JPH1030332A - Reinforcing bar arrangement scaffold for caisson constructing - Google Patents

Reinforcing bar arrangement scaffold for caisson constructing

Info

Publication number
JPH1030332A
JPH1030332A JP20425796A JP20425796A JPH1030332A JP H1030332 A JPH1030332 A JP H1030332A JP 20425796 A JP20425796 A JP 20425796A JP 20425796 A JP20425796 A JP 20425796A JP H1030332 A JPH1030332 A JP H1030332A
Authority
JP
Japan
Prior art keywords
reinforcing bar
caisson
scaffold
main
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20425796A
Other languages
Japanese (ja)
Inventor
Yuji Nagano
祐司 長野
Kenji Ito
賢治 伊東
Kenichi Inoue
賢一 井之上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Construction Co Ltd
Original Assignee
Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Construction Co Ltd filed Critical Mitsui Construction Co Ltd
Priority to JP20425796A priority Critical patent/JPH1030332A/en
Publication of JPH1030332A publication Critical patent/JPH1030332A/en
Pending legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

PROBLEM TO BE SOLVED: To simply carry out installation (or removal) of a scaffold when bar arrangement of a caisson is executed and to facilitate reinforcing bar arrangement work. SOLUTION: Caisson construction yards 1a are arranged between rails 2 and 2, bearing trucks 31 are provided on the rails 2 and 2, bearing poles 32 are erected on the bearing trucks 31, and a scaffold unit capable of being vertically lifted, moved and positioned is so provided that it is constructed between the bearing poles 32. The scaffold unit is so constituted that a main stage 35 having a horizontal scaffold surface 35b on the upper surface thereof and an upper stage 39 having a horizontal upper scaffold surface 39b on the upper surface are vertically arranged in a layered state, a reinforcing bar insertion space capable of making a reinforcing bar unit 65 vertically pass through is penetrated into the main stage 35 to form, and a plurality of bar arrangement holes capable of making vertical main bars 66 pass through are penetrated into the upper stage 39 to form and are so constituted that they are correspondently arranged upward of the reinforcing bar insertion space.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋コンクリート製の
ケーソンを構築する際に、その鉄筋の配筋等に利用する
のに好適なケーソン構築用鉄筋配筋足場装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing bar scaffolding device for caisson construction, which is suitable for use in reinforcing bars of reinforced concrete caisson.

【0002】[0002]

【従来の技術】従来、港湾工事などで用いられる鉄筋コ
ンクリート製のケーソンが構築されている。このような
ケーソンは大型の鉄筋コンクリート構造物となることが
多く、従ってその配筋作業も大がかりなものとなってい
た。
2. Description of the Related Art Conventionally, caisson made of reinforced concrete used for harbor construction and the like has been constructed. Such caissons were often large reinforced concrete structures, and the work of arranging the reinforcements was also extensive.

【0003】[0003]

【発明が解決しようとする課題】ケーソンの配筋を行う
際の足場の設置は、下方から上方へ、或いは横方向に、
配筋施工箇所の移動に伴って順次行っていく必要がある
が、大型のケーソンを構築したり、構築すべきケーソン
が複数あるような場合には、このような足場の設置(或
いは撤去)は特に煩雑な作業となる。また、配筋作業を
容易にし得るような足場装置が望まれている。
When the caisson is arranging the scaffolding, the scaffold must be set up from below or upward, or sideways.
It is necessary to carry out sequentially with the movement of the bar arrangement work, but when building a large caisson or when there are multiple caissons to be built, installation (or removal) of such a scaffold is This is particularly troublesome. In addition, a scaffolding device that can facilitate bar arrangement work is desired.

【0004】そこで本発明は上記事情に鑑み、ケーソン
の配筋を行う際の足場の設置(或いは撤去)を簡便に行
うことができ、配筋作業を容易にし得るケーソン構築用
鉄筋配筋足場装置を提供することを目的とする。
In view of the above circumstances, the present invention provides a reinforcing bar scaffolding device for caisson construction, which can easily install (or remove) a scaffold when performing caisson reinforcing, and can facilitate bar arranging work. The purpose is to provide.

【0005】[0005]

【課題を解決するための手段】即ち本発明のうち第1の
発明は、上下方向の複数の主筋(66)及び横方向の配
力筋(67)からなる鉄筋ユニット(65)を有したケ
ーソン(50)を構築する際に使用する鉄筋配筋足場装
置(30)において、1対のレール(2、2)を有し、
前記1対のレール(2、2)間に、複数のケーソン構築
ヤード(1a)を、これらレール(2、2)の伸延方向
に沿って配列して設け、前記各レール(2)上に、該レ
ール(2)に沿って所定の移動方向に移動自在な移動手
段(31)を設け、前記各移動手段(31)に支持部材
(32)をそれぞれ立設し、前記支持部材(32)に足
場ユニット(34)を、これら支持部材(32、32)
間を架け渡す形で、かつこれら支持部材(32)に対し
て上下方向に昇降移動・位置決め自在に設け、前記足場
ユニット(34)は、上面に水平な第1の足場面(35
b)が形成された第1の足場部材(35)及び、上面に
水平な第2の足場面(39b)が形成された第2の足場
部材(39)を、上下層状に配置して有し、前記第1の
足場部材(35)に、鉄筋ユニット(65)が上下に貫
通通過し得る鉄筋ユニット挿通間隙(36)を、該第1
の足場部材(35)を上下に貫通する形で形成し、前記
第2の足場部材(39)に、上下方向の主筋(66)が
貫通し得る複数の主筋貫通穴(43)を、該第2の足場
部材(39)を上下に貫通する形で、かつ前記鉄筋ユニ
ット挿通間隙(36)の上方に対応配置した形で形成し
て構成される。
That is, a first aspect of the present invention is a caisson having a reinforcing bar unit (65) comprising a plurality of main bars (66) in a vertical direction and a force bar (67) in a horizontal direction. A reinforcing bar scaffolding device (30) used when constructing (50) has a pair of rails (2, 2),
A plurality of caisson construction yards (1a) are arranged between the pair of rails (2, 2) along the extending direction of the rails (2, 2), and on each of the rails (2), A moving means (31) is provided along the rail (2) so as to be movable in a predetermined moving direction, and a support member (32) is erected on each of the moving means (31). The scaffold unit (34) is connected to these support members (32, 32).
The scaffolding unit (34) is provided so as to be able to move up and down and to be positioned vertically with respect to the support members (32) in such a manner as to bridge the space between the support members (32).
a first scaffold member (35) formed with b) and a second scaffold member (39) formed with a second horizontal scaffold (39b) formed on the upper surface are arranged in upper and lower layers. The first scaffold member (35) is provided with a reinforcing bar unit insertion gap (36) through which the reinforcing bar unit (65) can pass vertically.
Are formed so as to penetrate vertically, and the second scaffold member (39) is provided with a plurality of main muscle through holes (43) through which main muscles (66) in the vertical direction can penetrate. 2 is formed so as to penetrate vertically through the second scaffold member (39) and to be arranged above the reinforcing bar unit insertion gap (36).

【0006】また本発明のうち第2の発明は、第1の発
明によるケーソン構築用鉄筋配筋足場装置(30)にお
いて、前記各レール(2)上の移動手段(31)は、こ
れら移動手段(31)を前記各レール(2)に沿って同
期的に移動駆動させ得る同期移動駆動手段(31a)を
有する。
According to a second aspect of the present invention, in the reinforcing bar scaffolding apparatus (30) for caisson construction according to the first aspect, the moving means (31) on each of the rails (2) includes a moving means (31). (31) has a synchronous movement driving means (31a) capable of synchronously moving and driving the (31) along each of the rails (2).

【0007】なお、括弧内の番号等は、図面における対
応する要素を示す便宜的なものであり、従って、本記述
は図面上の記載に限定拘束されるものではない。以下の
「作用」の欄についても同様である。
[0007] The numbers in parentheses and the like are for convenience of indicating corresponding elements in the drawings, and therefore, the present description is not limited to the description on the drawings. The same applies to the following “action” column.

【0008】[0008]

【作用】上記した構成により本発明のうち第1の発明で
は、各移動手段(31)を移動させ、足場ユニット(3
4)を昇降移動させて、該足場ユニット(34)を構築
すべきケーソン(50)の鉄筋配筋施工位置に対して位
置決めし、該足場ユニット(34)の第1及び第2の足
場面(35b、39b)を足場として、主筋(66)及
び配力筋(67)の配筋・組立を行う。
According to the first aspect of the present invention, each of the moving means (31) is moved by the above structure, and the scaffold unit (3) is moved.
4) is moved up and down to position the scaffold unit (34) with respect to the reinforcing bar arrangement position of the caisson (50) to be constructed, and the first and second foot scenes ( 35b and 39b) are used as scaffolds to reinforce and assemble the main rebar (66) and the rebar (67).

【0009】また本発明のうち第2の発明では、ケーソ
ン構築用鉄筋配筋足場装置(30)を横方向に移動させ
る際には、1対の移動手段(31、31)が各レール
(2)に沿って同期的に移動駆動される。
According to a second aspect of the present invention, when the caisson-reinforcing reinforcing bar scaffolding device (30) is to be moved in the lateral direction, a pair of moving means (31, 31) is provided for each rail (2, 3). ).

【0010】[0010]

【実施例】以下、本発明の実施例を図面に基づき説明す
る。図1は、本発明によるケーソン構築用鉄筋配筋足場
装置の一例を用いてケーソンを構築している様子を示し
た模式斜視図、図2(a)は、図1に示されたケーソン
であり、その構築が完成した状態のものを示した一部断
面斜視図、図2(b)は、図2(a)に示すケーソンの
平面図、図3は、図1に示すケーソンが、ケーソン製造
ヤードに複数配置された様子を示す模式側面図、図4
は、図3に示す複数のケーソンにおける構築途中の様子
を示した模式平面図、図5は、図4のI矢視図、図6
は、図5のII矢視図、図7は、図4のIII矢視図、図8
は、図7のX1−Y1線断面図、図9は、図4のX2−
Y2線断面図、図10は、図9に示す鉄筋組立用足場装
置のメインステージの一部を示した拡大平面図、図11
は、図9に示す鉄筋組立用足場装置の上ステージの上方
に、吊下げ治具を介して吊下された主筋等を示した模式
側面図、図12は、供給装置及びフープ筋配筋装置によ
り配力筋の配筋を行っている様子を示した図、図13
は、図12に示す供給装置の詳細を示した斜視図、図1
4は、図12に示すフープ筋配筋装置の詳細を示した斜
視図である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a schematic perspective view showing a state in which a caisson is constructed using an example of a reinforcing bar scaffolding apparatus for caisson construction according to the present invention, and FIG. 2A is the caisson shown in FIG. FIG. 2 (b) is a plan view of the caisson shown in FIG. 2 (a), and FIG. 3 is a plan view of the caisson shown in FIG. FIG. 4 is a schematic side view showing a plurality of yards arranged in a yard.
FIG. 5 is a schematic plan view showing a state during the construction of the plurality of caissons shown in FIG. 3, FIG. 5 is a view taken in the direction of arrow I in FIG.
8 is a view taken in the direction of the arrow II in FIG. 5, FIG. 7 is a view taken in the direction of the arrow III in FIG.
Is a sectional view taken along line X1-Y1 of FIG. 7, and FIG. 9 is a sectional view taken along line X2-Y1 of FIG.
FIG. 10 is an enlarged plan view showing a part of the main stage of the rebar assembly scaffolding device shown in FIG. 9, and FIG.
Is a schematic side view showing a main reinforcing bar and the like suspended via a suspending jig above the upper stage of the reinforcing bar scaffolding device shown in FIG. 9, and FIG. 12 is a supply device and a hoop reinforcing bar reinforcing device. FIG. 13 is a diagram showing a state in which the reinforcing muscles are being arranged by using FIG.
FIG. 1 is a perspective view showing details of the supply device shown in FIG.
FIG. 4 is a perspective view showing details of the hoop muscle arrangement device shown in FIG. 12.

【0011】構築すべき複数(3つ)のケーソン50
が、図3及び図4に示すように、所定のケーソン構築ヤ
ード1に設置されている。各ケーソン50は、図2乃至
図4に示すように(なお、図2及び図3では、説明の便
宜上、完成した状態のケーソン50を図示している)、
略水平な長方形板状の底版51を有しており、底版51
の下面側には、該下面の4辺縁端に沿った形で刃部51
aが、下方に突出した形で形成されている。底版51の
上面側には、鉛直な壁状の4つの側壁52が、該上面の
4辺縁端に沿った形でそれぞれ立設されており、これら
底版51及び4つの側壁52により、ケーソン50は上
方に開口した直方体状の箱型に形成されている。更に底
版51の上面側には、該側壁52のうち、互いに対向し
た部位間を接続した形で複数の仕切壁53が立設設置さ
れている。これら側壁52及び仕切壁53は、図2
(b)或いは図4に示すように水平断面が格子状になる
形で、互いに交差して配置されており、従って側壁52
の内側には、図2(a)或いは図2(b)等に示すよう
に、該側壁52及び仕切壁53(或いは仕切壁53の
み)により囲まれた形で複数の中空部55が形成されて
いる。これら底版51、側壁52、仕切壁53は鉄筋コ
ンクリート製になっており、これらは全て一体的に接続
された形になっている。また、水平方向のうちケーソン
50の長辺方向を矢印A、B方向、短辺方向を矢印C、
D方向とすると、1つのケーソン50内に形成されてい
る中空部55は、矢印A、B方向に5個、矢印C、D方
向に3個並んだ形で配置されている。
A plurality (three) caisson 50 to be constructed
However, as shown in FIG. 3 and FIG. 4, it is installed in a predetermined caisson construction yard 1. Each caisson 50 is, as shown in FIGS. 2 to 4 (note that FIGS. 2 and 3 show the caisson 50 in a completed state for convenience of explanation).
The bottom plate 51 has a substantially horizontal rectangular plate shape.
The lower surface side of the blade portion 51 is formed along the four edges of the lower surface.
a is formed so as to protrude downward. On the upper surface side of the bottom plate 51, four vertical wall-like side walls 52 are respectively erected along the four edges of the upper surface, and the caisson 50 is formed by the bottom plate 51 and the four side walls 52. Is formed in a rectangular parallelepiped box shape opened upward. Further, on the upper surface side of the bottom plate 51, a plurality of partition walls 53 are provided upright so as to connect portions of the side walls 52 facing each other. These side walls 52 and partition walls 53 are shown in FIG.
(B) Or, as shown in FIG. 4, the horizontal cross sections are arranged in a grid pattern so as to intersect with each other.
As shown in FIG. 2 (a) or FIG. 2 (b), a plurality of hollow portions 55 are formed inside the side wall 52 so as to be surrounded by the side wall 52 and the partition wall 53 (or only the partition wall 53). ing. The bottom plate 51, the side walls 52, and the partition wall 53 are made of reinforced concrete, and are all integrally connected. In the horizontal direction, the long side direction of the caisson 50 is indicated by arrows A and B, and the short side direction is indicated by arrow C.
Assuming the direction D, five hollow portions 55 formed in one caisson 50 are arranged in the directions of arrows A and B and three in the directions of arrows C and D.

