JPH1096556A - Combustion equipment - Google Patents
Combustion equipmentInfo
- Publication number
- JPH1096556A JPH1096556A JP8271656A JP27165696A JPH1096556A JP H1096556 A JPH1096556 A JP H1096556A JP 8271656 A JP8271656 A JP 8271656A JP 27165696 A JP27165696 A JP 27165696A JP H1096556 A JPH1096556 A JP H1096556A
- Authority
- JP
- Japan
- Prior art keywords
- hot water
- water supply
- temperature
- heat exchanger
- supply heat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Instantaneous Water Boilers, Portable Hot-Water Supply Apparatuses, And Control Of Portable Hot-Water Supply Apparatuses (AREA)
Abstract
(57)【要約】
【課題】 給湯熱交換器の後沸きに起因して出湯開始時
に高温の湯が出湯するのを防止できる燃焼機器を提供す
る。
【解決手段】 制御装置20に出湯待機制御手段を設け
る。この制御手段はV2 弁10の閉弁状態で出湯温度が給
湯設定温度となるための給湯熱交換器1の目標湯温T
2calを算出し、給湯バーナ燃焼が停止した以降に目標湯
温T2calと給湯熱交換器湯温センサ14の実測湯温T2 を
比較し、T2 がT2calより予め定めた設定範囲を越えて
高いと判断したときにはV2 弁10への開信号を出力して
V2 弁10を開弁させる。また、出湯温度が給湯設定温度
となる総入水流量Q0 に対する給湯熱交換器1の流量Q
HEの流量比を検出し、V2 弁10への開信号を出力してい
るときには上記検出流量比となるように流量制御弁であ
るV1 弁7の開弁量を制御し次の出湯に備える。
(57) [Problem] To provide a combustion apparatus capable of preventing hot water from flowing out at the start of hot water supply due to post-boiling of a hot water supply heat exchanger. A hot water supply standby control means is provided in a control device (20). The control means target YuAtsushi hot water supply heat exchanger 1 for tapping temperature in the closed state of V 2 valve 10 is equal to the hot water supplying set temperature T
Calculating a 2Cal, compared to after the hot water supply burner combustion stops the measured water temperature T 2 of the target YuAtsushi T 2Cal and hot-water supply heat exchanger hot water temperature sensor 14, exceeds a preset range T 2 is predetermined from the T 2Cal when it is determined that the high Te to open the V 2 valve 10 by outputting an open signal to the V 2 valve 10. Moreover, tapping temperature of the hot water supply heat exchanger 1 to the total water inlet flow rate Q 0 of the hot water set temperature flow Q
Detecting a flow rate ratio of HE, when you are outputting an open signal to the V 2 valve 10 controls the opening amount of V 1 valve 7 which is a flow rate control valve so that the detected flow rate ratio to the next tapping Prepare.
Description
【0001】[0001]
【発明の属する技術分野】本発明は給水通路より導かれ
る水を給湯バーナ燃焼により加熱して給湯通路へ流出す
る給湯熱交換器を備えた燃焼機器に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a combustion apparatus provided with a hot water supply heat exchanger that heats water guided from a water supply passage by hot water supply burner combustion and flows out to the hot water supply passage.
【0002】[0002]
【従来の技術】燃焼機器として代表的な給湯器には、周
知のように、給湯熱交換器と給湯バーナが設けられ、給
湯熱交換器の入側には給水通路が、出側には給湯通路が
それぞれ接続され、給湯通路は台所等の給湯栓へ導かれ
ている。給湯熱交換器は、給湯栓が開けられると、水供
給源から給水通路を介して導かれた水を給湯バーナの給
湯燃焼の熱を利用して加熱し、この加熱した湯を給湯通
路を通し給湯栓を介して出湯する。2. Description of the Related Art As is well known, a typical water heater as a combustion device is provided with a hot water supply heat exchanger and a hot water supply burner, and a water supply passage is provided on the inlet side of the hot water supply heat exchanger and the hot water supply is provided on the outlet side. The passages are connected to each other, and the hot water supply passage is led to a hot water tap in a kitchen or the like. When the hot water tap is opened, the hot water supply heat exchanger heats the water guided from the water supply source through the water supply passage using the heat of the hot water supply combustion of the hot water supply burner, and passes the heated hot water through the hot water supply passage. Hot water is supplied through a hot water tap.
【0003】ところで、多量の湯を出湯供給するため
に、多量の水を給湯熱交換器に流し込むと、給湯熱交換
器は能力不足等によりその多量の流水を十分に加熱する
ことができず、給湯熱交換器の流水温が低下し給湯熱交
換器の水管表面温度が低下して、給湯バーナ燃焼により
発生した水蒸気が給湯熱交換器の水管表面に付着する結
露現象が発生することがある。この結露現象が多発する
と、給湯熱交換器の水管が劣化する等の弊害が生じると
いう問題がある。By the way, when a large amount of water is poured into a hot water supply heat exchanger in order to supply a large amount of hot water, the hot water supply heat exchanger cannot sufficiently heat the large amount of flowing water due to insufficient capacity or the like. The temperature of the flowing water of the hot water supply heat exchanger decreases, the surface temperature of the water pipe of the hot water supply heat exchanger decreases, and a dew condensation phenomenon may occur in which steam generated by the combustion of the hot water supply burner adheres to the surface of the water pipe of the hot water supply heat exchanger. If this condensation phenomenon occurs frequently, there is a problem that adverse effects such as deterioration of the water pipe of the hot water supply heat exchanger occur.
【0004】そこで、上記問題を回避するために、給湯
熱交換器の入側と出側を短絡するバイパス通路を設け、
水供給源から給水通路を介して導かれた水を給湯熱交換
器側とバイパス通路側とに分流させ、給湯熱交換器の流
水量を減少させ、給湯熱交換器の水管表面温度低下を防
止し、給湯熱交換器の結露防止を行う構成の給湯器が提
案されている。Therefore, in order to avoid the above-mentioned problem, a bypass passage which short-circuits the inlet and outlet of the hot water supply heat exchanger is provided.
The water guided from the water supply source via the water supply passage is diverted to the hot water supply heat exchanger side and the bypass passage side, reducing the flow rate of the hot water supply heat exchanger and preventing the water pipe surface temperature of the hot water supply heat exchanger from dropping. In addition, a hot water supply device configured to prevent dew condensation in the hot water supply heat exchanger has been proposed.
【0005】[0005]
【発明が解決しようとする課題】ところで、周知のよう
に、給湯栓の閉栓後つまり給湯停止後(止湯後)、給湯
熱交換器内に滞留した湯は、図6の実線カーブAに示す
ように、給湯停止後すぐに後沸き(給湯熱交換器の保有
熱量が給湯熱交換器の滞留湯に伝わって滞留湯温が上昇
する現象)によって止湯前の給湯熱交換器湯温より高い
湯温(オーバーシュート)の湯となる。このオーバーシ
ュートの湯が給湯栓が開けられて給湯熱交換器から流れ
出ると、湯の利用者が定めた給湯設定温度より高めの湯
が出湯し湯の利用者に不快感を与えてしまうという問題
が生じる。As is well known, hot water retained in the hot water supply heat exchanger after the hot water tap is closed, that is, after hot water supply is stopped (after hot water is stopped), is shown by a solid curve A in FIG. As described above, immediately after the hot water supply is stopped, the hot water is higher than the hot water temperature of the hot water supply heat exchanger before the hot water shuts off due to the after-boil (a phenomenon in which the retained heat of the hot water supply heat exchanger is transmitted to the stagnant hot water of the hot water supply heat exchanger and the stagnant hot water temperature rises). It becomes hot water (overshoot). When the hot water of this overshoot flows out of the hot water supply heat exchanger when the hot water tap is opened, the hot water higher than the hot water supply set temperature set by the user of the hot water may cause discomfort to the user of the hot water supply. Occurs.
【0006】そこで、上記問題を解決するために、前記
バイパス通路を多数設け、それらバイパス通路に該通路
の開閉を行う電磁弁等の開閉弁を介設し、それら開閉弁
の開閉制御を行うことによって、総入水流量に対する給
湯熱交換器の流量比、つまり、給湯熱交換器から流れ出
る湯量とバイパス通路から流れ出る水量のミキシング比
を、出湯時の出湯湯温が給湯設定温度となるように可変
制御する構成とすることが考えられる。Therefore, in order to solve the above problem, a large number of the bypass passages are provided, and an opening / closing valve such as an electromagnetic valve for opening / closing the passage is provided in the bypass passages, and the opening / closing control of the opening / closing valves is performed. The flow ratio of the hot water supply heat exchanger to the total incoming water flow rate, that is, the mixing ratio of the amount of hot water flowing out of the hot water supply heat exchanger and the amount of water flowing out of the bypass passage, is variably controlled so that the temperature of the hot water at the time of tapping becomes the set hot water supply temperature. It is conceivable to adopt a configuration in which
【0007】上記構成の給湯システムを採用する場合
に、給湯設定温度の湯を安定的に出湯させるためには、
バイパス通路およびその開閉弁を多数設け、それら開閉
弁を個々に開閉制御し、出湯時の出湯湯温が給湯設定温
度となるように総入水流量に対する給湯熱交換器の流量
比を制御することが考えられる。このようにするために
は、上記の如く、バイパス通路およびその開閉弁を多数
設けなければならず、その分、管路構成が複雑になる
し、コストもかかり、給湯器の価格が高価になってしま
う。また、バイパス通路を多数設けた分、管路抵抗が大
きくなり、流水量が減少し、多量の湯を供給できなくな
るという問題が生じてしまう。When the hot water supply system having the above configuration is adopted, in order to stably supply hot water at the set hot water supply temperature,
A large number of bypass passages and their on-off valves are provided, and these on-off valves are individually opened and closed to control the flow ratio of the hot water supply heat exchanger to the total incoming water flow rate so that the hot water temperature at the time of hot water reaches the hot water set temperature. Conceivable. In order to do this, as described above, a large number of bypass passages and their on-off valves must be provided, which complicates the pipe configuration, increases the cost, and increases the price of the water heater. Would. In addition, since a large number of bypass passages are provided, the pipe resistance increases, the amount of flowing water decreases, and a problem arises in that a large amount of hot water cannot be supplied.
【0008】本発明は上記課題を解決するためになされ
たものであり、その目的は、簡単な管路構成で、出湯時
の高温出湯を防止でき、しかも、多量の湯を供給でき、
安価な燃焼機器を提供することである。SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to prevent high-temperature hot tapping at the time of tapping with a simple pipe configuration, and to supply a large amount of hot tap water.
It is to provide an inexpensive combustion device.
【0009】[0009]
【課題を解決するための手段】上記目的を達成するため
に、本発明は次のような構成をもって前記課題を解決す
る手段としている。Means for Solving the Problems In order to achieve the above object, the present invention has the following structure to solve the above problems.
【0010】すなわち、第1の発明は、給水通路より導
かれる水を給湯バーナ燃焼の熱を利用して加熱し給湯通
路へ流出する給湯熱交換器と、この給湯熱交換器の入側
と出側を短絡するバイパス通路と、該バイパス通路の開
閉を行うバイパス通路開閉弁と、前記バイパス通路出側
接続部の上流側の給湯通路に設けられ流量を開弁量によ
り制御する流量制御弁と、給水通路の水の温度を検出す
る入水温度センサと、給湯熱交換器の湯水の温度を検出
する給湯熱交換器湯温センサと、給湯温度を設定するた
めの給湯温度設定手段とを有する燃焼機器において、給
湯バーナの給湯燃焼が停止した以降に、総入水流量に対
する予め定めた給湯熱交換器の流量比と、検出入水温
と、給湯設定温度とに基づき次の出湯時の出湯湯温が給
湯設定温度となる給湯熱交換器の目標湯温を求める給湯
熱交換器目標湯温検出部と;この目標湯温と給湯熱交換
器湯温センサの実測湯温を比較し、給湯熱交換器実測湯
温が前記目標湯温より予め与えられた設定範囲を越えて
高いと判断したときにはバイパス通路開閉弁への開信号
を出力し、それ以外のときにはバイパス通路開閉弁への
閉信号を出力するバイパス通路開閉弁開閉動作判断部
と;給湯熱交換器の実測湯温と入水温度センサの検出入
水温と給湯設定温度に基づいて出湯湯温が給湯設定温度
となるための総入水流量に対する給湯熱交換器の流量比
を求め、バイパス通路開閉弁開閉動作判断部からバイパ
ス通路開閉弁への開信号が出力されているときには上記
検出流量比となるように前記流量制御弁の開弁量を制御
して次の出湯に備える流量制御弁開弁量制御部と;を設
ける構成をもって前記課題を解決する手段としている。That is, the first aspect of the present invention provides a hot water supply heat exchanger that heats water guided from a water supply passage using heat of combustion of a hot water supply burner and flows out to the hot water supply passage, and an inlet and outlet of the hot water supply heat exchanger. A bypass passage that short-circuits the bypass passage, a bypass passage opening / closing valve that opens and closes the bypass passage, and a flow control valve that is provided in the hot water supply passage on the upstream side of the bypass passage outlet connection portion and that controls a flow rate by a valve opening amount. Combustion equipment having an incoming water temperature sensor for detecting the temperature of water in the water supply passage, a hot water supply heat exchanger hot water temperature sensor for detecting hot water temperature of the hot water supply heat exchanger, and hot water supply temperature setting means for setting hot water supply temperature After the hot water supply combustion of the hot water supply burner is stopped, the hot water temperature at the next hot water supply is determined based on the flow rate ratio of the predetermined hot water supply heat exchanger to the total incoming water flow rate, the detected incoming water temperature, and the hot water supply set temperature. Set temperature A hot water supply heat exchanger target hot water temperature detection unit for obtaining a target hot water temperature of the heat exchanger; comparing the target hot water temperature with the measured hot water temperature of the hot water supply heat exchanger hot water sensor, When it is determined that the temperature is higher than a predetermined set range than the hot water temperature, an opening signal to the bypass passage opening / closing valve is output, and otherwise, a closing signal to the bypass passage opening / closing valve is output, and the opening / closing operation of the bypass passage opening / closing valve is performed. A determination unit; based on the measured hot water temperature of the hot water supply heat exchanger and the input water temperature detected by the input water temperature sensor and the set hot water supply temperature, determine the flow ratio of the hot water supply heat exchanger to the total input water flow for the hot water supply temperature to reach the hot water supply set temperature. When the opening signal to the bypass passage opening / closing valve is output from the bypass passage opening / closing valve opening / closing operation determination section, the opening amount of the flow control valve is controlled so as to become the above detected flow ratio, and the next tapping is prepared. Flow control valve opening amount A control unit; with a configuration in which a is a means to solve the problem.
【0011】第2の発明は、給水通路より導かれる水を
給湯バーナ燃焼の熱を利用して加熱し給湯通路へ流出す
る給湯熱交換器と、この給湯熱交換器の入側と出側を短
絡するバイパス通路と、該バイパス通路の開閉を行うバ
イパス通路開閉弁と、前記バイパス通路出側接続部の上
流側の給湯通路に設けられ流量を開弁量により制御する
流量制御弁と、給水通路の水の温度を検出する入水温度
センサと、給湯温度を設定するための給湯温度設定手段
とを有する燃焼機器において、給湯バーナの給湯燃焼が
停止した以降に、総入水流量に対する予め定めた給湯熱
交換器の流量比と、検出入水温と、給湯設定温度とに基
づき次の出湯時の出湯湯温が給湯設定温度となる給湯熱
交換器の目標湯温を求める給湯熱交換器目標湯温検出部
と;給湯バーナの給湯燃焼停止後における給湯熱交換器
の滞留湯の温度の時間と共に変化する給湯熱交換器滞留
湯温特性データを格納するデータ格納部と;給湯バーナ
の給湯燃焼が停止する毎にその停止時からの経過時間を
計測する時間計測手段と;該時間計測手段の計測時間に
応じ前記給湯熱交換器滞留湯温特性データに基づいて給
湯熱交換器の湯温を推定検出する給湯熱交換器推定湯温
検出部と;前記給湯熱交換器目標湯温検出部の検出目標
湯温と前記給湯熱交換器推定湯温検出部の推定湯温を比
較し、推定湯温が前記目標湯温より予め与えられた設定
範囲を越えて高いと判断したときにはバイパス通路開閉
弁への開信号を出力し、それ以外のときにはバイパス通
路開閉弁への閉信号を出力するバイパス通路開閉弁開閉
動作判断部と;給湯熱交換器の推定湯温と入水温度セン
サの検出入水温と給湯設定温度に基づいて出湯湯温が給
湯設定温度となるための総入水流量に対する給湯熱交換
器の流量比を求め、バイパス通路開閉弁開閉動作判断部
からバイパス通路開閉弁への開信号が出力されていると
きには上記検出流量比となるように前記流量制御弁の開
弁量を制御して次の出湯に備える流量制御弁開弁量制御
部と;を設ける構成をもって前記課題を解決する手段と
している。According to a second aspect of the present invention, there is provided a hot water supply heat exchanger that heats water guided from a water supply passage by utilizing heat of combustion of a hot water supply burner and flows out to the hot water supply passage. A bypass passage to be short-circuited; a bypass passage opening / closing valve for opening / closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; In a combustion device having a hot water temperature sensor for detecting the temperature of hot water and hot water temperature setting means for setting the hot water temperature, a predetermined hot water supply heat with respect to the total incoming water flow rate after the hot water supply combustion of the hot water burner is stopped. Hot water supply heat exchanger target hot water temperature detection to find the target hot water temperature of the hot water heat exchanger at which the next hot water temperature becomes the hot water set temperature based on the flow rate ratio of the exchanger, the detected incoming water temperature, and the hot water set temperature Part of the hot water burner A data storage unit for storing the temperature data of the staying hot water in the hot water supply heat exchanger that changes with time of the temperature of the hot water in the hot water supply heat exchanger after the stop of hot water combustion; Time measuring means for measuring an elapsed time of the hot water supply; and a hot water supply heat exchanger estimated hot water for estimating and detecting a hot water temperature of the hot water supply heat exchanger based on the staying hot water temperature characteristic data of the hot water supply heat exchanger according to the time measured by the time measuring means. A temperature detector; comparing a detected target hot water temperature of the hot water supply heat exchanger target hot water temperature detector with an estimated hot water temperature of the hot water supply heat exchanger estimated hot water temperature detector, and the estimated hot water temperature is given in advance from the target hot water temperature. A bypass passage opening / closing valve opening / closing operation judging section for outputting an opening signal to the bypass passage opening / closing valve when it is determined to be higher than the set range, and outputting a closing signal to the bypass passage opening / closing valve otherwise; Heat exchanger estimation The flow ratio of the hot water supply heat exchanger to the total incoming water flow for the outlet water temperature to reach the hot water supply set temperature is determined based on the temperature and the incoming water temperature sensor's detection of the incoming water temperature and the set hot water supply temperature. When an open signal to the bypass passage opening / closing valve is being output, a flow control valve opening amount control unit for controlling the opening amount of the flow control valve so as to achieve the detected flow ratio and preparing for the next hot water supply. The configuration provided as a means for solving the above problem.
【0012】第3の発明は、給水通路より導かれる水を
給湯バーナ燃焼の熱を利用して加熱し給湯通路へ流出す
る給湯熱交換器と、この給湯熱交換器の入側と出側を短
絡するバイパス通路と、該バイパス通路の開閉を行うバ
イパス通路開閉弁と、前記バイパス通路出側接続部の上
流側の給湯通路に設けられ流量を開弁量により制御する
流量制御弁と、給水通路の水の温度を検出する入水温度
センサと、給湯熱交換器の湯水の温度を検出する給湯熱
交換器湯温センサと、給湯温度を設定するための給湯温
度設定手段とを有する燃焼機器において、給湯バーナの
給湯燃焼が停止した以降に、総入水流量に対する予め定
めた給湯熱交換器の流量比と、検出入水温と、給湯設定
温度とに基づき次の出湯時の出湯湯温が給湯設定温度と
なる給湯熱交換器の目標湯温を求める給湯熱交換器目標
湯温検出部と;この目標湯温と給湯熱交換器湯温センサ
の実測湯温を比較し、給湯熱交換器実測湯温が前記目標
湯温より予め与えられた設定範囲を越えて高いと判断し
たときにはバイパス通路開閉弁への開信号を出力し、そ
れ以外のときにはバイパス通路開閉弁への閉信号を出力
するバイパス通路開閉弁開閉動作判断部と;給湯バーナ
の給湯燃焼停止後における給湯熱交換器の滞留湯の温度
の時間と共に変化する給湯熱交換器滞留湯温特性データ
を格納するデータ格納部と;給湯バーナの給湯燃焼が停
止する毎にその停止時からの経過時間を計測する時間計
測手段と;該時間計測手段の計測時間に応じ前記給湯熱
交換器滞留湯温特性データに基づいて給湯熱交換器の湯
温を推定検出する給湯熱交換器推定湯温検出部と;給湯
熱交換器の推定湯温と入水温度センサの検出入水温と給
湯設定温度に基づいて出湯湯温が給湯設定温度となるた
めの総入水流量に対する給湯熱交換器の流量比を求め、
バイパス通路開閉弁開閉動作判断部からバイパス通路開
閉弁への開信号が出力されているときには上記検出流量
比となるように前記流量制御弁の開弁量を制御して次の
出湯に備える流量制御弁開弁量制御部と;を設ける構成
をもって前記課題を解決する手段としている。According to a third aspect of the present invention, there is provided a hot water supply heat exchanger which heats water guided from a water supply passage by utilizing heat of combustion of a hot water supply burner and flows out to the hot water supply passage. A bypass passage to be short-circuited; a bypass passage opening / closing valve for opening / closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; In the combustion apparatus having a hot water temperature sensor for detecting the temperature of hot water, a hot water supply heat exchanger hot water temperature sensor for detecting the temperature of hot water in the hot water supply heat exchanger, and hot water supply temperature setting means for setting the hot water supply temperature, After the hot water supply of the hot water supply burner is stopped, the hot water temperature at the next hot water discharge is determined based on the predetermined flow ratio of the hot water supply heat exchanger to the total incoming water flow rate, the detected hot water temperature, and the hot water set temperature. Hot water supply heat exchanger A hot water supply heat exchanger target hot water temperature detection unit for obtaining a target hot water temperature; comparing the target hot water temperature with an actually measured hot water temperature of a hot water supply heat exchanger hot water sensor; A bypass passage opening / closing valve opening / closing operation judging unit that outputs an opening signal to the bypass passage opening / closing valve when it is determined to be higher than the given set range, and outputs a closing signal to the bypass passage opening / closing valve otherwise; A data storage unit for storing the temperature data of the accumulated hot water in the hot water supply heat exchanger that changes with time of the temperature of the hot water in the hot water supply heat exchanger after the stop of the hot water supply combustion of the hot water supply burner; Time measuring means for measuring an elapsed time from a stop; and hot water heat exchange for estimating and detecting the hot water temperature of the hot water heat exchanger based on the staying hot water temperature characteristic data of the hot water heat exchanger according to the time measured by the time measuring means. Device estimation A temperature detection unit; a flow rate ratio of the hot water supply heat exchanger to a total incoming water flow rate for the outlet hot water temperature to become the hot water supply set temperature based on the estimated hot water temperature of the hot water supply heat exchanger and the detected input water temperature and the hot water supply set temperature. ,
When an opening signal to the bypass passage opening / closing valve is outputted from the bypass passage opening / closing valve opening / closing operation determination section, the opening amount of the flow control valve is controlled so as to have the above detected flow ratio, and the flow control for the next hot water supply And a valve-opening-amount control unit.
