JPH10220014A - Horizontal and vertical transfer device - Google Patents

Horizontal and vertical transfer device

Info

Publication number
JPH10220014A
JPH10220014A JP2644097A JP2644097A JPH10220014A JP H10220014 A JPH10220014 A JP H10220014A JP 2644097 A JP2644097 A JP 2644097A JP 2644097 A JP2644097 A JP 2644097A JP H10220014 A JPH10220014 A JP H10220014A
Authority
JP
Japan
Prior art keywords
building
horizontal
vertical
transport means
transfer unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2644097A
Other languages
Japanese (ja)
Inventor
Hideo Tanijiri
秀雄 谷尻
Takashi Arai
高志 荒井
Ryoji Yoshitake
亮二 吉武
Masao Kato
将夫 加藤
Hideaki Fujiki
秀明 藤木
Kyosuke Inoue
恭介 井上
Kazuo Ishikawa
一雄 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP2644097A priority Critical patent/JPH10220014A/en
Publication of JPH10220014A publication Critical patent/JPH10220014A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

(57)【要約】 【課題】 地上部の荷捌場から、最上階下部に形成され
る作業空間まで、建築部材を連続して自動搬送可能とし
た。 【解決手段】 地上部に設けた荷捌場Rと、同荷捌場R
から建築部材を受けて搬送する水平搬送手段bと、同水
平搬送手段bから建築部材を受けて作業空間に搬送する
垂直搬送手段dと、前記荷捌場Rから前記水平搬送手段
bに建築部材を移載する第1の移載手段aと、前記水平
搬送手段bから前記垂直搬送手段dに建築部材を移載す
る第2の移載手段cとからなり、同第2の移載手段c
は、水平搬送手段bと垂直搬送手段dとを接続する範囲
に位置して設置される第2門型クレーンc′と同第2門
型クレーンc′に懸垂される自動把持装置tとにより構
成したことを特徴とする。
(57) [Summary] [PROBLEMS] To automatically and continuously transport building members from a ground handling area to a work space formed in the lower part of the top floor. SOLUTION: A handling place R provided on the ground, and a same handling place R
Horizontal transport means b for receiving and transporting building members from the same, vertical transport means d for receiving the building members from the horizontal transport means b and transporting them to the work space, and building members from the cargo handling area R to the horizontal transport means b. A first transfer unit a for transferring the image, and a second transfer unit c for transferring the building member from the horizontal transfer unit b to the vertical transfer unit d. The second transfer unit c
Is composed of a second portal crane c 'installed in a range connecting the horizontal transport means b and the vertical transport means d, and an automatic gripping device t suspended on the second portal crane c'. It is characterized by having done.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、主に高層な建築物
等における建築部材を水平及び垂直に搬送する搬送装置
に関し、詳しくは、建物の最上階を先行して構築し最上
階を下方から上方に順次上昇させながら最上階下方を構
築する構築工法において、最上階の上昇に伴い建築部材
を水平と垂直に自動搬送する搬送装置に係るものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a transport device for transporting building members in a high-rise building or the like horizontally and vertically, and more particularly, to constructing the top floor of a building in advance and lowering the top floor from below. In a construction method for constructing a lower part of the top floor while sequentially ascending upward, the present invention relates to a transfer device for automatically transferring building members horizontally and vertically as the top floor is raised.

【0002】[0002]

【従来の技術】高層の建築物を構築する際、建物の最上
階を先行して構築し、最上階を支持する支持柱をガイド
にジャッキアップ装置により最上階を上昇させて同最上
階下部に下階を構築する作業空間を形成し地上部から建
築部材の供給を受けて順次高層階へと構築する高層建築
物における構築工法がある。
2. Description of the Related Art When constructing a high-rise building, the top floor of the building is constructed in advance, and the top floor is raised by a jack-up device using support columns supporting the top floor as guides, and the lower part of the top floor is raised. There is a construction method for a high-rise building in which a work space for constructing a lower floor is formed, and building materials are supplied from the above-ground portion to sequentially construct higher floors.

【0003】前記の構築工法においては、最上階下部作
業空間に下階を構築するため建築部材を搬送するため昇
降装置は、建設現場に仮設の荷揚げ用リフトがあり、特
に長尺物を搬送する既存のリフトとしては、ロングリフ
トといわれるものがあり、このリフトは2本のガイドレ
ールの間に長方形の荷台を昇降するもので、巻上機を地
上部に設置し、同巻上機に荷台昇降用ワイヤーを捲装し
て同荷台を所定の高さに昇降する。
In the construction method described above, a lifting device for transporting building members for constructing a lower floor in a lower working space on the uppermost floor has a temporary lifting lift at a construction site, and particularly transports a long object. There is an existing lift called a long lift, which lifts and lowers a rectangular carrier between two guide rails. A hoist is installed on the ground and the carrier is mounted on the hoist. The lifting wire is wound and the loading platform is raised and lowered to a predetermined height.

