Demand of refrigerating and air-conditioning machine

Info

Publication number
JPS6073232A
JPS6073232A JP58183829A JP18382983A JPS6073232A JP S6073232 A JPS6073232 A JP S6073232A JP 58183829 A JP58183829 A JP 58183829A JP 18382983 A JP18382983 A JP 18382983A JP S6073232 A JPS6073232 A JP S6073232A
Authority
JP
Japan
Prior art keywords
demand
temperature
central control
unit
refrigerator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP58183829A
Other languages
Japanese (ja)
Inventor
Kunio Sugiyama
杉山 邦生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP58183829A priority Critical patent/JPS6073232A/en
Publication of JPS6073232A publication Critical patent/JPS6073232A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D29/00Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D2700/00Means for sensing or measuring; Sensors therefor
    • F25D2700/12Sensors measuring the inside temperature

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Thermal Sciences (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

PURPOSE:To minimize the variability in indicating temperatures compared with set temperatures by a method wherein stopping command is inputted into a machine having an enough margin in temperature from a central control unit upon generating a demand signal in the demand unit in which a charge for electric power is restricted to a value lower than a given value by limiting the consuming amount of electric power for the air-conditioning machine. CONSTITUTION:The inputs of set temperature, indicating temperature and the like of respective refrigerating machines, air-conditioning machines and auxiliary machines are inputted into the central control unit 4 through an inputting unit 4a and the data thereof are memorized into a memory 4b. On the other hand, a demand signal 1A is inputted upon demanding from a demand controller 1 through an inputting unit 4c and the data thereof are memorized into the memory unit 4d. In a step 41, when the demand signal 1A is inputted into the central control unit 4, the central control unit 4 calls immediately the set temperature and the indicating temperature in the memory unit 4b through an operating unit 4e, operates the degree of margins in the temperatures of respective stores and rooms (step 42) and outputs the stopping command 4a to the machine and equipment which has the most enough margin in the temperature through an output unit 4f (step 44).

Description

【発明の詳細な説明】 〔発明の技術分野〕 この発明は冷凍機、空調機の電力使用量を制限すること
によシ、電力料金を一定額以下に押えるデマンドにおい
て、各庫内、室内流を可能な限り設定温度付近に保つこ
とができるようにした冷凍機、空調機のデマンドに関す
る。
[Detailed Description of the Invention] [Technical Field of the Invention] This invention reduces the amount of electricity used in each refrigerator and room by limiting the amount of electricity used by refrigerators and air conditioners. This relates to demand for refrigerators and air conditioners that can maintain the temperature as close to the set temperature as possible.

〔従来技術〕[Prior art]

従来、この種の装置として第1図に示すものがあった。 Conventionally, there has been a device of this type as shown in FIG.

この第1図において、1はデマンドコントローラ、2a
〜2eは冷凍機、空調機およびそれらの補機、3は制御
線である。この制御線3を通して冷凍機、空調機および
これらの補機2a〜2eがデマンドコントローラに接続
されている。
In this FIG. 1, 1 is a demand controller, 2a
2e is a refrigerator, an air conditioner, and their auxiliary equipment, and 3 is a control line. Through this control line 3, the refrigerator, the air conditioner, and their auxiliary machines 2a to 2e are connected to the demand controller.

次に動作について説明する。冷凍機、空調機およびそれ
らの補機2a〜2eはそれぞれ設定された温度に基づき
各冷蔵庫内、室内を冷凍、空調する。
Next, the operation will be explained. The refrigerator, the air conditioner, and their auxiliary machines 2a to 2e freeze and air condition the inside of each refrigerator and the room based on respective set temperatures.

一方、デマンドコントローラ1はシステム全体の単位時
間当シの電力使用量を常に監視する。
On the other hand, the demand controller 1 constantly monitors the amount of power used per unit time of the entire system.

なお、デマンドコントローラ1には、あらかじめ電力規
定値を越えた場合に冷凍機、空調機、補機を停止させる
順位を登録しておく。
Note that the order in which the refrigerator, air conditioner, and auxiliary equipment are to be stopped when the power exceeds the specified power value is registered in advance in the demand controller 1.

もし、規定値を越えfc場合、デマンドコントローラ1
ij:デマンド信号を発つし、登録順位にしたがい、規
定値以下に々るまで、それらを制御線3を通して停止さ
せ規定値以下の状態が一定時間継続すればデマンド信号
を解除し、再び順次運転させる。
If fc exceeds the specified value, demand controller 1
ij: A demand signal is issued, and according to the registered order, they are stopped through the control line 3 until they reach the specified value or less, and if the condition below the specified value continues for a certain period of time, the demand signal is released and the devices are operated sequentially again. .

