JPS5758724A - In-situ prestressed concrete pile construction work - Google Patents
In-situ prestressed concrete pile construction workInfo
- Publication number
- JPS5758724A JPS5758724A JP13493280A JP13493280A JPS5758724A JP S5758724 A JPS5758724 A JP S5758724A JP 13493280 A JP13493280 A JP 13493280A JP 13493280 A JP13493280 A JP 13493280A JP S5758724 A JPS5758724 A JP S5758724A
- Authority
- JP
- Japan
- Prior art keywords
- pit
- iron
- construction work
- iron bar
- bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title abstract 3
- 239000011513 prestressed concrete Substances 0.000 title abstract 3
- 238000011065 in-situ storage Methods 0.000 title abstract 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 24
- 229910052742 iron Inorganic materials 0.000 abstract 12
- 102000001999 Transcription Factor Pit-1 Human genes 0.000 abstract 3
- 108010040742 Transcription Factor Pit-1 Proteins 0.000 abstract 3
- 239000004567 concrete Substances 0.000 abstract 3
- 239000003795 chemical substances by application Substances 0.000 abstract 2
- 238000000034 method Methods 0.000 abstract 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
PURPOSE: To easily perform the construction work of in-situ prestressed concrete pile having high strength by a method in which an iron bar cage is inserted into a pile pit, a solidifying agent is placed into the lower part of the pit to fix the lower part of the iron bar cage, a tensile force is given to the main iron bars, and then concrete is placed.
CONSTITUTION: In the first place, pile pits 2 with given diameter and length are excavated in given places under the ground 1, and an iron bar cage 5 formed by connecting upper and lower iron bar cages 5a and 5b by a coupler 8 is inserted into the pit 2. In this case, each of the iron bar cages 5a and 5b is formed of the main iron bars 3 cylindrically arranged in parallel in the longitudinal direction and ringed connection iron bars 4 connecting the main iron bars 3. A solidifying agent 6 is placed into the lower part of the pit 2 to fix the lower part of the iron bar cage 5, a tension device 12 is connected to the upper end of the main iron bars 3, and the main iron bars 3 are pulled up. Under this condition, concrete 7 is placed into the pit 2, and after the concrete has set, the tensile force is released to complete the prestressed concrete pile construction work.
COPYRIGHT: (C)1982,JPO&Japio
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13493280A JPS5758724A (en) | 1980-09-27 | 1980-09-27 | In-situ prestressed concrete pile construction work |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP13493280A JPS5758724A (en) | 1980-09-27 | 1980-09-27 | In-situ prestressed concrete pile construction work |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5758724A true JPS5758724A (en) | 1982-04-08 |
| JPS6319650B2 JPS6319650B2 (en) | 1988-04-23 |
Family
ID=15139922
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP13493280A Granted JPS5758724A (en) | 1980-09-27 | 1980-09-27 | In-situ prestressed concrete pile construction work |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5758724A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6110622A (en) * | 1984-06-26 | 1986-01-18 | Hasegawa Komuten Co Ltd | Method of constructing cast-in-place concrete pile |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS55122916A (en) * | 1979-03-16 | 1980-09-22 | Kurosawa Kensetsu Kk | Method for building prestressed concrete-made pier foundation |
-
1980
- 1980-09-27 JP JP13493280A patent/JPS5758724A/en active Granted
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS55122916A (en) * | 1979-03-16 | 1980-09-22 | Kurosawa Kensetsu Kk | Method for building prestressed concrete-made pier foundation |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6110622A (en) * | 1984-06-26 | 1986-01-18 | Hasegawa Komuten Co Ltd | Method of constructing cast-in-place concrete pile |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6319650B2 (en) | 1988-04-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3650112A (en) | Method of shoring and apparatus therefor | |
| JPS5758722A (en) | In-situ prestresed concrete pile work | |
| JPS5758724A (en) | In-situ prestressed concrete pile construction work | |
| US4121325A (en) | Cable anchoring and coupling equipment | |
| JPS5758723A (en) | In-situ prestresed concrete pile construction work | |
| JPS55122916A (en) | Method for building prestressed concrete-made pier foundation | |
| JPS56122424A (en) | Construction of reinforced concrete structure and fabric formwork therefor | |
| CH642703A5 (en) | Method and apparatus for anchoring and removing a grouted anchor | |
| CA1059351A (en) | Cable bolt | |
| JPS56131713A (en) | Anchor using pc steel material | |
| JPS56125528A (en) | Construction of in-situ driven pile | |
| RU94028646A (en) | Method for withdrawal reinforcing bars of anchor link and appropriate anchor link | |
| DE1087984B (en) | Process for the production of prestressed concrete piles for landing systems, pile works, guide rods or the like and prestressed concrete piles produced by the process | |
| JPS57209329A (en) | Reinforcement of earthquake resistance of banking | |
| JPS55159020A (en) | Anchor cable for tensioning | |
| JPS6433345A (en) | Method for anchoring polymer tension material | |
| JPS56115415A (en) | Improvement method for subsoil | |
| JPS5766223A (en) | Deformation reduction work for landslide protection wall | |
| JPS5789019A (en) | Construction work of underground concrete structure | |
| JPS57146825A (en) | Construction of in-situ pc anchor | |
| JPS5768420A (en) | Executing method for foundation pile | |
| JPS5532809A (en) | Pile foundation practice | |
| JPS5565635A (en) | Method of constructing vertical block retaining wall and rear box-shaped block | |
| JPS55155818A (en) | Constructing method for underground continuous wall | |
| JPS56142925A (en) | Knoted pile with settling resistance reinforced by plurality of projections |