JPS60367Y2 - Precast concrete pile cap - Google Patents

Precast concrete pile cap

Info

Publication number
JPS60367Y2
JPS60367Y2 JP18076881U JP18076881U JPS60367Y2 JP S60367 Y2 JPS60367 Y2 JP S60367Y2 JP 18076881 U JP18076881 U JP 18076881U JP 18076881 U JP18076881 U JP 18076881U JP S60367 Y2 JPS60367 Y2 JP S60367Y2
Authority
JP
Japan
Prior art keywords
pile
concrete
pile cap
cap body
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP18076881U
Other languages
Japanese (ja)
Other versions
JPS5885654U (en
Inventor
和夫 橋本
Original Assignee
石川島播磨重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島播磨重工業株式会社 filed Critical 石川島播磨重工業株式会社
Priority to JP18076881U priority Critical patent/JPS60367Y2/en
Publication of JPS5885654U publication Critical patent/JPS5885654U/en
Application granted granted Critical
Publication of JPS60367Y2 publication Critical patent/JPS60367Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

【考案の詳細な説明】 本考案は土木工事現場や建設工事現場において、コンク
リートフーティング又はコンクリ−トスラフ等のコンク
リート物体の支持を堅固なものにするため地中に打込ん
たコンクリート製杭等の各種核の杭頭処理に使用するプ
レキャストコンクリート製杭キャップに関する。
[Detailed description of the invention] This invention is used at civil engineering work sites and construction sites to provide solid support for concrete objects such as concrete footings or concrete slabs. This article relates to precast concrete pile caps used for pile cap treatment of various types of cores.

コンクリートフーティング等の支持を堅固なものにする
ため地中に杭を打込んた場合は、杭打込後に杭頭処理を
行なう。
If piles are driven into the ground to provide solid support for concrete footings, etc., the pile cap should be treated after driving the piles.

しかし従来の抗頭処理においては次のような問題かある
。
However, conventional anti-head treatment has the following problems.

(1)杭とコンクリートフーティング等を結びつけるた
めの配筋作業を現場て行なわなければならないのて、多
大の労力と時間がかかる。
(1) Reinforcement work to connect the piles and concrete footings must be carried out on site, which requires a great deal of labor and time.

′[1) コンクリートフーティング等に働らく杭の
パンチングシャーの範囲が狭いため、コンクリートフー
ティング等の厚さを増す必要がある。
'[1] Since the range of the punching shear of the pile that acts on concrete footings, etc. is narrow, it is necessary to increase the thickness of concrete footings, etc.

本考案は以上の問題を解決するためになしたもので、継
ぎ用鉄筋を備えたコンクリート製杭キャップ本体の底部
に、杭頭部が入る差込穴を設け、且つ前記差込穴にモル
タルを注入する流路を前記杭キャップ本体に設け、前記
杭キャップ本体の上面でコンクリートフーティング等の
コンクリート物体を受は得るようにしたことを特徴とす
るものである。
The present invention was developed in order to solve the above problems, and involves providing an insertion hole into which the pile head can fit into the bottom of the concrete pile cap body equipped with reinforcing bars, and filling the insertion hole with mortar. The present invention is characterized in that a channel for injection is provided in the pile cap body, and a concrete object such as a concrete footing is received on the upper surface of the pile cap body.

以下本考案の実施例を図面により説明する。Embodiments of the present invention will be described below with reference to the drawings.

地面1から地中側に一定距離を隔てた個所て頭部側2a
を切断除去した杭2の頂部(切口)に本考案に係るプレ
キャストコンクリート製の杭キャップ3を設け、該杭キ
ャップ3を介してコンクリートフーティング4の荷重を
杭2に伝え得るようにしている。
Head side 2a at a certain distance from the ground 1 to the underground side
A pile cap 3 made of precast concrete according to the present invention is provided at the top (cut end) of the pile 2 which has been cut and removed, so that the load of the concrete footing 4 can be transmitted to the pile 2 via the pile cap 3.

