JPH109342A - Imbalance correction device for crankshaft - Google Patents

Imbalance correction device for crankshaft

Info

Publication number
JPH109342A
JPH109342A JP16757696A JP16757696A JPH109342A JP H109342 A JPH109342 A JP H109342A JP 16757696 A JP16757696 A JP 16757696A JP 16757696 A JP16757696 A JP 16757696A JP H109342 A JPH109342 A JP H109342A
Authority
JP
Japan
Prior art keywords
crankshaft
center hole
unbalance
imbalance
correction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16757696A
Other languages
Japanese (ja)
Inventor
Shiyousaku Abe
勝策 安部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP16757696A priority Critical patent/JPH109342A/en
Publication of JPH109342A publication Critical patent/JPH109342A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Of Balance (AREA)
  • Shafts, Cranks, Connecting Bars, And Related Bearings (AREA)

Abstract

(57)【要約】 【課題】 本発明はクランクシャフトのアンバランス修
正装置に関し、アンバランスが過大となった場合にも生
産性を低下させることなくアンバランスの修正が可能な
アンバランス修正装置を提供することを目的とする。 【解決手段】 センタ穴位置指示装置14は、工程54
及び58におけるクランクシャフトのアンバランス測定
結果を統計処理することにより、初期アンバランスが修
正可能な範囲に含まれるようなセンタ穴位置を算出し、
このセンタ穴位置をセンタ穴加工装置10に対して指示
する。このようにセンタ穴位置が自動的に修正されるこ
とで、製造工程を停止させることなく、アンバランス修
正が可能な状態を維持することができる。
(57) Abstract: The present invention relates to a crankshaft unbalance correction device, and more particularly to an unbalance correction device capable of correcting an imbalance without reducing productivity even when the imbalance becomes excessive. The purpose is to provide. SOLUTION: A center hole position indicating device 14 includes a step 54.
By performing statistical processing on the results of measuring the unbalance of the crankshafts in steps 58 and 58, the center hole position is calculated such that the initial unbalance is included in the correctable range,
This center hole position is instructed to the center hole processing apparatus 10. By automatically correcting the center hole position in this manner, it is possible to maintain a state in which imbalance correction is possible without stopping the manufacturing process.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、回転体のアンバラ
ンス修正装置に係わり、特に、クランクシャフトのアン
バランス修正に好適なアンバランス修正装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for correcting imbalance of a rotating body, and more particularly to an apparatus for correcting imbalance of a crankshaft.

【0002】[0002]

【従来の技術】クランクシャフトには、センタ穴中心回
りの慣性モーメントのアンバランス(以下、単に、アン
バランスと称す)を補償するためにバランスウェイトが
設けられる。しかしながら、クランクシャフトを加工す
る際の加工誤差等により、単にバランスウェイトを設け
ただけては、クランクシャフトのアンバランスを完全に
除去することはできない。このため、クランクシャフト
の製造工程においては、クランクシャフトの最終形状が
形成された後、最終的なアンバランスの修正が行われ
る。例えば、特開平1−257528号に開示されるク
ランクシャフトの製造方法においては、先ず、鋳造され
たクランクシャフト粗材の両端にセンタ穴を加工し、こ
のセンタ穴を基準として、ジャーナルやクランクピン等
の各部位が切削あるいは研削により加工される。そし
て、クランクシャフトが最終的な形状に加工された後、
センタ穴を基準としてアンバランスの修正が行われる。
2. Description of the Related Art A crankshaft is provided with a balance weight for compensating for an unbalance of an inertia moment around a center hole center (hereinafter, simply referred to as an unbalance). However, the imbalance of the crankshaft cannot be completely eliminated only by providing the balance weight due to a processing error or the like when processing the crankshaft. For this reason, in the crankshaft manufacturing process, after the final shape of the crankshaft is formed, the final imbalance is corrected. For example, in a method of manufacturing a crankshaft disclosed in Japanese Patent Application Laid-Open No. 1-257528, first, center holes are formed at both ends of a cast crankshaft coarse material, and a journal, a crankpin, and the like are formed based on the center holes. Are processed by cutting or grinding. And after the crankshaft is processed to the final shape,
The imbalance is corrected based on the center hole.

【0003】[0003]

【発明が解決しようとする課題】ところで、一般に、ク
ランクシャフト製造工程におけるアンバランスの修正
は、バランスウェイトに穴加工を行うことで、バランス
ウェイトの重量分布を変化させることにより行われる。
従って、かかる穴加工により修正可能なアンバランス
は、バランスウェイトの形状等により制約される。クラ
ンクシャフトは鋳造材を粗材として製造されることが多
いため、その寸法には鋳造ロッド毎に大きな誤差が生じ
やすい。このため、クランクシャフトのアンバランス量
が、バランスウェイトへの穴加工により修正可能な範囲
を越えて大きくなることがある。
Generally, correction of imbalance in the crankshaft manufacturing process is performed by changing the weight distribution of the balance weight by drilling holes in the balance weight.
Therefore, the imbalance that can be corrected by such a drilling is limited by the shape of the balance weight and the like. Since a crankshaft is often manufactured using a cast material as a rough material, a large error is likely to occur in the dimension of each cast rod. For this reason, the unbalance amount of the crankshaft may increase beyond the range that can be corrected by drilling holes in the balance weight.

【0004】上記従来のクランクシャフトの製造方法に
おいては、かかるアンバランスの修正はクランクシャフ
トの最終仕上げの直前に行われており、アンバランスが
修正可能な範囲を越えた場合に対する措置は何ら講じら
れていない。このため、かかる場合には、クランクシャ
フト粗材の修正加工や、鋳造の型の修正が必要となり、
長期にわたって製造工程が停止してしまうことになる。
このように、上記従来のクランクシャフトの製造方法に
おけるアンバランス修正は、アンバランス量が修正可能
な範囲を越えた場合に対応できず、かかる場合には、生
産性の大幅な低下を招くという問題を有するものであっ
た。
In the conventional method for manufacturing a crankshaft, such imbalance correction is performed immediately before final finishing of the crankshaft, and no measures are taken when the imbalance exceeds a correctable range. Not. Therefore, in such a case, it is necessary to correct the crankshaft coarse material and correct the casting mold.
The manufacturing process will be stopped for a long time.
As described above, the unbalance correction in the conventional method for manufacturing a crankshaft cannot cope with a case where the unbalance amount exceeds a correctable range, and in such a case, the productivity is significantly reduced. It had the following.