【0004】この他に、前記構築工法においては、最上
階下部に天井走行クレーンを設置し、同天井走行クレー
ンには電動トロリーに電動の巻上機(ホイスト)を取付
け、電動の巻上機(ホイスト)によって屋外から資材を
吊上げて天井走行クレーンを水平に走行して所定の取付
け位置に搬送し、他の取付装置に移載し搬送している。
In addition, in the above construction method, an overhead traveling crane is installed at the lower part of the top floor, and an electric hoist is attached to an electric trolley on the overhead traveling crane. The material is lifted from outside by a hoist, and the overhead traveling crane travels horizontally to be transported to a predetermined mounting position, and is transferred and transported to another mounting device.

【0005】[0005]

【発明が解決しようとする課題】前記したように最上階
を上昇させて同最上階下部に下階を構築する作業空間を
形成し、同作業空間が地上部から建築部材を供給する搬
送装置において、前記した従来の搬送装置には次のよう
な問題がある。前記の荷揚げ用リフトは長方形の荷台に
長尺の鉄筋や材木を荷揚げするもので、その積み込みは
作業員が行なったり、フォークリフトを使用して行うた
め、多くの人手を煩わし、多くの積み込み時間を要す。
As described above, a work space in which a top floor is raised to form a lower floor below the top floor is formed, and the work space is used to supply building members from the ground. However, the conventional transport device described above has the following problems. The unloading lift is for unloading long reinforcing bars and timber on a rectangular loading platform, and the loading is performed by an operator or using a forklift, which requires a lot of labor and a lot of loading time. I need it.

【0006】また、設置場所とリフト構造が簡便のため
大型の重量物、例えば、躯体に使用する鉄骨造の柱や大
梁(プレキャストコンクリート部材を含む)等を載荷し
て搬送するには不向きである。後者のように天井走行ク
レーンにおいては、最上階の上昇に伴い揚程が高くなる
につれて、天井走行クレーンの電動トロリーに取付けら
れた電動の巻上機に捲装されているワイヤーを捲き出し
て揚程に対応するため、巻上機には最終揚程分のワイヤ
ーを捲装しなければならないので、ワイヤーを収納する
捲き胴が大きくなり、巻上機自体が相当な重量となり、
それに伴う電動トロリーや天井走行クレーン装置が重厚
となり被荷揚体の重量の荷揚げにも限界があるととも
に、被荷揚体のガイド部材がないので吊り上げられる荷
揚げ姿勢が不安定で、また、他の搬送機材との接続が煩
雑となり自動制御による自動搬送には不向きである。
In addition, since the installation place and the lift structure are simple, it is not suitable for loading and transporting a large heavy object, for example, a steel frame column or a girder (including a precast concrete member) used for a frame. . As for the overhead traveling crane, as the height rises with the rise of the top floor, the wire wound on the electric hoist mounted on the electric trolley of the overhead traveling crane is unwound to lift the overhead traveling crane. In order to cope with this, the hoisting machine must be wound with the wire of the final lift, so the winding cylinder for storing the wire becomes large, and the hoisting machine itself becomes considerable weight,
As a result, the electric trolley and overhead traveling crane equipment are heavy and there is a limit to the unloading of the weight of the load, and there is no guide member for the load, so the lifting position to be lifted is unstable, and other transport equipment This makes connection with the camera complicated, and is not suitable for automatic conveyance by automatic control.

【0007】本発明は前記従来技術の有する問題点に鑑
みて提案されるもので、その目的とするところは、建築
物の最上階を先行して上昇させて同最上階下部に下階を
構築する作業空間を形成し、地上部から建築部材を供給
する搬送装置において、重量物の建築部材を水平搬送装
置と垂直搬送装置とを連動して積み込み時間を短縮し、
水平・垂直の搬送を全自動で行うことによって、迅速、
かつ安全に建築部材を搬送する水平垂直搬送装置を提供
するものである。
The present invention has been proposed in view of the above-mentioned problems of the prior art, and has an object to raise the top floor of a building in advance and construct a lower floor below the top floor. In a transport device that forms building work space and supplies building members from the ground part, the loading time of heavy building members is reduced by interlocking the horizontal transport device and the vertical transport device,
By performing horizontal and vertical conveyance fully automatically,
Another object of the present invention is to provide a horizontal and vertical transport device for transporting building members safely.

【0008】[0008]