本考案の杭キャップ3は、上面5から真上と斜め上方向
に延びる複数の継ぎ用鉄筋6,7を突出させ且つ前記上
面5の中央部に凸部8を形成した摺鉢形のコンクリート
製杭キャップ本体9の底部に、前記杭2の頂部と遊嵌す
る穴10を形成し、前記穴10と杭2との間の隙間11
に杭キャップ本体9の上側からモルタルを注入するため
杭キャップ本体9に前記穴10の壁面と杭キャップ本体
の上面5とて開口するモルタル注入用流路12を形成し
て該流路12の杭キャップ本体上面側開口をモルタル注
入口13とし、又前記穴10に杭2を挿入したとき杭キ
ャップ本体の上面5が地面1と同一高さとなってコンク
リートフーティング4の下面に接するよう構成している
。
The pile cap 3 of the present invention is a mortar-shaped concrete pile having a plurality of reinforcing bars 6 and 7 extending directly upward and diagonally upward from the upper surface 5 and having a convex portion 8 formed in the center of the upper surface 5. A hole 10 is formed in the bottom of the cap body 9 to fit loosely into the top of the stake 2, and a gap 11 between the hole 10 and the stake 2 is formed.
In order to inject mortar from the upper side of the pile cap body 9, a mortar injection channel 12 is formed in the pile cap body 9 and opens between the wall surface of the hole 10 and the top surface 5 of the pile cap body. The opening on the top side of the cap body is a mortar injection port 13, and when the pile 2 is inserted into the hole 10, the top surface 5 of the pile cap body is at the same height as the ground 1 and is in contact with the bottom surface of the concrete footing 4. There is.

本考案においては、前記構成の杭キャップ3を工場等て
予め製作しておいて現場に搬入する。
In the present invention, the pile cap 3 having the above structure is manufactured in advance at a factory or the like and then transported to the site.

現場ては地中に打込んだ杭2の打込位置周辺の地面を掘
削して凹部14を形成し、次で杭2を地面から地中側に
一定距離を隔てた個所で切断して頭部側2aを除去する
。
At the site, the ground around the driving position of the pile 2 driven into the ground is excavated to form a recess 14, and then the pile 2 is cut at a certain distance from the ground to the underground side to remove the head. Remove the section side 2a.

そして杭キャップ3を抗2の上方に位置させて穴10に
杭2の頂部を挿入することにより抗キャップ3を抗2の
頂部に載置し、次て前記凹部14を土砂等て埋め、しか
る後、モルタル注入口13からモルタル注入用流路12
にモルタルを注入して前記隙間11をモルタルで埋める
ことにより杭キャップ3を杭2に完全に固定し、最後に
杭キャップ本体の上面5を含む所要範囲にコンクリート
を打ってコンクリートフーティング4を形成し、以上に
より、コンクリートフーティング4の下面に杭キャップ
本体の上面5を接触すせてコンクリートフーティング4
の荷重を杭2で支持させ、又前記継ぎ用鉄筋6,7の作
用により杭キャップ本体9とコンクリートフーティング
4を結ひつけて両者の結合を確実なものに腰又前記凸部
8の作用により水平力を確実に伝達できるようにしてい
る。
Then, the pile cap 3 is placed above the pile 2 and the top of the pile 2 is inserted into the hole 10, so that the pile cap 3 is placed on the top of the pile 2. Next, the recess 14 is filled with earth and sand, etc. After that, from the mortar injection port 13 to the mortar injection channel 12
The pile cap 3 is completely fixed to the pile 2 by injecting mortar and filling the gap 11 with mortar, and finally concrete is poured in the required area including the top surface 5 of the pile cap body to form a concrete footing 4. As a result of the above, the top surface 5 of the pile cap body is brought into contact with the bottom surface of the concrete footing 4, and the concrete footing 4 is
The load of the pile 2 is supported by the pile 2, and the action of the convex portion 8 is used to connect the pile cap body 9 and the concrete footing 4 by the action of the reinforcing bars 6 and 7 to ensure the connection between the two. This ensures that horizontal force can be transmitted reliably.

このように本考案のプレキャストコンクリート製の杭キ
ャップ3を使用すれば、現場では杭キャップ本体9と杭
2との間にモルタルを注入するだけでよいので、現場で
の作業を大幅に簡略化できて杭頭処理を迅速且つ容易に
できる。
In this way, by using the precast concrete pile cap 3 of the present invention, it is only necessary to inject mortar between the pile cap body 9 and the pile 2 at the site, which greatly simplifies the work at the site. Pile head treatment can be done quickly and easily.

又杭キャップ3はコンクリートフーティング4の下面に
接スるように杭2にセットされるので、コンクリートフ
ーティング4に働く杭2のパンチングシャーの範囲を広
げることができ、従ってコンクリートフーティング4の
厚さを減少できる。
In addition, since the pile cap 3 is set on the pile 2 so as to be in contact with the lower surface of the concrete footing 4, the range of the punching shear of the pile 2 acting on the concrete footing 4 can be expanded, and therefore, the area of the punching shear of the pile 2 acting on the concrete footing 4 can be expanded. Can reduce thickness.

なお前記実施例ではコンクリートフーティングとの関係
で本考案を説明したが、本考案は以上の他、コンクリー
トスラブその他のコンクリート物体の支持を堅固なもの
にするための杭に設ける杭キャップとして実施できるこ
と等は勿論である。
Although the present invention was explained in the above embodiment in relation to concrete footings, the present invention can also be implemented as a pile cap installed on a pile for solidly supporting a concrete slab or other concrete object. Of course, etc.