【0005】本発明は、上述の点に鑑みてなされたもの
であり、粗材の寸法の誤差に起因して大きなアンバラン
スが生じた場合にも、生産性を低下させることなくアン
バランスの修正が可能なクランクシャフトのアンバラン
ス修正装置を提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made in view of the above points, and is intended to correct an unbalance without reducing productivity even when a large unbalance occurs due to a dimensional error of a coarse material. It is an object of the present invention to provide a crankshaft imbalance correcting device capable of performing the following.

【0006】[0006]

【課題を解決するための手段】上記の目的は、センタ穴
を基準としたクランクシャフトのアンバランスを検出す
るアンバランス検出手段を備え、該アンバランス検出手
段により検出されたアンバランスに基づいて前記クラン
クシャフトのアンバランスの修正を行うクランクシャフ
トのアンバランス修正装置において、前記アンバランス
検出手段により検出されたアンバランスに基づいて前記
センタ穴の目標位置を算出すると共に、該目標位置を前
記センタ穴を加工する加工機に対して指示するセンタ穴
位置指示手段を備えるクランクシャフトのアンバランス
修正装置により達成される。
The object of the present invention is to provide an imbalance detecting means for detecting an imbalance of a crankshaft with reference to a center hole, and to detect the imbalance based on the imbalance detected by the imbalance detecting means. An apparatus for correcting imbalance of a crankshaft, wherein the target position of the center hole is calculated based on the unbalance detected by the unbalance detecting means, and the target position is determined by the center hole. This is achieved by a crankshaft imbalance correcting device provided with a center hole position indicating means for instructing a processing machine for processing a hole.

【0007】本発明において、アンバランス検出手段は
センタ穴を基準としたクランクシャフトのアンバランス
を検出する。センタ穴位置指示手段はアンバランス検出
手段により検出されたアンバランスに基づいてセンタ穴
の目標位置を算出すると共に、該目標位置をセンタ穴を
加工する加工機に対して指示する。従って、センタ穴の
位置は、センタ穴を基準としたクランクシャフトのアン
バランスに基づいて修正される。これにより、センタ穴
の位置が修正された後のアンバランスは、当該修正前の
アンバランスに基づいて変化される。
In the present invention, the unbalance detecting means detects the unbalance of the crankshaft based on the center hole. The center hole position indicating means calculates a target position of the center hole based on the unbalance detected by the unbalance detecting means, and instructs the target position to a processing machine for processing the center hole. Therefore, the position of the center hole is corrected based on the unbalance of the crankshaft with respect to the center hole. Thereby, the unbalance after the position of the center hole is corrected is changed based on the unbalance before the correction.

【0008】[0008]

【発明の実施の形態】図1は、本発明の一実施例である
クランクシャフト製造システムを示す図である。図1に
示す如く、本システムは、センタ穴加工装置10、クラ
ンクシャフト加工装置12、及び、センタ穴位置指示装
置14を備えている。図1には、クランクシャフト加工
装置12において行われるクランクシャフトの製造工程
52〜62を併せて示している。センタ穴加工装置10
は、外部から指令された目標位置への穴加工が可能な数
値制御式の加工機械であり、鋳造により形成されたクラ
ンクシャフト粗材に対してセンタ穴の加工を行う。ま
た、クランクシャフト加工装置12は、クランクシャフ
トの機械加工、及び、バランス測定を行う機能を有して
おり、センタ穴が加工されたクランクシャフト粗材に対
して一連の機械加工を行うことにより、クランクシャフ
トを最終製品にまで仕上げる。更に、センタ穴位置指示
装置14は、クランクシャフトのバランス測定結果に基
づいてセンタ穴目標位置を算出し、この目標位置をセン
タ穴加工装置12に対して位置指令として送信する。
FIG. 1 is a diagram showing a crankshaft manufacturing system according to one embodiment of the present invention. As shown in FIG. 1, the present system includes a center hole processing device 10, a crankshaft processing device 12, and a center hole position indicating device 14. FIG. 1 also shows crankshaft manufacturing processes 52 to 62 performed in the crankshaft processing apparatus 12. Center hole processing device 10
Is a numerically controlled machining machine capable of machining a hole to a target position commanded from the outside, and performs machining of a center hole in a crankshaft coarse material formed by casting. In addition, the crankshaft processing device 12 has a function of performing crankshaft machining and balance measurement, and performs a series of machining processes on the crankshaft coarse material having the center hole processed, Finish the crankshaft to the final product. Further, the center hole position indicating device 14 calculates a center hole target position based on the crankshaft balance measurement result, and transmits the target position to the center hole processing device 12 as a position command.

【0009】また、図2は、図1に示すシステムにより
製造されるクランクシャフトの一例を示す図である。図
2に示すクランクシャフト20は、車両用V型6気筒エ
ンジンに用いられるものであり、ジャーナル部20a,
20b,20c,20d、クランクピン22a,22
b,22c,22d,20e,20fを備えている。ま
た、クランクピン22a,22b,22c,22d,2
0e,20fのそれぞれに対応して、これらクランクピ
ンと反対側に延びるバランスウェイト24a,24b,
24c,24d,24e,24fが設けられている。バ
ランスウェイト24a〜24fは、ピン22a〜22f
により生ずるクランクシャフト20のアンバランスを補
償するために設けられている。なお、ジャーナル部20
a〜20d、クランクピン22a〜22f、及びバラン
スウェイト24a〜24fをそれぞれ特に区別しない場
合には、それぞれ、単に、ジャーナル部20、クランク
ピン22、及び、バランスウェイト24と称する。
FIG. 2 is a view showing an example of a crankshaft manufactured by the system shown in FIG. The crankshaft 20 shown in FIG. 2 is used for a V-type 6-cylinder engine for a vehicle, and includes a journal portion 20a,
20b, 20c, 20d, crank pins 22a, 22
b, 22c, 22d, 20e, and 20f. Also, the crank pins 22a, 22b, 22c, 22d, 2
0e, 20f, and the balance weights 24a, 24b,
24c, 24d, 24e and 24f are provided. The balance weights 24a to 24f are connected to the pins 22a to 22f.
This is provided to compensate for the imbalance of the crankshaft 20 caused by the above. The journal unit 20
Unless otherwise specifically distinguished between a to 20d, crank pins 22a to 22f, and balance weights 24a to 24f, they are simply referred to as a journal 20, a crank pin 22, and a balance weight 24, respectively.

