JPH11316019A - Combustion device energization circuit - Google Patents

Combustion device energization circuit

Info

Publication number
JPH11316019A
JPH11316019A JP10124432A JP12443298A JPH11316019A JP H11316019 A JPH11316019 A JP H11316019A JP 10124432 A JP10124432 A JP 10124432A JP 12443298 A JP12443298 A JP 12443298A JP H11316019 A JPH11316019 A JP H11316019A
Authority
JP
Japan
Prior art keywords
opening
closing
control unit
power supply
operation switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10124432A
Other languages
Japanese (ja)
Inventor
Yukikazu Matsuda
幸和 松田
Shigeru Murakami
茂 村上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Priority to JP10124432A priority Critical patent/JPH11316019A/en
Publication of JPH11316019A publication Critical patent/JPH11316019A/en
Pending legal-status Critical Current

Links

Landscapes

  • Keying Circuit Devices (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Control Of Combustion (AREA)

Abstract

(57)【要約】 【課題】 運転スイッチOFF状態における消費電力の
発生をなくする燃焼装置の通電回路を提供する。 【解決手段】 運転スイッチ11のOFF操作後も遅延
動作を有するような負荷を含む負荷群15と、この負荷
群15を制御する制御部17と、運転スイッチ11の開
閉に同期して開閉動作を行う第1開閉手段14と、運転
スイッチ11の開閉信号を前記制御部に伝達する伝達手
段12と、この伝達手段12の信号を受けて所定の開閉
動作を行う第2開閉手段18とを備え、前記第1開閉手
段14と第2開閉手段18により制御部17への電源供
給を制御するようにしている。
(57) Abstract: Provided is an energization circuit of a combustion device that eliminates generation of power consumption in an operation switch OFF state. SOLUTION: A load group 15 including a load having a delay operation even after an OFF operation of an operation switch 11, a control unit 17 for controlling the load group 15, and an opening / closing operation in synchronization with opening / closing of the operation switch 11. A first opening / closing means 14 for performing the operation, a transmitting means 12 for transmitting an opening / closing signal of the operation switch 11 to the control unit, and a second opening / closing means 18 for receiving a signal from the transmitting means 12 and performing a predetermined opening / closing operation; The power supply to the control unit 17 is controlled by the first opening / closing means 14 and the second opening / closing means 18.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は装置がOFF状態で
は待機電力の発生がない燃焼装置の電気回路に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an electric circuit of a combustion device which does not generate standby power when the device is in an OFF state.

【0002】[0002]

【従来の技術】燃焼装置は種々の燃料を燃焼させて、そ
の燃焼熱を熱交換器などを介して温風または温水等に変
換して暖房や給湯に用いるというものであり、その通電
方法も一般的な家電商品とは一部異なる部分を有する。
つまり、一般家電商品においては運転スイッチの操作に
同期して機器の運転、停止を行うというものであるが、
燃焼装置においては燃料を燃焼させる、また燃焼熱によ
り熱交換器などを加熱するという点で停止動作時に運転
スイッチのOFF操作に同期して機器を停止させるとい
うことができなく、運転スイッチのOFF操作後に一部
の負荷を動作させたとえば送風動作を行う必要がある。
このため、従来の燃焼装置においては、この負荷を動作
させるため常時制御回路には電源が供給され通電状態と
なっていた。
2. Description of the Related Art A combustion apparatus burns various fuels, converts the combustion heat into hot air or hot water via a heat exchanger or the like, and uses it for heating or hot water supply. It has a part that differs from general home appliances.
In other words, in general home appliances, the device is started and stopped in synchronization with the operation of the operation switch,
In the case of a combustion device, it is not possible to stop the equipment in synchronization with the operation of turning off the operation switch at the time of the stop operation because the fuel is burned and the heat exchanger is heated by the combustion heat. It is necessary to operate a part of the load later to perform, for example, a blowing operation.
For this reason, in the conventional combustion apparatus, power is always supplied to the control circuit to operate this load, and the control circuit is in an energized state.

【0003】従来の通電回路の一例を図3および図4に
示す。図3において、1は運転スイッチ、2は負荷、3
は負荷2を制御するための制御部、4aは運転スイッチ
1の開閉信号を伝達する伝達手段4の発光側、4bは受
光側で制御部3に入力して通電制御を行う。5aは制御
部3の信号で動作する開閉手段5のコイル側、5bは開
閉接点側で負荷2の通電制御を行うように接続されてい
る。
FIGS. 3 and 4 show an example of a conventional energizing circuit. In FIG. 3, 1 is an operation switch, 2 is a load,
Is a control unit for controlling the load 2, 4a is a light emitting side of the transmission means 4 for transmitting an open / close signal of the operation switch 1, and 4b is a light receiving side. Reference numeral 5a denotes a coil side of the opening / closing means 5 operated by a signal from the control unit 3, and reference numeral 5b denotes an opening / closing contact side so as to control the energization of the load 2.

