JPS57201428A - Footing structure in foundation of abutment and pier - Google Patents
Footing structure in foundation of abutment and pierInfo
- Publication number
- JPS57201428A JPS57201428A JP8569281A JP8569281A JPS57201428A JP S57201428 A JPS57201428 A JP S57201428A JP 8569281 A JP8569281 A JP 8569281A JP 8569281 A JP8569281 A JP 8569281A JP S57201428 A JPS57201428 A JP S57201428A
- Authority
- JP
- Japan
- Prior art keywords
- footing
- frame
- foundation wall
- foundation
- buried underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 239000004567 concrete Substances 0.000 abstract 1
- 238000010276 construction Methods 0.000 abstract 1
- 239000000463 material Substances 0.000 abstract 1
- 239000011150 reinforced concrete Substances 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/18—Foundations formed by making use of caissons
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
PURPOSE:To raise the efficiency of operation in construction site by connecting frame parts previously processed for footing through anchor bolts on the upper part of a foundation wall buried underground. CONSTITUTION:The foundation wall portion 10 of a reinforced concrete box whose upper and lower sides are opened is buried underground, the upper opening portion 10a is excavated, and a sheathing part 11 is provided on the periphery of the opening portion 10a. A large number of steel materials 13a are combined vertically, horizontally, and slantly to form a rectangular frame 13 for footing, and the frame 13 is fitted with an anchor bolt 2 provided to the upper part of the foundation wall portion 10 and connected. Then, concrete is placed by using the frame 13 as an aggregate to form a top plate portion 14. Thus, a footing is completed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8569281A JPS5947096B2 (en) | 1981-06-05 | 1981-06-05 | Footing structure in the foundation of bridge abutments, piers, etc. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8569281A JPS5947096B2 (en) | 1981-06-05 | 1981-06-05 | Footing structure in the foundation of bridge abutments, piers, etc. |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS57201428A true JPS57201428A (en) | 1982-12-09 |
| JPS5947096B2 JPS5947096B2 (en) | 1984-11-16 |
Family
ID=13865885
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8569281A Expired JPS5947096B2 (en) | 1981-06-05 | 1981-06-05 | Footing structure in the foundation of bridge abutments, piers, etc. |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5947096B2 (en) |
-
1981
- 1981-06-05 JP JP8569281A patent/JPS5947096B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5947096B2 (en) | 1984-11-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206848090U (en) | A kind of building prefabrication reinforced concrete shear wall load testing machine | |
| CN1279319A (en) | Full-reverse construction technology for basement | |
| CN113585336B (en) | Quick construction method of sinking type concrete mixing station in soft foundation environment | |
| ES8701273A1 (en) | Foundation arrangement. | |
| CN219604416U (en) | Scour prevention device for foundation pit slope | |
| JPS5774435A (en) | Construction method for basement | |
| CN116556374A (en) | Frame prestressed zigzag anchor plate support system | |
| JPS57112523A (en) | Substructure of building | |
| CN221523817U (en) | Protection device for hole subsidence | |
| MY101663A (en) | A concrete block wall panel and methods of construction using same. | |
| CN217556976U (en) | Water conservancy construction cofferdam device | |
| CN221589678U (en) | Assembled foundation and assembled foundation system for prefabricated cabin | |
| CN223991382U (en) | Anti-sedimentation structure used between external wall of ground warehouse and guard post | |
| JPS57190839A (en) | Construction method for foundation of sheathing retaining wall | |
| CN207419525U (en) | Structure is built in a kind of room built for the underground space | |
| JPS6013863Y2 (en) | building foundations | |
| JPS57116835A (en) | Construction of structure with basement | |
| JPS57161228A (en) | Construction work of foundation | |
| JPH09302665A (en) | Reinforced earth wall embankment method to construct a vertical wall using sheet pile as wall material | |
| CN118207916A (en) | Basement roof post-pouring strip advanced sealing device and construction method | |
| JPH0426028B2 (en) | ||
| JPS55122925A (en) | Construction method of foundation for machine installation | |
| JPH0210205Y2 (en) | ||
| CN113152484A (en) | Full-prefabricated pier type portal oblique support pile structure system and construction method thereof | |
| JPS6483769A (en) | Method of constructing basement in existing building |