【0010】クランクシャフト20の両端部には、それ
ぞれ、フロント軸26及びリアフランジ28が設けられ
ている。フロント軸26及びリアフランジ28の中央部
には、それぞれ、ネジ穴30及びパイロット穴32が形
成されている。これらネジ穴30及びパイロット穴32
の開口部は、共にテーパ状に形成されており、それぞ
れ、後述する工程52〜62、及び、クランクシャフト
20の稼動時における基準となるセンタ穴34及び36
として用いられる。
At both ends of the crankshaft 20, a front shaft 26 and a rear flange 28 are provided, respectively. A screw hole 30 and a pilot hole 32 are formed in the center of the front shaft 26 and the rear flange 28, respectively. These screw holes 30 and pilot holes 32
Are formed in a tapered shape, and the center holes 34 and 36, which serve as references when the steps 52 to 62, which will be described later, and when the crankshaft 20 operates, respectively.
Used as

【0011】クランクシャフト20は、機械構造用炭素
鋼等により構成されている。鋳造により概略最終形状に
近い形状、即ち、上記ジャーナル部20、クランクピン
22、バランスウェイト24、フロント軸26、及びリ
アフランジ28を備える形状に形成されたクランクシャ
フト粗材を、以下に説明する工程に従って機械加工する
ことで、クランクシャフト20の最終製品が製造され
る。
The crankshaft 20 is made of carbon steel for machine structural use. A crankshaft coarse material formed by casting into a shape close to a substantially final shape, that is, a shape including the above-mentioned journal portion 20, crankpin 22, balance weight 24, front shaft 26, and rear flange 28, is described below. , The final product of the crankshaft 20 is manufactured.

【0012】図1に示す如く、先ず、クランクシャフト
粗材はセンタ穴加工装置10に導入される。センタ穴加
工装置10においては、両端部のジャーナル20a、2
0dが固定された状態で、ジャーナル20a、20dの
外周面を基準として、フロント軸26、及び、リアフラ
ンジ28の端面に、それぞれセンタ穴34及び36が加
工によって形成される。
As shown in FIG. 1, first, a crankshaft coarse material is introduced into a center hole machining apparatus 10. In the center hole drilling device 10, the journals 20a,
In a state where 0d is fixed, center holes 34 and 36 are formed by machining on the end surfaces of the front shaft 26 and the rear flange 28 with reference to the outer peripheral surfaces of the journals 20a and 20d, respectively.

【0013】センタ穴加工装置10による加工が終了さ
れたクランクシャフト粗材は、次に、クランクシャフト
加工装置12に導入され、最終形状までの一連の機械加
工が行われる。クランクシャフト加工装置12において
は、先ず、工程52において、各部の外周面の切削加工
が行われる。この切削加工は、各部の黒皮を除去するこ
とを目的として行われる。
The crankshaft coarse material that has been processed by the center hole processing device 10 is then introduced into a crankshaft processing device 12, where a series of mechanical processing to the final shape is performed. In the crankshaft processing device 12, first, in step 52, the outer peripheral surface of each part is cut. This cutting is performed for the purpose of removing black scales from each part.

【0014】工程52の加工が終了されると、次に、工
程54において、クランクシャフト20のアンバランス
測定が行われる。工程54におけるアンバランスの測定
は、クランクシャフト20の周囲の複数箇所にローラを
介して複数の荷重センサを配設した状態で、加工ワーク
をセンタ穴を中心として回転させ、各荷重センサの出力
の差異を検出することにより行われる。このアンバラン
ス測定方法は公知の方法であるため、その詳細について
の説明は省略する。工程54において得られたアンバラ
ンス測定データはセンタ穴位置指示装置14へ向けて送
信される。
When the processing in step 52 is completed, then, in step 54, the unbalance of the crankshaft 20 is measured. The measurement of the unbalance in the step 54 is performed by rotating the processing work around the center hole in a state where a plurality of load sensors are arranged via rollers at a plurality of positions around the crankshaft 20 and the output of each load sensor is measured. This is done by detecting differences. Since the unbalance measurement method is a known method, a detailed description thereof will be omitted. The unbalance measurement data obtained in step 54 is transmitted to the center hole position indicating device 14.

【0015】工程54の処理が終了されると、次に、工
程56においてクランクシャフト20の各部の外周面の
研削加工が行われる。工程56での加工により、クラン
クシャフト20の各部はほぼ最終的な形状及び寸法に形
成される。工程56の加工が終了されると、次に、工程
58において、クランクシャフト20のアンバランス測
定が行われる。工程58におけるアンバランス測定は上
記工程54と同様に行われ、この測定データもまたセン
タ穴位置指示装置14に向けて送出される。
When the process of step 54 is completed, next, in step 56, the outer peripheral surface of each part of the crankshaft 20 is ground. By the processing in the step 56, each part of the crankshaft 20 is formed to a substantially final shape and dimensions. When the processing in step 56 is completed, next, in step 58, the unbalance of the crankshaft 20 is measured. The unbalance measurement in step 58 is performed in the same manner as in step 54 described above, and this measurement data is also transmitted to the center hole position indicating device 14.

【0016】工程58の処理が終了されると、次に、工
程60において、アンバランス修正が行われる。このア
ンバランス修正の詳細については後述する。工程60の
アンバランス修正が終了されると、次に、工程60にお
いてペーパラップにより表面仕上げが行われて、クラン
クシャフト20の製造が完了される。
When the process of step 58 is completed, next, in step 60, imbalance correction is performed. The details of the imbalance correction will be described later. When the imbalance correction in the step 60 is completed, the surface is finished by paper wrap in the step 60, and the manufacture of the crankshaft 20 is completed.

【0017】次に、工程60におけるアンバランス修正
について説明する。アンバランスはセンタ穴中心を結ぶ
軸(以下、単に、センタ穴中心と称する)に対する重心
の位置ずれに起因して生じ、アンバランスと、センタ穴
中心に対する重心の位置ずれとは対応している。従っ
て、重心の位置をセンタ穴中心に向けて移動させること
で、アンバランスの修正を行うことができる。そこで、
工程60においては、バランスウェイト24に修正穴を
形成することによりバランスウェイト24の重量分布を
調整し、クランクシャフト20の重心位置を変更するこ
とによりアンバランス修正が行うこととしている。図3
に、アンバランス修正のためにバランスウェイト24に
修正穴38、40が加工された状態を示す。なお、図3
に示すY軸及びZ軸は、両軸がクランクシャフト20の
センタ穴中心Oで互いに直角に交わると共に、Z軸がバ
ランスウェイト24の対称軸に一致するように設けられ
ている。
Next, the imbalance correction in step 60 will be described. The imbalance is caused by the displacement of the center of gravity with respect to an axis connecting the center of the center hole (hereinafter, simply referred to as the center hole center), and the unbalance corresponds to the displacement of the center of gravity with respect to the center of the center hole. Therefore, the imbalance can be corrected by moving the position of the center of gravity toward the center hole center. Therefore,
In step 60, the weight distribution of the balance weight 24 is adjusted by forming a correction hole in the balance weight 24, and the imbalance correction is performed by changing the position of the center of gravity of the crankshaft 20. FIG.
7 shows a state in which the correction holes 38 and 40 are formed in the balance weight 24 to correct the imbalance. Note that FIG.
Are arranged so that both axes intersect at right angles at the center hole center O of the crankshaft 20, and the Z axis coincides with the symmetry axis of the balance weight 24.