【0004】上記のように構成された通電回路において
動作を説明する。まず運転スイッチ1がOFF状態では
制御部3に通電され運転信号の有無を確認する待機モー
ドとなる。次に、運転スイッチ1をONして運転状態に
入ると、伝達手段4の発光側4aに電流が流れ、電源周
波数に同期した半波の周期で発光が繰り返される。この
発光を受光側4bで検出して運転信号としてダイナミッ
ク信号で制御部3に入力する。制御部3はこのダイナミ
ック信号で入力された運転信号により運転動作を開始
し、開閉手段5のコイル側5aにON信号を出力して開
閉接点5bを閉状態とするとともに、予め定めた制御動
作により負荷2を制御して燃焼動作を開始させる。
[0004] The operation of the energizing circuit configured as described above will be described. First, when the operation switch 1 is in the OFF state, the control unit 3 is energized to enter a standby mode for confirming the presence or absence of an operation signal. Next, when the operation switch 1 is turned on to enter the operation state, a current flows to the light emitting side 4a of the transmission means 4, and light emission is repeated at a half-wave cycle synchronized with the power supply frequency. This light emission is detected by the light receiving side 4b and input to the control unit 3 as a driving signal as a dynamic signal. The control unit 3 starts the driving operation in response to the driving signal input by the dynamic signal, outputs an ON signal to the coil side 5a of the switching means 5, closes the switching contact 5b, and executes a predetermined control operation. The load 2 is controlled to start the combustion operation.

【0005】次に、停止動作を説明する。運転スイッチ
1をOFFして停止状態にすると、伝達手段4の発光側
4aへの電流が流れなくなり、受光側4bはOFF状態
となる。これにより制御部3には運転信号が入力されな
くなり、制御部3は燃焼動作を停止するように負荷2を
制御し、負荷2の中で送風モータなど(図示せず)のよ
うに遅延動作を要する負荷については所定時間動作を継
続させる。そして、所定時間経過した後、開閉手段5の
コイル側5aをOFF状態として、開閉接点5bを開状
態にする。
Next, the stop operation will be described. When the operation switch 1 is turned off to stop, the current does not flow to the light emitting side 4a of the transmission means 4, and the light receiving side 4b is turned off. As a result, no operation signal is input to the control unit 3, and the control unit 3 controls the load 2 so as to stop the combustion operation, and performs a delay operation in the load 2 such as a blower motor (not shown). For the required load, the operation is continued for a predetermined time. After a lapse of a predetermined time, the coil side 5a of the opening / closing means 5 is turned off, and the opening / closing contact 5b is opened.

【0006】また、別の方法としては図4に示すように
運転スイッチ1を制御部3に直接接続して、ONまたは
OFFの運転信号をスタティック信号で入力することで
通電回路を簡素化したものがある。この回路構成におい
ても、制御部3には常時電源が供給されて運転スイッチ
1の開閉信号を確認するようにしている。そして、運転
スイッチ1の閉信号が入力されると、制御部3は運転動
作を開始し、開閉手段5のコイル側5aにON信号を出
力して開閉接点5bを閉状態とするとともに、予め定め
た制御動作により負荷2を制御して燃焼動作を開始させ
る。そして、運転スイッチ1の開信号が入力されると、
制御部3は燃焼動作を停止するように負荷2を制御し、
負荷2の中で送風モータ(図示せず)のように遅延動作
を要する負荷については所定時間動作を継続させる。そ
して、所定時間経過した後、開閉手段5のコイル側5a
をOFF状態として、開閉接点5bを開状態にする。
As another method, as shown in FIG. 4, an operation switch 1 is directly connected to a control section 3 and an energizing circuit is simplified by inputting an ON or OFF operation signal as a static signal. There is. Also in this circuit configuration, the control unit 3 is always supplied with power and checks the open / close signal of the operation switch 1. Then, when the closing signal of the operation switch 1 is input, the control unit 3 starts the driving operation, outputs an ON signal to the coil side 5a of the opening / closing means 5, closes the opening / closing contact 5b, and sets a predetermined state. The load 2 is controlled by the control operation to start the combustion operation. When the open signal of the operation switch 1 is input,
The control unit 3 controls the load 2 so as to stop the combustion operation,
For a load requiring a delay operation such as a blower motor (not shown) in the load 2, the operation is continued for a predetermined time. Then, after a lapse of a predetermined time, the coil side 5a of the opening / closing means 5
Is turned off, and the switching contact 5b is opened.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、従来の
燃焼装置の通電回路においては、送風モータ等のように
運転スイッチをOFFした後に遅延動作を有する負荷を
含むため、運転スイッチの開閉動作に同期して負荷への
電源供給を行う構成が採れない。すなわち、運転スイッ
チの開閉動作による負荷への電源供給は運転スイッチの
開閉信号を制御部を介して行うようにする必要がある。
このため、制御部には常時電源が供給されるような構成
となっており、運転スイッチをOFFした状態でも僅か
ではあるが電力が消費されるものであった。
However, the conventional power supply circuit of the combustion device includes a load having a delay operation after the operation switch is turned off, such as a blower motor, so that the load is synchronized with the opening / closing operation of the operation switch. Therefore, a configuration for supplying power to the load cannot be adopted. That is, the power supply to the load by the opening / closing operation of the operation switch needs to be performed via the control unit by the operation switch opening / closing signal.
For this reason, the control unit is configured to be always supplied with power, and power is consumed, albeit slightly, even when the operation switch is turned off.

