Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Proterial Ltd
Original Assignee
Kajima Corp
Hitachi Metals Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Hitachi Metals LtdfiledCriticalKajima Corp
Priority to JP7196875ApriorityCriticalpatent/JPS51148923A/en
Publication of JPS51148923ApublicationCriticalpatent/JPS51148923A/en
Publication of JPS5334413B2publicationCriticalpatent/JPS5334413B2/ja
Method of assembling frame construction of pillar with steel skeleton reinforced concrete structure by field placing concrete and precast concrete beam