【0012】なお、上述した3つのケーソン50は、図
3及び図4に示すように、各ケーソン50の長辺方向で
ある矢印A、B方向及び、各ケーソン50の短辺方向で
ある矢印C、D方向が互いに一致する形で配置されてい
ると共に、3つのケーソン50が矢印A、B方向に一直
線に(即ち1列に)並んだ形で配置されている。一方、
ケーソン構築ヤード1には、図3及び図4に示すよう
に、上述した水平方向である矢印A、B方向に伸延した
形で地面等に敷設された、互いに平行な1対のレール
2、2を有しており、前記3つのケーソン50は、これ
らレール2、2の間に位置している。つまり、1対のレ
ール2、2の間には、これらレール2、2の伸延方向で
ある矢印A、B方向に並んだ形で複数(3つ)のケーソ
ン構築ヤード1aが設けられており、これら各ケーソン
構築ヤード1aに前記各ケーソン50がそれぞれ配置さ
れている。なお、各ケーソン50は、図示しない公知の
ケーソン支持手段(例えば、ケーソン50を載置するこ
とができる載置用台座などがある。この他に、ジャッキ
装置等を介してケーソン50を支持しつつ、所定の軌道
上を走行し得る公知の運搬用台車を設置してもよい。こ
の運搬用台車は、ジャッキ装置等により、支持していた
ケーソン50を載置用台座に受渡し載置させることがで
き、また載置用台座に載置されていたケーソン50を取
り外して移動運搬させることができるので、ケーソン5
0のケーソン製造ヤード1内での移動及びケーソン製造
ヤード1からの搬出がスムーズになる。)を介して各ケ
ーソン構築ヤード1aに設置されている。
As shown in FIGS. 3 and 4, the three caissons 50 described above have arrows A and B, which are the long sides of each caisson 50, and arrows C, which are the short sides of each caisson 50. , D directions are aligned with each other, and three caissons 50 are arranged in a straight line (that is, in a line) in the directions of arrows A and B. on the other hand,
As shown in FIGS. 3 and 4, the caisson construction yard 1 has a pair of rails 2, 2 parallel to each other, which are laid on the ground or the like so as to extend in the above-mentioned horizontal directions indicated by arrows A and B. And the three caissons 50 are located between the rails 2, 2. In other words, a plurality of (three) caisson construction yards 1a are provided between the pair of rails 2 and 2 in a direction in which the rails 2 and 2 extend in the directions of arrows A and B. Each caisson 50 is arranged in each caisson construction yard 1a. Each caisson 50 is a known caisson supporting means (not shown) (for example, a mounting base on which the caisson 50 can be mounted. In addition to this, while supporting the caisson 50 via a jack device or the like, A well-known transport trolley that can travel on a predetermined track may be installed, and the transport trolley may be configured to transfer the supported caisson 50 to the mounting pedestal using a jack device or the like. The caisson 50 placed on the mounting base can be removed and moved and transported.
The movement in the caisson manufacturing yard 1 and the carry-out from the caisson manufacturing yard 1 become smooth. ) Is installed in each caisson construction yard 1a.

【0013】以上のように構成されるケーソン50を構
築するには、まずケーソン製造ヤード1において、従来
の方法等を利用して各ケーソン50の底版51を構築す
る。構築されたこれら底版51は、図3等に示すよう
に、上述した構築完成した状態のケーソン50が配置さ
れるべき所定のケーソン構築ヤード1aに配置される
(或いは、予めこのケーソン構築ヤード1aで構築され
る。)。次いで、各底版51の上に側壁52や仕切壁5
3をそれぞれ構築していく。側壁52及び仕切壁53の
構築について以下詳述する。
In order to construct the caisson 50 constructed as described above, first, the bottom plate 51 of each caisson 50 is constructed in the caisson manufacturing yard 1 by using a conventional method or the like. As shown in FIG. 3 and the like, these constructed bottom slabs 51 are arranged in a predetermined caisson construction yard 1a where the caisson 50 in the completed construction state is to be arranged (or in advance, in the caisson construction yard 1a). Is built.) Next, the side wall 52 and the partition wall 5 are placed on each bottom plate 51.
Build 3 each. The construction of the side wall 52 and the partition wall 53 will be described in detail below.

【0014】まず構築に先だって、構築されるべき各ケ
ーソン50に対して、図2(a)及び図3に示すよう
に、該ケーソン50を上下方向に並んだ複数の水平層状
区画に分割する形で(図2(a)等では底版51よりも
上側の部分を4等分した形で)、4つの施工区画BJ1
〜BJ4を設定する。各ケーソン50に設定された複数
の施工区画BJ1〜BJ4は、図3に示すように、3つ
のケーソン50間で矢印A、B方向に対応した形で配置
されており、これら3つのケーソン50間において互い
に対応した施工区画BJ1〜BJ4は、区画ユニットK
Y1〜KY4をそれぞれ形成している。また、各ケーソ
ン50の各施工区画BJ1〜BJ4に対して、該施工区
画BJ1〜BJ4を水平方向に並んだ複数の並列区画に
分割する形で(図2(b)等では最も矢印A側から2番
目の中空部55の中央付近で1つの区切りを、最も矢印
A側から4番目の中空部55の中央付近でもう1つの区
切りを形成する形で)、3つのブロックBL1〜BL3
を設定する。
Prior to construction, for each caisson 50 to be constructed, as shown in FIGS. 2A and 3, the caisson 50 is divided into a plurality of horizontal layered sections arranged vertically. (In FIG. 2 (a) and the like, the upper part of the bottom plate 51 is divided into four equal parts), and four construction sections BJ1
To BJ4. As shown in FIG. 3, the plurality of construction sections BJ1 to BJ4 set in each caisson 50 are arranged between the three caissons 50 in a form corresponding to the directions of the arrows A and B. The construction sections BJ1 to BJ4 corresponding to each other in
Y1 to KY4 are respectively formed. Further, for each of the construction sections BJ1 to BJ4 of each caisson 50, the construction sections BJ1 to BJ4 are divided into a plurality of parallel sections arranged in a horizontal direction (in FIG. One block is formed near the center of the second hollow portion 55, and another is formed near the center of the fourth hollow portion 55 from the arrow A side) (three blocks BL1 to BL3).
Set.

【0015】ここで、ケーソン50の側壁52及び仕切
壁53を構築するのに使用する各種の装置を説明する。
まず、コンクリート打設用足場装置3は、図4乃至図6
に示すように、レール2、2上を走行自在な支持台車
5、5を、矢印A、B方向に垂直な図の矢印C、D方向
に互いに対応配置した形で有しており、各支持台車5、
5上には鉛直上方向に伸延した形のマストフレーム6、
6がそれぞれ立設されている。これらマストフレーム
6、6の上端部間には、これら両者を互いに接続する形
で矢印C、D方向に伸延した形の梁フレーム7が設けら
れており、梁フレーム7上には複数の揚重装置ユニット
9が設置されている。各揚重装置ユニット9内には、図
示しない公知のウインチ装置等が設けられており、該ウ
インチ装置等には、該ウインチ装置等の駆動により、巻
取・繰出自在となったワイヤ9aが設置されており、該
ワイヤ9aの先端側は前記揚重装置ユニット9の外部に
出ており、梁フレーム7の下方に吊下されている。これ
ら複数のワイヤ9aにより5つのゴンドラ足場10が昇
降自在に吊下されている。各ゴンドラ足場10は長方形
状の足場プレートの周囲に安全柵等を設置した形で構成
されており、これら5つのゴンドラ足場10は矢印C、
D方向に一列に並んだ形で配置されている。ところで、
該コンクリート打設用足場装置3は、図4乃至図6に示
すように、そのマストフレーム6、6及び梁フレーム7
により1つの構築中のケーソン50を跨いだ状態で配置
されており、例えば上述した複数のゴンドラ足場10
は、該ケーソン50のブロックBL2付近に配置されて
いる。即ち、5つのゴンドラ足場10のうち、最も矢印
C側及び最も矢印D側のものは、それぞれ該ブロックB
L2付近のうちの側壁52、52の外側近傍の位置(或
いは該位置の真上)に位置しており、残りの3つのゴン
ドラ足場10は、該ブロックBL2付近において矢印
C、D方向に並んだ3つの中空部55にそれぞれ挿入さ
れた位置(或いは該位置の真上)に位置している。
Here, various devices used for constructing the side wall 52 and the partition wall 53 of the caisson 50 will be described.
First, the concrete placing scaffolding device 3 is shown in FIGS.
As shown in FIG. 3, supporting carts 5 and 5 which can travel on the rails 2 and 2 are arranged corresponding to each other in the directions indicated by arrows C and D perpendicular to the directions indicated by arrows A and B, respectively. Dolly 5,
5 has a mast frame 6 extending vertically upward,
6 are erected. A beam frame 7 extending in the directions of arrows C and D is provided between the upper ends of the mast frames 6 and 6 so as to connect the two to each other. The device unit 9 is installed. A well-known winch device or the like (not shown) is provided in each lifting device unit 9. The winch device or the like is provided with a wire 9 a that can be wound and fed out by driving the winch device and the like. The distal end side of the wire 9 a extends out of the lifting device unit 9, and is suspended below the beam frame 7. Five gondola scaffolds 10 are suspended by these wires 9a so as to be able to move up and down. Each gondola scaffold 10 is configured by installing a safety fence or the like around a rectangular scaffold plate.
They are arranged in a line in the direction D. by the way,
As shown in FIGS. 4 to 6, the concrete placing scaffolding device 3 has mast frames 6 and 6 and a beam frame 7.
Are arranged so as to straddle one caisson 50 under construction, for example, the plurality of gondola scaffolds 10 described above.
Are arranged near the block BL2 of the caisson 50. That is, of the five gondola scaffolds 10, the ones on the arrow C side and the arrow D side are the blocks B respectively.
In the vicinity of L2, it is located at a position near the outside of the side walls 52, 52 (or directly above the position), and the remaining three gondola scaffolds 10 are arranged in the directions of arrows C and D near the block BL2. It is located at a position (or just above) inserted into each of the three hollow portions 55.

【0016】また、型枠取付用足場装置11は、図4及
び図7及び図8に示すように、レール2、2上にそれぞ
れ設置され、これら各レール2、2上を走行自在な支持
台車12、12を、図の矢印C、D方向に互いに対応配
置した形で有しており、各支持台車12、12上には鉛
直上方向に伸延した形のマストフレーム13、13がそ
れぞれ立設されている。これらマストフレーム13、1
3の上端部間には、これら両者を互いに接続する形で図
の矢印C、D方向に伸延した形の吊下装置用フレーム1
5が設けられており、吊下装置用フレーム15は、同一
の高さレベルにおいて矢印C、D方向に伸延した形の互
いに平行な2本のレール材16、16及び、これらレー
ル材16、16に挟まれた略中央位置に配置された矢印
C、D方向に伸延した形の駆動用レール17(該駆動用
レール17には図示しないギア等が形成されている)を
有して構成されている。この吊下装置用フレーム15に
は吊下装置19が設置されている。吊下装置19は、前
記2本のレール材16、16に架設載置された形の本体
20を有しており、本体20は、図示しない所定のロー
ラ等を介してレール材16、16上を、これらレール材
16、16に沿って、従って矢印C、D方向に移動自在
になっている。また、本体20の中央下部には駆動ユニ
ット21が設けられており、駆動ユニット21は前記駆
動用レール17に係合している。即ち、駆動ユニット2
1は、図示しない駆動用モータ及び、該駆動用モータに
よって駆動される図示しない駆動用ギア等を有してお
り、該駆動用ギアが前記駆動用レール17に噛合してい
る。つまり、駆動ユニット21の図示しない駆動用モー
タの駆動により、該駆動ユニット21及び該駆動ユニッ
ト21が設けられている本体20(従って吊下装置19
全体)は、駆動用レール17に沿って駆動されるように
なっている。即ち、吊下装置19は、レール材16、1
6及び駆動用レール17に沿って、矢印C、D方向に移
動駆動自在になっている。
As shown in FIGS. 4, 7 and 8, the form-mounting scaffolding device 11 is installed on the rails 2 and 2, respectively, and is a support cart that can run on these rails 2 and 2. Mast frames 13 and 13 extending vertically upward are provided on the support carts 12 and 12, respectively. Have been. These mast frames 13, 1
3, a frame 1 for a suspension device extending in the directions of arrows C and D in the figure so as to connect them to each other.
5, the suspension device frame 15 is composed of two parallel rail members 16, 16 extending in the directions of arrows C and D at the same height level, and these rail members 16, 16. And a driving rail 17 extending in the directions of arrows C and D disposed at a substantially central position between the driving rails 17 (a gear or the like (not shown) is formed on the driving rail 17). I have. A suspension device 19 is installed on the suspension device frame 15. The suspension device 19 has a main body 20 that is mounted and mounted on the two rail members 16, 16. The main body 20 is mounted on the rail members 16, 16 via predetermined rollers (not shown). Are movable along these rail members 16, 16 and therefore in the directions of arrows C and D. A drive unit 21 is provided at the lower center of the main body 20, and the drive unit 21 is engaged with the drive rail 17. That is, the drive unit 2
1 includes a drive motor (not shown), a drive gear (not shown) driven by the drive motor, and the like, and the drive gear meshes with the drive rail 17. That is, the drive unit 21 is driven by a drive motor (not shown), and the drive unit 21 and the main body 20 (therefore, the suspension device 19) on which the drive unit 21 is provided.
Is driven along the drive rail 17. That is, the suspension device 19 includes the rail members 16, 1.
Along the drive rail 6 and the drive rail 17, it can be moved and driven in the directions of arrows C and D.

【0017】更に、本体20には4つの揚重装置ユニッ
ト22が設けられており、各揚重装置ユニット22内に
は、図示しない公知のウインチ装置等が設けられてい
る。該ウインチ装置等には、該ウインチ装置等の駆動に
より、巻取・繰出自在となったワイヤ22aが設置され
ており、該ワイヤ22aの先端側は前記揚重装置ユニッ
ト22の外部に出ており、本体20及びレール材16、
16の下方に吊下されている。これら4本のワイヤ22
aのうち、2本のワイヤ22aにより1つの型枠吊下治
具23が、残りの2本のワイヤ22aによりもう1つ別
の型枠吊下治具23がそれぞれ昇降自在に吊下接続され
ている。各型枠吊下治具23は矢印C、D方向に伸延し
た水平な棒状に形成されており、各型枠吊下治具23の
下端側には複数(4つ)のフック23aが設けられてい
る。各型枠吊下治具23には、図7に示すように板面が
鉛直でかつ矢印C、D方向に平行な板状の型枠25が、
その上端側の複数の接続部25a(例えばフック等)が
前記型枠吊下治具23の複数(2つ)のフック23aに
係合接続した形で吊下され得るようになっている。また
型枠25の別の吊下態様としては、図8に示すように、
2つの型枠吊下治具23、23間に、板面が鉛直でかつ
矢印A、B方向に平行な板状の型枠25を、その上端側
の接続部25a、25aを各型枠吊下治具23のフック
23aにそれぞれ係合接続させた形で吊下することもで
きるようになっている。
Further, the main body 20 is provided with four lifting device units 22, and in each lifting device unit 22, a known winch device (not shown) or the like is provided. The winch device or the like is provided with a wire 22a that can be wound up and taken out by driving the winch device or the like, and the distal end side of the wire 22a is out of the lifting device unit 22. , Body 20 and rail material 16,
16 is suspended below. These four wires 22
In FIG. 3A, one form suspending jig 23 is suspended by two wires 22a, and another form suspending jig 23 is suspended by the remaining two wires 22a so as to be vertically movable. ing. Each form hanging jig 23 is formed in a horizontal bar shape extending in the directions of arrows C and D, and a plurality of (four) hooks 23 a are provided at a lower end side of each form hanging jig 23. ing. As shown in FIG. 7, a plate-shaped mold 25 having a vertical plate surface and parallel to the directions of arrows C and D is provided on each mold suspension jig 23.
A plurality of connection portions 25a (for example, hooks) on the upper end side can be hung in a form engaged with and connected to a plurality of (two) hooks 23a of the form hanging jig 23. As another suspension mode of the formwork 25, as shown in FIG.
A plate-shaped form 25 having a vertical plate surface and parallel to the directions of arrows A and B is connected between the two form-hanging jigs 23, 23, and connection portions 25a, 25a on the upper end side of each form-hanging jig 23 are hung. The lower jig 23 can also be hung so as to be engaged with and connected to the hooks 23a.