【0013】第4の発明は、給水通路より導かれる水を
給湯バーナ燃焼の熱を利用して加熱し給湯通路へ流出す
る給湯熱交換器と、この給湯熱交換器の入側と出側を短
絡するバイパス通路と、該バイパス通路の開閉を行うバ
イパス通路開閉弁と、前記バイパス通路出側接続部の上
流側の給湯通路に設けられ流量を開弁量により制御する
流量制御弁と、給水通路の水の温度を検出する入水温度
センサと、給湯熱交換器の湯水の温度を検出する給湯熱
交換器湯温センサと、給湯温度を設定するための給湯温
度設定手段とを有する燃焼機器において、給湯バーナの
給湯燃焼が停止した以降に、総入水流量に対する予め定
めた給湯熱交換器の流量比と、検出入水温と、給湯設定
温度とに基づき次の出湯時の出湯湯温が給湯設定温度と
なる給湯熱交換器の目標湯温を求める給湯熱交換器目標
湯温検出部と;給湯バーナの給湯燃焼停止後における給
湯熱交換器の滞留湯の温度の時間と共に変化する給湯熱
交換器滞留湯温特性データを格納するデータ格納部と;
給湯バーナの給湯燃焼が停止する毎にその停止時からの
経過時間を計測する時間計測手段と;該時間計測手段の
計測時間に応じ前記給湯熱交換器滞留湯温特性データに
基づいて給湯熱交換器の湯温を推定検出する給湯熱交換
器推定湯温検出部と;前記給湯熱交換器目標湯温検出部
の検出目標湯温と前記給湯熱交換器推定湯温検出部の推
定湯温を比較し、推定湯温が前記目標湯温より予め与え
られた設定範囲を越えて高いと判断したときにはバイパ
ス通路開閉弁への開信号を出力し、それ以外のときには
バイパス通路開閉弁への閉信号を出力するバイパス通路
開閉弁開閉動作判断部と;給湯熱交換器の実測湯温と入
水温度センサの検出入水温と給湯設定温度に基づいて出
湯湯温が給湯設定温度となるための総入水流量に対する
給湯熱交換器の流量の流量比を求め、バイパス通路開閉
弁開閉動作判断部からバイパス通路開閉弁への開信号が
出力されているときには上記検出流量比となるように前
記流量制御弁の開弁量を制御して次の出湯に備える流量
制御弁開弁量制御部と;を設ける構成をもって前記課題
を解決する手段としている。A fourth aspect of the present invention is a hot water supply heat exchanger that heats water guided from a water supply passage by utilizing heat of combustion of a hot water supply burner and flows out to the hot water supply passage, and includes an inlet and an outlet of the hot water supply heat exchanger. A bypass passage to be short-circuited; a bypass passage opening / closing valve for opening / closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; In the combustion apparatus having a hot water temperature sensor for detecting the temperature of hot water, a hot water supply heat exchanger hot water temperature sensor for detecting the temperature of hot water in the hot water supply heat exchanger, and hot water supply temperature setting means for setting the hot water supply temperature, After the hot water supply of the hot water supply burner is stopped, the hot water temperature at the next hot water discharge is determined based on the predetermined flow ratio of the hot water supply heat exchanger to the total incoming water flow rate, the detected hot water temperature, and the hot water set temperature. Hot water supply heat exchanger A hot-water supply heat exchanger target hot-water temperature detection unit for obtaining a target hot-water temperature; and storing hot-water temperature characteristic data of the hot-water supply heat exchanger that changes with time of the hot-water temperature of the hot-water supply heat exchanger after the hot-water supply burner stops hot-water supply combustion. A data storage unit;
Time measuring means for measuring an elapsed time from the time of stopping the hot water supply combustion of the hot water supply burner; and hot water supply heat exchange based on the staying hot water temperature characteristic data according to the measurement time of the time measuring means. A hot water supply heat exchanger estimated hot water temperature detecting section for estimating and detecting the hot water temperature of the hot water supply; a detected target hot water temperature of the hot water supply heat exchanger target hot water temperature detecting section and an estimated hot water temperature of the hot water supply heat exchanger estimated hot water temperature detecting section. By comparison, when it is determined that the estimated hot water temperature is higher than the target hot water temperature beyond a predetermined range, an open signal to the bypass passage opening / closing valve is output, and otherwise, a closing signal to the bypass passage opening / closing valve is output. A bypass passage opening / closing valve opening / closing operation judging unit for outputting a temperature of the hot water and a total incoming flow rate for the outlet hot water temperature to become the hot water setting temperature based on the measured hot water temperature and the hot water temperature detected by the hot water temperature sensor. Of hot water supply heat exchanger When the open signal to the bypass passage opening / closing valve is output from the bypass passage opening / closing valve determination section, the valve opening amount of the flow control valve is controlled so as to become the detected flow ratio. And a flow rate control valve opening amount control unit provided for hot water supply.
【0014】第5の発明は、上記第1又は第3又は第4
の発明の構成に加えて、給湯熱交換器側には場所を異に
して複数の給湯熱交換器湯温センサが設けられ、それら
複数の給湯熱交換器湯温センサの検出湯温の和を求め、
この算出値に予め定めた係数を掛けた積算値を給湯熱交
換器の実測湯温とする給湯熱交換器湯温算出部を設ける
構成をもって前記課題を解決する手段としている。According to a fifth aspect of the present invention, the first, third or fourth aspect of the invention is provided.
In addition to the configuration of the invention, a plurality of hot water supply heat exchanger hot water temperature sensors are provided at different locations on the hot water supply heat exchanger side, and the sum of the detected hot water temperatures of the plurality of hot water supply heat exchanger hot water temperature sensors is calculated. Asked,
The means for solving the above-described problem is provided by providing a hot water supply heat exchanger hot water temperature calculation unit that uses the integrated value obtained by multiplying the calculated value by a predetermined coefficient as the measured hot water temperature of the hot water supply heat exchanger.
【0015】第6の発明は、上記第1又は第3又は第4
の発明の構成に加えて、給湯熱交換器側には場所を異に
して複数の給湯熱交換器湯温センサが設けられ、それら
複数の給湯熱交換器湯温センサの検出湯温にそれぞれ予
め定めた係数を掛け、それら算出値の和を給湯熱交換器
の実測湯温とする給湯熱交換器湯温算出部を設ける構成
をもって前記課題を解決する手段としている。[0015] The sixth invention is directed to the first, third, or fourth aspect.
In addition to the configuration of the invention, a plurality of hot water supply heat exchanger hot water temperature sensors are provided at different locations on the hot water supply heat exchanger side, and the detected hot water temperatures of the plurality of hot water supply heat exchanger hot water sensors are respectively set in advance. The above-mentioned problem is solved by a configuration in which a hot water supply heat exchanger hot water temperature calculating unit is provided which multiplies the determined coefficient by a predetermined coefficient and uses the sum of the calculated values as the measured hot water temperature of the hot water supply heat exchanger.
【0016】第7の発明は、上記第1〜第6の発明のい
ずれか1つの発明を構成する給湯熱交換器の給水通路に
おけるバイパス通路接続部の下流側と、給湯熱交換器の
給湯通路における流量制御弁介設位置の上流側とを短絡
する開閉弁を持たない固定バイパス通路が設けられてい
る構成をもって前記課題を解決する手段としている。According to a seventh aspect of the present invention, there is provided a hot water supply heat exchanger comprising the hot water supply heat exchanger according to any one of the first to sixth aspects, wherein the downstream side of the bypass passage connecting portion is provided. The above-mentioned problem is solved by a configuration in which a fixed bypass passage having no on-off valve for short-circuiting the upstream side of the flow control valve interposition position is provided.
【0017】第8の発明は、給水通路より導かれる水を
給湯バーナ燃焼の熱を利用して加熱し給湯通路へ流出す
る給湯熱交換器と、この給湯熱交換器の入側と出側を短
絡するバイパス通路と、該バイパス通路の開閉を行うバ
イパス通路開閉弁と、前記バイパス通路出側接続部の上
流側の給湯通路に設けられ流量を開弁量により制御する
流量制御弁と、給水通路の水の温度を検出する入水温度
センサと、給湯温度を設定するための給湯温度設定手段
とを有する燃焼機器において、給湯熱交換器の給水通路
におけるバイパス通路接続部の下流側と、給湯熱交換器
の給湯通路における流量制御弁介設位置の上流側とを短
絡する固定バイパス通路が設けられ、給湯熱交換器の湯
温情報を検出する給湯熱交換器湯温情報検出手段と;給
湯熱交換器の湯温情報と検出入水温と給湯設定温度に基
づき給湯設定温度より予め定めた設定温度だけ高めの湯
が出湯するための総入水流量に対する給湯熱交換器の流
量比を求める流量比算出部と;給湯熱交換器の流量と固
定バイパス通路の流量の合計流量に対する給湯熱交換器
の流量比が予め基準流量比として与えられ、この基準流
量比と前記流量比算出部の算出流量比を比較し、給湯バ
ーナの給湯燃焼が停止した以降に算出流量比が基準流量
比を下回ったと判断したときにはバイパス通路開閉弁へ
の開信号を出力し、それ以外のときにはバイパス通路開
閉弁への閉信号を出力するバイパス通路開閉弁開閉動作
判断部と;給湯熱交換器の湯温情報と検出入水温と給湯
設定温度に基づいて出湯湯温が給湯設定温度となるため
の総入水流量に対する給湯熱交換器の流量比を求め、前
記バイパス通路開閉弁開閉動作判断部からバイパス通路
開閉弁への開信号が出力されているときには前記検出流
量比となるように流量制御弁の開弁量を制御する流量制
御弁開弁量制御部と;を設ける構成をもって前記課題を
解決する手段としている。According to an eighth aspect of the present invention, there is provided a hot water supply heat exchanger which heats water guided from a water supply passage by utilizing heat of combustion of a hot water supply burner and flows out to the hot water supply passage. A bypass passage to be short-circuited; a bypass passage opening / closing valve for opening / closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; In a combustion apparatus having an incoming water temperature sensor for detecting the temperature of water and a hot water supply temperature setting means for setting the hot water supply temperature, the downstream side of the bypass passage connection portion in the water supply passage of the hot water supply heat exchanger, A hot water supply heat exchanger hot water temperature information detecting means for providing a hot water supply heat exchanger with a fixed bypass passage for short-circuiting the hot water supply passage of the hot water supply passage with the upstream side of the flow control valve interposition position; Bowl hot water A flow ratio calculating unit for calculating a flow ratio of the hot water supply heat exchanger to a total flow rate of hot water for discharging hot water higher than the hot water supply set temperature by a predetermined temperature based on the hot water supply temperature and the detected hot water supply temperature; The flow rate of the hot water supply heat exchanger to the total flow rate of the flow rate of the exchanger and the flow rate of the fixed bypass passage is given in advance as a reference flow rate ratio, and this reference flow rate ratio is compared with the flow rate ratio calculated by the flow rate ratio calculation unit. When it is determined that the calculated flow ratio is lower than the reference flow ratio after the stop of hot water supply combustion, an open signal to the bypass passage on-off valve is output, and otherwise, a close signal to the bypass passage on-off valve is output. An opening / closing valve opening / closing operation determining unit; and a hot water supply heat exchanger for a total incoming flow rate so that the outgoing hot water temperature becomes the hot water supply set temperature based on the hot water temperature information of the hot water supply heat exchanger and the detected incoming water temperature and the hot water supply set temperature. A flow control valve for determining a flow ratio and controlling an opening amount of the flow control valve so that the detected flow ratio is obtained when an opening signal to the bypass passage opening / closing valve is output from the bypass passage opening / closing valve opening / closing operation determination section. And a valve-opening-amount control unit.
【0018】上記構成の発明において、例えば、給湯バ
ーナの給湯燃焼が停止した以降に、バイパス通路開閉弁
の開閉動作判断部は、バイパス通路開閉弁が閉弁状態で
の次の出湯時の出湯湯温が給湯設定温度より予め定めた
設定範囲を越えて高くなると判断したときにバイパス通
路開閉弁への開信号を出力し、バイパス通路開閉弁は開
弁状態で次の出湯に備える。また、バイパス通路開閉弁
開閉動作判断部からバイパス通路開閉弁への開信号が出
力されているときには、流量制御弁開弁量制御部は次の
出湯時の出湯湯温が給湯設定温度となるように流量制御
弁の開弁量を制御して次の出湯に備える。In the invention having the above structure, for example, after the hot water supply combustion of the hot water supply burner is stopped, the opening / closing operation determination unit of the bypass passage opening / closing valve determines whether or not the hot water is supplied at the next tapping with the bypass passage opening / closing valve closed. When it is determined that the temperature becomes higher than the hot water supply set temperature beyond a predetermined set range, an open signal to the bypass passage opening / closing valve is output, and the bypass passage opening / closing valve is in an open state to prepare for the next hot water supply. Also, when the opening signal to the bypass passage opening / closing valve is output from the bypass passage opening / closing valve opening / closing operation determination unit, the flow control valve opening amount control unit sets the outlet hot water temperature at the next hot water to the hot water supply set temperature. The opening amount of the flow control valve is controlled to prepare for the next hot water supply.
【0019】上記出湯待機状態から出湯が開始される
と、給湯熱交換器側の湯とバイパス通路側を通った水が
給湯通路のバイパス通路出側接続部でミキシング(混
合)されて給湯熱交換器側の高温の湯は湯温が下げら
れ、しかも、その給湯熱交換器側の湯量とバイパス通路
側の水量のミキシング比、つまり、総入水流量に対する
給湯熱交換器の流量比は流量制御弁開弁量制御部による
流量制御弁の開弁量制御により出湯湯温が給湯設定温度
となるように制御されているので、出湯開始時に給湯設
定温度の湯が安定に出湯されることになる。When hot water is started from the hot water supply standby state, hot water on the hot water supply heat exchanger side and water passing through the bypass passage side are mixed (mixed) at the bypass passage outlet side connection portion of the hot water supply passage, and hot water supply heat exchange is performed. The high-temperature hot water on the hot water side has a lower hot water temperature, and the mixing ratio of the hot water supply heat exchanger side water quantity and the bypass passage side water quantity, that is, the flow rate ratio of the hot water supply heat exchanger to the total incoming water flow rate is a flow control valve. Since the tap water temperature is controlled by the valve opening control of the flow control valve by the valve opening control unit so that the tap water temperature reaches the hot water supply set temperature, the hot water at the hot water supply set temperature is stably discharged at the start of hot water supply.
【0020】[0020]
【発明の実施の形態】以下に本発明に係る実施の形態例
を図面に基づき説明する。Embodiments of the present invention will be described below with reference to the drawings.
【0021】図7には第1の実施の形態例の燃焼機器で
ある給湯器の主要構成が示されている。同図に示すよう
に、この給湯器には給湯熱交換器1が設けられ、この給
湯熱交換器1の入側には給水通路3が接続され、出側に
は給湯通路4が接続されており、給湯通路4は台所等の
給湯栓19へ導かれている。前記給湯熱交換器1には入側
と出側を短絡する固定バイパス通路5が並設され、この
固定バイパス通路5は給湯熱交換器1側に流れる流量と
固定バイパス通路5側に流れる流量の流量比が管路抵抗
により予め定めた流量比(例えば7対3〜8対2)とな
るように形成されている。FIG. 7 shows a main configuration of a water heater as a combustion device according to the first embodiment. As shown in the figure, the hot water supply apparatus is provided with a hot water supply heat exchanger 1, an inlet side of the hot water supply heat exchanger 1 is connected to a water supply path 3, and an outlet side thereof is connected to a hot water supply path 4. The hot water supply passage 4 is guided to a hot water tap 19 such as a kitchen. The hot water supply heat exchanger 1 is provided with a fixed bypass passage 5 that short-circuits the inlet side and the outlet side. The fixed bypass passage 5 has a flow rate flowing to the hot water supply heat exchanger 1 side and a flow rate flowing to the fixed bypass path 5 side. The flow ratio is formed so as to be a flow ratio (for example, 7: 3 to 8: 2) determined in advance by the pipe resistance.
【0022】また、前記給湯通路4には固定バイパス通
路出側接続部Xより下流側に流量を開弁量により制御す
る流量制御弁であるV1 弁7が介設されている。このV
1 弁7は駆動手段(例えばステッピングモータ)により
開弁量が可変制御されるもので、通常の給湯運転時に
は、V1 弁7は予め定められている最大開弁量に開弁さ
れ、給湯バーナの燃焼能力不足により出湯湯温が給湯設
定温度まで上昇しないときだけ、給湯設定温度の湯が出
湯するための燃焼能力に応じて開弁量の絞り制御が行わ
れる。このV1 弁7の介設位置より下流側の給湯通路4
と、固定バイパス通路入側接続部Yより上流側の給水通
路3とを短絡するバイパス通路8が形成されている。バ
イパス通路8には該通路の開閉を行うバイパス通路開閉
弁であるV2 弁10が介設されている。Further, it said hot water supply passage 4 V 1 valve 7 is interposed a flow rate control valve for controlling the opening amount of the flow rate on the downstream side of the fixed bypass passage outlet side connecting portion X. This V
The first valve 7 in which the valve opening amount is variably controlled by driving means (for example, a stepping motor), during normal hot water supply operation, V 1 valve 7 is opened to the maximum opening amount is determined in advance, the hot water supply burner Only when the hot water temperature does not rise to the hot water supply set temperature due to insufficient combustion capacity of the hot water, the throttle control of the valve opening amount is performed in accordance with the combustion capacity for hot water at the hot water supply set temperature. Hot water supply passage 4 downstream of the position where V 1 valve 7 is interposed
And a bypass passage 8 that short-circuits the water supply passage 3 upstream of the fixed bypass passage entrance-side connection portion Y. V 2 valve 10 is interposed a bypass channel opening and closing valve for opening and closing the passage to the bypass passage 8.
【0023】また、この給湯器には該給湯器の運転動作
を制御する制御装置20が設けられ、この制御装置20には
リモコン18が接続されている。リモコン18には給湯器の
利用者が給湯温度を設定するための給湯温度設定手段21
が形成されている。The water heater is provided with a controller 20 for controlling the operation of the water heater, and a remote controller 18 is connected to the controller 20. Remote controller 18 has a hot water temperature setting means 21 for the user of the water heater to set the hot water temperature.
Are formed.
【0024】なお、図中、12は水供給源から給水通路3
を介して導かれた入水流量を検出するための流量検出セ
ンサを示し、13は給水通路3の入水の温度を検出するた
めのサーミスタ等の入水温度センサを示し、14は給湯熱
交換器1の出側の湯水の温度を検出するためのサーミス
タ等の給湯熱交換器湯温センサを示し、15は給湯熱交換
器1側の湯水と固定バイパス通路5側の水がミキシング
された後の湯水の温度を検出するためのサーミスタ等の
第1出湯温度センサを示し、16は給湯通路4のバイパス
通路出側接続部Zより下流側の湯水の温度を検出するた
めのサーミスタ等の第2出湯温度センサを示すものであ
る。In the drawing, reference numeral 12 denotes a water supply passage 3 from a water supply source.
