint pins (not shown) similar to the above are provided on both engaging portions.
You only have to penetrate. Therefore, ring joint 4
And the subsequent casing 5 are connected, the subsequent casing 5
Of the annular space 16 and the internal passage 21 of the ring joint 4
And are communicated with each other through the communication holes 18 and 20.

【0014】スイベル装置6は、図1及び図3に示すよ
うに、ポンプ11からホース12によって圧送されてく
る液体(滑剤)を、回転中の後続ケーシング5の環状空
間部16内に導入するもので、図3に示すように最後端
(最上段)の後続ケーシング5の接続用雄部14aに対
し着脱可能にして且つ相対回転可能に装着される取付部
24と、図1に示すようにホース12と接続している本
体部25とからなり、取付部24には、後続ケーシング
5の接続用雄部14aに相対回転可能に係合するフラン
ジ部24aに環状溝26が形成され、この環状溝26
は、本体部25内から延びた液体通路27と連通してい
る。しかして、本体部25内部から液体通路27を通っ
て環状溝26に圧送さられてくる滑剤は、この環状溝2
6から後続ケーシング5の上端ケーシング部14の連通
孔17を通じて当該ケーシング5内の環状空間部16に
導入される。
As shown in FIGS. 1 and 3, the swivel device 6 introduces the liquid (lubricant) pumped from the pump 11 by the hose 12 into the annular space 16 of the rotating subsequent casing 5. As shown in FIG. 3, a mounting portion 24 that is detachably attached to the connecting male portion 14a of the rearmost casing (uppermost stage) of the subsequent casing 5 and is rotatably mounted thereto, and a hose as shown in FIG. The mounting portion 24 has an annular groove 26 formed in the flange portion 24a that engages with the connecting male portion 14a of the subsequent casing 5 in a relatively rotatable manner. 26
Communicate with a liquid passage 27 extending from the inside of the main body 25. Then, the lubricant that is pressure-fed from the inside of the main body portion 25 through the liquid passage 27 to the annular groove 26 is
6 is introduced into the annular space 16 in the casing 5 through the communication hole 17 in the upper casing 14 of the subsequent casing 5.

【0015】上記のようにして最後端(最上段)の後続
ケーシング5の環状空間部16に導入された滑剤は、そ
の下端ケーシング部15の連通孔18から下段側の後続
ケーシング5の連通孔17を通じて環状空間部16に送
られ、この環状空間部16内の滑剤はその下端ケーシン
グ部15の連通孔18から連通孔20を介してリングジ
ョイント4の内部通路21内に導入され、注出口22か
らその外へ噴出されることになる。
The lubricant introduced into the annular space 16 of the rearmost end (uppermost stage) of the subsequent casing 5 as described above passes from the communication hole 18 of the lower end casing portion 15 thereof to the communication hole 17 of the subsequent casing 5 on the lower stage side. Through the communication hole 18 of the lower end casing portion 15 through the communication hole 20 into the internal passage 21 of the ring joint 4 and the spout 22 It will be ejected outside.