【0018】一方、マストフレーム13、13の間に
は、前記吊下装置用フレーム15のやや下側の位置に、
これらマストフレーム13、13を互いに接続する形で
図の矢印C、D方向に伸延した形の梁フレーム26が設
けられており、梁フレーム26上には複数の揚重装置ユ
ニット27が設置されている。各揚重装置ユニット27
内には、図示しない公知のウインチ装置等が設けられて
おり、該ウインチ装置等には、該ウインチ装置等の駆動
により、巻取・繰出自在となったワイヤ27aが設置さ
れており、該ワイヤ27aの先端側は前記揚重装置ユニ
ット27の外部に出ており、梁フレーム26の下方に吊
下されている。これら複数のワイヤ27aにより5つの
ゴンドラ足場29が昇降自在に吊下されている。各ゴン
ドラ足場29は長方形状の足場プレートの周囲に安全柵
等を設置して構成されており、これら5つのゴンドラ足
場29は矢印C、D方向に一列に並んだ形で配置されて
いる。これら5つのゴンドラ足場29のうち中央の3つ
のゴンドラ足場29については、各ゴンドラ足場29の
矢印A、B方向における幅が、前記2つの型枠吊下治具
23、23間の矢印A、B方向における間隔よりも小さ
く、また3つの各ゴンドラ足場29の矢印A、B方向に
おける位置は、前記2つの型枠吊下治具23、23間の
略中央に位置している。つまり、各ゴンドラ足場29は
型枠吊下治具23、23等と干渉しないように吊下配置
されている。ところで、該型枠取付用足場装置11は、
そのマストフレーム13、13及び梁フレーム26等に
より、1つの構築中のケーソン50を跨いだ状態で配置
されており、例えば図7及び図8等では、上述した複数
のゴンドラ足場29は、該ケーソン50のブロックBL
1に対応した形で配置されている。即ち、5つのゴンド
ラ足場29のうち、最も矢印C側及び最も矢印D側のも
のは、それぞれ該ブロックBL1のうちの側壁52、5
2の外側近傍の位置(或いは該位置の真上)に位置して
おり、残りの3つのゴンドラ足場29は、該ブロックB
L1の各中空部55に挿入された位置(或いは該位置の
真上)に位置している。
On the other hand, between the mast frames 13, 13, a position slightly below the suspension device frame 15 is provided.
A beam frame 26 extending in the directions of arrows C and D in the figure is provided so as to connect these mast frames 13 and 13 to each other. A plurality of lifting device units 27 are installed on the beam frame 26. I have. Each lifting device unit 27
A well-known winch device or the like (not shown) is provided therein, and the winch device or the like is provided with a wire 27a that can be wound and fed out by driving the winch device and the like. The tip side of 27a is out of the lifting device unit 27 and is suspended below the beam frame 26. Five gondola scaffolds 29 are suspended by these plural wires 27a so as to be able to move up and down. Each gondola scaffold 29 is configured by installing a safety fence or the like around a rectangular scaffold plate, and these five gondola scaffolds 29 are arranged in a line in the directions of arrows C and D. Regarding the central three gondola scaffolds 29 of the five gondola scaffolds 29, the width of each gondola scaffold 29 in the directions of arrows A and B is the same as the arrows A and B between the two form hanging jigs 23 and 23. The distance in the directions indicated by arrows A and B of the three gondola scaffolds 29 is smaller than the interval in the direction, and is located substantially at the center between the two form hanging jigs 23. That is, each gondola scaffold 29 is suspended so as not to interfere with the form suspension jigs 23, 23 and the like. Incidentally, the formwork mounting scaffolding device 11
The mast frames 13, 13 and the beam frame 26 are arranged so as to straddle one caisson 50 under construction. For example, in FIG. 7 and FIG. 50 blocks BL
1 are arranged. That is, among the five gondola scaffolds 29, those on the side of the arrow C and the side of the arrow D on the side are the side walls 52, 5 and 5 of the block BL1, respectively.
2 (or just above the position), and the remaining three gondola scaffolds 29
It is located at a position (or just above the position) inserted into each hollow portion 55 of L1.

【0019】また、鉄筋組立用足場装置30は、図1及
び図4及び図9に示すように、レール2、2上にそれぞ
れ設置され、これら各レール2、2上を走行自在な支持
台車31、31を、図の矢印C、D方向に互いに対応配
置した形で有しており、各支持台車31、31上には鉛
直上方向に伸延した円柱状の2本の支持ポール32、3
2がそれぞれ立設されている。各支持ポール32には、
図1及び図9に示すように、これら支持ポール32に係
合する形で、これら支持ポール32に沿って昇降し得る
昇降装置33がそれぞれ設けられており、4個の昇降装
置33には、水平な板状のメインステージ35が支持さ
れて設けられている。メインステージ35には、図1及
び図9及び図10に示すように、該メインステージ35
を上下に貫通した形で6つの鉄筋挿通間隙36が設けら
れており、これら鉄筋挿通間隙36のうち4つの鉄筋挿
通間隙36は、メインステージ35を矢印A、B方向に
貫いた筋状に形成されている。つまり、これら4つの鉄
筋挿通間隙36は矢印C、D方向に並列配置されてい
る。一方、残りの2つの鉄筋挿通間隙36は、上述した
4つの鉄筋挿通間隙36のうち最も矢印C側の鉄筋挿通
間隙36から最も矢印D側の鉄筋挿通間隙36に亙っ
て、矢印C、D方向に伸延した筋状に形成されており、
これら2つの鉄筋挿通間隙36は矢印A、B方向に並列
配置されている。また、これら2つの鉄筋挿通間隙36
は、ともに上述した4つの鉄筋挿通間隙36とそれぞれ
交差した形で配置されている。これら6つの鉄筋挿通間
隙36により、メインステージ35は複数(11個)の
ステージ片35aに分割されている。なお、各鉄筋挿通
間隙36の幅は、図10に示すように、矢印A、B方向
に、或いは矢印C、D方向に一定の幅W1となってい
る。
As shown in FIGS. 1, 4 and 9, the rebar assembling scaffolding device 30 is installed on the rails 2 and 2, respectively, and a supporting carriage 31 which can run on the rails 2 and 2 freely. , 31 are arranged in a manner corresponding to each other in the directions of arrows C and D in the figure, and two cylindrical support poles 32, 3 extending vertically upward are provided on each of the support carts 31, 31.
2 are erected. Each support pole 32 has
As shown in FIGS. 1 and 9, lifting devices 33 that can move up and down along the support poles 32 are provided so as to be engaged with the support poles 32, respectively. A horizontal plate-shaped main stage 35 is supported and provided. As shown in FIG. 1, FIG. 9 and FIG.
Are provided in a manner penetrating the main stage 35 in the directions indicated by the arrows A and B. Four of the rebar insertion gaps 36 are provided in a manner penetrating the main stage 35 in the directions of arrows A and B. Have been. That is, these four reinforcing bar insertion gaps 36 are arranged in parallel in the directions of arrows C and D. On the other hand, the remaining two rebar insertion gaps 36 extend from the rebar insertion gap 36 closest to the arrow C to the rebar insertion gap 36 closest to the arrow D among the four rebar insertion gaps 36 described above. It is formed in a streak extending in the direction,
These two reinforcing bar insertion gaps 36 are arranged in parallel in the directions of arrows A and B. In addition, these two rebar insertion gaps 36
Are arranged so as to intersect with the four reinforcing bar insertion gaps 36 described above. The main stage 35 is divided into a plurality of (11) stage pieces 35 a by these six reinforcing bar insertion gaps 36. As shown in FIG. 10, the width of each rebar insertion gap 36 is a constant width W1 in the directions of arrows A and B or in the directions of arrows C and D.

【0020】ところで各鉄筋挿通間隙36はケーソン5
0の鉄筋ユニット65(即ち主筋66及び配力筋67を
組み合わせたもの)の構築態様に対応して形成されてお
り、しかも鉄筋ユニット65は、この鉄筋挿通間隙36
を上下方向に自由に貫通通過し得るようになっている。
よって分割されたステージ片35a、35a間は、直接
には接続されていない。なお、昇降装置33に直接接続
されていない各ステージ片35aは、後述する上ステー
ジ39と図示しない支持ポール等によって接続されてお
り(つまり各ステージ片35aは図示しない支持ポール
等を介して上ステージ39に垂設されている)、よって
各ステージ片35aどうしは、後述する上ステージ39
及び図示しない支持ポール等によって互いに接続されて
いる。メインステージ35の上側には、該メインステー
ジ35と略同様に構成された上ステージ39が、前記4
個の昇降装置33及び図示しない支持柱等を介して前記
メインステージ35及び前記4個の昇降装置33に対し
て固定的に設けられている。即ち、上ステージ39に
は、該上ステージ39を上下に貫通した形で、矢印A、
B方向に伸延した4つの鉄筋挿通間隙40及び、矢印
C、D方向に伸延した2つの鉄筋挿通間隙40が設けら
れており、これら6つの鉄筋挿通間隙40により、上ス
テージ39は複数のステージ片39aに分割されてい
る。なお、各鉄筋挿通間隙40の幅は、図10に示す前
記メインステージ35の場合と同様に、一定の幅W1と
なっている。また、各鉄筋挿通間隙40により分割され
たステージ片39a、39a間は、図10の二点鎖線で
示すように、板面が鉛直な板状に形成された複数の接続
部材41により接続されており、各鉄筋挿通間隙40を
横切る複数の接続部材41は、該鉄筋挿通間隙40の伸
延方向において、前記幅W1と略等しい所定の間隔W2
で配置されている。つまり、各鉄筋挿通間隙40には、
複数の接続部材41によって仕切られた形で、複数の略
正方形状の穴である鉄筋配置穴43が形成されている。
なお、上述したメインステージ35及び上ステージ39
の周囲は、適宜な落下防止柵42等で囲まれており、メ
インステージ35の上面には足場として利用可能な足場
面35bが、上ステージ39の上面には足場として利用
可能な上足場面39bがそれぞれ形成されている。
By the way, each reinforcing bar insertion gap 36 is a caisson 5
The reinforcing bar unit 65 is formed corresponding to the construction mode of the reinforcing bar unit 65 (that is, the combination of the main reinforcing bar 66 and the force distribution bar 67).
Can be freely penetrated in the vertical direction.
Therefore, the divided stage pieces 35a, 35a are not directly connected. Each stage piece 35a that is not directly connected to the lifting / lowering device 33 is connected to an upper stage 39 described later by a support pole or the like (not shown) (that is, each stage piece 35a is connected to the upper stage via a support pole or the like not shown). 39, so that each stage piece 35a is connected to an upper stage 39 described later.
And a support pole (not shown). On the upper side of the main stage 35, an upper stage 39 having substantially the same configuration as the main stage 35 is provided.
The main stage 35 and the four lifting / lowering devices 33 are fixedly provided via a plurality of lifting / lowering devices 33 and supporting columns (not shown). In other words, the upper stage 39 has arrows A,
Four rebar insertion gaps 40 extending in the direction B and two rebar insertion gaps 40 extending in the directions of arrows C and D are provided. With these six rebar insertion gaps 40, the upper stage 39 is made up of a plurality of stage pieces. 39a. The width of each rebar insertion gap 40 is a fixed width W1, as in the case of the main stage 35 shown in FIG. Further, the stage pieces 39a, 39a divided by the reinforcing bar insertion gaps 40 are connected by a plurality of connecting members 41 each having a vertical plate shape as shown by a two-dot chain line in FIG. The plurality of connecting members 41 crossing each rebar insertion gap 40 have a predetermined interval W2 substantially equal to the width W1 in the direction in which the rebar insertion gap 40 extends.
It is arranged in. That is, in each rebar insertion gap 40,
Reinforcing bar arrangement holes 43, which are a plurality of substantially square holes, are formed so as to be partitioned by the plurality of connection members 41.
The main stage 35 and the upper stage 39 described above are used.
Is surrounded by an appropriate fall prevention fence 42 or the like. On the upper surface of the main stage 35, a foot scene 35b that can be used as a scaffold, and on the upper surface of the upper stage 39, an upper foot scene 39b that can be used as a scaffold. Are formed respectively.

【0021】一方、ケーソン製造ヤード1には、図1に
示すように適宜なクレーン60が、必要に応じて配置さ
れており、そのうちの1台のクレーン60のフック60
aには、例えば図1及び図9及び図11に示すように吊
下げ治具123が釣支されている。即ち、吊下げ治具1
23は、フック60aによって1本のワイヤ126を介
して天秤状に一点支持された治具本体125を有してお
り、治具本体125は前記ワイヤ126との接続箇所J
1を中心として図11の矢印XC、XD方向に伸延した
形状になっている。従って、治具本体125が前記ワイ
ヤ126を介してクレーン60のフック60aに支持さ
れることによって、吊下げ治具123は該フック60a
に釣支されている。治具本体125の下部側には5本の
チェーン127がそれらの一端において接続固定されて
垂設されており、これらチェーン127は、前記接続箇
所J1の両側、即ち該接続箇所J1を中心に矢印XC、
XD方向に対称に配置された形で、しかも治具本体12
5の長手方向即ち、矢印XC、XD方向に沿って所定の
間隔L1で配列され垂設されている。
On the other hand, as shown in FIG. 1, an appropriate crane 60 is disposed in the caisson manufacturing yard 1 as necessary, and a hook 60 of one of the cranes 60 is provided.
A hanging jig 123 is supported by a, for example, as shown in FIGS. 1, 9, and 11. That is, the hanging jig 1
23 has a jig body 125 which is supported at one point in the form of a balance via a single wire 126 by a hook 60a.
It has a shape extending in the directions of arrows XC and XD in FIG. Accordingly, when the jig body 125 is supported by the hook 60a of the crane 60 via the wire 126, the hanging jig 123
Is supported by At the lower side of the jig body 125, five chains 127 are connected and fixed at one end thereof, and are vertically suspended. These chains 127 are arranged on both sides of the connection point J1, that is, arrows around the connection point J1. XC,
The jig body 12 is arranged symmetrically in the XD direction.
5 are arranged vertically at predetermined intervals L1 along the longitudinal direction, that is, the directions of arrows XC and XD.

【0022】また、各チェーン127の他端には、図9
及び図11に示すように、例えばU字型に湾曲成形さ
れ、上下方向に伸延した形のU字型鋼板及び、クレビス
ピン等のピン部材から構成された吊り金具129がそれ
ぞれ接続されており、各吊り金具129には上端にカッ
プラ66bが螺嵌された主鉄筋66がそれぞれ係合支
持、即ち接続されている。つまり、各主鉄筋66はU字
型鋼板の内側に上下方向に挿入されており、U字型鋼板
の開口部側にはピン部材が、前記挿入された主鉄筋66
がU字型鋼板の開口部側に抜け出さないように着脱自在
に設置されている。また主鉄筋66のカップラ66b
は、U字型鋼板の内側を貫通できない大きさとなってい
るため、U字型鋼板等に当接して係合支持されている。
即ち、吊り金具129は、各主鉄筋66のカップラ66
bのすぐ下の位置である所定の接続支持位置T1におい
て、これら主鉄筋66を接続している。一方、チェーン
127に接続された吊り金具129と治具本体125と
の間の上下間隔をチェーン127による吊り金具129
の吊下距離とし、最も矢印XC側のチェーン127によ
る吊り金具129の吊下距離を吊下距離Q1、その矢印
XD側に順次隣接したチェーン127による吊り金具1
29の吊下距離を順次吊下距離Q2、Q3、Q4、Q5
とする。つまり、吊下距離Q1〜Q5は、吊下距離Q
3、Q4、Q2、Q5、Q1の順、即ち前記接続箇所J
1に近い順に短くなっている。なお、チェーン127が
矢印XC、XD方向に沿って所定の間隔L1で配列され
ており、治具本体125は水平に近い状態になっている
ので、吊下げられている主鉄筋66も矢印XC、XD方
向に沿ってほぼ所定の間隔L1で配列され吊下げられて
いる。
Further, the other end of each chain 127
As shown in FIG. 11, for example, a U-shaped steel plate curved and formed into a U-shape and extended in the up-down direction, and a suspension fitting 129 formed of a pin member such as a clevis pin are connected to each other. A main reinforcing bar 66 having a coupler 66b screwed to the upper end thereof is engaged with and supported by the suspending fitting 129, that is, is connected thereto. That is, each main reinforcing bar 66 is vertically inserted inside the U-shaped steel plate, and a pin member is provided at the opening side of the U-shaped steel plate, and the inserted main reinforcing bar 66 is inserted into the U-shaped steel plate.
Are detachably installed so as not to fall out to the opening side of the U-shaped steel plate. The coupler 66b of the main reinforcing bar 66
Is so large that it cannot penetrate through the inside of the U-shaped steel plate, and is engaged and supported by contacting the U-shaped steel plate or the like.
That is, the hanging metal fitting 129 is connected to the coupler 66 of each main reinforcing bar 66.
These main reinforcing bars 66 are connected at a predetermined connection support position T1, which is a position immediately below b. On the other hand, the vertical distance between the hanging fixture 129 connected to the chain 127 and the jig main body 125 is set by the hanging fixture 129 by the chain 127.
, And the hanging distance of the hanging bracket 129 by the chain 127 closest to the arrow XC is the hanging distance Q1, and the hanging bracket 1 by the chain 127 adjacent to the arrow XD side in that order.
The suspension distances of 29 are sequentially reduced to suspension distances Q2, Q3, Q4, and Q5.
And That is, the suspension distances Q1 to Q5 are the suspension distance Q
3, Q4, Q2, Q5, Q1 in the order, ie, the connection point J
It becomes shorter in the order closer to 1. Since the chains 127 are arranged at predetermined intervals L1 along the directions of the arrows XC and XD, and the jig body 125 is almost horizontal, the suspended main rebar 66 is also moved by the arrows XC and XD. They are arranged and suspended at substantially predetermined intervals L1 along the XD direction.