【0008】近年、消費エネルギーの削減が社会問題化
されている中、機器における消費電力の削減は大きな課
題であり、本願発明はこの点に着目して運転スイッチO
FF時の消費電力をなくすことを課題とする。
In recent years, while reduction of energy consumption has become a social problem, reduction of power consumption in equipment is a major problem.
It is an object to eliminate power consumption during FF.

【0009】[0009]

【課題を解決するための手段】本発明は上記従来の課題
を解決するため、運転のON/OFFを指示する運転ス
イッチと、燃焼動作を形成する負荷群と、この負荷群の
運転を制御する制御部と、前記運転スイッチの開閉に同
期して開閉動作を行う第1開閉手段と、運転スイッチの
開閉信号を前記制御部に伝達する伝達手段と、この伝達
手段の信号を受けて所定の開閉動作を行う第2開閉手段
とを備え、前記制御部は第1開閉手段と第2開閉手段に
より電源の供給が制御されるように構成している。
SUMMARY OF THE INVENTION In order to solve the above-mentioned conventional problems, the present invention controls an operation switch for instructing operation ON / OFF, a load group forming a combustion operation, and controls the operation of the load group. A control unit, a first opening / closing means for performing an opening / closing operation in synchronization with the opening / closing of the operation switch, a transmission means for transmitting an operation switch opening / closing signal to the control unit; There is provided a second opening / closing unit for performing an operation, and the control unit is configured so that the supply of power is controlled by the first opening / closing unit and the second opening / closing unit.

【0010】上記発明によれば、運転スイッチの開閉に
同期して開閉動作を行う第1開閉手段と運転スイッチの
開閉信号を受けて作動する制御部の出力で開閉動作を行
う第2開閉手段により制御部への電源供給を行うように
しているため、負荷群への電源供給は制御部で予め設定
した制御動作に基づいて行うことができるとともに、負
荷群への電源供給が停止された時点で制御部への電源供
給も停止されることになり、運転スイッチをOFFした
状態で消費電力をなくすることができる。また、第1開
閉手段および第2開閉手段は制御部への電源供給のみを
制御するようにしているため、開閉容量が極めて小容量
のものでもよく、小型化とコスト低減が図れるものであ
る。
According to the above-mentioned invention, the first opening / closing means for performing the opening / closing operation in synchronization with the opening / closing of the operation switch and the second opening / closing means for performing the opening / closing operation by the output of the control section which operates in response to the operation switch opening / closing signal. Since the power supply to the control unit is performed, the power supply to the load group can be performed based on the control operation set in advance by the control unit, and at the time when the power supply to the load group is stopped. Power supply to the control unit is also stopped, and power consumption can be eliminated with the operation switch turned off. Further, since the first opening / closing means and the second opening / closing means control only the power supply to the control section, the opening / closing capacity may be extremely small, so that downsizing and cost reduction can be achieved.

【0011】[0011]

【発明の実施の形態】本発明の請求項1の燃焼装置の通
電回路は、運転のON/OFFを指示する運転スイッチ
と、燃焼動作を形成する負荷群と、この負荷群の運転を
制御する制御部と、前記運転スイッチの開閉に同期して
開閉動作を行う第1開閉手段と、運転スイッチの開閉信
号を前記制御部に伝達する伝達手段と、この伝達手段の
信号を受けて所定の開閉動作を行う第2開閉手段とを備
え、前記制御部は第1開閉手段と第2開閉手段により電
源の供給が制御されるように構成している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A power supply circuit of a combustion apparatus according to a first aspect of the present invention controls an operation switch for instructing ON / OFF of operation, a group of loads forming a combustion operation, and operation of the group of loads. A control unit, a first opening / closing means for performing an opening / closing operation in synchronization with the opening / closing of the operation switch, a transmission means for transmitting an operation switch opening / closing signal to the control unit; There is provided a second opening / closing unit for performing an operation, and the control unit is configured so that the supply of power is controlled by the first opening / closing unit and the second opening / closing unit.

