JPH11124902A JP29082797A JP29082797A JPH11124902A JP H11124902 A JPH11124902 A JP H11124902A JP 29082797 A JP29082797 A JP 29082797A JP 29082797 A JP29082797 A JP 29082797A JP H11124902 A JPH11124902 A JP H11124902A
Authority
JP
Japan
Prior art keywords
slab
interior
work
members
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP29082797A
Other languages
Japanese (ja)
Inventor
Yuutarou Omote
佑太郎 表
Haruka Ogawa
晴果 小川
Kohei Kurita
康平 栗田
Ryunosuke Aoyama
龍之助 青山
Nobuyuki Azuma
信行 我妻
Katsushi Kashiwakura
克至 柏倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP29082797A priority Critical patent/JPH11124902A/en
Publication of JPH11124902A publication Critical patent/JPH11124902A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To increase the efficiency of interior finish work and to solve problems with transportation by assembling PC members and interior members alternately at a construction site. SOLUTION: A column 1 made of a PC member is erected at the corner angle part of a slab 5 made of a PC member installed in a predetermined position, and interior units member such as a prefabricated double floor panel 2 and a wall panel 3 are conveyed and installed in the open section of a ceiling face partitioned by the slab 5 and the column 1. Next, the operation of installing a PC beam 4 at the top between the columns 1, then assembling the PC beam 4 into place between the columns 1, and placing the slab 5 is repeated for each story.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、PC部材を用いた
建物の建設方法に関し、該当する区画におけるPC部材
工事後、直ちに内装据付けを行えるようにした方法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a building using PC members, and more particularly to a method for installing an interior immediately after PC members are constructed in a corresponding section.

【0002】[0002]

【従来の技術】例えばマンションなど、多層階の集合住
宅をPC部材により構築する場合、PC部材を用いて躯
体工事を行った後、内装材を躯体内部に組付けるのが一
般的である。
2. Description of the Related Art For example, when a multi-story apartment house such as an apartment building is constructed of PC members, it is common to carry out skeleton work using the PC members and then assemble interior materials inside the skeleton.

【0003】ところが、この建設方法では、躯体開口部
などにより内装材の大きさ、組付の工事段取に制限を受
けるとともに、大きな内装材にあっては、ベランダなど
のような大きな開口部からしか搬入することができず、
作業に手間がかかるものとなっていた。
[0003] However, in this construction method, the size of the interior material and the setup work for assembling are limited by the opening of the skeleton, and in the case of a large interior material, a large opening such as a veranda is required. Can only be brought in,
The work was troublesome.

【0004】そこで、PC部材を用いた建物の建設方法
として、例えば特開平5−9973号公報には、予めP
C部材の内側に内装材を組込んだ部材を順次所定位置に
揚重しつつ組立を行う方法が開示されている。
Therefore, as a construction method of a building using PC members, for example, Japanese Patent Application Laid-Open No.
There is disclosed a method of assembling a member incorporating an interior material inside a C member while sequentially lifting the member to a predetermined position.

【0005】この建設方法における施工手順としては、
図3に示すように、内装材製造工場などで作られた内装
材を、PC部材製造工場などで製造されたPC部材に組
付け、次いで梱包、養生などにより一体化し、この一体
化部材を工事現場まで搬送し、揚重組付けを行うことに
より、躯体工事の完成と同時に、内装も同時に完成させ
ていく方法であり、工期短縮を図る上で好適である。
The construction procedure in this construction method includes:
As shown in FIG. 3, an interior material manufactured in an interior material manufacturing factory or the like is assembled to a PC member manufactured in a PC member manufacturing factory or the like, and then integrated by packing, curing, etc., and the integrated member is constructed. It is a method of completing the framing work and completing the interior at the same time by carrying it to the site and performing lifting assembly, which is suitable for shortening the construction period.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、この方
法では、異種の部材同士を予め組付けるため、いずれか
一方の部材を他方の部材の製造工場に運搬する必要があ
り、その荷下ろしおよび荷揚げに手間取っていた。
However, in this method, in order to assemble different kinds of members in advance, it is necessary to transport one of the members to a manufacturing factory of the other member, and to unload and unload the members. It took time.