【0023】また、メインステージ35と上ステージ3
9との間に形成された作業空間253には、図1及び図
12及び図14に示すように、配筋装置であるフープ筋
配筋装置70が、チェーンブロック71を介して前記上
ステージ39の下面側から作業空間253に吊下された
形で配置されており、更に、メインステージ35上に
は、図1及び図12及び図13に示すように、該フープ
筋配筋装置70に配力筋67を所定本数づつ供給し得る
鉄筋供給装置である供給装置209が、ケーソン製造ヤ
ード1内の別のクレーン60により吊下された形で設け
られている。即ち、フープ筋配筋装置70とこれに配力
筋67を供給し得る供給装置209は、該供給装置20
9により保持セットした複数本の配力筋67を、作業空
間253の側方からフープ筋配筋装置70に受渡し、該
フープ筋配筋装置70によりそのまま水平に、所定の各
配筋位置に一括して横送りし、かつこの状態で複数本の
配力筋67を保持し得るように構成されている。供給装
置209は、図12及び図13に示すように、L材を主
体としたトラスにより、水平方向である図12及び図1
3の矢印E、F方向に伸延した形の外観形状直方体状に
形成されたフレームであるトレイ210を有しており、
トレイ210の上部には一対のフック210a、210
aが、該フック210aを介して前記クレーン60がト
レイ210を吊下し得る形の被吊下部として、ここに装
着されている。
The main stage 35 and the upper stage 3
9, a hoop rebar arrangement device 70, which is a repositioning device, is provided in a work space 253 formed between the upper stage 39 and the upper stage 39 via a chain block 71. 1 and suspended from the lower surface side of the work space 253, and arranged on the main stage 35 in the hoop rebar arrangement device 70, as shown in FIGS. A supply device 209, which is a rebar supply device capable of supplying a predetermined number of the reinforcing bars 67, is provided so as to be suspended by another crane 60 in the caisson manufacturing yard 1. That is, the hoop muscle arrangement device 70 and the supply device 209 capable of supplying the force distribution muscle 67 thereto are provided by the supply device 20.
9, the plurality of force bars 67 held and set are transferred to the hoop muscle arrangement device 70 from the side of the work space 253, and the hoop muscle arrangement device 70 collectively arranges the plurality of force bars 67 horizontally at the predetermined bar arrangement positions. And a plurality of force distribution muscles 67 can be held in this state. As shown in FIGS. 12 and 13, the supply device 209 uses a truss mainly made of L-material, and
3 has a tray 210 which is a frame formed in a rectangular parallelepiped shape having an external appearance extending in the directions of arrows E and F.
A pair of hooks 210a, 210
a is mounted here as a suspended portion capable of suspending the tray 210 by the crane 60 via the hook 210a.

【0024】供給装置209のトレイ210のうち、前
記矢印E、F方向に垂直な水平方向である図13の矢印
G、H方向両側部には、鉄筋支持面210b、210b
が形成されており、各鉄筋支持面210bには、その各
々が回動自在な送りローラである従動ローラ211aを
鉄筋供給方向即ち矢印E、F方向に沿って所定の間隔を
なすように複数並べたローラ列211が、上下方向に前
記配力筋67を配筋すべきピッチL11に対応一致した
所定のピッチL11をなす形で複数(実施例においては
各鉄筋支持面210bに7段づつ)設けられている。複
数の従動ローラ211aが構成しているローラ列211
のそれぞれは、各ローラ211aが形成する転動面によ
って、配力筋67を鉄筋供給方向(矢印E、F方向)に
沿って水平方向に摺動させるように移動自在に保持し得
る形で、鉄筋保持部Qnをそれぞれ形成しており、従っ
て、供給装置209には鉄筋保持部Qnが、上下方向に
前記ピッチL11をなす形で形成されている。
In the tray 210 of the supply device 209, reinforcing bar support surfaces 210b, 210b are provided on both sides in the directions of arrows G, H in FIG.
A plurality of driven rollers 211a, each of which is a rotatable feed roller, are arranged on each rebar supporting surface 210b at predetermined intervals along the rebar supplying direction, ie, the directions of arrows E and F. Roller rows 211 are provided in the form of a predetermined pitch L11 corresponding to the pitch L11 at which the force distribution bars 67 are to be arranged in the vertical direction (in the embodiment, seven steps are provided on each rebar supporting surface 210b). Have been. Roller row 211 composed of a plurality of driven rollers 211a
Are formed so that they can be movably held by the rolling surfaces formed by the rollers 211a so as to slide the force distribution bars 67 in the horizontal direction along the reinforcing bar supply direction (the directions of arrows E and F). Reinforcing bar holding portions Qn are respectively formed, and accordingly, the reinforcing bar holding portions Qn are formed in the supply device 209 at the pitch L11 in the vertical direction.

【0025】複数のローラ列211には、図12及び図
13に示すように、駆動機構212が、該ローラ列21
1により保持される配力筋67を矢印E、F方向に沿っ
て移動駆動するための鉄筋送り手段として接続されてお
り、駆動機構212は、図12及び図13に示すように
各ローラ列211の鉄筋供給方向先方側(矢印E方)に
それぞれ設けられた駆動ローラ211Xと、該駆動ロー
ラ211Xとの間で配力筋67を挟み込み自在な押えロ
ーラ215を有している。各駆動ローラ211Xの転動
面には滑り止めゴム材が張設されており、該駆動ローラ
211Xはその回動駆動動作を介して配力筋67を鉄筋
供給方向に横送りし得るようになっている(例えば、各
駆動ローラ211Xには、図示しないスプロケットが接
続装着されており、複数の駆動ローラ211Xには、各
スプロケットに嵌着された図示しないチェーンによっ
て、図示しないギアを介して図示しないモータが、該駆
動ローラ211Xのそれぞれを正逆両方向に回転自在な
形で接続されている。)。また、各駆動ローラ211X
より若干後方側には、上記押えローラ215が、1ヶの
駆動ローラ211Xに対して1ヶづつそれぞれ設けられ
ており、各押えローラ215は、常時図12及び図13
の下方向に付勢された形で、且つ必要に応じて跳上り自
在な形になっている。これにより、ローラ列211の各
鉄筋保持部Qnにそれぞれ保持される配力筋67は、該
押えローラ215により図下方向側に付勢されながら、
駆動ローラ211Xの回転駆動が行われることによっ
て、該駆動ローラ211Xと押えローラ215の間を円
滑に横送りされ得るようになっている。一方、先に述べ
たローラ列211を構成している複数の従動ローラ21
1aは、このように駆動ローラ211Xが駆動機構21
2を介して回転駆動される動作に従動して回動自在であ
るようになっており、駆動ローラ211X及び従動ロー
ラ211aは、その各々が前記配力筋67に対して相対
的に転動することによって、該配力筋67を所定の配筋
位置に対応した所定位置において摺動自在に支持し得る
ようになっている。
As shown in FIGS. 12 and 13, a driving mechanism 212 is provided on the plurality of roller rows 211.
1 is connected as rebar feed means for moving and driving the force distribution muscles 67 held by 1 in the directions of arrows E and F. As shown in FIGS. , A driving roller 211X provided on the forward side (arrow E direction) of the reinforcing bar supply direction, and a pressing roller 215 capable of sandwiching the force distribution muscle 67 between the driving roller 211X and the driving roller 211X. A non-slip rubber material is stretched on the rolling surface of each drive roller 211X, and the drive roller 211X can laterally feed the distribution muscle 67 in the rebar supply direction through its rotation driving operation. (For example, a sprocket (not shown) is connected and attached to each drive roller 211X, and a plurality of drive rollers 211X are connected to a chain (not shown) fitted to each sprocket via a gear (not shown). A motor is connected to each of the drive rollers 211X so as to be rotatable in both forward and reverse directions.) In addition, each drive roller 211X
A slightly rearward side is provided with one pressing roller 215 for each driving roller 211X, and each pressing roller 215 is always provided in FIGS.
It is in a shape biased downward, and is capable of jumping up as required. As a result, the force distribution muscles 67 held by the respective reinforcing bar holding portions Qn of the roller row 211 are urged by the pressing rollers 215 in the downward direction in FIG.
When the drive roller 211X is rotationally driven, the drive roller 211X can be smoothly fed laterally between the drive roller 211X and the pressing roller 215. On the other hand, the plurality of driven rollers 21 forming the roller row 211 described above
1a is that the drive roller 211X is
The driving roller 211 </ b> X and the driven roller 211 a are each relatively rotated with respect to the force distribution muscle 67. Thereby, the force distribution muscle 67 can be slidably supported at a predetermined position corresponding to a predetermined reinforcement arrangement position.

【0026】また、各ローラ列211は、図12及び図
13に示すように、トレイ210の矢印E、F方向真中
付近に位置する形の、鉄筋落下防止手段として鉄筋クラ
ンプ213を有しており、鉄筋クランプ213には、配
力筋67を押し込み自在な形で、鉄筋挿通空間213s
が、ガイド空間として矢印E、F方向に貫通形成されて
いる。従って、鉄筋クランプ213は、これを開くこと
によって、鉄筋挿通空間213sを開放自在であるよう
に形成されており、また、鉄筋クランプ213は、これ
を閉じた状態で、該鉄筋挿通空間213sに挿通された
配力筋67を鉄筋供給方向である矢印E、F方向にのみ
移動自在に把持し、これによって、配力筋67の鉄筋保
持部Qnからの落下を防止し得るようになっている。
Further, as shown in FIGS. 12 and 13, each roller row 211 has a reinforcing bar clamp 213 as a reinforcing bar drop preventing means which is located near the center of the tray 210 in the directions of arrows E and F. In the rebar clamp 213, the rebar insertion space 213 s is formed so that the distributing bars 67 can be pushed in freely.
Are formed as guide spaces in the directions of arrows E and F. Therefore, the rebar clamp 213 is formed so that the rebar insertion space 213s can be freely opened by opening it, and the rebar clamp 213 is inserted into the rebar insertion space 213s in a closed state. The arranged force bars 67 are movably gripped only in the directions of the rebar supply arrows E and F, thereby preventing the force muscles 67 from dropping from the reinforcing bar holding portion Qn.

【0027】一方、前記フープ筋配筋装置70は、図1
2及び図14に示すように、前記チェーンブロック71
に吊下された支持部材である吊り桁221を有してお
り、吊り桁221は、図12及び図14に示すように、
配力筋67の伸延方向、例えば図の矢印E、F方向に沿
って長い形の枠状に形成されている。吊り桁221に
は、ワイヤ223等を介してローラユニット222が、
吊り桁221の長手方向に沿って(矢印E、F方向に沿
って)並ぶように整列して複数吊下されており、各ロー
ラユニット222は、ターンバックル222pを介して
吊り桁221に対する吊下距離L5が調整自在な形にな
っている。各ローラユニット222は、縦長箱状に形成
されたケーシング222aを有しており、ケーシング2
22aの上面部の4隅には、被吊下部として前記ワイヤ
223が繋着取外し自在な掛輪221aが、該掛輪22
1aを介してケーシング222aが吊り桁221下に吊
下され得るように設けられている。ケーシング222a
には、鉄筋受けローラである受けローラ224が、図示
しない軸を介して矢印P、Q方向に回動自在な形で、配
筋すべき配筋ピッチL11に対応したピッチL11をな
すよう上下方向に複数設けられており、複数の受けロー
ラ224は、ケーシング222aの矢印G、H方向(即
ち、前記矢印E、F方向に垂直な水平方向)に示す互い
に背向する2側面222M、222Mに対してそれぞれ
水平方向に突出退入自在であるように設けられている。
複数の受けローラ224は、ケーシング222aが配筋
済みの主筋66、66間に配置したときに、これら主筋
66、66に対して設定される配力筋67の配筋位置P
nに対応した位置に配置し得るようになっており、各配
筋位置Pnに位置決めされた受けローラ224は、ここ
において配力筋67を鉄筋供給方向である矢印E、F方
向に沿って移動自在な形で搭載保持し得るようになって
いる。
On the other hand, the hoop rebar arrangement device 70 shown in FIG.
As shown in FIG. 2 and FIG.
Has a hanging girder 221 as a supporting member, and the hanging girder 221 is, as shown in FIGS.
It is formed in a long frame shape along the extension direction of the distribution muscle 67, for example, the directions of arrows E and F in the figure. A roller unit 222 is connected to the suspension girder 221 via a wire 223 or the like.
A plurality of the suspension girders 221 are suspended so as to be aligned along the longitudinal direction (along arrow E and F directions), and each roller unit 222 is suspended from the suspension girders 221 via a turnbuckle 222p. The distance L5 is adjustable. Each roller unit 222 has a casing 222a formed in a vertically long box shape.
At the four corners of the upper surface of the hook 22a, hanging hooks 221a are provided as hanging parts, to which the wire 223 can be freely attached and detached.
The casing 222a is provided so as to be able to be hung below the suspension girder 221 via 1a. Casing 222a
In the vertical direction, the receiving roller 224, which is a reinforcing bar receiving roller, is rotatable in the directions of arrows P and Q via a shaft (not shown) so as to form a pitch L11 corresponding to the reinforcing bar pitch L11. And a plurality of receiving rollers 224 are provided on two opposite side surfaces 222M, 222M of the casing 222a that are opposed to each other in the directions of arrows G and H (that is, the horizontal direction perpendicular to the directions of the arrows E and F). Are provided so as to be freely protruding and retractable in the horizontal direction.
When the casing 222a is disposed between the main reinforcements 66, 66 where the reinforcements are arranged, the plurality of receiving rollers 224 are arranged at the reinforcement arrangement positions P of the force distribution reinforcements 67 set for the main reinforcements 66, 66.
n, and the receiving roller 224 positioned at each bar arrangement position Pn moves the force distribution bar 67 here along the arrow E or F direction which is the rebar supply direction. It can be mounted and held freely.

