JPS5965162A - Apparatus for continuously constructing concrete wall - Google Patents
Apparatus for continuously constructing concrete wallInfo
- Publication number
- JPS5965162A JPS5965162A JP17567882A JP17567882A JPS5965162A JP S5965162 A JPS5965162 A JP S5965162A JP 17567882 A JP17567882 A JP 17567882A JP 17567882 A JP17567882 A JP 17567882A JP S5965162 A JPS5965162 A JP S5965162A
- Authority
- JP
- Japan
- Prior art keywords
- concrete wall
- column
- formwork
- restrained
- hydraulic jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Movable Scaffolding (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
本発明は、鉄筋あるいは鉄骨コンクリート壁体を、順次
所要の高さ1で、連続的に、安全かつ容易に構築する装
置、詳しくは、型枠と足場付き支柱とを交互に上昇させ
る装置に関するものである。DETAILED DESCRIPTION OF THE INVENTION The present invention provides an apparatus for safely and easily constructing reinforcing bars or steel-framed concrete walls sequentially to a required height 1, and more specifically, a device for constructing reinforcing bars or steel-framed concrete walls in a continuous manner, safely and easily. It concerns an alternating raising device.
以下に本発明装置の実施の一例を図面に基づき説明する
。An example of implementation of the device of the present invention will be described below based on the drawings.
第1図において、Aは、基盤上に予め構築された最下段
のコンクリート壁体であって、このコンクリート壁体A
の前後面には、各支柱1の下部がアンカーポルト2によ
り取外し可能に拘束立設されている。In FIG. 1, A is the lowest concrete wall constructed in advance on the foundation, and this concrete wall A
The lower part of each support column 1 is removably restrained and erected by an anchor port 2 on the front and rear surfaces of the apparatus.
なお同一面側の支柱1は、コンクリート壁体Aの幅方向
に所要間隔を存して設けら几でいるものとする。It is assumed that the supports 1 on the same side are provided at required intervals in the width direction of the concrete wall A.
同一面側の各支柱1の外側間には、例えば上、中、下段
の足場3が設けられており、この足場3によって配筋、
コンクリート打設、型枠操作等の作業を行う。For example, upper, middle, and lower scaffolds 3 are provided between the outer sides of each column 1 on the same side, and these scaffolds 3 allow reinforcement
Performs work such as pouring concrete and operating formwork.
前記各支柱1の内側上下間には鋼棒4が設けられており
、この914俸4には、鋼棒4を中心に貫通噛合させた
油圧ジヤツキ5が設けられている0
この各油圧ジヤツキ5は、各支柱1に摺動可能に設けら
れたアーム6によって支持されている0
また同一面側の各油圧ジヤツキ5には、前記アーム6を
介して型枠7の上部が連結されており、この型枠7の下
部には、同一面側の各支柱lに摺動可11目に設けら几
たアーム8が連結されている。A steel rod 4 is provided between the upper and lower inner sides of each of the pillars 1, and a hydraulic jack 5 that penetrates and meshes with the steel rod 4 at the center is provided on this 914 shaft 4. is supported by an arm 6 slidably provided on each support column 1. Further, the upper part of the formwork 7 is connected to each hydraulic jack 5 on the same side via the arm 6, At the bottom of this formwork 7, a slim arm 8 is connected to each support l on the same side and is slidably provided at the 11th position.
前記油圧ジヤツキ5は、第2図に示す如く、油圧ジヤツ
キ5の上下部に、鋼棒4に噛合する逆方向の各一対のコ
ンク)5a、5bを有し、かつ各一対のコンク)5a、
5b’5開閉するレバー5Cを有しており、前記型枠7
を上昇させるときは、各レバー5c’を押上げて、油圧
ジーVツキ5の上部ポー )5dから圧油を供給し、ま
た前記支柱1を上昇させるときは、各レバー5ck押下
げて、油圧ジヤツキ5の下部ポート5eから圧油を供給
する。As shown in FIG. 2, the hydraulic jack 5 has, at the upper and lower portions of the hydraulic jack 5, a pair of concs 5a and 5b in opposite directions that mesh with the steel rod 4, and each pair of concs 5a,
5b'5 has a lever 5C for opening and closing, and the formwork 7
When raising the column 1, push up each lever 5c' to supply pressure oil from the upper port (5d) of the hydraulic geyser 5, and when to raise the column 1, push down each lever 5ck to supply hydraulic oil. Pressure oil is supplied from the lower port 5e of the jack 5.
