JPH1081905A - 炉体リングブロックの接続方法 - Google Patents
炉体リングブロックの接続方法Info
- Publication number
- JPH1081905A JPH1081905A JP23338596A JP23338596A JPH1081905A JP H1081905 A JPH1081905 A JP H1081905A JP 23338596 A JP23338596 A JP 23338596A JP 23338596 A JP23338596 A JP 23338596A JP H1081905 A JPH1081905 A JP H1081905A
- Authority
- JP
- Japan
- Prior art keywords
- welding
- furnace body
- furnace
- ring block
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
工法によって行う場合に、鉄皮接合部の片面溶接による
ルートギャップの溶接欠陥を防止するとともに、リフト
アップまでの時間を短縮する。 【解決手段】鉄皮の接合部両側に予め裏当金を取付けて
おき、上記裏当金の板端面を互いに接触させ、接触面を
ガウジングして溶接ルートギャップを形成し、裏波溶接
ビードを出して溶接するとともに、鉄皮の板厚の1/2
以上を溶接したときブロックをリフトアップし、次の作
業を行うことができるようにする。
Description
採用される炉体リングブロックリフトアップ工法におけ
る炉体リングブロックの接続方法に関する。
数の水平な炉体リングブロックに分割し、この炉体リン
グブロックを接続しながら順次リフトアップして組み立
てる、いわゆる炉体リングブロックリフトアップ工法が
知られている。この場合の炉体リングブロックの接続
は、上下炉体リングブロックを溶接することによって行
われる。
法においては鉄皮の全開先部の溶接終了後にリフトアッ
プしていた。また、一般に、片面開先溶接法では裏波溶
接か又は裏当金を用いる溶接が行われている。
フトアップ工法では、構造上、鉄皮を両面から溶接する
ことはできず、片面溶接をする。鉄皮は板厚が厚く、全
開先部の溶接を完了するには非常に長い時間を要する。
この溶接作業の間は、炉体リングブロックリフトアップ
工法では搬入装置上で作業が行われるために次工程の準
備ができない。そこで本発明は、溶接の途中で次の工程
の準備ができるようにし、作業工程時間の節約を図るこ
とができる炉体リングブロックの接続方法を提供するこ
とを目的とする。 次に、片面溶接において、裏波溶接
の場合、大ブロックの構造物の接合においては接合部の
肌違い等据付誤差があるため、適切な溶接ルートギャッ
プが得られず、溶接欠陥を生ずるという問題がある。ま
た裏当金を用いる溶接の場合、接続すべき鉄皮間の寸法
精度差によって、隙間を生じたり、接合部の急激な断面
変化により、応力集中を発生するという問題がある。本
発明はこのような問題点を解決した炉体リングブロック
の溶接方法を提供することを別の目的とする。
決する方法を提供するもので、高炉の炉体を高さ方向複
数段のリングブロックに分けて製作し、高炉基礎上へ炉
上部のリングブロックから順次取り込み、各リングブロ
ックを溶接接続して炉体を形成する、炉体リングブロッ
クリフトアップ工法において、炉体リングブロック間の
溶接を行う際に、鉄皮板厚の1/2以上の溶接高さのと
き、炉体をリフトアップし、リフトアップ後、残余の溶
接を行うことを特徴とするリングブロックの接続方法で
ある。
り決まるもので、鉄皮吊り上げ時の接続部は鉄皮厚さと
等しい溶接部寸法を必要としない。本発明者は鉄皮吊り
上げ時の応力解析を実施した結果このことを知見し、リ
フトアップ時に必要な溶接高さを決めた。この結果、溶
接による作業時間が他の作業の進行を妨げる影響を最小
限に留めることができるようになった。
高さ方向複数段のリングブロックに分けて製作し、高炉
基礎上へ炉上部のリングブロックから順次取り込み、各
リングブロックを溶接接続して炉体を形成する、炉体リ
ングブロックリフトアップ工法において、炉体リングブ
ロック間の溶接を行う際に、接合すべき鉄皮の接合端部
の炉内面側にそれぞれ予め裏当金を取付け、鉄皮接合ル
ートギャップ間で裏当金の端面を接触させて溶接開先間
隔を形成し、鉄皮外面側から裏当金を削り開先を形成
し、鉄皮外面側から裏波溶接することを特徴とする炉体
リングブロックの接続方法である。この方法により、溶
接ルート部に溶接欠陥を生ずることなく、優れた溶接接
合部を得ることができる。
する。図4は本発明が適用される高炉の炉体リングブロ
ックリフトアップ工法の説明図である。リング状にブロ
ック化された高炉のリングブロック21、22、23、
24、25は、順次上から結合されながら、ジャッキ3
1、吊り棒32により上方に引き上げられて高炉炉体を
組み立てる。各リングブロック21〜25は、上下の接
続部を溶接接合される。図4に示すように、高炉のすべ
てのブロックが連結されてリフトアップしたとき、一番
上のブロック21と次のブロック22との接合部の溶接
部に最大応力が作用する。例えば全重量が5477トン
の場合、この部分に作用する吊下げ最大応力は13.2
