JPS5810545B2 - How to get the job done - Google Patents
How to get the job doneInfo
- Publication number
- JPS5810545B2 JPS5810545B2 JP47046996A JP4699672A JPS5810545B2 JP S5810545 B2 JPS5810545 B2 JP S5810545B2 JP 47046996 A JP47046996 A JP 47046996A JP 4699672 A JP4699672 A JP 4699672A JP S5810545 B2 JPS5810545 B2 JP S5810545B2
- Authority
- JP
- Japan
- Prior art keywords
- engine generator
- power
- installation stand
- frame
- engine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】
本発明は無線中継所等に使用されている無停電電源シス
テムの機関発電機用電源局舎の建設方法に関するもので
ある。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for constructing a power station building for an engine generator of an uninterruptible power supply system used in a wireless relay station or the like.
従来、無線中継所等に使用されている無停電電源システ
ムは、ガソリンまたは軽油等を燃料とした機関発電機に
よって交流電源を供給して商用電源停電時の非常用とし
て用いられたシ、商用電源の給電されていない山間僻地
等における常用電源として用いられている。Conventionally, uninterruptible power supply systems used in wireless relay stations, etc., supply AC power using engine generators fueled by gasoline or light oil, etc., and are used for emergency purposes during commercial power outages. It is used as a regular power source in remote mountain areas where electricity is not available.
しかるに、機関発電機は比較的重量が大きく、据付用台
床として強固なものが必要なこと、機関発電機用の配管
部は外部の環境に左右されやすいこと、また各種関連機
器を固定すること等の理由によシ、通常第1図に示すよ
うな電源局舎または電力室のたぐいの家屋1が建設され
る。However, engine generators are relatively heavy and require a strong base for installation, piping for engine generators is easily affected by the external environment, and various related equipment must be fixed. For these reasons, a power station building or power room-type house 1 as shown in FIG. 1 is usually constructed.
この家屋1の建設に当っては、取付台床2の建設はもと
より、機関発電機3、関連機器4の設置および配線、配
管工事も一切設置現場で行なわなければならない。In constructing this house 1, not only the construction of the mounting floor 2 but also the installation of the engine generator 3 and related equipment 4, as well as wiring and piping work, must be done at the installation site.
したがって、遠隔地に前記機関発電機を含む無停電電源
プラントを建設する場合は、各機器を個別に梱包して建
設地へ輸送し、建設地で解梱した後、現地工事によって
各機器の据え付け、配線、配管およびテストを行なわな
ければならず、これに伴う輸送時の各機器の損傷、梱包
のだめのコストアップ、悪環境下での現地工事の困難さ
および工事期間の長期化等有形、無形上の不利がある。Therefore, when constructing an uninterruptible power supply plant including the engine generator in a remote location, each device is individually packed and transported to the construction site, unpacked at the construction site, and then installed by on-site construction. , wiring, piping, and testing must be carried out, resulting in damage to each device during transportation, increased packaging costs, difficulty in on-site construction in adverse environments, and prolonged construction period, etc. Tangible and intangible There is a disadvantage above.
この外に可搬形または移動形の機関発電システムも実用
に供されているが、いずれも常用固定局としては不向で
ある。In addition to these systems, portable or mobile engine power generation systems are also in practical use, but they are unsuitable for regular use as fixed stations.
本発明はこのような欠点に鑑みなされたもので、無停電
電源プラント建設にあたって、各機器の損傷が防止でき
るとともにコストの低減、工事期間の短縮化等を図るこ
とのできる電源局舎の建設方法を得ることを目的とする
。The present invention was made in view of these drawbacks, and provides a method for constructing a power station building that can prevent damage to various equipment, reduce costs, shorten construction period, etc. when constructing an uninterruptible power supply plant. The purpose is to obtain.
この目的を達成するため本発明は、工場で電力面内に機
関発電機および必要な関連機器を据え付け、これらの各
機器の配線、配管等の内部接続を完了する一方、プラン
ト建設地内に電力画用据付台および前記機関発電機を保
持する枠台内に下方より臨む機関発電機用据付台をそれ
ぞれ分離して建設し、ここへ前記電力面を輸送してこの
電力面を電力画用据付台に固定した後、前記枠台を除去
して機関発電機用据付台に機関発電機を固定することに
よって電源局舎を建設することを特徴としている。In order to achieve this objective, the present invention installs an engine generator and necessary related equipment within the power supply area in a factory, completes internal connections such as wiring and piping for each of these equipment, and at the same time installs a power supply plan within the plant construction site. A mounting stand for the engine generator and a mounting stand for the engine generator facing from below within the frame holding the engine generator are constructed separately, and the power plane is transported there and used as the installation stand for the power drawing. The power supply station building is constructed by removing the frame and fixing the engine generator to the engine generator installation stand.