【0016】前記逆止弁23は、図6及び図7に詳細に
示すように、リングジョイント4の内部通路21と注出
口22との間に設けられた弁孔28と、この弁孔28の
内径より径小で弁孔28の孔長よりも長い弁軸29と、
注出口22内に位置するように上記弁軸29の外端に突
設され、土圧によって弁孔28を閉止する弁体30と、
上記弁軸29の内端に放射状に突設され、上記弁体30
を弁開放位置に保持するように上記弁孔28の内端面に
当接される保持部片31とから構成されている。従っ
て、掘削装置に使用中に、リングジョイント4の内部通
路21に加圧された滑剤が導入されていないときは、弁
体30は、リングジョイント4の周囲地盤の土圧によっ
て図6の(A)に示す状態に弁孔28の外端に押し付け
られて弁孔28を閉止し、従って土砂が弁孔28内に侵
入することがない。また、リングジョイント4の内部通
路21に加圧された滑剤が導入されると、その滑剤の圧
力によって弁体30が図6の(B)に示すように土圧に
抗して開放されるようになっている。図7の(A)は、
弁体30を弁孔28の外側から見た図面、同図の(B)
は、弁体30を弁孔28の内側から見た図面である。
As shown in detail in FIGS. 6 and 7, the check valve 23 has a valve hole 28 provided between the internal passage 21 and the spout 22 of the ring joint 4, and the valve hole 28. A valve shaft 29 having a diameter smaller than the inner diameter and longer than the hole length of the valve hole 28;
A valve body 30 which is provided on the outer end of the valve shaft 29 so as to be located in the spout 22 and closes the valve hole 28 by earth pressure;
The valve shaft 30 is provided radially at the inner end of the valve shaft 29 so as to project radially.
Is held at the valve open position, and a holding portion piece 31 is brought into contact with the inner end surface of the valve hole 28. Therefore, when the pressurized lubricant is not introduced into the internal passage 21 of the ring joint 4 during use in the excavator, the valve element 30 is moved by the earth pressure of the ground around the ring joint 4 as shown in (A) of FIG. In the state shown in (), the valve hole 28 is closed by being pressed against the outer end of the valve hole 28, so that the sediment does not enter the valve hole 28. When the pressurized lubricant is introduced into the internal passage 21 of the ring joint 4, the pressure of the lubricant causes the valve body 30 to open against earth pressure as shown in FIG. 6B. It has become. In FIG. 7A,
Drawing which looked at valve body 30 from the outside of valve hole 28, (B) of the same figure
[FIG. 3] is a view of the valve body 30 as viewed from the inside of the valve hole 28.

【0017】このような構成の逆止弁23によれば、注
出口22内の弁体30が、リングジョイント4の内部通
路21からの滑剤の圧力、周囲地盤の土圧によって、軸
方向に移動して、弁孔28を開閉するようになっている
ため、弁体がヒンジ形となっている従来の逆止弁に比
べ、構造的に頑強で耐用性に優れていると共に、開閉動
作を迅速で確実に行うことができる。
According to the check valve 23 having such a structure, the valve body 30 in the spout 22 is moved in the axial direction by the pressure of the lubricant from the internal passage 21 of the ring joint 4 and the earth pressure of the surrounding ground. Since the valve hole 28 is opened and closed, the valve body is structurally robust and has excellent durability as compared with the conventional check valve in which the valve body is a hinge type, and the opening and closing operation is quick. Can be done reliably.

【0018】前記滑剤は、水、ベントナイト及び増粘造
壁剤(調整剤)の混合物であって、好ましい滑剤として
は、水1000Kgに対し、ベントナイト50Kgと増
粘造壁剤2Kgを加えたものがよい。この滑剤は、図1
に示すグラウトミキサー10によって混合する。また、
上記掘削装置において、先行ケーシング2の長さは1
m、リングジョイント4の長さは2m、後続ケーシング
5の長さは5mとし、またそれらの外径は3000mm
とする。
The above-mentioned lubricant is a mixture of water, bentonite and a thickening wall-forming agent (conditioning agent), and a preferable lubricant is 1000 kg of water to which 50 kg of bentonite and 2 kg of thickening wall-forming agent are added. Good. This lubricant is shown in Figure 1.
Mix by the grout mixer 10 shown in FIG. Also,
In the above excavator, the length of the preceding casing 2 is 1
m, the length of the ring joint 4 is 2 m, the length of the succeeding casing 5 is 5 m, and their outer diameter is 3000 mm.
And

【0019】以上説明したような構成の掘削装置の使用
による掘削方法について、図7を参照して説明すると、
先ず図7の(A)に示すように、先行ケーシング2及び
リングジョイント4を接続した1本目の後続ケーシング
5を、全旋回型ケーシング回転圧入機1により回転(正
転)させながら地盤中に圧入し、この後続ケーシング5
をある程度まで圧入した後、ケーシング5内部の土砂を
ハンマーグラブ32によって掘削し、排土する。このよ
うな圧入と掘削排土を繰り返して1本目の後続ケーシン
グ5による掘孔を終えたならば、同図(B)に示すよう
に、この後続ケーシング5に2本目の後続ケーシング5
を接続して、引き続き上記同様な圧入と掘削排土を行
う。尚、1本目のケーシング5によって7〜8m程度ま
で掘孔されることになる。
An excavation method using the excavation device having the above-described structure will be described with reference to FIG.
First, as shown in FIG. 7 (A), the first succeeding casing 5 to which the preceding casing 2 and the ring joint 4 are connected is press-fitted into the ground while being rotated (normal rotation) by the full-swivel type casing rotary press-fitting machine 1. And this subsequent casing 5
After press-fitting to a certain extent, the earth and sand inside the casing 5 are excavated by the hammer grab 32, and the earth is discharged. After the press-fitting and excavating and discharging soil are repeated to finish the drilling by the first succeeding casing 5, as shown in FIG.
Then, the same press-fitting and excavation and earth removal are continued. It should be noted that the first casing 5 digs up to about 7 to 8 m.