【0028】なお、ローラユニット222のケーシング
222aには、図示しない所定数量のエアシリンダが、
配力筋67の伸延方向である矢印E、F方向に2列をな
し、前記供給装置209のトレイ210のローラ列21
1の配設段数に対応一致した段数だけ上下方向に並ぶ形
で内蔵され設けられている。各エアシリンダは、ロッド
レスタイプのものであり、そのシリンダチューブ内に収
納されたピストンと、該シリンダチューブの外周に嵌合
されたスライダのそれぞれに磁石が嵌着されている。そ
して、任意に選択したポートを介してシリンダチューブ
内に供給したエアの圧により、ピストンをシリンダチュ
ーブの略全長分のストローク動かし、これによってスラ
イダを該ストローク分摺動移動出来るようになってい
る。そして、ローラユニット222のケーシング222
aには、このようにシリンダチューブの略全長に亙る程
大きなスライダの前記ストロークを利用した形で、所定
数量の受けローラ224が、上述したようにケーシング
222aの互いに背向する2側面222M、222Mか
ら矢印G、H方向に突出退入し得るように、コンパクト
に収容されている。また、各ローラユニット222のケ
ーシング222aの下端には、振れ止め治具226が設
けられており、振れ止め治具226には1対のプレート
261、261が、前記ケーシング222aの2側面2
22M、222Mから矢印G又はH方向にそれぞれ突出
退入自在な形の、ユニット位置決め手段として設けられ
ている。当該揺れ止め治具226によって、フープ筋配
筋装置70の各ローラユニット222部分は、既に配筋
された主筋66、66間に吊下セットされた状態におい
て、該主筋66、66にプレート261、261をそれ
ぞれ押し付けるようにして、コンクリート充填空間23
3sにおける各受けローラ224の配置位置を位置決め
調整し得るようになっている。
The casing 222a of the roller unit 222 is provided with a predetermined number of air cylinders (not shown).
The roller row 21 of the tray 210 of the feeding device 209 is formed in two rows in the directions of arrows E and F,
The number of stages corresponding to the number of arrangement stages of 1 is built in and provided in the form of being vertically arranged. Each air cylinder is of a rodless type, and a magnet is fitted to each of a piston housed in the cylinder tube and a slider fitted to the outer periphery of the cylinder tube. The piston is moved by the stroke of substantially the entire length of the cylinder tube by the pressure of the air supplied into the cylinder tube through an arbitrarily selected port, whereby the slider can be slid by the stroke. Then, the casing 222 of the roller unit 222
As described above, a predetermined number of receiving rollers 224 are formed on the two side surfaces 222M, 222M of the casing 222a facing each other, using the above-mentioned stroke of the slider that is as large as substantially the entire length of the cylinder tube. Are housed in a compact manner so that they can protrude and retreat in the directions of arrows G and H. A steadying jig 226 is provided at the lower end of the casing 222a of each roller unit 222. The steadying jig 226 has a pair of plates 261 and 261 on two sides 2 of the casing 222a.
It is provided as a unit positioning means which is capable of protruding and retracting from 22M, 222M in the direction of arrow G or H, respectively. The roller unit 222 of the hoop rebar arrangement device 70 is suspended by the anti-swing jig 226 in a state where the roller unit 222 is suspended between the main rebars 66 already arranged. 261 is pressed against the concrete filling space 23.
The position of each receiving roller 224 in 3s can be adjusted.

【0029】ケーソン50の側壁52及び仕切壁53を
構築するのに使用する各種の装置等は以上のように構成
されているので(なお、前記1対のレール2、2は、コ
ンクリート打設用足場装置3、型枠取付用足場装置1
1、鉄筋組立用足場装置30が共有する構成要素となっ
ている)、これらの装置を利用して、既に構築された前
記各底版51の上に側壁52や仕切壁53をそれぞれ構
築していくには以下のように行う。なお、説明の便宜
上、上述した3つの構築すべきケーソン50は、図の最
も矢印A側のものから矢印B側のものに向かって順にケ
ーソン50A、50B、50Cとして区別する。即ち、
これらケーソン50A、50B、50Cの構築、従って
側壁52及び仕切壁53の構築は、これらケーソン50
A、50B、50Cにおいて設定されている前記区画ユ
ニットKY1〜KY4毎に、区画ユニットKY1、KY
2、KY3、KY4の順に行う。また、各区画ユニット
KY1〜KY4における構築は以下のように行う。
Since the various devices used for constructing the side wall 52 and the partition wall 53 of the caisson 50 are constructed as described above (the pair of rails 2 and 2 are used for concrete casting). Scaffolding device 3, scaffolding device 1 for formwork installation
1, the rebar assembling scaffolding device 30 is a common component), and by using these devices, the side walls 52 and the partition walls 53 are respectively constructed on the respective bottom plates 51 already constructed. Is performed as follows. For convenience of explanation, the three caissons 50 to be constructed are distinguished as caissons 50A, 50B, and 50C in the order from the arrow A side to the arrow B side in the figure. That is,
The construction of these caissons 50A, 50B, 50C, and thus the construction of the side wall 52 and the partition wall 53, is
A, KY1, KY for each of the partition units KY1 to KY4 set in A, 50B, 50C.
2, KY3 and KY4 are performed in this order. The construction in each of the partition units KY1 to KY4 is performed as follows.

【0030】まず、各区画ユニットKY1〜KY4の各
施工区画BJ1〜BJ4毎に、該施工区画施工区画BJ
1〜BJ4に対応した部分に対する鉄筋の配筋を順次行
う。この各施工区画BJ1〜BJ4毎に行う鉄筋の配筋
は、該施工区画BJ1〜BJ4の各ブロックBL1〜B
L3毎に、該ブロックBL1〜BL3に対応した部分に
対する鉄筋の配筋を順次行う形で行う。具体的には、ケ
ーソン50Aにおける施工区画BJ1のブロックBL1
に対する鉄筋の配筋を行い、以降、ケーソン50Aの施
工区画BJ1のブロックBL2、ケーソン50Aの施工
区画BJ1のブロックBL3という順で鉄筋の配筋を行
う。更に、ケーソン50Bの施工区画BJ1のブロック
BL1、BL2、BL3の順で配筋を行い、続いてケー
ソン50Cの施工区画BJ1のブロックBL1、BL
2、BL3の順で配筋を行うことにより区画ユニットK
Y1での鉄筋の配筋を完了させる。その後、区画ユニッ
トKY2、KY3、KY4でも区画ユニットKY1の場
合と同様にして、ケーソン50Aの施工区画BJ2(B
J3、BJ4)のブロックBL1、BL2、BL3、ケ
ーソン50Bの施工区画BJ2(BJ3、BJ4)のブ
ロックBL1、BL2、BL3、ケーソン50Cの施工
区画BJ2(BJ3、BJ4)のブロックBL1、BL
2、BL3の順で配筋を行いケーソン50A、50B、
50Cの全ての配筋を完了させるようにする。
First, for each construction section BJ1 to BJ4 of each of the division units KY1 to KY4, the construction section construction section BJ
Reinforcing the reinforcing bars for the portions corresponding to 1 to BJ4 is sequentially performed. The reinforcing bar arrangement for each of the construction sections BJ1 to BJ4 is made up of the blocks BL1 to B1 of the construction sections BJ1 to BJ4.
For each L3, the reinforcing bars are sequentially arranged for the portions corresponding to the blocks BL1 to BL3. Specifically, block BL1 of construction section BJ1 in caisson 50A
After that, the reinforcement is arranged in the order of the block BL2 of the construction section BJ1 of the caisson 50A and the block BL3 of the construction section BJ1 of the caisson 50A. Further, reinforcement is arranged in the order of the blocks BL1, BL2, BL3 of the construction section BJ1 of the caisson 50B, and subsequently, the blocks BL1, BL of the construction section BJ1 of the caisson 50C.
By arranging reinforcement in the order of 2, BL3, partition unit K
The arrangement of the reinforcing bars in Y1 is completed. Thereafter, in the partition units KY2, KY3, and KY4, similarly to the case of the partition unit KY1, the construction section BJ2 (B
J3, BJ4) blocks BL1, BL2, BL3, caisson 50B construction section BJ2 (BJ3, BJ4) blocks BL1, BL2, BL3, caisson 50C construction section BJ2 (BJ3, BJ4) blocks BL1, BL.
2. Arrange the bars in the order of BL3 and caisson 50A, 50B,
All bar arrangements for 50C are to be completed.

【0031】一方、鉄筋の配筋が完了したブロックBL
1〜BL3毎に、型枠の設置を順次行う。例えば、ケー
ソン50Aの施工区画BJ1のブロックBL1での鉄筋
の配筋が完了し、ケーソン50Aの施工区画BJ1のブ
ロックBL2での鉄筋の配筋に取りかかる際に、ケーソ
ン50Aの施工区画BJ1のブロックBL1での型枠の
設置を開始する。以降、鉄筋の配筋作業が行われている
位置から1ブロック分遅れた形で型枠の設置作業を移行
していく。即ち、ケーソン50Aの施工区画BJ1のブ
ロックBL2、ケーソン50Aの施工区画BJ1のブロ
ックBL3という順で型枠の設置を行う。更に、ケーソ
ン50Bの施工区画BJ1のブロックBL1、BL2、
BL3、ケーソン50Cの施工区画BJ1のブロックB
L1、BL2、BL3の順で型枠の設置を行うことによ
り区画ユニットKY1での型枠の設置を完了させる。そ
の後、区画ユニットKY2、KY3、KY4でも区画ユ
ニットKY1の場合と同様にして、ケーソン50Aの施
工区画BJ2(BJ3、BJ4)のブロックBL1、B
L2、BL3、ケーソン50Bの施工区画BJ2(BJ
3、BJ4)のブロックBL1、BL2、BL3、ケー
ソン50Cの施工区画BJ2(BJ3、BJ4)のブロ
ックBL1、BL2、BL3の順で型枠の設置を行いケ
ーソン50A、50B、50Cの全ての型枠の設置を完
了させるようにする。(なお上述した実施例では、型枠
の設置作業は、鉄筋の配筋作業が行われている位置から
1ブロック分遅れた形で行われていたが、型枠の設置作
業は、鉄筋の配筋作業が行われている位置から2ブロッ
ク分以上遅れた形で行われてもよい。)
On the other hand, the block BL in which the reinforcing bars have been
The setting of the formwork is sequentially performed for each of 1 to BL3. For example, when the reinforcement of the reinforcing bar in the block BL1 of the construction section BJ1 of the caisson 50A is completed and the reinforcement of the reinforcement in the block BL2 of the construction section BJ1 of the caisson 50A is started, the block BL1 of the construction section BJ1 of the caisson 50A is used. Start setting up the formwork in. Thereafter, the installation work of the formwork is shifted in a form delayed by one block from the position where the rebar arrangement work is being performed. That is, the formwork is installed in the order of the block BL2 of the construction section BJ1 of the caisson 50A and the block BL3 of the construction section BJ1 of the caisson 50A. Further, blocks BL1, BL2 of the construction section BJ1 of the caisson 50B,
BL3, block B of construction section BJ1 of caisson 50C
By installing the formwork in the order of L1, BL2, and BL3, the installation of the formwork in the partition unit KY1 is completed. After that, the blocks BL1, B2 of the construction section BJ2 (BJ3, BJ4) of the caisson 50A are also used in the section units KY2, KY3, and KY4 in the same manner as in the case of the section unit KY1.
Construction section BJ2 (BJ2) of L2, BL3, caisson 50B
3, BJ4) block BL1, BL2, BL3, caisson 50C construction section BJ2 (BJ3, BJ4) block BL1, BL2, BL3 block form, and formwork installation in this order, all caisson 50A, 50B, 50C formwork. To complete the installation. (In the above-described embodiment, the formwork installation work was performed one block later than the position where the reinforcement work was performed. However, the formwork installation work was performed with the reinforcement work. (It may be performed in a form delayed by two blocks or more from the position where the muscle work is performed.)

【0032】一方、型枠の設置が完了した施工区画BJ
1〜BJ4毎に、コンクリートの打設を順次行う。例え
ば、ケーソン50Aの施工区画BJ1のブロックBL1
〜BL3での鉄筋の配筋及び型枠の設置が完了し、これ
ら配筋及び型枠設置の作業がケーソン50B(或いはケ
ーソン50C)に移行した時点で、ケーソン50Aの施
工区画BJ1のブロックBL1〜BL3でのコンクリー
トの打設を開始する。以降、型枠の設置作業が行われて
いる施工区画より少なくとも1施工区画分遅れた形でコ
ンクリートの打設作業を移行していく。即ち、ケーソン
50Aの施工区画BJ1、ケーソン50Bの施工区画B
J1、ケーソン50Cの施工区画BJ1の順でコンクリ
ートの打設を行うことにより区画ユニットKY1でのコ
ンクリートの打設を完了させる。その後、区画ユニット
KY2、KY3、KY4でも区画ユニットKY1の場合
と同様にして、ケーソン50Aの施工区画BJ2(BJ
3、BJ4)、ケーソン50Bの施工区画BJ2(BJ
3、BJ4)、ケーソン50Cの施工区画BJ2(BJ
3、BJ4)の順でコンクリートの打設を行いケーソン
50A、50B、50Cの全てのコンクリートの打設を
完了させるようにする。(なお上述した実施例では、コ
ンクリートの打設作業は、型枠の設置作業が行われてい
る位置から1施工区画分遅れた形で行われていたが、コ
ンクリートの打設作業は、型枠の設置作業が行われてい
る位置から2施工区画分以上遅れた形で行われてもよ
い。また、コンクリートの打設作業は、各施工区画BJ
1〜BJ4の各ブロックBL1〜BL3毎に行ってもよ
い。例えば、コンクリートの打設作業は、型枠の設置作
業が行われている位置から少なくとも1ブロック分以上
遅れた形で、ブロックBL1、BL2、BL3という順
序で行われてもよい。)
On the other hand, the construction section BJ in which the
Concrete placement is performed sequentially for each 1 to BJ4. For example, block BL1 of construction section BJ1 of caisson 50A
~ When the reinforcement of the reinforcing bars and the installation of the formwork in BL3 are completed, and the work of the arrangement of these reinforcements and the formwork shifts to the caisson 50B (or the caisson 50C), the blocks BL1 to B1 of the construction section BJ1 of the caisson 50A. Start placing concrete in BL3. Thereafter, the concrete placing operation is shifted in a form delayed by at least one construction section from the construction section in which the formwork is being installed. That is, the construction section BJ1 of the caisson 50A and the construction section B of the caisson 50B
The concrete placement in the section unit KY1 is completed by placing concrete in the order of J1 and the construction section BJ1 of the caisson 50C. Thereafter, in the partition units KY2, KY3, and KY4, similarly to the case of the partition unit KY1, the construction section BJ2 (BJ2) of the caisson 50A is constructed.
3, BJ4), construction section BJ2 (BJ) of caisson 50B
3, BJ4), construction section BJ2 (BJ) of caisson 50C
3, BJ4), and the concrete is cast in all caisson 50A, 50B, 50C. (In the above-described embodiment, the concrete placing operation was performed with a delay of one construction section from the position where the formwork was being installed. May be carried out at least two construction sections later than the position where the installation work is being performed.
This may be performed for each of the blocks BL1 to BL3 of 1 to BJ4. For example, the concrete placing operation may be performed in the order of the blocks BL1, BL2, and BL3 with a delay of at least one block or more from the position where the formwork is being installed. )

【0033】以上のようにケーソン50A、50B、5
0Cの全てのコンクリートの打設を完了させるように各
作業を行って、打設されたコンクリートを固結させるこ
とによりこれらケーソン50A、50B、50Cの構築
が完了する。また以下、鉄筋の配筋作業、型枠の設置作
業、コンクリートの打設作業についての詳細な内容を説
明する。
As described above, the caisson 50A, 50B, 5
Each operation is performed so as to complete the placement of all concrete at 0C, and the caisson 50A, 50B, 50C is completed by consolidating the placed concrete. Hereinafter, detailed contents of the rebar arrangement work, the formwork installation work, and the concrete placement work will be described.

