JPH11293686A - Pile arrangement structure - Google Patents

Pile arrangement structure

Info

Publication number
JPH11293686A
JPH11293686A JP10320298A JP10320298A JPH11293686A JP H11293686 A JPH11293686 A JP H11293686A JP 10320298 A JP10320298 A JP 10320298A JP 10320298 A JP10320298 A JP 10320298A JP H11293686 A JPH11293686 A JP H11293686A
Authority
JP
Japan
Prior art keywords
pile
piles
earthquake
force
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10320298A
Other languages
Japanese (ja)
Inventor
Takumi Kimura
匠 木村
Yoshio Kaneko
佳生 金子
Masayuki Hasegawa
正幸 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP10320298A priority Critical patent/JPH11293686A/en
Publication of JPH11293686A publication Critical patent/JPH11293686A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce stress of piles at an earthquake by arranging shearing force bearing piles only supporting horizontal force on the further outside of piles corresponding to the outer circumferential corner parts of an upper structure within a pile group transmitting force to the ground. SOLUTION: The weight of an upper building 1 is supported with a pile 3 group through a foundation 2. When the piles 3 are arranged in this way, maximum shearing stress is generated in the piles 3a on the four corners by horizontal force at an earthquake. For reducing the stress, shearing force bearing pipes 4 supporting only horizontal force are arranged outside the piles 3a. Since the piles 4 are deformed to absorb earthquake energy at a big earthquake, the piles 4 function as energy absorbing piles. Accordingly, damage of the other pile 3 group is restrained to minimum. Particularly, even if the piles 4 are deformed by a big earthquake, influence on the supporting performance of the building can be minimized, and increase of cost can be restrained to minimum.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、地震時に杭に発生
する応力の低減を図ることのできる杭の配置構造に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile arrangement capable of reducing the stress generated in a pile during an earthquake.

【0002】[0002]

【従来の技術】一般に、建物(上部構造物)は基礎を介
して多数の杭により支持されており、杭は地盤に対して
縦横に間隔をおいて配列されている。平面視矩形の建物
では、建物平面に対応して杭が縦横に並び、全部の杭で
建物の荷重を支えている。
2. Description of the Related Art Generally, a building (superstructure) is supported by a large number of piles via a foundation, and the piles are arranged vertically and horizontally at intervals with respect to the ground. In a rectangular building in plan view, piles are arranged vertically and horizontally corresponding to the building plane, and all piles support the load of the building.

【0003】ところで、地震時に、杭に発生する応力と
しては、上部建物(上部構造物)から加わるせん断力
(水平力)により発生する応力と、地盤自体が変形する
ことにより発生する応力とがある。このうち、上部建物
から加わる水平力により発生する応力は、多数の杭のう
ちの四隅の杭が最も大きいことが知られている。この杭
には更に大きな付加軸力が加わるため、結果的に、地震
時には、これら四隅の杭に被害が多く発生する。
[0003] By the way, the stress generated in the pile during the earthquake includes a stress generated by a shear force (horizontal force) applied from an upper building (upper structure) and a stress generated by deformation of the ground itself. . Among them, it is known that the stress generated by the horizontal force applied from the upper building is the largest at the four corner piles among the many piles. Since a larger additional axial force is applied to the piles, as a result, the piles at the four corners are often damaged during an earthquake.

【0004】[0004]

【発明が解決しようとする課題】上述したように、従来
では、建物を支える四隅の杭に地震の被害が多く発生す
ることが知られているが、現在のところ、コストをあま
り上昇させることなく、杭の地震時応力を有効に低減さ
せる技術が提供されていないのが実状である。
As described above, conventionally, it is known that the piles at the four corners supporting a building are often damaged by an earthquake, but at present, the cost is not increased so much. However, there is no technology for effectively reducing the stress of piles during earthquakes.

【0005】本発明は、上記事情を考慮し、コスト負担
を増加させることなく、有効に地震時の杭の応力低減を
図ることのできる、杭の配置構造を提供することを目的
とする。
The present invention has been made in view of the above circumstances, and has as its object to provide a pile arrangement structure capable of effectively reducing the stress of a pile during an earthquake without increasing the cost burden.