【0020】図7の(B)に示すように2本目の後続ケ
ーシング5を圧入して、掘孔長さが例えば10m程度に
達すると、ケーシング5の外周面にかかる土圧Pが急激
に増大して、その周面摩擦抵抗が異常に大きくなり、圧
入不能状態となる。斯かる状態になったとき、またはそ
の若干手前の段階において、全旋回型ケーシング回転圧
入機1の駆動を一旦停止し、上段(最後端)の後続ケー
シング5の上端に、同図の(C)に示すようにスイベル
装置6を装着する。しかして、グラウトミキサー10に
よって混合される滑剤を、ポンプ11により圧送して、
スイベル装置6の取付部24から上段の後続ケーシング
5、下段の後続ケーシング5及びリングジョイント4に
亘る一連の流路に加圧供給し、リングジョイント4外周
面の各注出口22から注出する。こうして滑剤を各注出
口22から注出しながら、全旋回型ケーシング回転圧入
機1の駆動を再開して、後続ケーシング5を回転させ且
つ所定ストローク上下動させる。
As shown in FIG. 7B, when the second succeeding casing 5 is press-fitted and the hole length reaches, for example, about 10 m, the earth pressure P applied to the outer peripheral surface of the casing 5 rapidly increases. Then, the peripheral frictional resistance becomes abnormally large and the press-fitting is impossible. In such a state, or at a stage slightly before that, the drive of the full-swivel type casing rotary press-fitting machine 1 is temporarily stopped, and (C) in the same figure is provided at the upper end of the succeeding casing 5 at the upper stage (the last end). The swivel device 6 is attached as shown in FIG. Then, the lubricant mixed by the grout mixer 10 is pumped by the pump 11,
The swivel device 6 is supplied under pressure from a mounting portion 24 of the swivel device 6 to a series of passages extending from the upper casing 5 to the lower casing 5 and the ring joint 4, and is discharged from each spout 22 on the outer peripheral surface of the ring joint 4. In this way, while pouring out the lubricant from each pouring port 22, the drive of the fully swiveling casing rotary press-fitting machine 1 is restarted to rotate the succeeding casing 5 and vertically move a predetermined stroke.

【0021】リングジョイント4外周面の各注出口22
から注出された滑剤は、後続ケーシング5の回転と上下
動に伴って、図7(C)に示すように先行ケーシング2
外周面及び後続ケーシング5外周面と掘孔壁面との隙間
に十分に浸透し、ケーシング外周面と掘孔壁面との滑り
を良くして、ケーシング周面摩擦抵抗を低減せしめる。
このように、滑剤の注出によってケーシング周面摩擦抵
抗が低減されるから、3000mmもの大口径の掘孔作
業を、数10mという大深度までも継続して容易に行う
ことができる。尚、滑剤を注出しながら、ケーシング5
を回転させてそのまま圧入してもよいが、ケーシング5
を、上述のように回転させながら尚且つ所定ストローク
上下動させることにより、滑剤がケーシング5と掘孔壁
との隙間に広く行き渡って、ケーシング周面摩擦抵抗を
より効果的に低減させることができる。
Each spout 22 on the outer peripheral surface of the ring joint 4
The lubricant poured out from the front casing 2 as shown in FIG. 7 (C) as the rear casing 5 rotates and moves up and down.
It sufficiently penetrates into the gap between the outer peripheral surface and the outer peripheral surface of the succeeding casing 5 and the wall surface of the borehole, and improves the sliding between the outer peripheral surface of the casing and the wall surface of the borehole to reduce the frictional resistance of the casing peripheral surface.
As described above, since the frictional resistance of the casing peripheral surface is reduced by the pouring of the lubricant, it is possible to easily carry out the work of boring a hole having a large diameter of 3000 mm up to a large depth of several tens of meters. While pouring the lubricant, the casing 5
It may be rotated and press-fitted as it is, but the casing 5
By rotating the above as described above and moving it up and down by a predetermined stroke, the lubricant can be widely spread in the gap between the casing 5 and the hole wall, and the casing circumferential surface friction resistance can be reduced more effectively. .