【0018】図3に示す如く、修正穴38、40はバラ
ンスウェイト24のZ軸に対して角度θをなし、かつ、
その中心線がセンタ穴中心Oを通るように設けられる。
修正穴38、40が深く設けられると、修正穴形成部位
における重量が減少する。この減少の度合いは、センタ
穴38、40の深さの増加に応じて大きくなる。従っ
て、修正穴38、40が設けられることで、クランクシ
ャフト20の重心Gは修正穴38、40の中心軸方向
に、修正穴38、40の深さに応じた距離だけ移動する
ことになる。この場合、修正穴38、40の深さの和を
調整することにより、重心GをZ方向に移動させること
ができ、また、修正穴38、40の深さの差を調整する
ことにより、重心GをY方向に移動させることができ
る。従って、アンバランスの修正に際しては、アンバラ
ンスのZ成分より修正穴38、40の深さの和を求める
と共に、アンバランスのY成分より修正穴38、40の
深さの差を求め、これらの和及び差から、各修正穴3
6、38の深さを決定することにより、アンバランスを
ゼロに向けて修正することができる。
As shown in FIG. 3, the correction holes 38 and 40 form an angle θ with respect to the Z axis of the balance weight 24, and
The center line is provided so as to pass through the center hole center O.
When the correction holes 38 and 40 are provided deeply, the weight at the correction hole formation site is reduced. The degree of this decrease increases as the depth of the center holes 38 and 40 increases. Therefore, by providing the correction holes 38 and 40, the center of gravity G of the crankshaft 20 moves in the center axis direction of the correction holes 38 and 40 by a distance corresponding to the depth of the correction holes 38 and 40. In this case, the center of gravity G can be moved in the Z direction by adjusting the sum of the depths of the correction holes 38, 40, and the center of gravity can be moved by adjusting the difference between the depths of the correction holes 38, 40. G can be moved in the Y direction. Therefore, when correcting the imbalance, the sum of the depths of the correction holes 38 and 40 is obtained from the Z component of the unbalance, and the difference between the depths of the correction holes 38 and 40 is obtained from the Y component of the unbalance. From the sum and difference, each correction hole 3
By determining the depth of 6, 38, the imbalance can be corrected towards zero.

【0019】上記した修正穴38、40の加工は、クラ
ンクシャフト加工装置12内で、バランスウェイト24
の外周部にドリル加工を施すことにより行われる。上述
の如く、アンバランス修正にあたっては、修正穴38、
40の位置を変更することは不要であり、その深さを制
御するだけでよい。従って、修正穴38、40加工用の
工具の位置を制御することは不要とされ、これにより、
アンバランス修正工程が簡易化されている。
The above-described processing of the correction holes 38 and 40 is performed in the crankshaft processing apparatus 12 by the balance weight 24.
The drilling is performed on the outer peripheral portion of the device. As described above, when correcting the imbalance, the correction holes 38,
It is not necessary to change the position of 40, it is only necessary to control its depth. Therefore, it is not necessary to control the position of the tool for processing the correction holes 38 and 40, and thereby,
The imbalance correction process has been simplified.

【0020】しかしながら、修正穴38、40の位置が
予め規定され、また、修正穴38、40の深さはバラン
スウェイト24の大きさに制限されるため、修正穴3
8、40により修正可能なアンバランスの範囲は制限さ
れる。上述の如く、修正穴38、40のそれぞれを加工
することによる重心Gの移動方向は各修正穴の中心軸方
向に一致し、また、重心Gの移動量は、各修正穴の深さ
により定められる。従って、重心Gの移動を示すベクト
ルは、修正穴38、40の中心軸方向を向き、各修正穴
の深さに応じた大きさを有するベクトルの和となる。図
4に、修正穴38、40の深さを制御することにより修
正可能なアンバランスの範囲を示す。図4に示す如く、
修正可能なアンバランスの範囲は、修正穴38、40の
中心軸方向を向き、修正穴38、40の最大深さに応じ
た大きさを有するベクトルv1 、v 2 により生成される
菱形の領域Hとなる。なお、図4には、後述するアンバ
ランス測定結果の例をx印で示している。
However, the positions of the correction holes 38 and 40 are
The depth of the correction holes 38 and 40 is predetermined.
Since the size of the weight 24 is limited, the correction hole 3
The range of unbalance that can be corrected by 8, 40 is limited
It is. As described above, each of the correction holes 38 and 40 is machined.
The direction of movement of the center of gravity G is the direction of the center axis of each correction hole.
And the amount of movement of the center of gravity G depends on the depth of each correction hole.
Defined by Therefore, the vector indicating the movement of the center of gravity G
Are oriented in the direction of the central axis of the correction holes 38 and 40, and each correction hole
Is the sum of vectors having a magnitude corresponding to the depth of Figure
4 by controlling the depth of the correction holes 38 and 40.
This shows the range of imbalance that can be corrected. As shown in FIG.
The range of the imbalance that can be corrected depends on the correction holes 38 and 40.
Facing the central axis, depending on the maximum depth of the correction holes 38, 40
Vector v with different magnitude1, V TwoGenerated by
A diamond-shaped region H is obtained. Note that FIG.
An example of the lance measurement result is indicated by an x mark.

【0021】上記したように、修正可能なアンバランス
の範囲は図4に示す領域Hに制限されるため、クランク
シャフト粗材及びクランクャフト20の各工程での加工
寸法の設計にあたっては、工程58におけるアンバラン
ス修正の直前、即ち、工程56における研削加工が終了
した直後の状態で、領域Hに含まれるようなアンバラン
スが生ずるように設計される。このように、設計上意図
的に設けられた、アンバランス修正直前の段階でのアン
バランスを、以下、初期アンバランスと称する。
As described above, since the range of the imbalance that can be corrected is limited to the region H shown in FIG. 4, when designing the machining dimensions of each step of the crankshaft coarse material and the crankshaft 20, the step 58 Immediately before the imbalance correction, that is, immediately after the completion of the grinding in the step 56, it is designed such that the imbalance included in the region H occurs. The imbalance immediately before the imbalance correction, which is intentionally provided in the design as described above, is hereinafter referred to as an initial imbalance.