以下、第2図、第3図および第4図を用いて本発明の実
施例を詳細に説明する。Embodiments of the present invention will be described in detail below with reference to FIGS. 2, 3, and 4.
第2図は工場等の作業環境の良い所で組立てられた電源
局舎の断面図であって、この電源局舎は内部に室内5a
を形成した電力面5を基に組立てられている。Figure 2 is a cross-sectional view of a power station building assembled in a place with a good working environment, such as a factory.
It is assembled based on the power plane 5 which has been formed.
そして、前記電力面5の室内5aには機関発電機3およ
びこの機関発電機3の運転に必要な関連機器4をそれぞ
れ据え付は固定する。In the room 5a of the power plane 5, an engine generator 3 and related equipment 4 necessary for operating the engine generator 3 are installed and fixed.
なお、機関発電機3を取付ける枠台6は、後述する現地
での取外しができるように電力面5内の床に固定されて
いる。Note that the frame 6 on which the engine generator 3 is attached is fixed to the floor within the power plane 5 so that it can be removed on site as described later.
しかる後各機器間の配線あるいは必要な配管を行ない内
部接続を完了する。After that, wiring or necessary piping between each device is completed to complete the internal connections.
したがって、試運転を行なう必要がある場合には、その
場、すなわち工場等の組立現場で外部との仮接続を行な
い、試運転を行なうことができる。Therefore, if it is necessary to perform a trial run, it is possible to perform the trial run on the spot, that is, at an assembly site such as a factory, by temporarily connecting to the outside.
このように組立てられた電源局舎は、輸送中の防水等を
考慮して電力面5の開孔部をふさぐとともに。The power station building assembled in this way is designed to cover the opening in the power side 5 in consideration of waterproofing during transportation, etc.
不要な損傷を避けると共に、取扱いが容易となるように
排風ダクト、出入口の庇等の突出部は取付けない。To avoid unnecessary damage and to facilitate handling, do not install protruding parts such as ventilation ducts or eaves at entrances and exits.
次に前述のように各機器3,4が取付けられた電源局舎
は、そのままの状態で遠隔地等の電源プラント建設現場
へ大型トラック、トレーラあるいは船舶等で輸送される
。Next, as described above, the power station building with each of the devices 3 and 4 attached thereto is transported as is to a power plant construction site in a remote location by large truck, trailer, ship, or the like.
この輸送のことをあらかじめ考慮して前記電力面5をコ
ンテナ構造にしておくこともできる。It is also possible to take this transportation into consideration and make the power plane 5 have a container structure.
一方、電源プラント建設地には、あらかじめ第3図に示
すような電力面5を支承するだめのコンクリート等で建
設された強固な電力画用据付台γが設けられ、この据付
台1上に電力面5を載置固定する。On the other hand, at the power plant construction site, a strong power installation stand γ made of concrete or the like to support the power plane 5 as shown in Figure 3 is installed in advance, and the power Place and fix surface 5.
なお、この電力画用据付台1の設置に当っては、この据
付台7とは別に分離して前記機関発電機3を支承する機
関発電機用据付台8が設けられ、この据付台8は電力面
5の枠台6内に臨む位置と高さをもって形成される。In addition, when installing this electric power drawing installation stand 1, an installation stand 8 for an engine generator that supports the engine generator 3 is provided separately from this installation stand 7, and this installation stand 8 is It is formed at a position and height facing the inside of the frame 6 on the power plane 5.
しかる後に外部配線、排風ダクト、出入口の庇等を取付
ける。After that, install external wiring, ventilation ducts, eaves at entrances and exits, etc.
次に、機関発電機30枠台6に対する固定を解くと共に
、機関発電機3上に備えられたアイビーム9にチェンブ
ロック10を取付け、このチェンブロック10により機
関発電機3を僅かに吊上げる。Next, the fixation of the engine generator 30 to the frame 6 is released, and a chain block 10 is attached to the eye beam 9 provided on the engine generator 3, and the engine generator 3 is slightly lifted by this chain block 10.
しかる後、機関発電機3を床面に固定していた枠台6を
抜き取シ、あらかじめ形成された機関発電機用据付台8
上に機関発電機3を降下させ固定する。After that, the frame 6 that fixed the engine generator 3 to the floor was removed, and the engine generator installation stand 8 that had been formed in advance was removed.