たとえば、第1図において冷凍機、空調機およびこれら
の補機2a、2b、2c、2d、2eがデマンドコント
ローラ1に接続されているが、ここで停止順位を冷疎機
、空調機およびこれらの補機2a、2c、2e、2b、
2dと登録しておけば、デマンド信号発令時デマンドコ
ントローラ1は冷凍機、空調機およびこれらの補機2a
にまず停止指令を出す。
For example, in Fig. 1, a refrigerator, an air conditioner, and their auxiliary equipment 2a, 2b, 2c, 2d, and 2e are connected to the demand controller 1, but here the stopping order is determined by the cooling and cooling equipment, the air conditioner, and their auxiliary equipment. Auxiliary machines 2a, 2c, 2e, 2b,
2d, the demand controller 1 will control the refrigerator, air conditioner, and their auxiliary equipment 2a when the demand signal is issued.
First, issue a stop command.

この状態で電力使用量を監視し、址だ規定値以上であれ
ば冷凍機、空調機および仁れらの補機2c〜2e−2b
−2dと順次停止指令を送る。
In this state, monitor the power consumption, and if it exceeds the specified value, the refrigerator, air conditioner, and other auxiliary equipment 2c to 2e-2b
-2d and sequentially send stop commands.

逆に、デマンド信号解除時は冷凍機、空調機およびこれ
らの補機2d−2b−2e−2cm2aの順に運転可能
となる。
Conversely, when the demand signal is released, the refrigerator, air conditioner, and their auxiliary machines 2d-2b-2e-2cm2a become operational in this order.

従来の冷凍機、空調機のデマンドは以上のようにあらか
じめ登録した順序になっていたため、順位の高いものの
温度余裕度が低く、順位の低いものの温度余裕度が高い
事態が発生しても停止順位は変更できず、各庫内、室内
の指示温度と設定流度の差のバラツキが大きくなりやす
いという欠点があった。
Conventionally, the demand for refrigerators and air conditioners is in the order registered in advance as described above, so even if a situation occurs where a high-ranking machine has a low temperature margin and a low-ranking machine has a high temperature margin, the stop order will be changed. cannot be changed, and there is a drawback that the difference between the indicated temperature and the set flow rate within each chamber or room tends to vary widely.

〔発明の概要〕[Summary of the invention]

この発明は、上記従来の欠点を除去するためになされた
もので、中央制御装置に各庫内、室内の設定温度、指示
温度を取り込むことによシそれぞれの温度余裕度を演算
し、デマンド信号発生時に中央制御装置よシ温度余裕度
の高いものに停止指令をかけ、設定温と指示溝のバラツ
キを最小にすることができる冷凍機、空調機のデマンド
を提案するものである。
This invention was made in order to eliminate the above-mentioned drawbacks of the conventional technology.The central control device calculates the temperature margin of each chamber and indoor temperature by inputting the set temperature and commanded temperature in each chamber, and then outputs a demand signal. When this happens, the central controller issues a stop command to those with a high temperature margin, and proposes a demand for refrigerators and air conditioners that can minimize variations in set temperature and indication groove.

〔発明の実施例〕[Embodiments of the invention]

以下、この発明の冷凍機、空調機のデマンドの実施例に
ついて図面に基づき説明する。第2図はその一実施例の
構成を示すブロック図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Examples of demands for refrigerators and air conditioners according to the present invention will be described below with reference to the drawings. FIG. 2 is a block diagram showing the configuration of one embodiment.

この第2図において、第1図と同一部分は同一符号を付
して述べる。
In FIG. 2, the same parts as in FIG. 1 will be described with the same reference numerals.

第2図における1はデマンドコントローラ、2a〜2e
は冷凍機、空調機および補機(クーリングタワー、冷却
水、ポンプなど)、3は制御線、4は中央制御装置であ
る。なお、デマンドコントローラ1は中央制御装置4と
のみ接続されている。
1 in FIG. 2 is a demand controller, 2a to 2e
are the refrigerator, air conditioner, and auxiliary equipment (cooling tower, cooling water, pump, etc.), 3 is the control line, and 4 is the central control unit. Note that the demand controller 1 is connected only to the central control device 4.

この第2図を第1図と比較しても明らかなように、第2
図では、第1図の構成に新たに中央制御装置4が付加さ
れたものである。
As is clear from comparing this Figure 2 with Figure 1,
In the figure, a central control unit 4 is newly added to the configuration of FIG. 1.