kgf/mm2 、短期許容応力は20.0kgf/mm
2 となる。
に示した。鉄皮1、2の接続部に開先角度7が30度の
片側開先5を設け、裏当金3、4を取付け、溶接する。
溶接金属6が鉄皮の板厚8の1/2以上の寸法9となっ
たとき、リフトアップする。本発明の第1の発明は、先
行ブロックと後行ブロックの芯出しを行い、片面先溶接
法により鉄皮の板厚の1/2以上を溶接し、溶接部の超
音波探傷試験を行い溶接部が良好であることを確認し、
上下ブロックの合体ブロックをリフトアップする。リフ
トアップ後、残溶接を行う。
の説明図である。図2は溶接部の詳細図、図3は炉内面
から見た正面図である。すなわち、鉄皮1、2の接合部
両側に予め裏当金3、4を取付けておき、裏当金3、4
の板端面を互いに接触させ、ルートギャップの中心12
で合わせる。裏当金3、4の接触面をガウジング等で鉄
皮外面側からはつりとり、適切な溶接ルートギャップを
形成し、裏波溶接ビード11を出して溶接することによ
って完全溶け込み溶接を可能とした。6は溶接金属であ
る。このとき溶接開先寸法は、ルートギャップを3mm
〜15mmとし、裏当金3、4のガウジングによるはつ
り量は、裏波溶接可能なまでとした。溶接中及び溶接後
超音波探傷試験を施工し、健全性を確認する。
リングブロックリフトアップ工法において、リングブロ
ックの付帯設備を事前に取付けた後に、鉄皮外側から片
面溶接をすることができ、炉内側作業を無くし、炉内足
場を不要にし、スリーブ等付帯設備を全量取付けること
が可能となった。
アップ移行時間が、従来36時間であったが、本発明で
は12時間に短縮された。また、図1の例では接合面3
ケ所のため108時間が36時間となった。さらに、厚
さ50mmを越える鉄皮の片面溶接は、接合部に溶接欠
陥が生ずるので、従来採用されていなかったが、本発明
によれば、良好な裏波溶接が可能となり、超音波探傷試
験による溶接品質の確認が可能となった。
Claims (2)
- 【請求項1】 高炉の炉体を高さ方向複数段のリングブ
ロックに分けて製作し、高炉基礎上へ炉上部のリングブ
ロックから順次取り込み、各リングブロックを溶接接続
して炉体を形成する、炉体リングブロックリフトアップ
工法において、炉体リングブロック間の溶接を行う際
に、鉄皮板厚の1/2以上の溶接高さのとき、炉体をリ
フトアップし、リフトアップ後、残余の溶接を行うこと
を特徴とするリングブロックの接続方法。 - 【請求項2】 高炉の炉体を高さ方向複数段のリングブ
ロックに分けて製作し、高炉基礎上へ炉上部のリングブ
ロックから順次取り込み、各リングブロックを溶接接続
して炉体を形成する、炉体リングブロックリフトアップ
工法において、炉体リングブロック間の溶接を行う際
に、接合すべき鉄皮の接合端部の炉内面側にそれぞれ予
め裏当金を取付け、鉄皮接合ルートギャップ間で裏当金
の端面を接触させて溶接開先間隔を形成し、鉄皮外面側
から裏当金を削り開先を形成し、鉄皮外面側から裏波溶
接することを特徴とする炉体リングブロックの接続方
法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23338596A JP3157723B2 (ja) | 1996-09-03 | 1996-09-03 | 炉体リングブロックの接続方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23338596A JP3157723B2 (ja) | 1996-09-03 | 1996-09-03 | 炉体リングブロックの接続方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH1081905A true JPH1081905A (ja) | 1998-03-31 |
| JP3157723B2 JP3157723B2 (ja) | 2001-04-16 |
Family
ID=16954274
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP23338596A Expired - Fee Related JP3157723B2 (ja) | 1996-09-03 | 1996-09-03 | 炉体リングブロックの接続方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3157723B2 (ja) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001200306A (ja) * | 2000-01-18 | 2001-07-24 | Sankyu Inc | リング状マンテルの接続方法 |
| WO2010013793A1 (ja) * | 2008-07-31 | 2010-02-04 | Jfeスチール株式会社 | 高炉炉体の建設および改修の方法 |
| CN117798564A (zh) * | 2024-01-31 | 2024-04-02 | 鞍钢建设集团有限公司 | 一种对接全熔透单面焊的组合坡口结构 |
-
1996