【0007】また、組立状態では異種材料同士の複合部
材となるため、梱包などの破損防止処置をした上で運搬
し、躯体組立時あるいは組立後、これら梱包を解かなけ
ればならないほか、運搬荷姿が大型、大重量化するた
め、大型のトレーラが必要で、搬送用の通路確保などの
問題も生じていた。
[0007] Further, in the assembled state, since it is a composite member of different materials, it must be transported after taking measures to prevent damage such as packing, and these packages must be unpacked at the time of assembling the frame or after assembling. However, a large trailer is required because of the large size and large weight, and problems such as securing a passage for transportation have arisen.

【0008】本発明は、以上の問題を解決するものであ
り、その目的は、建設現場において、PC部材の組立と
内装材の組立を交互に行うことにより、内装工事の効率
化と搬送時における諸問題を解決できるようにしたPC
部材を用いた建物の建設方法を提供するものである。
The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to assemble PC members and assembling of interior materials alternately at a construction site, thereby improving the efficiency of interior construction and transporting. PC that can solve various problems
An object of the present invention is to provide a method for constructing a building using members.

【0009】[0009]

【課題を解決するための手段】以上の目的を達成するた
め、本発明は、所定位置に設置されたPC部材からなる
スラブの隅角部にPC部材からなる柱を据え付け、前記
スラブおよび柱によって仕切られる区画内に、予め製作
された内装材ユニットを搬入、据付けした後、柱間の上
部にPC梁を設置して柱間に組付け、次いで、スラブを
配置する作業を各階毎に繰返すことを特徴とするもので
ある。
In order to achieve the above object, the present invention provides a method for mounting a pillar made of a PC member at a corner of a slab consisting of a PC member installed at a predetermined position. After loading and installing the prefabricated interior material unit in the section to be partitioned, install the PC beam on the upper part between the columns, assemble it between the columns, and then repeat the work of arranging the slab for each floor It is characterized by the following.

【0010】従って、本発明方法によれば、上の階のス
ラブすなわち天井が設置されていない段階で内装材ユニ
ットを吊り下ろして搬入できるため、一度に大面積の内
装材を供給できる。また、搬入作業終了後は内装材据付
け工事と、梁、天井スラブ工事を並行して行うことがで
き、工事段取上の問題もない。
Therefore, according to the method of the present invention, the interior material unit can be suspended and carried in at a stage where the slab of the upper floor, that is, the ceiling is not installed, so that a large area interior material can be supplied at one time. Further, after the loading work is completed, the installation work of the interior material and the slab work of the beams and the ceiling can be performed in parallel, and there is no problem in the work setup.

【0011】さらに本発明では、好ましくは前記内装材
ユニットは、部屋サイズまたは柱スパンサイズに対応し
た大きさに形成されていることにより、内装工事の省力
化を図ることができる。
Further, in the present invention, preferably, the interior material unit is formed in a size corresponding to a room size or a column span size, so that labor for interior work can be saved.

【0012】[0012]

【発明の実施の形態】以下、本発明の好ましい実施の形
態につき、添付図面を参照して詳細に説明する。図1
は、本発明方法の作業工程を示す流れ図である。
Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG.
4 is a flowchart showing the working steps of the method of the present invention.

【0013】まず、ステップST1では、PC部材製造
工場および内装材製造工場においてそれぞれ独立してP
C部材および内装材を製作する。PC部材製造工場で製
作される部材はPCスラブ材、PC柱、PC梁などであ
る。
First, in step ST1, the PC member manufacturing plant and the interior material manufacturing plant independently operate P
Manufacture C members and interior materials. The members manufactured at the PC member manufacturing factory are PC slab materials, PC columns, PC beams, and the like.