また、第3図に中央制御装置4の内部の構成を示す。こ
の第3図において、冷凍機、空調機および補機2a〜2
eの設足温度、指示温度などの入力2人を取シ込み記憶
する入力部4a、記憶部4b。
Further, FIG. 3 shows the internal configuration of the central control device 4. In this Fig. 3, a refrigerator, an air conditioner, and auxiliary equipment 2a to 2
An input section 4a and a storage section 4b which input and store inputs such as the foot temperature and instruction temperature of e.

デマンドコントローラ1よりのデマンド信号1Aを取シ
込み記憶する入力s4 c−記憶部4d、これらの記憶
部4b、4dの記憶内容を演舞−シ、冷凍機、空調機お
よび補機2a〜2eに運転、停止指令4Aを与える演算
部4e、出力部4fよシ構成されている。
Input s4 for receiving and storing the demand signal 1A from the demand controller 1; c-storage section 4d; and the storage contents of these storage sections 4b and 4d are operated to the controller, refrigerator, air conditioner, and auxiliary machines 2a to 2e. , an arithmetic unit 4e that gives a stop command 4A, and an output unit 4f.

次に、以上のように構成されたこの発明の冷凍機、空調
機のデマンドの動作について説明する。
Next, the demand operation of the refrigerator and air conditioner of the present invention configured as described above will be explained.

中央制御装置4は各機器の運転状態を監視し、運転停止
の指令が出せるものである。この中央制御装置4に各冷
凍機、空調機および補機2a〜2cの設定温度、指示温
度などの入力2人が常時入力部4aを通し入力され、そ
れらのデータは記憶部4bに記憶される。
The central control device 4 monitors the operating status of each device and can issue a command to stop the operation. Two people constantly input inputs such as set temperatures and commanded temperatures for each refrigerator, air conditioner, and auxiliary machines 2a to 2c to this central control device 4 through an input section 4a, and these data are stored in a storage section 4b. .

一方、デマンドコントローラ1からはデマンド時にデマ
ンド信号1人が入力部4cを通して入力され、それらの
データは記憶部4dに記憶される。
On the other hand, one demand signal is input from the demand controller 1 through the input section 4c at the time of demand, and the data is stored in the storage section 4d.

ここで、デマンド発生時の動作について、第4図の70
−チャートを併用して述べる。ステップ41において、
デマンド(fi号1Aを中央制御装置4が入力すると、
中央制御装置4はただちに演算部4eにて記憶部4bの
設定温、指示温を呼び出し、各庫内、室内の温度の余裕
度を演算しくステップ42)、一番余裕のある機器へ停
止指令4Aを出力部4fを通して出す(ステソゲ44)
Here, regarding the operation when a demand occurs, 70 in FIG.
-Explain using charts. In step 41,
When the central controller 4 inputs the demand (fi No. 1A),
The central control device 4 immediately calls up the set temperature and instruction temperature in the storage section 4b in the calculation section 4e, calculates the margin of temperature in each refrigerator and room (Step 42), and issues a stop command 4A to the equipment with the greatest margin. is output through the output part 4f (stesoge 44)
.

さらに、まだデマンド信号1人が続くようであれば(ス
テソゲ43)、二番目に余裕のある機器へ停止指令4A
を出し、以下同様の動作をデマンド信号1人が解除され
る寸で繰シ返す。
Furthermore, if the demand signal continues for one person (stesoge 43), a stop command 4A is given to the second most available device.
The same operation is repeated until one person's demand signal is released.

次に、第5図の70−チャートを併用してデマンド解除
時について述べる。第5図において、7テツプ51,5
2tでは第4図のステップ41゜42までの動作と同様
である。
Next, the time of demand release will be described using the 70-chart in FIG. 5. In Figure 5, 7 steps 51, 5
At 2t, the operations are similar to steps 41 and 42 in FIG.

次に、ステップ53でデマンド信号1人が解除され、一
定時間経過すると、中央制御装置4(は一番温度の余裕
のない機器へ運転許可指令を出す(ステップ54)。
Next, in step 53, the demand signal for one person is canceled, and after a certain period of time has elapsed, the central controller 4 issues an operation permission command to the device with the least temperature margin (step 54).