【課題を解決するための手段】前記の目的を達成するた
めに本発明に係る水平垂直搬送装置は、構築すべき建築
物の最上階を先行して上昇させて、同最上階下部に下階
を構築する作業空間を形成し、地上部から同作業空間に
建築部材を供給する水平垂直搬送装置において、地上部
に設けた荷捌場と、同荷捌場から建築部材を受けて搬送
する水平搬送手段と、同水平搬送手段から建築部材を受
けて前記作業空間に搬送する垂直搬送手段と、前記荷捌
場から前記水平搬送手段に建築部材を移載する第1の移
載手段と、前記水平搬送手段から前記垂直搬送手段に建
築部材を移載する第2の移載手段とからなり、第2の移
載手段は、水平搬送手段と、垂直搬送手段とを接続する
範囲に位置して設置される第2門型クレーンと同第2門
型クレーンに懸垂される自動把持装置とにより構成し
た。
In order to achieve the above object, a horizontal / vertical transport device according to the present invention raises the top floor of a building to be built in advance and places a lower floor below the top floor. In a horizontal and vertical transport device that forms a work space for constructing and supplies building members from the ground part to the work space, a cargo handling area provided on the ground part, and a horizontal transport means for receiving and transporting the building material from the cargo handling area Vertical transfer means for receiving a building member from the horizontal transfer means and transferring the building member to the work space; first transfer means for transferring the building member from the cargo handling area to the horizontal transfer means; and the horizontal transfer means. And a second transfer means for transferring the building member to the vertical transfer means, and the second transfer means is located in a range connecting the horizontal transfer means and the vertical transfer means. Hanging on the second gate crane and the second gate crane It was constructed by an automatic gripping device.

【0009】[0009]

【発明の実施の形態】以下、本発明の最も好ましい実施
の形態を示す図面によって説明する。図1は本発明の水
平垂直搬送装置Aの設置の状況を示す平面図で、図2は
立面図で、図3は断面図である。水平垂直搬送装置A
は、地上部に設けた荷捌場Rに設置されて、建築部材を
吊上げ移載する第1移載手段aと同第1移載手段aから
建築部材を受けて水平に搬送する水平搬送手段bと同水
平搬送手段bから建築部材を吊上げ移載する第2移載手
段cと同第2移載手段cと連接して建築部材を垂直に搬
送する垂直搬送手段dとから構成されている。図中、e
は建築部材を搬送するトラックである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The preferred embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a plan view showing the installation state of the horizontal / vertical transport device A of the present invention, FIG. 2 is an elevation view, and FIG. 3 is a sectional view. Horizontal and vertical transfer device A
Is installed at a cargo handling place R provided on the ground, and is a first transfer means a for lifting and transferring a building member, and a horizontal transfer means b for receiving the building member from the first transfer means a and horizontally transferring the building member. And a second transfer means c for lifting and transferring the building member from the horizontal transfer means b, and a vertical transfer means d for connecting the second transfer means c and vertically transferring the building member. In the figure, e
Is a truck for transporting building components.

【0010】次に各装置の詳細を説明する。地上部の荷
捌場Rに設置した第1移載手段aは第1門型クレーン
a′と、4本の支柱1の上部に取付けられた走行レール
2と、同走行レール2に設置した走行ガーダ3と、同走
行ガーダ3に懸架した電動ホイスト4とから構成され、
トラックeで搬送されてきた建築物Kは電動ホイスト4
で吊り上げられ、水平搬送するチェーンコンベヤよりな
る水平搬送手段bに移載される。
Next, details of each device will be described. The first transfer means a installed in the loading area R on the ground is a first portal crane a ', a traveling rail 2 mounted on the upper part of four columns 1, and a traveling girder installed on the traveling rail 2 3 and an electric hoist 4 suspended on the traveling girder 3,
The building K transported by the truck e is an electric hoist 4
And is transferred to a horizontal transport means b composed of a chain conveyor for horizontal transport.

【0011】図4は水平搬送手段bの詳細を示し、水平
搬送手段bは荷捌場Rと垂直搬送手段dとの中間に設置
されるもので、その長さは自由に設定される。水平搬送
手段bは架台10と、架台10の基端に設けられるチェ
ーンを駆動する主スプロケットホイール11と、減速機
付きのモータ12と、架台10先方に設けられる従スプ
ロケットホイール13と、前記両スプロケットホイール
11,13間に無端状に捲装される2条のチェーン14
とから構成されている。図中1201はチェーン駆動部
である。(図4(イ)(ロ)参照) また、チェーンコンベヤのチェーン14には、一定間隔
毎にアタッチメント15が取付けられている。その他、
減速機に図示せぬ距離測定器が、またチェーンコンベヤ
先端にはいずれも図示せぬインターロック及び逸走検知
リミッタースイッチが配設されている。
FIG. 4 shows the details of the horizontal transport means b. The horizontal transport means b is provided between the loading area R and the vertical transport means d, and its length can be freely set. The horizontal conveying means b includes a gantry 10, a main sprocket wheel 11 provided at the base end of the gantry 10 for driving a chain, a motor 12 with a speed reducer, a slave sprocket wheel 13 provided on the front of the gantry 10, and the two sprockets. Two-row chain 14 wound endlessly between wheels 11 and 13
It is composed of In the figure, reference numeral 1201 denotes a chain driving unit. (See FIGS. 4A and 4B.) Attachments 15 are attached to the chain 14 of the chain conveyor at regular intervals. Others
The speed reducer is provided with a distance measuring device (not shown), and the chain conveyor is provided with an interlock and runaway detection limiter switch (both not shown).