【0022】しかしながら、クランクシャフト20の粗
材の鋳造に際しては、鋳型精度のばらつき等により大き
な寸法誤差が生じやすく、かかる粗材の寸法誤差に起因
して、初期アンバランスが領域Hから外れてしまうこと
がある。かかる状況の下では、修正穴38、40の加工
によってクランクシャフト20のアンバランスを除去す
ることは不可能となる。この場合、初期アンバランスを
領域Hに入れるための対策として、クランクシャフト粗
材の寸法の修正を行う措置を取ったのでは、クランクシ
ャフト粗材の修正加工や、更には、鋳型の修正加工を行
うために、製造工程が長時間にわたって停止し、生産性
が大幅に低下することになる。
However, when casting the coarse material of the crankshaft 20, a large dimensional error is apt to occur due to variations in mold accuracy and the like, and the initial imbalance deviates from the region H due to the dimensional error of the coarse material. Sometimes. Under such circumstances, it becomes impossible to remove the imbalance of the crankshaft 20 by machining the correction holes 38 and 40. In this case, if measures were taken to correct the dimensions of the crankshaft coarse material as a measure for putting the initial imbalance in the region H, the correction processing of the crankshaft coarse material and further the correction processing of the mold were performed. Because of this, the manufacturing process is stopped for a long time, and the productivity is greatly reduced.

【0023】これに対して、本実施例のシステムは、ア
ンバランス測定結果に基づいてセンタ穴34、36の位
置を修正することにより、アンバランス修正が可能な領
域Hを修正し、生産性を低下させることなくアンバラン
ス修正を行い得る点に特徴を有している。
On the other hand, the system according to the present embodiment corrects the position H of the center holes 34 and 36 based on the result of the unbalance measurement, thereby correcting the region H in which the unbalance can be corrected, thereby improving productivity. It is characterized in that imbalance correction can be performed without lowering.

【0024】上述の如く、クランクシャフト20の粗材
である鋳造材の形状のばらつきは鋳型の寸法精度により
定まり、従って、鋳造ロッド毎に同様の傾向を示す。こ
のため、同一のロッドのクランクシャフト粗材から加工
されたクランクシャフト20の初期アンバランスは同様
の傾向を示すことになる。図4にx印で示す測定データ
は、同一のロッドのクランクシャフト粗材から加工され
たクランクシャフト20に対するものである。図4に示
す如く、同一のロッドに対する初期アンバランスは範囲
Sに集中して分布している。図4においては、この分布
の一部が、領域Hから外れており、領域Hから外れたア
ンバランスについては、修正穴38、40による修正が
行えないことになる。
As described above, the variation in the shape of the cast material, which is a coarse material of the crankshaft 20, is determined by the dimensional accuracy of the mold, and therefore shows the same tendency for each cast rod. Therefore, the initial imbalance of the crankshaft 20 processed from the crankshaft coarse material having the same rod shows a similar tendency. The measurement data indicated by x in FIG. 4 is for a crankshaft 20 machined from a crankshaft coarse material of the same rod. As shown in FIG. 4, the initial imbalance for the same rod is concentrated in the range S. In FIG. 4, a part of this distribution is out of the region H, and the imbalance out of the region H cannot be corrected by the correction holes 38 and 40.

【0025】上述の如く、クランクシャフト20のアン
バランスは、クランクシャフト20の重心Gがセンタ穴
中心Oに対して位置ずれすることにより生ずるため、セ
ンタ穴位置Oを変化させることにより、アンバランスを
調整することができる。即ち、アンバランスが一定の傾
向を示す(図4の場合では、左下方向に偏っている)こ
とを早期に検知できれば、この傾向に応じてセンタ穴位
置を修正することにより、以後加工されるクランクシャ
フト20の初期アンバランスをすべて領域H内に存在さ
せることが可能となるのである。図5に、クランクシャ
フト20のセンタ穴中心Oを移動することにより、修正
可能な領域Hが移動した状態を示す。図5においては、
センタ穴中心Oを左下方に移動させることで、修正可能
なアンバランスの範囲を示す領域Hは領域H’に移動
し、これにより、図4に示した測定データは全て領域
H’に含まれている。
As described above, since the unbalance of the crankshaft 20 is caused by the displacement of the center of gravity G of the crankshaft 20 with respect to the center hole center O, the unbalance is obtained by changing the center hole position O. Can be adjusted. That is, if it can be detected early that the unbalance shows a certain tendency (in the case of FIG. 4, it is biased to the lower left direction), the center hole position is corrected in accordance with this tendency, so that the crank to be processed thereafter can be detected. This allows the initial imbalance of the shaft 20 to be entirely within the region H. FIG. 5 shows a state in which the correctable region H has moved by moving the center hole center O of the crankshaft 20. In FIG.
By moving the center hole center O to the lower left, the region H indicating the range of the imbalance that can be corrected moves to the region H ′, whereby all the measurement data shown in FIG. 4 is included in the region H ′. ing.

【0026】そこで、本実施例においては、上述の如
く、上記工程54及び58でのアンバランス測定データ
に基づいて、センタ穴位置指示装置14によりセンタ穴
位置を修正することとしている。即ち、センタ穴位置決
定装置14は、アンバランス測定データを統計処理する
ことによりアンバランスの傾向を推定し、かかる推定値
に基づいて、センタ穴の修正位置を決定する。そして、
かかる目標位置がセンタ穴加工装置10に位置指令とし
て付与されることで、センタ穴34及びセンタ穴36
が、それぞれ修正された位置に加工される。
Therefore, in the present embodiment, the center hole position is corrected by the center hole position indicating device 14 based on the unbalance measurement data in the steps 54 and 58 as described above. That is, the center hole position determination device 14 estimates the tendency of unbalance by statistically processing the unbalance measurement data, and determines the correction position of the center hole based on the estimated value. And
By giving such a target position to the center hole processing apparatus 10 as a position command, the center hole 34 and the center hole 36 are provided.
Are processed to the corrected positions.