A flow rate detection sensor for detecting a flow rate of incoming water guided through the water supply passage; 13, an incoming water temperature sensor such as a thermistor for detecting the temperature of incoming water in the water supply passage 3; A hot water supply heat exchanger hot water temperature sensor such as a thermistor for detecting the temperature of the hot water on the exit side is shown. Reference numeral 15 denotes hot water after the hot water on the hot water supply heat exchanger 1 and the water on the fixed bypass passage 5 are mixed. Reference numeral 16 denotes a first tapping temperature sensor such as a thermistor for detecting the temperature. Reference numeral 16 denotes a second tapping temperature sensor such as a thermistor for detecting the temperature of the tap water downstream of the bypass passage outlet connection portion Z of the hot water supply passage 4. It shows.
【0025】図1にはこの第1の実施の形態例において
特徴的な制御装置20の主要構成が示されている。この制
御装置20は給湯バーナの給湯燃焼停止中(出湯待機中)
に次の出湯時の出湯湯温が給湯設定温度となるようにV
2 弁10の開閉制御とV1 弁7の開弁量制御を行う出湯待
機制御手段25を備えており、この出湯待機制御手段25
は、サンプリング部35と、給湯熱交換器目標湯温検出部
であるT2cal検出部36と、バイパス通路開閉弁開閉動作
判断部であるV2 開閉動作判断部37と、流量制御弁開弁
量制御部であるV1 開弁量制御部38と、データ格納部40
とを有して構成されている。FIG. 1 shows a main configuration of a control device 20 which is characteristic in the first embodiment. This control device 20 is stopping the hot water supply combustion of the hot water supply burner (during standby for tapping).
So that the temperature of the hot water at the next hot water reaches the hot water supply set temperature.
Comprises a tapping standby control unit 25 that performs valve opening amount control of the switching controller and V 1 valve 7 of the second valve 10, the hot water standby control unit 25
Includes a sampling unit 35, and T 2Cal detector 36 is a hot water supply heat exchanger target hot water temperature detecting section, a V 2 closing operation determination unit 37 is a bypass channel opening and closing valve opening and closing operation determination unit, a flow control valve opening amount and V 1 opening amount control unit 38 is a control unit, a data storage unit 40
And is configured.
【0026】上記サンプリング部35は入水温度センサ13
や給湯熱交換器湯温センサ14等の様々なセンサ出力や、
リモコン18の情報(例えば、給湯温度設定手段21の給湯
設定温度)等を予め定められたサンプリング時間間隔
(例えば1秒)毎にサンプリングする構成を有してい
る。The sampling section 35 is provided with the incoming water temperature sensor 13.
And various sensor outputs such as hot water supply heat exchanger hot water temperature sensor 14,
A configuration is provided in which information of the remote controller 18 (for example, the hot water supply setting temperature of the hot water supply temperature setting means 21) and the like are sampled at predetermined sampling time intervals (for example, one second).
【0027】データ格納部40は記憶装置により形成され
ており、このデータ格納部40には次に示すT2cal検出デ
ータが予め格納されている。このT2cal検出データはバ
イパス通路8のV2 弁10が閉弁している状態で出湯湯温
が給湯設定温度となるための給湯熱交換器の目標湯温T
2calを検出するためのデータであり、本実施の形態例で
は、下記の(1)式と、総入水流量に対する予め定めた
給湯熱交換器1の流量比m(0<m<1)とのデータが
T2cal検出データとしてデータ格納部40に格納されてい
る。The data storage unit 40 is formed by a storage device, and the following T 2 cal detection data is stored in the data storage unit 40 in advance. The T 2 cal detection data indicates the target hot water temperature T of the hot water supply heat exchanger for keeping the hot water temperature at the hot water supply set temperature when the V 2 valve 10 of the bypass passage 8 is closed.
This is data for detecting 2 cal , and in the present embodiment, the following equation (1) and a predetermined flow rate ratio m (0 <m <1) of the hot water supply heat exchanger 1 to the total incoming water flow rate are used. The data is stored in the data storage unit 40 as T2cal detection data.
【0028】 T2cal=(Ts −(1−m)T1 )/m・・・・・(1)T 2cal = (T s − (1-m) T 1 ) / m (1)
【0029】上記(1)式に示すTs は給湯設定温度を
表し、T1 は入水温度を表すもので、上記(1)式は次
のようにして導き出された。すなわち、出湯湯温が給湯
設定温度となるためには、給水通路3より導かれた総入
水流量Q0 の水を入水温T1から給湯設定温度Ts まで
上昇させるのに必要な熱量J0 (J0 =(Ts −T1)
・Q0 ・C(ただしCは水の比熱))と、上記総入水流
量Q0 のうちの給湯熱交換器1を流れる流量QHE(QHE
=m・Q0 )の水を入水温T1 から前記給湯熱交換器1
の目標湯温T2calまで上昇させるのに必要な熱量J
HE(JHE=(T2cal−T1 )・QHE・C=(T2cal−T
1 )・m・Q0 ・C)とが等しくなければならないとい
う関係((Ts −T1 )・Q0 ・C=(T2cal−T1 )
・m・Q0 ・C)から前記(1)式は導き出された。T s shown in the above equation (1) represents the hot water supply set temperature, T 1 represents the incoming water temperature, and the above equation (1) was derived as follows. In other words, in order for the hot water temperature to reach the hot water supply set temperature, the heat quantity J 0 required to raise the water having the total incoming flow rate Q 0 guided from the water supply passage 3 from the incoming water temperature T 1 to the hot water supply set temperature T s. (J 0 = (T s -T 1)
· Q 0 · C (although C is the specific heat of water) and), the flow rate flowing through the hot water supply heat exchanger 1 of the total incoming water flow rate Q 0 Q HE (Q HE
= M · Q 0 ) from the incoming water temperature T 1 to the hot water supply heat exchanger 1
Required to raise the target hot water temperature T2cal to J
HE (J HE = (T 2cal −T 1 ) · Q HE · C = (T 2cal −T
1 ) · m · Q 0 · C) must be equal ((T s −T 1 ) · Q 0 · C = (T 2cal −T 1 )
· M · Q 0 · C), the above equation (1) was derived.
【0030】前記(1)式のTs にリモコン18の給湯設
定手段21の給湯設定温度を、T1 に入水温度センサ13の
検出入水温を、mに予め定められている総入水流量に対
する給湯熱交換器1の流量比(例えば、V2 弁10が閉弁
している状態では入水は給湯熱交換器1側と固定バイパ
ス通路5側に分岐して流れ、その給湯熱交換器1の流量
と固定バイパス通路5の流量の流量比は管路抵抗により
予め定められているので、その流量比が、例えば、7対
3である場合にはm=0.7 と予め定められる)をそれぞ
れ代入し(1)式に従って演算を行うことによって、給
湯熱交換器1の目標湯温T2calを算出することができ
る。The hot water supply to the hot water set temperature of the hot water supply setting means 21 of the remote controller 18 to T s of the formula (1), the detection input water temperature entering water temperature sensor 13 to T 1, relative to the total water inlet flow rate predetermined for m The flow rate ratio of the heat exchanger 1 (for example, when the V 2 valve 10 is closed, the incoming water branches and flows to the hot water supply heat exchanger 1 side and the fixed bypass passage 5 side. Since the flow ratio of the flow rate of the fixed bypass passage 5 and the flow rate of the fixed bypass passage 5 is predetermined by the pipe resistance, when the flow rate ratio is, for example, 7: 3, m = 0.7 is predetermined. By performing the calculation according to the expression 1), the target hot water temperature T 2cal of the hot water supply heat exchanger 1 can be calculated.
【0031】T2cal検出部36は給湯バーナの給湯燃焼が
停止した以降に、前記サンプリング部35がサンプリング
した入水温度センサ13の検出入水温T1 と給湯温度設定
手段21の給湯設定温度Ts を、例えば予め定めた時間間
隔(例えば1秒)毎に取り込み、また、前記データ格納
部40から前記T2cal検出データを読み出して、検出入水
温T1 と給湯設定温度Ts とT2cal検出データに基づき
出湯湯温が給湯設定温度Ts となるための給湯熱交換器
1の目標湯温T2calを演算検出する。After the hot water supply burner stops the hot water supply combustion, the T 2 cal detecting section 36 detects the incoming water temperature T 1 detected by the incoming water temperature sensor 13 sampled by the sampling section 35 and the hot water set temperature T s of the hot water temperature setting means 21. , for example, incorporation predetermined time interval (e.g., 1 second) for each, also said from the data storage unit 40 reads out the T 2Cal detection data, the detection input temperature T 1 and the hot water set temperature T s and T 2Cal detection data hot water temperature of the hot water based detects calculates a target YuAtsushi T 2Cal of the hot water supply heat exchanger 1 for a hot water set temperature T s.
【0032】前記データ格納部40には、さらに、給湯設
定温度からの出湯湯温許容ずれ範囲が許容範囲α(例え
ば3℃)として予め定められ格納されている。なお、上
記許容範囲αとして0℃を与えてもよい。In the data storage section 40, a permissible deviation range of the hot water temperature from the set hot water supply temperature is predetermined and stored as a permissible range α (for example, 3 ° C.). Note that 0 ° C. may be given as the allowable range α.
【0033】V2 開閉動作判断部37は、サンプリング部
35がサンプリングした給湯熱交換器湯温センサ14の実測
湯温T2 と、前記T2cal検出部36が検出した給湯熱交換
器1の目標湯温T2calとを取り込んで比較し、給湯バー
ナの給湯燃焼が停止した以降に上記実測湯温T2 が目標
湯温T2calより前記データ格納部40の許容範囲αを越え
て高いと判断したとき(T2 >T2cal+α)には、V2
弁10の閉弁状態で出湯が開始されると給湯設定温度より
許容範囲を越えた高めの湯が出湯してしまうので、V2
弁10を開弁し出湯時にバイパス通路8から給湯通路4へ
水を流れ込ませ給湯通路4の湯の温度を下げる必要があ
ると判断し、V2 開閉駆動手段41へV2弁開信号(バイ
パス通路開閉弁への開信号)を出力し、V2 開閉駆動手
段41の開弁動作によりV2 弁10を開弁させると共に、上
記V2 弁開信号をV1 開弁量制御部38へ加える。それ以
外のときにはV2 開閉駆動手段41へV2 弁閉信号(バイ
パス通路開閉弁への閉信号)を出力しV2 弁10を閉弁さ
せておく。[0033] V 2 closing operation determination unit 37, a sampling unit
35 that the actual water temperature T 2 of the hot water supply heat exchanger hot water temperature sensor 14 which is sampled, the T 2Cal detecting unit 36 compares captures the target YuAtsushi T 2Cal of the hot water supply heat exchanger 1 detection, hot water burner by the time the hot water supply combustion is the actual water temperature T 2 after having stopped is determined to be high beyond the allowable range alpha of the than the target YuAtsushi T 2Cal data storage unit 40 (T 2> T 2cal + α), V 2
Since the hot water in a closed state of the valve 10 is started yu enhanced beyond the allowable range from the hot water set temperature results in pouring, V 2
When it is determined that it is necessary to open the valve 10 and allow the water to flow from the bypass passage 8 to the hot water supply passage 4 at the time of hot water supply to lower the temperature of the hot water in the hot water supply passage 4, the V 2 opening / closing drive means 41 sends a V 2 valve open signal (by-pass signal). and outputting an open signal) to the channel opening and closing valve, it causes opening the V 2 valve 10 by opening operation of the V 2 closing driving means 41, adding the V 2 valve open signal to V 1 opening amount control unit 38 . Allowed to close the output and V 2 valve 10 (close signal to the bypass passage on-off valve) to V 2 close drive means 41 V 2 valve closing signal when the other.
【0034】V1 開弁量制御部38は、前記データ格納部
40に予め格納されているT4cal検出演算式データ(T
4cal=(T2 −T1 )・M+T1 ;(ただしMは定
数))に、サンプリング部35がサンプリングした入水温
度センサ13の検出入水温T1 と、給湯熱交換器湯温セン
サ14の実測湯温T2 とを代入し、給湯熱交換器1で温め
られた湯と固定バイパス通路5を通った水のミキシング
後の湯温T4calを推定演算検出する。The V 1 valve opening control section 38 is provided with the data storage section.
T 4cal detection arithmetic expression data (T
4cal = (T 2 −T 1 ) · M + T 1 ; (where M is a constant), the measured incoming water temperature T 1 of the incoming water temperature sensor 13 sampled by the sampling unit 35 and the actual measurement of the hot water supply heat exchanger hot water temperature sensor 14 substituting the water temperature T 2, estimates and calculates detecting water temperature T 4Cal after mixing of the water through the hot water heated by the hot water supply heat exchanger 1 static bypass passage 5.
【0035】上記T4cal検出演算式データは給湯熱交換
器1の湯と固定バイパス通路5の水をミキシングしたと
きの湯温T4calを推定検出するためのデータであり、T
4cal検出演算式データの定数Mは給湯熱交換器1の流量
と固定バイパス通路5の流量の合計流量QV1に対する給
湯熱交換器1の流量QHEの流量比(M=QHE/QV1)を
表し、前記の如く、その流量比は予め定められたもので
あることから、定数(例えばM=0.7 )として与えられ
ている。上記T4cal検出演算式データは、給湯熱交換器
1の流量と固定バイパス通路5の流量の合計流量QV1の
水が入水温T1から湯温T4calまで上昇するのに要する
熱量JV1(JV1=(T4cal−T1 )・QV1・C;(ただ
しCは水の比熱))と、給湯熱交換器1が上記合計流量
QV1のうちの流量QHE(QHE=M・QV1)の水に与える
熱量JHE(JHE=(T2 −T1 )・QHE・C)とが等し
くなるという関係から導き出されたものである。The T 4 cal detection arithmetic expression data is data for estimating and detecting the hot water temperature T 4 cal when the hot water of the hot water supply heat exchanger 1 and the water of the fixed bypass passage 5 are mixed.
The constant M of the 4 cal detection calculation formula data is the flow ratio of the flow rate Q HE of the hot water supply heat exchanger 1 to the total flow rate Q V1 of the flow rate of the hot water supply heat exchanger 1 and the fixed bypass passage 5 (M = Q HE / Q V1 ). As described above, since the flow ratio is predetermined, it is given as a constant (for example, M = 0.7). The above T 4 cal detection arithmetic expression data indicates the amount of heat J V1 required for the water of the total flow rate Q V1 of the flow rate of the hot water supply heat exchanger 1 and the flow rate of the fixed bypass passage 5 to rise from the incoming water temperature T 1 to the hot water temperature T 4 cal ( J V1 = (T 4cal -T 1 ) · Q V1 · C (where C is the specific heat of water), and the hot water supply heat exchanger 1 determines the flow rate Q HE of the total flow rate Q V1 (Q HE = M · This is derived from the relationship that the amount of heat J HE (J HE = (T 2 −T 1 ) · Q HE · C) given to water of Q V1 ) is equal.
【0036】また、V1 開弁量制御部38は、上記算出さ
れた湯温T4calと、サンプリング部35がサンプリングし
た検出入水温T1 と、給湯設定温度Ts と、前記データ
格納部40に予め格納されているN算出演算式データ(N
=M・(Ts −T1 )/(T4cal−T1 ))とに基づい
て、出湯湯温が給湯設定温度Ts となるための総入水流
量Q0 に対する給湯熱交換器1の流量QHEの流量比N
(N=QHE/Q0 )を算出する。上記N算出演算式デー
タは、上記の如く、出湯湯温が給湯設定温度Tsとなる
ための総入水流量Q0 に対する給湯熱交換器1の流量Q
HEの流量比を算出するためのデータである。この演算式
データの定数Mは、前記T4cal検出演算式データに用い
た定数Mと同数の定数であり、給湯熱交換器1の流量と
固定バイパス通路5の流量の合計流量QV1に対する給湯
熱交換器1の流量QHEの流量比を表すものである。The V 1 valve opening control section 38 stores the calculated hot water temperature T 4 cal , the detected incoming water temperature T 1 sampled by the sampling section 35, the hot water supply set temperature T s, and the data storage section 40. Calculation calculation formula data (N
= M · (T s −T 1 ) / (T 4cal −T 1 )), and the flow rate of the hot water supply heat exchanger 1 with respect to the total incoming flow rate Q 0 for the hot water temperature to reach the hot water supply set temperature T s. Q HE flow ratio N
(N = Q HE / Q 0 ) is calculated. Said N calculating operation expression data, as described above, hot water hot water temperature is hot water set temperature T s to become total incoming water flow rate Q 0 flow rate Q of the hot water supply heat exchanger 1 against for
This is data for calculating the HE flow ratio. The constant M of this arithmetic expression data is the same number of constants as the constant M used in the T 4 cal detection arithmetic expression data, and the hot water supply heat with respect to the total flow rate Q V1 of the flow rate of the hot water supply heat exchanger 1 and the flow rate of the fixed bypass passage 5. It shows the flow rate ratio of the flow rate Q HE of the exchanger 1.
【0037】上記N算出演算式データは、出湯湯温が給
湯設定温度となるためには、総入水流量Q0 の入水温T
1 の水を給湯設定温度Ts まで加熱するのに要する熱量
J0(J0 =(Ts −T1 )・Q0 ・C)と、総入水流
量Q0 のうちのV1 弁7を通る流量QV1(給湯熱交換器
1の流量と固定バイパス通路5の流量の合計流量)の湯
が入水温T1 から湯温T4calまで上昇するのに受け取っ
た熱量JV1(JV1=(T4cal−T1 )・QV1・C)とが
等しくなければならないという関係、および、前述した
ようなQHE=M・QV1という関係により導き出されるも
のである。The above-mentioned N calculation formula data indicates that the incoming water temperature T of the total incoming water flow rate Q 0 is required for the outlet water temperature to reach the hot water supply set temperature.
The amount of heat J 0 (J 0 = (T s −T 1 ) · Q 0 · C) required to heat the water 1 to the hot water supply set temperature T s and the V 1 valve 7 of the total incoming water flow rate Q 0 The amount of heat J V1 (J V1 = (J V1 = (J V1 = ()) that the hot water of the passing flow rate Q V1 (the total flow rate of the flow rate of the hot water supply heat exchanger 1 and the flow rate of the fixed bypass passage 5) rises from the incoming water temperature T 1 to the hot water temperature T 4cal. T 4cal -T 1 ) ・ Q V1 CC) and the relationship Q HE = M ・ Q V1 as described above.
【0038】さらに、V1 開弁量制御部38は、給湯バー
ナの給湯燃焼停止以降に前記V2 開閉動作判断部37から
V2 弁開信号を加えられたときには、上記算出した流量
比NとなるようにV1 弁7の開弁量を制御し次の出湯に
備える。それ以外のときにはV1 弁7は給湯停止前の開
弁量で次の出湯に備えることになる。[0038] Further, V 1 opening amount control unit 38, when added to V 2 valve opening signal from the V 2 closing operation determination unit 37 after the hot water supply combustion stop of hot water burner, the flow rate ratio N calculated above controlling the opening amount of V 1 valve 7 so as to prepare for the next tapping. It V 1 valve 7 and in the other cases will be ready for the next tapping at the valve opening amount before stopping the hot water supply.
【0039】なお、上記V1 弁7の駆動手段にV1 弁7
の開弁量を測定するためのポジションメーターやエンコ
ーダ等の開弁量測定手段を取り付けて周知のようにV1
弁7の開弁量を測定できるようにし、その測定開弁量に
基づいてV1 弁7の開弁量を制御するようにしてもよい
し、駆動手段がステッピングモータで形成されている場
合にはステッピングモータへ加えられるパルス駆動信号
のパルス数およびモータの回転方向を制御装置20に取り
込み、予め与えられるパルス数とV1 弁開弁量の関係デ
ータに基づいてV1 弁7の開弁量を検出するようにし、
その検出開弁量に基づいてV1 弁7の開弁量を制御する
等、V1 弁7の開弁量制御手法には様々な手法が提案さ
れており、それら提案手法のうちのどの手法を用いても
構わず、その手法は周知であるのでその説明は省略す
る。もちろん、前記データ格納部40には前記流量比Nと
V1 弁開弁量の関係データである開弁量制御データが予
め実験や演算等により求め与えられている。The V 1 valve 7 is driven by the V 1 valve 7.
V 1 As is known to attach a valve opening amount measuring means such as a position meter and the encoder for measuring the valve opening amount
To be able to measure the opening amount of the valve 7, may be controlled the valve opening amount of V 1 valve 7 based on the measurement opening amount, when the driving means is formed by a stepping motor the number of pulses of the pulse drive signal applied to the stepping motor and captures the rotational direction of the motor to the controller 20, the amount of opening of the V 1 valve 7 based on the relationship data in advance the number given pulse and V 1 valve opening amount To detect
Etc. for controlling the valve opening amount of V 1 valve 7 based on the detected opening amount, the opening amount control method of V 1 valve 7 have been proposed various techniques, which techniques of them proposed method May be used, and the description thereof is omitted because the method is well known. Of course, in the data storage unit 40 the valve opening amount control data is a relation data of the flow rate ratio N and V 1 valve opening amount is given determined by experiment, calculation or the like.