【0012】そして、運転スイッチの開閉に同期して開
閉動作を行う第1開閉手段と運転スイッチの開閉信号を
受けて作動する制御部の出力で開閉動作を行う第2開閉
手段により制御部への電源供給を行うようにしているた
め、負荷群への電源供給は制御部で予め設定した制御動
作に基づいて行うことができるとともに、負荷群への電
源供給が停止された時点で制御部への電源供給も停止さ
れることになり、運転スイッチをOFFした状態で消費
電力をなくすることができる。さらに、第1開閉手段お
よび第2開閉手段は制御部への電源供給のみを制御する
ようにしているため、開閉容量が極めて小容量のもので
もよく、小型化とコスト低減が図れるものである。
[0012] The first opening / closing means for performing the opening / closing operation in synchronization with the opening / closing of the operation switch and the second opening / closing means for performing the opening / closing operation by the output of the control section which operates in response to the opening / closing signal of the operation switch, control the control section. Since the power supply is performed, the power supply to the load group can be performed based on the control operation set in advance by the control unit, and the power supply to the control unit is stopped when the power supply to the load group is stopped. Power supply is also stopped, and power consumption can be eliminated with the operation switch turned off. Further, since the first opening / closing means and the second opening / closing means control only the power supply to the control section, the opening / closing capacity may be extremely small, so that downsizing and cost reduction can be achieved.

【0013】また、請求項2の燃焼装置の通電回路は、
第1開閉手段と第2開閉手段は論理和回路を構成して、
電源の供給を制御するようにしている。
[0013] The power supply circuit of the combustion device according to claim 2 is
The first opening / closing means and the second opening / closing means constitute an OR circuit,
The power supply is controlled.

【0014】そして、制御部への電源供給を第1開閉手
段と第2開閉手段を並列接続とした論理和回路で構成す
ることで、運転スイッチOFF後の遅延動作を可能にす
るとともに、遅延動作完了後に制御部への電源供給が遮
断でき、運転スイッチOFF時の消費電力を零にするこ
とができる。
The power supply to the control unit is constituted by an OR circuit in which the first opening / closing means and the second opening / closing means are connected in parallel, thereby enabling the delay operation after the operation switch is turned off and the delay operation. After completion, power supply to the control unit can be cut off, and power consumption when the operation switch is turned off can be reduced to zero.

【0015】また、請求項3の燃焼装置の通電回路は、
負荷群は第1開閉手段および第2開閉手段を経由する前
の電源間に接続するように構成している。
The power supply circuit of the combustion device according to claim 3 is
The load group is configured to be connected between the power supplies before passing through the first switching means and the second switching means.

【0016】そして、第1開閉手段と第2開閉手段に負
荷群の負荷電流が流れないようにすることで、開閉容量
を小さくして小型化とコスト低減を図るようにしてい
る。
By preventing the load current of the load group from flowing through the first switching means and the second switching means, the switching capacity can be reduced to reduce the size and cost.

【0017】また、請求項4の燃焼装置の通電回路は、
第2開閉手段は制御部を介して制御するとともに、運転
スイッチのOFF信号が入力されたとき、予め定めた遅
延時間が経過した後、開動作を行うようにしている。
Further, the power supply circuit of the combustion device according to claim 4 is
The second opening / closing means is controlled via the control unit, and performs an opening operation after a predetermined delay time has elapsed when an OFF signal of the operation switch is input.

【0018】そして、第2開閉手段の動作を制御部を介
して予め設定した制御動作に基づき行うようにしている
ため、いわゆる自殺回路を構成することになり、動作の
確実性と回路構成の簡素化が図れるものである。
Since the operation of the second opening / closing means is performed based on a control operation set in advance via the control unit, a so-called suicide circuit is formed, and the reliability of the operation and the simplification of the circuit configuration are achieved. Can be achieved.

【0019】[0019]

【実施例】(実施例1)以下本発明の実施例1について
図面に基づき説明する。
(Embodiment 1) Hereinafter, Embodiment 1 of the present invention will be described with reference to the drawings.

【0020】まず、図1を用いて本発明の実施例1の燃
焼装置の通電回路の構成を説明する。
First, the configuration of the power supply circuit of the combustion apparatus according to the first embodiment of the present invention will be described with reference to FIG.