【0012】前記水平搬送手段bには、一定間隔に平行
して配設された2条からなる前記チェーンコンベヤに跨
って建築部材Kを載置するもので、例えば、1階層に建
てられる鉄骨柱を同柱の梁型ブラケットがチェーンコン
ベヤに干渉しないように柱両端を各チェーン14に載置
する。建築部材Kは前記トラックeで搬送され、第1門
型クレーンa′で吊上げられて2条のチェーンコンベヤ
上に載置される。その際、チェーンコンベヤに設けられ
ているアタッチメント15を最初の所定の位置に停止
し、吊上げた建築部材Kを前記アタッチメント15に掛
止する位置に載置する。
The horizontal conveying means b is for mounting a building member K over the two-chain chain conveyor arranged in parallel at a fixed interval, and is, for example, a steel column built on one level. The both ends of the column are placed on each chain 14 so that the beam-type bracket of the column does not interfere with the chain conveyor. The building member K is conveyed by the truck e, lifted by the first portal crane a ', and placed on the two-chain conveyor. At this time, the attachment 15 provided on the chain conveyor is stopped at the initial predetermined position, and the lifted building member K is placed at a position where it is hooked on the attachment 15.

【0013】チェーンの送りはアタッチメント15が一
定間隔に設けてあるので一回操作する度に減速機付きモ
ーターに設けた距離測定器が距離を計測し、アタッチメ
ントの取り付け間隔で前進する。一方、チェーンコンベ
ヤ先端に建築部材が到達すると先端のインターロックに
より建築部材が取り除かれないとチェーンコンベヤは作
動するようになっており、さらに、同インターロックが
不調の場合は逸走検知リミッタースイッチが作動して、
チェーンコンベヤが停止するように構成されている。
Since the attachment 15 is provided at regular intervals in the feed of the chain, a distance measuring device provided on the motor with a speed reducer measures the distance each time the attachment 15 is operated, and the chain is advanced at intervals of attachment. On the other hand, when the building member reaches the tip of the chain conveyor, the chain conveyor operates if the building member is not removed by the interlock at the tip, and if the interlock is malfunctioning, the runaway detection limiter switch is activated do it,
The chain conveyor is configured to stop.

【0014】次に、前記水平搬送手段bから建築部材K
を移載する第2移載手段cは第2門型クレーンc′と、
水平搬送手段bと垂直搬送手段dとに跨った位置に設置
され、4本の支柱20と、支柱上部に装架された走行レ
ール21と、同走行レール21を走行する走行ガーダ2
2と、同走行ガーダ22に走行自在に装架されたホイス
ト23より構成されている。
Next, the building member K is moved from the horizontal conveying means b.
The second transfer means c for transferring
Four pillars 20, a traveling rail 21 mounted on the upper part of the pillar, and a traveling girder 2 traveling on the traveling rail 21, which is installed at a position straddling the horizontal transportation means b and the vertical transportation means d.
2 and a hoist 23 movably mounted on the traveling girder 22.

【0015】前記第2門型クレーンc′のホイスト23
には、図5に示す如く建築部材Kを吊り上げる自動把持
装置tが懸吊されている。この自動把持装置tは長方形
の吊り架台30と、同吊り架台30の左右に設けたピン
3201を中心として開閉する略L形の一双の挟持桿3
2と、同挾持桿32間に介装される油圧シリンダー33
と、油圧シリンダー33に接続されて挾持桿32を制御
する制御装置3301と、吊り環35とから構成されて
いる。
The hoist 23 of the second gate crane c '
, An automatic gripping device t for lifting the building member K is suspended as shown in FIG. The automatic gripping device t includes a rectangular suspension base 30 and a pair of substantially L-shaped clamping rods 3 that open and close about pins 3201 provided on the left and right sides of the suspension base 30.
2 and a hydraulic cylinder 33 interposed between the holding rods 32
, A control device 3301 connected to the hydraulic cylinder 33 to control the holding rod 32, and a suspension ring 35.

【0016】そして建築部材Kの挟持に当っては油圧シ
リンダー33を作動すると、両端のシリンダーロッドを
退縮して、吊上体30にピン3201を介して軸支され
た一対のL形の挟持桿32の先端挟持部は開き、(図5
(ニ)参照)建築部材Kを挟んで再び油圧シリンダー3
3を前とは反対方向に作動し前記L形挟持桿32を閉じ
て建築部材を挟持し、(図5(ロ)参照)吊上架台30
をホイスト23によって吊り上げ、所定の位置に搬送す
る。図示の例の場合は垂直搬送手段を構成する昇降台車
に移載される。なお、吊上架台30の移動範囲は水平搬
送手段bの最終到達位置と垂直搬送装置の始発位置であ
り、吊り上げ、吊り下げの高さはそれぞれの装置の高さ
に限定され、しかも、水平、垂直の距離が決まっている
のでホイスト23と自動把持装置tの移動範囲は予め制
御盤に入力してそれぞれの移動範囲で制御される。図中
37は吊りワイヤーである。
When the hydraulic cylinder 33 is actuated to clamp the building member K, the cylinder rods at both ends are retracted, and a pair of L-shaped clamping rods are supported by the lifting body 30 via pins 3201. 32 is opened, (FIG. 5
(See (d)) Hydraulic cylinder 3
3 is actuated in the opposite direction to the front to close the L-shaped clamping rod 32 to clamp the building member (see FIG. 5B).
Is lifted by the hoist 23 and transported to a predetermined position. In the case of the example shown in the figure, the wafer is transferred to an elevating vehicle constituting the vertical transport means. In addition, the moving range of the lifting stand 30 is the final arrival position of the horizontal transfer means b and the starting position of the vertical transfer device, and the height of lifting and hanging is limited to the height of each device. Since the vertical distance is determined, the moving range of the hoist 23 and the automatic gripping device t is input to the control panel in advance and controlled in each moving range. In the figure, reference numeral 37 denotes a suspension wire.