【0040】上記構成の出湯待機制御手段25の動作例を
図2のフローチャートに基づいて簡単に説明する。ま
ず、ステップ101 で給湯バーナの給湯燃焼が停止すると
(つまり、出湯待機中になると)、ステップ102 でサン
プリング部35がサンプリングした給湯設定温度Ts と検
出入水温T1 をT2cal検出部36が取り込み、ステップ10
3 で、その給湯設定温度Ts および検出入水温T1 と、
データ格納部40のT2cal検出データとに基づいて、T
2cal検出部36はV2 弁10の閉弁状態での出湯湯温が給湯
設定温度Ts となるための給湯熱交換器1の目標湯温T
2calを算出する。An example of the operation of the hot water supply standby control means 25 having the above configuration will be briefly described with reference to the flowchart of FIG. First, the hot water supply combustion of the hot water supply burner is stopped at step 101 (i.e., becomes in tapping waiting), the hot water set temperature T s and the detected incoming water temperature T 1 of the sampling unit 35 is sampled in step 102. T 2Cal detector 36 Capture, step 10
3, the hot water supply set temperature T s and the detected incoming water temperature T 1 ,
Based on the T 2cal detection data in the data storage unit 40,
2cal detector 36 target YuAtsushi hot water hot water in the closed state of the hot-water heat exchanger 1 for a hot water set temperature T s of the V 2 valve 10 T
Calculate 2cal .
【0041】ステップ104 で、V2 開閉動作判断部37は
上記算出した目標湯温T2calと給湯熱交換器湯温センサ
14の実測湯温T2 を比較し、T2 がT2calより設定範囲
(許容範囲)αを越えて高い(T2 >(T2cal+α))
と判断したときには、ステップ105 で、V2 弁10の閉弁
状態での次の出湯時の出湯湯温が給湯設定温度Ts より
許容範囲αを越えて高くなると判断し、V2 弁開信号を
V2 開閉駆動手段41へ出力してV2 弁10を開弁させると
共に、V2 弁開信号をV1 開弁量制御部38へ加える。[0041] In step 104, V 2 closing operation determination unit 37 is a target YuAtsushi T 2Cal and hot-water supply heat exchanger hot water temperature sensor calculated above
Comparing 14 measured hot water temperatures T 2 , T 2 is higher than T 2cal beyond the set range (allowable range) α (T 2 > (T 2cal + α))
And when it is determined, at step 105, it is determined that the next pouring hot water temperature during tapping in the closed state of V 2 valve 10 is increased beyond the allowable range α from the hot water set temperature T s, V 2 valve open signal the causes opening the V 2 valve 10 is output to the V 2 close drive means 41, adding V 2 valve open signal to V 1 opening amount control unit 38.
【0042】ステップ106 で、前記V2 弁開信号を受け
たV1 開弁量制御部38は、データ格納部40のT4cal検出
演算式データおよびN算出演算式データと、給湯設定温
度Ts と、検出入水温T1 と、給湯熱交換器1の実測湯
温T2 とに基づいて、次の出湯時の出湯湯温が給湯設定
温度Ts となるための総入水流量Q0 に対する給湯熱交
換器1の流量QHEの流量比N(N=QHE/Q0 )を検出
し、ステップ107 で、その検出流量比NとなるようにV
1 弁7の開弁量を制御する。[0042] In step 106, V 1 opening amount control unit 38 receives the V 2 valve-open signal, the T 4Cal detection calculation formula data and N calculated arithmetic expression data of the data storage unit 40, the hot water set temperature T s And the detected hot water temperature T 1 and the actually measured hot water temperature T 2 of the hot water supply heat exchanger 1, the hot water supply for the total incoming flow rate Q 0 so that the hot water temperature at the next hot water becomes the hot water supply set temperature T s. The flow rate ratio N of the flow rate Q HE of the heat exchanger 1 (N = Q HE / Q 0 ) is detected.
The opening amount of one valve 7 is controlled.
【0043】そして、ステップ108 で、V2 開閉動作判
断部37は次の給湯熱交換器1の実測湯温T2 を取り込
み、前記ステップ104 で、この実測湯温T2 と検出目標
湯温T2calを比較し、T2 >T2cal+αと判断したとき
には、前記ステップ105 以降の動作を繰り返し行い、前
記ステップ104 で、T2 ≦T2cal+αと判断したときに
は、ステップ109 でV2 開閉駆動手段41へV2 弁閉信号
を出力しV2 弁10を閉弁させ、前記ステップ104 以降の
動作を繰り返し行いながら次の出湯に備える。[0043] Then, at step 108, V 2 closing operation determination unit 37 takes in the measured water temperature T 2 of the following hot-water supply heat exchanger 1, in step 104, this measured water temperature T 2 detected target YuAtsushi T The two cals are compared, and when it is determined that T 2 > T 2cal + α, the operation from step 105 is repeated. When it is determined in step 104 that T 2 ≦ T 2cal + α, the V 2 opening / closing driving means is determined in step 109. 41 is closed the output to V 2 valves 10 V 2 valve close signal to, while repeating the operation of step 104 and subsequent ready for the next tapping.
【0044】この実施の形態例によれば、給湯バーナの
給湯燃焼が停止した以降に、V2 弁10の閉弁状態におけ
る次の出湯時の出湯湯温が給湯設定温度Ts より予め定
めた許容範囲αを越えて高くなると判断したときには、
V2 弁10を開け、出湯湯温が給湯設定温度Ts となるよ
うにV1 弁7の開弁量を制御して総入水流量Q0 に対す
る給湯熱交換器1の流量QHEの流量比Nを小さくする方
向に制御し次の出湯に備える構成としたので、例えば、
給湯熱交換器1の滞留湯に後沸きが生じオーバーシュー
トの湯となり、この状態で給湯栓19が開けられ出湯開始
してそのオーバーシュートの湯が給湯熱交換器1から流
れ出したとしても、このオーバーシュートの湯に固定バ
イパス通路5およびバイパス通路8からの水がミキシン
グされて湯温が下げられ、しかも、そのミキシング比、
つまり、流量比Nは、出湯湯温が給湯設定温度Ts とな
るように制御されているために、給湯設定温度Ts の湯
を出湯させることができる。このことにより、湯の利用
者に出湯時の高温出湯による不快感を与えてしまうとい
う問題を回避することが可能となる。[0044] According to this embodiment, since the hot water supply combustion of the hot water supply burner is stopped, hot water hot water during the next pouring in a closed state of V 2 valve 10 is predetermined from the hot water set temperature T s When it is determined that the value exceeds the allowable range α,
Opening the V 2 valve 10, the flow rate ratio of the flow rate Q HE hot water supply heat exchanger 1 to the total water inlet flow rate Q 0 by controlling the valve opening amount of V 1 valve 7 as hot water hot water is hot water set temperature T s Since N was controlled in the direction of decreasing and prepared for the next hot water, for example,
Even though the hot water in the hot water supply heat exchanger 1 is post-boiled and becomes overshoot water, the hot water tap 19 is opened and the hot water starts flowing out of the hot water supply source, and even if the overshoot water flows out of the hot water supply heat exchanger 1, The water from the fixed bypass passage 5 and the bypass passage 8 is mixed with the overshoot water to lower the temperature of the hot water.
In other words, the flow rate ratio N in order to tapping hot water temperature is controlled to be equal to the hot water supplying set temperature T s, the hot water of the hot water set temperature T s can be tapped. This makes it possible to avoid a problem that the user of the hot water gives discomfort due to the high-temperature hot water when the hot water is discharged.
【0045】また、上記の如く、バイパス通路8のV2
弁10を開け、V1 弁7の開弁量を制御するだけで、容易
に総入水流量Q0 に対する給湯熱交換器1の流量比Nを
制御することが可能であることから、バイパス通路およ
びその開閉弁をこれ以上設ける必要がないので、管路構
成が簡単で、また、コスト低減を図ることが可能である
し、管路抵抗の増加を抑制でき、多量の給湯設定温度の
湯を供給することが可能である。As described above, the V 2 of the bypass passage 8 is
Open the valve 10, since only by controlling the opening amount of V 1 valve 7, it is possible to easily control the total water inlet flow rate Q 0 flow rate ratio N of the hot water supply heat exchanger 1 for the bypass passage and Since there is no need to provide the on-off valve any more, the pipeline configuration is simple, the cost can be reduced, the increase in pipeline resistance can be suppressed, and a large amount of hot water at the set hot water supply temperature can be supplied. It is possible to
【0046】なお、上記出湯待機制御手段25が適用され
る燃焼機器は図7の給湯器に限定されるものではなく、
給湯熱交換器1と、給湯熱交換器1の入側と出側を短絡
するバイパス通路8およびそのV2 弁10と、バイパス通
路出側接続部Zより上流側に設けられるV1 弁7と、給
湯熱交換器湯温センサ14と、給湯湯温設定手段21とを有
する燃焼機器であれば、上記出湯待機制御手段25を適用
することができる。例えば、図9には、上記第1の実施
の形態例における出湯待機制御手段25が適用される燃焼
機器である給湯器の他の例が示されている。この給湯器
は図7に示す給湯器の構成に風呂の湯張り機能や高温差
し湯機能を加えた構成を有するものである。同図に示す
ように、この給湯器の給湯通路4には通路23の一端側が
接続され、この通路23の他端側は電磁弁等の注湯制御弁
22を介して浴槽24へ導かれており、例えば、注湯制御弁
22を開け、給湯バーナ燃焼により温められた湯を通路23
を通して浴槽24へ導くことにより湯張りや高温差し湯が
行われる。The combustion equipment to which the hot water standby control means 25 is applied is not limited to the water heater shown in FIG.
A hot water supply heat exchanger 1, the bypass passage 8 and V 2 valve 10 for short-circuiting side incoming and outgoing side of the hot water supply heat exchanger 1, and V 1 valve 7 provided on the upstream side of the bypass passage outlet-side connecting portion Z The hot water supply standby control means 25 can be applied to any combustion apparatus having a hot water supply heat exchanger hot water temperature sensor 14 and hot water supply temperature setting means 21. For example, FIG. 9 shows another example of a water heater that is a combustion device to which the hot water supply standby control unit 25 according to the first embodiment is applied. This water heater has a configuration in which a bath filling function and a high-temperature hot water supply function are added to the configuration of the water heater shown in FIG. As shown in the figure, one end of a passage 23 is connected to a hot water supply passage 4 of the water heater, and the other end of the passage 23 is connected to a pouring control valve such as a solenoid valve.
It is led to a bathtub 24 via 22, for example, a pouring control valve
22 is opened and hot water heated by hot water
The bath is filled with water and hot water is supplied to the bathtub 24 through the bath.
【0047】上記の如く、湯張りや高温差し湯を行うと
きには、通常、給湯を行う場合よりも給湯熱交換器の湯
温が高めとなることから、湯張りや高温差し湯が終了し
た後には給湯時より高温の湯が給湯熱交換器1に滞留す
ることになるし、その上、後沸きが生じて上記給湯熱交
換器1の滞留湯の湯温がさらに高温となる。このよう
に、給湯熱交換器1に給湯時より高温の湯が滞留してい
る状態から給湯栓19が開けられ給湯が開始されると、最
初に高温の湯が給湯熱交換器1から流れ出ることにな
り、給湯設定温度より高温の湯が出湯し湯の利用者に不
快感を与えてしまうという問題が生じる。特に、高温差
し湯のために作り出された非常に高温の滞留湯が出湯開
始により給湯熱交換器1から流れ出て出湯すると、湯の
利用者に火傷を負わせてしまうという問題があるが、上
記第1の実施の形態例に示した出湯待機制御手段25を制
御装置20に設け、出湯待機動作を行うことで、上記問題
を回避することができる。As described above, when hot water or hot water is supplied, the hot water temperature of the hot water supply heat exchanger is usually higher than when hot water is supplied. Hot water having a temperature higher than that at the time of hot water supply will stay in the hot water supply heat exchanger 1, and after-boiling will occur, and the hot water temperature of the hot water staying in the hot water supply heat exchanger 1 will further increase. As described above, when hot water tap 19 is opened and hot water supply is started from a state where hot water stays in hot water supply heat exchanger 1 at the time of hot water supply, hot water flows out of hot water supply heat exchanger 1 first. Therefore, there arises a problem that hot water having a temperature higher than the set hot water supply temperature gives discomfort to a user of tap water. In particular, there is a problem that when a very high-temperature stagnant hot water created for high-temperature hot water flows out of the hot water supply heat exchanger 1 at the start of hot water supply and gives out hot water, a user of the hot water may be burned. The above-described problem can be avoided by providing the hot water standby control means 25 shown in the first embodiment in the control device 20 and performing the hot water standby operation.
【0048】図8には上記第1の実施の形態例に示した
出湯待機制御手段が適用される燃焼機器である複合給湯
器の一例が示されている。この複合給湯器は、図7に示
す給湯器の構成に、湯張り機能や、高温差し湯機能や、
追い焚き機能等の風呂機能を加えた構成を有するもので
ある。図8に示すように、この複合給湯器は、図7に示
す給湯システム構成に加えて、図示されていない風呂バ
ーナと、浴槽水を循環ポンプ28の駆動により導入して風
呂バーナの燃焼の熱を利用し追い焚き熱交換器26で加熱
し浴槽24へ戻す追い焚き循環路27と、この追い焚き循環
路27と給湯通路4を接続する湯張り通路30と、該通路の
開閉を行う注湯制御弁22とを有しており、例えば、注湯
制御弁22を開け、給湯熱交換器1で温められた湯を湯張
り通路30と追い焚き循環路27を介して浴槽24へ落とし込
み風呂の湯張りを行ったり、同様にして高温差し湯を行
ったり、循環ポンプ28を駆動し、浴槽水を追い焚き循環
路27で循環させると共に風呂バーナ燃焼の熱を利用して
追い焚き熱交換器26で加熱することで風呂の追い焚きを
行うことができるものである。FIG. 8 shows an example of a combined water heater that is a combustion device to which the hot water supply standby control means shown in the first embodiment is applied. This combined water heater has a hot water filling function, a high-temperature hot water supply function,
It has a configuration in which a bath function such as a reheating function is added. As shown in FIG. 8, in addition to the hot water supply system configuration shown in FIG. 7, this combined hot water supply system includes a bath burner (not shown) and bathtub water introduced by driving a circulation pump 28 to generate heat of combustion of the bath burner. A reheating cycle 27, which is heated by the reheating heat exchanger 26 and returned to the bathtub 24, a filling passage 30 connecting the reheating circuit 27 and the hot water supply passage 4, and a pouring opening and closing the passage. The control valve 22 is provided, for example, the pouring control valve 22 is opened, the hot water warmed by the hot water supply heat exchanger 1 is dropped into the bathtub 24 through the hot water passage 30 and the reheating circuit 27, and Filling the water, hot water supply in the same manner, driving the circulation pump 28, recirculate the bath water in the reheating circuit 27, and use the heat of the bath burner combustion to reheat the heat exchanger 26. It is possible to reheat a bath by heating at a temperature.
【0049】上記複合給湯器の制御装置20に前記出湯待
機制御手段25を設け、出湯待機動作を行うことによっ
て、出湯時の高温出湯により湯の利用者に不快感を与え
てしまうという問題、および、高温出湯により湯の利用
者に火傷を負わせてしまうという危険を回避することが
できる。The hot water supply standby control means 25 is provided in the control device 20 of the combined water heater to perform the hot water supply standby operation, thereby causing a problem of discomfort to a user of the hot water due to high-temperature hot water supply at the time of hot water supply. Further, it is possible to avoid the danger that the user of the hot water may burn the user due to the hot water.
【0050】図10には上記第1の実施の形態例に示した
出湯待機制御手段が適用される燃焼機器である一缶二水
構成の給湯器の一例が示されている。この給湯器は、図
7に示す給湯器の構成に、湯張り機能や、高温差し湯機
能や、追い焚き機能等の風呂機能の構成を加えたもので
あり、給湯バーナが風呂バーナを兼用し、給湯熱交換器
1には給湯用の湯水が流れる給湯用管路47と浴槽循環水
が流れる追い焚き用管路48が形成されている。給湯用管
路47の入側には給水通路3が、出側には給湯通路4がそ
れぞれ接続され、前記追い焚き用管路48は浴槽24の湯水
を循環するための追い焚き循環路27に介設されている。FIG. 10 shows an example of a water heater of a one-can-two-water configuration, which is a combustion apparatus to which the hot water supply standby control means shown in the first embodiment is applied. This water heater is obtained by adding a bath function such as a hot water filling function, a hot water supply function, and a reheating function to the configuration of the water heater shown in FIG. 7, and the hot water supply burner also functions as a bath burner. The hot water supply heat exchanger 1 is provided with a hot water supply pipe 47 through which hot water flows and a reheating pipe 48 through which bathtub circulating water flows. The hot water supply pipe 47 is connected to the inlet side of the hot water supply pipe 47 and the hot water supply path 4 is connected to the outlet side thereof. The reheating pipe 48 is connected to the reheating circuit 27 for circulating the hot water in the bathtub 24. It is interposed.
【0051】上記一缶二水構成の給湯器は、例えば、給
湯栓19が開けられると、給湯バーナの給湯燃焼を行っ
て、給水通路3より導かれた水を給湯熱交換器1で加熱
し、その湯を給湯通路4を通し給湯栓19を介して出湯す
る給湯運転を行う。また、この給湯器は、例えば、循環
ポンプ28を駆動させ、浴槽24の水を追い焚き循環路27で
循環させると共に、給湯バーナの追い焚き燃焼を行って
加熱し追い焚き単独運転を行う。When the hot-water tap 19 is opened, for example, the hot-water supply burner performs hot-water combustion of the hot-water supply burner, and heats the water guided from the water-supply passage 3 by the hot-water supply heat exchanger 1. Then, a hot water supply operation is performed in which the hot water passes through the hot water supply passage 4 and is discharged through the hot water tap 19. In addition, this water heater drives, for example, a circulation pump 28 to circulate water in the bathtub 24 in the reheating circuit 27, and performs reheating combustion by heating the hot water supply burner to perform reheating operation alone.
【0052】前記図10に示すような一缶二水構成の給湯
器では、追い焚き単独運転による給湯バーナの追い焚き
燃焼によって、給湯熱交換器1の給湯用管路47の滞留湯
水も加熱されてしまい、次の出湯時に給湯設定温度より
高めの湯が出湯し、前記の如く、湯の利用者に高めの湯
による不快感を与えてしまうという問題および高温出湯
による火傷の危険があるという問題が生じる。そこで、
制御装置20に前記出湯待機制御手段25を設け、出湯待機
動作を行うことによって、追い焚き単独運転による給湯
バーナの追い焚き燃焼により給湯熱交換器1の給湯用管
路47の滞留湯が加熱され、給湯時の給湯熱交換器湯温よ
り高くなってしまっても、上記第1の実施の形態例で示
したようにV2 弁10の開閉弁制御およびV1 弁7の開弁
量制御を行うことで、出湯時に給湯設定温度の湯を出湯
させることができ、上記問題を回避することができる。In the water heater having a one-can, two-water configuration as shown in FIG. 10, the hot water in the hot water supply line 47 of the hot water heat exchanger 1 is also heated by the reheating combustion of the hot water supply burner in the reheating alone operation. The next time the hot water is supplied, the hot water that is higher than the set hot water supply temperature flows out, and as described above, there is a problem that the user of the hot water gives discomfort due to the high hot water and a problem that there is a danger of burns due to the high temperature hot water. Occurs. Therefore,
By providing the hot water standby control means 25 in the control device 20 and performing the hot water standby operation, the hot water in the hot water supply pipe 47 of the hot water heat exchanger 1 is heated by the additional heating of the hot water supply burner by the additional heating operation. , even it has become higher than the hot water supply heat exchanger hot water temperature during hot water supply, the valve opening amount control of the on-off valve control and V 1 valve 7 of V 2 valve 10 as shown in embodiment of the first embodiment By doing so, hot water at the set hot water supply temperature can be discharged at the time of tapping, and the above problem can be avoided.
【0053】以下に第2の実施の形態例を説明する。こ
の実施の形態例は図7に示すような単機能の給湯器を対
象にしており、この実施の形態例において特徴的なこと
は、給湯熱交換器1の湯温を実測するのではなく、図3
に示すように、制御装置20の出湯待機制御手段25に、給
湯熱交換器推定湯温検出部である推定T2 検出部42およ
び時間計測手段43を設け、給湯熱交換器1の湯温T2 を
推定検出し、この推定湯温T2 を用いて給湯バーナの給
湯燃焼が停止した以降に次の出湯時の出湯湯温が給湯設
定温度となるようにV2 弁10の開閉制御およびV1 弁7
の開弁量制御を行って次の出湯に備える構成としたこと
であり、それ以外の構成は前記第1の実施の形態例と同
様であり、その重複説明は省略する。この実施の形態例
において特徴的な制御装置20の出湯待機制御手段25は、
サンプリング部35と、T2cal検出部36と、V2 開閉動作
判断部37と、V1 開閉量制御部38と、データ格納部40
と、推定T2 検出部42と、時間計測手段43とを有して構
成されている。Hereinafter, a second embodiment will be described. This embodiment is directed to a single-function water heater as shown in FIG. 7, and a characteristic of this embodiment is not to actually measure the hot water temperature of the hot water supply heat exchanger 1, FIG.