The engine generator 3 is lowered and fixed on top.
本発明によれば、第4図に示すように複数個に分割組立
できる電力面を形成して輸送を便利にすることもできる
。According to the present invention, it is also possible to form a power plane that can be divided and assembled into a plurality of pieces as shown in FIG. 4, thereby making transportation convenient.
また複数個の機関発電機による連携動作の電源プラント
も可能である。It is also possible to create a power plant in which multiple engine generators work together.
以上の説明から明らかなように本発明にあっては、電力
園内に各機器が固定されかつ配線、配管等がなされた状
態で輸送されるから、遠隔地に機関発電機による電源プ
ラントを損傷なく安全に輸送できる。As is clear from the above explanation, in the present invention, each device is fixed in the power plant and transported with wiring, piping, etc. completed, so that a power plant using an engine generator can be transported to a remote location without damage. Can be transported safely.
また、輸送前に燃料タンク、機関発電機制御盤、整流器
、バッテリ、換気扇、コンセント、室内照明用具、配電
盤等の電源プラント運転に必要な内部据付、配線、配管
等の工事を作業環境の良い工場で、しかも熟練した技術
者によってあらかじめ完了しておくので、輸送前に電源
プラントの試運転を実施できる。In addition, before transportation, we carry out internal installation work, wiring, piping, etc. necessary for power plant operation, such as fuel tanks, engine generator control panels, rectifiers, batteries, ventilation fans, outlets, indoor lighting equipment, and switchboards, at a factory with a good working environment. Moreover, since it is completed in advance by a skilled engineer, a trial run of the power plant can be carried out before transportation.
したがって、遠隔地に輸送後、不利な環境ないし条件下
でおこなわなければならない工事を大幅に減少して、短
期間に電源プラントを稼動させることが可能となるとと
もに、高品質、高信頼度の電源プラントを提供できる利
点がある。Therefore, the work that must be carried out in unfavorable environments or conditions after being transported to a remote location can be greatly reduced, making it possible to start operating a power plant in a short period of time, and making it possible to provide a high-quality, highly reliable power source. It has the advantage of being able to provide plants.
まだ、機関発電機を工場では枠台を介して電力園内に取
付け、電源プラント建設地では枠台を除去してあらかじ
め設けられた機関発電機用据付台に固定するものである
から、比較的環境ないし条件の良い工場で機関発電機関
連の配線、配管が総で行なえると共に必要な試運転ない
しテストも行なえる。At present, the engine generator is installed in the power plant via a frame at the factory, and at the power plant construction site, the frame is removed and fixed to a pre-installed installation stand for the engine generator, so it is relatively environmentally friendly. Alternatively, all wiring and piping related to the engine generator can be done at a factory with good conditions, and necessary trial runs and tests can also be carried out.
まだ、輸送に際して機関発電機はもとよりこれに関連す
る部材の梱包、解梱などを必要とせず資材と作業能率面
からみた経済的な利点もある。Still, there is an economical advantage in terms of materials and work efficiency, as it does not require packaging or unpacking of the engine generator or related parts during transportation.
また、現地における機関発電機の据付けは、機関発電機
を移動させることなく僅か引上げるだけで行なうことが
できるかへ配線、配管等を変える必要がなく、また山間
僻地のように作業条件の悪い場所でも作業を容易に行な
えるという利点がある。In addition, installation of the engine generator on-site can be done by simply raising the engine generator slightly without moving it, and there is no need to change wiring, piping, etc., and there is also no need to change the wiring or piping, etc. It has the advantage of being easy to work with anywhere.
さらに機関発電機は、独立して設置された機関発電機用
据付台上に固定されるから、運転時に生じる振動が電力
面を介して他の機器類に伝達されることがなく、したが
って電力面、機器類の耐振性を簡単な構造とすることが
できる。Furthermore, since the engine generator is fixed on an independently installed engine generator mounting stand, the vibrations generated during operation are not transmitted to other equipment via the power side, and therefore the power side , the vibration resistance of equipment can be made simple.