【0021】11は運転スイッチ、12は運転スイッチ
11の開閉信号を伝達する伝達手段で発光側12aと受
光側12bで構成され、発光側12aは運転スイッチ1
1の閉動作時に抵抗13を介して電源周波数に同期した
半波電流が流れ発光が繰り返される。そして、受光側1
2bは前記発光信号に応答してON/OFFを繰り返
す。14は運転スイッチ11の開閉に同期して開閉動作
を行う第1開閉手段でコイル側14aと開閉接点14b
で構成されている。15は燃焼動作を行う負荷群で送風
モータ(図示せず)等の燃焼停止後に所定時間遅延動作
を行う負荷も含まれている。16は低圧回路を構成する
ための電源トランス、17は低圧回路で構成された制御
部で伝達手段12の受光側12bにより運転スイッチ1
1の開閉信号が入力されるようになっている。18は制
御部17により予め定められた制御動作に基づき開閉動
作を行う第2開閉手段でコイル側18aと開閉接点18
bで構成されている。
Reference numeral 11 denotes an operation switch. Reference numeral 12 denotes a transmission means for transmitting an open / close signal of the operation switch 11. The transmission means includes a light emitting side 12a and a light receiving side 12b.
During the closing operation of 1, a half-wave current synchronized with the power supply frequency flows via the resistor 13 and light emission is repeated. And the light receiving side 1
2b repeats ON / OFF in response to the light emission signal. Reference numeral 14 denotes a first opening / closing means for performing an opening / closing operation in synchronization with the opening / closing of the operation switch 11, and a coil side 14a and an opening / closing contact 14b.
It is composed of Reference numeral 15 denotes a load group that performs a combustion operation, and includes a load that performs a predetermined time delay operation after the combustion of a blower motor (not shown) or the like is stopped. Reference numeral 16 denotes a power transformer for forming a low-voltage circuit, and 17 denotes a control unit formed of a low-voltage circuit.
1 open / close signal is input. Reference numeral 18 denotes a second opening / closing means for performing an opening / closing operation based on a control operation predetermined by the control unit 17.
b.

【0022】そして、第1開閉手段14の開閉接点14
bと第2開閉手段の開閉接点18bを並列に接続するこ
とで論理和回路を構成し、制御部17への電源の供給を
制御できるような位置に配している。また、負荷群15
は第1開閉接点14bと第2開閉接点18bの並列回路
を経由する前の電源間に接続して電源の供給を行い、制
御部17により、その運転を制御するように構成してい
る。
The switching contact 14 of the first switching means 14
b is connected in parallel with the opening / closing contact 18b of the second opening / closing means to form an OR circuit, which is arranged at a position where the supply of power to the control unit 17 can be controlled. In addition, load group 15
Is connected to a power supply before passing through a parallel circuit of the first switching contact 14b and the second switching contact 18b to supply power, and the control unit 17 controls its operation.

【0023】上記のように構成された燃焼装置の通電回
路の動作を説明する。まず、運転スイッチ11がOFF
状態では伝達手段12の発光側12aおよび第1開閉手
段14のコイル側14aには通電されていないため、第
1開閉手段14の開閉接点14bは開状態であり、電源
トランス16には電源は供給されず、制御部17は停止
状態となるため、負荷群15も停止状態となり、電力の
消費は発生しない。
The operation of the power supply circuit of the combustion apparatus having the above configuration will be described. First, the operation switch 11 is turned off.
In this state, the light-emitting side 12a of the transmission means 12 and the coil side 14a of the first opening / closing means 14 are not energized, so that the opening / closing contact 14b of the first opening / closing means 14 is open, and power is supplied to the power transformer 16. However, since the control unit 17 is in the stopped state, the load group 15 is also in the stopped state, and no power is consumed.

【0024】次に、運転スイッチ11をON状態にする
と、伝達手段12の発光側12aには抵抗13を介して
電源周波数に同期した半波電流が流れ、半波周期で発光
が繰り返されると同時に第1開閉手段14のコイル側1
4aにも通電される。このコイル側14aに通電される
ことにより開閉接点14bが閉状態となり電源トランス
16で構成する低圧回路に電源が供給され、制御部17
が作動状態となる。そして、この制御部17に伝達手段
12の受光側12bより発光側12aの発光信号に同期
して運転信号が入力され、予め定めた制御動作に基づい
て負荷群15が燃焼動作を開始する。さらに、制御部1
7は運転信号が入力されると第2開閉手段18のコイル
側18aを動作させ、開閉接点18bを閉状態とする。
このように運転スイッチ11がONの状態においては第
1開閉接点14bと第2開閉接点18bを共に閉状態と
して電源トランス16に電源を供給し、制御部17を介
して負荷群15を作動するようにしている。また、負荷
群15は第1開閉接点14bと第2開閉接点18bを経
由する前の電源間に接続されているため、第1開閉接点
14bと第2開閉接点18bには負荷電流が流れず、開
閉容量も小さいものでもよいことになる。
Next, when the operation switch 11 is turned on, a half-wave current synchronized with the power supply frequency flows through the light-emitting side 12a of the transmission means 12 via the resistor 13, and light emission is repeated in a half-wave cycle. Coil side 1 of first opening / closing means 14
4a is also energized. When the coil side 14a is energized, the open / close contact 14b is closed so that power is supplied to the low-voltage circuit formed by the power transformer 16 and the control unit 17
Is activated. Then, an operation signal is input to the control unit 17 from the light receiving side 12b of the transmission means 12 in synchronization with the light emitting signal of the light emitting side 12a, and the load group 15 starts the combustion operation based on a predetermined control operation. Further, the control unit 1
7 operates the coil side 18a of the second opening / closing means 18 when an operation signal is input, and closes the opening / closing contact 18b.
As described above, when the operation switch 11 is ON, the first switching contact 14b and the second switching contact 18b are both closed to supply power to the power transformer 16 and operate the load group 15 via the control unit 17. I have to. Further, since the load group 15 is connected between the power supply before passing through the first switching contact 14b and the second switching contact 18b, no load current flows through the first switching contact 14b and the second switching contact 18b, A small switching capacity may be used.