又コンクリートモルタルのかわりにエポキシモルタルを
注入することも可能である。
It is also possible to inject epoxy mortar instead of concrete mortar.

本考案によれば前述したように、 (I) 杭頭処理を迅速且つ容易になし得る。According to the present invention, as mentioned above, (I) Pile cap processing can be done quickly and easily.

(II) コンクリートフーティング等のコンクリー
ト物体に働く杭のパンチングシャーの範囲を広げること
ができて、コンクリートフーティング等の厚みを減らす
ことができる。
(II) The range of the punching shear of the pile acting on concrete objects such as concrete footings can be expanded, and the thickness of concrete footings and the like can be reduced.

等の優れた効果を奏し得る。It can produce excellent effects such as

【図面の簡単な説明】[Brief explanation of drawings]

図面は本考案の実施例を示す断面図である。 1・・・・・・地面、2・・・・・・杭、3・・・・・
・杭キャップ、4・・・・・・コンクリートフーティン
グ、5・・・・・・杭キャップ本体の上面、6,7・・
・・・・継ぎ用鉄筋、9・・・・・・杭キャップ本体、
10・・・・・・穴、11・・・・・・隙間、13・・
・・・・モルタル注入口。
The drawing is a sectional view showing an embodiment of the present invention. 1...ground, 2...pile, 3...
・Pile cap, 4...Concrete footing, 5...Top surface of the pile cap body, 6, 7...
...Reinforcing bar for joint, 9...Pile cap body,
10... Hole, 11... Gap, 13...
...Mortar injection port.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 継ぎ用鉄筋を備えたコンクリート製杭キャップ本体の底
部に、杭頂部が入る差込穴を設け、且つ荊記差込穴にモ
ルタルを注入する流路を前記杭キャップ本体に設け、前
記抗キャップ本体の上面でコンクリートフーティング等
のコンクリート物体を受は得るよ−)にしたことを特徴
とするプレキャストコンクリート製杭キャップ。
An insertion hole into which the top of the pile enters is provided at the bottom of a concrete pile cap body provided with reinforcing bars, and a channel for injecting mortar into the insertion hole is provided in the pile cap body. A precast concrete pile cap characterized in that the top surface of the precast concrete pile cap is designed to receive a concrete object such as a concrete footing.
JP18076881U 1981-12-04 1981-12-04 Precast concrete pile cap Expired JPS60367Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18076881U JPS60367Y2 (en) 1981-12-04 1981-12-04 Precast concrete pile cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18076881U JPS60367Y2 (en) 1981-12-04 1981-12-04 Precast concrete pile cap

Publications (2)

Publication Number Publication Date
JPS5885654U JPS5885654U (en) 1983-06-10
JPS60367Y2 true JPS60367Y2 (en) 1985-01-08

Family

ID=29977652

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18076881U Expired JPS60367Y2 (en) 1981-12-04 1981-12-04 Precast concrete pile cap

Country Status (1)

Country Link
JP (1) JPS60367Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020180510A (en) * 2019-04-26 2020-11-05 大和ハウス工業株式会社 Pile head cap and building foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020180510A (en) * 2019-04-26 2020-11-05 大和ハウス工業株式会社 Pile head cap and building foundation

Also Published As

Publication number Publication date
JPS5885654U (en) 1983-06-10

Similar Documents

Publication Publication Date Title
JPS615125A (en) Foundation of building
ES8701273A1 (en) Foundation arrangement.
JPH02164930A (en) Foundation structure for building
JP2899668B2 (en) Simple underground construction
JPH0657768A (en) Retaining wall structure and its construction method
JPH0721196B2 (en) Reverse construction method of underground structure
JPH03199528A (en) Steel frame foundation of construction
JPH0243848B2 (en)
JPS6011972Y2 (en) Brake cast concrete pile cap for steel pipe piles
KR102759964B1 (en) Flood wall and construction method of the same
JPH0338275Y2 (en)
JPH02164933A (en) Architecture foundation construction method
JPH10306457A (en) Foundation block
JP3162654B2 (en) Construction method of floor slab support structure in building structure using pile as pillar
JP3105706B2 (en) Construction method of piled raft foundation using existing foundation
JP2922731B2 (en) How to connect slabs and concrete columns
JPH0332580Y2 (en)
JPH0452815B2 (en)
JP2643760B2 (en) How to build foundation beams
JPH108482A (en) Joint structure between trussed columns and piles and post-construction method for trussed columns
JP2506978Y2 (en) Synthetic retaining wall
JPH0726569A (en) Pile foundation construction method for structures subjected to uneven earth pressure
JP2555796B2 (en) Underground construction method using hollow PC columns
JPH0754355A (en) Foundation for small buildings
JPH0649987B2 (en) Underground continuous wall foundation construction method