さらに、一定時間デマント信号1Aが解除されていれば
同様の動作を次に余裕のない機器へと繰シ返す。たとえ
ばデマンド信号1人の発令時、演算結果によシ冷凍機、
空調機およびそれらの補機2b 、2d 、2a 、2
c 、2eの1願に流度の余裕度があるとすれば中央制
御装置4は冷凍機、空調機およびこれらの補機2b−2
2b−2d−2a−2の順にデマンド信号1Aが解除さ
れるまで停止指令4Aを出す。
Further, if the demand signal 1A is released for a certain period of time, the same operation is repeated for the next device with less capacity. For example, when one person issues a demand signal, depending on the calculation result, the refrigerator
Air conditioners and their auxiliary equipment 2b, 2d, 2a, 2
If one application of c and 2e has a margin of flow rate, the central control device 4 controls the refrigerator, air conditioner, and their auxiliary equipment 2b-2.
The stop command 4A is issued in the order of 2b-2d-2a-2 until the demand signal 1A is released.

逆にデマンド解除時、冷凍機、空調機およびこれらの補
機2a 、2b 、2c 、2d 、2eの順に湯度の
余裕がなければ、中央制御装置はデマンド信号が解除さ
れている間は冷凍機、空調機およびこれらの補機2a−
2b−2cm2d−2eの順に運転を許可する。
On the other hand, when the demand signal is released, if there is insufficient hot water for the refrigerator, air conditioner, and their auxiliary equipment 2a, 2b, 2c, 2d, and 2e in that order, the central controller will shut down the refrigerator while the demand signal is released. , air conditioners and their auxiliary equipment 2a-
Allow operation in the order of 2b-2cm2d-2e.

なお、上記実施例では、中央制御装@4とデマンドコン
トローラ1は分離されているが、一体形でもよい。
In the above embodiment, the central control unit @4 and the demand controller 1 are separated, but they may be integrated.

また、接続される冷凍機、空調機および補機2a〜2e
の台数制限はない。さらに、制御線3の種類、配線方法
、信号の伝達方法に制限はない。
In addition, the refrigerator, air conditioner, and auxiliary equipment 2a to 2e to be connected
There is no limit to the number of units. Furthermore, there are no restrictions on the type of control line 3, the wiring method, or the signal transmission method.

〔発明の効果〕〔Effect of the invention〕

以上のように、この発明の冷凍機、空調機のデマンドに
よれば、中央制御装置C(冷凍機、空調機の各庫内、室
内の設足温度、指示温度を取り込むことによシ、それぞ
れの流度余裕度を演算し、デマンド信号発生時に中央制
御装置よシ温度余裕度の高Bものに停止指令を出すよう
にしたので、各庫内幅、室温が設定湛近くに可能な限シ
保たれることになる。これにともない、電力使用量を一
定値以下に押さえることができるものである。
As described above, according to the demands of the refrigerator and air conditioner of the present invention, the central control device C (by taking in the installed temperature and indicated temperature in each compartment and room of the refrigerator and air conditioner, respectively By calculating the flow rate margin of B, and when a demand signal is generated, the central controller issues a stop command to the high temperature margin B, so that the width and room temperature of each refrigerator can be kept close to the set maximum limit. As a result, power consumption can be kept below a certain level.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は従来の冷凍機、空調機のデマンドのブロック図
、第2図はこの発明の冷凍機、空調機のデマンドの一実
施例の構成を示すブロック図、第3図は第2図の冷凍機
、空調機のデマンドにおける中央制御装置の詳細な構成
を示すブロック図、第4図はこの発明の冷凍機、空調機
のデマンドにおけるデマンド信号発生時の制御フローチ
ャート図、第5図は同上冷凍機、空調機のデマンドにお
けるデマンド解除時の制御フローチャート図である。 1・・・デマンドコントローラ、2FL〜’lo・−冷
凍機、空調機及び補機、3・・・ili制御線、4・・
・中央ftt制御装置 なお、図中同一符号は同一またけ相当部分を示す。 オ lal オ χ 1 4 t 4 図 76図 □
FIG. 1 is a block diagram of the demand of a conventional refrigerator and air conditioner, FIG. 2 is a block diagram showing the configuration of an embodiment of the demand of a refrigerator and air conditioner of the present invention, and FIG. 3 is a block diagram of the demand of a conventional refrigerator and air conditioner. A block diagram showing the detailed configuration of the central control unit for the demands of refrigerators and air conditioners, FIG. 4 is a control flowchart when a demand signal is generated in the demands of refrigerators and air conditioners of the present invention, and FIG. FIG. 4 is a control flowchart when the demand of the air conditioner and the air conditioner is canceled. 1...Demand controller, 2FL~'lo-refrigerator, air conditioner and auxiliary equipment, 3...ili control line, 4...
・Central FTT control device Note that the same reference numerals in the drawings indicate parts corresponding to the same straddle. O lal O χ 1 4 t 4 Figure 76 □