なお第1図は、前後面の型枠7を上昇させ、各型枠7の
下部を最下段のコンクリート壁体Aの上部においてアン
カーボルト9により収外し可能に拘束し、前後向の型枠
7の上部間にアンカーボルト9をセットした後、コンク
リートを打設し、第2段のコンクリート壁体I3金構築
した状態を示す。In FIG. 1, the front and rear formworks 7 are raised, and the lower part of each formwork 7 is removably restrained by anchor bolts 9 at the top of the lowest concrete wall A, and the front and rear formworks 7 are raised. After setting the anchor bolts 9 between the upper parts of the walls, concrete was poured and the second stage concrete wall I3 gold was constructed.
さて、第3段のコンクリ−ト8体を構築するに当っては
、第1図における前後向の型枠7のアンカーボルト9に
よる拘束を解き、かつ渠2段のコンクリート壁体Bから
型枠7を剥離した後、油圧ジヤツキ5の在勤行程にて鋼
棒4に対し油圧ジヤツキ5を上昇させることにより、型
枠7の下部を第3図に示す如く第2段のコンクリート壁
体Bの上部首で上昇させ、型枠7の下部を第2段のコン
クIJ −ト壁体Bの上部においてアンカーボルト9に
より拘束し、型枠7の上部にアンカーボルト9をセット
した後、コンクリートを打設し、第3段のコンクリート
壁体Cを構築する。Now, in constructing the eight concrete bodies of the third stage, the restraint by the anchor bolts 9 of the formwork 7 in the front and back directions in Fig. 1 is released, and the formwork is removed from the concrete wall B of the second stage of the culvert. After peeling off the formwork 7, the lower part of the formwork 7 is removed from the upper part of the second stage concrete wall B as shown in FIG. The lower part of the formwork 7 is restrained by the anchor bolts 9 at the upper part of the second stage concrete IJ-to wall body B. After the anchor bolts 9 are set on the upper part of the formwork 7, concrete is poured. Then, construct the third stage concrete wall C.
構築された・刊3段のコンクリート・壁体Cの養生後、
前後面側における支柱1の下部と最下段のコンクリート
・壁体Aとのアンカーボルト2による拘束”k jQ’
tいた後、油圧ジヤツキ5の復動行程にて、型枠7ケ反
力材として支柱1の下部を、第4図に示す如く最下段の
コンクリート壁体Aの上部と第2段のコンクリート壁体
Bの下部との間にわたるまで上昇させ、支柱1の下部を
最下段のコンクリート壁体Aの上部と第2段のコンクリ
ート壁体Bの下部とにおいてアンカーボルト2により拘
束した後、前記と同様に、型枠7を上昇させて、第4段
のコンクIJ )壁体を構築する。After curing the constructed 3-tier concrete wall C,
Restriction by anchor bolts 2 between the lower part of the pillar 1 and the lowest concrete wall A on the front and rear sides "k jQ'
After that, in the return stroke of the hydraulic jack 5, the lower part of the support column 1 is used as a reaction force for the 7 formworks, and the upper part of the concrete wall A of the lowest stage and the concrete wall of the second stage as shown in FIG. The lower part of the pillar 1 is restrained by the anchor bolt 2 between the upper part of the lowest concrete wall A and the lower part of the second concrete wall B, and then the same as above. Then, the formwork 7 is raised and the fourth stage concrete IJ) wall is constructed.
なお、支柱1あるいは型枠7は、前1麦而11411同
時に、あるいは片面側毎((上昇させ7tばよい。In addition, the support column 1 or the formwork 7 may be raised at the same time as the front 11411, or on each side ((it is only necessary to raise it by 7t).