【0006】[0006]

【課題を解決するための手段】請求項1の発明は、上部
構造物の荷重を基礎を介して地盤に伝える杭群のうち上
部構造物の外周隅部に対応した杭のさらに外側に、主と
して水平力のみを支持するせん断力負担杭を配置したこ
とを特徴とする。
According to the present invention, a pile group for transmitting a load of an upper structure to the ground via a foundation is mainly provided outside a pile corresponding to an outer peripheral corner of the upper structure. A shear-bearing pile that supports only horizontal force is provided.

【0007】この構造の場合、最外周部に配置したせん
断力負担杭が、上部構造物から加わる水平力を一番多く
負担することになるので、その分、せん断力負担杭の内
側に位置する上部構造物の外周隅部に対応した杭のせん
断応力を低減することができる。また、大地震時には、
せん断力負担杭がエネルギ吸収杭としての機能を果たし
て、自身が変形することにより地震エネルギを吸収する
ので、他の杭群の被害を最小に止めることができる。特
に、その場合、せん断力負担杭は上部構造物の重量自体
を支持する目的で設けたものではなく、上部構造物の重
量は他の杭群で支えているので、杭による上部構造物の
支持性能を損なうことはない。
In the case of this structure, the shear load bearing pile arranged at the outermost peripheral portion bears the most horizontal force applied from the upper structure. The shear stress of the pile corresponding to the outer peripheral corner of the upper structure can be reduced. Also, during a major earthquake,
Since the shear force bearing pile functions as an energy absorbing pile and absorbs seismic energy by deforming itself, damage to other pile groups can be minimized. In particular, in this case, the shear load bearing pile is not provided to support the weight of the superstructure itself, and the weight of the superstructure is supported by other pile groups, so the pile supports the superstructure. There is no loss in performance.

【0008】請求項2の発明は、請求項1において、前
記せん断力負担杭が、上部構造物の施工時は上下方向に
絶縁され、施工完了時に連結されたものであることを特
徴とする。
A second aspect of the present invention is characterized in that, in the first aspect, the shearing force bearing pile is vertically insulated when the superstructure is constructed, and is connected when the construction is completed.

【0009】この構造では、せん断力負担杭が上部構造
物の重量を負担しないように施工されているので、上部
構造物から加わる水平力と地震時の付加軸力を最も多く
負担することができる。そして、上部構造物の重量自体
は負担していないので、大地震時に変形した場合でも、
上部構造物の支持性能に影響がほとんど出ない。
In this structure, since the shear load bearing pile is constructed so as not to bear the weight of the upper structure, the horizontal force applied from the upper structure and the additional axial force at the time of the earthquake can be borne most. . And because the weight of the superstructure itself is not borne, even if it is deformed during a large earthquake,
There is almost no effect on the support performance of the superstructure.

【0010】請求項3の発明は、請求項1または2にお
いて、前記上部構造物が平面略矩形であり、その四隅に
対応した杭のさらに外側に前記せん断力負担杭が配置さ
れていることを特徴とする。
According to a third aspect of the present invention, in the first or second aspect, the upper structure has a substantially rectangular shape in a plane, and the shear force-carrying pile is disposed further outside a pile corresponding to four corners thereof. Features.

【0011】[0011]

【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて説明する。図1は実施形態の杭の配置構造を示
す図で、(a)は側面図、(b)は(a)のIb−Ib
矢視断面図である。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a diagram showing an arrangement structure of a pile according to an embodiment, where (a) is a side view and (b) is Ib-Ib of (a).
It is arrow sectional drawing.