【0034】各ブロックBL1〜BL3における鉄筋の
配筋作業は、図1及び図4に示すように(なお、図1及
び図4では施工区画BJ3のブロックBL2についての
配筋作業を示しているが、以下に説明する配筋の方法
は、その他の施工区画のその他のブロックにおいても同
様である)、該ブロックBLn(nは1以上3以下の整
数)において、途中まで構築されている側壁52及び仕
切壁53の鉄筋ユニット65(即ち、上下方向の主筋6
6及び水平方向の配力筋67からなるもの)の上端側に
続けて(或いは構築されている底版51の主筋等の上端
側に続けて)、該鉄筋ユニット65を更に上方に延長構
築する形(或いは底版51の上方に鉄筋ユニット65を
構築する形)で行なわれる。具体的には、まず鉄筋組立
用足場装置30を支持台車31、31を介してレール
2、2上で移動させ、該鉄筋組立用足場装置30のメイ
ンステージ35が、鉄筋の配筋作業を行なおうとしてい
る所定のブロックBLnの真上に位置するように、従っ
て該ブロックBLnを覆うように支持台車31、31を
配置させる。次いで、複数の昇降装置33を駆動させ
て、これら昇降装置33を複数の支持ポール32に沿っ
て上下移動させることにより、図9に示すように、メイ
ンステージ35を、鉄筋の配筋作業を行なおうとしてい
る前記ブロックBLnの下側の既に構築されている側壁
52及び仕切壁53(或いは底版51)の構築上端57
のやや上方に配置させる。この配置により、該構築上端
57から上方に突出していた主筋66(即ち、既に構築
されている側壁52及び仕切壁53の鉄筋ユニット65
を構築している主筋、或いは底版51の主筋)の上端部
66aは、図9及び図10に示すように、メインステー
ジ35の鉄筋挿通間隙36に挿入貫通した状態になる。
なお、各上端部66aには主筋66、66どうしを直列
に接続するためのカップラ66bが装着されている。
As shown in FIGS. 1 and 4, the rebar arrangement work of the reinforcing bars in each of the blocks BL 1 to BL 3 is shown in FIG. 1 (FIG. 1 and FIG. 4 show the arrangement work of the block BL 2 in the construction section BJ 3. The same applies to the arrangement method of the reinforcing bars described below for other blocks in other construction sections.) In the block BLn (n is an integer of 1 to 3), the side walls 52 and The reinforcing bar unit 65 of the partition wall 53 (that is, the main reinforcing bar 6 in the vertical direction)
6 and the horizontal reinforcing bars 67) (or following the upper end of the main reinforcement or the like of the bottom slab 51 being constructed) to extend the reinforcing bar unit 65 further upward. (Or, a reinforcing bar unit 65 is constructed above the bottom slab 51). Specifically, first, the rebar assembling scaffolding device 30 is moved on the rails 2 and 2 via the supporting carts 31 and 31, and the main stage 35 of the rebar assembling scaffolding device 30 performs a reinforcing bar rebar work. The supporting carts 31, 31 are arranged so as to be located right above the predetermined block BLn to be closed, and thus to cover the block BLn. Next, by driving the plurality of elevating devices 33 and moving the elevating devices 33 up and down along the plurality of support poles 32, as shown in FIG. The upper end 57 of the side wall 52 and the partition wall 53 (or the bottom slab 51) that have already been constructed under the block BLn to be under construction.
Place it slightly above. With this arrangement, the main reinforcement 66 projecting upward from the construction upper end 57 (that is, the reinforcement unit 65 of the already constructed side wall 52 and partition wall 53).
9 or 10, the upper end 66a of the main reinforcement or the main reinforcement of the bottom slab 51 is inserted and penetrated into the rebar insertion gap 36 of the main stage 35, as shown in FIGS.
A coupler 66b for connecting the main bars 66, 66 in series is mounted on each upper end 66a.

【0035】次いで、適宜なクレーン60で一点吊りし
た前記吊下げ治具123を介して、図1及び図9及び図
11に示すように、複数本の主筋66(図では5本)を
一度に揚重し、これら主筋66の下端側を、対応する既
設の主筋66のやや上方に対応整合させて配置させる。
この際、これら既設の主筋66が挿入されているメイン
ステージ35の鉄筋挿通間隙36の上方に、各主筋66
を配筋すべき所定の配筋位置と1対1で対応する形で、
上ステージ39の鉄筋挿入穴43が配置されているの
で、揚重吊下された前記5本の主筋66は、対応する上
ステージ39の鉄筋挿入穴43をそれぞれ通過する形
で、それぞれ対応する既設の主筋66のやや上方に配置
される。つまり、これら5本の主筋66の位置決め配置
は、上ステージ39における対応する鉄筋挿入穴43を
それぞれ挿入通過させることにより自動的に行なわれる
ので便利である。その後、メインステージ35に待機し
ていた作業員が、吊下げ治具123の治具本体125
を、図11に示す接続箇所J1を中心に垂直面内で天秤
のように回動させる形で、吊下された各主筋66を1本
づつ順次下方に引っ張り降下させることにより(例え
ば、吊下距離Q1で吊下された主筋66、吊下距離Q5
で吊下された主筋66、吊下距離Q2で吊下された主筋
66、吊下距離Q4で吊下された主筋66、吊下距離Q
3で吊下された主筋66の順に引っ張る)、該主筋66
を対応する既存の主筋66の上端部66aに順次到達さ
せると共に、該到達した主筋66を対応する主筋66の
上端部66aにカップラ66bを介して順次接続する形
で建込み作業を行なう。即ち、一点吊りされ得る治具本
体125は接続箇所J1を中心に垂直面内で回動できる
ため、一度に揚重吊下された複数の主筋66のうち、既
設の主筋66の上端部66aに位置合わせして接続すべ
き主筋66を1本づつ順次下方に引っ張り降下させ、従
って既設の主筋66と未接続状態の残りの主筋66は空
中で待機させることが可能となる。つまり、一度に揚重
吊下された複数の主筋66のうち、幾つかの主筋66を
既設の主筋66の上端部66aに位置合わせ(或いは、
接続)し、他の幾つかの鉄筋を空中で待機させることが
容易になる。つまり、既設の主筋66の上端部66aで
の位置合わせや接合作業が順次行えるので、これら位置
合わせや接合作業を行う作業員は極力小人数で済む。ま
た、一度に複数の主筋66を揚重することができるよう
になるので、クレーン60の使用時間を短縮させ、作業
の効率を向上させることができる。更に、主筋66の微
妙な位置合わせ作業をクレーン60の上下動作ではな
く、該主筋66を手などで下方に引っ張り降下させる動
作によって行うので、細かい位置合わせが容易になる。
以降、更に別の5本の主筋66を吊下げ治具123を介
して揚重し、これら主筋66を対応する既設の主筋66
の上端部66aに位置合わせし、両者を接合する一連の
作業を繰り返して、当該ブロックBLnにおける全ての
側壁52及び仕切壁53(或いは底版51)からの主筋
66の上方に新たな主筋66を建て込む。なお、本実施
例では、1本の主筋66の長さは、図1等に示すように
2施工区画分の高さに相当する長さである。従って、本
実施例における鉄筋の配筋は、施工区画BJ1、BJ3
でのみ行うようにし、施工区画BJ2、BJ4では以下
に説明する配力筋67の配筋のみ行う。また、その他の
実施例として、1本の主筋66の長さを1施工区画分の
高さに相当する長さにしてもよいし、3施工区画分以上
の高さに相当する長さにしてもよい。
Then, as shown in FIGS. 1, 9 and 11, a plurality of main bars 66 (five in the figure) are simultaneously connected through the hanging jig 123 suspended at one point by an appropriate crane 60. Lifting is performed, and the lower ends of these main reinforcements 66 are arranged so as to correspond to and slightly above the corresponding existing main reinforcements 66.
At this time, each of the main reinforcements 66 is placed above the rebar insertion gap 36 of the main stage 35 into which the existing main reinforcements 66 are inserted.
In a form that corresponds one-to-one with a predetermined reinforcing arrangement position where
Since the rebar insertion holes 43 of the upper stage 39 are arranged, the five main bars 66 suspended by lifting pass through the corresponding rebar insertion holes 43 of the upper stage 39, respectively, so as to pass through the corresponding existing reinforcing bars. Is arranged slightly above the main streak 66. In other words, the positioning of these five main bars 66 is automatically performed by inserting and passing through the corresponding reinforcing bar insertion holes 43 in the upper stage 39, which is convenient. Thereafter, the worker waiting on the main stage 35 moves the jig body 125 of the hanging jig 123
11 is pulled down one by one in such a manner as to rotate like a balance in a vertical plane around a connection point J1 shown in FIG. Main bar 66 suspended at distance Q1, suspension distance Q5
The main reinforcement 66 suspended at the suspension distance Q2, the main reinforcement 66 suspended at the suspension distance Q4, the main reinforcement 66 suspended at the suspension distance Q4, the suspension distance Q
3), the main bars 66 suspended in the order of
Are sequentially reached to the corresponding upper ends 66a of the existing main bars 66, and the erected work is performed by sequentially connecting the reached main bars 66 to the upper ends 66a of the corresponding main bars 66 via couplers 66b. That is, since the jig body 125 that can be hung at one point can rotate in a vertical plane around the connection point J1, the jig body 125 at the upper end 66a of the existing main streaks 66 among the plurality of main streaks 66 lifted and suspended at one time. The main bars 66 to be aligned and connected are pulled down one by one sequentially, so that the existing main bars 66 and the remaining main bars 66 not connected to the main bars 66 can stand by in the air. That is, of the plurality of main bars 66 lifted and suspended at one time, some main bars 66 are aligned with the upper end 66a of the existing main bar 66 (or
Connection) and make it easier to have some other rebar standing in the air. That is, since the alignment and the joining work at the upper end 66a of the existing main bar 66 can be sequentially performed, the number of the workers performing the alignment and the joining work can be minimized. Further, since the plurality of main bars 66 can be lifted at one time, the use time of the crane 60 can be reduced, and the work efficiency can be improved. Further, since the fine positioning of the main bar 66 is performed not by the vertical movement of the crane 60 but by the operation of pulling down the main bar 66 by hand or the like, fine positioning is facilitated.
Thereafter, another five main reinforcements 66 are lifted via the hanging jig 123, and these main reinforcements 66 are connected to the existing main reinforcements 66.
A new main reinforcement 66 is built above the main reinforcement 66 from all the side walls 52 and the partition wall 53 (or the bottom plate 51) in the block BLn by aligning with the upper end 66a and joining the two. Put in. In this embodiment, the length of one main bar 66 is a length corresponding to the height of two construction sections as shown in FIG. Therefore, the reinforcing bar arrangement in this embodiment is the construction section BJ1, BJ3
And in the construction sections BJ2 and BJ4, only the reinforcing bars 67 described below are provided. Further, as another embodiment, the length of one main bar 66 may be a length corresponding to the height of one construction section, or may be a length corresponding to the height of three construction sections or more. Is also good.

【0036】次いで、配力筋67の配筋を行う。即ち、
適宜なクレーン60で、ローラ列211に配力筋67を
保持した供給装置209を、図1及び図12に示すよう
に、フック210aを介して揚重吊下し、上述したよう
に建て込まれた主筋66のうち配力筋67を配筋しよう
としているメインステージ35上方の所定の位置に対応
して該供給装置209のトレイ210を配置させる。こ
の状態で、保持されていた配力筋67を駆動機構212
により、前記主筋66のうち、配力筋67を配筋しよう
としている所定の位置に向けて移動運搬する。一方、上
述した配力筋67を配筋しようとしている所定の位置付
近には、フープ筋配筋装置70を配置しておく。従っ
て、供給装置209から移動運搬されて来た配力筋67
は、該フープ筋配筋装置70の受けローラ224に、該
配力筋67を横方向に伸延させる形で供給される。該受
けローラ224は、その回動動作を介して、供給されて
きた配力筋67を保持すると共に、これらを水平方向に
移動させて所定の配筋位置Pnに導く。この際、受けロ
ーラ224上の配力筋67は該受けローラ224を介し
て水平方向に移動出来るので、これら配力筋67の位置
決めは簡単かつ正確になる。その後、該受けローラ22
4により位置決め保持された配力筋67を、既設の主筋
66に結束接続する。更にこの後、受けローラ224を
ケーシング222a内に退入させ、吊り桁221を介し
て複数のローラユニット222を上下移動させれば、受
けローラ224を新たな配筋位置Pnに直ちに配置させ
ることが出来る。従って、短時間のうちに能率的に配筋
作業を行うことが出来る。
Next, the reinforcing bars 67 are arranged. That is,
As shown in FIGS. 1 and 12, the supply device 209 holding the force bars 67 on the roller row 211 is lifted and suspended via the hook 210a by an appropriate crane 60, and is built as described above. The tray 210 of the supply device 209 is arranged corresponding to a predetermined position above the main stage 35 where the distribution muscle 67 of the main reinforcement 66 is to be arranged. In this state, the held force distribution muscle 67 is moved to the drive mechanism 212.
Thus, the main muscles 66 are moved and transported to a predetermined position where the force distribution muscles 67 are to be arranged. On the other hand, a hoop muscle arrangement device 70 is arranged in the vicinity of a predetermined position where the above-described force arrangement muscle 67 is to be arranged. Accordingly, the distribution muscles 67 that have been moved and transported from the supply device 209.
Is supplied to the receiving roller 224 of the hoop muscle arrangement device 70 in such a manner that the force distribution muscle 67 extends in the lateral direction. The receiving roller 224 holds the supplied force distribution muscles 67 through its rotation operation, and moves them in the horizontal direction to guide them to a predetermined reinforcement arrangement position Pn. At this time, since the force distribution muscles 67 on the receiving roller 224 can move in the horizontal direction via the receiving roller 224, the positioning of these force distribution muscles 67 becomes simple and accurate. Then, the receiving roller 22
The power distribution lines 67 positioned and held by the step 4 are bound and connected to the existing main lines 66. Thereafter, the receiving roller 224 is retracted into the casing 222a, and the plurality of roller units 222 are moved up and down via the suspension girders 221, so that the receiving roller 224 can be immediately disposed at the new bar arrangement position Pn. I can do it. Therefore, it is possible to efficiently perform the reinforcing work in a short time.

【0037】以降、配力筋67を供給し終えた供給装置
209(或いは別の供給装置209)に、更に別の配力
筋67を保持して揚重吊下し、上述したように建て込ま
れた主筋66のうち、配力筋67を配筋しようとしてい
るメインステージ35上方の更に別の位置に対応して該
供給装置209のトレイ210を配置させ、配力筋67
を配筋しようとしている前記更に別の位置に向けて配力
筋67を移動運搬する。また一方、前記更に別の位置に
もフープ筋配筋装置70を予め配置しておき、前記供給
装置209から移動運搬されて来た配力筋67を該フー
プ筋配筋装置70を介して所定の配筋位置Pnに位置決
めする。その後、位置決め保持された配力筋67を、既
設の主筋66に結束接続する。この一連の作業を繰返す
ことにより、該ブロックBLnに建て込まれた主筋66
に配力筋67が接続され、これにより、構築途中の側壁
52及び仕切壁53(或いは底版51)の上方に鉄筋ユ
ニット65が延長構築された。以上でブロックBLnに
おける鉄筋の配筋作業が完了した。なお、鉄筋の配筋作
業を次のブロックBLnに移行させる際には、鉄筋組立
用足場装置30を次のブロックBLnに移動設置させ
る。この際、昇降装置33によりメインステージ35及
び上ステージ39を上昇させ、これらステージ35、3
9を、これらに貫通していた主筋66から外した後、支
持台車31、31を介して鉄筋組立用足場装置30全体
を移動させるようにすればよい。
Thereafter, the supply device 209 (or another supply device 209) which has completed supplying the force distribution muscles 67 is further lifted and suspended while holding another force distribution muscle 67 as described above. The tray 210 of the supply device 209 is arranged at a further position above the main stage 35 where the distribution muscles 67 are to be arranged, of the main reinforcements 66, and the distribution muscles 67 are arranged.
Is moved and conveyed toward the further position where the reinforcement is to be arranged. On the other hand, the hoop rebar arrangement device 70 is arranged in advance at the further position, and the force receptors 67 which are moved and conveyed from the supply device 209 are predetermined via the hoop rebar arrangement device 70. Is positioned at the bar arrangement position Pn. Thereafter, the positioning and holding force distribution muscle 67 is bound and connected to the existing main muscle 66. By repeating this series of operations, the main reinforcement 66 built in the block BLn
A reinforcing bar unit 65 is extended above the side wall 52 and the partition wall 53 (or the bottom slab 51) during construction. Thus, the rebar arrangement work of the reinforcing bar in the block BLn is completed. When the rebar arrangement work is shifted to the next block BLn, the rebar assembling scaffolding device 30 is moved and installed to the next block BLn. At this time, the main stage 35 and the upper stage 39 are lifted by the lifting device 33, and these stages 35, 3
After removing 9 from the main reinforcement 66 penetrating them, the entire rebar assembling scaffolding device 30 may be moved via the supporting carts 31, 31.