【0017】次に図2、3、6、7を参照して垂直搬送
手段を説明する。dは垂直搬送手段で、垂直搬送手段d
は建築部材を地上の水平搬送手段bから第2移載手段を
介して垂直搬送手段dに移載しそのまま上階の取り付け
階に直接搬送する装置である。垂直搬送手段dは建築部
材Kを搬送する建築物Bの地上階F1 から供給階Fx
至る昇降路40と、建築部材Kを搬入する搬入口41
と、第2移載手段とに亘って取付けられるガイドレール
42と、同ガイドレール42に昇降自在に設置される昇
降台車43と、同昇降台車43を昇降する上部階Fy
設置した巻上装置44と、巻上装置44と昇降台車43
とを連結するワイヤー45とから構成されている。
Next, the vertical transfer means will be described with reference to FIGS. d is a vertical transport means, and a vertical transport means d
Is a device for transferring a building member from the horizontal transfer means b on the ground to the vertical transfer means d via the second transfer means, and directly transferring the building member directly to the upper mounting floor. Entrance 41 vertical transport means d for carrying the hoistway 40 leading to the feed floor F x, the building components K from the ground floor F 1 of the building B to transport the building components K
When, a guide rail 42 which is mounted over the second transfer means, the guide rail 42 and the lifting carriage 43 which is disposed vertically movably in, on winding installed in the upper floor F y to lift the same lifting carriage 43 Device 44, hoisting device 44 and lift truck 43
And a wire 45 connecting the two.

【0018】前記ガイドレール42は第2の門型クレー
ン内においては傾斜路42aを形成し、搬入口41から
垂直昇降路に亘って湾曲42bし、さらに同昇降路は垂
直に設置されて供給階Fxに至り、後述する建設工法に
より作業階の上昇に伴い前記ガイドレール42は順次継
ぎ足される。45aは前記した搬入口41から傾斜路に
いたる間にワイヤーの方向を変えるシーブで、昇降台車
43が自重で傾斜路42aに移動した際、ワイヤーが当
接して回転し、方向を変える。
The guide rail 42 forms a ramp 42a in the second portal crane, curves 42b from the carry-in entrance 41 to the vertical hoistway, and the hoistway is installed vertically to supply floor. Fx is reached, and the guide rails 42 are successively added as the work floor rises by the construction method described later. Reference numeral 45a denotes a sheave that changes the direction of the wire from the above-described carry-in entrance 41 to the slope, and when the lift truck 43 moves to the slope 42a by its own weight, the wire contacts and rotates to change the direction.

【0019】前記昇降台車43は、前記ガイドレール4
2に走行する台車枠4301に落下防止装置46を具備
し該落下防止装置46は吊り下げシーブ47と、台車上
下に設けられる一対の部材挾持装置48と、台車中央に
設けられる制御装置49とから構成されている。430
0はガイドレール42にガイドされるローラで、43a
は下部受け台で、43aは上部受け台である。(図6参
照) さらに詳細に説明すると、落下防止装置46は台車枠4
301にピン4303を介して軸支されたアーム430
2と、同アーム4302の後方に設けたカム支持部材4
304と、同カム支持部材に支持されるカム4305と
からなりカム4305がガイドレール42に接触するよ
うに設けられている。また、アーム4302はピン43
06に回動自在に接合されて一対の吊り下げシーブ43
07と一体になり、アーム4302下部に弾機4308
が設けられている。
The lift truck 43 is mounted on the guide rail 4.
The trolley frame 4301 which travels in the second direction is provided with a fall prevention device 46. The fall prevention device 46 includes a hanging sheave 47, a pair of member holding devices 48 provided above and below the trolley, and a control device 49 provided at the center of the trolley. It is configured. 430
0 is a roller guided by the guide rail 42, 43a
Reference numeral 43 denotes a lower support, and 43a denotes an upper support. (Refer to FIG. 6.) To describe in more detail, the fall prevention device 46
Arm 430 pivotally supported on pin 301 via pin 4303
2 and a cam support member 4 provided behind the arm 4302
304 and a cam 4305 supported by the cam support member, and the cam 4305 is provided so as to contact the guide rail 42. The arm 4302 is connected to the pin 43
06 and a pair of suspended sheaves 43
07 and an armature 4308 below the arm 4302
Is provided.

