JPS54407A - Method of strengthening supporting force of foundation pile by method of intermediate excavation construction - Google Patents
Method of strengthening supporting force of foundation pile by method of intermediate excavation constructionInfo
- Publication number
- JPS54407A JPS54407A JP15550476A JP15550476A JPS54407A JP S54407 A JPS54407 A JP S54407A JP 15550476 A JP15550476 A JP 15550476A JP 15550476 A JP15550476 A JP 15550476A JP S54407 A JPS54407 A JP S54407A
- Authority
- JP
- Japan
- Prior art keywords
- supporting force
- foundation pile
- excavation construction
- strengthening supporting
- intermediate excavation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title 2
- 238000009412 basement excavation Methods 0.000 title 1
- 238000010276 construction Methods 0.000 title 1
- 238000005728 strengthening Methods 0.000 title 1
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15550476A JPS54407A (en) | 1976-12-23 | 1976-12-23 | Method of strengthening supporting force of foundation pile by method of intermediate excavation construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP15550476A JPS54407A (en) | 1976-12-23 | 1976-12-23 | Method of strengthening supporting force of foundation pile by method of intermediate excavation construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPS54407A true JPS54407A (en) | 1979-01-05 |
Family
ID=15607480
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP15550476A Pending JPS54407A (en) | 1976-12-23 | 1976-12-23 | Method of strengthening supporting force of foundation pile by method of intermediate excavation construction |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS54407A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5235719A (en) * | 1975-09-16 | 1977-03-18 | Hitachi Metals Ltd | Method of manufacturing permanent magnets with magnetic anisotropy |
| US4593076A (en) * | 1983-12-05 | 1986-06-03 | Enichimica, S.P.A. | Polymer of caprolactam containing elastomeric copolyesteramide having high impact strength |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5358105A (en) * | 1976-11-08 | 1978-05-25 | Nippon Concrete Ind Co Ltd | Method of generating supporting force for middle excavation system |
-
1976
- 1976-12-23 JP JP15550476A patent/JPS54407A/en active Pending
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5358105A (en) * | 1976-11-08 | 1978-05-25 | Nippon Concrete Ind Co Ltd | Method of generating supporting force for middle excavation system |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5235719A (en) * | 1975-09-16 | 1977-03-18 | Hitachi Metals Ltd | Method of manufacturing permanent magnets with magnetic anisotropy |
| US4593076A (en) * | 1983-12-05 | 1986-06-03 | Enichimica, S.P.A. | Polymer of caprolactam containing elastomeric copolyesteramide having high impact strength |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS5346113A (en) | Method of chipping foundation pile | |
| JPS54407A (en) | Method of strengthening supporting force of foundation pile by method of intermediate excavation construction | |
| JPS5416807A (en) | Method of foundation pile construction | |
| JPS5331307A (en) | Foundation pile | |
| JPS5334310A (en) | Method of installing pile with horizontal anchor on foundation | |
| JPS5424416A (en) | Method of controlling direction in method of underground excavation construction by structure | |
| JPS53609A (en) | Method of driving steellpipe foundation pile | |
| JPS5347108A (en) | Consolidation of foundation for preemoulded pile | |
| JPS5338101A (en) | Method of excavating inside of steel pipe pile | |
| JPS527109A (en) | Method of driving enlargeddhead foundation piles | |
| JPS5447312A (en) | Method of construction of pile foundation | |
| JPS51133905A (en) | Pile foundation method | |
| JPS5349811A (en) | Method of building foundation pile | |
| JPS52107108A (en) | Method of building foundation pile | |
| JPS5471807A (en) | Method of executing pile foundation | |
| JPS5456229A (en) | Method of construction of levelling underwater riprap foundation and heavy weight for levelling | |
| JPS534309A (en) | Execution method of foundation supporting pile | |
| JPS5321805A (en) | Method of forming casttin place concrete foundation pile | |
| JPS52149810A (en) | Method of rotatingly driving foundation pile | |
| JPS5438607A (en) | Method of constructing foundation pile | |
| JPS5291504A (en) | Foundation pile | |
| JPS54105810A (en) | Method of excavation construction of foundation pillar | |
| JPS5219403A (en) | Method of driving foundation piles | |
| JPS527108A (en) | Method of driving foundation piles | |
| JPS5439908A (en) | Foundation pile |