【0022】また、上述した本発明の掘削装置では、滑
剤が注出される注出口22を、先行ケーシング2や後続
ケーシング5に設けるのではなく、外周圧が最も大きく
作用し周面摩擦抵抗の大きい、掘削刃3先端より例えば
2〜3m上方のリングジョイント4部分に設けているた
め、ケーシング周面摩擦抵抗をより効果的に低減させる
ことができ、また先行ケーシング2や後続ケーシング5
に設けるのに比べ、製作的に有利である。
Further, in the above-described excavating device of the present invention, the spout 22 through which the lubricant is spouted is not provided in the preceding casing 2 or the succeeding casing 5, but the outer peripheral pressure acts most and the peripheral frictional resistance is large. Since the ring joint 4 is provided, for example, 2 to 3 m above the tip of the excavating blade 3, the casing circumferential surface friction resistance can be reduced more effectively, and the preceding casing 2 and the following casing 5
It is advantageous in terms of manufacturing as compared with the case where

【0023】また、滑剤を供給するための流路を、各後
続ケーシング5の側壁に、該後続ケーシング5相互が接
続された状態で互いに連通可能に設けると共に、各後続
ケーシング5の流路を注出口22に接続可能としている
ため、特別な配管が不要になると共に、流路相互の接続
が簡単となる。特に、各後続ケーシング5の流路は、後
続ケーシング5のケーシング本体13に形成されている
環状空間部16を利用し、これに連通孔17,18を設
けたものであるから、流路の形成が容易である。また、
注出口22に逆止弁23を設けているため、掘削施工中
に土砂等が注出口22内に侵入することがない。また、
最後端の後続ケーシング5の流路に滑剤を加圧供給する
のにスイベル装置6を用いるため、ケーシング5を回転
させながら、滑剤の供給を行うことができ、しかもこの
スイベル装置6は後続ケーシング5に対し着脱可能であ
るから、滑剤の供給時のみ装着すればよい。更に、滑剤
は、グラウトの注入に使用されるミキサー10によって
混合すると共に、このミキサー10に接続されたモルタ
ルポンプ11によってケーシング側に圧送するようにし
ているため、滑剤の混合及び圧送のための特別な設備が
不要となる。
Further, a flow path for supplying a lubricant is provided on the side wall of each succeeding casing 5 so as to be able to communicate with each other while the succeeding casings 5 are connected to each other, and the flow path of each succeeding casing 5 is poured. Since it can be connected to the outlet 22, no special piping is required, and the mutual connection of the flow paths becomes simple. In particular, since the flow path of each succeeding casing 5 uses the annular space 16 formed in the casing body 13 of the succeeding casing 5 and the communication holes 17 and 18 are provided therein, the flow path is formed. Is easy. Also,
Since the check valve 23 is provided at the pouring port 22, soil or the like does not enter the pouring port 22 during excavation work. Also,
Since the swivel device 6 is used to pressurize and supply the lubricant to the flow path of the trailing casing 5 at the rearmost end, the lubricant can be supplied while the casing 5 is rotated, and the swivel device 6 can also supply the lubricant. Since it can be attached and detached, it may be attached only when the lubricant is supplied. Further, since the lubricant is mixed by the mixer 10 used for pouring grout and is pressure-fed to the casing side by the mortar pump 11 connected to the mixer 10, it is special for mixing and pressure-feeding the lubricant. Unnecessary equipment is unnecessary.

【0024】[0024]

【発明の効果】請求項1に係る掘削方法によれば、掘削
の途上で、ケーシング側壁に形成された流路より供給さ
れる滑剤をケーシングの先端側外周面所要部からケーシ
ング外周面と掘削孔壁との間に注出することによって、
ケーシング外周部と掘孔壁面との滑りを良くして、ケー
シング周面摩擦抵抗を低減させることができる。従っ
て、孔径が2000〜3000mmといった大口径で、
掘孔長が数10mにも及ぶような大口径大深度竪孔の掘
削施工が容易に可能となる。
According to the excavating method according to the first aspect of the present invention, during excavation, the lubricant supplied from the flow path formed in the casing side wall is supplied to the casing outer peripheral surface and the excavation hole from the front end side outer peripheral surface required portion of the casing. By pouring between the walls,
It is possible to improve the sliding between the outer peripheral portion of the casing and the wall surface of the hole and reduce the frictional resistance of the outer peripheral surface of the casing. Therefore, with a large diameter of 2000-3000 mm,
This makes it possible to easily carry out excavation work for large-diameter, deep-deep vertical holes with a length of several tens of meters.