【0012】この構造では、矩形平面の上部建物(上部
構造物)1の重量は、矩形版状の基礎2を介して、縦横
多列(3×4列)に配した12本の杭3の群により支持
されている。この杭3の配列であると、地震時の水平力
により、四隅(外周隅部)の杭3aに最も大きなせん断
応力が生じる。そこで、それを軽減するために、四隅の
杭3aのさらに外側に、主として水平力のみを支持する
せん断力負担杭4が配されている。
In this structure, the weight of an upper building (upper structure) 1 having a rectangular plane is weighted by twelve piles 3 arranged in multiple rows and columns (3 × 4 rows) via a rectangular plate-shaped foundation 2. Supported by groups. With this arrangement of the piles 3, the largest shear stress is generated in the piles 3a at the four corners (outer peripheral corners) due to the horizontal force at the time of the earthquake. Therefore, in order to alleviate this, a shear force bearing pile 4 mainly supporting only horizontal force is arranged further outside the four corner piles 3a.

【0013】この場合のせん断力負担杭4は、図2
(a)に示すように、施行時には上下方向の付着を絶縁
するべく、杭頭部の鉄筋4aが基礎2の開口6内にただ
単に挿入されており、建物完成直前(施工完了時)に、
図2(b)に示すように、開口6内にコンクリート7を
充填することで、基礎2と一体に結合されたものであ
る。従って、このせん断力負担杭4は、上部建物1の重
量は負担せず、主として水平力のみを負担できるように
なっている。従って、地震時には、建物1から加わる水
平力と付加軸力を最も多く負担することができる。
In this case, the shear force bearing pile 4 is shown in FIG.
As shown in (a), at the time of construction, a reinforcing bar 4a of the pile head is simply inserted into the opening 6 of the foundation 2 in order to insulate the adhesion in the vertical direction.
As shown in FIG. 2 (b), the opening 6 is filled with concrete 7 to be integrated with the foundation 2. Therefore, the shear force bearing pile 4 does not bear the weight of the upper building 1, but can bear mainly the horizontal force. Therefore, at the time of an earthquake, the horizontal force and the additional axial force applied from the building 1 can be borne most.

【0014】この構造によれば、最外周部に位置するせ
ん断力負担杭4が、上部建物1から加わる水平力を一番
多く負担することになるので、その分、その内側に位置
する四隅の杭3aのせん断応力を低減することができ
る。また、同様に杭3群全体のせん断応力を軽減するこ
とができる。さらに、地震時の付加軸力をも最も多く負
担できるので、他の杭3群の地震時の軸力の負担も減ら
することができる。
According to this structure, since the shearing force bearing pile 4 located at the outermost periphery bears the most horizontal force applied from the upper building 1, the four corners located inside thereof are correspondingly increased. The shear stress of the pile 3a can be reduced. Similarly, the shear stress of the entire group of piles 3 can be reduced. Further, since the additional axial force during an earthquake can be borne most, the load on the other piles 3 during the earthquake can be reduced.

【0015】また、大地震時には、最外周部に位置する
せん断力負担杭4が変形(破壊を含む)することによ
り、地震エネルギを吸収することになるので、せん断力
負担杭4がエネルギ吸収杭としての機能を果たすことに
なり、他の杭3群の被害を最小に止めることができる。
特に、せん断力負担杭4は、建物1自体の重量を支えて
いるものでないので、大地震によって変形しても、建物
の支持性能に与える影響は少なくてすむ。
In the event of a large earthquake, the shear force-carrying pile 4 located at the outermost periphery is deformed (including destruction), thereby absorbing seismic energy. As a result, the damage to the other three groups of piles can be minimized.
In particular, since the shear load bearing pile 4 does not support the weight of the building 1 itself, even if it is deformed by a large earthquake, the influence on the support performance of the building is small.