【0038】以上のように、鉄筋組立用足場装置30を
用いると、足場ユニット34の足場面35b及び上足場
面39bを足場として利用して、主筋66及び配力筋6
7の配筋・組立を行うことができる。また、鉄筋配筋施
工位置が上方に移動し、これに伴って足場を上方に移動
させる際には、足場ユニット34を昇降移動させればよ
く、或いは、鉄筋配筋施工位置が横方向に移動し、これ
に伴って足場を横方向に移動させる際には、支持台車3
1、31を介して足場ユニット34を横方向に移動させ
ればよい。つまり、足場の設置は簡便に行われる。な
お、足場ユニット34を次の鉄筋配筋施工位置に移動さ
せることにより、施工が終わった鉄筋配筋施工位置から
足場ユニット34が撤去されることになるので、足場の
撤去は、その設置とともに簡便に行われる。
As described above, when the rebar assembling scaffolding device 30 is used, the main rebar 66 and the distributing muscle 6 are used by using the foot scene 35b and the upper foot scene 39b of the scaffold unit 34 as scaffolds.
7 can be arranged and assembled. In addition, when the reinforcing bar arrangement position moves upward and the scaffold is moved upward accordingly, the scaffold unit 34 may be moved up and down, or the reinforcing bar arrangement position moves in the horizontal direction. However, when the scaffold is moved laterally with this, the supporting cart 3
What is necessary is just to move the scaffolding unit 34 in the horizontal direction via 1 and 31. That is, the installation of the scaffold is performed easily. In addition, by moving the scaffolding unit 34 to the next reinforcing bar rebar construction position, the scaffolding unit 34 is removed from the rebar reinforcing bar construction position where the construction has been completed. Done in

【0039】次に、型枠の設置作業について説明する。
各ブロックBL1〜BL3における型枠の設置作業は、
図1及び図4及び図7及び図8に示すように(なお、図
1では施工区画BJ3のブロックBL1について、図7
及び図8では施工区画BJ2のブロックBL1について
の型枠の設置作業を示しているが、以下に説明する型枠
設置の方法は、その他の施工区画のその他のブロックに
おいても同様である)、該ブロックBLn(nは1以上
3以下の整数)において構築されている鉄筋ユニット6
5に対して型枠を取り付ける形で行なわれる。具体的に
は、まず型枠取付用足場装置11を支持台車12、12
を介してレール2、2上で移動させ、該型枠取付用足場
装置11の梁フレーム26が、型枠の設置作業を行なお
うとしている所定のブロックBLnの真上に位置するよ
うに支持台車12、12を配置させる。次いで、揚重装
置ユニット22を介して型枠吊下治具23を降下させ、
該型枠吊下治具23にそのフック23aを介して型枠2
5を吊下させる。その後、更に揚重装置ユニット22を
介して型枠吊下治具23と共に型枠25を、取り付ける
べき高さレベルまで上昇させ、そのまま駆動ユニット2
1を介して吊下装置19全体を矢印C、D方向に移動駆
動させることにより、吊下した型枠25を取付位置に位
置決めする(この際、支持台車12、12を介して型枠
取付用足場装置11全体を矢印A、B方向に移動させ
て、吊下した型枠25の矢印A、B方向における位置決
めを行なうようにしてもよい)。なお、型枠設置位置の
下方、即ち1つ下の施工区画において、既に設置されて
いた型枠25を取外し、その上方の施工区画の位置にお
いて転用して設置する場合には、まず揚重装置ユニット
22を介して型枠吊下治具23を既に設置されている型
枠25の位置まで降下させ、該型枠吊下治具23にその
フック23aを介して設置していた型枠25を吊下させ
ると共に該型枠25を躯体から取り外す。その後、揚重
装置ユニット22を介して型枠吊下治具23と共に型枠
25を、取り付けるべき高さレベルまで上昇させ、その
まま駆動ユニット21を介して吊下装置19全体を矢印
C、D方向に移動駆動させることにより、吊下した型枠
25を取付位置に位置決めする。以上の作業を繰返す形
で前記ブロックBLnにおける鉄筋ユニット65に対す
る全ての型枠25を取り付けて、該ブロックBLnにお
ける型枠の設置作業を完了する。なお、型枠の設置作業
の最中には、型枠25の取付位置(或いは型枠25の取
外位置)にあわせて、揚重装置ユニット27を介してゴ
ンドラ足場29を上下移動させて配置し、該ゴンドラ足
場29を介して型枠25の作業を行なうようにする。
Next, the work of installing the formwork will be described.
The installation work of the formwork in each of the blocks BL1 to BL3
As shown in FIGS. 1 and 4 and FIGS. 7 and 8 (in FIG. 1, the block BL1 of the construction section BJ3 is
And FIG. 8 shows the work of installing the formwork for the block BL1 of the construction section BJ2, but the method of setting the formwork described below is the same for other blocks of the other construction sections). Reinforcing bar unit 6 constructed in block BLn (n is an integer of 1 to 3)
5 is performed by attaching a formwork. Specifically, first, the formwork mounting scaffolding device 11 is connected to the support carts 12, 12.
On the rails 2 and 2 so that the beam frame 26 of the formwork mounting scaffolding device 11 is positioned directly above a predetermined block BLn on which the formwork installation operation is to be performed. The carts 12 and 12 are arranged. Next, the form hanging jig 23 is lowered via the lifting device unit 22,
The form 2 is attached to the form suspending jig 23 via the hook 23a.
5 is suspended. Thereafter, the mold 25 together with the mold suspending jig 23 is further raised via the lifting device unit 22 to a height level to be mounted, and the drive unit 2 is left as it is.
1 to position the suspended formwork 25 at the mounting position by moving and driving the entire suspension apparatus 19 in the directions of arrows C and D. The entire scaffolding device 11 may be moved in the directions of arrows A and B to position the suspended formwork 25 in the directions of arrows A and B). In addition, when removing the formwork 25 already installed in the construction section below the formwork installation position, that is, one work section below, and diverting and installing it in the position of the construction section above it, first, the lifting device The form hanging jig 23 is lowered to the position of the formwork 25 already installed via the unit 22, and the formwork 25 installed on the form suspending jig 23 via the hook 23 a is removed. At the same time, the form 25 is detached from the frame. Thereafter, the formwork 25 is raised to a height level to be mounted together with the form suspending jig 23 via the lifting device unit 22, and the entire suspending device 19 is directly moved through the drive unit 21 in the directions of arrows C and D. , The suspended formwork 25 is positioned at the mounting position. By repeating the above operation, all the molds 25 are attached to the reinforcing bar units 65 in the block BLn, and the work of installing the mold in the block BLn is completed. During the installation work of the formwork, the gondola scaffold 29 is moved up and down via the lifting device unit 27 in accordance with the mounting position of the formwork 25 (or the removal position of the formwork 25). Then, the work of the formwork 25 is performed via the gondola scaffold 29.

【0040】次に、コンクリートの打設作業について説
明する。各施工区画BJ1〜BJ4におけるコンクリー
トの打設作業は、図4乃至図6に示すように(なお、図
4乃至図6では施工区画BJ2のコンクリートの打設作
業を示しているが、以下に説明するコンクリートの打設
の方法は、その他の施工区画においても同様である)、
該施工区画BJn(nは1以上4以下の整数)において
設置されている型枠25により囲まれたコンクリート充
填空間233sにコンクリートを打設充填する形で行な
われる。具体的には、まずコンクリート打設用足場装置
3を支持台車5、5を介してレール2、2上で移動さ
せ、該コンクリート打設用足場装置3の梁フレーム7
が、コンクリートの打設作業を行なおうとしている所定
の施工区画BJnの真上に位置するように支持台車5、
5を配置させる。なお、設置された型枠25の上端部付
近、従ってコンクリートの打設位置にあわせて、揚重装
置ユニット9を介してゴンドラ足場10を上下移動させ
て配置し、該ゴンドラ足場10を介してコンクリート打
設の作業を行うようにする。次いで、ケーソン製造ヤー
ド1に配備されている適宜なコンクリート供給装置62
(コンクリート圧送ポンプ車など)のコンクリート供給
管62aの先端部をゴンドラ足場10を介して、型枠2
5に囲まれたコンクリート充填空間233sに固定し、
コンクリートを該コンクリート充填空間233sに充填
させる。前記鉄筋ユニット65を埋没させる形で該コン
クリート充填空間233s全体にコンクリートを充填さ
せることにより、該施工区画BJnにおけるコンクリー
トの打設作業を完了する。
Next, the concrete placing operation will be described. The concrete placing work in each construction section BJ1 to BJ4 is shown in FIG. 4 to FIG. 6 (the concrete placing work in the construction section BJ2 is shown in FIG. 4 to FIG. The method of placing concrete is the same in other construction sections),
The concrete filling space 233s surrounded by the formwork 25 installed in the construction section BJn (n is an integer of 1 or more and 4 or less) is cast and filled with concrete. Specifically, first, the concrete placement scaffolding device 3 is moved on the rails 2 and 2 via the supporting carts 5 and 5, and the beam frame 7 of the concrete placement scaffolding device 3 is moved.
The support trolley 5, so that it is located right above the predetermined construction section BJn where the concrete placing operation is to be performed.
5 is arranged. In addition, the gondola scaffolding 10 is vertically moved and arranged via the lifting device unit 9 in accordance with the vicinity of the upper end portion of the installed formwork 25, that is, the placement position of the concrete. Do the casting work. Next, an appropriate concrete supply device 62 provided in the caisson manufacturing yard 1 is used.
The end of the concrete supply pipe 62a of a concrete pump (such as a concrete pumping pump) is connected to the formwork 2 via the gondola scaffold 10.
5 fixed to the concrete filling space 233s surrounded by
Concrete is filled in the concrete filling space 233s. By filling the entire concrete filling space 233s with concrete so as to bury the reinforcing bar unit 65, the concrete placing operation in the construction section BJn is completed.

【0041】なお、上述した実施例はケーソン50を3
つ構築する例であったが、本発明ではケーソン50を1
つ又は2つだけ構築する場合にも適用でき、また4つ以
上のケーソン50を構築する場合にも適用できる。つま
り、ケーソン構築ヤード1aの個数は3個に限定されず
任意でよい。
In the above-described embodiment, the caisson 50 is
In the present invention, one caisson 50 is used.
The present invention can be applied to the case where only one or two caisson 50 are constructed, and also applicable to the case where four or more caissons 50 are constructed. That is, the number of the caisson building yards 1a is not limited to three and may be arbitrary.

【0042】また別の実施例として、前記鉄筋組立用足
場装置30において、各レール2上の支持台車31が、
これら支持台車31を各レール2に沿って同期的に移動
駆動させ得る同期移動駆動手段を備えていてもよい。例
えば、同期移動駆動手段の一例である同期移動駆動手段
31aは、図4に示すように、各支持台車31にそれぞ
れ内蔵された形で駆動装置(図示せず)を有しており、
各駆動装置は、各支持台車31をレール2に沿って移動
駆動し得る性能的に同等な公知のモータなどからなって
いる。また、これら駆動装置は、所定の同期駆動制御装
置31b(二点鎖線で図示)に接続されている。同期駆
動制御装置31bには、支持台車31、31の移動駆動
の開始・停止の命令を入力できるようになっており、こ
の開始・停止の命令を受けて同期駆動制御装置31b
は、前記各駆動装置を同期的に運転・停止させるように
なっている。これにより、鉄筋組立用足場装置30を横
方向に移動させる際には、支持台車31、31が各レー
ル2に沿って同期的に移動駆動されるので、2つの支持
台車31、31の移動のずれなどにより、足場ユニット
34にねじれ等の不都合な力が作用することが極力防止
され安全性が高い。
As another embodiment, in the scaffolding apparatus 30 for assembling a reinforcing bar, the supporting cart 31 on each rail 2 is
Synchronous movement driving means which can synchronously move and drive these support carts 31 along each rail 2 may be provided. For example, as shown in FIG. 4, the synchronous movement driving means 31a, which is an example of the synchronous movement driving means, includes a driving device (not shown) in a form incorporated in each support cart 31, respectively.
Each drive device is composed of a well-known motor or the like capable of moving and driving each support cart 31 along the rail 2. These driving devices are connected to a predetermined synchronous driving control device 31b (shown by a two-dot chain line). The synchronous drive control device 31b can input a command to start and stop the movement of the support carts 31 and 31. The synchronous drive control device 31b receives the command to start and stop.
Is configured to start and stop the driving devices synchronously. Accordingly, when the rebar assembling scaffolding device 30 is moved in the lateral direction, the support carts 31, 31 are synchronously moved and driven along the respective rails 2, so that the movement of the two support carts 31, 31 is prevented. An adverse force such as twisting is prevented from acting on the scaffolding unit 34 due to displacement or the like, so that safety is high.