【0014】また、内装材製造工場で製作される内装材
としては、二重床大型パネルおよび内装用大型壁パネル
であり、これらは予め設計された柱スパンなどの設計寸
法に合わせて製作されるほか、必要な配管、設備機器類
もこれらに組付けることが可能である。
The interior materials manufactured at the interior material manufacturing plant include a large double-wall panel and a large interior wall panel, which are manufactured in accordance with design dimensions such as a previously designed column span. In addition, necessary piping and equipment can be assembled to these.

【0015】次に、ステップST2,ST3では、工事
開始時期に合わせて各部材を工事現場まで搬送し、現場
のストックヤードにストックする。
Next, in steps ST2 and ST3, each member is transported to the construction site in accordance with the construction start time, and stocked in the stock yard at the site.

【0016】次いで、ステップST4,ST5では、予
め作られた基礎上にPCスラブ材の設置および現場打ス
ラブコンクリート(PC柱およびPC梁がハーフプレキ
ャスト製品である場合はそれらの中空部に打設すべきコ
ンクリートを含む)の打設作業が行われ、その後、PC
柱の建て込みが行われる。
Next, in steps ST4 and ST5, a PC slab material is placed on a prefabricated foundation and cast-in-place slab concrete (when the PC columns and PC beams are half precast products, they are cast into their hollow portions. Including concrete to be installed), and then the PC
Pillars are built.

【0017】以上の工事が終了した後、ステップST
6,ST7では、天井開口面より二重床大型パネルの搬
入、据付け引続き壁大型パネルの搬入据付け作業が行わ
れる。
After the above construction is completed, step ST
6, In ST7, the large-sized double-panel panel is carried in from the ceiling opening surface, and installation is carried out.

【0018】この後、直ちにステップST8,9でPc
柱に対するPc梁の組付け作業および上階のPcスラブ
の組付け作業がなされ、さらに現場打コンクリートの打
設作業がなされる。このステップST8,9の工程中は
内装材工事と、躯体工事との取合いは少ないので、この
躯体工事に並行して内装工事、あるいは内装仕上げ工事
も行うことができる。
Then, immediately in steps ST8 and ST9, Pc
The work of assembling the Pc beam to the column and the work of assembling the Pc slab on the upper floor are performed, and the work of placing concrete in place is performed. During the process of steps ST8 and ST9, there is little interaction between the interior material work and the skeleton work, so that the interior work or the interior finish work can be performed in parallel with the skeleton work.

【0019】以上の作業は建設計画階まで反復され(ス
テップST10)、最上階迄行われると作業を終了す
る。
The above operation is repeated up to the construction plan floor (step ST10). When the operation is performed up to the top floor, the operation is completed.

【0020】図2は、以上の作業工程の具体的な施工構
造を示すものであり、現在所定の階Fでは床工事および
Pc柱1の建て込みが完了し、これの内部に大型二重床
パネル2と大型壁パネル3が据付けられた状態を示して
いる。なお二重床パネル2および壁パネル3とも柱1の
スパンに合わせた部材寸法となっている。
FIG. 2 shows a concrete construction structure of the above-mentioned work process. At present, the floor work and the installation of the Pc column 1 are completed at a predetermined floor F, and a large double floor is installed inside the floor work. It shows a state where the panel 2 and the large wall panel 3 are installed. Note that both the double floor panel 2 and the wall panel 3 have a member size corresponding to the span of the column 1.

【0021】この柱1上にはさらにPc梁4が連結さ
れ、Pcスラブ5で天井を覆うとともにこのスラブ5の
上部には現場打コンクリート6で覆われ、次の階F+1
の柱1が組立てられている。
On this pillar 1, a Pc beam 4 is further connected. The ceiling is covered with a Pc slab 5, and the upper part of the slab 5 is covered with cast-in-place concrete 6, and the next floor F + 1
Column 1 is assembled.