As shown in the figure, the hot water supply standby control means 25 of the control device 20 is provided with an estimated T 2 detecting section 42 and a time measuring means 43 which are an estimated hot water temperature detecting section for the hot water supply heat exchanger. 2 was estimated detection, opening and closing control and V of V 2 valve 10 as hot water hot water at the next tapping after the hot water supply combustion is stopped in the hot-water supply burner temperature using the estimated water temperature T 2 is equal to the hot water supplying set temperature 1 valve 7
The valve opening amount control is performed to prepare for the next hot water supply. Other configurations are the same as those of the first embodiment, and the duplicate description will be omitted. Hot water supply standby control means 25 of control device 20 which is characteristic in this embodiment
Sampling unit 35, T 2 cal detecting unit 36, V 2 opening / closing operation determining unit 37, V 1 opening / closing amount control unit 38, data storage unit 40
, An estimated T 2 detecting unit 42 and a time measuring unit 43.
【0054】データ格納部40には、前記第1の実施の形
態例に示したT2cal検出データおよびT4cal検出演算式
データおよびN検出演算式データに加えて、給湯熱交換
器滞留湯温特性データである滞留湯温特性データが予め
格納されている。この滞留湯温特性データは、給湯停止
からの経過時間と、給湯熱交換器1の滞留湯温との関係
データであり、予め実験や演算等により求められ、図6
に示すグラフデータや演算式データや表データ等のデー
タ形式でデータ格納部40に格納されている。The data storage section 40 stores, in addition to the T 2 cal detection data, the T 4 cal detection calculation formula data, and the N detection calculation formula data shown in the first embodiment, the hot water temperature characteristic of the hot water supply heat exchanger. The retained hot water temperature characteristic data, which is data, is stored in advance. The retained hot water temperature characteristic data is data relating to the elapsed time from the stoppage of hot water supply and the retained hot water temperature of the hot water supply heat exchanger 1, and is obtained in advance by experiments, calculations, and the like.
Are stored in the data storage unit 40 in a data format such as graph data, arithmetic expression data, and table data shown in FIG.
【0055】時間計測手段43は給湯バーナの給湯燃焼が
停止する毎にその停止時からの経過時間を計測する構成
を有し、推定T2 検出部42は、給湯バーナの給湯燃焼が
停止した以降に、前記時間計測手段43の計測時間とデー
タ格納部40の前記滞留湯温特性データに基づいて、予め
定めた時間間隔(例えば1秒)毎に給湯熱交換器1の湯
温T2 を推定検出する。The time measuring means 43 has a structure for measuring the elapsed time from the stop each time hot water combustion of the hot water supply burner is stopped. The estimated T 2 detecting section 42 detects the time after the hot water supply combustion of the hot water supply burner stops. Next, the hot water temperature T 2 of the hot water supply heat exchanger 1 is estimated at predetermined time intervals (for example, one second) based on the measured time of the time measuring means 43 and the accumulated hot water temperature characteristic data of the data storage unit 40. To detect.
【0056】V2 開閉動作判断部37は、給湯バーナの給
湯燃焼が停止した以降に、予め定めた時間間隔(例えば
1秒)毎に、T2cal検出部36で検出された給湯熱交換器
1の目標湯温T2calと、上記推定T2 検出部42が推定検
出した給湯熱交換器1の推定湯温T2 とを取り込んで比
較し、推定湯温T2 が目標湯温T2calよりデータ格納部
40の許容範囲αを越えて高い(T2 >T2cal+α)と判
断したときには、前記第1の実施の形態例同様にV2 弁
10の閉弁状態での次の出湯時の出湯湯温が給湯設定温度
より高くなると判断し、V2 開閉駆動手段41へV2 弁開
信号を出力しV2 弁10を開弁させると共に、V2 弁開信
号をV2 開弁量制御部38へ加える。それ以外のときには
V2 開閉駆動手段41へV2 弁閉信号を出力しV2 弁10を
閉弁状態にする。[0056] V 2 closing operation determination unit 37, since the hot water supply combustion of the hot water supply burner is stopped, in advance for each predetermined time interval (e.g. one second), T 2cal detector 36 hot water supply heat exchanger is detected by the 1 a target YuAtsushi T 2Cal of the estimated T 2 detecting section 42 compares captures the estimated hot water temperature T 2 of the estimated detected hot water supply heat exchanger 1, the estimated hot water temperature T 2 data than the target YuAtsushi T 2Cal Storage
When it is determined that the temperature exceeds the allowable range α of 40 (T 2 > T 2cal + α), the V 2 valve is used in the same manner as in the first embodiment.
Pouring hot water temperature during the next tapping in the closed state of 10 is determined to be higher than the hot water set temperature, it causes opening the V 2 valve 10 outputs the V 2 valve open signal to V 2 close drive means 41, Add V 2 valve open signal to V 2 the valve opening amount control unit 38. Otherwise when to output closed state V 2 valves 10 V 2 valve close signal to V 2 close drive means 41.
【0057】V1 開弁量制御部38は、前記V2 弁開信号
が加えられているときには、上記推定湯温T2 と検出入
水温T1 と給湯設定温度Ts とデータ格納部40のT4cal
検出演算式データとN算出演算式データに基づき、前記
第1の実施の形態例同様に、次の出湯時の出湯湯温が給
湯設定温度となるようにV1 弁7の開弁量を制御し、次
の出湯に備える。[0057] V 1 opening amount control unit 38, when the V 2 valve opening signal is applied, the estimated hot water temperature T 2 and the detection input temperature T 1 and the hot water set temperature T s and the data storage unit 40 T 4cal
Based on the detected operation expression data and N calculated arithmetic expression data, the similar first exemplary embodiment, the control valve opening degree of V 1 valve 7 as hot water hot water temperature during the next tapping is hot water set temperature And prepare for the next hot spring.
【0058】この実施の形態例によれば、前記第1の実
施の形態例同様に、簡単な管路構成で、出湯開始時に給
湯設定温度の湯を多量に出湯させることが可能となると
いう画期的な効果を奏することができる。また、給湯熱
交換器1の湯温を実測するのではなく、推定検出し、そ
の推定湯温を用いてV2 弁10の開閉制御およびV1 弁7
の開弁量制御を行う構成であるので、給湯熱交換器湯温
センサ14が故障してセンサ出力T2 が実際の湯温と大き
く異なっているという事態が生じても、本実施の形態例
では、そのセンサ出力は用いず、前記の如く、推定湯温
を用いてV2 弁10の開閉制御およびV1 弁7の開弁量制
御を行っていることから、出湯湯温が給湯設定温度とな
るように正確にV2 弁10の開閉制御およびV1 弁7の開
弁量制御を行うことができ、高温の湯が出湯し湯の利用
者に不快感を与えてしまうという問題や高温出湯による
危険を回避することができる。According to this embodiment, similarly to the first embodiment, it is possible to discharge a large amount of hot water at the set hot water supply temperature at the start of hot water supply with a simple pipe configuration. A periodical effect can be achieved. Further, instead of actually measuring the hot water temperature hot-water supply heat exchanger 1, and estimated detection, switching control and V 1 valve V 2 valve 10 using the estimated water temperature 7
Since it is configured to perform a valve opening amount control, even when a situation that the hot water supply heat exchanger hot water temperature sensor 14 is the sensor output T 2 failed is largely different from the actual water temperature, this embodiment in its sensor output is not used, the as, since it is performed the opening amount control of the switching controller and V 1 valve 7 of V 2 valve 10 using the estimated water temperature, hot water temperature of the hot water is hot water set temperature become exactly as it is possible to perform the valve opening amount control of the switching controller and V 1 valve 7 of V 2 valve 10, the high-temperature hot water is tapped by the user to and disadvantageously discomfort hot water The danger caused by tapping can be avoided.
【0059】以下に第3の実施の形態例を説明する。こ
の実施の形態例は、図7に示す給湯器のシステムを有す
る燃焼機器、例えば、図7の給湯器はもちろんのこと、
それ以外の図8の複合給湯器や、図9の多機能給湯器
や、図10の一缶二水構成の給湯器等を対象にしている。
第3の実施の形態例において特徴的なことは、前記各実
施の形態例に示したT2cal検出部36を設けるのではな
く、図4に示すように、制御装置20の出湯待機制御手段
25に、流量比算出部44を設けたことであり、給湯熱交換
器1の滞留湯温に基づいてV2 弁10の開閉判断動作を行
うのではなく、上記流量比算出部44が算出する流量比に
基づいてV2 弁10の開閉判断動作を行う構成としたこと
である。それ以外の構成は前記各実施の形態例同様であ
り、その重複説明は省略する。Hereinafter, a third embodiment will be described. This embodiment is a combustion apparatus having the water heater system shown in FIG. 7, for example, the water heater shown in FIG.
Other than the above, the combined water heater of FIG. 8, the multifunctional water heater of FIG. 9, and the water heater of one can and two water configuration of FIG.
The feature of the third embodiment is that the T 2 cal detection unit 36 shown in each of the above embodiments is not provided, but as shown in FIG.
25, and by providing the flow rate calculation unit 44, instead of performing a closing determination operation of V 2 valve 10, the above flow ratio calculating section 44 calculates on the basis of the residence hot water temperature of the hot water supply heat exchanger 1 is that where the structure for opening and closing determination operation of V 2 valve 10 on the basis of the flow ratio. Other configurations are the same as those of the above-described embodiments, and the description thereof will not be repeated.
【0060】本実施の形態例では、給湯熱交換器湯温セ
ンサ14を給湯熱交換器湯温情報検出手段として用いても
よいし、あるいは、給湯熱交換器湯温情報検出手段とし
て制御装置20の出湯待機制御手段25に推定T2 検出部42
および時間計測手段43を設けてもよい。前記流量比算出
部44は、上記給湯熱交換器湯温情報検出手段の検出湯温
T2 と、入水温度センサ13の検出入水温T1 と、給湯温
度設定手段21の給湯設定温度Ts と、データ格納部40に
予め格納されるNcal 検出演算式データ(Ncal =
((Ts +α)−T1 )/(T2 −T1 ))とに基づい
て、給湯設定温度Ts より予め定めた許容範囲α(例え
ば3℃)だけ高めの湯が出湯するための総入水流量Q0
に対する給湯熱交換器1の流量QHEの流量比Ncal を算
出する。In this embodiment, the hot water supply heat exchanger hot water temperature sensor 14 may be used as hot water supply heat exchanger hot water temperature information detecting means, or the control device 20 may be used as hot water supply heat exchanger hot water temperature information detecting means. Estimated T 2 detection unit 42
And a time measuring means 43. The flow ratio calculating section 44, a detection water temperature T 2 of the said hot-water supply heat exchanger hot water temperature information detecting means, and detects incoming water temperature T 1 of the incoming water temperature sensor 13, a hot water set temperature T s of the hot water supply temperature setting means 21 , N cal detection arithmetic expression data (N cal =
((T s + α) -T 1 ) / (T 2 −T 1 )), so that hot water higher than the hot water supply set temperature T s by a predetermined allowable range α (for example, 3 ° C.) is discharged. Total incoming water flow Q 0
The flow rate ratio N cal of the flow rate Q HE of the hot water supply heat exchanger 1 to the flow rate N cal is calculated.
【0061】上記Ncal 検出演算式データは、上記流量
比Ncal を算出するための演算式であり、前記各実施の
形態例で述べたN算出演算式データ同様に導き出された
ものである。そのNcal 算出演算式データの導出手順の
詳細な説明は前記N算出演算式データの導出手順と同様
であるので省略する。The N cal detection calculation formula data is a calculation formula for calculating the flow rate ratio N cal , and is derived similarly to the N calculation calculation formula data described in each of the above embodiments. The detailed description of the procedure for deriving the N cal calculation expression data is the same as the procedure for deriving the N calculation expression data, and a description thereof will be omitted.
【0062】データ格納部40には、予め定められている
給湯熱交換器1の流量と固定バイパス通路5の流量の合
計流量QV1に対する給湯熱交換器1の流量QHEの流量比
M(M=QHE/QV1;(例えばM=0.7 ))が基準流量
比として格納されている。The data storage unit 40 stores a flow rate ratio M (M (M) of the flow rate Q HE of the hot water supply heat exchanger 1 to the total flow rate Q V1 of the predetermined flow rate of the hot water supply heat exchanger 1 and the flow rate of the fixed bypass passage 5. = Q HE / Q V1 ; (for example, M = 0.7) is stored as the reference flow ratio.
【0063】V2 開閉動作判断部37は、給湯バーナが給
湯燃焼停止した以降に、前記流量比算出部44の算出流量
比Ncal とデータ格納部40の基準流量比Mを取り込んで
比較し、Ncal がMを下回った(M>Ncal )と判断し
たときには、V2 弁10の閉弁状態での次の出湯時の出湯
湯温が給湯設定温度Ts より設定範囲(許容範囲α)を
越えて高くなってしまうと判断し、V2 開閉駆動手段41
へV2 弁開信号を出力し、V2 弁10を開弁させると共
に、V2 弁開信号をV1 開弁量制御部38へ加える。それ
以外のときにはV1 弁閉信号をV2 開閉駆動手段41へ出
力し、V2 弁10を閉弁状態にする。The V 2 opening / closing operation judging section 37 fetches and compares the calculated flow rate ratio N cal of the flow rate ratio calculating section 44 with the reference flow rate ratio M of the data storage section 40 after the hot water supply burner stops hot water supply combustion. N cal falls below M when it is determined that the (M> N cal), the next hot water tapping hot water temperature is set from the hot water supply set temperature T s range during at closed state of V 2 valve 10 (tolerance alpha) It was determined that becomes high beyond, V 2 close drive means 41
To output a V 2 valve open signal, it causes opening the V 2 valve 10, addition of V 2 valve open signal to V 1 opening amount control unit 38. The No. V 1 valve closing signal is output to the V 2 close drive means 41 in the other cases, the V 2 valve 10 in a closed state.
【0064】V1 開弁量制御部38は、前記V2 開閉動作
判断部37のV2 弁開信号を受けて、前記各実施の形態例
同様に、次の出湯時の出湯湯温が給湯設定温度Ts とな
るようにV1 弁7の開弁量、つまり、総入水流量Q0 に
対する給湯熱交換器1の流量QHEの流量比Nを制御す
る。[0064] V 1 opening amount control unit 38 receives the V 2 valve opening signal of the V 2 closing operation determination unit 37, the embodiment similarly to each exemplary, tapping hot water for the next hot water is hot water the amount of opening of the V 1 valve 7 such that the set temperature T s, that is, to control the flow rate ratio N of the flow rate Q HE hot water supply heat exchanger 1 to the total water inlet flow rate Q 0.
【0065】この実施の形態例によれば、前記各実施の
形態例同様の優れた効果を奏することができる。According to this embodiment, excellent effects similar to those of the above embodiments can be obtained.
【0066】以下に、第4の実施の形態例を説明する。
この実施の形態例において特徴的なことは、図7の鎖線
で示すように、給湯器の周りの外気温を検出するための
外気温センサ32を設け、図3および図4に示す推定T2
検出部42および時間計測手段43を形成して給湯熱交換器
1の湯温T2 を推定検出する際に、前記外気温センサ32
の検出外気温に応じて推定湯温T2 を補正する構成とし
たことであり、それ以外の構成は前記各実施の形態例同
様であり、その重複説明は省略する。Hereinafter, a fourth embodiment will be described.
The characteristic of this embodiment is that an external air temperature sensor 32 for detecting the external air temperature around the water heater is provided as shown by a dashed line in FIG. 7, and an estimated T 2 shown in FIG. 3 and FIG.
When forming the detection unit 42 and the time measuring means 43 for estimating detecting water temperature T 2 of the hot water supply heat exchanger 1, the outside temperature sensor 32
Detection out is to have a configuration to correct the estimated water temperature T 2 in accordance with the temperature, and the other configuration is the same embodiment of the respective embodiments, the description will not be repeated.
【0067】データ格納部40には外気温に応じて推定湯
温T2 を補正するための湯温補正データ(例えば、外気
温と推定湯温補正係数の関係データ)が予め実験や演算
等により求め格納されている。[0067] hot water temperature correction data for the data storage unit 40 to correct the estimated water temperature T 2 in accordance with the ambient temperature (e.g., relationship data of the outside air temperature and the estimated hot water temperature correction coefficient) by the pre-experiment or calculation, etc. Sought and stored.
【0068】推定T2 検出部42は前記第2の実施の形態
例同様に給湯熱交換器1の湯温T2を推定検出し、この
推定湯温T2 を外気温センサ32の検出外気温とデータ格
納部40の湯温補正データに基づいて補正する。例えば、
湯温補正データが外気温と推定湯温補正係数の関係デー
タで構成されている場合には、上記湯温補正データに基
づき検出外気温に応じた推定湯温補正係数を検出し、前
記推定湯温T2 にその検出した推定湯温補正係数を掛け
て補正する。上記のように、補正した推定湯温T2 ′を
推定湯温T2 として検出する。The estimated T 2 detector 42 estimates and detects the hot water temperature T 2 of the hot water supply heat exchanger 1 in the same manner as in the second embodiment, and uses the estimated hot water temperature T 2 as the detected outside air temperature of the outside air temperature sensor 32. Is corrected based on the hot water temperature correction data in the data storage unit 40. For example,
When the hot water temperature correction data is composed of data relating to the outside air temperature and the estimated hot water temperature correction coefficient, an estimated hot water temperature correction coefficient corresponding to the detected outside air temperature is detected based on the hot water temperature correction data, and the temperature T 2 by multiplying the detected estimated hot water temperature correction coefficient to correct. As described above, the corrected estimated hot water temperature T 2 ′ is detected as the estimated hot water temperature T 2 .
【0069】この実施の形態例によれば、外気温センサ
32を設け、外気温センサ32の検出外気温に応じ給湯熱交
換器1の推定湯温T2 を補正する構成としたので、より
正確に給湯熱交換器1の湯温T2 を推定検出することが
可能となり、出湯時の高温出湯により湯の利用者に不快
感を与えてしまうという問題および高温出湯による危険
を回避することができる。According to this embodiment, the outside air temperature sensor
32 is provided, since a configuration to correct the estimated water temperature T 2 of the hot water supply heat exchanger 1 according to the detection air temperature of the outside air temperature sensor 32, to more accurately estimate the water temperature T 2 of the hot water supply heat exchanger 1 Detection This makes it possible to avoid the problem of giving a user of the hot water discomfort due to the high-temperature hot-water tapping at the time of tapping and the danger of the hot-water tapping.
【0070】なお、外気温を考慮した滞留湯温特性デー
タ、つまり、給湯停止してからの経過時間と外気温に基
づいて給湯熱交換器1の滞留湯温を求めるための表デー
タや演算式データやグラフデータ等を予め実験や演算等
により求めてデータ格納部40に格納しておき、時間計測
手段43の計測時間と外気温センサ32の検出外気温と上記
滞留湯温特性データに基づいて、給湯熱交換器1の湯温
を推定検出するようにすれば、この実施の形態例に示し
たような推定湯温の補正を行わなくても、給湯熱交換器
1の湯温を正確に推定検出することができる。Table data and calculation formulas for determining the staying hot water temperature of the hot water supply heat exchanger 1 based on the staying hot water temperature characteristic data in consideration of the outside air temperature, that is, the elapsed time since the stop of hot water supply and the outside air temperature. Data and graph data are obtained in advance by experiments and calculations and stored in the data storage unit 40, based on the measurement time of the time measuring unit 43, the detected outside air temperature of the outside air temperature sensor 32, and the staying hot water temperature characteristic data. If the hot water temperature of the hot water supply heat exchanger 1 is estimated and detected, the hot water temperature of the hot water supply heat exchanger 1 can be accurately determined without performing the correction of the estimated hot water temperature as shown in this embodiment. Estimation can be detected.
【0071】以下に第5の実施の形態例を説明する。第
5の実施の形態例において特徴的なことは、給湯熱交換
器1側に場所を異にして複数の給湯熱交換器湯温センサ
14を設け、制御装置20の出湯待機制御手段25に、前記各
実施の形態例の構成に加えて、図5に示すように、複数
の給湯熱交換器湯温センサ14(14a,14b,14c)の検
出湯温の演算処理を行う給湯熱交換器湯温算出部である
T2 算出部45を設ける構成としたことであり、それ以外
の構成は前記各実施の形態例同様である。Hereinafter, a fifth embodiment will be described. A characteristic of the fifth embodiment is that a plurality of hot water supply heat exchanger hot water sensors are provided at different locations on the hot water supply heat exchanger 1 side.
14 and a plurality of hot-water supply heat exchanger hot-water sensors 14 (14a, 14b, 14c) as shown in FIG. ) and the detection hot water it has T 2 the calculator 45 is provided configured as a hot water supply heat exchanger water temperature calculation unit for performing arithmetic processing temperature of the other configuration is the same embodiment of the respective embodiments.
【0072】なお、図5では、サンプリング部35とデー
タ格納部40とT2 算出部45以外の出湯待機制御手段25の
ブロック構成は前記図1又は図3又は図4と同様である
ため、その図示を省略し、その重複説明は省略する。[0072] In FIG. 5, since the block configuration of the sampling unit 35 and the data storage unit 40 and the T 2 calculator 45 other tapping standby control unit 25 is similar to FIG. 1 or FIG. 3 or FIG. 4, the The illustration is omitted, and the overlapping description is omitted.