【0025】請求項2によれば、滑剤を注出しながら、
ケーシングを回転させ且つ所定ストローク上下動させる
ことにより、滑剤がケーシングと掘孔側壁との隙間に十
分行き渡って、ケーシング周面摩擦抵抗をより効果的に
低減させることができる。
According to claim 2, while pouring out the lubricant,
By rotating the casing and moving the casing up and down by a predetermined stroke, the lubricant can sufficiently spread in the gap between the casing and the side wall of the hole, and the casing circumferential surface friction resistance can be more effectively reduced.

【0026】請求項3に係る掘削装置を使用することに
よって、大口径大深度竪孔の掘削施工を容易に実施する
ことができる。特に、この掘削装置によれば、滑剤が注
出される注出口を、先行ケーシングや後続ケーシングに
設けるのではなく、外周圧が最も大きく作用し周面摩擦
抵抗の大きい、掘削刃先端よりのリングジョイント部分
に設けるから、ケーシング周面摩擦抵抗を効果的に低減
させることができ、また先行ケーシングや後続ケーシン
グに設けるのに比べ、製作が容易となる。
By using the excavating device according to the third aspect, it is possible to easily carry out excavation work for a large-diameter, large-depth vertical hole. Particularly, according to this drilling device, the spout for pouring the lubricant is not provided in the preceding casing or the succeeding casing, but the ring joint from the tip of the excavating blade, which has the largest outer peripheral pressure and the large frictional resistance on the peripheral surface. Since it is provided in a part, the frictional resistance on the casing peripheral surface can be effectively reduced, and the production becomes easier as compared with the case where it is provided in the preceding casing or the succeeding casing.

【0027】また、滑剤を供給するための流路を、各後
続ケーシングの側壁に、該後続ケーシング相互が接続さ
れた状態で互いに連通可能に設けると共に、各後続ケー
シングの流路を注出口に接続可能としているため、特別
な配管が不要になると共に、流路相互に接続が簡単とな
る。また、注出口に逆止弁を設けているため、掘削施工
中に土砂等が注出口内に侵入することがない。また、最
後端の後続ケーシングの流路に滑剤を加圧供給するのに
スイベル装置を用いるため、ケーシングを回転させなが
ら、滑剤の供給を行うことができ、しかもこのスイベル
装置は後続ケーシングに対し着脱可能であるから、滑剤
の供給時のみ装着すればよい。
Further, a flow path for supplying a lubricant is provided on the side wall of each succeeding casing so as to be able to communicate with each other while the succeeding casings are connected to each other, and the flow path of each succeeding casing is connected to the spout. Since this is possible, no special piping is required and the flow paths can be easily connected to each other. Further, since the check valve is provided at the spout, soil and sand will not enter the spout during excavation work. In addition, since the swivel device is used to pressurize and supply the lubricant to the flow path of the subsequent casing at the rearmost end, the lubricant can be supplied while rotating the casing, and the swivel device is detachable from the subsequent casing. Since it is possible, it is necessary to mount it only when the lubricant is supplied.

【0028】請求項4によれば、注出口内の弁体が、リ
ングジョイントの内部通路からの滑剤の圧力、周囲地盤
の土圧によって、軸方向に移動して、弁孔を開閉するよ
うになっているため、弁体がヒンジ形となっている従来
の逆止弁に比べ、構造的に頑強で耐用性に優れていると
共に、開閉動作を迅速で確実に行うことができる。
According to the fourth aspect, the valve body in the pouring port is moved in the axial direction by the pressure of the lubricant from the internal passage of the ring joint and the earth pressure of the surrounding ground to open and close the valve hole. Therefore, compared with the conventional check valve in which the valve body is a hinge type, it is structurally robust and has excellent durability, and the opening / closing operation can be performed quickly and reliably.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明に係る掘削装置の全体側面図である。FIG. 1 is an overall side view of an excavation device according to the present invention.