【図面の簡単な説明】
第1図は従来の電源局舎を示す断面図、第2図は本発明
の実施例を示す輸送前の組立状態を示す電力面の断面図
、第3図は本発明の電源局舎を設置した状態で示す断面
図、第4図は複数個の電力面を組合わせた場合の実施例
を示す断面図である。
3……機関発電機、4……関連機器、5……電力函、6
……枠台、γ……電力函用据付台、8……機関発電機用
据付台、9……アイビーム、10……チェンブロック[Brief Description of the Drawings] Fig. 1 is a sectional view showing a conventional power station building, Fig. 2 is a sectional view of the power side showing an embodiment of the present invention in an assembled state before transportation, and Fig. 3 is a sectional view of the main power station building. FIG. 4 is a cross-sectional view showing the power station building of the invention in an installed state, and FIG. 4 is a cross-sectional view showing an embodiment in which a plurality of power stations are combined. 3... Engine generator, 4... Related equipment, 5... Power box, 6
... Frame stand, γ ... Installation stand for power box, 8 ... Installation stand for engine generator, 9 ... Eye beam, 10 ... Chain block
Claims (1)
て機関発電機3を取付けると共にこの機関発電機3の関
連機器4の据付けおよび内部配線・配管を行なう工程と
、電源プラント建設地に前記電力面5を支承する電力画
用据付台1と前記枠台6内に下方から臨む機関発電機3
を支承する機関発電機用据付台8とをそれぞれ分離して
建設する工程と、前記各機器3,4が取付けられた電力
面5を工場から前記電源プラント建設地へ輸送し、この
電力面5を前記電力画用据付台γに固定した後、機関発
電機3が取付けられた枠台6を除去して前記機関発電機
用据付台8に機関発電機3を固定する工程とからなる電
源局舎の建設方法。1. The process of installing the engine generator 3 on the floor of the power plane 5 via a removable frame 6 at the factory, installing related equipment 4 of the engine generator 3, and internal wiring and piping, and constructing the power plant. A power drawing installation stand 1 that supports the power plane 5 on the ground, and an engine generator 3 that faces from below within the frame 6.
The process of separately constructing the installation stand 8 for the engine generator that supports The power source station comprises the steps of fixing the engine generator 3 to the power drawing installation stand γ, removing the frame 6 on which the engine generator 3 is attached, and fixing the engine generator 3 to the engine generator installation stand 8. How to construct a building.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP47046996A JPS5810545B2 (en) | 1972-05-12 | 1972-05-12 | How to get the job done |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP47046996A JPS5810545B2 (en) | 1972-05-12 | 1972-05-12 | How to get the job done |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS497713A JPS497713A (en) | 1974-01-23 |
| JPS5810545B2 true JPS5810545B2 (en) | 1983-02-26 |
Family
ID=12762790
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP47046996A Expired JPS5810545B2 (en) | 1972-05-12 | 1972-05-12 | How to get the job done |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5810545B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5786785A (en) * | 1980-11-20 | 1982-05-29 | Hitachi Ltd | Method of constructing atomic power plant building |
-
1972
- 1972-05-12 JP JP47046996A patent/JPS5810545B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS497713A (en) | 1974-01-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8789269B2 (en) | Modular manufacturing facility and method | |
| RU13562U1 (en) | TRANSPORT GAS-TURBINE POWER PLANT | |
| US3925679A (en) | Modular operating centers and methods of building same for use in electric power generating plants and other industrial and commercial plants, processes and systems | |
| RU2680900C2 (en) | Plant comprising engine | |
| CN201317978Y (en) | Splicing novel container machine room | |
| US20160248230A1 (en) | Modular power plant assembly | |
| JP6650932B2 (en) | Wind turbine generator assembly | |
| JP2015190156A (en) | Simple building structure using box that may be carried on vehicle | |
| JP5578834B2 (en) | building | |
| JP3274238B2 (en) | Construction method of thermal power plant | |
| CN104153610B (en) | Plant gas modularity box over all Integration type control panel and installation method thereof | |
| JP2010048313A (en) | Equipment storage unit | |
| CN207218629U (en) | A kind of group of string inverter concentrates the unified platform and inverter system placed | |
| CN217387884U (en) | Novel outdoor power distribution is integrated device | |
| CN204060065U (en) | Plant gas modularization box type integral integrated-type control panel | |
| JP3220308U (en) | Outdoor power generator storage system | |
| JPH0517531Y2 (en) | ||
| CN203104228U (en) | Dust-free constant-temperature and constant-humidity device for stator payoff installation of hydraulic turbine set | |
| JP7597536B2 (en) | Equipment installation method, riser unit and building | |
| CN209228545U (en) | It is used to support the support device of tower | |
| KR20110012014U (en) | Container type mobile generator with lifting device | |
| CN210465727U (en) | Tower meteorological monitoring device | |
| JP6888192B2 (en) | Solar panel mounting structure | |
| JPS6062607A (en) | Turbine housing shop | |
| KR101811045B1 (en) | Method for Constructiong Solar Cell Generator Equipment by Using Gunga |