【0016】次に、杭の負担せん断力を3次元薄層法を
用いて解析した結果について簡単に述べる。解析に用い
たモデルは、図3に示すように、基礎2から地盤までの
長さH1=15m、根入れ深さH2=2m、せん断力負
担杭4が4本存在する構造であり、図4(a)、(b)
に示すように、主たる杭3が16本の場合(杭間隔6
m、12m)と、64本の場合(杭間隔6m)につい
て、杭頭を1m強制的に変形させて各杭のせん断力を調
べた。通常の杭頭変位は1cm程度であるので、1cm
時のせん断力で比較した。また、せん断力負担杭4の存
在により、主たる杭3の1本あたりのせん断力が減って
くるため、本数の比率で補正したせん断力を用いて比較
した。
Next, a brief description will be given of the result of analyzing the load shearing force of a pile using a three-dimensional thin-layer method. As shown in FIG. 3, the model used for the analysis has a structure in which the length from the foundation 2 to the ground H1 = 15 m, the embedding depth H2 = 2 m, and four shear force bearing piles 4 exist. (A), (b)
As shown in the figure, when there are 16 main piles 3 (pile spacing 6
m, 12 m) and 64 cases (pile spacing 6 m), the pile head was forcibly deformed by 1 m and the shear force of each pile was examined. Normal pile head displacement is about 1cm, so 1cm
The shear force at the time was compared. Further, since the shear force per one of the main piles 3 is reduced due to the presence of the shear force-carrying piles 4, the comparison was made using the shear force corrected by the ratio of the number of the piles.

【0017】その結果、杭16本、杭間隔6mの場合
は、通常の四隅にあたる杭3aのせん断力は83%、そ
の他の杭のせん断力は90%から95%に低減された。
その他の場合も、通常の四隅にあたる杭3aのせん断力
は90%程度、その他の杭のせん断力も95%程度に低
減された。また、全体の傾向として、杭本数が少ないほ
ど、また、杭間隔が狭いほど、せん断力負担杭4を設け
た効果が高いことが分かった。即ち、せん断力負担杭4
は、4本分だけ杭本数が増えた以上に、全体の杭のせん
断力を低減させる効果があることが分かった。
As a result, in the case of 16 piles and a pile spacing of 6 m, the shear force of the pile 3a at the four regular corners was reduced to 83%, and the shear force of the other piles was reduced from 90% to 95%.
In other cases, the shearing force of the piles 3a at the four regular corners was reduced to about 90%, and the shearing force of other piles was also reduced to about 95%. In addition, as a general tendency, it was found that the smaller the number of piles and the narrower the interval between the piles, the higher the effect of providing the shear force bearing piles 4. That is, the shear load bearing pile 4
It was found that the effect of reducing the shearing force of the entire pile was more than the number of piles increased by four.

【0018】なお、矩形平面以外の建物についても、外
周隅部の杭に地震時に一番負担がかかることが分かって
いるので、その杭の外側にせん断力負担杭を配置するこ
とにより、上記と同様の効果を奏することができる。
It is known that the largest load is applied to the piles at the outer peripheral corners of the building other than the rectangular plane in the event of an earthquake. Similar effects can be obtained.

【0019】また、上記実施形態では、せん断力負担杭
4を各隅部に1本ずつ配置したが、複数本ずつ配置して
もよい。
Further, in the above embodiment, the shear force-carrying piles 4 are arranged one at each corner, but a plurality of them may be arranged.

【0020】[0020]

【発明の効果】以上説明したように、請求項1の発明に
よれば、上部構造物の荷重を基礎を介して地盤に伝える
杭群のうち、上部構造物の外周隅部に対応した杭のさら
に外側に、せん断力負担杭を配置したので、特に外周隅
部の杭のせん断応力を低減することができる。また、大
地震時には、せん断力負担杭がエネルギ吸収杭としての
機能を果たすので、他の杭群の被害を最小に止めること
ができる。また、そのようにせん断力負担杭が変形して
も、せん断力負担杭は上部構造物の重量自体を支持する
目的のものではないので、杭による上部構造物の支持性
能を損なうことはない。この場合、せん断力負担杭を最
外周部に適当本数配置するだけで以上の効果を期待でき
るので、コストの上昇を最小限に抑えることができる。
As described above, according to the first aspect of the present invention, of the pile group for transmitting the load of the superstructure to the ground via the foundation, the pile corresponding to the outer peripheral corner of the superstructure is used. Further, since the shear force-carrying pile is arranged on the outside, the shear stress of the pile at the outer peripheral corner can be reduced. Further, at the time of a large earthquake, the shear force bearing pile functions as an energy absorbing pile, so that damage to other pile groups can be minimized. Further, even if the shear load bearing pile is deformed in such a manner, the shear load bearing pile is not intended to support the weight itself of the upper structure, so that the pile support performance of the upper structure is not impaired. In this case, the above effects can be expected only by arranging a suitable number of shear force bearing piles at the outermost peripheral portion, so that an increase in cost can be minimized.