【0073】ところで、図10に示すような一缶二水構成
の給湯器において、追い焚き単独運転が行われる場合に
は、給湯バーナの追い焚き燃焼により給湯熱交換器1の
給湯用管路47内の滞留湯水に温度むらが生じる。この温
度むらのために給湯熱交換器湯温センサ14が唯一個しか
設けられていないときには給湯熱交換器湯温センサ14の
検出湯温と、給湯熱交換器1の給湯用管路47内の滞留湯
の湯温を均一化したときの平均湯温とが大きくことなっ
てしまう場合があり、出湯時には給湯用管路47の湯水は
水流により撹拌され温度が均一化されて流れ出るので、
上記検出湯温は給湯用管路47から流れ出る湯の湯温と大
きく異なる虞れがあり、前記各実施の形態例同様に出湯
待機動作を行っても、出湯時に給湯設定温度より許容範
囲を越えた高めの湯が出湯し湯の利用者に不快感を与え
てしまうという問題が生じる虞れがある。By the way, in the single-can, two-water hot water supply system as shown in FIG. 10, when the reheating operation is performed alone, the reheating combustion of the hot water supply burner causes the hot water supply line 47 of the hot water supply heat exchanger 1 to operate. The temperature of the hot water stays in the room. When only one hot water supply heat exchanger hot water temperature sensor 14 is provided due to this temperature unevenness, the detected hot water temperature of the hot water supply heat exchanger hot water temperature sensor 14 and the hot water supply pipe 47 of the hot water supply heat exchanger 1 The average hot water temperature when the hot water temperature of the stagnant hot water is made uniform may be large, and at the time of hot water supply, the hot water in the hot water supply pipe 47 is agitated by the water flow and the temperature is made uniform and flows out.
The detected hot water temperature may greatly differ from the hot water temperature of the hot water flowing out of the hot water supply pipe 47. Even when the hot water standby operation is performed as in each of the above embodiments, the detected hot water temperature exceeds an allowable range from the hot water supply set temperature at the time of hot water supply. There is a possibility that a problem may occur that the hot water having a high temperature gives a discomfort to a user of the hot water.
【0074】そこで、本実施の形態例では、図10に示す
ように、給湯熱交換器1の給湯用管路47に場所を異にし
て複数の給湯熱交換器湯温センサ14a,14b,14cを設
け(例えば、給湯用管路47のU字の曲がり部分(Uベン
ド)および給湯用管路47の出側に設け)、前記の如く、
制御装置20の出湯待機制御手段25に、図5に示すよう
に、T2 算出部45を設ける構成とした。Therefore, in this embodiment, as shown in FIG. 10, a plurality of hot water supply heat exchanger hot water temperature sensors 14a, 14b, and 14c are provided at different locations in the hot water supply pipe 47 of the hot water supply heat exchanger 1. (For example, provided at the U-shaped bent portion (U-bend) of the hot water supply pipe 47 and at the exit side of the hot water supply pipe 47), as described above.
The tapping standby control unit 25 of the control device 20, as shown in FIG. 5, and a configuration in which a T 2 calculation section 45.
【0075】上記T2 算出部45は、各給湯熱交換器湯温
センサ14a,14b,14cの検出湯温T2a,T2b,T2cを
サンプリング部35を介して取り込み、それら検出湯温T
2a,T2b,T2cと、データ格納部40に格納されている平
均湯温算出データとに基づいて給湯用管路47内の平均湯
温(給湯用管路47内の湯温を均一にしたときの湯温)を
求め、この平均湯温を実測湯温T2 として検出する。The T 2 calculating section 45 takes in the detected hot water temperatures T 2a , T 2b , T 2c of the hot water supply heat exchanger hot water sensors 14a, 14b, 14c through the sampling section 35, and detects the detected hot water temperatures T 2a , T 2b , T 2c.
2a , T 2b , T 2c and the average hot water temperature in the hot water supply pipe 47 (the hot water temperature in the hot water supply pipe 47 is made uniform based on the average hot water temperature calculation data stored in the data storage unit 40). the water temperature) when determined, to detect the average water temperature as measured water temperature T 2.
【0076】上記平均湯温算出データは、給湯用管路47
内の平均湯温T2 を算出するための演算式データであ
り、例えば、T2 =(T2a+T2b+T2c)・K、あるい
は、T2 =Ka ・T2a+Kb ・T2b+Kc ・T2c、等の
演算式で予め与えられ、定数である上記K,Ka ,
Kb ,Kc は予め実験や演算等により求め与えられてい
る。例えば、上記検出された湯温T2a,T2b,T2cを単
純に平均する場合には、上記定数K,Ka ,Kb ,Kc
には1/n(ただし、nは検出する湯温の数、つまり、
この実施の形態例ではn=3)が与えられる。The above-mentioned average hot water temperature calculation data is supplied to the hot water supply line 47.
An arithmetic expression data for calculating the average water temperature T 2 of the inner, for example, T 2 = (T 2a + T 2b + T 2c) · K, or, T 2 = K a · T 2a + K b · T 2b + K c , T 2c , etc., which are given in advance and are constants K, K a ,
K b and K c are obtained in advance through experiments, calculations, and the like. For example, the detected water temperature T 2a, T 2b, when the simple average of the T 2c, the above constant K, K a, K b, K c
Is 1 / n (where n is the number of hot water temperatures to be detected,
In this embodiment, n = 3) is given.
【0077】この実施の形態例によれば、給湯熱交換器
1(給湯用管路47)内の平均湯温を求め、この湯温を実
測湯温T2 として検出する構成としたので、例えば、給
湯用管路47内の滞留湯水に温度むらが生じても、出湯時
の給湯用管路47から流れる湯温、つまり、平均湯温に応
じて、出湯湯温が給湯設定温度となるようにV2 弁10の
開閉制御やV1 弁7の開弁量制御が正確に行われること
になり、出湯時に給湯設定温度より許容範囲を越えた高
温の湯が出湯し、湯の利用者に不快感を与えてしまうと
いう問題や高温出湯による危険を防止することができ
る。[0077] According to this embodiment, obtains the average water temperature in the hot-water supply heat exchanger 1 (the hot water supply conduit 47), since the structure for detecting the water temperature as measured water temperature T 2, for example, Even when the temperature of the hot water in the hot water supply pipe 47 has uneven temperature, the temperature of the hot water flowing from the hot water supply pipe 47 at the time of hot water supply, that is, according to the average hot water temperature, becomes the hot water supply set temperature. the valve opening amount control of the switching controller and V 1 valve 7 of V 2 valve 10 is to be carried out accurately, high-temperature water exceeds the allowable range from the hot water set temperature is tapped at tapping, in hot water at user The problem of giving discomfort and danger due to hot water can be prevented.
【0078】なお、この発明は上記各実施の形態例に限
定されるものではなく、様々な実施の形態を採り得る。
例えば、図3に示すV2 開閉動作判断部37は、給湯熱交
換器湯温センサ14の実測湯温をサンプリング部35を介し
て取り込み、この実測湯温に基づいてV2 弁10の開閉判
断動作を行い、V1 開弁量制御部38は、上記実測湯温を
用いるのではなく、推定T2 検出部42の検出推定湯温を
用いてV1 弁7の開弁量制御を行い、出湯湯温が給湯設
定温度となるように出湯待機する構成としてもよい。The present invention is not limited to the above-described embodiments, but can adopt various embodiments.
For example, V 2 closing operation determination unit 37 shown in FIG. 3, the actual water temperature of the hot water supply heat exchanger hot water temperature sensor 14 captures through the sampling unit 35, closing the determination of V 2 valve 10 based on the measured water temperature performs an operation, V 1 opening amount control unit 38, rather than using the actual water temperature, performs valve opening amount control of V 1 valve 7 using the detected estimated water temperature estimation T 2 detecting section 42, It is good also as a structure which stands by hot water so that hot water temperature becomes hot water supply set temperature.
【0079】また、例えば、V2 開閉動作判断部37は、
推定T2 検出部42の検出推定湯温を用いてV2 弁10の開
閉判断動作を行い、V1 開弁量制御部38は給湯熱交換器
湯温センサ14の実測湯温を用いてV1 弁7の開弁量を制
御し、出湯湯温が給湯設定温度となるように出湯待機す
る構成としてもよい。[0079] Also, for example, V 2 closing operation determination unit 37,
It opens and closes determination operation of V 2 valve 10 using the detected estimated water temperature estimation T 2 detecting section 42, V 1 opening amount control unit 38 using measured water temperature of the hot water supply heat exchanger hot water temperature sensor 14 V The valve opening amount of one valve 7 may be controlled so that the hot water is kept at the hot water supply standby temperature so as to reach the hot water supply set temperature.
【0080】さらに、上記各実施の形態例では、V1 開
弁量制御部38はV1 弁7の開弁量を、検出した流量比N
(N=QHE/Q0 )となるように流量比の変化に対応し
て連続的に可変制御していたが、例えば、表1に示すよ
うに、検出した流量比Nが予め定めた流量比N1 以上か
つ流量比N2 未満であるときには開弁量はA1 、NがN
2 以上かつN3 未満であるときには開弁量はA2 という
如く、総入水流量に対する給湯熱交換器1の流量比Nに
対応するV1 弁7の開弁量を段階的(2段階以上)に予
め定め開弁量制御データとしてデータ格納部40に格納し
ておき、V1 開弁量制御部38は、V2 開閉動作判断部37
からV2 弁開信号を受けたときには、上記データ格納部
40の開弁量制御データに基づいて段階的にV1 弁7の開
弁量を制御するようにしても構わない。Further, in each of the above embodiments, the V 1 valve opening control section 38 determines the valve opening amount of the V 1 valve 7 based on the detected flow rate ratio N
(N = Q HE / Q 0 ), the variable control is continuously performed in response to the change of the flow ratio. For example, as shown in Table 1, the detected flow ratio N is a predetermined flow rate. opening amount when the ratio N 1 or more and less than the flow rate ratio N 2 is a 1, N is N
2 or more and N opening amount when less than 3 A as of 2, total incoming water flow rate stepwise opening amount of V 1 valve 7 corresponding to the flow rate ratio N of the hot-water supply heat exchanger 1 for (two or more stages) predetermined it is stored in the data storage unit 40 as the valve opening amount control data, V 1 opening amount control unit 38, V 2 closing operation determination unit 37
When subjected to V 2 the valve opening signal from said data storage unit
It may be controlled the amount of opening of the stepwise V 1 valve 7 based on the 40 of the valve opening amount control data.
【0081】[0081]
【表1】 [Table 1]
【0082】なお、具体例としては、流量比の変化に対
応してV1 弁7の開弁量を予め定めた最大、最小、最大
と最小の中間の3段階に可変制御を行うようにする。[0082] As specific examples, maximum in response to a change in flow ratio determined in advance the valve opening amount of V 1 valve 7, minimum, to perform the variable control on the three stages of maximum and minimum of the intermediate .
【0083】さらに、上記第5の実施の形態例では、給
湯熱交換器1の給湯用管路47に3個の給湯熱交換器湯温
センサ14a,14b,14cを設けたが、給湯用管路47に場
所を異にして設ける給湯熱交換器湯温センサ14の数は2
個でも4個以上でもよく、そのような場合にも前記第5
の実施の形態例同様に給湯用管路47の平均湯温を検出す
ることができる。Further, in the fifth embodiment, three hot water supply heat exchangers 14a, 14b and 14c are provided in the hot water supply pipe line 47 of the hot water supply heat exchanger 1. The number of hot water supply heat exchanger hot water temperature sensors 14 provided at different places in the road 47 is 2
Or four or more. In such a case, the fifth
The average hot water temperature of the hot water supply pipe 47 can be detected in the same manner as in the embodiment.
【0084】さらに、図7〜図10に示した給湯器には固
定バイパス通路5が設けられていたが、この固定バイパ
ス通路5を省略した給湯器でも、上記各実施の形態例同
様に出湯待機動作を行うことによって、出湯時に給湯設
定温度より許容範囲を越えた高温の湯が出湯し湯の利用
者に不快感を与えるという問題および高温出湯による危
険を回避できる。上記のように固定バイパス通路5を省
略した場合にはその分管路構成を簡単にできる。Furthermore, although the hot water heater shown in FIGS. 7 to 10 is provided with the fixed bypass passage 5, even in the water heater in which the fixed bypass passage 5 is omitted, the hot water supply standby is performed similarly to the above-described embodiments. By performing the operation, it is possible to avoid the problem that hot water having a temperature exceeding the allowable range from the set hot water supply temperature when dispensing the hot water causes discomfort to the user of the hot water and the danger caused by the high temperature hot water. When the fixed bypass passage 5 is omitted as described above, the configuration of the pipeline can be simplified accordingly.
【0085】なお、上記のように、固定バイパス通路5
を省略した場合には、図7に示す流量QV1が全て給湯熱
交換器1に流れ込むことになるので、流量QHE=流量Q
V1となり、上記各実施の形態例に示したT2cal検出デー
タ(T2cal=(Ts −(1−m)T1 )/m)、T4cal
検出演算式データ(T4cal=(T2 −T1 )・M+
T1 )、N算出演算式データ(N=M・(Ts −T1 )
/(T4cal−T1 ))の定数m、M(m=M=QHE/Q
V1)は「1」が予め与えられることになる。As described above, the fixed bypass passage 5
Is omitted, the entire flow rate Q V1 shown in FIG. 7 flows into the hot water supply heat exchanger 1, so that the flow rate Q HE = flow rate Q
V1 becomes, T 2cal detection data shown in embodiments of the above embodiments (T 2cal = (T s - (1-m) T 1) / m), T 4cal
Detection formula data (T 4cal = (T 2 −T 1 ) · M +
T 1 ), N calculation expression data (N = M · (T s −T 1 ))
/ (T 4cal -T 1 )) constant m, M (m = M = Q HE / Q
V1 ) is given "1" in advance.
【0086】さらに、上記各実施の形態例では、バイパ
ス通路8の入側接続部より上流側の給水通路3に流量検
出センサ12が介設されていたが、図7の点線で示すよう
にバイパス通路入側接続部より下流側の給水通路3に流
量検出センサ12を設けてもよい。Further, in each of the above-described embodiments, the flow rate detection sensor 12 is provided in the water supply passage 3 upstream of the inlet-side connection portion of the bypass passage 8. However, as shown by a dotted line in FIG. The flow rate detection sensor 12 may be provided in the water supply passage 3 downstream of the passage entrance side connection portion.
【0087】上記各実施の形態例に示すようにバイパス
通路入側接続部より上流側に流量検出センサ12を設ける
場合には、V2 弁10が開・閉のどちらの状態であって
も、総入水流量Q0 を正確に検出できるし、上記の如
く、バイパス通路入側接続部より下流側に流量検出セン
サ12を設ける場合には、流量検出センサ12は給湯熱交換
器1の流量と固定バイパス通路5の流量の合計流量QV1
を実測でき、この流量QV1に対する予め定めた給湯熱交
換器1の流量QHEの流量比に基づいて、給湯熱交換器1
に流れ込む流量を的確に検出できる。このことから、給
湯熱交換器1に滞留していた湯水が出湯開始により流出
し始めてから全て流出し、給湯熱交換器1内が水供給源
から供給された新しい水に入れ換えられたことを確認す
ることができ、例えば、出湯が開始された以降に、出湯
開始前に給湯熱交換器に滞留していた湯が全て流出した
ことを検出し、それ以降に、V2 弁10を閉弁し、通常の
給湯運転動作へ移行するようにする等、流量検出センサ
12のセンサ出力を用いて出湯開始以降のV2 弁10の閉弁
タイミングを決定することができる。In the case where the flow rate detection sensor 12 is provided on the upstream side of the bypass passage entrance side connection portion as shown in each of the above embodiments, regardless of whether the V 2 valve 10 is open or closed, The total incoming water flow rate Q 0 can be accurately detected, and as described above, when the flow detection sensor 12 is provided downstream from the bypass passage entrance side connection portion, the flow detection sensor 12 is fixed to the flow rate of the hot water supply heat exchanger 1. Total flow Q V1 of the flow in the bypass passage 5
Can be measured, and based on the flow rate ratio of the flow rate Q HE of the hot water supply heat exchanger 1 to the flow rate Q V1 ,
It is possible to accurately detect the flow rate flowing into the device. From this, it was confirmed that all of the hot water that had stayed in the hot water supply heat exchanger 1 started flowing out of the hot water supply start and then flowed out, and the inside of the hot water supply heat exchanger 1 was replaced with new water supplied from the water supply source. it can be, for example, after the tapping is initiated, and detects that all outflow water staying in the hot water supply heat exchanger before tapping begins, thereafter, closed and V 2 valve 10 Flow rate detection sensor, such as shifting to normal hot water supply operation
It is possible to determine the closing timing of the tapping since the start of the V 2 valve 10 by using the sensor output 12.
【0088】さらに、前記第5の実施の形態例では、図
10に示す一缶二水構成の給湯器を例にして説明したが、
例えば、図7〜図9に示す給湯器の給湯熱交換器1に場
所を異にして複数の給湯熱交換器湯温センサ14を設け、
前記第5の実施の形態例同様にT2 算出部45を設けて、
T2 算出部45の平均湯温に基づいてV2 弁10の開閉制御
やV1 弁7の開弁量制御を行い、出湯待機するようにし
てもよい。Further, in the fifth embodiment, FIG.
Although described as an example of a water heater of one can and two water configuration shown in 10,
For example, a plurality of hot water supply heat exchanger hot water temperature sensors 14 are provided at different locations in the hot water supply heat exchanger 1 of the hot water supply shown in FIGS.
A T 2 calculator 45 is provided as in the fifth embodiment,
Based on the average hot water temperature of T 2 calculation section 45 performs a valve opening amount control of the switching controller and V 1 valve 7 of V 2 valve 10 may be tapped wait.
【0089】さらに、上記各実施の形態例では、T2cal
検出部36はT2cal検出データである演算式(T2cal=
(Ts −(1−m)T1 )/m)に基づいて目標湯温T
2calを検出していたが、例えば、給湯設定温度Ts と入
水温T1 の関係から目標湯温T2calを検出するための表
データやグラフデータ等を予め求めT2cal検出データと
してデータ格納部40に格納しておき、このT2cal検出デ
ータに基づいて目標湯温T2calを検出するという如く、
演算を用いない他の手法によりT2calを検出するように
してもよい。Further, in each of the above embodiments, T 2cal
Arithmetic expression detection unit 36 is a T 2Cal detection data (T 2cal =
(T s - (1-m ) T 1) / m) targets based on YuAtsushi T
Although 2 cal was detected, for example, table data and graph data for detecting the target hot water temperature T 2 cal are obtained in advance from the relationship between the set hot water supply temperature T s and the incoming water temperature T 1 , and the data storage unit is used as T 2 cal detection data. 40, and the target hot water temperature T 2cal is detected based on the T 2cal detection data.
T 2cal may be detected by another method not using an operation.
【0090】さらに、上記各実施の形態例では、V1 開
弁量制御部38は、T4cal検出演算式データとN算出演算
式データに基づいて出湯湯温が給湯設定温度となるため
の総入水流量に対する給湯熱交換器1の流量比Nを求め
て、V1 弁7の開弁量制御を行っていたが、例えば、給
湯設定温度と入水温の関係から上記流量比Nを検出する
ための表データやグラフデータ等を予め求めておき、そ
のデータを用いて上記流量比Nを検出し、V1 弁7の開
弁量制御を行うという如く、演算を用いない他の手法に
より流量比Nを求めてV1 弁7の開弁量制御を行うよう
にしてもよい。[0090] Further, in the embodiment the above embodiments, V 1 opening amount control unit 38, the total hot water hot water is for the hot water supply set temperature on the basis of the T 4Cal detection calculation formula data and the N calculated arithmetic expression data seeking flow ratio N of the hot water supply heat exchanger 1 for the incoming water flow rate, but had done the opening amount control of V 1 valve 7, for example, to detect the flow rate ratio N from a relationship hot water set temperature and inlet coolant temperature flow ratio as by other methods without using the calculation that previously obtained in advance table data and graph data, etc., to detect the flow rate ratio N using the data and performs the valve opening amount control of V 1 valve 7 it may perform valve opening amount control of V 1 valve 7 seeking N.
【0091】さらに、上記各実施の形態例では、給湯熱
交換器1の湯温を給湯熱交換器湯温センサ14を用いて検
出していたが、給湯熱交換器1に湯水が滞留していると
きには給湯熱交換器湯温センサ14で検出される湯温と第
1出湯温度センサ15で検出される湯温がほぼ同じとなる
ことから、第1出湯温度センサで検出される湯温を給湯
熱交換器1の湯温T2 として用いてもよい。Further, in each of the above embodiments, the hot water temperature of the hot water supply heat exchanger 1 is detected by using the hot water supply heat exchanger hot water temperature sensor 14, but the hot water stays in the hot water supply heat exchanger 1 When the hot water is detected, the hot water temperature detected by the hot water supply heat exchanger hot water temperature sensor 14 and the hot water temperature detected by the first hot water temperature sensor 15 are substantially the same. it may be used as a hot water temperature T 2 of the heat exchanger 1.
