JPS5646031A - Constructing method for pile foundation footing with erected trunk - Google Patents

Constructing method for pile foundation footing with erected trunk

Info

Publication number
JPS5646031A
JPS5646031A JP12002979A JP12002979A JPS5646031A JP S5646031 A JPS5646031 A JP S5646031A JP 12002979 A JP12002979 A JP 12002979A JP 12002979 A JP12002979 A JP 12002979A JP S5646031 A JPS5646031 A JP S5646031A
Authority
JP
Japan
Prior art keywords
caisson
sunken
trunk
erected
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP12002979A
Other languages
Japanese (ja)
Other versions
JPS5761851B2 (en
Inventor
Toshio Suzuki
Akiji Oda
Katsutoshi Kimura
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIRAISHI KISO KOJI KK
Original Assignee
SHIRAISHI KISO KOJI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHIRAISHI KISO KOJI KK filed Critical SHIRAISHI KISO KOJI KK
Priority to JP12002979A priority Critical patent/JPS5646031A/en
Publication of JPS5646031A publication Critical patent/JPS5646031A/en
Publication of JPS5761851B2 publication Critical patent/JPS5761851B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE: To support pile-driving pipes and the like in a stabilized manner and to make accurate driving by providing a working frame fitted with guide members on the upper part of a sunken caisson.
CONSTITUTION: The sunken caisson 4 with the erected trunk is prepared by fixing the erected trunk 3 to the sunken caisson 2 having through holes, while a working frame 5 provided with guide members 6 is fitted on to the sunken caisson 2. The caisson 4 is carried to the destination and there it is sunken on temporarily-supporting piles 25. The pile-driving pipes 7 are inserted sequentially into the guide members 6 and the through holes. Then, the ground is excavated by inserting an excavating tool 27 into the pile-driving pipe 7 and a pile hole 8 is formed. And, concrete is placed down to the level in the through hole where the concrete is placed, and a foundation pile 9 is made. The water inside the sunken caisson 2 is discharged and the concrete is placed inside the sunken caisson 2 and also inside the erected trunk 3.
COPYRIGHT: (C)1981,JPO&Japio
JP12002979A 1979-09-20 1979-09-20 Constructing method for pile foundation footing with erected trunk Granted JPS5646031A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12002979A JPS5646031A (en) 1979-09-20 1979-09-20 Constructing method for pile foundation footing with erected trunk

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12002979A JPS5646031A (en) 1979-09-20 1979-09-20 Constructing method for pile foundation footing with erected trunk

Publications (2)

Publication Number Publication Date
JPS5646031A true JPS5646031A (en) 1981-04-27
JPS5761851B2 JPS5761851B2 (en) 1982-12-27

Family

ID=14776138

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12002979A Granted JPS5646031A (en) 1979-09-20 1979-09-20 Constructing method for pile foundation footing with erected trunk

Country Status (1)

Country Link
JP (1) JPS5646031A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6162162U (en) * 1984-09-27 1986-04-26
JPS6427370U (en) * 1987-08-12 1989-02-16
JPH03100283A (en) * 1989-09-13 1991-04-25 Sanpourotsuku:Kk Lock for automatic vending machine
CN103195074A (en) * 2013-03-27 2013-07-10 上海市机械施工有限公司 Bottom cleaning method of pile foundation

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63119242A (en) * 1986-11-07 1988-05-23 Toshiba Corp Circuit board

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6162162U (en) * 1984-09-27 1986-04-26
JPS6427370U (en) * 1987-08-12 1989-02-16
JPH03100283A (en) * 1989-09-13 1991-04-25 Sanpourotsuku:Kk Lock for automatic vending machine
CN103195074A (en) * 2013-03-27 2013-07-10 上海市机械施工有限公司 Bottom cleaning method of pile foundation

Also Published As

Publication number Publication date
JPS5761851B2 (en) 1982-12-27

Similar Documents

Publication Publication Date Title
JPS5646031A (en) Constructing method for pile foundation footing with erected trunk
JPS55142835A (en) Earth retaining method
JPS5721623A (en) Treatment work for top of pile
DE60002810D1 (en) IMPROVED EDUCATION OF A COVER SUPPORT FOR PILE FOUNDATIONS
JPS5664028A (en) Sheathing construction work by antecedent support framework
JPS57108326A (en) Construction of pile foundation with underground wall
JPS5991228A (en) Pit excavation work using caisson
JPS5648413A (en) Harbor structure such as quay wall on a cement blended foundation and construction method thereof
JPS554455A (en) Method of constructing structure in ground lower than underground water level
JPS57161228A (en) Construction work of foundation
JPS5781525A (en) Construction of underground continuous wall
JPS56163323A (en) Exection of foundation of bridge such as abutment, bridge pier or the like
JPS56115426A (en) Construction of vibration-proof foundation of building
DE60327291D1 (en) Method for creating an anchoring under an existing building
JPS57130622A (en) Construction of continuous underground wall
JPS5532809A (en) Pile foundation practice
JPS554410A (en) Earth retaining method
JPS641829A (en) Construction foundation
SU667636A1 (en) Method of erecting a building structure in soil
JPS5585738A (en) Driving method for ground beam
JPH07180164A (en) How to build an underground structure
JPS57197315A (en) Method and apparatus for sheathing wall work
GB2259315A (en) Improved methods for providing foundations for building structures
JPS5766232A (en) Soil sheathing method and apparatus for soft ground in particular
JPS5631925A (en) Constructing method for pit