【0020】前記落下防止装置46は台車4301に建
築部材を搭載し吊り上げ状態のときは、アーム4302
は上部受け台43bに当接し、巻上装置44の操作によ
って昇降台車は昇降路を昇降し、何かの都合で、巻上装
置と吊り下げシーブ4307とワイヤー45が緩むと弾
機4308の引っ張り力により、アーム4302は変位
し、さらには、カム支持部材4304も同時に変位して
カム4305がガイドレール42に接触し、カムの摩擦
力により昇降台車は停止し落下を防止する。
The fall prevention device 46 is provided with an arm 4302 when a building member is mounted on a carriage 4301 and is suspended.
Is in contact with the upper receiving stand 43b, and the hoisting vehicle moves up and down the hoistway by operating the hoisting device 44. If the hoisting device, the hanging sheave 4307 and the wire 45 are loosened for some reason, the pulling of the bullet 4308 is performed. The arm 4302 is displaced by the force, and the cam support member 4304 is also displaced at the same time, so that the cam 4305 comes into contact with the guide rail 42, and the lift truck is stopped by the frictional force of the cam to prevent falling.

【0021】部材把持装置48は、走行する台車430
1の上下に設置され、台車4301幅両端から建築部材
Kを挟むクランプ4801と、クランプを駆動するチェ
ーン4802と、減速機付きモータ4803とから構成
されている。巻上装置44は図2に示すように減速機4
401と、一対の巻上胴4402からなり、吊り下げシ
ーブ4307からシーブ4403を介して巻上胴440
2からワイヤリングされている。(図2(ロ)参照) 前記部材把持装置48は、左右の減速機4803を操作
してクランプを開閉することにより建築部材を固定する
もので、走行台車に建築部材を搭載して建築部材を挟ん
で固定し、昇降台車43は昇降路40を上昇して供給階
x に到達しクランプより開放して他の組み立て装置に
引き渡す。
The member holding device 48 includes a traveling cart 430.
1, a clamp 4801 sandwiching the building member K from both ends of the carriage 4301, a chain 4802 for driving the clamp, and a motor 4803 with a speed reducer. The hoisting device 44 is, as shown in FIG.
401, and a pair of hoisting drums 4402, and the hoisting drums 440 from the suspended sheaves 4307 through the sheaves 4403.
Wired from 2. (Refer to FIG. 2 (b).) The member gripping device 48 fixes the building member by operating the left and right reduction gears 4803 to open and close the clamps. sandwiched therebetween and fixing, lifting carriage 43 passes opened beyond the clamp reaches the feed floor F x by raising the hoistway 40 the other assembly device.

【0022】次に本装置を使って建築部材の搬送の過程
を図1、2、8によって説明する。まず、本装置によっ
て建築物の施工方法を説明すると、図8に示すようにす
でに、F1 からFn1まで本工法によって構築されている
が、最初に最上階Fy と作業階Fx を地上で組立てるも
ので、作業階Fx と最上階Fy には、ジャッキ柱Pが立
設され、最上階Fy 下部に天井走行レール50にトラバ
サー52が懸装され、トラバサー52に走行自在に組立
装置Tが懸装されている。
Next, the process of transporting building members using the present apparatus will be described with reference to FIGS. First, explaining the construction method of a building by the apparatus, as already shown in FIG. 8 have been constructed by the present method from F 1 to F n1, a first top floor F y and working floor F x ground those assembled, the working floor F x and top floor F y, is erected jack column P is Torabasa 52 overhead traveling rail 50 on the top floor F y bottom is KakaSo, freely travel in Torabasa 52 assembly Device T is suspended.

【0023】作業階Fx においてはジャッキ柱Pを操作
して油圧シリンダーp1 を伸長して1層階分をジャッキ
アップして作業階Fx に作業空間Nx が形成し、同空間
に1層階を構築すべく建築部材(柱、梁、床材)を地上
の搬送装置から建築物内の垂直搬送装置に供給され、前
記組立装置Tにより所定の位置に搬送し、所要位置のジ
ャッキ柱Pの油圧シリンダーp1 を伸縮して柱60、梁
61、床材62を組立てて1層階Fxnが構築される。p
2 は油圧ユニットで、Wは全体をコントロールする制御
装置を収容したコントロールルームである。(図8参
照) そして、前記工程を繰り返して、所要の階数を構築する
ものである。
On the work floor F x , the hydraulic cylinder p 1 is extended by operating the jack column P to jack up one floor to form a work space N x on the work floor F x , and one space is formed in the work space F x. Building members (pillars, beams, flooring) are supplied from a ground transportation device to a vertical transportation device in a building to construct a story, and are transported to a predetermined position by the assembling device T. column 60 by expansion and contraction of the hydraulic cylinder p 1 of P, the beam 61, assembled flooring 62 1 Sokai F xn is constructed. p
2 is a hydraulic unit, and W is a control room containing a control device for controlling the whole. (Refer to FIG. 8) Then, the above steps are repeated to construct a required floor number.