【0043】[0043]

【発明の効果】以上説明したように本発明のうち第1の
発明は、上下方向の複数の主筋66等の主筋及び横方向
の配力筋67等の配力筋からなる鉄筋ユニット65等の
鉄筋ユニットを有したケーソン50等のケーソンを構築
する際に使用する鉄筋配筋足場装置において、レール
2、2等の1対のレールを有し、前記1対のレール間
に、ケーソン構築ヤード1a等の複数のケーソン構築ヤ
ードを、これらレールの伸延方向に沿って配列して設
け、前記各レール上に、該レールに沿って所定の移動方
向に移動自在な支持台車31等の移動手段を設け、前記
各移動手段に支持ポール32等の支持部材をそれぞれ立
設し、前記支持部材に足場ユニット34等の足場ユニッ
トを、これら支持部材間を架け渡す形で、かつこれら支
持部材に対して上下方向に昇降移動・位置決め自在に設
け、前記足場ユニットは、上面に水平な足場面35b等
の第1の足場面が形成されたメインステージ35等の第
1の足場部材及び、上面に水平な上足場面39b等の第
2の足場面が形成された上ステージ39等の第2の足場
部材を、上下層状に配置して有し、前記第1の足場部材
に、鉄筋ユニットが上下に貫通通過し得る鉄筋挿通間隙
36等の鉄筋ユニット挿通間隙を、該第1の足場部材を
上下に貫通する形で形成し、前記第2の足場部材に、上
下方向の主筋が貫通し得る複数の鉄筋配置穴43等の主
筋貫通穴を、該第2の足場部材を上下に貫通する形で、
かつ前記鉄筋ユニット挿通間隙の上方に対応配置した形
で形成して構成されるので、各ケーソン構築ヤードでケ
ーソンを構築するには、各移動手段を移動させ、足場ユ
ニットを昇降移動させて、該足場ユニットを構築すべき
ケーソンの鉄筋配筋施工位置に対して位置決めし、該足
場ユニットの第1及び第2の足場面を足場として、主筋
及び配力筋の配筋・組立を行う。また、鉄筋配筋施工位
置が上方に移動し、これに伴って足場を上方に移動させ
る際には、足場ユニットを昇降移動させればよく、或い
は、鉄筋配筋施工位置が横方向に移動し、これに伴って
足場を横方向に移動させる際には、移動手段を介して足
場ユニットを横方向に移動させればよい。つまり、足場
の設置は簡便に行われる。なお、足場ユニットを次の鉄
筋配筋施工位置に移動させることにより、施工が終わっ
た鉄筋配筋施工位置から足場ユニットが撤去されること
になるので、足場の撤去は、その設置とともに簡便に行
われる。また、上下方向の主筋を建込む際には、第1及
び第2の足場部材の、鉄筋ユニット挿通間隙と主筋貫通
穴を、ガイドとして利用しながら主筋の位置決め等を行
えるので、配筋作業が容易になる。なお、第1の足場部
材の鉄筋ユニット挿通間隙は、主筋と配力筋からなる鉄
筋ユニットが上下に貫通通過できるようになっているの
で、第1及び第2の足場部材の間で主筋に対する配力筋
の設置まで行える。つまり、足場ユニットを撤去する際
には、第1の足場部材の鉄筋ユニット挿通間隙を介し
て、施工完了した鉄筋ユニットを下方に通過させる形
で、該足場ユニットを上昇させ、該鉄筋ユニットから取
り外すことができる。
As described above, according to the first aspect of the present invention, the rebar unit 65 and the like comprising the main rebars such as a plurality of main rebars 66 in the vertical direction and the distributing bars such as the lateral distributing bars 67 are provided. A reinforcing bar scaffolding device used for constructing a caisson such as a caisson 50 having a reinforcing bar unit has a pair of rails such as rails 2 and 2 and a caisson building yard 1a between the pair of rails. And a plurality of caisson construction yards are arranged along the direction of extension of these rails, and on each of the rails, moving means such as a support cart 31 that is movable in a predetermined moving direction along the rail is provided. A support member such as a support pole 32 is erected on each of the moving means, and a scaffold unit such as a scaffold unit 34 is laid on the support member in such a manner that the support member is bridged between these support members. direction The scaffold unit is provided so as to be able to move up and down and positioned freely. The scaffold unit includes a first scaffold member such as the main stage 35 on which a first foot scene such as a horizontal foot scene 35b is formed on an upper surface, and an upper foot scene that is horizontal on an upper surface. Second scaffold members such as the upper stage 39 having a second scaffold scene formed thereon such as 39b are arranged in upper and lower layers, and a reinforcing bar unit can pass vertically through the first scaffold members. A plurality of rebar arrangement holes such as a rebar insertion gap 36 are formed so as to penetrate the first scaffold member up and down, and the second scaffold member has a plurality of rebar arrangement holes 43 through which main bars in the vertical direction can penetrate. Etc. in a form penetrating the second scaffold member up and down,
And since it is formed and formed in a form corresponding to the upper part of the reinforcing bar unit insertion gap, in order to construct a caisson in each caisson construction yard, each moving means is moved, and the scaffold unit is moved up and down. The scaffold unit is positioned with respect to the caisson reinforcing bar arrangement position to be constructed, and the first and second foot scenes of the scaffold unit are used as scaffolds to arrange and assemble the main bars and the distributing bars. In addition, when the reinforcing bar arrangement position moves upward and the scaffold is moved upward with this, the scaffold unit may be moved up and down, or the reinforcing bar arrangement position moves laterally. Accordingly, when the scaffold is moved in the lateral direction, the scaffold unit may be moved in the lateral direction via the moving means. That is, the installation of the scaffold is performed easily. By moving the scaffolding unit to the next reinforcing bar construction position, the scaffolding unit will be removed from the reinforcing bar construction position where construction has been completed. Will be In addition, when the vertical main reinforcement is erected, positioning of the main reinforcement can be performed while using the reinforcing bar unit insertion gap and the main reinforcement through hole of the first and second scaffold members as guides. It will be easier. In addition, since the reinforcing bar unit insertion gap of the first scaffold member is configured so that the reinforcing bar unit including the main reinforcing bar and the distribution bar can pass through vertically, the distribution of the reinforcing bar unit between the first and second scaffold members relative to the main reinforcing bar is performed. You can even set up muscles. That is, when removing the scaffolding unit, the scaffolding unit is raised and removed from the reinforcing bar unit in a form in which the completed reinforcing bar unit passes downward through the reinforcing bar unit insertion gap of the first scaffold member. be able to.

【0044】また本発明のうち第2の発明は、第1の発
明によるケーソン構築用鉄筋配筋足場装置において、前
記各レール上の移動手段は、これら移動手段を前記各レ
ールに沿って同期的に移動駆動させ得る同期移動駆動手
段31a等の同期移動駆動手段を有するので、ケーソン
構築用鉄筋配筋足場装置を横方向に移動させる際には、
1対の移動手段が各レールに沿って同期的に移動駆動さ
れる。よって、第1の発明による効果に加えて、2つの
移動手段の移動のずれなどにより、足場ユニットにねじ
れ等の不都合な力が作用することが極力防止され安全性
が高い。
According to a second aspect of the present invention, in the reinforcing bar scaffolding apparatus for caisson construction according to the first aspect, the moving means on each of the rails synchronously moves the moving means along each of the rails. When the caisson construction reinforcing bar scaffolding device is moved laterally, the
A pair of moving means are synchronously moved and driven along each rail. Therefore, in addition to the effect of the first aspect, an undesired force such as a twist is applied to the scaffolding unit due to a shift of the movement of the two moving means, and the safety is high.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、本発明によるケーソン構築用鉄筋配筋
足場装置の一例を用いてケーソンを構築している様子を
示した模式斜視図である。
FIG. 1 is a schematic perspective view showing a state in which a caisson is constructed using an example of a reinforcing bar scaffolding apparatus for caisson construction according to the present invention.

【図2】図2(a)は、図1に示されたケーソンであ
り、その構築が完成した状態のものを示した一部断面斜
視図、図2(b)は、図2(a)に示すケーソンの平面
図である。
2 (a) is a partially sectional perspective view showing the caisson shown in FIG. 1 in a state where the construction is completed, and FIG. 2 (b) is a view showing FIG. 2 (a). It is a top view of the caisson shown in FIG.

【図3】図3は、図1に示すケーソンが、ケーソン製造
ヤードに複数配置された様子を示す模式側面図である。
FIG. 3 is a schematic side view showing a state where a plurality of caissons shown in FIG. 1 are arranged in a caisson manufacturing yard.

【図4】図4は、図3に示す複数のケーソンにおける構
築途中の様子を示した模式平面図である。
FIG. 4 is a schematic plan view showing a state in which a plurality of caissons shown in FIG. 3 are being constructed.

【図5】図5は、図4のI矢視図である。FIG. 5 is a view on arrow I of FIG. 4;

【図6】図6は、図5のII矢視図である。FIG. 6 is a view on arrow II of FIG. 5;

【図7】図7は、図4のIII矢視図である。FIG. 7 is a view on arrow III in FIG. 4;

【図8】図8は、図7のX1−Y1線断面図である。FIG. 8 is a sectional view taken along line X1-Y1 of FIG. 7;

【図9】図9は、図4のX2−Y2線断面図である。FIG. 9 is a sectional view taken along line X2-Y2 in FIG. 4;

【図10】図10は、図9に示す鉄筋組立用足場装置の
メインステージの一部を示した拡大平面図である。
FIG. 10 is an enlarged plan view showing a part of a main stage of the rebar assembling scaffolding device shown in FIG. 9;

【図11】図11は、図9に示す鉄筋組立用足場装置の
上ステージの上方に、吊下げ治具を介して吊下された主
筋等を示した模式側面図である。
FIG. 11 is a schematic side view showing main bars and the like suspended via a suspending jig above an upper stage of the reinforcing bar assembly scaffolding device shown in FIG. 9;

【図12】図12は、供給装置及びフープ筋配筋装置に
より配力筋の配筋を行っている様子を示した図である。
FIG. 12 is a diagram showing a state in which the supply force and the hoop muscle arrangement device perform arrangement of the arrangement muscles.

【図13】図13は、図12に示す供給装置の詳細を示
した斜視図である。
FIG. 13 is a perspective view showing details of a supply device shown in FIG. 12;

【図14】図14は、図12に示すフープ筋配筋装置の
詳細を示した斜視図である。
FIG. 14 is a perspective view showing details of the hoop muscle arrangement device shown in FIG. 12;

【符号の説明】[Explanation of symbols]

1a……ケーソン構築ヤード 2……レール 30……ケーソン構築用鉄筋配筋足場装置(鉄筋組立用
足場装置) 31……移動手段(支持台車) 31a……同期移動駆動手段 32……支持手段(支持ポール) 34……足場ユニット 35……第1の足場部材(メインステージ) 35b……第1の足場面(足場面) 36……鉄筋ユニット挿通間隙(鉄筋挿通間隙) 39……第2の足場部材(上ステージ) 39b……第2の足場面(上足場面) 43……主筋貫通穴(鉄筋配置穴) 50……ケーソン 65……鉄筋ユニット 66……主筋 67……配力筋
1a Caisson construction yard 2 ... Rail 30 ... Caisson construction reinforcing bar scaffolding device (rebar assembly scaffolding device) 31 ... Transportation means (support cart) 31a ... Synchronous movement drive means 32 ... supporting means ( Supporting pole) 34 Scaffold unit 35 First scaffold member (main stage) 35b First foot scene (foot scene) 36 Rebar unit insertion gap (rebar insertion gap) 39 Second Scaffolding member (upper stage) 39b 2nd foot scene (upper foot scene) 43 ... main-bar through-hole (rebar placement hole) 50 ... caisson 65 ... rebar unit 66 ... main bar 67 ... power distribution bar

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】上下方向の複数の主筋及び横方向の配力筋
からなる鉄筋ユニットを有したケーソンを構築する際に
使用する鉄筋配筋足場装置において、 1対のレールを有し、 前記1対のレール間に、複数のケーソン構築ヤードを、
これらレールの伸延方向に沿って配列して設け、 前記各レール上に、該レールに沿って所定の移動方向に
移動自在な移動手段を設け、 前記各移動手段に支持部材をそれぞれ立設し、 前記支持部材に足場ユニットを、これら支持部材間を架
け渡す形で、かつこれら支持部材に対して上下方向に昇
降移動・位置決め自在に設け、 前記足場ユニットは、上面に水平な第1の足場面が形成
された第1の足場部材及び、上面に水平な第2の足場面
が形成された第2の足場部材を、上下層状に配置して有
し、 前記第1の足場部材に、鉄筋ユニットが上下に貫通通過
し得る鉄筋ユニット挿通間隙を、該第1の足場部材を上
下に貫通する形で形成し、 前記第2の足場部材に、上下方向の主筋が貫通し得る複
数の主筋貫通穴を、該第2の足場部材を上下に貫通する
形で、かつ前記鉄筋ユニット挿通間隙の上方に対応配置
した形で形成して構成したケーソン構築用鉄筋配筋足場
装置。
1. A reinforcing bar scaffolding device used when constructing a caisson having a reinforcing bar unit including a plurality of vertical main reinforcing bars and a lateral force bar, comprising: a pair of rails; Multiple caisson construction yards between pairs of rails,
Arranged along the extending direction of these rails, provided on each of the rails, a moving means movable in a predetermined moving direction along the rail, and a support member is erected on each of the moving means, A scaffold unit is provided on the support member so as to extend between the support members and to be vertically movable and positionable with respect to the support member. The scaffold unit is a first foot scene horizontal to the upper surface. And a second scaffolding member having a horizontal second scenic scene formed on an upper surface, the first scaffolding member being arranged in upper and lower layers, and a reinforcing bar unit is provided on the first scaffolding member. Are formed so as to penetrate vertically through the first scaffold member, and a plurality of main muscle through holes through which main muscles in the vertical direction can penetrate the second scaffold member. Through the second scaffold member up and down. Form in, and the reinforcing bar unit insertion gap caisson construction reinforcing bar reinforcement scaffold constituted by forming in a manner that corresponds disposed above the To.
【請求項2】前記各レール上の移動手段は、これら移動
手段を前記各レールに沿って同期的に移動駆動させ得る
同期移動駆動手段を有することを特徴とする請求項1記
載のケーソン構築用鉄筋配筋足場装置。
2. A caisson construction system according to claim 1, wherein said moving means on each of said rails has a synchronous moving driving means capable of synchronously driving said moving means along each of said rails. Reinforcing bar scaffolding device.
JP20425796A 1996-07-15 1996-07-15 Reinforcing bar arrangement scaffold for caisson constructing Pending JPH1030332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20425796A JPH1030332A (en) 1996-07-15 1996-07-15 Reinforcing bar arrangement scaffold for caisson constructing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20425796A JPH1030332A (en) 1996-07-15 1996-07-15 Reinforcing bar arrangement scaffold for caisson constructing

Publications (1)

Publication Number Publication Date
JPH1030332A true JPH1030332A (en) 1998-02-03

Family

ID=16487472

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20425796A Pending JPH1030332A (en) 1996-07-15 1996-07-15 Reinforcing bar arrangement scaffold for caisson constructing

Country Status (1)

Country Link
JP (1) JPH1030332A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022518271A (en) * 2019-01-22 2022-03-14 コーニンクレッカ・バム・グループ・エン・フェー Methods for Manufacturing Gravity Foundations for Offshore Equipment and Gravity Foundations
CN116397877A (en) * 2023-04-11 2023-07-07 镇江市给排水管理处 Formwork system and construction method of ultra-deep segmental subsidence large-diameter working well

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022518271A (en) * 2019-01-22 2022-03-14 コーニンクレッカ・バム・グループ・エン・フェー Methods for Manufacturing Gravity Foundations for Offshore Equipment and Gravity Foundations
US12006648B2 (en) 2019-01-22 2024-06-11 Koninklijke Bam Groep N.V. Method for manufacturing a gravity based foundation for an offshore installation, and gravity based foundation
CN116397877A (en) * 2023-04-11 2023-07-07 镇江市给排水管理处 Formwork system and construction method of ultra-deep segmental subsidence large-diameter working well

Similar Documents

Publication Publication Date Title
US5255489A (en) Construction apparatus for buildings and constructing method therewith
JP5671373B2 (en) Bridge removal method and new construction method
CN109968522B (en) Installation device and installation method for prefabricated box girder bottom web steel reinforcement framework
JPH0841826A (en) Bridge construction method, bridge construction equipment and main girder unit
CN110713104B (en) Ultra-long and ultra-large steel bar skeleton processing device, hoisting device and hoisting method
JP2894226B2 (en) Bridge construction method
JP6449637B2 (en) Building construction method
CN208870380U (en) Mobile device and removable wall form for wall form
JPH1030331A (en) Form installation scaffold device for caisson constructing
JP5224245B2 (en) Pile main bar lifting device and bar arrangement method
JPH1030332A (en) Reinforcing bar arrangement scaffold for caisson constructing
JP2768280B2 (en) Bridge construction method
JP2000087314A (en) Method and device for construction of floor slab
JPH108473A (en) Caisson construction method
JPH0280741A (en) Unit floor manufacturing, stocking method and equipment
JP2000087315A (en) Method and device for construction of floor slab
JP3032052U (en) Construction equipment for pier reinforcement work
JP2768281B2 (en) Bridge construction method
CN112195802A (en) Variable-section U-shaped hollow thin-wall pier steel bar partition prefabricated jig frame and partition installation method
CN119083577B (en) Truss layer of super high-rise reinforced concrete structure and construction method
JP2768279B2 (en) Construction girder for precast block method
CN223018135U (en) A construction platform suitable for various occasions
JP3781497B2 (en) How to install beams
JP2764890B2 (en) Rebar assembling method
JP2832278B2 (en) Building method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050705

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050726

A02 Decision of refusal

Effective date: 20051220

Free format text: JAPANESE INTERMEDIATE CODE: A02