【0092】さらに、上記第2、第4の実施の形態例で
は、図7に示す単機能の給湯器を例にし、出湯待機中に
おける給湯熱交換器1の滞留湯温を推定検出し、この推
定湯温に基づいて出湯待機動作を行う出湯待機制御手段
25を説明したが、図8および図9の給湯器においても同
様に給湯熱交換器1の滞留湯温を推定して出湯待機動作
を行ってもよく、このように出湯待機動作を行うことに
より、出湯時の高温出湯を防止できる。また、図10に示
す一缶二水構成の給湯器では、前記の如く、追い焚き単
独運転が行われるときには給湯バーナの追い焚き燃焼に
よって、給湯熱交換器1の給湯用管路47の滞留湯が加熱
され湯温が上昇することから、滞留湯温を正確に推定検
出するためには、前記給湯バーナ燃焼停止後の滞留湯温
特性データに加えて、追い焚き単独運転時における給湯
熱交換器1の給湯用管路47の滞留湯温の時間と共に変化
する湯温特性データを時間と給湯バーナの追い焚き燃焼
能力をパラメータにして予め求めデータ格納部40に格納
しておき、それら特性データに基づいて滞留湯温を推定
検出するようにすれば、追い焚き単独運転による給湯バ
ーナの追い焚き燃焼によって滞留湯が加熱される場合に
も、滞留湯温を正確に推定検出でき、この推定湯温に基
づいて上記各実施の形態例同様に出湯待機動作を行うこ
とで出湯時の高温出湯を防止できる。Further, in the second and fourth embodiments, the single-function water heater shown in FIG. 7 is taken as an example, and the temperature of the hot water in the hot water supply heat exchanger 1 during standby for hot water supply is estimated and detected. Hot-water supply standby control means for performing a hot-water supply standby operation based on the estimated hot water temperature
25 has been described, but the hot water supply of FIGS. 8 and 9 may similarly perform the hot water standby operation by estimating the stagnant hot water temperature of the hot water supply heat exchanger 1, and performing the hot water standby operation in this manner. In addition, it is possible to prevent high-temperature tapping when tapping. In addition, in the water heater of the one-can-two-water configuration shown in FIG. Is heated and the hot water temperature rises, in order to accurately estimate and detect the retained hot water temperature, in addition to the retained hot water temperature characteristic data after the stop of the hot water supply burner combustion, the hot water supply heat exchanger during reheating alone operation. The hot water temperature characteristic data that changes with time of the staying hot water temperature in the hot water supply pipe 47 is obtained in advance by using the time and the reheating combustion capacity of the hot water supply burner as parameters, and stored in the data storage unit 40. If the accumulated hot water temperature is estimated and detected based on the same, the accumulated hot water temperature can be accurately estimated and detected even when the accumulated hot water is heated by the reheating combustion of the hot water supply burner in the reheating alone operation, and the estimated hot water temperature can be detected. Based on Hot tapping during tapping can be prevented by performing the embodiment similarly tapped standby operation of each of the above embodiments.
【0093】さらに、上記各実施形態例では、総入水流
量に対する給湯熱交換器1の流量比(固定バイパス比)
mは予め定めた固定値であったが、次式(2)に従って
通常給湯運転時に固定バイパス比mを自動補正・更新す
るようにしても良い。Further, in each of the above embodiments, the flow ratio (fixed bypass ratio) of the hot water supply heat exchanger 1 to the total incoming water flow rate.
Although m is a predetermined fixed value, the fixed bypass ratio m may be automatically corrected and updated during the normal hot water supply operation according to the following equation (2).
【0094】 m=(TS −T1 )/(T2 −T1 )・・・・・(2)M = (T S −T 1 ) / (T 2 −T 1 ) (2)
【0095】上記固定バイパス比mは燃焼機器の個体
差、経年劣化、加工精度等によりばらつきが生じる場合
があるが、上記の如く、固定バイパス比mを補正・更新
することにより上記ばらつきが補正されて、より確実に
出湯時の高温出湯を防止することができる。The fixed bypass ratio m may vary due to individual differences, aging deterioration, machining accuracy, etc. of the combustion equipment. However, as described above, the variation is corrected by correcting and updating the fixed bypass ratio m. Thus, it is possible to more reliably prevent the hot water from being discharged at the time of tapping.
【0096】[0096]
【発明の効果】本発明によれば、給湯バーナの給湯燃焼
が停止した以降、つまり、出湯待機中に、バイパス通路
開閉弁が閉弁状態では次の出湯時に給湯設定温度より設
定範囲を越えた高温の湯が出湯すると判断したときに、
バイパス通路開閉弁を開け、出湯温度が給湯設定温度と
なるように流量制御弁の開弁量を制御し総入水流量に対
する給湯熱交換器の流量比を可変制御し、次の出湯に備
える構成としたので、給湯熱交換器の後沸きに起因した
高温の湯が出湯時に出湯するのを防止できるし、風呂へ
の湯張りや高温差し湯機能を有した燃焼機器の場合に
は、湯張りや高温差し湯の終了以降の出湯時に湯張りや
高温差し湯に用いた高めの湯が出湯するのを防止するこ
とができるし、一缶二水構成を有した燃焼機器の場合に
は、追い焚き単独運転による給湯バーナの追い焚き燃焼
によって給湯熱交換器の給湯側の滞留水が加熱し、高温
の湯が出湯開始により出湯するのを防止することがで
き、湯の利用者に出湯時の高温出湯により不快感を与え
てしまうという問題や高温出湯による危険を回避するこ
とができる。According to the present invention, after the hot-water supply combustion of the hot-water supply burner is stopped, that is, during standby for hot water supply, if the bypass passage opening / closing valve is in the closed state, the set temperature exceeds the set temperature at the next hot water supply. When it is determined that hot water is coming out,
Opening the bypass passage opening and closing valve, controlling the opening amount of the flow control valve so that the tap water temperature becomes the hot water supply set temperature, variably controlling the flow ratio of the hot water supply heat exchanger to the total incoming water flow rate, and preparing for the next hot water supply; As a result, it is possible to prevent high-temperature hot water resulting from the post-boiling of the hot-water supply heat exchanger from flowing out at the time of tapping. It is possible to prevent hot water used for hot water filling and hot water pouring from hot water at the time of hot water pouring after the end of hot water pouring. The stagnant water on the hot water supply side of the hot water supply heat exchanger is heated by the reheating combustion of the hot water supply burner in isolated operation, and it is possible to prevent high-temperature hot water from flowing out at the start of hot water supply. The problem of discomfort caused by the hot water It is possible to avoid the danger caused by temperature hot water.
【0097】また、給湯熱交換器の入側と出側を短絡す
るバイパス通路およびその開閉弁を設け、バイパス通路
出側接続部より上流側の給湯通路に流量制御弁を設ける
だけで(必要に応じて固定バイパス通路を設けるだけ
で)、つまり、必要最低限のバイパス通路およびその開
閉弁と、流量制御弁を設けるだけで、上記の如く、総入
水流量に対する給湯熱交換器の流量比を可変制御するこ
とが可能となる。このことから、管路構成や制御構成が
簡単となり、コストの低減を図ることが可能となるし、
管路抵抗の増加が抑制されるので、給湯設定温度の湯を
多量に供給することができる。Further, a bypass passage for short-circuiting the inlet side and the outlet side of the hot water supply heat exchanger and an opening / closing valve thereof are provided, and a flow control valve is provided only in the hot water supply passage upstream of the bypass passage outlet side connection (necessary). In other words, by simply providing a fixed bypass passage according to the requirements), that is, by merely providing the minimum required bypass passage and its on-off valve and a flow control valve, the flow ratio of the hot water supply heat exchanger to the total incoming water flow can be varied as described above. It becomes possible to control. For this reason, the pipeline configuration and the control configuration are simplified, and it is possible to reduce costs.
Since an increase in pipeline resistance is suppressed, a large amount of hot water at the hot water supply set temperature can be supplied.
【0098】給湯熱交換器湯温センサの実測湯温を用い
て、前記の如く、バイパス通路開閉弁の開閉制御や流量
制御弁の開弁量制御を行う構成にあっては、実測湯温を
用いているので、給湯熱交換器の湯温変動に合わせて、
バイパス通路開閉弁の開閉制御および流量制御弁の開弁
量制御を行うことができ、出湯時に高温の湯が出湯し湯
の利用者に不快感を与えてしまうという問題や高温出湯
による危険を確実に防止できる。In the configuration in which the opening / closing control of the bypass passage opening / closing valve and the valve opening control of the flow rate control valve are performed using the measured hot water temperature of the hot water supply heat exchanger hot water sensor as described above, the measured hot water temperature is used. Since it is used, according to the hot water temperature fluctuation of the hot water supply heat exchanger,
The opening and closing control of the bypass passage opening and closing valve and the valve opening control of the flow control valve can be performed. Can be prevented.
【0099】給湯熱交換器の滞留湯の温度を推定検出
し、この推定湯温に基づいてバイパス通路開閉弁の開閉
制御や流量制御弁の開弁量制御を行う構成にあっては、
給湯熱交換器湯温センサのセンサ出力(実測湯温)を用
いておらず、上記の如く、推定湯温を用いているので、
例えば、給湯熱交換器湯温センサが故障し検出湯温が実
際の湯温から大きく離れた値となってしまいバイパス通
路開閉弁の開閉制御や流量制御弁の開弁量制御を正確に
行えないというような問題を回避することができる。In a configuration in which the temperature of the hot water staying in the hot water supply heat exchanger is estimated and detected, the opening / closing control of the bypass passage opening / closing valve and the opening control of the flow control valve are performed based on the estimated hot water temperature.
Since the sensor output (actually measured hot water temperature) of the hot water supply heat exchanger hot water temperature sensor is not used and the estimated hot water temperature is used as described above,
For example, the hot-water supply heat exchanger hot-water temperature sensor fails and the detected hot-water temperature becomes a value far apart from the actual hot-water temperature, so that the opening / closing control of the bypass passage opening / closing valve and the opening control of the flow control valve cannot be accurately performed. Such a problem can be avoided.
【0100】給湯熱交換器側に場所を異にして複数の給
湯熱交換器湯温センサを設け、それら複数の給湯熱交換
器湯温センサの検出湯温を演算処理し、この演算処理に
よって得られた演算値を給湯熱交換器の実測湯温とする
構成にあっては、給湯熱交換器内の湯温を均一化したと
きの平均湯温を求めることが可能となり、特に、一缶二
水構成の給湯器のように追い焚き単独運転による給湯バ
ーナの追い焚き燃焼によって給湯熱交換器の給湯側の滞
留湯に温度むらが生じ易い場合にも、上記の如く、給湯
熱交換器の平均湯温を求めることができてその平均湯温
に基づいて出湯待機中におけるバイパス通路開閉弁の開
閉制御や流量制御弁の開弁量制御を行うので、上記温度
むらに起因してバイパス通路開閉弁の開閉制御や流量制
御弁の開弁量制御に用いた給湯熱交換器の検出湯温が出
湯時に給湯熱交換器から流れ出た湯の温度と大きく異な
り、出湯時の出湯湯温が給湯設定温度から大きく離れて
しまうという問題を回避することができる。A plurality of hot water supply heat exchanger hot water temperature sensors are provided at different locations on the hot water supply heat exchanger side, and the detected hot water temperatures of the plurality of hot water supply heat exchanger hot water temperature sensors are calculated and obtained. In the configuration in which the calculated value is used as the measured hot water temperature of the hot water supply heat exchanger, the average hot water temperature when the hot water temperature in the hot water supply heat exchanger is made uniform can be obtained. As described above, even when the temperature of the retained hot water on the hot water supply side of the hot water supply heat exchanger is likely to be uneven due to the additional heating of the hot water supply burner as in a water heater having a water configuration, the average of the hot water supply heat exchanger is also used. Since the hot water temperature can be obtained and the opening / closing control of the bypass passage opening / closing valve and the opening amount control of the flow rate control valve during standby for hot water supply are performed based on the average hot water temperature, the bypass passage opening / closing valve is caused by the temperature unevenness. Opening / closing control and flow control valve opening control It is possible to avoid the problem that the detected hot water temperature of the used hot water supply heat exchanger is significantly different from the temperature of hot water flowing out of the hot water supply heat exchanger at the time of hot water supply, and the hot water temperature at the time of hot water departs greatly from the set hot water supply temperature. .
【0101】給湯熱交換器の給水通路におけるバイパス
通路入側接続部の下流側と、給湯通路における流量制御
弁介設位置の上流側とを短絡する固定バイパス通路が設
けられている構成にあっては、給水通路の固定バイパス
通路入側接続部で、入水は給湯熱交換器側と固定バイパ
ス通路側に分岐して流れ込み、給湯通路の固定バイパス
通路出側接続部で、給湯熱交換器で加熱された湯と固定
バイパス通路を通った水がミキシングされて流れ出るこ
とになるので、例えば、バイパス通路開閉弁を開弁して
バイパス通路を通る水によって給湯熱交換器の湯の温度
を下げなければならないのにもかかわらず、バイパス通
路開閉弁が故障して開弁しないという事態が発生して
も、上記の如く、給湯熱交換器の湯は固定バイパス通路
の水がミキシングされることによって湯温が下げられる
ことから、高温の湯が出湯し湯の利用者に火傷を負わせ
てしまうというような重大な問題は回避することができ
る。A fixed bypass passage is provided for short-circuiting the downstream side of the bypass passage entrance side connection portion in the hot water supply heat exchanger and the upstream side of the flow control valve interposition position in the hot water supply passage. Is the connection of the feed water passage to the fixed bypass passage entrance side, and the incoming water branches into the hot water supply heat exchanger side and the fixed bypass passage side and flows in. Since the hot water and the water passing through the fixed bypass passage are mixed and flow out, for example, the temperature of the hot water in the hot water supply heat exchanger must be lowered by opening the bypass passage opening / closing valve and the water passing through the bypass passage. However, even if the bypass passage opening / closing valve fails and does not open, the water in the hot water supply heat exchanger is mixed with the water in the fixed bypass passage as described above. Since the hot water temperature is lowered by Rukoto can high-temperature hot water can cause serious problems, such as that would inflict burns to the user of the hot water and hot water is avoided.
【図1】第1の実施の形態例において特徴的な制御装置
の主要構成を示すブロック図である。FIG. 1 is a block diagram illustrating a main configuration of a control device that is characteristic in the first embodiment.
【図2】図1に示す出湯待機制御手段の動作例を示すフ
ローチャートである。FIG. 2 is a flowchart showing an operation example of a hot water supply standby control unit shown in FIG. 1;
【図3】第2の実施の形態例において特徴的な制御装置
の主要構成を示すブロック図である。FIG. 3 is a block diagram showing a main configuration of a control device which is characteristic in the second embodiment.
【図4】第3の実施の形態例において特徴的な制御装置
の主要構成を示すブロック図である。FIG. 4 is a block diagram showing a main configuration of a characteristic control device in a third embodiment.
【図5】第5の実施の形態例において特徴的な制御装置
の主要構成を示すブロック図である。FIG. 5 is a block diagram showing a main configuration of a control device characteristic of a fifth embodiment.
【図6】給湯熱交換器の滞留湯の温度における時間的変
化の一例を示すグラフである。FIG. 6 is a graph showing an example of a temporal change in the temperature of staying hot water in the hot water supply heat exchanger.
【図7】本発明の燃焼機器である給湯器の一システム構
成例を示すモデル図である。FIG. 7 is a model diagram showing an example of a system configuration of a water heater that is a combustion device of the present invention.
【図8】本発明の燃焼機器である複合給湯器の一システ
ム構成例を示すモデル図である。FIG. 8 is a model diagram showing one system configuration example of a combined water heater that is a combustion device of the present invention.
【図9】本発明の燃焼機器である湯張り機能(高温差し
湯機能)付給湯器の一システム構成例を示すモデル図で
ある。FIG. 9 is a model diagram showing an example of a system configuration of a water heater with a hot water filling function (high-temperature hot water supply function), which is a combustion device of the present invention.
【図10】本発明の燃焼機器である一缶二水構成の給湯器
の一システム構成例を示すモデル図である。FIG. 10 is a model diagram showing an example of a system configuration of a water heater having a one-can-two-water configuration, which is a combustion device of the present invention.
1 給湯熱交換器 3 給水通路 4 給湯通路 5 固定バイパス 7 V1 弁 8 バイパス通路 10 V2 弁 13 入水温度センサ 14,14a〜14c 給湯熱交換器湯温センサ 36 T2cal検出部 37 V2 開閉動作判断部 38 V1 開弁量制御部 40 データ格納部 42 推定T2 検出部 43 時間計測手段 44 目標流量比算出部 45 T2 算出部DESCRIPTION OF SYMBOLS 1 Hot water supply heat exchanger 3 Water supply passage 4 Hot water supply passage 5 Fixed bypass 7 V 1 valve 8 Bypass passage 10 V 2 valve 13 Incoming water temperature sensor 14, 14a-14c Hot water heat exchanger hot water temperature sensor 36 T 2 cal detecting part 37 V 2 opening and closing operation determination unit 38 V 1 opening amount control unit 40 data storage unit 42 estimates T 2 detecting section 43 time measurement means 44 target flow rate ratio calculator 45 T 2 calculator
───────────────────────────────────────────────────── フロントページの続き (72)発明者 近藤 正登 神奈川県大和市深見台3丁目4番地 株式 会社ガスター内 ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Masato Kondo 3-4 Fukamidai, Yamato-shi, Kanagawa Pref.
Claims (8)
焼の熱を利用して加熱し給湯通路へ流出する給湯熱交換
器と、この給湯熱交換器の入側と出側を短絡するバイパ
ス通路と、該バイパス通路の開閉を行うバイパス通路開
閉弁と、前記バイパス通路出側接続部の上流側の給湯通
路に設けられ流量を開弁量により制御する流量制御弁
と、給水通路の水の温度を検出する入水温度センサと、
給湯熱交換器の湯水の温度を検出する給湯熱交換器湯温
センサと、給湯温度を設定するための給湯温度設定手段
とを有する燃焼機器において、給湯バーナの給湯燃焼が
停止した以降に、総入水流量に対する予め定めた給湯熱
交換器の流量比と、検出入水温と、給湯設定温度とに基
づき次の出湯時の出湯湯温が給湯設定温度となる給湯熱
交換器の目標湯温を求める給湯熱交換器目標湯温検出部
と;この目標湯温と給湯熱交換器湯温センサの実測湯温
を比較し、給湯熱交換器実測湯温が前記目標湯温より予
め与えられた設定範囲を越えて高いと判断したときには
バイパス通路開閉弁への開信号を出力し、それ以外のと
きにはバイパス通路開閉弁への閉信号を出力するバイパ
ス通路開閉弁開閉動作判断部と;給湯熱交換器の実測湯
温と入水温度センサの検出入水温と給湯設定温度に基づ
いて出湯湯温が給湯設定温度となるための総入水流量に
対する給湯熱交換器の流量比を求め、バイパス通路開閉
弁開閉動作判断部からバイパス通路開閉弁への開信号が
出力されているときには上記検出流量比となるように前
記流量制御弁の開弁量を制御して次の出湯に備える流量
制御弁開弁量制御部と;を設ける構成としたことを特徴
とする燃焼機器。1. A hot water supply heat exchanger that heats water guided from a water supply passage by using heat of combustion of a hot water supply burner and flows out to the hot water supply passage, and a bypass passage that short-circuits an input side and an output side of the hot water supply heat exchanger. A bypass passage opening / closing valve for opening and closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; and a temperature of water in the water supply passage. An inlet water temperature sensor for detecting
In a combustion apparatus having a hot water supply heat exchanger hot water temperature sensor for detecting hot water temperature of hot water supply heat exchanger and hot water supply temperature setting means for setting hot water supply temperature, after the hot water supply burner of hot water supply burner is stopped, A target hot water temperature of the hot water supply heat exchanger at which the next hot water temperature becomes the hot water supply set temperature based on the predetermined flow ratio of the hot water supply heat exchanger to the incoming water flow rate, the detected incoming water temperature, and the hot water supply set temperature is determined. A hot water supply heat exchanger target hot water temperature detection unit; comparing the target hot water temperature with the measured hot water temperature of the hot water supply heat exchanger hot water sensor, and setting the measured hot water temperature of the hot water supply heat exchanger in advance from the target hot water temperature; A bypass passage opening / closing valve opening / closing operation judging section that outputs an opening signal to the bypass passage opening / closing valve when it is determined to be higher than Measured hot water temperature and incoming water temperature Based on the detected incoming water temperature and the set hot water supply temperature, the flow ratio of the hot water supply heat exchanger to the total incoming water flow for the outlet hot water temperature to reach the set hot water supply temperature is obtained, and the bypass passage opening / closing valve opening / closing operation determination section determines the bypass passage opening / closing valve And a flow control valve opening amount control unit for controlling the opening amount of the flow control valve so that the detected flow ratio is obtained when the opening signal is output to prepare for the next tapping. Combustion equipment.