【0027】上述の如く、同一ロッドのクランクシャフ
ト粗材から加工されたクランクシャフト20の初期アン
バランスは同様の傾向を示す。このため、あるロッド内
の初期に加工されたクランクシャフト20の初期アンバ
ランスが一定の傾向を示したならば、このロッドの以後
に続くクランクシャフト20の初期アンバランスも同様
の傾向を示すことが予想される。従って、同一ロッド内
の過去の加工ワークに対して得られた全てのアンバラン
ス測定データに基づいてセンタ穴34、36の位置を修
正することで、そのロッド内のワークについて、初期ア
ンバランスを修正可能範囲内に位置させることができ
る。
As described above, the initial imbalance of the crankshaft 20 processed from the same rod material of the crankshaft shows a similar tendency. For this reason, if the initial unbalance of the initially processed crankshaft 20 in a certain rod shows a certain tendency, the initial imbalance of the crankshaft 20 following this rod also shows the same tendency. is expected. Therefore, by correcting the positions of the center holes 34 and 36 based on all the unbalance measurement data obtained for past work pieces in the same rod, the initial unbalance of the work in the rod is corrected. It can be located within the possible range.

【0028】センタ穴位置支持装置14における統計処
理は例えば、過去のアンバランス測定データの平均値、
中央値、標準偏差など、データ母集団の傾向を示す統計
量を計算し、かかる統計量に基づいてセンタ穴34、3
6の位置を重心Gに向けて修正することにより行われ
る。このように統計的なデータに基づいてセンタ穴位置
を修正することにより、特異的なデータによりセンタ穴
位置が不要に変更されるのを防止することができる。
Statistical processing in the center hole position supporting device 14 includes, for example, an average value of past unbalance measurement data,
Calculate statistics such as a median and a standard deviation indicating the tendency of the data population, and calculate the center holes 34, 3
6 is corrected toward the center of gravity G. By correcting the center hole position based on the statistical data in this way, it is possible to prevent the center hole position from being unnecessarily changed by specific data.

【0029】ところで、工程58に達するまでの加工工
程数が大きいため、ロッド内の最初に加工されるクラン
クシャフト20(加工中のクランクシャフト20を個々
に区別して称する場合には、以下、加工ワークという)
が工程58に達した時点では、既に相当数の加工ワーク
がセンタ穴加工以降の加工工程に入っていることにな
る。更に、上述の如く、センタ穴位置の修正は、複数の
データを統計処理することで行われるため、センタ穴位
置の修正が行われるまでに、更に多くの加工ワークが加
工工程に入ることになる。従って、工程58におけるバ
ランス測定結果のみに基づいて、センタ穴位置決定装置
64による上述の如き統計処理を行った場合、これらの
加工ワークについてはセンタ穴位置の修正が行われない
ため、アンバランス修正が不可能な加工ワークが生ずる
可能性がある。そこで、本実施例においては、工程58
の他、比較的上流に位置する工程54においてもバラン
ス測定を行い、センタ穴位置の修正にあたっては、かか
る測定データをも考慮することとしている。
By the way, since the number of machining steps required to reach the step 58 is large, the crankshaft 20 to be machined first in the rod (when the crankshaft 20 being machined is referred to individually, That)
Has reached the step 58, a considerable number of processed workpieces have already entered the processing step after the center hole processing. Further, as described above, the correction of the center hole position is performed by performing statistical processing on a plurality of data, so that a larger number of processed workpieces enter the processing process before the correction of the center hole position is performed. . Therefore, when the above-described statistical processing is performed by the center hole position determination device 64 based on only the balance measurement result in the step 58, the center hole position is not corrected for these processed workpieces, and thus the unbalance correction is performed. There is a possibility that a work that cannot be performed may occur. Therefore, in this embodiment, step 58
In addition, the balance measurement is also performed in the process 54 located relatively upstream, and such measurement data is taken into consideration when correcting the center hole position.

【0030】工程54におけるアンバランス測定は、工
程58よりも工程56の研削工程を隔てて上流に位置し
ているため、その測定結果は工程58において測定され
た初期アンバランスと必ずしも一致しない。しかしなが
ら、上述の如く、初期アンバランスの変動は、粗材の寸
法のばらつきを主な原因として生ずるものであるため、
比較的上流に位置する工程54におけるアンバランス測
定結果には、工程58で測定される初期アンバランスが
かなり反映されるとみなすことができる。従って、工程
54のアンバランス測定結果をも利用してセンタ穴位置
の修正を行うことで、アンバランス修正をより早期に行
うことができ、これにより、アンバランス修正が不可能
な加工ワークの発生を最小限に抑制することができる。
Since the measurement of the unbalance in the step 54 is located upstream of the step 58 by the grinding step of the step 56, the measurement result does not always correspond to the initial unbalance measured in the step 58. However, as described above, the fluctuation of the initial imbalance is mainly caused by the variation in the dimensions of the coarse material,
The imbalance measurement at step 54, located relatively upstream, can be considered to be a significant reflection of the initial imbalance measured at step 58. Therefore, by correcting the center hole position also by using the unbalance measurement result in the step 54, the unbalance correction can be performed earlier, thereby causing the generation of a work piece that cannot be corrected. Can be minimized.

【0031】この場合、センタ穴位置指示装置14での
統計処理においては、工程54での測定データと工程5
8での測定データを同等に取り扱って統計処理すること
としてもよいし、あるいは、各工程での測定データにそ
れぞれ重み付けを行った後、統計処理することとしても
よい。
In this case, in the statistical processing in the center hole position indicating device 14, the measured data in the step 54 and the
The measurement data in step 8 may be treated equally and statistically processed, or the measurement data in each step may be weighted and then statistically processed.

【0032】上述の如く、本実施例のシステムによれ
ば、クランクシャフト粗材の寸法誤差が過大となって
も、クランクシャフト粗材の修正や鋳型の修正を行うこ
となく、初期アンバランスを修正可能な範囲内に存在さ
せることができる。更に、センタ穴中心の修正は、セン
タ穴位置指示装置14からセンタ穴加工装置10へ位置
指令が付与されることで自動的に行われるため、センタ
穴中心の修正のために、製造工程を停止させることは不
要である。このように、本実施例においては、高い生産
性を維持することが可能なクランクシャフトのアンバラ
ンス修正が実現されている。
As described above, according to the system of the present embodiment, even if the dimensional error of the crankshaft coarse material becomes excessive, the initial imbalance is corrected without correcting the crankshaft coarse material or the mold. It can be in the possible range. Further, the correction of the center hole center is automatically performed when a position command is given from the center hole position indicating device 14 to the center hole processing device 10, so that the manufacturing process is stopped to correct the center hole center. It is not necessary to do so. As described above, in this embodiment, the unbalance correction of the crankshaft that can maintain high productivity is realized.

