JPS5771926A - Treatment of extra-banking concrete at head of pile driven at site - Google Patents
Treatment of extra-banking concrete at head of pile driven at siteInfo
- Publication number
- JPS5771926A JPS5771926A JP14772480A JP14772480A JPS5771926A JP S5771926 A JPS5771926 A JP S5771926A JP 14772480 A JP14772480 A JP 14772480A JP 14772480 A JP14772480 A JP 14772480A JP S5771926 A JPS5771926 A JP S5771926A
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- pile
- extra
- banking
- iron bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 8
- 229910052742 iron Inorganic materials 0.000 abstract 4
- 239000002184 metal Substances 0.000 abstract 3
- 229910052751 metal Inorganic materials 0.000 abstract 3
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
PURPOSE: To remove extra-banking concrete without breaking by a method in which pile concrete is placed under a condition that a tool by which the adherence of concrete to iron bars is prevented is attached to the iron bars positioned above the upper level of a set pile level in such a way as to cause cracks to occur in the side area of the pile, and then the tool is lifted up.
CONSTITUTION: Under a condition that a tool 2 by which the adherence of concrete to iron bars 1 is prevented is attached to the iron bars 1 positioned above the upper end P of a set pile level, pile concrete C is placed, and a hanging metal 3 is buried in an extra-banking concrete portion C' in unhardened state. Then, the area around the pile is excavated to form an excavated portion 4 and a hole is drilled in the side of the pile concrete C. A wedge 6 is then inserted into the hole in such a way as to cause cracks to take place. Then, the hook of a lifter is coupled with the hanging metal 3, the hanging metal 3 is lifted up, and the blocks of the extra-banking concrete C' are removed.
COPYRIGHT: (C)1982,JPO&Japio
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14772480A JPS5771926A (en) | 1980-10-21 | 1980-10-21 | Treatment of extra-banking concrete at head of pile driven at site |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14772480A JPS5771926A (en) | 1980-10-21 | 1980-10-21 | Treatment of extra-banking concrete at head of pile driven at site |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPS5771926A true JPS5771926A (en) | 1982-05-06 |
Family
ID=15436734
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14772480A Pending JPS5771926A (en) | 1980-10-21 | 1980-10-21 | Treatment of extra-banking concrete at head of pile driven at site |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5771926A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6030714A (en) * | 1983-07-27 | 1985-02-16 | Komatsu Ltd | Treatment of head of cast-in-place pile |
| DE3343961A1 (en) * | 1983-12-06 | 1985-06-20 | Gkn Keller Gmbh, 6050 Offenbach | Method of producing piles or pile-like bodies |
| JPS60174747U (en) * | 1984-04-26 | 1985-11-19 | 積水化学工業株式会社 | Rod protection tube |
| JP2015078564A (en) * | 2013-10-18 | 2015-04-23 | 鹿島建設株式会社 | Pile head processing jig and pile head processing method |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS49114205A (en) * | 1973-03-07 | 1974-10-31 | ||
| JPS53629A (en) * | 1976-06-23 | 1978-01-06 | Kajima Corp | Method of curing reinforcement projected to concrete portion material |
| JPS5336911A (en) * | 1976-09-17 | 1978-04-05 | Taisei Corp | Method of cutting head of casttin place reinforced concrete pile |
| JPS5346113A (en) * | 1976-10-08 | 1978-04-25 | Akinori Ishii | Method of chipping foundation pile |
| JPS5491907A (en) * | 1977-12-28 | 1979-07-20 | Mitsui Constr | Method of removing top of stake driven on spot |
-
1980
- 1980-10-21 JP JP14772480A patent/JPS5771926A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS49114205A (en) * | 1973-03-07 | 1974-10-31 | ||
| JPS53629A (en) * | 1976-06-23 | 1978-01-06 | Kajima Corp | Method of curing reinforcement projected to concrete portion material |
| JPS5336911A (en) * | 1976-09-17 | 1978-04-05 | Taisei Corp | Method of cutting head of casttin place reinforced concrete pile |
| JPS5346113A (en) * | 1976-10-08 | 1978-04-25 | Akinori Ishii | Method of chipping foundation pile |
| JPS5491907A (en) * | 1977-12-28 | 1979-07-20 | Mitsui Constr | Method of removing top of stake driven on spot |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6030714A (en) * | 1983-07-27 | 1985-02-16 | Komatsu Ltd | Treatment of head of cast-in-place pile |
| DE3343961A1 (en) * | 1983-12-06 | 1985-06-20 | Gkn Keller Gmbh, 6050 Offenbach | Method of producing piles or pile-like bodies |
| JPS60174747U (en) * | 1984-04-26 | 1985-11-19 | 積水化学工業株式会社 | Rod protection tube |
| JP2015078564A (en) * | 2013-10-18 | 2015-04-23 | 鹿島建設株式会社 | Pile head processing jig and pile head processing method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2009810A1 (en) | Retrievable Bridge Plug and Packer | |
| JPS56131712A (en) | Removing method of defective concrete at upper part of pile when driving pile in site | |
| JPS559953A (en) | Method and apparatus for installing steel pipe pile | |
| JPS5771926A (en) | Treatment of extra-banking concrete at head of pile driven at site | |
| JPS5721623A (en) | Treatment work for top of pile | |
| JPS56142922A (en) | Treatment of top of in-place concrete pile | |
| JPS6436812A (en) | Decorative concrete slab for river bank wall and river bank wall covering work therewith | |
| JPS5766223A (en) | Deformation reduction work for landslide protection wall | |
| JPS5693916A (en) | Construction for water-surface structure | |
| JPS5532809A (en) | Pile foundation practice | |
| DE59209299D1 (en) | Process for monitoring the state of corrosion of metallic piles and masts embedded in cement foundations | |
| JPS56150222A (en) | Construction of marine structure | |
| JP3843167B2 (en) | Sand pile driving method and apparatus | |
| JPS5751331A (en) | Construction of continuous underground wall | |
| JPS56131716A (en) | Removal of pile | |
| JPS56105023A (en) | Preventing method for frost heaving of pile | |
| JPS55161118A (en) | Pile driving method and pile | |
| JPS5761111A (en) | Reduction of extra-banking concrete for head of pile driven in situ | |
| JPS57108324A (en) | Construction of concrete foundation | |
| SU675134A1 (en) | Method of sinking sleeve foundation block in soil | |
| JPS56135627A (en) | Construction of foundation pile | |
| JPS641829A (en) | Construction foundation | |
| JPS56142926A (en) | Foundation pile with enlarged bottom by splitting at underground | |
| JPS5578715A (en) | Processing method for site pile head | |
| JPS62215720A (en) | Driving work of steel tube |