【0025】次に、運転スイッチ11をOFF状態にす
ると、伝達手段12の発光側12aへの電流が流れなく
なり、受光側12bには半波周期の発光信号が伝達され
なくなって制御部17は運転停止の状態を確認する。こ
の運転停止により制御部17は負荷群15への燃焼動作
信号の供給を停止し燃焼動作を完了する。
Next, when the operation switch 11 is turned off, no current flows to the light emitting side 12a of the transmitting means 12, and no light emitting signal having a half-wave period is transmitted to the light receiving side 12b. Check the stop status. By stopping the operation, the control unit 17 stops supplying the combustion operation signal to the load group 15 and completes the combustion operation.

【0026】また、運転スイッチ11のOFFにより第
1開閉手段14のコイル側14aへの通電も停止される
ため、開閉接点14bは開状態となる。そして、電源ト
ランス16への電源供給は第2開閉接点18bの閉状態
により維持される。この第2開閉手段18は制御部17
により運転停止から予め定めた所定時間継続するように
しており、この間、第2開閉接点18bを閉状態に維持
して運転停止後に遅延動作を必要とする負荷への動作状
態を確保するようにしている。
When the operation switch 11 is turned off, the power supply to the coil side 14a of the first opening / closing means 14 is also stopped, so that the opening / closing contact 14b is opened. The power supply to the power transformer 16 is maintained by the closed state of the second switching contact 18b. The second opening / closing means 18 includes a controller 17
, The second switching contact 18b is maintained in a closed state to secure an operation state to a load requiring a delay operation after the operation is stopped. I have.

【0027】そして、所定時間経過すると制御部17は
遅延動作を有した負荷の動作を停止するとともに、第2
開閉手段18のコイル側18aの動作を停止して開閉接
点18bを開状態とする。
When a predetermined time has elapsed, the control unit 17 stops the operation of the load having the delay operation, and
The operation of the coil side 18a of the switching means 18 is stopped, and the switching contact 18b is opened.

【0028】この第2開閉接点18bの開動作により電
源トランス16で構成する低圧回路への電源供給が停止
されることになり、電力の消費が完全に発生しない状態
となる。
By the opening operation of the second switching contact 18b, power supply to the low-voltage circuit constituted by the power transformer 16 is stopped, and power consumption is completely prevented.

【0029】次に、図2のブロック図を用いて制御部1
7の動作を説明する。まず、運転スイッチ11により運
転が指示されると、第1開閉手段14の第1開閉接点1
4bより制御部17に電源が供給される。制御部17
は、この電源供給により作動状態となり伝達手段12か
ら運転信号が入力されると第2開閉手段18を動作さ
せ、第2開閉接点18bにより、前記第1開閉接点14
bと論理和回路を形成し、制御部17に電源供給を行
う。そして、制御部17より負荷群15に燃焼動作信号
を供給して燃焼を開始する。また、制御部17は第2開
閉手段18の動作により運転スイッチ11がOFF後も
保持されるように構成されており、第2開閉手段18の
動作が停止するまで作動状態が継続されるようになって
いる。
Next, referring to the block diagram of FIG.
7 will be described. First, when the operation is instructed by the operation switch 11, the first switching contact 1 of the first switching means 14 is turned on.
Power is supplied to the control unit 17 from 4b. Control unit 17
Is turned on by this power supply, and when an operation signal is input from the transmission means 12, the second opening / closing means 18 is operated.
A logical sum circuit is formed with b to supply power to the control unit 17. Then, a combustion operation signal is supplied from the control unit 17 to the load group 15 to start combustion. The control unit 17 is configured to be held even after the operation switch 11 is turned off by the operation of the second opening / closing means 18 so that the operation state is continued until the operation of the second opening / closing means 18 is stopped. Has become.

【0030】そして、運転スイッチ11より停止が指示
されると、第1開閉手段14はOFF状態となり第1開
閉接点14bは開状態となるが、制御部17は第2開閉
手段18により作動状態が保持されているため、動作を
継続し負荷群15のうち遅延動作を有する負荷の動作を
継続する。そして、同時に伝達手段12より運転停止信
号が制御部17に入力され、制御部17は予め定めた停
止動作に基づき遅延動作が継続され、所定時間経過後、
第2開閉手段18を停止させ、第2開閉接点18bを開
状態とする。この第2開閉手段18の停止により制御部
17への電源供給を停止し、負荷群15の動作を停止さ
せることで電力の消費をなくするようにしている。
When the stop is instructed by the operation switch 11, the first opening / closing means 14 is turned off and the first opening / closing contact 14 b is opened, but the control section 17 is activated by the second opening / closing means 18. Since it is held, the operation is continued, and the operation of the load having the delay operation in the load group 15 is continued. At the same time, an operation stop signal is input from the transmission unit 12 to the control unit 17, and the control unit 17 continues the delay operation based on the predetermined stop operation.
The second opening / closing means 18 is stopped, and the second opening / closing contact 18b is opened. By stopping the second opening / closing means 18, the power supply to the control unit 17 is stopped, and the operation of the load group 15 is stopped, thereby eliminating power consumption.