【0033】なお、同一のロッドで鋳造されるクランク
シャフト粗材であっても、鋳造時の型の摩耗等により、
その寸法が徐々に変化することがある。かかる場合に
は、初期アンバランス量も同一ロッド内で徐々に変化す
る。また、クランクシャフト加工装置12における工具
の摩耗等に起因して、工程52或いは56等において加
工誤差が生じた場合にも、クランクシャフト20の初期
アンバランスは、加工ワーク数が増加するにつれて、徐
々に変化することになる。これに対して、本実施例のシ
ステムにおいては、センタ穴位置指示装置14は、同一
ロッドについての過去の全データを用いて、センタ穴位
置を修正することとしている。従って、上述の如く、同
一ロッド内で初期アンバランスが徐々に変化する場合に
おいても、これら徐々に変化するアンバランスの測定デ
ータを含む情報に基づいてセンタ穴位置を適切に修正す
ることで、初期バランスを常に修正可能な領域Hに存在
させることができる。
It should be noted that even a coarse crankshaft cast with the same rod, due to wear of the mold during casting, etc.
Its dimensions may change gradually. In such a case, the initial imbalance amount also gradually changes within the same rod. Further, even when a processing error occurs in the process 52 or 56 due to wear of a tool in the crankshaft processing device 12, the initial imbalance of the crankshaft 20 gradually increases as the number of workpieces increases. Will change. On the other hand, in the system according to the present embodiment, the center hole position indicating device 14 corrects the center hole position by using all the past data of the same rod. Therefore, as described above, even when the initial imbalance gradually changes within the same rod, the center hole position is appropriately corrected based on the information including the measurement data of these gradually changing imbalances, so that the initial hole is appropriately corrected. The balance can always be in the region H that can be corrected.

【0034】なお、上述の如く、初期アンバランスは、
粗材のロッド毎に特有の傾向を有している。従って、あ
るロッドのワークに対して得られたアンバランス測定デ
ータを用いて異なるロッドのワークのアンバランス修正
を行ったり、異なるロッドのワークの測定データが混在
した状態でデータの統計的処理を行ったのでは、適切な
アンバランス修正を行うことができない。この場合、例
えば、センタ穴位置指示装置14に測定データと共にロ
ッドを示す識別コードを記憶させ、ロッド毎にアンバラ
ンス測定データの管理を行うことにより、異なるロッド
のワークが混在した状態で加工を行う場合にも、ロッド
毎に適切なセンタ穴位置の修正を行うことができる。
As described above, the initial imbalance is
Each rod of coarse material has a unique tendency. Therefore, using the unbalance measurement data obtained for a certain rod work, the unbalance correction of the work of different rods is performed, or the statistical processing of the data is performed in a state where the measurement data of the work of different rods are mixed. Therefore, it is not possible to make an appropriate imbalance correction. In this case, for example, the center hole position indicating device 14 stores the identification code indicating the rod together with the measurement data, and manages the unbalanced measurement data for each rod, thereby performing processing in a state where workpieces of different rods are mixed. Also in this case, the center hole position can be appropriately corrected for each rod.

【0035】なお、上記実施例においては、本発明がV
型6気筒エンジン用クランクシャフト20のアンバラン
ス修正に適用されるものとしたが、本発明はこれに限定
されるものではなく、他の任意に型式のクランクシャフ
トのアンバランス修正に適用することができ、更に、ク
ランクシャフトだけではなく、アンバランス修正が必要
な任意の回転体のアンバランス修正に適用することがで
きる。
It should be noted that, in the above embodiment, the present invention
Although the present invention is applied to the correction of the unbalance of the crankshaft 20 for the type 6 cylinder engine, the present invention is not limited to this, and may be applied to the correction of the unbalance of the crankshaft of any other type. Further, the present invention can be applied not only to the crankshaft but also to the imbalance correction of any rotating body requiring the imbalance correction.

【0036】[0036]

【発明の効果】上述の如く、本発明によれば、クランク
シャフトのアンバランスを、アンバランス修正が可能な
範囲に含まれるように変化させることができる。これに
より、粗材の寸法誤差が大きい場合にも、生産性を低下
させることなくアンバランス修正を行うことができる。
As described above, according to the present invention, the unbalance of the crankshaft can be changed so as to be included in a range where the unbalance can be corrected. Thus, even when the dimensional error of the coarse material is large, the imbalance correction can be performed without reducing the productivity.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例のシステム構成図である。FIG. 1 is a system configuration diagram of an embodiment of the present invention.

【図2】本実施例において製造されるクランクシャフト
の構成図である。
FIG. 2 is a configuration diagram of a crankshaft manufactured in the embodiment.

【図3】バランスウェイトに修正穴を加工した状態を示
す図である。
FIG. 3 is a diagram showing a state where a correction hole is machined in a balance weight.

【図4】バランスウェイトへの修正穴の加工により修正
可能なアンバランスの範囲を、アンバランス測定データ
の例と共に示す図である。
FIG. 4 is a diagram showing a range of unbalance that can be corrected by machining a correction hole in a balance weight, together with an example of unbalance measurement data.

【図5】センタ穴を修正することにより修正可能なアン
バランスの範囲が変更された状態を示す図である。
FIG. 5 is a diagram showing a state in which the range of unbalance that can be corrected by correcting the center hole has been changed.

【符号の説明】[Explanation of symbols]

10 センタ穴加工装置 12 クランクシャフト加工装置 14 センタ穴位置指示装置 20 クランクシャフト 24 バランスウェイト 34、36 センタ穴 38、40 修正穴 Reference Signs List 10 center hole processing device 12 crankshaft processing device 14 center hole position indicating device 20 crankshaft 24 balance weight 34, 36 center hole 38, 40 correction hole

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 センタ穴を基準としたクランクシャフト
のアンバランスを検出するアンバランス検出手段を備
え、該アンバランス検出手段により検出されたアンバラ
ンスに基づいて前記クランクシャフトのアンバランスの
修正を行うクランクシャフトのアンバランス修正装置に
おいて、 前記アンバランス検出手段により検出されたアンバラン
スに基づいて、前記センタ穴の目標位置を算出すると共
に、該目標位置を前記センタ穴を加工する加工機に対し
て指示するセンタ穴位置指示手段を備えることを特徴と
するクランクシャフトのアンバランス修正装置。
1. An unbalance detecting means for detecting an unbalance of a crankshaft with reference to a center hole, and correcting the imbalance of the crankshaft based on the unbalance detected by the unbalance detecting means. An apparatus for correcting an unbalance of a crankshaft, wherein a target position of the center hole is calculated based on the unbalance detected by the unbalance detecting means, and the target position is converted to a processing machine for processing the center hole. An unbalance correcting device for a crankshaft, comprising a center hole position indicating means for indicating.
JP16757696A 1996-06-27 1996-06-27 Imbalance correction device for crankshaft Pending JPH109342A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16757696A JPH109342A (en) 1996-06-27 1996-06-27 Imbalance correction device for crankshaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16757696A JPH109342A (en) 1996-06-27 1996-06-27 Imbalance correction device for crankshaft