【0022】柱1が組立てられた状態で大型クレーンな
どにより、この階F+1の二重床パネル3が吊り下ろさ
れてスラブ上に据付け固定され、次いで壁パネル2も同
じく吊り下ろされて所定位置に据付け固定される。
With the column 1 assembled, the double floor panel 3 of this floor F + 1 is hung down and installed and fixed on the slab by a large crane or the like, and then the wall panel 2 is also hung down to a predetermined position. Installed and fixed.

【0023】この状態で柱1上にはPc梁4が連結さ
れ、次いでPcスラブ5が設置される。
In this state, the Pc beam 4 is connected to the column 1 and then the Pc slab 5 is installed.

【0024】この作業の間、内装工事、あるいは内装仕
上げ工事も並行して行うことができ、以後次々と、PC
部材の組立と内装材の搬入および据付け工事を階毎に交
互に行うことができる。
During this work, interior work or interior finish work can be performed in parallel.
Assembly of members and loading and installation of interior materials can be performed alternately for each floor.

【0025】[0025]

【発明の効果】以上の説明により明らかなように、本発
明によるPC部材を用いた建物の建設方法にあっては、
従来の予めPC部材の内部に内装材を組付けた状態で建
物を建設する場合における固有の問題である部材組立時
の不具合や養生のための梱包の問題や、搬送などの手間
が省け、しかも大開口部分から内装材を搬入できるた
め、搬入作業およびその後の組立作業性も改善される。
As is apparent from the above description, in the method for constructing a building using the PC member according to the present invention,
Conventionally, when building a building in a state where the interior material is assembled inside the PC member in advance, it is possible to eliminate troubles such as defects at the time of member assembly and packaging problems for curing, which are inherent problems, and labor such as transportation. Since the interior material can be carried in from the large opening portion, the carrying-in work and subsequent assembling workability are also improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明方法の作業工程を示すフローチャートで
ある。
FIG. 1 is a flowchart showing the working steps of the method of the present invention.

【図2】同方法における具体的な施工構造を示す縦断面
図である。
FIG. 2 is a longitudinal sectional view showing a specific construction structure in the method.

【図3】従来の内装材一体のPC部材による建設方法の
施工手順を示すフローチャートである。
FIG. 3 is a flowchart showing a construction procedure of a conventional construction method using a PC member integrated with an interior material.

【符号の説明】[Explanation of symbols]

1 Pc柱 2 大型二重床パネル 3 大型壁パネル 4 Pc梁 5 Pcスラブ 6 現場打コンクリート 1 Pc column 2 Large double floor panel 3 Large wall panel 4 Pc beam 5 Pc slab 6 Cast-in-place concrete

───────────────────────────────────────────────────── フロントページの続き (72)発明者 青山 龍之助 埼玉県入間郡大井町亀久保1150 株式会社 内外テクノス東京工場内 (72)発明者 我妻 信行 埼玉県入間郡大井町亀久保1150 株式会社 内外テクノス東京工場内 (72)発明者 柏倉 克至 埼玉県入間郡大井町亀久保1150 株式会社 内外テクノス東京工場内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Ryunosuke Aoyama 1150 Kamekubo, Oimachi, Iruma-gun, Saitama Prefecture Inside and outside Technos Tokyo Plant (72) Inventor Nobuyuki Aguma 1150 Kamekubo, Oimachi, Iruma-gun, Saitama Prefecture Inside and outside Technos Tokyo plant (72) Inventor Katsushi Kashiwakura 1150 Kamekubo, Oimachi, Iruma-gun, Saitama