以上述べた如く本発明装置は、足場付き支柱の上下間に
鋼棒を設け、この鋼棒を中心に油圧ジヤツキを貫通噛合
し、油圧ジヤツキに型枠を連結し、型枠が既設のコンク
リート壁体に未拘束であって、支柱の下部が既設のコン
クリート、壁体に拘束されているとき、油圧ジヤツキの
在勤行程にて、鋼棒に対し油圧ジヤツキを上昇させるこ
とにより、型枠を所要の高さまで上昇させることができ
、上昇させた型枠の下部を既設のコンクリート壁体に拘
束し、かつ支柱下部の既設のコンクリート壁体に対する
拘束を解き、油圧ジヤツキの復動行程にて、型枠を反力
材として支柱を上昇させることができ、従って鋼棒に対
して油圧ジヤツキの負荷荷重が引張り方向に作用するの
で、比較的細い鋼棒および小型の油圧ジヤツキを使用し
ても、型枠と足場付き支柱とを交互に、安全かつ容易に
上昇させることができ、鉄筋あるいは鉄骨コンクリート
壁体を、順次所要の高さまで、連続的に、安全かつ容易
に構築することができる。As described above, in the device of the present invention, a steel rod is provided between the upper and lower sides of a support with a scaffold, a hydraulic jack is penetrated and engaged around this steel rod, a formwork is connected to the hydraulic jack, and the formwork is attached to an existing concrete wall. When the lower part of the column is not restrained by the existing concrete or wall, the formwork can be moved to the required position by raising the hydraulic jack relative to the steel rod during the hydraulic jack's working stroke. The lower part of the raised formwork is restrained to the existing concrete wall, the lower part of the column is released from the existing concrete wall, and the hydraulic jack returns to the formwork. The column can be raised as a reaction force, and the load of the hydraulic jack acts on the steel rod in the tensile direction, so even if relatively thin steel rods and small hydraulic jacks are used, the formwork It is possible to safely and easily raise the pillars and scaffolding columns alternately, and it is possible to safely and easily construct reinforcing bars or steel-framed concrete walls one after another to a required height.
第1図は本発明装置により第2段のコンクリート壁体を
構築した状態を示す説明図、第2図?:i油圧ジヤツキ
の一例を示す概略図、第3図は型枠と上昇させた説明図
、第4図は支柱を上昇させた説明図である。
出 願 人 西松建設株式会社
出 願 人 川鉄機材工業株式会社
第1図 1¥2図
313−Fig. 1 is an explanatory diagram showing the state in which the second stage concrete wall is constructed using the device of the present invention, and Fig. 2? :i A schematic diagram showing an example of a hydraulic jack, FIG. 3 is an explanatory diagram showing the formwork and raised, and FIG. 4 is an explanatory diagram showing the strut raised. Applicant: Nishimatsu Construction Co., Ltd. Applicant: Kawatetsu Jizai Kogyo Co., Ltd. Figure 1 ¥2 Figure 313-
Claims (1)
後面に、当初はそ几ぞn下部が取外し可能に拘束されて
立設される足場付き支柱と、この支柱の上下間に設けら
れた鋼棒と、この鋼棒を中心に貫通噛合され、かつ前記
支柱にアームを介して摺動可能に支持さnた油圧ジヤツ
キと、このアームを介して上部が連結され、かつ前記支
柱に摺動可能に設けられたアームを介して下部が連結さ
几ており、当初は前記コンクリート壁体の前後面の上部
にそ几ぞn下部が取外し可能に拘束さrしる型枠とから
なり、この型枠が既設のコンクリート壁体に未拘束であ
って、前記支柱の下部が既設のコンクリート壁体に拘束
されているとき、前記油圧ジヤツキの在勤行程にて、油
圧ジヤツキ’k1.A棒に対し上昇させることにより、
型枠を所要の高さまで上昇させ、上昇させた型枠の下部
を既設のコンクリート壁体に取外し可能に拘束し、かつ
支柱下部の既設のコンクリート壁体に対する拘束を解き
、前記油圧ジヤツキの復動行程にて、型枠を反力材とし
て支柱を上昇させ、支柱の下部を一段上の既設のコノク
リート壁体に取外し可能に拘束するようにしたコンクリ
ート壁体の連続構築装置。On the front and rear surfaces of the lowest conocrete wall that had been pre-constructed on the foundation, a scaffolding column was originally installed with its lower part removably restrained, and a column was installed between the top and bottom of this column. a hydraulic jack that is penetratingly meshed with the steel rod as a center and is slidably supported on the column via an arm; the upper portion is connected via the arm and slides on the column; The lower part is connected to the upper part of the front and rear surfaces of the concrete wall through an arm that is removably provided, and it originally consisted of a formwork whose lower part was removably restrained to the upper part of the front and rear surfaces of the concrete wall. When the formwork is not restrained by the existing concrete wall and the lower part of the support is restrained by the existing concrete wall, during the working process of the hydraulic jack, the hydraulic jack 'k1. By raising it relative to A bar,