Publications (1)

Publication Number Publication Date
JPH109342A true JPH109342A (en) 1998-01-13

Family

ID=15852314

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16757696A Pending JPH109342A (en) 1996-06-27 1996-06-27 Imbalance correction device for crankshaft

Country Status (1)

Country Link
JP (1) JPH109342A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006292632A (en) * 2005-04-13 2006-10-26 Kokusai Keisokki Kk Crankshaft machining system
JP2007120429A (en) * 2005-10-28 2007-05-17 Toyota Central Res & Dev Lab Inc Internal combustion engine and compressor
JP4195079B1 (en) * 2007-07-03 2008-12-10 テクノメタル株式会社 Crankshaft and method for manufacturing the same
WO2009016988A1 (en) * 2007-08-01 2009-02-05 Komatsu Machinery Corp. Treating apparatus, center-hole working system, center-hole position deciding program, and center-hole position deciding method
JP2015044249A (en) * 2013-08-27 2015-03-12 コマツNtc株式会社 Turning and broaching machine with balance measurement function
JP2018189491A (en) * 2017-05-02 2018-11-29 コマツNtc株式会社 Center hole determination device
CN109341952A (en) * 2018-10-09 2019-02-15 上海大众动力总成有限公司 A kind of dynamically balanced dynamic adjustment central hole location degree method of raising engine crankshaft
CN110977331A (en) * 2018-10-03 2020-04-10 通用汽车环球科技运作有限责任公司 Method for manufacturing crankshaft
JP2022033626A (en) * 2020-08-17 2022-03-02 株式会社長浜製作所 Learning method, center hole position determination system, and center hole position determination method
CN114595535A (en) * 2022-03-15 2022-06-07 孝感松林智能计测器有限公司 A Deduplication Optimization Algorithm for Symmetric and Asymmetric Crankshaft Automatic Deduplication Balance System
CN115771042A (en) * 2022-11-28 2023-03-10 山西柴油机工业有限责任公司 Correction method for central hole of large-deformation crankshaft after induction quenching

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006292632A (en) * 2005-04-13 2006-10-26 Kokusai Keisokki Kk Crankshaft machining system
JP2007120429A (en) * 2005-10-28 2007-05-17 Toyota Central Res & Dev Lab Inc Internal combustion engine and compressor
KR101309989B1 (en) * 2007-07-03 2013-09-24 테크노 메탈 가부시끼가이샤 Crank shaft, process for manufacturing material therefor, and process for machining shaped item for crank shaft
JP4195079B1 (en) * 2007-07-03 2008-12-10 テクノメタル株式会社 Crankshaft and method for manufacturing the same
WO2009004738A1 (en) * 2007-07-03 2009-01-08 Techno-Metal Co., Ltd. Crank shaft and process for manufacturing material therefor
WO2009016988A1 (en) * 2007-08-01 2009-02-05 Komatsu Machinery Corp. Treating apparatus, center-hole working system, center-hole position deciding program, and center-hole position deciding method
JP4791577B2 (en) * 2007-08-01 2011-10-12 コマツNtc株式会社 Processing apparatus, center hole machining system, center hole position determination program, and center hole position determination method
US8103374B2 (en) 2007-08-01 2012-01-24 Komatsu Ntc Ltd. Processing apparatus, center-hole working system, center-hole position deciding program, and center-hole position deciding method
JPWO2009016988A1 (en) * 2007-08-01 2010-10-14 コマツ工機株式会社 Processing apparatus, center hole machining system, center hole position determination program, and center hole position determination method
JP2015044249A (en) * 2013-08-27 2015-03-12 コマツNtc株式会社 Turning and broaching machine with balance measurement function
JP2018189491A (en) * 2017-05-02 2018-11-29 コマツNtc株式会社 Center hole determination device
CN110977331A (en) * 2018-10-03 2020-04-10 通用汽车环球科技运作有限责任公司 Method for manufacturing crankshaft
CN109341952A (en) * 2018-10-09 2019-02-15 上海大众动力总成有限公司 A kind of dynamically balanced dynamic adjustment central hole location degree method of raising engine crankshaft
JP2022033626A (en) * 2020-08-17 2022-03-02 株式会社長浜製作所 Learning method, center hole position determination system, and center hole position determination method
CN114595535A (en) * 2022-03-15 2022-06-07 孝感松林智能计测器有限公司 A Deduplication Optimization Algorithm for Symmetric and Asymmetric Crankshaft Automatic Deduplication Balance System
CN115771042A (en) * 2022-11-28 2023-03-10 山西柴油机工业有限责任公司 Correction method for central hole of large-deformation crankshaft after induction quenching

Similar Documents

Publication Publication Date Title
KR960015757B1 (en) Method of producting crankschafts
KR101446637B1 (en) Treating apparatus, center-hole working system, a computer-readable recrding medium recoding thereon a center-hole position deciding program, and center-hole position deciding method
US4884210A (en) Method and machine for a balancing centering of workpieces which are to be machined only at certain portions, particularly crankshafts
CN101730801B (en) Crank shaft and process for manufacturing material therefor
CN102089118B (en) Method and device for determining center hole of crankshaft
JPH109342A (en) Imbalance correction device for crankshaft
CN104854438B (en) Forge the processing method and system of processing of rotary body centre bore
US10821527B2 (en) Method of manufacturing a crankshaft
JP7235205B2 (en) Machining system and machining method for crankshaft
US20140130561A1 (en) Method for the roller-straightening of crankshafts
EP0081376A2 (en) Crankshaft centring
CN115121841B (en) Center hole determination device and center hole determination method
JP2009020009A (en) Rotating body centering method and apparatus
CN100450794C (en) Method and apparatus for manufacturing alloy wheel for motor vehicle
JP2004050300A (en) Large workpiece automatic finishing method and equipment
JP5169110B2 (en) Rotary machining center calculation method, rotary machining center calculation program, rotary machining center calculation device, and cutting system
JPH05172682A (en) Device for estimating unbalance of crankshaft
JP2025097639A (en) Molded rotary body measurement system
JP4609237B2 (en) Unbalance correction method and apparatus
JP2938085B2 (en) Unbalance correction method and unbalance correction device
JP2588836Y2 (en) Work size control device for grinding machine
JP2000304028A (en) Manufacturing method of connecting rod and connecting rod
JP3269151B2 (en) Feedback processing condition correction device
JP3206167B2 (en) Feedback processing condition correction device
JPH0223406A (en) Nc machine tool adaptive control device