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 所定位置に設置されたPC部材からなる
スラブの隅角部にPC部材からなる柱を据え付け、前記
スラブおよび柱によって仕切られる区画内に、予め製作
された内装材ユニットを搬入、据付けした後、柱間の上
部にPC梁を設置して柱間に組付け、次いで、スラブを
配置する作業を各階毎に繰返すことを特徴とするPC部
材を用いた建物の建設方法。
1. A pillar made of a PC member is installed at a corner of a slab made of a PC member installed at a predetermined position, and a prefabricated interior material unit is carried into a section partitioned by the slab and the pillar. A method of constructing a building using a PC member, wherein after the installation, a PC beam is installed on the upper part between the columns, assembled to the columns, and then the operation of arranging the slab is repeated for each floor.
【請求項2】 前記内装材ユニットは、部屋サイズまた
は柱スパンサイズに対応した大きさに形成されているこ
とを特徴とする請求項1に記載のPC部材を用いた建物
の建設方法。
2. The method according to claim 1, wherein the interior material unit is formed in a size corresponding to a room size or a column span size.
JP29082797A 1997-10-23 1997-10-23 Constructing of building using pc member Pending JPH11124902A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29082797A JPH11124902A (en) 1997-10-23 1997-10-23 Constructing of building using pc member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29082797A JPH11124902A (en) 1997-10-23 1997-10-23 Constructing of building using pc member

Publications (1)

Publication Number Publication Date
JPH11124902A true JPH11124902A (en) 1999-05-11

Family

ID=17761005

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29082797A Pending JPH11124902A (en) 1997-10-23 1997-10-23 Constructing of building using pc member

Country Status (1)

Country Link
JP (1) JPH11124902A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061516A (en) * 2013-01-15 2013-04-24 中南大学 A new substructure modular prefabricated assembled frame structure assembly method
WO2015145772A1 (en) * 2014-03-28 2015-10-01 大和ハウス工業株式会社 Row house
JP2021134484A (en) * 2020-02-21 2021-09-13 三井住友建設株式会社 How to build a building with an RC structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061516A (en) * 2013-01-15 2013-04-24 中南大学 A new substructure modular prefabricated assembled frame structure assembly method
CN103061516B (en) * 2013-01-15 2015-07-08 中南大学 A new substructure modular prefabricated assembled frame structure assembly method
WO2015145772A1 (en) * 2014-03-28 2015-10-01 大和ハウス工業株式会社 Row house
JP6050549B2 (en) * 2014-03-28 2016-12-21 大和ハウス工業株式会社 Multi-family house
JP2021134484A (en) * 2020-02-21 2021-09-13 三井住友建設株式会社 How to build a building with an RC structure

Similar Documents

Publication Publication Date Title
CA2329083C (en) A method for building construction
US6067771A (en) Method and apparatus for manufacturing modular building
CN1075766A (en) Construction method of precast combined building
CN101395324A (en) Prefabricated reinforced concrete single family dwelling and method for assembling said dwelling
CN108005410B (en) Assembled steel-concrete combined structure residential system and construction method thereof
EP1971727B1 (en) Construction of buildings
CN108005266B (en) Strip steel frame precast reinforced concrete shear wall structure and preparation and installation methods
JPH11124902A (en) Constructing of building using pc member
JP2000352116A (en) Building unit construction method and unit building
JP2618567B2 (en) Construction method of unit building
JPS6335931A (en) Construction of building of atomic power plant
JPH11124903A (en) Construction method for building using pc member
JPH06158728A (en) Construction method of wooden structure
JP3740594B2 (en) Construction method of building
JP3230895B2 (en) Unit building construction method
JP3069832U (en) A modular building employing a piloti style
JPH05505433A (en) modular building
JPH0735925Y2 (en) Building frame
CN117145067A (en) Prefabricated room module, processing method and construction method
JP2002013205A (en) Wooden framwork unit house
JPS6322969A (en) Mold frame raising and lowering stand
JP2025024769A (en) Gate manufacturing method
JP2820542B2 (en) Box-type housing unit manufacturing method
JPH0421970Y2 (en)
JPH0671528A (en) Manufacture of building unit with stairway

Legal Events

Date Code Title Description
A621 Written request for application examination

Effective date: 20041007

Free format text: JAPANESE INTERMEDIATE CODE: A621

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20041007

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060502

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060606

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060803

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20060803

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061003

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070213