Claims (2)

【特許請求の範囲】[Claims] (1) 複数台の冷凍機、空調機およびこれらの補機を
中央制御装置に接続し、この中央制御装置にデマンド信
号がデマンドコントローラよシ入力されかつ、各冷凍機
、空調機よシ各庫内、室内の設定温度、指示温度が中央
制御装置に入力されるとき、中央制御装置にて各庫内、
室内の温度の余裕度を演算して、デマンド信号発生時、
温度の余裕度のある冷凍機、空調機およびこれらの補機
より停止指令を出し、デマンド信号解除時温度の余裕度
のない冷凍機、空調機およびこれらの補機より運転指令
を出すことを特徴とする冷凍機、空調機のデマンド。
(1) A plurality of refrigerators, air conditioners, and their auxiliary equipment are connected to a central control device, and a demand signal is input to the central control device from the demand controller, and each refrigerator, air conditioner, and each storage When the set temperature and commanded temperature for each room are input to the central control device, the central control device
Calculate the room temperature margin and when a demand signal is generated,
A stop command is issued from refrigerators, air conditioners, and their auxiliary equipment that have a temperature margin, and when the demand signal is released, an operation command is issued from refrigerators, air conditioners, and their auxiliary equipment that do not have a temperature margin. demand for refrigerators and air conditioners.
(2)デマンドコントローラと中央制御装置は一体形で
構成されることを特徴とする特許請求の範囲第1項記載
の冷凍機、空調機のデマンド。
(2) A demand controller for a refrigerator or an air conditioner according to claim 1, wherein the demand controller and the central control device are integrated.
JP58183829A 1983-09-30 1983-09-30 Demand of refrigerating and air-conditioning machine Pending JPS6073232A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP58183829A JPS6073232A (en) 1983-09-30 1983-09-30 Demand of refrigerating and air-conditioning machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP58183829A JPS6073232A (en) 1983-09-30 1983-09-30 Demand of refrigerating and air-conditioning machine

Publications (1)

Publication Number Publication Date
JPS6073232A true JPS6073232A (en) 1985-04-25

Family

ID=16142569

Family Applications (1)

Application Number Title Priority Date Filing Date
JP58183829A Pending JPS6073232A (en) 1983-09-30 1983-09-30 Demand of refrigerating and air-conditioning machine

Country Status (1)

Country Link
JP (1) JPS6073232A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01114655A (en) * 1987-10-28 1989-05-08 Matsushita Seiko Co Ltd Electric power demand controller

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5450138A (en) * 1977-09-28 1979-04-19 Daikin Ind Ltd Separate type air conditioner

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5450138A (en) * 1977-09-28 1979-04-19 Daikin Ind Ltd Separate type air conditioner

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01114655A (en) * 1987-10-28 1989-05-08 Matsushita Seiko Co Ltd Electric power demand controller

Similar Documents

Publication Publication Date Title
KR100529907B1 (en) Air conditioner's central controlling system and its operating method
EP2148147B1 (en) Method of controlling air conditioner
TW201736790A (en) Systems and methods for controlling a refrigeration system
DE69302591T2 (en) Automatic shutdown sequence for a cooler
JP2001108277A (en) Air conditioning control system and air conditioning control method
CN105299824A (en) Air conditioner and method for controlling same
JP3306612B2 (en) How to control the number of operating heat source units
CN108302739B (en) Temperature adjusting system and temperature adjusting method
JPS6073232A (en) Demand of refrigerating and air-conditioning machine
JPS63302237A (en) Demand control device of air conditioner
JP3320631B2 (en) Cooling and heating equipment
JPH01118051A (en) Power demand controller
JPH02187554A (en) Airconditioning control system based on building monitor and control device
JP2575923B2 (en) Control method of multi-room air conditioner
JP2541172B2 (en) Operation control device for air conditioner
JPH06159819A (en) Air conditioner and air conditioner control method
JPH11304278A (en) How to control the number of absorption chillers
JPS6073233A (en) Demand of refrigerating and air-conditioning machine
JP3098793B2 (en) Control device for air conditioner
JPS6060474A (en) Energy-conserving operation control system of refrigerator for air-conditioning
JP2702777B2 (en) Air conditioner
JPS6073231A (en) Transfer control device for refrigerating and air- conditioning device
JPH06147684A (en) Controlling method for number of absorption refrigerator and cold/hot water machine
JPH03210083A (en) Demand control system for air conditioner
JPH04281139A (en) Schedule operater for air conditioner