【0024】本発明による建築部材(柱)の搬送は、建
築部材を搬送するトラックが荷捌場Rに設置されている
第1門型クレーンa′により吊り上げられ、水平搬送手
段bに移載されてチェーンコンベヤ14により順次建築
部材のストックと補給とを繰り返し、更に、第2の門型
クレーンc′の自動把持装置tによって垂直搬送装置d
の昇降台車43に移載され、昇降路を経て作業階Fx
搬送され、作業階Fxの天井に設置されている組立装置
Tにより組立位置に移動して組立てられる。これら一連
の作業は各装置個別の制御盤と全体をコントロールする
制御装置により自動的に行われる。
The transport of the building members (pillars) according to the present invention is carried out by lifting a truck for transporting the building members by a first portal crane a 'installed in the cargo handling area R, and transferring it to the horizontal transport means b. The stocking and replenishment of the building members are sequentially repeated by the chain conveyor 14, and furthermore, the vertical conveying device d by the automatic gripping device t of the second portal crane c '.
Are transferred to the lifting carriage 43, through the hoistway is conveyed to the working floor F x, assembled by moving the assembly position by an assembly device T which is installed on the ceiling of the working floor F x. These series of operations are automatically performed by a control panel for each device and a control device for controlling the whole.

【0025】[0025]

【発明の効果】本発明は前記したように、地上部に設け
た荷捌場と、同荷捌場から建築部材を受けて搬送する水
平搬送手段と、同水平搬送手段から建築部材を受けて建
築物の最上階下部の作業空間に搬送する垂直搬送手段
と、前記荷捌場から前記水平搬送手段に建築部材を移載
する第1の移載手段と、前記水平搬送手段から前記垂直
搬送手段に建築部材を移載する第2の移載手段とからな
り、同第2の移載手段は、水平搬送手段と垂直搬送手段
とを接続する範囲に位置して設置される第2門型クレー
ンと、同第2門型クレーンに懸吊される自動把持装置と
により構成したものであるから第2の移載手段は、水平
搬送手段から垂直搬送手段への建築部材の移載を連続し
て円滑に行なうことができて搬送に要する作業員が軽減
されると共に建築部材の移載が迅速かつ安全にできる等
の効果を有する。
As described above, the present invention provides a cargo handling place provided on the ground, a horizontal transport means for receiving and transporting building members from the loading location, and a building receiving the building members from the horizontal transport means. Vertical transport means for transporting a building member from the cargo handling area to the horizontal transport means, and vertical building means for transporting building members from the cargo handling area to the horizontal transport means, and building members from the horizontal transport means to the vertical transport means. And a second portal crane installed in a range where the horizontal transport means and the vertical transport means are connected to each other. Since it is constituted by an automatic gripping device suspended by a second portal crane, the second transfer means continuously and smoothly transfers building members from the horizontal transfer means to the vertical transfer means. The number of workers required for transportation is reduced, and the building department Transfer of an effect such as can be quickly and safely.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る一実施例を示し水平垂直搬送装置
の平面配置の概要を説明する平面図である。
FIG. 1 is a plan view showing an embodiment according to the present invention and illustrating an outline of a planar arrangement of a horizontal / vertical transport device.

【図2】(イ)は図1の縦断面図、(ロ)は巻上装置の
ワイヤリングを示す模式図である。
2A is a longitudinal sectional view of FIG. 1, and FIG. 2B is a schematic diagram showing wiring of a hoisting device.

【図3】図1のI−Iの矢視した縦断面図である。FIG. 3 is a vertical sectional view taken along the line II of FIG. 1;

【図4】(イ)は水平搬送装置の平面図、(ロ)は図4
(イ)のA−Aを矢視した側面図、(ハ)はチェーンの
拡大で、(ニ)は(ハ)のB−Bを矢視した縦断面図で
ある。
FIG. 4A is a plan view of a horizontal transfer device, and FIG.
(A) is a side view taken along the line AA, (C) is an enlarged view of the chain, and (D) is a longitudinal sectional view taken along the line BB of (C).

【図5】建築部材の把持装置で、(イ)は平面図で、
(ロ)は短辺の立面図で、(ハ)は長辺の立面図で、
(ニ)の挟持部の挟持の開閉を説明する立面図である。
FIG. 5 is a gripping device for building members, (a) is a plan view,
(B) is an elevation view of the short side, (c) is an elevation view of the long side,
It is an elevation view explaining opening and closing of the holding of the holding part of (d).

【図6】垂直搬送手段の縦側面図である。FIG. 6 is a vertical side view of a vertical transport unit.

【図7】垂直搬送手段の縦正面図である。FIG. 7 is a vertical front view of a vertical transport unit.

【図8】本装置によって建築部材が搬送されて構築され
る工程を説明する建物の断面図である。
FIG. 8 is a cross-sectional view of a building explaining a process in which a building member is transported and constructed by the present apparatus.