【0031】以上のように、第1開閉手段14と第2開
閉手段18を用いて制御部17への電源供給を行い、制
御部17を介して負荷群15の動作を制御するようにす
ることで、運転停止後に遅延動作を有するような負荷を
含むものにおいても、運転スイッチOFF状態において
消費電力をなくすることができ、かつ第1開閉接点14
bと第2開閉接点18bは負荷電流が流れないため、開
閉容量が小さくてもよく、制御部17の小型化とコスト
低減が図れるものである。
As described above, power is supplied to the control unit 17 using the first opening / closing means 14 and the second opening / closing means 18, and the operation of the load group 15 is controlled via the control unit 17. Therefore, even in a load including a load having a delay operation after the operation is stopped, the power consumption can be eliminated in the operation switch OFF state, and the first switching contact 14
Since a load current does not flow between b and the second switching contact 18b, the switching capacity may be small, and the size and cost of the control unit 17 can be reduced.

【0032】[0032]

【発明の効果】以上説明したように請求項1の燃焼装置
の通電回路によれば、運転スイッチの開閉に同期して開
閉動作を行う第1開閉手段と運転スイッチの開閉信号を
受けて作動する制御部の出力で開閉動作を行う第2開閉
手段により制御部への電源供給を行うようにしているた
め、負荷群への電源供給は制御部で予め設定した制御動
作に基づいて行うことができるとともに、負荷群への電
源供給が停止された時点で制御部への電源供給も停止さ
れることになり、運転スイッチをOFFした状態で消費
電力をなくすることができる。さらに、第1開閉手段お
よび第2開閉手段は制御部への電源供給のみを制御する
ようにしているため、開閉容量が極めて小容量のもので
もよく、小型化とコスト低減を図ることができる。
As described above, according to the power supply circuit of the combustion device of the first aspect, the first opening / closing means for performing the opening / closing operation in synchronization with the opening / closing of the operation switch and the operation signal of the operation switch are operated. Since the power supply to the control unit is performed by the second opening / closing unit that performs the opening / closing operation by the output of the control unit, the power supply to the load group can be performed based on the control operation set in advance by the control unit. At the same time, when the power supply to the load group is stopped, the power supply to the control unit is also stopped, and power consumption can be eliminated with the operation switch turned off. Further, since the first opening / closing means and the second opening / closing means control only the power supply to the control unit, the opening / closing capacity may be extremely small, and the size and cost can be reduced.

【0033】また、請求項2の燃焼装置の通電回路によ
れば、制御部への電源供給を第1開閉手段と第2開閉手
段を並列接続とした論理和回路で構成することで、運転
スイッチOFF後の遅延動作を可能にするとともに、遅
延動作完了後に制御部への電源供給が遮断でき、運転ス
イッチOFF時の消費電力を零にすることができる。
According to the power supply circuit of the combustion device of the second aspect, the power supply to the control unit is constituted by an OR circuit in which the first switching means and the second switching means are connected in parallel. The delay operation after the OFF operation is enabled, and the power supply to the control unit can be cut off after the delay operation is completed, so that the power consumption when the operation switch is OFF can be reduced to zero.

【0034】また、請求項3の燃焼装置の通電回路によ
れば、第1開閉手段と第2開閉手段に負荷群の負荷電流
が流れないようにしているため、開閉容量を小さくでき
小型化とコスト低減を図ることができる。
According to the power supply circuit of the combustion apparatus of the third aspect, the load current of the load group does not flow through the first switching means and the second switching means, so that the switching capacity can be reduced and the size can be reduced. Cost can be reduced.

【0035】また、請求項4の燃焼装置の通電回路によ
れば、第2開閉手段の動作を制御部を介して予め設定し
た制御動作に基づき行うようにしているため、いわゆる
自殺回路を構成することになり、動作の確実性と回路構
成の簡素化を図ることができる。
According to the power supply circuit of the combustion device of the fourth aspect, since the operation of the second opening / closing means is performed based on a control operation set in advance via the control unit, a so-called suicide circuit is formed. As a result, the reliability of the operation and the simplification of the circuit configuration can be achieved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例1の燃焼装置の通電回路の構成
FIG. 1 is a configuration diagram of an energization circuit of a combustion device according to a first embodiment of the present invention.

【図2】同回路のブロック図FIG. 2 is a block diagram of the circuit.