【図2】 ケーシングの拡大縦断面図である。FIG. 2 is an enlarged vertical sectional view of a casing.

【図3】 ケーシングへのスイベル装置の取付状態を示
す拡大縦断面図である。
FIG. 3 is an enlarged vertical sectional view showing how the swivel device is attached to the casing.

【図4】 図1のX−X線拡大断面図である。FIG. 4 is an enlarged sectional view taken along line XX of FIG. 1;

【図5】 図2のY−Y線断面図である。5 is a cross-sectional view taken along line YY of FIG.

【図6】 逆止弁を示す縦断面図で、(A)は閉弁状態
を示し、(B)は開弁状態を示す。
FIG. 6 is a vertical cross-sectional view showing a check valve, (A) showing a closed state, and (B) showing an open state.

【図7】 (A)は逆止弁を弁孔の外側から見た正面
図、(B)は同逆止弁を弁孔の内側から見た正面図であ
る。
FIG. 7A is a front view of the check valve as viewed from the outside of the valve hole, and FIG. 7B is a front view of the check valve as viewed from the inside of the valve hole.

【図8】 (A)〜(C)は、掘削工程を順次説明する
説明図である。
8 (A) to (C) are explanatory views sequentially explaining an excavation process.

【符号の説明】[Explanation of symbols]

1 全旋回型ケーシング回転圧入機 2 先行ケーシング 3 掘削刃 4 リングジョイント 5 後続ケーシング 6 スイベル装置 22 滑剤の注出口 23 逆止弁 24 スイベル装置 28 弁孔 29 弁軸 30 弁体 31 保持部片 1 Full swivel type casing rotary press-fitting machine 2 Preceding casing 3 Drilling blade 4 Ring joint 5 Subsequent casing 6 Swivel device 22 Lubricant spout 23 Check valve 24 Swivel device 28 Valve hole 29 Valve shaft 30 Valve body 31 Holding piece

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 先端に掘削刃を備えたケーシングをケー
シング回転圧入機によって回転させながら地盤中に圧入
し、ケーシング内部の土砂を排出しつつ地盤の掘削を行
う掘削工法であって、上記掘削の途上において、ケーシ
ングの側壁に形成された流路より供給される滑剤をケー
シングの先端側外周面所要部からケーシング外周面と掘
孔壁面との間に注出するようにした掘削工法。
1. A method for excavating the ground, wherein a casing equipped with an excavating blade at its tip is pressed into the ground while being rotated by a casing rotary press-fitting machine, and earth and sand are discharged while the inside of the casing is discharged. An excavation method in which a lubricant supplied from a flow path formed on a side wall of the casing is poured out from a required portion on the outer peripheral surface on the tip end side of the casing between the outer peripheral surface of the casing and the wall surface of the borehole along the way.
【請求項2】 前記滑剤を注出しながらケーシングを回
転及び上下動させるようにした請求項1に記載の掘削工
法。
2. The excavation method according to claim 1, wherein the casing is rotated and vertically moved while pouring out the lubricant.
【請求項3】 ケーシング回転圧入機、掘削刃を有する
先行ケーシング、該先行ケーシングに接続されるリング
ジョイント、該リングジョイントに接続され、互いに接
続可能な複数の後続ケーシング、及び最後端の後続ケー
シングに着脱可能に装着されるスイベル装置からなり、
上記各後続ケーシングの側壁には、後続ケーシング相互
が接続された状態で互いに連通可能な流路を設け、上記
リングジョイントには、該リングジョイントに接続され
る後続ケーシングの流路と接続可能な注出口を外周面に
開口するように設けると共に、該注出口に逆止弁を設
け、最後端の後続ケーシングの流路に上記スイベル装置
を介して滑剤を加圧供給するように構成してなる掘削装
置。
3. A casing rotary press-fitting machine, a leading casing having an excavating blade, a ring joint connected to the leading casing, a plurality of trailing casings connected to the ring joint and connectable to each other, and a trailingmost trailing casing. It consists of a swivel device that is detachably attached,
The side wall of each of the succeeding casings is provided with a flow path that can communicate with each other while the succeeding casings are connected to each other, and the ring joint is connectable to the flow path of the succeeding casing connected to the ring joint. The excavator is provided so that the outlet is opened to the outer peripheral surface, the check valve is provided at the outlet, and the lubricant is pressurized and supplied to the flow path of the subsequent casing at the rearmost end through the swivel device. apparatus.
【請求項4】 前記逆止弁は、前記リングジョイントの
内部通路と前記注出口との間に設けられた弁孔と、該弁
孔の内径より径小で該弁孔の孔長よりも長い弁軸と、前
記注出口内に位置するように弁軸の外端に突設され、土
圧によって弁孔を閉止する弁体と、上記弁軸の内端に放
射状に突設され、上記弁体を開放位置に保持するように
上記弁孔の内端面に当接される保持部片とからなり、上
記内部通路に導入される滑剤の圧力により弁体が土圧に
抗して開放されるようになっている請求項3に記載の掘
削装置。
4. The check valve includes a valve hole provided between an internal passage of the ring joint and the spout, and a diameter smaller than an inner diameter of the valve hole and longer than a hole length of the valve hole. A valve shaft, a valve body projecting at an outer end of the valve shaft so as to be located in the pouring port, and closing a valve hole by earth pressure, and a valve body radially projecting at an inner end of the valve shaft. A holding part that abuts the inner end surface of the valve hole so as to hold the body in the open position, and the pressure of the lubricant introduced into the internal passage opens the valve body against earth pressure. The excavation rig according to claim 3, wherein
JP22662995A 1995-09-04 1995-09-04 Excavation method and excavator Withdrawn JPH0972183A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22662995A JPH0972183A (en) 1995-09-04 1995-09-04 Excavation method and excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22662995A JPH0972183A (en) 1995-09-04 1995-09-04 Excavation method and excavator