The formwork is raised to the required height, the lower part of the raised formwork is removably restrained to the existing concrete wall, and the restraint of the lower part of the column to the existing concrete wall is released, and the hydraulic jack is moved back. Continuous concrete wall construction equipment that uses the formwork as a reaction force to raise the column during the process, and removably restrains the lower part of the column to the existing conocrete wall one step above.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17567882A JPS5965162A (en) | 1982-10-06 | 1982-10-06 | Apparatus for continuously constructing concrete wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17567882A JPS5965162A (en) | 1982-10-06 | 1982-10-06 | Apparatus for continuously constructing concrete wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5965162A true JPS5965162A (en) | 1984-04-13 |
| JPS6243024B2 JPS6243024B2 (en) | 1987-09-11 |
Family
ID=16000317
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP17567882A Granted JPS5965162A (en) | 1982-10-06 | 1982-10-06 | Apparatus for continuously constructing concrete wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5965162A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS646464A (en) * | 1987-06-29 | 1989-01-11 | Yoichi Shiba | Execution of retaining mold in concrete structure |
-
1982
- 1982-10-06 JP JP17567882A patent/JPS5965162A/en active Granted
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS646464A (en) * | 1987-06-29 | 1989-01-11 | Yoichi Shiba | Execution of retaining mold in concrete structure |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6243024B2 (en) | 1987-09-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3952843B2 (en) | Construction method of tower structure | |
| KR101889064B1 (en) | Construction method of a long span bridge main tower | |
| JPH09310492A (en) | Self elevating type form device and elevating method thereof | |
| DE1138208B (en) | Method and device for setting up multi-storey buildings with a basement | |
| JP3125653B2 (en) | Bridge girder construction method | |
| JP3049402B2 (en) | Supporting type scaffold form lifting device and concrete skeleton construction method | |
| CN116716812B (en) | Construction method for solid section at top of main tower pier of river-facing super bridge | |
| US5490367A (en) | Apparatus for supporting and moving vertically an erected form assembly | |
| CN217711625U (en) | Half contrary construction support body structure of superelevation independent wall body | |
| CN217326481U (en) | I-steel subassembly fast combination construction structures | |
| DE2208911C3 (en) | Device for distributing concrete in the course of erecting buildings | |
| JP2829363B2 (en) | Formwork equipment for pillar construction | |
| CN215101546U (en) | Maintenance of pavilions and roof lifting devices in ancient Chinese buildings | |
| JPS6243024B2 (en) | ||
| JP3063548B2 (en) | Formwork method and equipment | |
| JP3417865B2 (en) | Method of constructing structure using strut and strut structure | |
| JPH06248614A (en) | High bridge pier and construction thereof | |
| CN113089897A (en) | Construction method for integrally hoisting disassembly-free cement formwork | |
| JPH0584740U (en) | Scaffolding / formwork lifting device | |
| KR960016754B1 (en) | Caisson form and caisson continuous construction method | |
| JPS6351529A (en) | Construction of reinforced concrete underground beam and slab | |
| JPH083926A (en) | Construction method of composite structure pier | |
| CN118326904A (en) | Aqueduct pier body construction tool and method | |
| JPH05132959A (en) | Form for application of retaining wall | |
| JPS6358197A (en) | A block body for constructing a nuclear reactor containment vessel, a construction method using the same, and its manufacturing device |