【図3】従来の燃焼装置の通電回路の構成図FIG. 3 is a configuration diagram of an energization circuit of a conventional combustion device.

【図4】同通電回路の構成図FIG. 4 is a configuration diagram of the energizing circuit.

【符号の説明】[Explanation of symbols]

11 運転スイッチ 12 伝達手段 14 第1開閉手段 15 負荷群 17 制御部 18 第2開閉手段 DESCRIPTION OF SYMBOLS 11 Operation switch 12 Transmission means 14 1st opening / closing means 15 Load group 17 Control part 18 2nd opening / closing means

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】運転のON/OFFを指示する運転スイッ
チと、燃焼動作を形成する負荷群と、この負荷群の運転
を制御する制御部と、前記運転スイッチの開閉に同期し
て開閉動作を行う第1開閉手段と、運転スイッチの開閉
信号を前記制御部に伝達する伝達手段と、この伝達手段
の信号を受けて所定の開閉動作を行う第2開閉手段とを
備え、前記制御部は第1開閉手段と第2開閉手段により
電源の供給が制御されるようにしてなる燃焼装置の通電
回路。
An operation switch for instructing operation ON / OFF, a load group for forming a combustion operation, a control unit for controlling the operation of the load group, and an opening / closing operation in synchronization with opening / closing of the operation switch. First opening / closing means for performing the operation, a transmitting means for transmitting an opening / closing signal of an operation switch to the control unit, and a second opening / closing means for performing a predetermined opening / closing operation in response to the signal from the transmitting means, wherein the control unit A power supply circuit for a combustion device, wherein the supply of power is controlled by the first opening / closing means and the second opening / closing means.
【請求項2】第1開閉手段と第2開閉手段は論理和回路
を構成して、電源の供給を制御するようにした請求項1
記載の燃焼装置の通電回路。
2. The power supply according to claim 1, wherein said first switching means and said second switching means form a logical sum circuit to control power supply.
A power supply circuit for the described combustion device.
【請求項3】負荷群は第1開閉手段および第2開閉手段
を経由する前の電源間に接続するようにした請求項1ま
たは2記載の燃焼装置の通電回路。
3. The power supply circuit according to claim 1, wherein the load group is connected between the power supplies before passing through the first switching means and the second switching means.
【請求項4】第2開閉手段は制御部を介して制御すると
ともに、運転スイッチのOFF信号が入力されたとき、
予め定めた遅延時間が経過した後、開動作を行うように
した請求項1ないし3のいずれか1項記載の燃焼装置の
通電回路。
4. The second opening / closing means is controlled via a control unit, and when an operation switch OFF signal is inputted,
4. An energization circuit for a combustion device according to claim 1, wherein the opening operation is performed after a predetermined delay time has elapsed.
JP10124432A 1998-05-07 1998-05-07 Combustion device energization circuit Pending JPH11316019A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10124432A JPH11316019A (en) 1998-05-07 1998-05-07 Combustion device energization circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10124432A JPH11316019A (en) 1998-05-07 1998-05-07 Combustion device energization circuit

Publications (1)

Publication Number Publication Date
JPH11316019A true JPH11316019A (en) 1999-11-16

Family

ID=14885350

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10124432A Pending JPH11316019A (en) 1998-05-07 1998-05-07 Combustion device energization circuit

Country Status (1)

Country Link
JP (1) JPH11316019A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021182119A1 (en) * 2020-03-12 2021-09-16 東和制電工業株式会社 Level switch

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021182119A1 (en) * 2020-03-12 2021-09-16 東和制電工業株式会社 Level switch

Similar Documents

Publication Publication Date Title
US20050269420A1 (en) Apparatus and methods for operating a gas valve
JPH11316019A (en) Combustion device energization circuit
JPH11211078A (en) Combustion device energization circuit
JPH0117167B2 (en)
JP3914184B2 (en) Burning appliance
JPH11211079A (en) Combustion device energization circuit
JP3720287B2 (en) Communication device
JP2000234733A (en) Combustion control device
JP3783990B2 (en) Control device for interlocking ventilation fan
JPS625545Y2 (en)
JP2003161437A (en) Power control device for combustion equipment
JP2000037289A (en) rice cooker
JPH0746670A (en) Control terminal and lighting control system
JP4362429B2 (en) Electromagnetic valve control device, gas engine device provided with the electromagnetic valve control device, and gas engine power generation system provided with the gas engine device
JP4135618B2 (en) rice cooker
JPH11125422A (en) Combustion safety controller
JP2562052Y2 (en) Electricity control device for ignition heater
JPS642093Y2 (en)
JP2003014228A (en) Power control device for combustion equipment
JPH0351644Y2 (en)
JPH0113929Y2 (en)
JP2000111008A (en) Circulation controller for combustion exhaust gas
JP2003074845A (en) Method and apparatus for fuel valve control
JPH03175229A (en) Control of oil heater
JPH0248215A (en) Heater for vehicle