- 1996-09-03 JP JP23338596A patent/JP3157723B2/ja not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001200306A (ja) * | 2000-01-18 | 2001-07-24 | Sankyu Inc | リング状マンテルの接続方法 |
| WO2010013793A1 (ja) * | 2008-07-31 | 2010-02-04 | Jfeスチール株式会社 | 高炉炉体の建設および改修の方法 |
| JP2010053441A (ja) * | 2008-07-31 | 2010-03-11 | Jfe Steel Corp | 高炉炉体の建設および改修の方法 |
| CN117798564A (zh) * | 2024-01-31 | 2024-04-02 | 鞍钢建设集团有限公司 | 一种对接全熔透单面焊的组合坡口结构 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP3157723B2 (ja) | 2001-04-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113148058B (zh) | 一种分段建造阶段双舵套筒及尾铸安装定位的工艺 | |
| CN102513664B (zh) | 超大型高精度基座的实船装焊工艺 | |
| CN111250833A (zh) | 一种用于钢箱梁节段拼装的桥位焊接方法 | |
| CN107717346B (zh) | 一种1600t桅杆吊上桅杆建造工艺 | |
| CN115229436A (zh) | 大型双幅栓接式钢箱梁总拼方法 | |
| WO2024103711A1 (zh) | 一种单块壁板状态下法兰盘搅拌摩擦焊接方法 | |
| CN110977106B (zh) | 一种钛合金风扇机匣裂纹补焊修理方法 | |
| CN111872587B (zh) | 一种超厚壁板钢塔节段现场环缝焊接方法 | |
| CN119527511A (zh) | 一种船舶挂舵臂的换新方法 | |
| CN112407189A (zh) | 超大型船舶艏部锚链筒和锚台的精度建造工艺 | |
| JP3157723B2 (ja) | 炉体リングブロックの接続方法 | |
| CN117697210A (zh) | 船舶总组搭载阶段薄板变形控制方法及船舶 | |
| CN116100182A (zh) | 一种c型船用lng储罐止移块的装焊方法 | |
| CN212000591U (zh) | 一种钢管拱法兰盘加劲板及法兰盘 | |
| CN215393354U (zh) | 管体分段连接装置 | |
| CN116493795A (zh) | 集装箱船舵筒装焊方法 | |
| CN116142436A (zh) | 一种焊接式密封伸缩推进器及其焊接方法 | |
| CN115319326A (zh) | 裂纹修补方法 | |
| CN115740826A (zh) | 一种高强钢奥氏体熔透角焊缝不清根焊接方法 | |
| CN115892382B (zh) | 一种浚测井导轨组安装工艺 | |
| CN116748811B (zh) | 自升式风电安装平台耐磨板换新方法 | |
| CN116140850A (zh) | 一种耙管吊架底座的定位安装方法 | |
| CN110064858A (zh) | 桁架式桩腿分段主弦管的制造方法 | |
| CN110485394A (zh) | 一种碎石铺设整平船升降框架建造方法 | |
| CN115194409B (zh) | 一种用于三角管桁架大梁的小车轨道施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20010130 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080209 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090209 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100209 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100209 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110209 Year of fee payment: 10 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120209 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120209 Year of fee payment: 11 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130209 Year of fee payment: 12 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130209 Year of fee payment: 12 |
|
| LAPS | Cancellation because of no payment of annual fees |