焼の熱を利用して加熱し給湯通路へ流出する給湯熱交換
器と、この給湯熱交換器の入側と出側を短絡するバイパ
ス通路と、該バイパス通路の開閉を行うバイパス通路開
閉弁と、前記バイパス通路出側接続部の上流側の給湯通
路に設けられ流量を開弁量により制御する流量制御弁
と、給水通路の水の温度を検出する入水温度センサと、
給湯温度を設定するための給湯温度設定手段とを有する
燃焼機器において、給湯バーナの給湯燃焼が停止した以
降に、総入水流量に対する予め定めた給湯熱交換器の流
量比と、検出入水温と、給湯設定温度とに基づき次の出
湯時の出湯湯温が給湯設定温度となる給湯熱交換器の目
標湯温を求める給湯熱交換器目標湯温検出部と;給湯バ
ーナの給湯燃焼停止後における給湯熱交換器の滞留湯の
温度の時間と共に変化する給湯熱交換器滞留湯温特性デ
ータを格納するデータ格納部と;給湯バーナの給湯燃焼
が停止する毎にその停止時からの経過時間を計測する時
間計測手段と;該時間計測手段の計測時間に応じ前記給
湯熱交換器滞留湯温特性データに基づいて給湯熱交換器
の湯温を推定検出する給湯熱交換器推定湯温検出部と;
前記給湯熱交換器目標湯温検出部の検出目標湯温と前記
給湯熱交換器推定湯温検出部の推定湯温を比較し、推定
湯温が前記目標湯温より予め与えられた設定範囲を越え
て高いと判断したときにはバイパス通路開閉弁への開信
号を出力し、それ以外のときにはバイパス通路開閉弁へ
の閉信号を出力するバイパス通路開閉弁開閉動作判断部
と;給湯熱交換器の推定湯温と入水温度センサの検出入
水温と給湯設定温度に基づいて出湯湯温が給湯設定温度
となるための総入水流量に対する給湯熱交換器の流量比
を求め、バイパス通路開閉弁開閉動作判断部からバイパ
ス通路開閉弁への開信号が出力されているときには上記
検出流量比となるように前記流量制御弁の開弁量を制御
して次の出湯に備える流量制御弁開弁量制御部と;を設
ける構成としたことを特徴とする燃焼機器。2. A hot water supply heat exchanger that heats water guided from a water supply passage by using heat of combustion of a hot water supply burner and flows out to the hot water supply passage, and a bypass passage that short-circuits an inlet and an outlet of the hot water supply heat exchanger. A bypass passage opening / closing valve for opening and closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; and a temperature of water in the water supply passage. An inlet water temperature sensor for detecting
In a combustion apparatus having a hot water temperature setting means for setting a hot water temperature, after the hot water combustion of the hot water burner is stopped, a predetermined flow rate ratio of the hot water heat exchanger to the total incoming water flow rate, and a detected incoming water temperature, A hot-water supply heat exchanger target hot-water temperature detector for obtaining a target hot-water temperature of the hot-water supply heat exchanger at which the next hot-water temperature becomes the hot-water supply set temperature based on the hot water supply set temperature; A data storage unit for storing the temperature data of the hot water in the hot water supply heat exchanger that changes with time of the temperature of the hot water in the heat exchanger; each time the hot water supply burner of the hot water supply burner stops, the elapsed time from the stop is measured. A time measuring means; a hot water supply heat exchanger estimated hot water temperature detecting section for estimating and detecting a hot water temperature of the hot water supply heat exchanger based on the hot water heat exchanger stagnant hot water temperature characteristic data in accordance with a time measured by the time measuring means;
Compare the detected target hot water temperature of the hot water supply heat exchanger target hot water temperature detection unit and the estimated hot water temperature of the hot water supply heat exchanger estimated hot water temperature detection unit, and set the estimated hot water temperature to a setting range given in advance from the target hot water temperature. A bypass passage opening / closing valve opening / closing operation judging unit for outputting an opening signal to the bypass passage opening / closing valve when it is judged to be too high, and outputting a closing signal to the bypass passage opening / closing valve otherwise; The flow rate of the hot water supply heat exchanger to the total flow rate of incoming water for the outlet water temperature to reach the hot water supply setting temperature is determined based on the hot water temperature and the detection temperature of the hot water supply temperature sensor and the hot water supply set temperature, and a bypass passage opening / closing valve open / close operation determination unit A flow control valve opening amount control unit that controls the opening amount of the flow control valve so that the detected flow ratio is obtained when an opening signal is output from the control unit to the bypass passage opening / closing valve; With a configuration to provide Combustion equipment according to claim.
焼の熱を利用して加熱し給湯通路へ流出する給湯熱交換
器と、この給湯熱交換器の入側と出側を短絡するバイパ
ス通路と、該バイパス通路の開閉を行うバイパス通路開
閉弁と、前記バイパス通路出側接続部の上流側の給湯通
路に設けられ流量を開弁量により制御する流量制御弁
と、給水通路の水の温度を検出する入水温度センサと、
給湯熱交換器の湯水の温度を検出する給湯熱交換器湯温
センサと、給湯温度を設定するための給湯温度設定手段
とを有する燃焼機器において、給湯バーナの給湯燃焼が
停止した以降に、総入水流量に対する予め定めた給湯熱
交換器の流量比と、検出入水温と、給湯設定温度とに基
づき次の出湯時の出湯湯温が給湯設定温度となる給湯熱
交換器の目標湯温を求める給湯熱交換器目標湯温検出部
と;この目標湯温と給湯熱交換器湯温センサの実測湯温
を比較し、給湯熱交換器実測湯温が前記目標湯温より予
め与えられた設定範囲を越えて高いと判断したときには
バイパス通路開閉弁への開信号を出力し、それ以外のと
きにはバイパス通路開閉弁への閉信号を出力するバイパ
ス通路開閉弁開閉動作判断部と;給湯バーナの給湯燃焼
停止後における給湯熱交換器の滞留湯の温度の時間と共
に変化する給湯熱交換器滞留湯温特性データを格納する
データ格納部と;給湯バーナの給湯燃焼が停止する毎に
その停止時からの経過時間を計測する時間計測手段と;
該時間計測手段の計測時間に応じ前記給湯熱交換器滞留
湯温特性データに基づいて給湯熱交換器の湯温を推定検
出する給湯熱交換器推定湯温検出部と;給湯熱交換器の
推定湯温と入水温度センサの検出入水温と給湯設定温度
に基づいて出湯湯温が給湯設定温度となるための総入水
流量に対する給湯熱交換器の流量比を求め、バイパス通
路開閉弁開閉動作判断部からバイパス通路開閉弁への開
信号が出力されているときには上記検出流量比となるよ
うに前記流量制御弁の開弁量を制御して次の出湯に備え
る流量制御弁開弁量制御部と;を設ける構成としたこと
を特徴とする燃焼機器。3. A hot water supply heat exchanger that heats water guided from a water supply passage using heat of combustion of a hot water supply burner and flows out to the hot water supply passage, and a bypass passage that short-circuits an inlet and an outlet of the hot water supply heat exchanger. A bypass passage opening / closing valve for opening and closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; and a temperature of water in the water supply passage. An inlet water temperature sensor for detecting
In a combustion apparatus having a hot water supply heat exchanger hot water temperature sensor for detecting hot water temperature of hot water supply heat exchanger and hot water supply temperature setting means for setting hot water supply temperature, after the hot water supply burner of hot water supply burner is stopped, A target hot water temperature of the hot water supply heat exchanger at which the next hot water temperature becomes the hot water supply set temperature based on the predetermined flow ratio of the hot water supply heat exchanger to the incoming water flow rate, the detected incoming water temperature, and the hot water supply set temperature is determined. A hot water supply heat exchanger target hot water temperature detection unit; comparing the target hot water temperature with the measured hot water temperature of the hot water supply heat exchanger hot water sensor, and setting the measured hot water temperature of the hot water supply heat exchanger in advance from the target hot water temperature; A bypass passage opening / closing valve opening / closing operation judging section which outputs an opening signal to the bypass passage opening / closing valve when it is judged to be higher than the threshold value, and outputs a closing signal to the bypass passage opening / closing valve otherwise; Salary after stop A data storage unit for storing the temperature data of the hot water in the hot water supply heat exchanger that changes with time of the temperature of the hot water in the heat exchanger; each time the hot water supply burner of the hot water supply burner stops, the elapsed time from the stop is measured. Time measuring means;
A hot water supply heat exchanger estimation hot water temperature detection section for estimating and detecting the hot water temperature of the hot water supply heat exchanger based on the residence hot water temperature characteristic data in accordance with the time measured by the time measuring means; The flow rate of the hot water supply heat exchanger to the total flow rate of incoming water for the outlet water temperature to reach the hot water supply setting temperature is determined based on the hot water temperature and the detection temperature of the hot water supply temperature sensor and the hot water supply set temperature, and a bypass passage opening / closing valve open / close operation determination unit A flow control valve opening amount control unit that controls the opening amount of the flow control valve so that the detected flow ratio is obtained when an opening signal is output from the control unit to the bypass passage opening / closing valve; A combustion device characterized by having a configuration provided with:
焼の熱を利用して加熱し給湯通路へ流出する給湯熱交換
器と、この給湯熱交換器の入側と出側を短絡するバイパ
ス通路と、該バイパス通路の開閉を行うバイパス通路開
閉弁と、前記バイパス通路出側接続部の上流側の給湯通
路に設けられ流量を開弁量により制御する流量制御弁
と、給水通路の水の温度を検出する入水温度センサと、
給湯熱交換器の湯水の温度を検出する給湯熱交換器湯温
センサと、給湯温度を設定するための給湯温度設定手段
とを有する燃焼機器において、給湯バーナの給湯燃焼が
停止した以降に、総入水流量に対する予め定めた給湯熱
交換器の流量比と、検出入水温と、給湯設定温度とに基
づき次の出湯時の出湯湯温が給湯設定温度となる給湯熱
交換器の目標湯温を求める給湯熱交換器目標湯温検出部
と;給湯バーナの給湯燃焼停止後における給湯熱交換器
の滞留湯の温度の時間と共に変化する給湯熱交換器滞留
湯温特性データを格納するデータ格納部と;給湯バーナ
の給湯燃焼が停止する毎にその停止時からの経過時間を
計測する時間計測手段と;該時間計測手段の計測時間に
応じ前記給湯熱交換器滞留湯温特性データに基づいて給
湯熱交換器の湯温を推定検出する給湯熱交換器推定湯温
検出部と;前記給湯熱交換器目標湯温検出部の検出目標
湯温と前記給湯熱交換器推定湯温検出部の推定湯温を比
較し、推定湯温が前記目標湯温より予め与えられた設定
範囲を越えて高いと判断したときにはバイパス通路開閉
弁への開信号を出力し、それ以外のときにはバイパス通
路開閉弁への閉信号を出力するバイパス通路開閉弁開閉
動作判断部と;給湯熱交換器の実測湯温と入水温度セン
サの検出入水温と給湯設定温度に基づいて出湯湯温が給
湯設定温度となるための総入水流量に対する給湯熱交換
器の流量の流量比を求め、バイパス通路開閉弁開閉動作
判断部からバイパス通路開閉弁への開信号が出力されて
いるときには上記検出流量比となるように前記流量制御
弁の開弁量を制御して次の出湯に備える流量制御弁開弁
量制御部と;を設ける構成としたことを特徴とする燃焼
機器。4. A hot water supply heat exchanger that heats water guided from a water supply passage by using heat of combustion of a hot water supply burner and flows out to the hot water supply passage, and a bypass passage that short-circuits an inlet and an outlet of the hot water supply heat exchanger. A bypass passage opening / closing valve for opening and closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; and a temperature of water in the water supply passage. An inlet water temperature sensor for detecting
In a combustion apparatus having a hot water supply heat exchanger hot water temperature sensor for detecting hot water temperature of hot water supply heat exchanger and hot water supply temperature setting means for setting hot water supply temperature, after the hot water supply burner of hot water supply burner is stopped, A target hot water temperature of the hot water supply heat exchanger at which the next hot water temperature becomes the hot water supply set temperature based on the predetermined flow ratio of the hot water supply heat exchanger to the incoming water flow rate, the detected incoming water temperature, and the hot water supply set temperature is determined. A hot water supply heat exchanger target hot water temperature detection section; a data storage section for storing the hot water temperature characteristic data of the hot water supply heat exchanger that changes with time of the temperature of the hot water in the hot water supply heat exchanger after the hot water supply burner stops the hot water supply combustion; Time measuring means for measuring an elapsed time from the time of stopping the hot water supply combustion of the hot water supply burner; and hot water supply heat exchange based on the staying hot water temperature characteristic data according to the measurement time of the time measuring means. Bowl hot water An estimated hot water supply heat exchanger estimated hot water temperature detection unit; a target hot water temperature detected by the hot water supply heat exchanger target hot water temperature detection unit and an estimated hot water temperature by the hot water supply heat exchanger estimated hot water temperature detection unit; A bypass passage that outputs an open signal to the bypass passage opening / closing valve when it is determined that the temperature is higher than the target hot water temperature by exceeding a predetermined set range, and otherwise outputs a close signal to the bypass passage opening / closing valve. An opening / closing valve opening / closing operation determining unit; and a hot water supply heat exchanger for a total incoming flow rate so that the outgoing hot water temperature becomes the hot water supply set temperature based on the measured hot water temperature of the hot water supply heat exchanger and the detected incoming water temperature and the hot water supply set temperature. When the open signal to the bypass passage opening / closing valve is output from the bypass passage opening / closing valve determination section, the valve opening amount of the flow control valve is controlled so as to be the detected flow ratio. For the next hot spring Burning appliance, characterized in that the provided construction and the; a flow control valve opening amount control unit that.
の給湯熱交換器湯温センサが設けられ、それら複数の給
湯熱交換器湯温センサの検出湯温の和を求め、この算出
値に予め定めた係数を掛けた積算値を給湯熱交換器の実
測湯温とする給湯熱交換器湯温算出部を設ける構成とし
たことを特徴とする請求項1又は請求項3又は請求項4
記載の燃焼機器。5. A plurality of hot water supply heat exchanger hot water temperature sensors are provided at different locations on the hot water supply heat exchanger side, and the sum of the detected hot water temperatures of the plurality of hot water supply heat exchanger hot water temperature sensors is obtained. 4. A hot water supply heat exchanger hot water temperature calculating section for obtaining an integrated value obtained by multiplying a calculated value by a predetermined coefficient as an actual measured hot water temperature of the hot water supply heat exchanger. Item 4
The combustion device as described.
の給湯熱交換器湯温センサが設けられ、それら複数の給
湯熱交換器湯温センサの検出湯温にそれぞれ予め定めた
係数を掛け、それら算出値の和を給湯熱交換器の実測湯
温とする給湯熱交換器湯温算出部を設ける構成としたこ
とを特徴とする請求項1又は請求項3又は請求項4記載
の燃焼機器。6. A plurality of hot water supply heat exchanger hot water temperature sensors are provided at different locations on the hot water supply heat exchanger side, and the detected hot water temperatures of the plurality of hot water supply heat exchanger hot water temperature sensors are predetermined coefficients, respectively. 5. A hot water supply heat exchanger hot water temperature calculation unit which multiplies the sum of the calculated values and sets the sum of the calculated values to the actually measured hot water temperature of the hot water supply heat exchanger. Combustion equipment.
ス通路接続部の下流側と、給湯熱交換器の給湯通路にお
ける流量制御弁介設位置の上流側とを短絡する開閉弁を
持たない固定バイパス通路が設けられている構成とした
ことを特徴とする請求項1乃至請求項6のうちのいずれ
か1つに記載の燃焼機器。7. A fixed bypass having no on-off valve for short-circuiting a downstream side of a bypass passage connecting portion in a water supply passage of a hot water supply heat exchanger and an upstream side of a flow control valve interposition position in a hot water supply passage of the hot water supply heat exchanger. The combustion device according to any one of claims 1 to 6, wherein a passage is provided.
焼の熱を利用して加熱し給湯通路へ流出する給湯熱交換
器と、この給湯熱交換器の入側と出側を短絡するバイパ
ス通路と、該バイパス通路の開閉を行うバイパス通路開
閉弁と、前記バイパス通路出側接続部の上流側の給湯通
路に設けられ流量を開弁量により制御する流量制御弁
と、給水通路の水の温度を検出する入水温度センサと、
給湯温度を設定するための給湯温度設定手段とを有する
燃焼機器において、給湯熱交換器の給水通路におけるバ
イパス通路接続部の下流側と、給湯熱交換器の給湯通路
における流量制御弁介設位置の上流側とを短絡する固定
バイパス通路が設けられ、給湯熱交換器の湯温情報を検
出する給湯熱交換器湯温情報検出手段と;給湯熱交換器
の湯温情報と検出入水温と給湯設定温度に基づき給湯設
定温度より予め定めた設定温度だけ高めの湯が出湯する
ための総入水流量に対する給湯熱交換器の流量比を求め
る流量比算出部と;給湯熱交換器の流量と固定バイパス
通路の流量の合計流量に対する給湯熱交換器の流量比が
予め基準流量比として与えられ、この基準流量比と前記
流量比算出部の算出流量比を比較し、給湯バーナの給湯
燃焼が停止した以降に算出流量比が基準流量比を下回っ
たと判断したときにはバイパス通路開閉弁への開信号を
出力し、それ以外のときにはバイパス通路開閉弁への閉
信号を出力するバイパス通路開閉弁開閉動作判断部と;
給湯熱交換器の湯温情報と検出入水温と給湯設定温度に
基づいて出湯湯温が給湯設定温度となるための総入水流
量に対する給湯熱交換器の流量比を求め、前記バイパス
通路開閉弁開閉動作判断部からバイパス通路開閉弁への
開信号が出力されているときには前記検出流量比となる
ように流量制御弁の開弁量を制御する流量制御弁開弁量
制御部と;を設ける構成としたことを特徴とする燃焼機
器。8. A hot water supply heat exchanger that heats water guided from a water supply passage by using heat of combustion of a hot water supply burner and flows out to the hot water supply passage, and a bypass passage that short-circuits an inlet and an outlet of the hot water supply heat exchanger. A bypass passage opening / closing valve for opening and closing the bypass passage; a flow control valve provided in the hot water supply passage upstream of the bypass passage outlet connection portion to control a flow rate by a valve opening amount; and a temperature of water in the water supply passage. An inlet water temperature sensor for detecting
In a combustion apparatus having hot water temperature setting means for setting a hot water temperature, a downstream side of a bypass passage connection portion in a water supply passage of a hot water heat exchanger and a flow control valve interposition position in a hot water supply passage of the hot water heat exchanger are provided. A hot water supply heat exchanger hot water temperature information detecting means for detecting hot water temperature information of the hot water supply heat exchanger provided with a fixed bypass passage for short-circuiting the upstream side and a hot water supply heat exchanger; A flow ratio calculating unit for calculating a flow ratio of the hot water supply heat exchanger to a total incoming water flow amount for discharging hot water higher than the set hot water supply temperature by a predetermined set temperature based on the temperature; a flow rate of the hot water supply heat exchanger and a fixed bypass passage The flow ratio of the hot water supply heat exchanger to the total flow rate of the hot water supply is given in advance as a reference flow ratio, and this reference flow ratio is compared with the flow ratio calculated by the flow ratio calculation unit. When it is determined that the calculated flow ratio is lower than the reference flow ratio, an open signal to the bypass passage opening / closing valve is output, and at other times, a bypass passage opening / closing valve opening / closing operation determining unit that outputs a close signal to the bypass passage opening / closing valve is provided. ;
Based on the hot water temperature information of the hot water supply heat exchanger, the detected incoming water temperature, and the set hot water supply temperature, the flow ratio of the hot water supply heat exchanger to the total incoming water flow for the outlet hot water temperature to reach the hot water supply set temperature is obtained, and the bypass passage opening and closing valve is opened and closed A flow control valve opening amount control unit that controls an opening amount of the flow control valve so that the detected flow ratio is obtained when an opening signal is output from the operation determination unit to the bypass passage opening / closing valve; Combustion equipment characterized by the following.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8271656A JPH1096556A (en) | 1996-09-20 | 1996-09-20 | Combustion equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8271656A JPH1096556A (en) | 1996-09-20 | 1996-09-20 | Combustion equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH1096556A true JPH1096556A (en) | 1998-04-14 |
Family
ID=17503079
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8271656A Pending JPH1096556A (en) | 1996-09-20 | 1996-09-20 | Combustion equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH1096556A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008138952A (en) * | 2006-12-04 | 2008-06-19 | Chofu Seisakusho Co Ltd | Heat exchanger abnormality detection device and heat exchanger abnormality detection method |
-
1996
- 1996-09-20 JP JP8271656A patent/JPH1096556A/en active Pending
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008138952A (en) * | 2006-12-04 | 2008-06-19 | Chofu Seisakusho Co Ltd | Heat exchanger abnormality detection device and heat exchanger abnormality detection method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH1096555A (en) | Combustion equipment | |
| JPH10103778A (en) | Combustion equipment | |
| JP3776975B2 (en) | Combustion equipment | |
| JP3738082B2 (en) | Combustion equipment | |
| JP3880119B2 (en) | One can two water bath hot water heater | |
| JP3756988B2 (en) | Combustion equipment | |
| JP2526463B2 (en) | Hot water supply control device | |
| JP3776985B2 (en) | Combustion equipment | |
| JP3756999B2 (en) | Combustion equipment | |
| JPH11193956A (en) | Bath insulation device and bath insulation method | |
| JP3776974B2 (en) | Combustion equipment | |
| JPH10103777A (en) | Combustion equipment | |
| JP3252384B2 (en) | Water heater control device | |
| JP3382692B2 (en) | Stabilization control method of re-spring hot water temperature in water heater | |
| JP2536442B2 (en) | Water heater | |
| JP3776997B2 (en) | One can two water bath hot water heater | |
| JP3776983B2 (en) | Combustion equipment | |
| JP2000310445A (en) | Bath unit and estimation of temperature before reheating | |
| JPH1123058A (en) | Combustion equipment | |
| JP2552586B2 (en) | Inlet water temperature detection method and hot water supply control method in water heater | |
| JP2867758B2 (en) | Operation control method of bath kettle with water heater | |
| JPH1026416A (en) | Bath burner with hot water feeder | |
| JPH1137551A (en) | One-can two-channel combustion device | |
| JP2946862B2 (en) | Operation control method of bath kettle with water heater | |
| JP2636572B2 (en) | Hot water re-control system in hot and cold water mixing system |