Publications (1)

Publication Number Publication Date
JPH0972183A true JPH0972183A (en) 1997-03-18

Family

ID=16848191

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22662995A Withdrawn JPH0972183A (en) 1995-09-04 1995-09-04 Excavation method and excavator

Country Status (1)

Country Link
JP (1) JPH0972183A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000029712A1 (en) * 1998-11-17 2000-05-25 Industrial Innovations & Concepts Pty Ltd. Apparatus for delivering a flowable substance to a remote location

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000029712A1 (en) * 1998-11-17 2000-05-25 Industrial Innovations & Concepts Pty Ltd. Apparatus for delivering a flowable substance to a remote location
US6595281B1 (en) 1998-11-17 2003-07-22 Industrial Innovations & Concepts Pty Ltd Apparatus for delivering a flowable substance to a remote location

Similar Documents

Publication Publication Date Title
KR101922032B1 (en) DCM soft ground improved apparatus and method using a ground rig
JP2013194465A (en) Diameter enlarging bit
KR101883328B1 (en) Single two-way swivel rotary drilling rigs in the ground
JPH0972183A (en) Excavation method and excavator
JP3673186B2 (en) Concrete pile setting method and pile head gripping device
JP2003027469A (en) Steel pipe pile, foundation pile producing method using the same and device of the method
KR100512095B1 (en) Excavator bit using UCM method
JPH1018743A (en) Drilling method for pile pull-out construction method and casing for pile pull-out construction method
KR200275366Y1 (en) Series of wall structure method
JPH0718665A (en) Screw rod for underground boring machine
US4027490A (en) Self-sinking, axial passage foundation pile and method
KR20040075984A (en) UCM method and drilling road of ground drilling rigs using UCM method
KR102155343B1 (en) Drive reducer for double casing-auger
JP2004339819A (en) Combined normal and reverse circulation system type water swivel
KR100451962B1 (en) Series of wall structure method and device
KR200314982Y1 (en) UCM method and drilling road of ground drilling rigs using method
JPH0718664A (en) Rotary joint for underground boring machine
KR200331562Y1 (en) Excavator bit using UCM method
JP3545723B2 (en) Shaft construction machine, shaft construction method and deep foundation method
JPH0788661B2 (en) Construction method of foundation and rotary press-fitting device for pile body in soil
JPS6248010B2 (en)
JPH06240660A (en) Pipe sheet-pile retaining wall
JPH07122389B2 (en) Drilling rig
JP3944005B2 (en) Chemical injection method to press-fit shaft and its excavation ground
JP3306709B2 (en) Side hole construction machine

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20021105