【符号の説明】 R 荷捌場 a 第1移載手段 b 水平搬送手段 c 第2移載手段 c′ 第2門型クレーン d 垂直搬送手段 t 自動把持装置[Description of Signs] R Handling Place a First transfer means b Horizontal transfer means c Second transfer means c 'Second portal crane d Vertical transfer means t Automatic gripping device

フロントページの続き (72)発明者 加藤 将夫 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内 (72)発明者 藤木 秀明 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内 (72)発明者 井上 恭介 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内 (72)発明者 石川 一雄 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内Continued on the front page (72) Inventor Masao Kato 4-6-115 Sendagaya, Shibuya-ku, Tokyo Inside Fujita Co., Ltd. (72) Inventor Hideaki Fujiki 4-6-115 Sendagaya, Shibuya-ku, Tokyo Fujita Co., Ltd. (72) Inventor Kyosuke Inoue 4-6-115 Sendagaya, Shibuya-ku, Tokyo Inside Fujita Co., Ltd. (72) Inventor Kazuo Ishikawa 4-6-1-15 Sendagaya, Shibuya-ku, Tokyo Fujita Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 構築すべき建築物の最上階を先行して上
昇させて、同最上階下部に下階を構築する作業空間を形
成し、地上部から同作業空間に建築部材を供給する水平
垂直搬送装置において、地上部に設けた荷捌場と、同荷
捌場から建築部材を受けて搬送する水平搬送手段と、同
水平搬送手段から建築部材を受けて前記作業空間に搬送
する垂直搬送手段と、前記荷捌場から前記水平搬送手段
に建築部材を移載する第1の移載手段と、前記水平搬送
手段から前記垂直搬送手段に建築部材を移載する第2の
移載手段とからなり、同第2の移載手段は、水平搬送手
段と垂直搬送手段とを接続する範囲に位置して設置され
る第2門型クレーンと同第2門型クレーンに懸垂される
自動把持装置とにより構成した水平垂直搬送装置。
1. A work space for building a lower floor below a top floor of a building to be built in advance by raising the top floor of the building to be built, and supplying a building member from the ground portion to the work space. In the vertical transport device, a cargo handling area provided on the ground, a horizontal transport means for receiving and transporting a building member from the same loading location, and a vertical transport means for receiving a building member from the horizontal transport means and transporting it to the work space. A first transfer unit for transferring a building member from the cargo handling area to the horizontal transfer unit, and a second transfer unit for transferring a building member from the horizontal transfer unit to the vertical transfer unit, The second transfer means includes a second portal crane installed in a range connecting the horizontal transport device and the vertical transport device, and an automatic gripping device suspended from the second portal crane. Horizontal and vertical transfer equipment.
JP2644097A 1997-02-10 1997-02-10 Horizontal and vertical transfer device Pending JPH10220014A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2644097A JPH10220014A (en) 1997-02-10 1997-02-10 Horizontal and vertical transfer device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2644097A JPH10220014A (en) 1997-02-10 1997-02-10 Horizontal and vertical transfer device

Publications (1)

Publication Number Publication Date
JPH10220014A true JPH10220014A (en) 1998-08-18

Family

ID=12193578

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2644097A Pending JPH10220014A (en) 1997-02-10 1997-02-10 Horizontal and vertical transfer device

Country Status (1)

Country Link
JP (1) JPH10220014A (en)

Similar Documents

Publication Publication Date Title
CN110550544B (en) Crane and method for lifting and transporting heavy objects using the same
JPH03138294A (en) Passenger conveyor reconstructing method
JP2528994B2 (en) Vehicles for building structures and passenger transportation facilities, and methods for traveling passenger transportation facilities
JPH05113026A (en) Temporary scaffold structure
JP3994458B2 (en) Operation method of vertical and horizontal transfer device
JPH10220015A (en) Automatic gripping device
JPH0949334A (en) Traveling vehicle for transporting building members and method for transporting building members
JPH0941667A (en) A dolly with an undulating device for transporting a building member, and a method for transporting a building member by the trolley
JPH079156B2 (en) Segment transfer device
JPH09125578A (en) Floor member mounting device and floor member mounting method
JPH10220013A (en) Horizontal and vertical transfer device
JPS63300100A (en) Heavy goods transport equipment
JPH08326323A (en) Construction equipment for high-rise buildings
JPH08338136A (en) Lifting equipment for construction
JPH0949332A (en) Car with a turntable for transporting building members and method of transporting building members
JP2775206B2 (en) Material transport equipment for building construction
JP3075162B2 (en) Lifting transfer device and transfer method thereof
JPH10220016A (en) Vertical transfer device
KR0139129B1 (en) Lifting device and method in carrage
JPH07324490A (en) Transport system and construction method of building using the same
JP2964825B2 (en) Multi-story parking facilities
JPH09100629A (en) Beam member attachment device and beam member attachment method
JP3608677B2 (en) Mechanical parking equipment
JPH07252055A (en) Lifting device
JP2001317225A (en) Elevator device for multistory parking device