【0021】請求項2の発明によれば、せん断力負担杭
と基礎は施工完了時に初めて連結されており、せん断力
負担杭が上部構造物の重量を負担しないようになってい
るので、上部構造物から加わる水平力と地震時の付加軸
力を、せん断力負担杭で最も多く負担することができ
る。従って、大地震時にせん断力負担杭が変形した場合
でも、上部構造物の支持性能に影響がほとんど出なくな
る。
According to the second aspect of the present invention, the shear force bearing pile and the foundation are connected for the first time upon completion of the construction, and the shear force bearing pile does not bear the weight of the upper structure. The shear force-carrying pile can bear the horizontal force applied from the object and the additional axial force during an earthquake. Therefore, even if the shearing load-carrying pile is deformed during a large earthquake, the support performance of the upper structure is hardly affected.

【0022】請求項3の発明によれば、上部構造物の四
隅の杭の外側にせん断力負担杭を配置したことで、請求
項1または2の効果を奏することができる。
According to the third aspect of the present invention, the effect of the first or second aspect can be obtained by arranging the shear load bearing pile outside the four corner piles of the upper structure.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の実施形態の構成を示し、(a)は側
面図、(b)は(a)図のIb−Ib矢視断面図であ
る。
1A and 1B show a configuration of an embodiment of the present invention, wherein FIG. 1A is a side view, and FIG. 1B is a cross-sectional view taken along the line Ib-Ib in FIG.

【図2】 同実施形態におけるせん断力負担杭と基礎と
の結合のタイミングについて説明するための図であり、
(a)は施工時の状態、(b)は施工完了時の状態を示
す断面図である。
FIG. 2 is a diagram for explaining the timing of connection between the shear load bearing pile and the foundation in the same embodiment,
(A) is a state at the time of construction, (b) is sectional drawing which shows the state at the time of completion of construction.

【図3】 前記せん断力負担杭を設けたことによる効果
の検証に用いたモデルの側面図である。
FIG. 3 is a side view of a model used for verifying an effect provided by providing the shear force bearing pile.

【図4】 図3のモデルにおける杭の配置例(a)、
(b)をそれぞれ示す平面図である。
FIG. 4 shows an example of a pile arrangement (a) in the model of FIG. 3,
It is a top view which each shows (b).

【符号の説明】[Explanation of symbols]

1 上部建物(上部構造物) 2 基礎 3 杭 3a 四隅の杭 4 せん断力負担杭 DESCRIPTION OF SYMBOLS 1 Upper building (superstructure) 2 Foundation 3 Pile 3a Four corner pile 4 Shear load bearing pile

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 上部構造物の荷重を基礎を介して地盤に
伝える杭群のうち上部構造物の外周隅部に対応した杭の
さらに外側に、主として水平力のみを支持するせん断力
負担杭を配置したことを特徴とする杭の配置構造。
1. A shear force-carrying pile mainly supporting only a horizontal force is further provided outside a pile corresponding to an outer peripheral corner of an upper structure in a group of piles for transmitting a load of the upper structure to the ground via a foundation. Pile arrangement structure characterized by being arranged.
【請求項2】 前記せん断力負担杭が、上部構造物の施
工時は上下方向に絶縁され、施工完了時に連結されたも
のであることを特徴とする請求項1記載の杭の配置構
造。
2. The pile arrangement structure according to claim 1, wherein the shear force bearing pile is vertically insulated when the superstructure is constructed, and is connected when the construction is completed.
【請求項3】 前記上部構造物が平面略矩形であり、そ
の四隅に対応した杭のさらに外側に前記せん断力負担杭
が配置されていることを特徴とする請求項1または2記
載の杭の配置構造。
3. The pile according to claim 1, wherein the upper structure has a substantially rectangular shape in a plane, and the shear force-carrying pile is further disposed outside a pile corresponding to four corners thereof. Arrangement structure.
JP10320298A 1998-04-14 1998-04-14 Pile arrangement structure Pending JPH11293686A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10320298A JPH11293686A (en) 1998-04-14 1998-04-14 Pile arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10320298A JPH11293686A (en) 1998-04-14 1998-04-14 Pile arrangement structure

Publications (1)

Publication Number Publication Date
JPH11293686A true JPH11293686A (en) 1999-10-26

Family

ID=14347942

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10320298A Pending JPH11293686A (en) 1998-04-14 1998-04-14 Pile arrangement structure

Country Status (1)

Country Link
JP (1) JPH11293686A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587402A (en) * 2012-02-09 2012-07-18 石家庄铁道大学 Sparse pile foundation of building composite foundation
CN103696433A (en) * 2013-12-30 2014-04-02 中铁二十四局集团有限公司 Method for improving bearing capacity of pile group by grillage-type row pile foundations
JP2015045199A (en) * 2013-08-29 2015-03-12 鹿島建設株式会社 Reinforcement structure for existing foundation of existing structure
JP2015178734A (en) * 2014-03-19 2015-10-08 株式会社クボタ Basic structure of the structure
JP2016205038A (en) * 2015-04-27 2016-12-08 パイルフォーラム株式会社 Design method of pile and support structure of structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587402A (en) * 2012-02-09 2012-07-18 石家庄铁道大学 Sparse pile foundation of building composite foundation
JP2015045199A (en) * 2013-08-29 2015-03-12 鹿島建設株式会社 Reinforcement structure for existing foundation of existing structure
CN103696433A (en) * 2013-12-30 2014-04-02 中铁二十四局集团有限公司 Method for improving bearing capacity of pile group by grillage-type row pile foundations
CN103696433B (en) * 2013-12-30 2017-02-01 中铁二十四局集团有限公司 Method for improving bearing capacity of pile group by grillage-type row pile foundations
JP2015178734A (en) * 2014-03-19 2015-10-08 株式会社クボタ Basic structure of the structure
JP2016205038A (en) * 2015-04-27 2016-12-08 パイルフォーラム株式会社 Design method of pile and support structure of structure

Similar Documents

Publication Publication Date Title
CN110512761A (en) A kind of viscous friction composite damping wall
JPS62190494A (en) Spent fuel storage rack
CN210105036U (en) Earthquake-resistant building wall
JPS5918864A (en) Earthquake-proof enclosure
JP3629674B2 (en) Building vibration control structure
JPH10292643A (en) How to add a seismic isolated building and how to newly build a seismic isolated building
JP2001295494A (en) Multiple buildings connected.
JPH09105247A (en) Excessive deformation prevention device for seismic isolated building
JPS62160321A (en) Seismic reinforcement method for pile foundation structures
JP2000291025A (en) Pile head seismic isolation method for group pile buildings
JP2749391B2 (en) Building frame
JPS62174416A (en) Flexible concrete pile
JPH03275816A (en) Building method for main slab in underground space
JPH01102182A (en) Earthquakeproof wall
JP7436258B2 (en) high rise building
JPH04339977A (en) Response control apparatus in building
JP2956546B2 (en) Seismic isolation structure
JP2000080670A (en) Base isolation structure for pile
JP2002038766A (en) Vibration damping device
JP2001295498A (en) Base isolation structure
JPH09228391A (en) Seismic underground wall
JPS62189265A (en) Construction of building
JPH116326A (en) Dynamic rigid structure
JPH1162310A (en) Seismic isolated building
JPS61155574A (en) Earthquake-proof structure

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040921

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050222